AU2020202743B2 - Strip support method by using filler and residual coal pillar in irregular goaf - Google Patents
Strip support method by using filler and residual coal pillar in irregular goaf Download PDFInfo
- Publication number
- AU2020202743B2 AU2020202743B2 AU2020202743A AU2020202743A AU2020202743B2 AU 2020202743 B2 AU2020202743 B2 AU 2020202743B2 AU 2020202743 A AU2020202743 A AU 2020202743A AU 2020202743 A AU2020202743 A AU 2020202743A AU 2020202743 B2 AU2020202743 B2 AU 2020202743B2
- Authority
- AU
- Australia
- Prior art keywords
- grouting
- filling
- irregular
- strip
- goaf
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F15/00—Methods or devices for placing filling-up materials in underground workings
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910270745 | 2019-04-04 | ||
CN201910726866.3A CN110307034B (zh) | 2019-04-04 | 2019-08-07 | 采空区的条带式注浆充填方法 |
CN201910726866.3 | 2019-08-07 |
Publications (2)
Publication Number | Publication Date |
---|---|
AU2020202743A1 AU2020202743A1 (en) | 2021-02-25 |
AU2020202743B2 true AU2020202743B2 (en) | 2021-08-19 |
Family
ID=68082088
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
AU2020202743A Active AU2020202743B2 (en) | 2019-04-04 | 2020-04-24 | Strip support method by using filler and residual coal pillar in irregular goaf |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN110307034B (zh) |
AU (1) | AU2020202743B2 (zh) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110761832B (zh) * | 2019-11-29 | 2020-07-03 | 山东科技大学 | 一种采空区经纬状充填方法 |
CN112761718B (zh) * | 2021-01-11 | 2023-03-10 | 太原理工大学 | 一种膏体材料结构充填控制地表残余沉陷的方法 |
CN113704863B (zh) * | 2021-10-28 | 2022-02-18 | 中煤科工集团西安研究院有限公司 | 一种房柱式采空区控制充填关键参数设计方法 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102392644A (zh) * | 2010-11-30 | 2012-03-28 | 淄博市王庄煤矿 | 中厚以下煤层的条带式流体膨胀充填开采方法 |
CN109899109A (zh) * | 2019-04-04 | 2019-06-18 | 中国矿业大学(北京) | 非规则采空区的注浆充填方法 |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101797771A (zh) * | 2010-04-02 | 2010-08-11 | 中铁二局股份有限公司 | 高速公路下伏采空区注浆投沙时浆液的制备方法 |
CN105422170B (zh) * | 2015-11-02 | 2018-10-23 | 安徽理工大学 | 一种建筑基础下中深采空区注浆加固处理方法 |
CN106640190B (zh) * | 2016-12-22 | 2020-01-03 | 煤炭科学技术研究院有限公司 | 地表建设光伏电站的矿井采空区治理方法 |
CN207177964U (zh) * | 2017-09-21 | 2018-04-03 | 山东科技大学 | 一种废弃矿井采空区注浆充填结构 |
CN108240234B (zh) * | 2017-12-28 | 2019-06-28 | 辽宁工程技术大学 | 一种铁路沿线下伏煤矿采空区注浆处治方法 |
-
2019
- 2019-08-07 CN CN201910726866.3A patent/CN110307034B/zh active Active
-
2020
- 2020-04-24 AU AU2020202743A patent/AU2020202743B2/en active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102392644A (zh) * | 2010-11-30 | 2012-03-28 | 淄博市王庄煤矿 | 中厚以下煤层的条带式流体膨胀充填开采方法 |
CN109899109A (zh) * | 2019-04-04 | 2019-06-18 | 中国矿业大学(北京) | 非规则采空区的注浆充填方法 |
Also Published As
Publication number | Publication date |
---|---|
AU2020202743A1 (en) | 2021-02-25 |
CN110307034B (zh) | 2020-05-22 |
CN110307034A (zh) | 2019-10-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10989051B2 (en) | Multi-section non-pillar staggered protected roadway for deep inclined thick coal seam and method for coal pillar filling between sections | |
AU2020202743B2 (en) | Strip support method by using filler and residual coal pillar in irregular goaf | |
CN104763432B (zh) | 一种高应力巷道围岩卸压控制大变形的方法 | |
CN104612695B (zh) | 一种剧烈垮塌立井井壁修复加固方法 | |
WO2011103620A1 (en) | A method of reducing subsidence or windblast impacts from longwall mining | |
CN103195443B (zh) | 深部开采优化支护参数预防巷道滞后突水的方法 | |
CN113914862B (zh) | 切顶卸压无煤柱自成巷开采设计与评价方法 | |
CN113175325B (zh) | 基于关键层保护的煤与共生砂岩型铀矿协调开采方法 | |
CN109899109B (zh) | 非规则采空区的注浆充填方法 | |
CN108087021A (zh) | 一种充填采煤回收遗留煤柱并控制隔水关键层稳定的方法 | |
CN110173301B (zh) | 基于集束式多分支井定向钻探的综采采空区注浆方法 | |
CN104358572A (zh) | 大倾角急倾斜煤层自然垮落充填护巷无煤柱开采技术 | |
CN115182729B (zh) | 倾斜煤层穿小煤柱深切浅注阻矸护巷技术及切顶位置确定方法 | |
CN109854297A (zh) | 一种基于定向钻探工艺的小煤窑采空区注浆方法 | |
Li et al. | Trial of small gateroad pillar in top coal caving longwall mining of large mining height | |
Tian et al. | Stability control of a roadway surrounding rock during the cutting and pressure relief of a coal-bearing roof at a shallow mining depth | |
CN111022050B (zh) | 一种注浆改造复合顶板的全闭合爆破卸压及自留巷方法 | |
CN104265294A (zh) | 大倾角煤层炮采面无煤柱开采技术 | |
Singh et al. | Optimal underground extraction of coal at shallow cover beneath surface/subsurface objects: Indian practices | |
CN116220554A (zh) | 一种用于急倾斜多煤层采空区充填的组合钻探方法 | |
CN110359910A (zh) | 煤矿铁路下厚煤层条带综放高位充填开采方法 | |
CN112302718B (zh) | 煤层顶板含水层水资源保护方法 | |
Yin et al. | Gob-side entry retaining formed by roof cutting without roadside support | |
Wang et al. | Numerical investigation into evolution of crack and stress in residual coal pillars under the influence of longwall mining of the adjacent underlying coal seam | |
Jiang et al. | Surrounding Rock Control Technology When the Longwall Face Crosses Abandoned Roadways: A Case Study |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
FGA | Letters patent sealed or granted (standard patent) |