AU2769900A - An apparatus for pressure wave suppression from a small charge blast - Google Patents

An apparatus for pressure wave suppression from a small charge blast Download PDF

Info

Publication number
AU2769900A
AU2769900A AU27699/00A AU2769900A AU2769900A AU 2769900 A AU2769900 A AU 2769900A AU 27699/00 A AU27699/00 A AU 27699/00A AU 2769900 A AU2769900 A AU 2769900A AU 2769900 A AU2769900 A AU 2769900A
Authority
AU
Australia
Prior art keywords
pressure wave
flyrock
hole
requirement
suppression
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
AU27699/00A
Other versions
AU739768B2 (en
Inventor
Peter N Georgiou
John D. Watson
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ROCKMIN Pty Ltd
Original Assignee
ROCKMIN Pty Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ROCKMIN Pty Ltd filed Critical ROCKMIN Pty Ltd
Priority to AU27699/00A priority Critical patent/AU739768B2/en
Publication of AU2769900A publication Critical patent/AU2769900A/en
Application granted granted Critical
Publication of AU739768B2 publication Critical patent/AU739768B2/en
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Description

P/00/011 Regulation 3.2
AUSTRALIA
PATENTS ACT 1990 COMPLETE SPECIFICATION FOR A STANDARD PATENT Name of Applicant: Address of Applicant: *0*e
C
C.
C..
ROCKMIN PTY LTD Lot 333 Harries Way Pinjarra, Western Australia 6208 Australia Actual Inventor: Address for Service: Griffith Hack, Patent and Trade Mark Attorneys, 6th Floor, 256 Adelaide Terrace, Perth, Western Australia, 6000.
Standard Complete Specification for the invention entitled: AN APPARATUS FOR PRESSURE WAVE SUPPRESSION FROM A SMALL-CHARGE BLAST Details of Parent Application for Divisional Applications: Australian Patent Application No 44777/99 dated 27 August 1999 The following is a full description of this invention, including the best method of performing it known to me:- AN APPARATUS FOR PRESSURE WAVE SUPPRESSION FROM A SMALL-CHARGE BLAST FIELD OF THE INVENTION The present invention is directed generally to methods and devices for small charge blasting of rock and other materials and specifically to an apparatus for pressure wave suppression from a small-charge 10 blast.
1 0 BACKGROUND OF THE INVENTION In civil excavation projects in urban environments, many restrictions are imposed on operators that substantially increase the operator's capital and operating costs. The 15 operator must generally comply with strict requirements regarding not only the transportation, storage and use of explosives but also airblast, noise, and airborne flyrock particles. "Airblast" refers to pressure waves in air emanating from a rapid release of energy a blast).
Airblast noise is the audible part of the airblast energy spectrum, having frequencies in the range from 20 to 20,000 Hz. Airblast concussion is the inaudible part of the airblast energy spectrum, having a frequency content below Hz. "Noise" refers to pressure waves in air generated by equipment other than the small charge blasting equipment, such -1Aas the drill during formation of one or more holes for small charge blasting and/or the impact breaker during removal of fractured material. "Flyrock" refers to rock particles thrown into the air by the rapid release of energy blast).
Flyrock may be in the form of a shower of small pieces at relatively high velocities (20 to 50 m/s typical), which typically originate from the collar region of the drill hole.
Flyrock may also be in the form of larger pieces of rock at relatively low velocity (1 to 10 m/s typical), which 10 typically originate in the mass of rock excavated from the crater formed by the blasting event.
Existing drill and blast methods may be inapplicable in many applications as a result of these restrictions, even though the blasting methods are the most cost effective method for the specific application. For example, small charge blasting which commonly has a lower seismic and airblast signature, cause less flyrock, and have lower operating costs compared to conventional drill and blast techniques, can nonetheless generate airblast, equipment noise, and/or flyrock levels that exceed the maximum permissible levels in many applications. "Small charge blasting" refers to any excavation method where relatively small amounts of an energetic substance (typically a few kilograms or less) are consumed for each hole in a rock fracturing sequence.
S S -2-
J
SUMMARY OF THE INVENTION Objectives of the present invention include providing a drilling and blasting methodology for excavating rock, particularly hard rock, in airblast, noise, and/or flyrock restricted areas, such as urban settings, and providing a methodology and apparatus(es) for use with small-charge blasting techniques for controlling and/or suppressing airblast in airblast restricted areas, controlling and/or .0 suppressing equipment noise in noise restricted areas, and/or for controlling and/or suppressing flyrock in flyrock restricted areas.
These and other objectives are addressed by the methodology and apparatuses of the present invention. In a .5 first embodiment, a method is provided for selecting one or more pressure wave suppression devices for use with smallcharge blasting of a material that is near a pressure wave an airblast and/or noise) restricted area. The method broadly includes the steps of: >0 determining one or more pressure wave level requirement(s) at corresponding selected distance(s) from the material to be broken; determining a corresponding unsuppressed pressure wave level(s) at each selected distance produced by the -3- 9 excavation equipment in the absence of a pressure wave suppression device; comparing the pressure wave level requirement(s) with the corresponding unsuppressed pressure wave level(s) to determine a desired amount of pressure wave suppression; comparing the desired amount(s) of pressure wave suppression at one or more distances fromthe material to be broken with an amount of pressure wave suppression for each of a plurality of pressure wave suppression devices; and 10 thereafter selecting one or more pressure wave suppression devices based on the comparing step to produce the desired amount(s) of pressure wave suppression. As used herein, a "pressure wave level requirement" refers to the maximum permissible pressure wave emission levels and is often expressed as a maximum allowable pressure wave emission level at a specified distance from the blasting site the location of the energetic substance used in the small charge blasting process). The method provides an operator with versatility in meeting the unique requirements of each job and a relatively low cost and simple excavation technique that complies with the often demanding requirements in pressure wave restricted areas.
The process is particularly applicable to small charge blasting techniques using controlled fracturing to break the S. S t0.
material. Generally,- controlled fracturing is performed by drilling a hole in the material to be broken, inserting a sealing member, which can be a stemming bar, a gas injector barrel, or other pressurizing device, into the drill hole, and releasing a pressurized working fluid rapidly into a portion of the drill hole, usually the bottom portion.
"Sealing" refers to partial or total blockage of the hole to inhibit the escape of the fluid from the drill hole. "Sealing member" refers to any downhole device capable of sealing a pressurized working fluid in the bottom of a hole, including without limitation loosely consolidated or unconsolidated particles such as sand, gravel, rock fragments, and the like, and a solid material such as grout, a stemming bar, a gas injector barrel, and the like. The pressurized fluid is typically generated by combustion of a propellant or explosive source, by an electrical discharge into a conductive fluid, or by compression of the working fluid. The fractured material is thereafter removed from the face by an impact breaker and mucking equipment. Because of the relatively low weight of the energetic substance used to generate the working fluid and the relatively low pressure wave and flyrock emissions, equipment and personnel commonly remain in the area of the hole during the small charge blast.
The plurality of pressure wave suppression devices and their performance capabilities can be listed in the form of a menu from which any number of appropriate devices can be selected. The plurality of pressure wave suppression devices preferably includes at least one of, more preferably at least two of, and even more preferably at least three of: a downhole pressure wave suppression device located in a hole in the material for directing flow of the working fluid through one or more nonlinear pathways and/or for contacting at least a portion of the working fluid with a *.thermal energy absorbing material having a plurality of heat transfer surfaces, and/or for attenuating the noise generated by downhole equipment a drill), (ii) a collar pressure wave suppression device S 15 located at or near the opening of the drill hole in communication with the drill hole for directing flow of the working fluid through one or more nonlinear pathways, for contacting at least a portion of the working fluid with a thermal energy absorbing material having a plurality of heat transfer surfaces, and/or for attenuating the noise generated by the downhole equipment, (iii) a mat positioned on the surface of the material to be broken around the hole opening for directing flow of the working fluid through one or more nonlinear pathways in the mat and/or for absorbing thermal energy from the working fluid by contacting the working fluid with a plurality of heat transfer surfaces, (iv) an enclosure substantially surrounding the hole opening for containing the equipment noise and/or working fluid the pressure waves) and impeding the discharge of the noise and/or working fluid into the ambient atmosphere, a barrier located between the hole opening and 00*0 0. the pressure wave restricted area for absorbing and/or 10 deflecting at least a portion of the pressure wave energy, and •ooe (vi) a plurality of atomized liquid droplets (preferably having a droplet size ranging from about 0.01 to about 0.1 mm) suspended in the air adjacent to the surface of the material during the blast to absorb thermal energy from 15 the working fluid. The plurality of devices includes not only devices capable of resisting the high gas pressures in close proximity to the small-charge blast but also devices capable of resisting only relatively low gas pressures further away from the blast. Many of the devices can not only suppress pressure wave energy but also reduce or eliminate flyrock.
The determining step can include a number of substeps to determine the pressure wave level requirement. By way of example, the substeps can include: -7determining operator pressure wave requirement(s) at one or more selected distances from the material to be broken the "operator pressure wave requirement" refers to pressure wave restrictions that are generally applied by the operator and are independent of the specific job, such as mandated by the operator to protect personnel and equipment); determining job pressure wave requirement(s) at one or more selected distance(s) from the material to be broken the "job pressure wave requirement" refers to pressure 10 wave restrictions that are unique to the specific job, such as imposed by regulatory authorities or by the surroundings of the job, nearby structures or thoroughfares); and comparing the operator pressure wave requirement with the job pressure wave requirement with the more restrictive of the 15 two the requirement mandating a greater degree of pressure wave attention) being the pressure wave level 0. requirement.
S"The operator pressure wave requirement(s) in small charge blasting typically includes a machine pressure wave requirement(s) and/or a personnel pressure wave requirement(s) In small charge blasting, the equipment and personnel commonly remain at or near the hole during the blast. Because of the small charge used in the blast, complete excavation of the blasting site during blasting, as -8normally is the case in conventional large charge blasting, is often unnecessary and even undesirable for reasons of productivity. For these reasons, the small charge blasting operator commonly formulates requirements unique to small charge blasting and independent of the specific job to protect equipment from pressure wave emissions of the blast ("the machine pressure wave requirement") and from flyrock ("the machine flyrock distance requirement") and personnel from pressure wave emissions of the blast ("the personnel pressure 10 wave requirement") and from flyrock ("the personnel flyrock distance requirement").
The unsuppressed pressure wave levels at the selected distance from the material to be broken are commonly eo S determined by numerous field measurements.
15 Once the unsuppressed pressure wave level and the eeo.
eo pertinent pressure wave level requirement are known, a sufficient number of pressure wave suppression devices are selected to realize the desired amount of pressure wave suppression. Each of the pressure wave suppression devices in the menu will yield a specific amount of pressure wave suppression, usually determined and quantified by field measurements. The appropriate pressure wave suppression devices for a given application are commonly selected based not only on the desired pressure wave level reduction but also -9on the requirements of the job, cost considerations, and the like.
The process can include various substeps. For example, step can include the substep of determining at least two of a job pressure wave requirement, a machine pressure wave requirement, and a personnel pressure wave requirement. In that event, step includes the substep of determining a corresponding unsuppressed pressure wave level for each of the at least two of a job pressure wave requirement, a machine 10 pressure wave requirement, and a personnel pressure wave requirement at a corresponding selected distance from at least 0 a portion of the material to be broken and step the substep of comparing the at least two of a job pressure wave requirement, a machine pressure wave requirement, and a 15 personnel pressure wave requirement with the corresponding unsuppressed pressure wave level to determine a corresponding degree of pressure wave suppression. Steps and are o Sthereafter repeated for each of the corresponding degrees of pressure wave suppression to verify that the selected pressure wave suppression devices are sufficient to comply with the at least two of the job pressure wave requirement, the machine pressure wave requirement, and the personnel pressure wave requirement.
The above-described steps are commonly repeated for each step of the process (and each piece of equipment) that generates pressure waves. For example, the above-noted steps are typically repeated for the step of drilling the hole impact breaking of the fractured rock, and/or mucking of the fractured rock.
Commonly, a number of the pressure wave suppression devices selected in the process mats and barriers) remain in place during the repeated drilling and small charge 10 blasting sequences. This is so because only one or at most a few holes are shot at any one time because the small charge blasting machine can only seal one hole at a time. In contrast in conventional large charge blasting a large number o* o of holes are simultaneously shot and the pressure wave 15 suppression devices are thereafter removed to remove fractured material and drill new holes and repositioned before the next blasting cycle.
S"To control flyrock, the method can include additional steps. Specifically, the steps include: determining at least two of a job flyrock distance requirement the "job flyrock distance requirement" refers to flyrock distance restrictions that are unique to the specific job, such as imposed by regulatory authorities or by the surroundings of the job, nearby structures or -11- I a thoroughfares), the personnel flyrock distance requirement, and the machine flyrock distance requirement; comparing the at least two of the job flyrock distance requirement, the personnel flyrock distance requirement, and the machine flyrock distance requirement to determine a flyrock distance requirement; and comparing the flyrock distance requirement with an uncontrolled (or unsuppressed) flyrock distance(s) to determine whether protection against flyrock is required.
10 "Unsuppressed flyrock distance" refers to the probable flight distance of flyrock from the hole. If the flyrock distance requirement is more restrictive than the unsuppressed flyrock distance(s), the operator should consider the need for flyrock ee protection in selecting a device(s) from among the various 15 devices in the menu.
In a second embodiment of the present invention, a pressure wave suppression device is provided that has at least one nonlinear pathway extending therethrough for channeling the flow of the gas released by the energetic material. The nonlinear pathway can remove energy from the airblast and thereby facilitate pressure wave suppression. Typically, the device will have a plurality of nonlinear (or tortuous) pathways of different lengths to achieve suppression. The device can include, for example, a plurality of baffles and -12dead end chambers that may be separated by an attenuation material a fibrous porous filament material such as metal copper, steel, etc.) wool, packed metal copper, steel, etc.) balls or ball bearings, a series of perforated mats stacked on top of the other and having different sized and/or misaligned perforations. The device can be located at and/or around the hole opening and/or in the hole itself and generally substantially surrounds the outer perimeter of the sealing member. The device is particularly 10 effective in airblast suppression.
6*e* 0 ~In another embodiment of the present invention, a pressure wave and flyrock suppression device is provided that is an enclosure substantially surrounding and enclosing the *Se.
opening of the hole. For pressure wave suppression, the 15 enclosure interior can have a pressure wave layer for absorbing, dissipating or reflecting the pressure waves and an impact resistant layer located on the interior surface of the enclosure (interiorly of the impact resistant layer) for deflecting flyrock. The enclosure is sufficiently large to contain the sealing member for small charge blasting and a drill and/or impact breaker for more effective pressure wave suppression. The enclosure can be a flexible canopy, a rigid box-like structure, or combination of rigid and flexible elements. The enclosure encloses a sufficient volume such -13that the gas pressure within the enclosure is controlled to an average overpressure of preferably no more than about 15 KPa during formation and propagation of a fracture from the hole.
The volume of the enclosure preferably is at least about 4 cubic meters and more preferably ranges from about 4 to about 100 cubic meters. The pressure wave layer can be any suitable material including rubber, canvas, fiberglass mesh, industrial conveyor belt or commercially available acoustic material and the impact resistant layer can be any suitable material including a perforated steel plate, steel mesh, fiberglass mesh, industrial conveyor belt, heavy canvas sheet, composite materials such as "KEVLAR" or impact resistant plastics. For additional pressure wave suppression the enclosure can have a plurality of leakage vents for discharging the gas released by the energetic material into the ambient atmosphere at a *o controlled rate.
Finally, another embodiment of the present invention is directed to a method for employing blasting mats for pressure wave and/or flyrock suppression to efficiently and inexpensively perform small charge blasting. The steps are: positioning a blasting mat on at least a portion of the material to be broken; drilling or otherwise forming a hole in the at least a portion of the material through the blasting mat; -14inserting an energetic substance (and/or sealing member) through the blasting mat and into the hole; and releasing energy from the energetic substance in the hole to initiate and propagate a fracture from the hole. The fracture can be a penetrating cone fracture or another type of controlled fracture.
The drilling step is typically performed by forming a hole in the mat and inserting at least a portion of the drill through the hole in the mat. The hole can be formed in the mat by cutting through the mat or by deforming a preexisting opening in the mat. The latter approach is used where the blasting mat is composed of one or more flexible o*o.
mats of a mesh material. The flexible mats preferably have differing mesh sizes to facilitate removing and/or dispersing of energy from the pressure wave and an upper layer above the perforated mesh material that will inhibit the release of the pressure waves into the environment and thereby force the pressure waves to negotiate the tortuous passages through the mats to be released from the outer perimeter of the mats.
In another embodiment, a method is provided for selecting one or more flyrock control devices for use with small-charge blasting of a material that is near a flyrock restricted area.
The method broadly includes the steps of: determining a flyrock distance requirement for the material to be broken; determining an uncontrolled flyrock distance produced by the small-charge blast in the absence of a flyrock control device; comparing the flyrock distance requirement with the uncontrolled (or unsuppressed) flyrock distance to determine whether flyrock control is needed; if the uncontrolled flyrock distance of step is 0 more than the flyrock distance requirement of step selecting one or more flyrock control devices from a menu of flyrock control devices to produce a desired degree of flyrock control. "Uncontrolled flyrock distance" refers to the probable flight distance of flyrock from the hole. The method provides an operator with versatility in meeting the unique requirements of each job and a relatively low cost and simple excavation technique that complies with the demanding requirements in flyrock restricted areas.
The process is particularly applicable to small charge blasting techniques using controlled fracturing to break the material. Generally, controlled fracturing is performed by drilling a hole in the material to be broken, inserting a sealing member, which can be a stemming bar, a gas injector barrel, or other pressurizing device, into the drill hole, and -16- 1 releasing a pressurized working fluid rapidly into a portion of the drill hole, usually the bottom portion. "Sealing" refers to partial or total blockage of the hole to inhibit the escape of the fluid from the drill hole. "Sealing member" refers to any downhole device capable of sealing a pressurized working fluid in the bottom of a hole, including without limitation loosely consolidated or unconsolidated particles such as sand, gravel, rock fragments and the like, and a solid material such as grout, a stemming bar, a gas injector barrel, and the like. The pressurized fluid is typically '.i generated by combustion of a propellant or explosive source, by an electrical discharge into a conductive fluid, or by compression of the working fluid. The fractured material is thereafter removed from the face by an impact breaker and mucking equipment. Because of the relatively low weight of the energetic substance used to generate the working fluid and the relatively low pressure wave and flyrock emissions, equipment and personnel commonly remain in the area of the hole during the small charge blast.
The menu of flyrock control devices preferably includes at least: a collar flyrock control device located at or near the opening of the hole and engaged with a sealing member -17positioned in the hole, the collar flyrock control device having a surface for suppressing or deflecting flyrock, (ii) a mat positioned on the surface of the material to be broken around the hole opening for deflecting or suppressing flyrock, (iii) an enclosure substantially surrounding the hole opening for deflecting flyrock, and (iv) a barrier located between the hole opening and the sensitive area for deflecting flyrock.
The determining step can include a number of substeps to determine the flyrock distance requirement. By way of r'r example, the substeps can include: determining at least one of a job flyrock distance :requirement the "job flyrock distance requirement" refers to flyrock distance restrictions that are unique to the specific job, such as imposed by regulatory authorities or by the surroundings of the job, nearby structures or thoroughfares), a personnel flyrock distance requirement the "personnel flyrock distance requirement" refers to flyrock distance restrictions that are generally applied by the operator to protect personnel and are independent of the specific job), and a machine flyrock distance requirement the "machine flyrock distance requirement" refers to flyrock distance restrictions that are generally applied by -18the operator to protect equipment and are independent of the specific job) and comparing at least two of the job flyrock distance requirement, the personnel flyrock distance requirement, and the machine flyrock distance requirement with the more restrictive being the flyrock distance requirement.
The uncontrolled flyrock distance is typically a function of the degree of pre-existing fracturing of the rock and the type of rock and the energy released by the blast.
10 The function is often construed from the measured results of many shots of the small charge blast being used. In the case oo of small charge blasting with explosives or propellants, the energy released may be replaced by a mass of the explosive or propellant used.
To control pressure waves such as airblast, the method can include additional steps. Specifically, the steps include: determining a pressure wave level requirement at a selected distance from the material to be broken; determining an unsuppressed pressure wave level at the selected distance produced by the small-charge blast in the absence of a pressure wave suppression device; if the unsuppressed pressure wave level is more than the pressure wave level requirement, selecting one or more -19pressure wave suppression devices from a menu of pressure wave suppression devices to produce a desired degree of pressure wave suppression.
The menu of pressure wave suppression devices preferably includes at least: a downhole pressure wave suppression device located in a hole in the material for directing flow of the working fluid through one or more nonlinear pathways and/or for contacting at least a portion of the working fluid with a thermal energy absorbing material having a plurality of heat transfer surfaces, *o (ii) a collar pressure wave suppression device (which may be combined with the collar flyrock control device) located at or near the opening of the drill hole for directing flow of the working fluid through one or more nonlinear pathways and/or for contacting at least a portion of the working fluid with a thermal energy absorbing material having a plurality of heat transfer surfaces, (iii) the mat noted above having features for directing flow of the working fluid through one or more nonlinear pathways in the mat and/or for absorbing thermal energy from the working fluid by contacting the working fluid with a plurality of heat transfer surfaces, (iv) the enclosure noted above and having features for containing the equipment noise and/or working fluid and impeding the discharge of the noise and/or working fluid into the ambient atmosphere, the barrier noted above including a material for absorbing and/or deflecting at least a portion of the airblast energy, and (vi) a plurality of atomized liquid droplets (preferably having a droplet size ranging from about 0.01 to .oo.
about 0.1 mm) suspended in the air adjacent to the surface of the material during the blast to absorb thermal energy from o*o *the working fluid.
The first determining step can include a number of substeps to determine the pressure wave level requirement. By way of example, the substeps can include: S""determining an operator pressure wave requirement the "operator pressure wave requirement" refers to pressure wave restrictions that are generally applied by the operator and are independent of the specific job, such as mandated by the operator to protect personnel and equipment) at the selected distance from the material to be broken; determining a job pressure wave requirement the "job pressure wave requirement" refers to pressure wave restrictions that are unique to the specific job, such as -21imposed by regulatory authorities or by the surroundings of the job, nearby structures or thoroughfares) at the selected distance from the material to be broken; and comparing the operator pressure wave requirement with the job pressure wave requirement with the more restrictive lesser) of the operator pressure wave requirement and the job pressure wave requirement being the pressure wave level requirement. The job pressure wave requirement is the maximum allowable pressure wave level for the pressure wave restricted area. For example, the job pressure wave requirement can be the maximum allowable noise level for a building or other ooeo .structure including an appropriate safety factor.
As in the case of flyrock control, the operator pressure wave requirement in small charge blasting typically o*o.
includes a machine pressure wave requirement(s) and/or a Spersonnel pressure wave requirement(s). In small charge blasting, the equipment and personnel commonly remain at or near the hole during the blast. Because of the small charge used in the blast, complete excavation of the blasting site during blasting, as normally is the case in conventional large charge blasting, is often unnecessary and even undesirable for reasons of productivity. For these reasons, the small charge blasting operator commonly formulates requirements unique to small charge blasting and independent of the specific job to protect equipment from pressure wave emissions of the blast ("the machine pressure wave requirement") and from flyrock -22- ("the machine flyrock distance requirement") and personnel from pressure wave emissions of the blast ("the personnel pressure wave requirement") and from flyrock ("the personnel flyrock distance requirement") Once the unsuppressed pressure wave level and the pressure wave level requirement are known, the selecting step can further include the following substeps: comparing the pertinent pressure wave level *e requirement(s) with the corresponding unsuppressed pressure o...o wave level(s) to determine a desired pressure wave level reduction; comparing the desired pressure wave level "reduction(s) with a pressure wave level reduction associated e with a plurality of the pressure wave suppression devices; and based on the comparing step, selecting a sufficient number of pressure wave suppression devices to realize the 0 "desired pressure wave level reduction. As will be appreciated, each of the pressure wave suppression devices in the menu will realize a specific level of pressure wave suppression, usually obtained by field measurements. The appropriate pressure wave suppression devices for a given application are commonly selected based not only on the desired pressure wave level reduction but also on the requirements of the job, cost considerations, and the like.
-23-
I
Commonly, a number of the pressure wave suppression devices selected in the process mats and barriers) remain in place during the repeated drilling and small charge blasting sequences. This is so because only one or at most a few holes are shot at any one time because the small charge blasting machine can only seal one hole at a time. In contrast, in conventional large charge blasting a large number .of holes are simultaneously shot and the pressure wave suppression devices are thereafter removed to remove fractured o.
10 material and drill new holes and repositioned during the next blasting cycle.
In an additional embodiment of the present invention, a flyrock control device is provided that engages a sealing member positioned in the hole. The device has a surface e adjacent to a free surface of the material for deflecting or suppressing flyrock in the vicinity of the hole opening. The surface is preferably substantially flat or convex to inhibit ricocheting of the flyrock away from the material being broken. The surface can be in contact with the free surface of the material.
In an alternative embodiment of the present invention, an airblast and flyrock suppression device is provided that is an enclosure substantially surrounding and enclosing the opening of the hole. The enclosure has an interior surface that -24-
A
substantially absorbs the kinetic energy -of the flyrock. The enclosure can be a suspended canopy or a rigid box-like structure.
The enclosure can include a plurality of leakage vents for discharging the gas released by the energetic material into the ambient atmosphere at a controlled rate. The enclosure encloses a sufficient volume *such that the gas pressure within the enclosure is controlled to an average overpressure of preferably no more than about 15 KPa during
S.
10 formation and propagation of a fracture from the hole. The
S.
volume of the enclosure preferably is at least about 4 cubic meters and more preferably ranges from about 4 to about 100 cubic meters.
BRIEF DESCRIPTION OF THE DRAWINGS Figure 1 is a decision tree that can used by a smallcharge blasting estimator and/or operator to select the airblast suppression, noise abatement, and flyrock control devices appropriate to a particular excavation job.
Figure 2 is an exemplary plot of flyrock trajectories in both the vertical and horizontal directions.
Figure 3 is a cutaway side view of a sealing member which includes a series of high-pressure baffles for disrupting and
A
de-energizing the flow of high pressure working fluid in the drill hole.
Figure 4 is a cutaway cross-sectional view of a device for intercepting flyrock that originates from the collar region of a drill hole.
Figures 5A and 5B respectively are a cutaway side view taken along line 5A-5A of Figure 5B and a cutaway plan view taken along line 5B-5B of Figure 5A of a collar shroud installed around the collar of a drill hole and secured by the 10 stemming or gas-injecting means.
Figure 5C is a cutaway side view of an alternative embodiment of a collar shroud decoupled from the stemming or gas injecting device.
Figure 6 is a cutaway side 'view of an alternative embodiment of a collar shroud for use with a drill.
Figures 7A and 7B are respectively a cutaway side view taken along line 7A-7A of Figure 7B and plan view of a ground shroud installed such that several shots can be fired before the shroud is moved.
Figures 8A and 8B are respectively a cutaway side view and exploded view of a section through a wall of an enclosure that is attached to the proximal end of a boom of a smallcharge blasting machine.
-26- Figure 8C is an isometric view of another configuration of an enclosure.
Figure 8D is a cutaway side view of an enclosure that is affixed to the supporting cable such as might be used on an excavation apparatus for hole drilling, small charge blasting, and impact breaking in shaft excavation.
Figure 9 is a cutaway side view of a moveable barrier for pressure wave suppression and flyrock control.
Figure 10 is a plan view of a layout of the relative 10 positions of pressure wave-flyrock barriers might be deployed to protect an area.from the small-charge blasting work site.
9 Figure 11 is a side view of a small charge excavation machine in firing position with an atomized spray pattern for pressure wave suppression.
DETAILED DESCRIPTION *ooe9 The Selection of an Appropriate Pressure Wave and Flyrock Suppression Device Referring to Figure 1, the first step 20 in selecting appropriate pressure wave and flyrock suppression device(s) is to characterize the unsuppressed pressure wave and flyrock emissions 24 of the small charge excavation process. For example, the drilling noise characteristics of a particular drilling device, the airblast and fly rock characteristics of -27a particular small-charge blasting method, and the noise characteristics of a particular impact breaker are generally determined by field measurements.
The characteristics of both equipment noise and airblast can be characterized by a peak amplitude versus distance curve and an energy amplitude versus frequency curve. The former shows the decay of peak amplitude with distance and the latter shows at which frequencies the energy of the pressure waves are concentrated.
10 i The unsuppressed pressure wave amplitude for the small charge blasting process at a given distance from the hole to be drilled/blasted is often a function of the energy of the small charge blast. In the case of propellant or explosive based small charge blasting, the dependence of airblast on o 15 distance may be expressed in terms of propellant or explosive weight used (since their energy densities are usually all in the range of about 3.5 to about 4.5 MJ/kg). The functional relationship is usually plotted on a log-log plot showing either pressure or decibels as a function of scaled distance where scaled distance is the actual distance divided by the cube root of the charge energy or weight.
The characteristics of flyrock can be characterized statistically by a probability distribution function that relates charge weight and rock type with the distribution of -28-
A
flyrock at varying distances from the hole or by a plot such as that in Figure 2 generated for a specific charge weight and rock type.
In box 28, the job and operator pressure wave requirements job and operator airblast requirements and/or job and operator equipment noise requirements 32, if different), job and operator flyrock requirements 34, and any other pertinent pressure wave and flyrock requirements are determined.
10 Each excavation job and particularly urban excavation work, has a number of unique job pressure wave restrictions on air-blast and noise. These may be simple restrictions such as o a noise level not to be exceeded at a certain distance from the job site. The restrictions may be more elaborate and 15 contain not-to-exceed levels for pulsed, intermittent and continuous air/blast noise levels at several distances and under certain atmospheric conditions. Generally the pressure wave restrictions are expressed as the peak pressure wave amplitude at one or more distances from the work area or shot point and often will specify the range of frequencies where the peak amplitude requirements apply.
The operator pressure wave requirement(s) commonly include the personnel and machine pressure wave requirements.
For example, the operator might have a near-field pressure -29wave limit imposed as a safety measure to comply with the ooerating company's internal requirements. In complying with this, the operator may have to add additional pressure wave suppression devices.
After determining all of the pertinent pressure wave specifications, the operator selects 36 the most stringent requirement(s) as the requirement(s) to be complied with.
Commonly, the most stringent pressure wave requirement(s) is the requirement that mandates the lowest pressure wave emissions, and the most stringent flyrock distance requirement(s) is the requirement(s) that mandates the lowest flyrock trajectory distance from the jobsite.
In some cases, the pressure wave requirements for airblast will be different from the pressure wave requirements S" 15 for equipment noise. In such cases, the most stringent pressure wave requirement(s) is determined for each type of pressure wave emissions.
Next, the operator determines 38 the difference between the unsuppressed pressure wave emissions and the most stringent pressure wave requirement(s).
Because airblast requirements are typically more demanding than noise and flyrock requirements, the process first focuses on selecting appropriate pressure wave devices for suppressing airblast energy followed by determinations 1 1 whether additional devices are required for attenuating equipment noise and/or flyrock. As will be appreciated, in some applications equipment noise or flyrock may be the more demanding requirement and the process would be reconfigured to consider that requirement first followed by verification that the devices chosen also comply with the less restrictive requirements.
The difference of step 38 (or the unsuppressed pressure wave emissions) may be adjusted 40 upwards (or sometimes eeoc downwards) based on safety factors, atmospheric conditions, and other factors. The difference (or the unsuppressed pressure wave emissions) may be increased by a suitable safety factor to ensure compliance with pertinent regulations. The difference may be adjusted based on the forecasted atmospheric conditions received from an outside service. Such special conditions might include strong atmospheric temperature inversions, heavy low cloud cover or heavy fog. These type of atmospheric conditions can reflect noise and airblast energy initially radiated upwards back down toward the ground and may even focus noise and airblast energy in a specific location quite far from the work site. The estimator/operator may have access to services that provide such information or he may have to use his judgement.
-31- After suitable adjustments of the difference between the unsuppressed pressure wave emissions and the pressure wave requirement, the operator determines 42 whether the difference is positive or negative. If the difference is negative or zero, the small charge process is airblast compliant 1008 without the need for airblast pressure wave attenuation devices. If the difference is positive the unsuppressed pressure wave levels exceed the pressure wave level requirement), the operator in box 44 selects a sufficient number of cost effective pressure wave suppression devices "from a menu of such devices to attenuate the difference. If possible, the operator selects the combination of devices that minimizes capital and operating costs, controls equipment noise to meet the job pressure wave specification, and controls flyrock to meet the job flyrock specification. For example, the adjusted differences may be 40 to 50 dB at a first distance from the jobsite and 60 to 70 dB at a second distance from the jobsite with the first distance being less than the second distance.
The menu must characterize the devices at least in terms of the amount of pressure wave attenuation they provide at specified distances from the drill hole/jobsite. This is usually expressed in terms of dB of attenuation at the specified distance. Most well designed passive devices will -32provide in the range of about 10 to 20 dB of pressure wave attenuation at a specified distance relatively close to the hole/jobsite. Some devices will of course provide an amount of attenuation that is indirectly proportional to the distance from the jobsite. The pressure wave attenuations determined for each pressure wave suppression device may contain a safety factor be stated conservatively) to ensure that the devices will suppress the stated amounts of pressure wave energy. An example of such a menu might be: AMOUNT OF PRESSURE PRESSURE WAVE SUPPRESSION DEVICE WAVE ATTENUATION (dB) Down Hole Baffle Device SCollar Shroud Ground Mats Atomized Fluid Spray Flexible Rig Canopy Rigid Rig Enclosure Wall Sound Absorbing Barriers (for example, liners for shafts) Stand Alone Sound Barriers Referring to Figure 1, once the pertinent pressure wave suppression requirements have been met for airblast, the operator must verify 48 that equipment noise and other types of pressure wave emissions do not exceed the pertinent pressure wave specification(s) when the devices selected above -33are in place. This will require the operator to determine whether unsuppressed equipment noise noise from a drill or impact breaker) or other types of pressure wave emissions exceeds, for the specific type of pressure waves, the more stringent of the job pressure wave and operator pressure wave requirements. If not, additional pressure wave attenuation is unnecessary. If so and if the devices are inadequate to suppress the type of pressure waves, a second menu of pressure wave attenuation devices, which is similar to (but typically not the same as) the table described above, is reviewed and S"additional devices selected to suppress the type of pressure waves.
Although many pressure wave suppression devices can suppress both equipment noise and airblast, some devices will provide differing degrees of attenuation for airblast and equipment noise. For example, some devices will have higher attenuation of airblast and have little or no attenuation of equipment noise. The downhole baffle device and ground mats attenuate at most only a small fraction of the drilling noise while a collar shroud, flexible rig canopy, rigid rig enclosure, wall sound absorbing barriers, and stand alone sound barriers are effective in attenuating equipment noise such as drilling noise.
-34- Other devices that are able to suppress the type of pressure waves but not airblast energy may not be listed in the menu. For example, devices not listed in the menu above include, additional muffling for engines; a noise suppression collar for the rock drill; and a separate noise abatement enclosure for an impact hammer.
Once the pressure wave requirements have been met for airblast, equipment noise, and/or other types of pressure wave emissions, the operator must verify 50 that flyrock control requirements are also met. The flyrock verification step requires the operator to compare the more stringent of the personnel, machine, and job flyrock distance requirements with the unsuppressed flyrock distance(s) to determine if flyrock protection is necessary. If the pertinent flyrock distance 15 requirement is less than the unsuppressed flyrock distance(s), flyrock control equipment is required. In that event, the devices selected above are analyzed to determine whether they are able to suppress flyrock and comply with the requirements, If not, yet another menu of flyrock control devices is considered to select additional devices to suppress the flyrock. Usually the use of ground mats, collar shrouds and barriers will be sufficient to meet flyrock control requirements. However, if only barriers are required to achieve the job and operator pressure wave requirements, then additional devfces such as ground mats or a collar shroud may be required to achieve adequate flyrock control. The operator may also require some close-in flyrock control to protect the excavating machine or some other piece of equipment used at or near the work face.
After applying the above-noted steps, the operator should be in full compliance 52 with job and operator pressure wave ''.and flyrock requirements and all pressure wave requirements.
As will be appreciated, the above-described process steps may vary somewhat depending on the job type (surface Sexcavation, basement excavation, partially enclosed excavation, shaft, tunnel, drift or cavern). The process steps were described generally with reference to pressure wave and flyrock restrictions in an urban environment.
Down Hole Pressure Wave Suppression Devices Down hole pressure wave suppression devices are aimed at intercepting and controlling the airblast adjacent to the source of the small charge blast event in the drill hole and around the barrel or sealing member. In one configuration, rigid impact resistant annular housing fits around and is connected to the sealing member and functions like a silencer on a gun. The housing is substantially open at the both the downhole and uphole ends, and has a series of internal baffle plates and/or dead-end chambers and/or attenuation material -36that cause the pressurized working fluid that leaks up the drill hole to negotiate a series of separate paths of unequal length (nonlinear pathways). In this way, the coherence of the airblast that exits the silencer is eroded such that the peak pressure of the airblast is diminished and its pulse width is lengthened, resulting in a lower amplitude, lower frequency air-blast than would be otherwise generated. The baffles and/or dead-end chambers and attenuation material will also increase the surface area over which the energetic working fluid must flow thereby enhancing heat transfer from the working fluid to the baffle plates. This acts to de-energize the pressurized working fluid that leaks up the 2> drill hole which, in turn, acts to reduce the peak amplitude and pulse width of the resultant airblast wave.
15 An example of such a down hole airblast silencer device is shown in Figure 3. The silencer 2001 is firmly connected to the sealing member 2002 which is inserted into a drill hole 2003. The small-charge blasting agent (or working fluid) pressurizes the bottom portion 2004 of the drill hole 2003.
The sealing member 2002 seals the bottom portion 2004 by a sealing surface or other sealing device 2005 near the hole bottom. The silencer 2001 is located uphole of the sealing surface 2005 and substantially fills the cross-sectional area of the hole. The down hole end 2006 of the silencer 2001 is -37open or perforated to allow the flow of high-pressure gases to enter. The inside of the silencer includes a plurality of baffles 2007, a plurality of dead-end chambers 2008 and/or attenuation material 2009. The uphole end 2010 of the silencer 2001 is also open or perforated to allow the highpressure gases to escape in a less coherent and less energetic state than they entered. The gas pressures that the silencer device is exposed to are typically in the range of about 5,000 to about 50,000 psi.
Collar Pressure Wave and Flyrock Suppression Devices Collar pressure wave and flyrock suppression devices intercept and control the energetic working fluid that escapes from the collar opening area) of the drill hole and/or stop small pieces of relatively high velocity flyrock that to 15 originate from the collar of the drill hole. The collar pressure wave suppression device can have the same features as the downhole silencer device except that the collar devices are commonly much larger, have a larger internal volume and are positioned outside the drill hole over the collar of the drill hole instead of inside the hole.
An example of a collar shroud device for airblast suppression is shown in Figure 5A. The collar shroud 5001 is typically rigidly connected to the proximal end of the sealing member 5002 such that when the sealing member 5002 is inserted -38in a drill hole 5003, the body of the collar-shroud 5001 and a flexible skirt 5005 contact the region around the collar of the drill hole 5006 to form a rough seal. The down hole end 5007 of the collar shroud 5001 is open or perforated to allow the flow of high-pressure gases to enter from the hole. The inside of the collar shroud includes a plurality of baffles 5008, a plurality of dead-end chambers 5009 and/or the 9attenuation material 5010 which together form non-linear "Se. *pathways of different lengths and a large surface area for heat transfer. The uphole end 5011 of the collar shroud 5001 is also open or perforated to allow the high-pressure gases to Oslsescape in a less coherent and less energetic state than they *see @see entered. The heavy flexible outer skirt 5005 further contains 6:0 the escaping gases. This outer flexible skirt 5005 may be *of.
0 15 made from flexible air conditioning duct material, heavy canvas or industrial conveyor belt, and the like. This outer flexible skirt 5005 may or may not be included as part of the collar shroud 5001 and may be attached to the uphole end 5011 of the collar shroud 5001 and the downhole end 5007 by any number of means (such as by a heavy chain as shown)or directly to the sealing member. The collar shroud 5001 is shown in plan view in Figure 5B which shows the hole for the sealing member 5013, perforations 5014 on the uphole end 5011 and the flexible outer skirt 5005. The collar shroud 5001 shown in -39plan view 5015 may be either round, rectangular, or any other shape.
An alternate embodiment of a collar shroud device is shown in Figure 5C. This embodiment shows a collar shroud 5021 that is decoupled from the sealing member 5023 by any suitable device 5022, such as a spring. It also shows internal baffles 5024 that are shock-isolated from the main *o body 5025 by rubber or shock isolation elements 5026. The nonlinear escape path of the working fluid is shown by arrows.
Since the rigid collar shroud must contain substantially undiluted but expanded energetic working fluid, it must be of robust construction. The gas pressures are in the range of about 1,000 to about 5,000 psi. The internal volume of the collar shroud is preferably in the range of about 0.03 m 3 to 2 m 3 more preferably in the range of about 0.06 m 3 to 1 m 3 and most preferably in the range of about 0.1 m 3 to 0.5 m 3 Figure 6 depicts a collar shroud for suppressing pressure waves.generated during the drilling of the hole. The drill has a drill steel that is decoupled from the collar shroud 102 so that the drill steel may rotate freely from the shroud 102.
This shroud 102 is designed to substantially attenuate the noise emanating from the drill hole 104 as a result of the percussive hammering of the rock by the drill bit 105 at the downhole end of the drill steal. The shroud, like the other collar devices discussed above, surrounds and encloses the hole from the exterior environment. The proximal end 106 of the device is rigid and made from a suitable high strength material such as steel plate. The distal end 107 of the device is a flexible shroud such that when the drill slide 103 is positioned next to the rock face 108 for drilling, the flexible end 107 can conform to the rock face 108 to seal the pressure wave emissions in the shrouded area 109 and thereby impede the release of or attenuate the pressure waves in the exterior environment. The flexible end 107 may be made from a deformable material such as a heavy industrial plastic, rubber, canvas and the like. The flexible end 107 will also *o allow drilling fluids (water and air) and rock dust to escape through the rough seal formed with the rock face 108. The outside of the noise suppression device may be further covered .i with one or more additional layers 110 of acoustic material such as heavy industrial plastic, rubber, canvas or other commercially available acoustic materials. Noise from the drill motor piston hammering on the proximal end of the drill steel can be suppressed by wrapping the drill motor and proximal end of the drill steel with a noise absorbing material such as a heavy rubber sheath.
A collar shroud can also be used only for intercepting and controlling small, higher velocity flyrock originating in -41the drill hole or at the collar of the drill hole used for the small charge blast. The collar of the drill hole, in particular, is often the source of smaller, higher velocity flyrock.
If the collar shroud is used only for flyrock control, its internal construction may be simplified by removing the internal baffles, dead-end chambers and internal attenuation material. The flyrock will be substantially stopped by the bottom plate and flexible outer skirt.
10 An exemplary flyrock control device is depicted in Figure 4. Figure 4 shows a cross-sectional view of a collar flyrock suppression shroud 201 positioned around and enclosing the collar 202 of the hole 203 for intercepting flyrock that originates from the collar region of the drill hole during small-charge blasting. A sealing member 204 is shown inserted into a drill hole 203 in firing position. Since some or all ee.
of the gases generated in the drill hole when the gasgenerating device 204 is fired can escape up the drill hole 203, there is a strong potential for these gases to accelerate at high velocities broken or partially broken rock 205 in the collar region 202. The collar shroud 201 is solidly attached at its proximal end 206 to the sealing member 204 such that when the sealing member 204 is positioned in the drill hole for firing, the shroud 201 substantially blocks the line-of- -42flight of the flyrock that would originate in the collar region 202 of the drill hole 203. The flyrock shroud 201 may be made from a heavy impact resistant material such as steel, impact resistant plastics or composite materials, and the like. The shape of the flyrock shroud 201 may be convex as shown or in the shape of a cylindrical housing with its open end facing towards the entrance of the drill hole 203. For shooting holes drilled vertically into the rock, a shroud of mesh or chain links 207 or another deformable impact resistant 10 material may be attached to the distal end 208 of the flyrock shroud 201 so as to further intercept flyrock that is accelerated laterally.
Ground Pressure Wave and Flyrock Suooppression Devices Ground pressure wave and flyrock suppression devices 15 intercept and control the air-blast that escapes from fissures or fractures existing or created around the working face centered on the drill hole used for the small charge blast.
A series of perforated mats are laid on top of each other over an area around the hole collar. The perforations in the adjacent, stacked mats are of differing sizes and/or are misaligned to form a labyrinth of gas passageways. For pressure wave suppression (but not for flyrock suppression alone), the mats are covered by a mat that is substantially impermeable to the flow of gas to force the working fluid -43through a labyrinth formed by the overlapping and interlinked meshes and/or perforations. The labyrinth forces the pressurized working fluid to negotiate a series of intricate passage ways of differing lengths and de-energizes the pressurized fluid by forcing the fluid to contact a large surface area to create conditions for significant heat transfer to the mesh. The gas pressures that this apparatus is exposed to are typically in the range of about 1,000 to about 10,000 psi.
i One of the principal features of this embodiment is that oo it can be set in place and used without moving for several or S. many shots. One of the advantages of the mesh structure is that a hole for inserting the sealing member or drill can be readily formed by simply deforming the mesh to create a suitable insertion hole.
An example of such a ground shroud device is shown in "Figures 7A and 7B. The ground mat 6001 may be formed from a plurality of separate mats 6003a-c and 6004a-c covered by the impermeable mat 6000 such as shown in Figure 7A. The mats may be formed from compliant industrial mesh mats 6003 and/or perforated rubber or canvas 6004 or other similar types of flexible, deformable, perforated mats. The impermeable mat can be made from heavy rubber, conveyor belt or plastic sheet or from a lighter gauge sheet metal or from a combination of -44such materials layered together to form a strong but impermeable mat. Referring to Figure 7B, several holes 6006 are formed in the mat as needed for drilling of successive holes and placement of successive small charge blasting shots in the holes.
If the ground shroud is used only for flyrock control, its layered construction may be simplified by using only one or two layers of material. For example, if used only for fly .e rock, the ground shroud can be made from one layer of heavy 10 chain link mesh, or from two layers of lighter chain link mesh, or from a layer of lighter chain link mesh and a layer of heavy canvas or rubber mat and the upper impermeable layer omitted.
Enclosure for Pressure Wave and Flyrock Suppression Enclosures for pressure wave and flyrock suppression are aimed at intercepting and controlling the expanded air-blast S" in the immediate vicinity of the small charge blast around the undercarrier or rig stationed at the working face as well as equipment noise and flyrock. An enclosure is erected over the boom of the undercarrier or around the entire undercarrier or, in the case of a shaft rig, over the entire shaft rig. The enclosure may not be strongly coupled to the rock to be broken (as is the case for the collar or ground shrouds) but can be suspended over the work area from an independent structure that may or may not be the undercarrier or rig. Thus the enclosure can be of a lighter weight construction than a collar shroud. Its function is to contain the expanded working fluid that escapes from the hole collar and/or ground fractures and fissures, and then slowly dissipate this expanded gas to the outside world. The enclosure may include controlled leakage vents to facilitate controlled dissipation S"of the gas.
"The enclosure contains enough volume of atmospheric air to dilute and mix with the expanded working fluid. In the S"case of a flexible canopy, the mass of ambient air contained within the enclosure is substantially greater than the mass of ao energetic working fluid so that the diluted energy of the mixture is only slightly greater than the ambient energy of the air. In the case of a rigid enclosure, the volume of ambient air may be much less so that substantial momentary over-pressures may be developed but these can be contained by the enclosure.
Figure 8A shows a cutaway side view of a rigid type canopy 7001 that is attached to the end of a boom 7002 of a small-charge blasting machine. A sealing member 7003 is mounted on the boom 7002. There may be a rock drilling apparatus 7004 also attached to the boom 7002. The drilling apparatus 7004 is located outside of the canopy 7001. As -46shown in Figure 8B, the enclosure 7001 is constructed of a heavy rigid outer shell 7005 (such as metallic plate) which may be lined on the inside with one or more thick rubber or canvas membranes 7006a, b which can both mitigate sound transmission through the shell 7005 and absorb flyrock impacts. The rigid canopy 7001 may have several large or many small holes or vents 7008 on its body 7009. or in its top 7010 to allow controlled venting of the gases during and after a shot. The enclosure 7001 may also have a flexible skirt 7011 10 that can form a rough seal 7012 with the ground to deflect the airblast and flyrock into the enclosure 7001. The inside of the enclosure 7001 may be further lined with a impact resistant layer 7013 for flyrock protection and/or with a pressure wave absorbent material 7014 for pressure wave mitigation.
Figure 8C depicts another configuration of a rigid-type canopy 300 that is designed to be attached to the feed holder or boom assembly of a small-charge blasting machine. In this embodiment, both the rock drill apparatus and the sealing member are housed in within the canopy 300 so that all pressure waves and machine noise as well as flyrock from the collar region are captured in the enclosure. The outside of the canopy 301 may be fabricated from sheet metal, light steel plate, or another heavy rigid material attached to a frame -47structure fabricated from wood, aluminum, steel, or other types of structural members. One or more pressure wave absorbing, dissipating, and/or reflecting layers 307 are used to line the interior of the enclosure. The layer 307 may be held in place and protected by a impact resistant layer 306 of heavy industrial plastic, rubber, canvas or metallic mesh 307 and the like that is impact resistant and capable of resisting flyrock. There is a hinged door 304 for access to the rock drill and/or small charge blasting device. In addition,there 10 may be a relatively heavy layer or layers of industrial plastic, rubber, canvas, or other deformable material secured to the bottom of the canopy 305 to form a shroud around the drill hole.
Figure 8D shows a cutaway side view of a heavy flexible type canopy 8001 shown affixed to the supporting cable 8002 such as might be used on a small-charge blasting apparatus 8003 used for shaft excavation. The flexible canopy formed from heavy flexible materials such as industrial conveyor belt, heavy canvas or a flexible sandwich such as heavy aluminum foil on either side of an acoustic material (e.g.
ethyl vinyl acetate, poly vinyl chloride or other such plastic or foamed materials) such that it will absorb and deaden the airblast and equipment noise. The enclosure should form a heavy flexible bag type structure to contain the -48over-pressure. The enclosure may have a flap or door that can be secured shut during firing of the shot. The canopy 8001 is attached to a rigid support frame 8004 that may be constructed from wood or structural steel members. The canopy 8001 is draped onto the ground to form a rough seal 8005. The volume 8006 inside the canopy is sufficient to dilute the energy of the airblast as described above. The canopy 8001 may have several large or many small holes on its body 8007 or in its top 8008 to allow controlled venting of the gases during and 10 after a shot.
The internal volume of the flexible canopy is preferably in the range of about 50 m 3 to 200 m 3 more preferably in the range of about 50 m 3 to 100 m 3 and most preferably in the .range of about 75 m 3 to 100 m 3 The internal volume of the a rigid enclosure is preferably in the range of about 1 m 3 to 10 m 3 more preferably in the range of about 2 m 3 to 10 m 3 and most preferably in the range of about 2 m 3 to 5 m 3 The enclosures described above can be used to contain equipment other than a small charge blasting device to suppress pressure waves. For example, the enclosures can contain a drill, an impact breaker, and the like.
Pressure Wave and Flyrock Suppression Barriers The pressure wave and flyrock suppression barriers intercept, absorb and/or deflect the noise or substantially -49weakened air-blast in the intermediate to far-field region of the small charge blast. Barriers of sound absorbent material are erected between the work area and the areas to be protected from noise (buildings, residences, playgrounds etc) The barriers are located such that they absorb and/or deflect the noise energy up and over or away from the areas to be protected. In the case of a shaft work area, the noise barriers may be assembled as a lining for the shaft.
This same apparatus can also be used for intercepting any flyrock that escapes the immediate working area. In addition to being located to best absorb and deflect noise, the barriers are located such that they will also intercept any direct line of flight, high velocity flyrock; or lower velocity flyrock that is follows an arched trajectory. It may be necessary to protect any layers of noise absorbing material lining the inside of the barrier with a layer of mesh or other material that can absorb the impact of flyrock while protecting the noise absorbent material.
Figure 9 shows a cutaway side view of the construction for a pressure wave and flyrock suppression barrier 9001. The barrier frame 9002 may be constructed from wood beams or structural steel members. The vertical members may be inserted into holes 9003 in the ground for support if the barriers are free-standing. The main barrier structure or skin 9004 may be made from plywood or sheet metal and covered with sound absorbent material such as acoustic tile, heavy canvas or industrial conveyor belt. Figure 10 shows how such barriers 10001 may be deployed around a work site 10002 to protect airblast and flyrock sensitive areas 10003. The angle defined by a line extending from the work site 10002 to the structure and a line extending from the work site to the end of the barrier 10001 is typically at least about 30 and no more than about 90 degrees with about 45 degrees -being 10 preferred.
Stand alone barriers may be typically 2 to 4 meters high and anchored typically 0.5 to 1 meters into the ground.
Atomization Device for Suppressing Airblast The airblast that escapes from the drill hole or fragmented rock around the shot point, moves at a velocity equal to or greater than the speed of sound. The pulse width of the airblast immediately around the shot point is on the order of a few milliseconds. It is possible to extract energy from the airblast or escaping working fluid by causing it to pass through a cloud of atomized fluid particles or spray.
The spray must be atomized to increase the surface area of spray particles. For a given mass of fluid, the total surface area is proportional to the cube root of the number of droplets. The mechanism of extracting energy is by convective -51and conductive heat transfer of hot gases to fluid particles.
If the amount of spray is large enough and the atomization is fine enough, then the resultant fog cloud can extract significant energy from the airblast and expanded working fluid, and therefore reduce the amplitude and pulse width of the airblast near the source. The atomized fluid spray has the advantage that it is relatively easy to generate and apply compared to some of the mechanical airblast suppression apparatuses. Further, the spray has the beneficial side 0 effect of helping to suppress dust.
To achieve effective heat transfer of a significant portion of the airblast energy, it is necessary to envelope the work face with a large volume of fluid such as water in a highly atomized state. The droplet size ranges preferably •eg.
from about 1 mm to 0.01 mm, more preferably from about 0.5 mm to 0.01 mm and most preferably from about 0.1 mm to 0.01 mm.
The volume of fluid suspended around the working face at the time of firing is dependent on the charge weight of the explosive or propellant used. The volume of fluid ranges preferably from about 10 liters per kg of charge to 2000 liters per kg, more preferably from about 50 liters per kg to 2000 liters per kg and most preferably from about 100 liters per kg to 2000 liters per kg.
-52- Figure 11 shows a typical small charge excavation machine 11001 in firing position at the work face 11002. A small charge blasting device 11003 is positioned in a drill hole 11004. A spray system 11005 for atomizing a fluid such as water may be mounted on the machine 11001 and used to create a spray pattern 11006 that envelopes the working area 11007 between the machine 11001 and the drill hole 11004.
The foregoing description of the present invention has been presented for purposes of illustration and description.
1 0 Furthermore, the description is not intended to limit the invention to the form disclosed herein. Consequently, variations and modifications commensurate with the above teachings, and the skill or knowledge of the relevant art, are within the scope of the present invention. The embodiments described hereinabove are further intended to explain best modes known for practicing the invention and to enable others skilled in the art to utilize the invention in such, or other, embodiments and with various modifications required by the particular applications or uses of the present invention. It is intended that the appended claims be construed to include alternative embodiments to the extent permitted by the prior art.
-53-

Claims (9)

  1. 2. The apparatus of Claim 1, wherein the device has a plurality of nonlinear pathways.
  2. 3. The apparatus of Claim 1 or 2, wherein each nonlinear pathway is tortuous. ooo• ose•
  3. 4. The apparatus of any one of Claims 1 to 3, wherein 20 the device is a fibrous material. The apparatus of any one of the Claims 1 to 4, wherein the device includes a plurality of baffles.
  4. 6. The apparatus of any one of the Claims 1 to wherein the device includes a packed bed of discrete particles.
  5. 7. The apparatus of Claim 6, wherein the plurality of baffles are each supported by a resilient material.
  6. 8. The apparatus of any one of the Claims 1 to 7, wherein the device includes two or more nonlinear pathways having differing lengths.
  7. 9. The apparatus of any one of the Claims 1 to 8, wherein the device has a passageway extending therethrough for receiving a sealing member for insertion into the hole during initiation of the energetic material. The apparatus of any one of the Claims 1 to 9, wherein the device is located in the hole between the energetic material and the hole opening.
  8. 11. The apparatus of any one of the Claims 1 to 9, wherein the device is located at or near the opening of the hole and the nonlinear pathways are in communication with the hole.
  9. 12. An apparatus according to Claim 1, substantially as herein described with reference to and as illustrated by 15 the accompanying drawings. Dated this 1 2 th day of April 2000 ROCKMIN PTY LTD 20 By Its Patent Attorneys GRIFFTTH HACK Fellows Institute of Patent and Trade Mark Attorneys of Australia.
AU27699/00A 1999-03-11 2000-04-12 An apparatus for pressure wave suppression from a small charge blast Ceased AU739768B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
AU27699/00A AU739768B2 (en) 1999-03-11 2000-04-12 An apparatus for pressure wave suppression from a small charge blast

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
US60/124275 1999-03-11
US09/289527 1999-04-09
US09/288735 1999-04-09
AU27699/00A AU739768B2 (en) 1999-03-11 2000-04-12 An apparatus for pressure wave suppression from a small charge blast

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
AU44777/99A Division AU722846B1 (en) 1999-03-11 1999-08-27 A method and apparatuses for pressure wave suppression and fly rock control in small-charge blasting

Publications (2)

Publication Number Publication Date
AU2769900A true AU2769900A (en) 2000-09-14
AU739768B2 AU739768B2 (en) 2001-10-18

Family

ID=3715997

Family Applications (1)

Application Number Title Priority Date Filing Date
AU27699/00A Ceased AU739768B2 (en) 1999-03-11 2000-04-12 An apparatus for pressure wave suppression from a small charge blast

Country Status (1)

Country Link
AU (1) AU739768B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114353608A (en) * 2022-01-14 2022-04-15 金当量能源科技(山东)有限公司 Safe ore mining method
CN114812319A (en) * 2022-04-11 2022-07-29 山东唐口煤业有限公司 High-altitude long-distance pneumatic boosting device for blasting top-breaking columnar cartridges

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4754705A (en) * 1986-11-17 1988-07-05 The Curators Of The University Of Missouri Mechanical stemming construction for blast holes and method of use

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114353608A (en) * 2022-01-14 2022-04-15 金当量能源科技(山东)有限公司 Safe ore mining method
CN114353608B (en) * 2022-01-14 2024-03-22 金当量能源科技(山东)有限公司 Safety ore mining method
CN114812319A (en) * 2022-04-11 2022-07-29 山东唐口煤业有限公司 High-altitude long-distance pneumatic boosting device for blasting top-breaking columnar cartridges
CN114812319B (en) * 2022-04-11 2024-03-26 山东唐口煤业有限公司 High-altitude long-distance pneumatic boosting device for explosive cartridge with broken top column

Also Published As

Publication number Publication date
AU739768B2 (en) 2001-10-18

Similar Documents

Publication Publication Date Title
US8590437B2 (en) Blast effect mitigating assembly using aerogels
US6332401B1 (en) Method and apparatus for pressure wave suppression in small-charge blasting
AU722846B1 (en) A method and apparatuses for pressure wave suppression and fly rock control in small-charge blasting
EP0204863A1 (en) Improved method for explosive blast control
AU739768B2 (en) An apparatus for pressure wave suppression from a small charge blast
AU739490B2 (en) An apparatus for suppressing a pressure wave resulting from the initiation of an energetic material
CN106088098A (en) Supporting removal construction method
AU729372B2 (en) A method of small charge blasting of a material
AU739617B2 (en) A method for small charge blasting of a material
AU739826B2 (en) Apparatus for suppressing fly rock generated by the initiation of an energetic material
AU728492B2 (en) A method for selecting one or more fly rock control devices
KR101249722B1 (en) Apparatus for distributed blasting and the method thereof
JP2020063660A (en) Underground pile breaking method
US10508464B2 (en) Structure of a facility for demining, investigating and testing of an explosive device
US3397756A (en) Reduction of explosive shock and noise by dispersion of water particles
CN114322686A (en) Detonating network structure and control method for safety blasting of underground excavation tunnel
JPH07208900A (en) Sound-proof apparatus for explosive
KR102350514B1 (en) Method for Blasting Rock Utilizing Air Deck and Decoupling
CN217083515U (en) Energy gathering structure for building blasting danger elimination
KR20080015179A (en) Preasure release blasting method for low vibration and low noise and the preasure releasing blasting mat for that
CN112880507B (en) Perforation explosive charging explosion method suitable for blasting demolition of middle shear wall
US6698357B2 (en) Hydrocarbon warhead and method
RU2090741C1 (en) Charge for well perforation
KR20220169998A (en) Method of explosive demolition for structure
Serena An On-Site Demilitarization Container for Unexploded Ordnance

Legal Events

Date Code Title Description
FGA Letters patent sealed or granted (standard patent)