AU2019336054A1 - A energy absorption arrangement for reducing peak mooring loads - Google Patents

A energy absorption arrangement for reducing peak mooring loads Download PDF

Info

Publication number
AU2019336054A1
AU2019336054A1 AU2019336054A AU2019336054A AU2019336054A1 AU 2019336054 A1 AU2019336054 A1 AU 2019336054A1 AU 2019336054 A AU2019336054 A AU 2019336054A AU 2019336054 A AU2019336054 A AU 2019336054A AU 2019336054 A1 AU2019336054 A1 AU 2019336054A1
Authority
AU
Australia
Prior art keywords
mooring
energy absorption
load
arrangement
arrangement according
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
AU2019336054A
Inventor
Geir Olav Hovde
Anders LIE EIDE
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
APL Norway AS
Original Assignee
APL Norway AS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by APL Norway AS filed Critical APL Norway AS
Publication of AU2019336054A1 publication Critical patent/AU2019336054A1/en
Assigned to APL NORWAY AS reassignment APL NORWAY AS Request for Assignment Assignors: APL TECHNOLOGY AS
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B21/00Tying-up; Shifting, towing, or pushing equipment; Anchoring
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B21/00Tying-up; Shifting, towing, or pushing equipment; Anchoring
    • B63B21/50Anchoring arrangements or methods for special vessels, e.g. for floating drilling platforms or dredgers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B21/00Tying-up; Shifting, towing, or pushing equipment; Anchoring
    • B63B21/18Stoppers for anchor chains
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B22/00Buoys
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B22/00Buoys
    • B63B22/02Buoys specially adapted for mooring a vessel
    • B63B22/021Buoys specially adapted for mooring a vessel and for transferring fluids, e.g. liquids
    • B63B22/025Buoys specially adapted for mooring a vessel and for transferring fluids, e.g. liquids and comprising a restoring force in the mooring connection provided by means of weight, float or spring devices
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B27/00Arrangement of ship-based loading or unloading equipment for cargo or passengers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B21/00Tying-up; Shifting, towing, or pushing equipment; Anchoring
    • B63B2021/001Mooring bars, yokes, or the like, e.g. comprising articulations on both ends
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B21/00Tying-up; Shifting, towing, or pushing equipment; Anchoring
    • B63B2021/003Mooring or anchoring equipment, not otherwise provided for
    • B63B2021/005Resilient passive elements to be placed in line with mooring or towing chains, or line connections, e.g. dampers or springs
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B21/00Tying-up; Shifting, towing, or pushing equipment; Anchoring
    • B63B21/50Anchoring arrangements or methods for special vessels, e.g. for floating drilling platforms or dredgers
    • B63B2021/501Anchoring arrangements or methods for special vessels, e.g. for floating drilling platforms or dredgers by means of articulated towers, i.e. slender substantially vertically arranged structures articulated near the sea bed

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Other Liquid Machine Or Engine Such As Wave Power Use (AREA)
  • Vibration Prevention Devices (AREA)
  • Vibration Dampers (AREA)

Abstract

The invention relates to an energy absorption arrangement for reducing peak mooring loads between a mooring structure with a turret rotatable around a vertical axis, and a floating structure. The energy absorption arrangement comprises a rigid yoke horizontally rotatable in two axes and connected to the turret, a weighted pendulum member arranged on the end of the yoke and at least one mooring tether connected to the weighted pendulum member, and at least one energy absorption device for reducing peak mooring loads, comprising a fixed part connected to the floating structure, a movable rod and an absorption medium.

Description

Title: A energy absorption arrangement for reducing peak mooring loads
Technical field
[0001] The present invention relates to an arrangement for mooring a floating vessel, in which the arrangement comprises a rigid yoke, which at one end is connected via a three-degree of freedom rotational joint to a structure attached to the sea floor, and at the other end to the floating vessel via at least one mooring tethers, and where a mooring load reducing device is attached to the connection points on the floating vessel.
Background
[0002] For mooring, loading and unloading a floating vessel in shallow waters, such as a Floating Production, Offloading and Storage (FPSO) vessel, Floating Storage and Offloading (FSO) vessel, Floating Storage and Regasification Unit (FSRU), Floating Liquified Natural Gas (FLNG) vessel, etc., one possible mooring and fluid transfer arrangement is to use a submerged turret yoke system. This system or arrangement comprises a structure attached to the sea floor. A rigid yoke is further attached to this structure by a turret that makes it possible for the yoke to rotate around the vertical axis of the said structure. The yoke is further fitted with rotational means, located close to the turret, allowing the yoke to also rotate around the two other rotational axes. At the other end the yoke is attached to mooring tethers, which are further connected to the floating vessel. The tethers have limited or full freedom to rotate around its own axis. The position restoring forces of the vessel from the yoke system is then obtained by adding permanent ballast to the yoke at a distance from the turret table that typically coincides with the connection points for the tethers. The total weight of the yoke, including the required amount of ballast, can be significant, and especially if the arrangement shall moor the vessel in extreme weather conditions.
[0003] The fluid transfer from the structure on the sea floor and the floating vessel is typically via a fluid swivel on the said structure, hard pipes, flexible lines and required valve arrangement. The fluid swivel can be located either subsea or above sea level. The rotational axis of the fluid swivel is the same as for the turret.
[0004] Designing a mooring arrangement in shallow water can in areas with very extreme weather conditions prove difficult, and especially due to the extreme non- linear characteristics of the restoring force the extreme loads in the system may be very sensitive to the actual wave train, even though the wave spectrum is the same. An arrangement that can reduce the wide scatter in the potential extreme loads may thus be required.
[0005] Related prior art is disclosed in US6439147B2, WO2007/096019A1 and US2014/0014017A1. These prior arts focus on increasing the general damping of the vessel or yoke motion and thereby reducing the extreme loads, while the present invention focus on reducing the extreme peak loads in the arrangement only.
[0006] In order to reduce the peak loads in a mooring arrangement a damping arrangement according to claim 1 is provided.
Short summary of the invention
[0007] The invention relates to an energy absorption arrangement for reducing peak mooring loads between a mooring structure with a turret rotatable around a vertical axis and a floating structure. The energy absorption arrangement comprises a rigid yoke horizontally rotatable in two axes and connected to the turret, a weighted pendulum member arranged on the end of the yoke and at least one mooring tether connected to the weighted pendulum member, and at least one energy absorption device for reducing peak mooring loads, comprising a fixed part connected to the floating structure, a movable rod and an absorption medium. Mooring loads up to a first predetermined load is absorbed by the weighted pendulum, and mooring loads higher than the first predetermined load is absorbed by the at least one energy absorption device, wherein the rod, whose outer end is connected to the at least one tether has an initial first length when exposed to a mooring load up to the first load and is extended a second length when exposed to a second load greater than the first load and the second length is longer than the first length. The energy absorption device exerts a restoring force opposite of the first and second load, causing the rod to retract from its second length to its first length when the mooring loads decreases from the second load to the first load.
Brief description of the figures
[0008] Below, various embodiments of the invention will be described with reference to the figures, in which like numerals in different figures describes the same features.
[0009] Fig. 1 shows a side view of typical general arrangement of a vessel connected to a submerged yoke system with fluid swivel above sea level.
[0010] Fig. 2 shows a side view of a typical general arrangement of a vessel connected to a submerged yoke system with fluid swivel below sea level, i.e. subsea fluid swivel. [0011] Fig. 3 shows a typical general arrangement of the mooring yoke.
[0012] Fig. 4 shows the restoring force as function of vessel displacement for a yoke system, both without and with a peak energy absorber.
[0013] Fig. 5 shows the restoring force as function of energy stored in the restoring system, both without and with a peak energy absorber.
[0014] Fig. 6 shows a typical mooring cradle for the tether hang-off on the vessel.
[0015] Fig. 7 shows the mooring cradle and energy absorber in nominal position.
[0016] Fig. 8 shows the mooring cradle and energy absorber at maximum
displacement position.
[0017] Fig. 9 shows a principal arrangement of the energy absorber based on compressible fluid only.
[0018] Fig. 10 shows a principal arrangement of the energy absorber based on a combination of incompressible and compressible fluid.
[0019] Fig. 11 shows a typical restoring force as function of rod displacement for the energy absorber.
[0020] Fig. 12 shows the mooring cradle and energy absorber in nominal position for inclined sliding path.
[0021] Fig. 13 shows an arrangement with fixed cradle position and energy absorber device as part of mooring tether.
Detailed description of preferred embodiments
[0022] This invention describes a system and a method for reducing the peak loads in a mooring yoke arrangement for a floating structure 3, such as a vessel, tanker, barge or boat, in which the mooring yoke arrangement is connected to the vessel via typically mooring tethers 8 and at least one fluid line 10. The system comprises several devices on the vessel such as mooring arms 9, mooring cradles 15, energy absorbing devices 22, sliding paths 30, and stopper arrangements 28, 29. The parts of the mooring yoke arrangement not located on the vessel comprise devices such as such as mooring tethers 8, which mates with the mooring cradles 15 on the vessel, a mooring yoke 6 with a weighted pendulum part 7 and x-axis rotational means 17 and y-axis rotational means 18, a turntable, such as a mooring turret, and structure 4 attached to the sea floor 1 by foundation means 5.
[0023] The major difference from a typical yoke system is the introduction of the energy absorbing device 22, which affects the mooring restoring characteristics such that the maximum loads in the system reduces for the same amount of stored energy in the restoring system. This stored energy is the systems capability to absorb the kinetic energy from the motion of the floating structure. [0024] In one embodiment the energy absorbing device 22 is part of the equipment on the vessel, as described above. In another alternative embodiment the energy absorbing device 22 is part of the mooring tether 8 or part of the x-axis rotational means 17 for rotation about the x-axis.
[0025] To ease the explanation, we use an orthogonal axes system wherein the z-axis coincides with the centerline of the tower 11, turret 14 and fluid swivel 12. The x-axis is in the length direction of the yoke 6, while the y-axis is in the beam direction of the yoke. The length axis of the yoke 6 is in the same vertical plane as the plane
containing the vector defined by a line between the vessel 6 and the tower 11.
[0026] Fig. 1 gives an overall view of a submerged yoke arrangement with the fluid swivel above sea surface 2. The system comprises a subsea structure 4, which is attached to the sea floor 1 by foundation means 5, which can be driven piles, drilled and grouted piles, suction piles, weight element(s), etc. A tower structure 11 is attached on top of structure 4. This tower structure comprises an inner and outer part, where the inner part (geo-stationary part) is fixed to the structure 4, while the outer part is connected to the yoke 6 and can rotate around the inner part by the turret 14. At the top of the tower the fluid swivel and associated piping and valves are mounted, which is herein defined as the topside 12. The topside 12 is also divided into a geostationary part and a rotating part. The rotation of the rotating part is driven by the weather- vaning of the vessel 3 via the yoke 6 and the outer part of the tower 11. Fluid, power and utility lines 10 are at one end connected to the rotating part of the topside 12 and to the vessel 3 at the other end. The yoke 6 has a weighted pendulum member 7 which provides the mooring restoring characteristics of the yoke system. The yoke 6 is further connected to the vessel via mooring tethers 8, which at the lower end is connected to the yoke close to the weighted member 7, and at the upper end is connected to a mooring cradle 15 mounted on a mooring arm 9 on the vessel 3.
Further, an access bridge 13 between the vessel 3 and the topside 12 secures that personnel can access the topside from the vessel. This bridge can be disconnected at the topside and swung around a pedestal at the vessel into parked position on the vessel, when not in use or when the weather conditions gets rougher than the
operational limits of the bridge. The bridge may be of a telescopic type to obtain a wide envelope of relative motions between vessel and topside.
[0027] Fig. 2 gives an overall view of a submerged yoke arrangement with the fluid swivel below sea surface 2. The arrangement is very similar to the arrangement shown in Fig. 1. The main difference is that the tower structure 11 and the access bridge 13 are not present, and the fluid swivel and associated piping and valves 12 are located subsea directly on top of the structure 4. This arrangement is typically applied when the number of fluid lines 10 are few.
[0028] Fig. 3 shows a typical mooring yoke 6. The yoke is at one end connected to the mooring tethers 8 via attachment means 16. The weighted member 7 is typically a large tank, which can be filled with ballast to obtain the weight required for the targeted mooring restoring characteristics. The attachment means 16 and the weighted member 7 is typically, but not necessarily, located at the same length position (x) of the yoke. The inner end provides a two degrees-of-freedom joint connection towards the turret 14. Rotation is obtained by x-axis rotational means 17 and y-axis rotational mean 18. The y-axis rotational means 18 attaches the yoke 6 to the turret 14.
[0029] Fig. 4 shows a typical restoring force for a yoke system without a peak energy absorber and with a peak energy absorber. For a system without a peak energy absorber the restoring characteristic is defined entirely by the dimensions and the weight of the yoke system together with the stiffness characteristics of the structural components. The figure shows the exponentially increasing restoring force for increasing displacement (offset) of the floating vessel. This restoring behavior implies that for just a small change in the wave train or a small change in the weather condition the loads in the system may change significantly. To reduce the sensitivity in loads due to such changes a peak energy absorber is introduced. This device affects the system restoring for loads above a defined extreme level Fl (also referred to as the pre-tension for the device) in such a way that a larger vessel displacement can be accepted by the system. This defined extreme level is typically, but not necessarily, defined as a load close to the most likely extreme loads, i.e. the energy absorbing device only affects the restoring characteristic for incidents with a probability of occurrence less than the most likely extreme incident.
[0030] In the most extreme events, mooring loads could reach dangerously high levels and the floating structure will need to disconnect from the mooring arrangement. The energy absorption device will therefor decrease the probability of needing to
disconnect.
[0031] Fig. 5 shows the maximum restoring force as function of the stored energy without and with a peak energy absorber. For loads below the predetermined level Fl it is seen that the stored energy (energy available for absorbing the kinetic energy in the yoke- vessel system) is the same for a system without and with a peak energy absorbing device, while for loads above this level the system with a peak absorbing device has higher stored energy than a system without the said device for the same restoring force. [0032] Fig. 6 shows a typical arrangement for the mooring cradle 15. In this embodiment the main pin 21 of the mooring tether 8 is placed into the grooves l9a,b of the mooring cradle. The grooves are typically open in the top and closed at the bottom for easy installation and connection. This means that the pin will be placed in the grooves from the top and prevented from falling out. A securing device can be added to prevent the tether to work itself out through the open part, but due to the weight of the yoke and by a proper design of the grooves this is considered as an unlikely event. [0033] In one embodiment the mooring cradle l5is connected to a rod 23 of the energy absorption device 22 as shown in Fig. 7. The main body of the energy absorption device 22 is then fixed to the mooring arms 9 of the vessel 3. The mooring cradle 15 can further slide on a sliding path 30, which is integrated in the mooring arm 9. The sliding path or mooring arm is fitted with an inner stopper 28 and an outer stopper 29, which defines the allowable operating sliding range of the mooring cradle. These stoppers can alternatively be integrated directly in the energy absorption device, but then the energy absorption device needs to be designed for the potential loads in the system after the rod has reached its maximum displacement, which may not be the preferred load path for these potential high loads. The sliding path and/or cradle will be fitted with device(s) that clearly defines the motion path of the cradle, e.g. device(s) that prevents the cradle from moving sideways. Further, the sliding path and/or cradle will typically be fitted with sliding bearing arrangements that provides low and predictable friction loads as well as predictable wear. [0034] Fig. 8 shows the same as Fig. 12, but with the rod at its maximum
displacement position.
[0035] Fig. 9 shows one possible arrangement of the energy absorption device 22. In this embodiment the said device comprises a main body 26, which is fixed to the floating vessel 3, and a rod 23 with end plate 31 where the rod extends outside the main body and connects to the mooring cradle 15 at the end 27. The rod 23 can move inside the main body and thus provide a variable length of the energy absorption device 22.
A high-pressure vessel/chamber 24 will be at one side of the end plate 31 and a low- pressure chamber 25 will be at the other side. The two pressure chambers are separated by a seal arrangement 32. The high-pressure vessel/chamber can in another
embodiment be connected to external pressure chambers via piping to reduce the size of the main body 26. The low-pressure chamber can either be closed or open to the atmosphere. The nominal pressure pl in the high-pressure chamber, which is the pressure associated with nominal position XI of the rod, defines the minimum load Fl required to provide a displacement of the rod. For a passive arrangement the high- pressure vessel/chamber and the fluid inside must be such that the pressure increases for decreasing volume. This is typically obtained by using an absorption medium such as a compressible fluid 34, such as nitrogen gas, which would be known by a person skilled in the art.
[0036] An active arrangement for adjusting the pressure of the absorption medium and thus the spring characteristics is also possible, but for such an arrangement an incompressible fluid, such as oil, will typically be used together with an actively controlled Hydraulic Power Unit (HPU) or pump.
[0037] Fig. 9a shows the device 22 with the rod 23 at its nominal position, while Fig. 9b shows the energy absorption device 22 with the rod 23 at a displacement and thus with a pressure p>pl in the high-pressure chamber. F2 is the load required to pull the rod to its extreme displacement position X2. At this position the pressure will be p2 in the high-pressure chamber.
[0038] Fig. 10 shows another possible arrangement of the energy absorption device 22. In this arrangement a combination of compressible and incompressible fluid is utilized as an absorption medium, where the compressible fluid typically will be nitrogen gas and the incompressible fluid will typically be oil. The compressible fluid 34 and the incompressible fluid 33 is then separated by a membrane or another type of seal arrangement 35 in external tanks. The pressure on each side of the separation device 35 will be the same.
[0039] In addition to the spring effect (force dependent on displacement) the piping arrangement between the main body 26 and the external pressure chambers can be designed such that the compressible fluid also provides a flow velocity dependent force.
[0040] Fig. 11 shows a typical restoring force of the energy absorbing device 22, where the working range is between position XI and X2, where XI refers to a load Fl in the rod 23 and X2 refers to a load F2 >Fl in the rod, and respectively to a pressure pl and p2 in the high-pressure chamber 24. In between the extremities defined by the points (XI, Fl) and (X2, F2) the restoring force versus displacement will depend on the characteristics of the damping system, which may be linear or non-linear. [0041] In another embodiment the restoring characteristic of the energy absorbing device 22 can be obtained by using a mechanical spring or a combination of spring and fluids as an absorption medium. [0042] It may be beneficial with an inclined sliding path 30 to compensate for vessel trim and pitch motion and tether load direction, and thus obtain a sliding direction closer to the mooring tether direction. The principals of such an arrangement is shown in Fig. 12. [0043] In another embodiment the peak energy absorber can be located elsewhere in the yoke system. Fig. 13 shows the peak energy absorber 22 as part of the mooring tether 8. Another alternative is to integrate the peak energy absorber in the node 17 of the yoke 6. [0044] Although specific embodiments of the invention have been described and illustrated herein, it is recognized that modifications and variations may readily occur to those skilled in the art, and consequently, it is intended that the claims be interpreted to cover such modifications and equivalents. Reference numerals
[0045]
1 Sea floor
2 Sea surface
3 Floating structure, vessel or ship
4 Structure attached to sea floor
5 Foundation means for attaching structure on sea floor to sea floor, such as pile
6 Mooring yoke
7 Weighted pendulum member of mooring yoke
8 Mooring tether
9 Mooring hang-off arm on vessel
10 Flexible fluid line
11 Tower structure
12 Topside including fluid swivel
13 Access bridge
l3a Access bridge when connected to topside
l3b Access bridge when parked on vessel
14 Mooring turret for rotation about z-axis
15 Mooring cradle on vessel
16 Attachment means between tethers and mooring yoke Rotational means for rotation about x-axis
Rotational means for rotation about y-axis
Groove in mooring cradle for main connecting pin of mooring tether.
Neutral position for mooring cradle
Main connecting pin of mooring tether
Energy absorbing device / energy absorber
Rod in energy absorbing device
a Rod in energy absorbing device at nominal displacement
b Rod in energy absorbing device at maximum displacement
High-pressure chamber
Low-pressure chamber
Main body of energy absorbing device
Connection point between rod and mooring cradle
Inner stopper device for mooring cradle
Outer stopper device for mooring cradle
Sliding path for mooring cradle
End plate of rod
Pressure seal
Incompressible fluid, such as oil
Compressible fluid, such as gas
Barrier between incompressible fluid and compressible fluid

Claims (10)

Claims
1. An energy absorption arrangement for reducing peak mooring loads between a mooring structure with a turret (14) rotatable around a vertical axis (Z), and a floating structure (3), wherein the energy absorption arrangement comprises;
- a rigid yoke (6) horizontally rotatable in two axes (X, Y) and connected to the turret (14)
- a weighted pendulum member (7) arranged on the end of the yoke (6) and
- at least one mooring tether (8) connected to the weighted pendulum member (7), and
- at least one energy absorption device (22) for reducing peak mooring loads, comprising a fixed part (26) connected to the floating structure (3), a movable rod (23) and an absorption medium
characterized in that mooring loads up to a first predetermined load (Fl) is absorbed by the weighted pendulum (7), and mooring loads higher than the first predetermined load (Fl) is absorbed by the at least one energy absorption device (22),
wherein the rod (23) whose outer end is connected to the at least one tether has an initial first length (XI) when exposed to a mooring load up to the first load (Fl), and is extended a second length (X2) when exposed to a second load (F2) greater than the first load (Fl) and the second length (X2) is longer than the first length (XI), and
the energy absorption device (22) exerts a restoring force opposite of the first (Fl) and second load (F2), causing the rod (23) to retract from its second length (X2) to its first length (XI) when the mooring loads decreases from the second load (F2) to the first load (Fl).
2. An arrangement according to claim 1, wherein the outer end of the rod (23) is fastened to a cradle (15) and wherein the cradle (15) is movable along a sliding path (30) when the energy absorption device (22) extends or retracts.
3. An arrangement according to claim 2, wherein the sliding path (30) has a horizontal inclination angle.
4. An arrangement according to claim 2, wherein the sliding path (30) has an inclination angle different from horizontal.
5. An arrangement according to claim 2, wherein the sliding path comprising an inner stopper (28) and an outer stopper (29), wherein the distance between the inner and outer stopper (28, 29) defines the sliding range of the mooring cradle (15).
6. An arrangement according to claim 1, wherein the energy absorption device (22) comprises an inner stopper (28) and an outer stopper (29), wherein the distance between the inner and outer stopper (28, 29) defines the distance between the first length (XI) and the second length (X2) of the rod (23).
7. An arrangement according to any of the preceding claims, wherein the
energy absorption device (22) comprises a high-pressure chamber (24) and a low-pressure chamber (25).
8. An arrangement according to any one of the preceding claims, wherein the absorption medium is either a compressible fluid., an incompressible fluid, a mechanical spring or a combination of those.
9. An arrangement according to any one of the preceding claims, wherein the energy absorption device (22) comprises a pump arrangement for control of the predetermined first load (Fl) and predetermined second load (F2).
10. An arrangement according to any one of the preceding claims, wherein the energy absorption device (22) and the cradle (15) are situated on a mooring arm (9) protruding from the bow or stem of the floating structure (3).
AU2019336054A 2018-09-05 2019-09-04 A energy absorption arrangement for reducing peak mooring loads Pending AU2019336054A1 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
NO20181157A NO346077B1 (en) 2018-09-05 2018-09-05 An energy absorption arrangement for reducing peak mooring loads
NO20181157 2018-09-05
PCT/NO2019/000024 WO2020050724A1 (en) 2018-09-05 2019-09-04 A energy absorption arrangement for reducing peak mooring loads

Publications (1)

Publication Number Publication Date
AU2019336054A1 true AU2019336054A1 (en) 2021-03-18

Family

ID=69722616

Family Applications (1)

Application Number Title Priority Date Filing Date
AU2019336054A Pending AU2019336054A1 (en) 2018-09-05 2019-09-04 A energy absorption arrangement for reducing peak mooring loads

Country Status (5)

Country Link
US (1) US11679843B2 (en)
AU (1) AU2019336054A1 (en)
MX (1) MX2021002604A (en)
NO (1) NO346077B1 (en)
WO (1) WO2020050724A1 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11738828B2 (en) 2021-10-08 2023-08-29 Sofec, Inc. Disconnectable yoke mooring systems and processes for using same
FR3140064A1 (en) * 2022-09-22 2024-03-29 Eti Group Fluid exploitation installation, particularly on an offshore platform, with submerged rotating joint device

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA1087035A (en) * 1975-11-28 1980-10-07 Exxon Research And Engineering Company Riser and yoke mooring system
US4493282A (en) * 1983-03-18 1985-01-15 Exxon Production Research Co. Combination mooring system
WO2001051345A1 (en) * 2000-01-07 2001-07-19 Fmc Corporation Mooring systems with active force reacting systems and passive damping
NO316266B1 (en) * 2002-01-17 2004-01-05 Advanced Prod & Loading As Mooring device
DK1826116T3 (en) 2006-02-23 2008-09-08 Bluewater Energy Services Bv Anchoring system for a floating structure
EP2070812A1 (en) 2007-12-10 2009-06-17 Bluewater Energy Services B.V. Mooring assembly
US9038558B2 (en) 2011-03-11 2015-05-26 Single Buoy Moorings Inc. Yoke damping system

Also Published As

Publication number Publication date
NO346077B1 (en) 2022-02-07
WO2020050724A1 (en) 2020-03-12
NO20181157A1 (en) 2020-03-06
MX2021002604A (en) 2021-05-12
US20210354789A1 (en) 2021-11-18
US11679843B2 (en) 2023-06-20

Similar Documents

Publication Publication Date Title
US4494475A (en) System for mooring a floating structure
US8499709B2 (en) Mooring system for a vessel
CA1087035A (en) Riser and yoke mooring system
KR102256567B1 (en) A transfer structure, a transfer system and a method for transferring lng and/or electric power
US11679843B2 (en) Energy absorption arrangement for reducing peak mooring loads
US5951061A (en) Elastomeric subsea flex joint and swivel for offshore risers
CA1256327A (en) Motion compensators and mooring devices
US11279452B2 (en) Motion absorbing system and method for a structure
US7610934B2 (en) Hydrocarbon transfer system with a damped transfer arm
EP1725447B1 (en) Floating structure
KR101205357B1 (en) Horizontal leveling apparatus for structure on floating sea facility and a floating sea plant using the same
CN111989262B (en) Mooring device and floating unit comprising at least one mooring device
CN109562811B (en) Mooring frame for mooring a floating unit and floating unit comprising a mooring frame
KR101511360B1 (en) Processing apparatus for single point mooring
WO2019158710A1 (en) A mooring device and a floating unit comprising at least one mooring device
WO2000063598A1 (en) Scr top connector
WO2009093920A1 (en) Apparatus for extracting energy from the movement of structures
WO2023244121A1 (en) A heave compensated marine vessel, a method of operating the vessel, and a semi-submersible platform

Legal Events

Date Code Title Description
PC1 Assignment before grant (sect. 113)

Owner name: APL NORWAY AS

Free format text: FORMER APPLICANT(S): APL TECHNOLOGY AS