AU2017903344A0 - A methodology during the process of constructing a reinforced concrete building, which allows prefabricated volumetric bathroom modules to be installed on the level of the latest slab pour on the same working day upon which the pouring of columns and erection of slab falsework is commenced for construction of the concrete structure above that particular slab pour.
- Google Patents
A methodology during the process of constructing a reinforced concrete building, which allows prefabricated volumetric bathroom modules to be installed on the level of the latest slab pour on the same working day upon which the pouring of columns and erection of slab falsework is commenced for construction of the concrete structure above that particular slab pour.
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
AU2017903344A
Inventor
David Anthony Wheeler
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Project Initiation and Facilitation Pty Ltd
Original Assignee
Project Initiation and Facilitation Pty Ltd
Filing date
Publication date
Application filed by Project Initiation and Facilitation Pty LtdfiledCriticalProject Initiation and Facilitation Pty Ltd
Publication of AU2017903344A0publicationCriticalpatent/AU2017903344A0/en
AU2017903344A2017-08-18A methodology during the process of constructing a reinforced concrete building, which allows prefabricated volumetric bathroom modules to be installed on the level of the latest slab pour on the same working day upon which the pouring of columns and erection of slab falsework is commenced for construction of the concrete structure above that particular slab pour.
AbandonedAU2017903344A0
(en)
A methodology during the process of constructing a reinforced concrete building, which allows prefabricated volumetric bathroom modules to be installed on the level of the latest slab pour on the same working day upon which the pouring of columns and erection of slab falsework is commenced for construction of the concrete structure above that particular slab pour.
Prefabricated formwork element, formwork obtained and method for manufacturing a slab of a construction with a pass through opening delimited by said formwork
An innovative methodology undertaken during the process of constructing a reinforced concrete building, which allows Table-form false-work to be transported across a recently poured concrete slab on the second calendar day after that particular pour had been undertaken. The methodology is specifically applicable to that type of Table-Form false-work, which is assembled using Table-Heads into which the top plates of its props can be so securely locked that said props do not require to have any cross-bracing between them.
Advanced Formwork System D.E.B Dropped Edge Beam. Is a far superior system used in the construction of concrete slabs that require a D.E.B. Dropped Edge Beams as a method of that construction