AU4366279A - Recovery of lead values - Google Patents
Recovery of lead valuesInfo
- Publication number
- AU4366279A AU4366279A AU43662/79A AU4366279A AU4366279A AU 4366279 A AU4366279 A AU 4366279A AU 43662/79 A AU43662/79 A AU 43662/79A AU 4366279 A AU4366279 A AU 4366279A AU 4366279 A AU4366279 A AU 4366279A
- Authority
- AU
- Australia
- Prior art keywords
- recovery
- lead values
- lead
- values
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
Classifications
-
- C—CHEMISTRY; METALLURGY
- C22—METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
- C22B—PRODUCTION AND REFINING OF METALS; PRETREATMENT OF RAW MATERIALS
- C22B13/00—Obtaining lead
- C22B13/04—Obtaining lead by wet processes
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
AU43662/79A AU4366279A (en) | 1979-01-25 | 1979-01-25 | Recovery of lead values |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
AU43662/79A AU4366279A (en) | 1979-01-25 | 1979-01-25 | Recovery of lead values |
Publications (1)
Publication Number | Publication Date |
---|---|
AU4366279A true AU4366279A (en) | 1980-07-31 |
Family
ID=3730935
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
AU43662/79A Abandoned AU4366279A (en) | 1979-01-25 | 1979-01-25 | Recovery of lead values |
Country Status (1)
Country | Link |
---|---|
AU (1) | AU4366279A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US10400306B2 (en) | 2014-05-12 | 2019-09-03 | Summit Mining International Inc. | Brine leaching process for recovering valuable metals from oxide materials |
-
1979
- 1979-01-25 AU AU43662/79A patent/AU4366279A/en not_active Abandoned
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US10400306B2 (en) | 2014-05-12 | 2019-09-03 | Summit Mining International Inc. | Brine leaching process for recovering valuable metals from oxide materials |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
AU546133B2 (en) | Recovery of solvents | |
AU6380080A (en) | Separator | |
AU539279B2 (en) | Preparation of dialkyldithiophosphinates | |
AU545130B2 (en) | Recovery of solvents | |
AU5532280A (en) | Calalytic electrode | |
AU540097B2 (en) | Recovering uranium | |
AU524091B2 (en) | Selective separation of uranium | |
AU521613B2 (en) | Recovery of uranium values | |
AU531026B2 (en) | Numeric data fetch-alignment of data | |
AU536607B2 (en) | Recovering of uranium | |
AU537159B2 (en) | Hydrometallurgical recovery of lead | |
AU524016B2 (en) | Hydroliquefaction of coal | |
AU524017B2 (en) | Hydroliquefaction of coal | |
AU6025980A (en) | Separation of isotopes | |
AU534825B2 (en) | Lead electrodes | |
AU536530B2 (en) | Removal of uranium values | |
AU4366279A (en) | Recovery of lead values | |
AU527211B2 (en) | Manufacture of fusecord | |
AU535970B2 (en) | Perfluoroamides of n-phosphonomethyl-glycinonitrile | |
AU527090B2 (en) | Values | |
GB2040896B (en) | Recovery of lead values | |
AU546205B2 (en) | Preparation of 3-aryl-3-hydroxyphthalimidines | |
AU6011980A (en) | Separation of isotopes | |
AU535106B2 (en) | Method of construction | |
AU5851180A (en) | Reduction of ores |