AU2021103216A4 - Intelligent tracking & managing system for water quality distribution and water consumption plan scheduling using block chain - Google Patents

Intelligent tracking & managing system for water quality distribution and water consumption plan scheduling using block chain Download PDF

Info

Publication number
AU2021103216A4
AU2021103216A4 AU2021103216A AU2021103216A AU2021103216A4 AU 2021103216 A4 AU2021103216 A4 AU 2021103216A4 AU 2021103216 A AU2021103216 A AU 2021103216A AU 2021103216 A AU2021103216 A AU 2021103216A AU 2021103216 A4 AU2021103216 A4 AU 2021103216A4
Authority
AU
Australia
Prior art keywords
water
distribution
valve
geographical location
block chain
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
AU2021103216A
Inventor
S .B. Goyal
Bhanu K. N.
Devendra Kumar
Jugnesh Kumar
Raju KUMAR
Preetishree Patnaik
Jitender RAI
Uma Rani
Ritika
Neha Singhal
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
K N Bhanu Dr
Kumar Jugnesh Dr
Kumar Raju Dr
Patnaik Preetishree Ms
Rai Jitender Dr
Rani Uma Dr
Ritika Dr
Singhal Neha Dr
Goyal S B Dr
Original Assignee
K N Bhanu Dr
Kumar Jugnesh Dr
Kumar Raju Dr
Patnaik Preetishree Ms
Rai Jitender Dr
Rani Uma Dr
Ritika Dr
Singhal Neha Dr
Goyal S B Dr
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by K N Bhanu Dr, Kumar Jugnesh Dr, Kumar Raju Dr, Patnaik Preetishree Ms, Rai Jitender Dr, Rani Uma Dr, Ritika Dr, Singhal Neha Dr, Goyal S B Dr filed Critical K N Bhanu Dr
Priority to AU2021103216A priority Critical patent/AU2021103216A4/en
Application granted granted Critical
Publication of AU2021103216A4 publication Critical patent/AU2021103216A4/en
Ceased legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04QSELECTING
    • H04Q9/00Arrangements in telecontrol or telemetry systems for selectively calling a substation from a main station, in which substation desired apparatus is selected for applying a control signal thereto or for obtaining measured values therefrom
    • H04Q9/02Automatically-operated arrangements
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03BINSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
    • E03B7/00Water main or service pipe systems
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply
    • GPHYSICS
    • G08SIGNALLING
    • G08CTRANSMISSION SYSTEMS FOR MEASURED VALUES, CONTROL OR SIMILAR SIGNALS
    • G08C2201/00Transmission systems of control signals via wireless link
    • G08C2201/40Remote control systems using repeaters, converters, gateways
    • G08C2201/42Transmitting or receiving remote control signals via a network
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04QSELECTING
    • H04Q2209/00Arrangements in telecontrol or telemetry systems
    • H04Q2209/10Arrangements in telecontrol or telemetry systems using a centralized architecture
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04QSELECTING
    • H04Q2209/00Arrangements in telecontrol or telemetry systems
    • H04Q2209/60Arrangements in telecontrol or telemetry systems for transmitting utility meters data, i.e. transmission of data from the reader of the utility meter
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use
    • Y02A20/152Water filtration

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Health & Medical Sciences (AREA)
  • Economics (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Strategic Management (AREA)
  • General Business, Economics & Management (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • General Health & Medical Sciences (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • Human Resources & Organizations (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

INTELLIGENT TRACKING & MANAGING SYSTEM FOR WATER QUALITY DISTRIBUTION AND WATER CONSUMPTION PLAN SCHEDULING USING BLOCK CHAIN ABSTRACT The present invention is related to an intelligent tracking & managing system for water quality distribution and water consumption plan scheduling using block chain. The objective of present invention is to solve the anomalies presented in the prior art techniques related to water supply management using advance computerized systems. 28 DRAWINGS Water Water availability meter meter Water avialte y vilailt -mmeter Water availability Watelr meter availability meter WATERSOPLY SCENTRAL CONTROL SYSTE M UNIT FIGURE 1 29

Description

DRAWINGS
Water Water availability meter meter
Water
avialte y vilailt -mmeter
Water availability Watelr meter availability meter
WATERSOPLY SYSTE M SCENTRAL CONTROL UNIT
FIGURE 1
INTELLIGENT TRACKING & MANAGING SYSTEM FOR WATER QUALITY DISTRIBUTION AND WATER CONSUMPTION PLAN SCHEDULING USING BLOCK CHAIN FIELD OF INVENTION
[001]. The present invention relates to the technical field of block
chain, in particular to a block chain -based water supply
management system.
[002]. The presents invention related to the technical field of a water
supply of the security management system, in particular to a
secondary water supply safety intelligent management system.
[003]. The present invention provides the municipal engineering field,
in particular to a municipal water supply network management.
[004]. More particularly, the present invention is related to an
intelligent tracking & managing system for water quality
distribution and water consumption plan scheduling using block
chain.
BACKGROUND & PRIOR ART
[005]. Water allocation refers to the level-by-level allocation of the
total amount of water resources available or allocable to
administrative regions, and the determination of the share of water
that can be consumed for living and production in the
administrative region or the share of water withdrawn is an
important foundation of water resources management. jobs. The
water share of the administrative region determined by the water
distribution is the basis for the implementation of a system that
combines total water use control and quota management.
[006]. According to the general keynote of the water conservancy
reform and development of "water conservancy projects to make up
for shortcomings and strong supervision of the water conservancy
industry", the Ministry of Water Resources has set the goal of
water resources management as "rational water distribution and
water control." The implementation of the annual water distribution
plan and dispatch plan is the main measure to implement the
application of the river water plan, an important means of
"reasonable water distribution and water control", and is of specific significance for ensuring the ecological flow of rivers and the safety of regional water supply.
[007]. The traditional water allocation and dispatching plan work
process is shown in Figure 1. First, based on the water allocation
plan approved by the upper-level water administrative department,
based on the forecast results of the next year's inflow of water, and
the water use reported by localities (dispatch) Plan the demand and
draw up the water distribution plan for the next year under the
corresponding frequency of incoming water; secondly, according to
the annual water distribution plan, further allocate the annual water
consumption to month by month; finally, the area involved in the
water distribution plan is allocated according to the water volume
The results of the plan, arrange the local water withdrawal and
water scheduling plan, and refer to the plan for water withdrawal. It
can be seen that the water allocation plan in this process is greatly
affected by the results of the incoming water forecast, and the plan
lacks a dynamic adjustment mechanism after being issued by the
higher-level water administrative department; at the same time, the
water allocation process lacks a water-saving incentive mechanism,
especially the incoming water in the case of relatively abundant, it is not conducive to the implementation of water-saving measures in various places.
[008]. Some of the prior work is listed herewith:
[009]. CN206360016U Municipal water supply network
management washing unit The utility model discloses a
municipal water supply network management washing unit,
including water supply network and rainwater well, be provided
with water seepage layer, the feed water person in charge and drain
pipe in the water supply network, the feed water is responsible for
and the drain pipe passes through the gate valve connection, the
drain pipe other end sets up in rainwater well, the drain pipe tip sets
up to the outlet, the utility model discloses a position that the drain
pipe inserted rainwater well is raised to
[0010].
[0011]. CN208954599U Novel municipal water supply and
drainage construction management progress display special device
The utility model discloses a novel municipal water supply and
drainage construction management progress display special device.
Including a motherboard, a note board is arranged on the front side
surface of the main board; a storage box is arranged below the note
board; a first groove is formed in one side of the main plate; a
transparent window is arranged on one side of the first groove; a
planning board is arranged in the first groove; the top and the
bottom of the planning plate are in sliding connection with the first
groove; a project name board is arranged above the front side
surface of the planning board; a plurality of serial number plates
are arranged below the project name plate; a project plan writing
board is arranged on one side of each serial number board; one side
of the project plan writing board is provided with a project
completion indicating lamp and a project incompletion indicating
lamp. The novel municipal water supply and drainage construction
management progress display special device is novel in structure,
capable of being repeatedly used, convenient to carry and capable
of being used in various environments, and therefore the novel
[0012]. CN111764460A Municipal water supply system
and water supply method for solving too low local water pressure
The invention discloses a municipal water supply system and
water supply method for solving too low local water pressure, and
relates to the technical field of water supply. The municipal water
supply system aims to solve the problem that manual maintenance
is tedious. The municipal water supply system for solving the too
low local water pressure involves a water distribution module, a
water delivery module, a water purification module, a water taking
module and a background management module. The municipal
water supply method for solving the too low local water pressure
comprises the following steps that the water taking module takes
out raw water from the underground or the earth surface and
conveys the raw water to a water distribution plant. According to
the municipal water supply system, the water supply problems such
as pressure monitoring of a water supply system pipeline are solved
in a monitoring room, when the water pressure in the pipeline is too
low, a PLC controller is electrically connected with and co"
[0013]. CN107958104A Water supply pipe network
management and hydraulic model construction method by using
open source GIS and database The present invention belongs to
the technical field of municipal engineering water supply pipe
network information. In order to overcome the deficiencies of the
prior art, the present invention aims to propose a water supply pipe
network model construction method, which has a simple structure,
good performance, and a low cost. The technical scheme of the
present invention is a water supply pipe network management and
hydraulic model construction method by using an open source GIS
and a database. The method comprises the following steps: (1) for a
pipe section, a node, and a reservoir layer that are necessary for a
water supply pipe network, rationally designing attribute fields
thereof; (2) using open source QGIS (Quantum GIS) desktop
software to manage data and maps of the water supply pipe
network, and to implement data entry and editing functions and
query and statistics functions; (3) using open-source Postages
geodatabases to store water pipe network data; (4) inputting the
conversion of files to the EPANET; and (5) carrying out hydraulic
simulation and calculation. The method provided by the present invention can be mainly applied to information processing occasions of a municipal engineering water supply pipe network.
[0014]. CN213329231U Intelligent municipal water supply
system for solving local water pressure excessively low The
utility model provides an intelligent municipal water supply system
for solving the too low local water pressure, which comprises a
water supply system. The control system comprises a control
module, an electromagnetic valve and a water pressure sensor,
wherein each water delivery branch pipe is connected with a
plurality of water delivery branch pipes, and each water delivery
branch pipe is connected with a control module. PLC control
module comprises a control module, a monitor and PLC
controllers. The utility model discloses realize the intelligent
management of municipal water supply, improve water supply
efficiency and can in time discover and solve the water supply
problem, guarantee citizen water demand, improve people's life
quality.
[0015]. CN212801774U Bypass municipal pipe network
protection device for non-negative pressure water supply system
The utility model provides a bypass municipal pipe network
protection device for a non-negative pressure water supply system.
The utility model relates to a water supply pressure holder on a
water conveying pipeline between a water outlet of a municipal
pipe network and a water inlet of a non-negative pressure water
supply device. The control valve arranged on the water conveying
pipeline between the water supply pressure maintaining device and
the water outlet of the municipal pipe network and the flow change
monitoring device arranged on the water conveying pipeline
between the water supply pressure maintaining device and the
water inlet of the non-negative pressure water supply device. The
water supply pressure retainer adopted by the utility model can
maintain the preset certain pressure data of the urban water supply
pipe network. When the urban water supply pipe network is lower
than a preset pressure value, the water supply pressure retainer is
automatically closed, and the flow change monitoring device
matched with the water"
[0016]. CN208650171U Residual quantity compensation
pressurize water supply system The utility model relates to a
water supply equipment technical field especially relates to a
residual quantity compensation pressurize water supply system,
including water tank, municipal network management way, the user
is with the water pipe line and locate water tank and the user
residual quantity compensation pressurizer between with the water
pipe line, residual quantity compensation pressurizer includes the
stationary flow jar and locates the multistage pump package and the
switch board of stationary flow jar one side, be equipped with an
electric contact pressure gauge on the stationary flow jar, electric
contact pressure gauge and multistage pump package all with
switch board electric connection, the municipal administration
network management is said and is connected with the stationary
flow jar of water tank and residual quantity compensation
pressurizer respectively, be connected with a diversion pipeline on
the water tank, when municipal pipe network water positive
pressure often, operating condition"
[0017]. CN107862446A Integrated management and
analysis system for water supply pipe network on the basis of
Internet of ThingsThe invention discloses an integrated
management and analysis system for a water supply pipe network
on the basis of the Internet of Things. A municipal water supply
pipe network collector, a municipal district water supply pipe
network collector, a community water supply pipe network
collector and a unit resident water supply pipe network collector
select a way of a parallel structure on the basis of the Internet of
Things and can utilize the way of the parallel structure to
accurately divide complex and complicated water supply pipe
network data, a GIS (Geographic Information System), a
GPS(Global Positioning System) and a 4G (the 4th Generation
mobile communication technology) communication network can be
cooperated to accurately position the water supply network data,
and in addition, data transmission efficiency can be improved; a
complete urban water supply network flow graph is established and
is displayed on a liquid crystal display, and workers can visually
observe the water supply"
[0018]. CN102750428A Water supply network node
hydraulic computation equation parallel algorithm regional
construction method The patent refers to the field of 'electric
digital data processing'. The invention relates to a water supply
network node hydraulic computation equation parallel algorithm
regional construction method, belonging to the technical field of
municipal engineering. The method mainly comprises the
following steps: determining an ideal operation load of parallel
computers; merging and resolving the existing physical functional
regions by adding nodes according to the operation load; and after
finishing the secondary division, rearranging the node sequence
numbers of all sub regions. The method effectively utilizes the
physical functional region division structure of the water supply
network, and provides powerful references for sub region division
strategy in parallel computation; and meanwhile, the independent
simulation after the network region division becomes possible, and
is simple to operate.
[0019]. CN102750428B Water supply network node
hydraulic computation equation parallel algorithm regional
construction method The invention relates to a water supply
network node hydraulic computation equation parallel algorithm
regional construction method, belonging to the technical field of
municipal engineering. The method mainly comprises the
following steps: determining an ideal operation load of parallel
computers; merging and resolving the existing physical functional
regions by adding nodes according to the operation load; and after
finishing the secondary division, rearranging the node sequence
numbers of all sub regions. The method effectively utilizes the
physical functional region division structure of the water supply
network, and provides powerful references for sub region division
strategy in parallel computation; and meanwhile, the independent
simulation after the network region division becomes possible, and
is simple to operate. Since parallel hydraulic computation and
network region division are key technologies for large-size water
supply network management in future, the method can be used as a
technology which efficiently combines the two technologies, and
has thus, wide application prospects.
[0020]. Groupings of alternative elements or embodiments of the
invention disclosed herein are not to be construed as limitations.
Each group member can be referred to and claimed individually or in
any combination with other members of the group or other elements
found herein. One or more members of a group can be included in,
or deleted from, a group for reasons of convenience and/or
patentability. When any such inclusion or deletion occurs, the
specification is herein deemed to contain the group as modified thus
fulfilling the written description of all Markus groups used in the
appended claims.
[0021]. As used in the description herein and throughout the claims that
follow, the meaning of "a," "an," and "the" includes plural reference
unless the context clearly dictates otherwise. Also, as used in the
description herein, the meaning of "in" includes "in" and "on" unless
the context clearly dictates otherwise.
[0022]. The recitation of ranges of values herein is merely intended to
serve as a shorthand method of referring individually to each separate
value falling within the range. Unless otherwise indicated herein, each
individual value is incorporated into the specification as if it were
individually recited herein. All methods described herein can be
performed in any suitable order unless otherwise indicated herein or
otherwise clearly contradicted by context.
[0023]. The use of any and all examples, or exemplary language (e.g.
"such as") provided with respect to certain embodiments herein is
intended merely to better illuminate the invention and does not pose a
limitation on the scope of the invention otherwise claimed. No
language in the specification should be construed as indicating any
non-claimed element essential to the practice of the invention.
[0024]. The above information disclosed in this Background section is
only for enhancement of understanding of the background of the
invention and therefore it may contain information that does not form
the prior art that is already known in this country to a person of
ordinary skill in the art.
SUMMARY
[0025]. The present invention mainly cures and solves the technical
problems existing in the prior art. In response to these problems, the
present invention provides an intelligent tracking & managing system
for water quality distribution and water consumption plan scheduling
using block chain.
[0026]. The present invention discloses a An intelligent tracking
& managing system for water quality distribution and water
consumption plan scheduling using block chain, wherein the system
comprises: A water distribution pipe network and the customer water
homework geographical location and distribution stop state map
layer and a superposed, water distribution stop for stopping the
distribution of the work support display Device and display Device
generating section for generating a work support, Displayed on the
monitor display Device and through the distribution stop work
support geographical location subject to water distribution pipe
network while, actually stopped the distribution stop geographical
location on the basis of the inputted work layer plotted in the
geographical location defined by the contour line,
[0027]. water distribution is stopped and the distribution stop
geographical location setting part for setting as the geographical
location, The water distribution is stopped is set on the basis of the
water distribution is stopped to stop the distribution of water to the
geographical location of the shut-off valve for stopping the
distribution of the block data including the position of a plug and a
plugging block data generating part, A water distribution pipe
network management system is provided, wherein Among a
plurality of dwelling cost of water to a dwelling prepaying starts the
distribution of water, a considerable amount of water used to cost
prepaying using a water cost for stopping the distribution of water to
the home system, The block chain central control unitat a place away
from the home is provided, Each of the respective dwellings water
meter for measuring the amount of water used and, for each of the
respective dwellings and stopping the distribution of water and for
switching the water valve, the water valve is controlled by the
central control processing unit and the processing unit for the control
valve and which can be provided in each housing, The block chain
central control unit, the cost is prepaying payment block data in
accordance with the block data written in the dwelling and storage,
The block data in the storage of the home payment block data is
written into a processing unit for controlling the valve, for opening
the water valve to the water distribution, a start command for a start
command and output function, The water meter and the block data
on the basis of the measurement result and, to use costs the
prepaying a considerable amount of water is used to discriminate
whether the depletion and completion discriminating function,
According to the result of the determination of the completion
discriminating function, exhaustion of the water is used for the
housing of a processing unit controlled valve, for closing the water
valve to the water stop signal is output to stop signal output function
is provided , the function of the stopping signal output, before the
water is used to fill the additional cost continues for a predetermined
time or more prepaying procedure is performed with respect to the
housing, the water is used for a predetermined period even if the
water valve is not closed until the lapse of the given function grace
period and is provided with a water cost management system.
OBJECTIVE OF THE INVENTION
[0028]. The principle objective of the present invention is to provide an
intelligent tracking & managing system for water quality distribution
and water consumption plan scheduling using block chain.
BRIEF DESCRIPTION OF DRAWINGS
[0029]. Further clarify various aspects of some example embodiments of
the present invention, a more particular description of the invention
will be rendered by reference to specific embodiments thereof which
are illustrated in the appended drawings. It is appreciated that these
drawings depict only illustrated embodiments of the invention and are
therefore not to be considered limiting of its scope. The invention will
be described and explained with additional specificity and detail
through the use of the accompanying drawings.
[0030]. In order that the advantages of the present invention will be
easily understood, a detailed description of the invention is discussed
below in conjunction with the appended drawings, which, however,
should not be considered to limit the scope of the invention to the
accompanying drawings, in which:
[0031]. Figure 1 shows an exemplary representation of an intelligent
tracking & managing system for water quality distribution and water
consumption plan scheduling using block chain, according to the
present invention.
DETAIL DESCRIPTION
[0032]. The present invention discloses an intelligent tracking
& managing system for water quality distribution and water consumption
plan scheduling using block chain.
[0033]. Figure 1 shows the exemplary representation of an intelligent
tracking & managing system for water quality distribution and water
consumption plan scheduling using block chain, according to the
present invention.
[0034]. Although the present disclosure has been described with the
purpose of to an intelligent tracking & managing system for water
quality distribution and water consumption plan scheduling using
block chain, it should be appreciated that the same has been done
merely to illustrate the invention in an exemplary manner and to
highlight any other purpose or function for which explained structures
or configurations could be used and is covered within the scope of the
present disclosure.
[0035]. An intelligent tracking & managing system for water quality
distribution and water consumption plan scheduling using block chain,
wherein the system comprises: A water distribution pipe network and
the customer water homework geographical location and distribution
stop state map layer and a superposed, water distribution stop for
stopping the distribution of the work support display Device and display
Device generating section for generating a work support, Displayed on
the monitor display Device and through the distribution stop work
support geographical location subject to water distribution pipe network
while, actually stopped the distribution stop geographical location on
the basis of the inputted work layer plotted in the geographical location
defined by the contour line.
[0036]. The water distribution is stopped and the distribution stop
geographical location setting part for setting as the geographical
location, the water distribution is stopped is set on the basis of the water
distribution is stopped to stop the distribution of water to the
geographical location of the shut-off valve for stopping the distribution
of the block data including the position of a plug and a plugging block
data generating part.
[0037]. A water distribution pipe network management system is
provided, wherein Among a plurality of dwelling cost of water to a
dwelling prepaying starts the distribution of water, a considerable
amount of water used to cost prepaying using a water cost for stopping
the distribution of water to the home system.
[0038]. The block chain central control unitat a place away from the
home is provided, each of the respective dwellings water meter for
measuring the amount of water used and, for each of the respective
dwellings and stopping the distribution of water and for switching the
water valve.
[0039]. Tithe water valve is controlled by the central control processing
unit and the processing unit for the control valve and which can be
provided in each housing, the block chain central control unit, the cost
is prepaying payment block data in accordance with the block data
written in the dwelling and storage.
[0040]. The block data in the storage of the home payment block data is
written into a processing unit for controlling the valve, for opening the
water valve to the water distribution, a start command for a start
command and output function.
[0041]. The water meter and the block data on the basis of the
measurement result and, to use costs the prepaying a considerable
amount of water is used to discriminate whether the depletion and
completion discriminating function, According to the result of the
determination of the completion discriminating function, exhaustion of
the water is used for the housing of a processing unit controlled valve,
for closing the water valve to the water stop signal is output to stop
signal output function is provided , the function of the stopping signal
output, before the water is used to fill the additional cost continues for a
predetermined time or more prepaying procedure is performed with
respect to the housing, the water is used for a predetermined period
even if the water valve is not closed until the lapse of the given function
grace period and is provided with a water cost management system.

Claims (1)

CLAIMS I/We claim:
1. An intelligent tracking & managing system for water
quality distribution and water consumption plan scheduling
using block chain, wherein the system comprises:
A water distribution pipe network and the customer water
homework geographical location and distribution stop state
map layer and a superposed, water distribution stop for
stopping the distribution of the work support display
Device and display Device generating section for
generating a work support, Displayed on the monitor
display Device and through the distribution stop work
support geographical location subject to water distribution
pipe network while, actually stopped the distribution stop
geographical location on the basis of the inputted work layer plotted in the geographical location defined by the contour line, water distribution is stopped and the distribution stop geographical location setting part for setting as the geographical location, The water distribution is stopped is set on the basis of the water distribution is stopped to stop the distribution of water to the geographical location of the shut-off valve for stopping the distribution of the block data including the position of a plug and a plugging block data generating part, A water distribution pipe network management system is provided, wherein Among a plurality of dwelling cost of water to a dwelling prepaying starts the distribution of water, a considerable amount of water used to cost prepaying using a water cost for stopping the distribution of water to the home system, The block chain central control unitat a place away from the home is provided, Each of the respective dwellings water meter for measuring the amount of water used and, for each of the respective dwellings and stopping the distribution of water and for switching the water valve, the water valve is controlled by the central control processing unit and the processing unit for the control valve and which can be provided in each housing,
The block chain central control unit, the cost is prepaying
payment block data in accordance with the block data
written in the dwelling and storage, The block data in the
storage of the home payment block data is written into a
processing unit for controlling the valve, for opening the
water valve to the water distribution, a start command for a
start command and output function, The water meter and
the block data on the basis of the measurement result and,
to use costs the prepaying a considerable amount of water
is used to discriminate whether the depletion and
completion discriminating function, According to the
result of the determination of the completion
discriminating function, exhaustion of the water is used for
the housing of a processing unit controlled valve, for closing the water valve to the water stop signal is output to stop signal output function is provided , the function of the stopping signal output, before the water is used to fill the additional cost continues for a predetermined time or more prepaying procedure is performed with respect to the housing, the water is used for a predetermined period even if the water valve is not closed until the lapse of the given function grace period and is provided with a water cost management system..
FIGURE 1 DRAWINGS
AU2021103216A 2021-06-08 2021-06-08 Intelligent tracking & managing system for water quality distribution and water consumption plan scheduling using block chain Ceased AU2021103216A4 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
AU2021103216A AU2021103216A4 (en) 2021-06-08 2021-06-08 Intelligent tracking & managing system for water quality distribution and water consumption plan scheduling using block chain

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
AU2021103216A AU2021103216A4 (en) 2021-06-08 2021-06-08 Intelligent tracking & managing system for water quality distribution and water consumption plan scheduling using block chain

Publications (1)

Publication Number Publication Date
AU2021103216A4 true AU2021103216A4 (en) 2022-03-24

Family

ID=80777774

Family Applications (1)

Application Number Title Priority Date Filing Date
AU2021103216A Ceased AU2021103216A4 (en) 2021-06-08 2021-06-08 Intelligent tracking & managing system for water quality distribution and water consumption plan scheduling using block chain

Country Status (1)

Country Link
AU (1) AU2021103216A4 (en)

Similar Documents

Publication Publication Date Title
CN103714426B (en) Medium and small radial-flow type GROUP OF HYDROPOWER STATIONS integrated dispatching system
CN107767012A (en) A kind of water supply network water leakage management system and its method for building up and system application
CN202548623U (en) Comprehensive online energy consumption management system
CN201266319Y (en) System for managing, scheduling and controlling building energy based on network
AU2021103216A4 (en) Intelligent tracking & managing system for water quality distribution and water consumption plan scheduling using block chain
CN204065814U (en) Agricultural foggara Ore-controlling Role
Ming The prediction and analysis of water resource carrying capacity in Chongqing Metropolitan, China
Huang et al. A decision support system based on GIS for flood prevention of Quanzhou City
CN115469688A (en) Intelligent water-saving control system
CN112632754A (en) Method for analyzing water volume change of urban water storage body based on SWMM model
Zhu et al. The status quo and development trend of smart water research
Cui et al. Pressurized Water Supply System of Energy Saving Optimization and Technical Innovation
Barate Study on benefits and economic feasibility of smart water distribution system
Wang et al. Fight for Our Reservoir
Basmenji et al. Analysis of the urban water requisition demand for the purpose of re-engineering and water network optimization (case study: Tabriz’Eram urban area)
Zhao Hydropower balance under resource allocation
Chen et al. Reclaimed Water Use and Energy Consumption: Case Study in Hotel Industry, Beijing
Wang et al. Review and prospect about water resources operation research
Bao et al. Water demand management: a strategic approach towards a sustainable urban water system in Hanoi
Yang et al. Study on water saving strategy of students' dormitory in Chifeng University
Ye et al. Research on the joint adjustment model of regional water resource network based on the network flow theory
Huang et al. Strategic Research on Urban Stormwater Resource Utilization in the Resource Water Shortage Cities-Base on Stormwater Data of 58 Resource Water Shortage Cities
Li et al. Discussion on the Water Supply Engineering Planning of Small Towns in Southern China
Chen et al. The current situation of water resources and future feasible plans in Taiwan
Li et al. Data Analysis of Water Supply Demand and Study on Scale of Water Transfer Project in Xiong'an New Area

Legal Events

Date Code Title Description
FGI Letters patent sealed or granted (innovation patent)
MK22 Patent ceased section 143a(d), or expired - non payment of renewal fee or expiry