AU2017904953A0 - The innovative step in a methodology is that the two different types of walling system are transported into place by being attached to the table-forms and the inventive step in a methodology is a system that enables the table-forms to be removed easily when the required concrete strength in the slab has been reached and in a manner that allows at least a 50mm clearance to each of the external surfaces of the side-walls as well as a 50mm clearance not only to the soffit of the slab above but also to the level of the surface upon which the table-forms had been positioned. - Google Patents

The innovative step in a methodology is that the two different types of walling system are transported into place by being attached to the table-forms and the inventive step in a methodology is a system that enables the table-forms to be removed easily when the required concrete strength in the slab has been reached and in a manner that allows at least a 50mm clearance to each of the external surfaces of the side-walls as well as a 50mm clearance not only to the soffit of the slab above but also to the level of the surface upon which the table-forms had been positioned.

Info

Publication number
AU2017904953A0
AU2017904953A0 AU2017904953A AU2017904953A AU2017904953A0 AU 2017904953 A0 AU2017904953 A0 AU 2017904953A0 AU 2017904953 A AU2017904953 A AU 2017904953A AU 2017904953 A AU2017904953 A AU 2017904953A AU 2017904953 A0 AU2017904953 A0 AU 2017904953A0
Authority
AU
Australia
Prior art keywords
forms
methodology
clearance
slab
soffit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
AU2017904953A
Inventor
David Anthony Wheeler
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Project Initiation and Facilitation Pty Ltd
Original Assignee
Project Initiation and Facilitation Pty Ltd
Filing date
Publication date
Application filed by Project Initiation and Facilitation Pty Ltd filed Critical Project Initiation and Facilitation Pty Ltd
Publication of AU2017904953A0 publication Critical patent/AU2017904953A0/en
Abandoned legal-status Critical Current

Links

AU2017904953A 2017-12-09 The innovative step in a methodology is that the two different types of walling system are transported into place by being attached to the table-forms and the inventive step in a methodology is a system that enables the table-forms to be removed easily when the required concrete strength in the slab has been reached and in a manner that allows at least a 50mm clearance to each of the external surfaces of the side-walls as well as a 50mm clearance not only to the soffit of the slab above but also to the level of the surface upon which the table-forms had been positioned. Abandoned AU2017904953A0 (en)

Publications (1)

Publication Number Publication Date
AU2017904953A0 true AU2017904953A0 (en) 2017-12-21

Family

ID=

Similar Documents

Publication Publication Date Title
HUE057786T2 (en) Fiber cement decking products and methods for the production thereof
EP3205790A4 (en) Assembled early-removal building formwork system and erecting method thereof
EP3306000A4 (en) Prefabricated light steel concrete plate column structure and construction method therefor
PL3526415T3 (en) Wall construction system for building houses, having dry construction composite columns of structural steel and concrete
MX2017009030A (en) Interlocking structural block reinforcement means and modular building system.
EP3259238A4 (en) Compositions and methods for the introduction of elastomeric reinforcement fibers in asphalt cement concrete
GB202202707D0 (en) Building construction management system and process
IL286187A (en) Systems and methods for the construction of structures
IL291208A (en) Concrete element and method for its production
KR102236428B9 (en) Fiber reinforcement of the concrete structures
AU2017904953A0 (en) The innovative step in a methodology is that the two different types of walling system are transported into place by being attached to the table-forms and the inventive step in a methodology is a system that enables the table-forms to be removed easily when the required concrete strength in the slab has been reached and in a manner that allows at least a 50mm clearance to each of the external surfaces of the side-walls as well as a 50mm clearance not only to the soffit of the slab above but also to the level of the surface upon which the table-forms had been positioned.
EP3279127A4 (en) Lifting and carrying system for maintaining building facades
AU2016241146A1 (en) Lifting and carrying system for maintaining building facades
GB2569186B (en) Method for the reinforcement of masonry structures
GB2574406B (en) Improvements in or relating to building structures
EP3332962A4 (en) Composite building element and method for the production thereof
GB2575676B (en) Automating the interconnection of concrete building elements
EP3775420A4 (en) Precast structural element and method for connecting the precast structural element to each other
GB2577153B (en) Improvements in or relating to building structures
PT3573939T (en) Fiber cement decking products and methods for the production thereof
AU2018901230A0 (en) A building component for use in the construction of concrete poured buildings
AU2017904766A0 (en) Concrete Reinforcing Member and Method
AU2018904891A0 (en) Building Formwork Component
IL267178A (en) Building and building method
AU2018901613A0 (en) Building construction method