AU2016201882A1 - Trip optimization system and method for a train - Google Patents

Trip optimization system and method for a train Download PDF

Info

Publication number
AU2016201882A1
AU2016201882A1 AU2016201882A AU2016201882A AU2016201882A1 AU 2016201882 A1 AU2016201882 A1 AU 2016201882A1 AU 2016201882 A AU2016201882 A AU 2016201882A AU 2016201882 A AU2016201882 A AU 2016201882A AU 2016201882 A1 AU2016201882 A1 AU 2016201882A1
Authority
AU
Australia
Prior art keywords
train
trip
locomotive
trip plan
route
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
AU2016201882A
Other versions
AU2016201882B2 (en
Inventor
David So Keung Chan
Sukru Alper Eker
Paul Kenneth Houpt
Ajith Kuttannair Kumar
Bernardo Adrian Movsichoff
Glenn Robert Shaffer
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
General Electric Co
Original Assignee
General Electric Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from AU2007202928A external-priority patent/AU2007202928A1/en
Priority claimed from AU2012261786A external-priority patent/AU2012261786A1/en
Application filed by General Electric Co filed Critical General Electric Co
Priority to AU2016201882A priority Critical patent/AU2016201882B2/en
Publication of AU2016201882A1 publication Critical patent/AU2016201882A1/en
Application granted granted Critical
Publication of AU2016201882B2 publication Critical patent/AU2016201882B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

TRIP OPTIMIZATION SYSTEM AND METHOD FOR A TRAIN A system for operating a train having one or more locomotive consists with each locomotive consist comprising one or more locomotives, the system including a locator element to determine a location of the train, a track characterization element to provide information about a track, a sensor for measuring an operating condition of the locomotive consist, a processor operable to receive information from the locator element, the track characterizing element, and the sensor, and an algorithm embodied within the processor having access to the information to create a trip plan that optimizes performance of the locomotive consist in accordance with one or more operational criteria for the train,

Description

TRIP OPTIMIZATION SYSTEM AND METHOD FOR A TRAIN FIELD OF THE INVENTION The field of invention relates to optimizing train operations, and more particularly to monitoring and controlling a train's operations to improve efficiency while satisfying schedule constraints BACKGROUND Locomotives are complex systems with numerous subsystems, with each subsystem being interdependent on other subsystems, An operator is aboard a locomotive to insure the proper operation of the locomotive and its associated load of freight cars, In addition to insuring proper operations of the locomotive the operator also is responsible for determining operating speeds of the train and forces within the train that the locomotives are part of To perform this fmation, the operator generally must have extensive experience with operating the locomotive and various trains over the specified terrain, This knowledge is needed to comply with perscibeable operating speeds that may vary with the train location along the track. Moreover, the operator is also responsible for assuring in-train forces remain within acceptable limits. However, even with knowledge to assure safe operation, the operator cannot usually operate the locomotive so that the fuel consumption is mainimized for each trp For example, other factors that must be considered may include emission output operator's environmental conditions like noise/vfttion, a weighted combination of fuel consumption and emissions output, etc. This is difficult to do since, as an example, the size and loading of trains vary, locomotives and their fuel/emissions characteristics are different, and weather and traffic conditions vary Operators could more effectively operate a train if they were provided with a means to determine the best way to drive the train on a given day to meet a required schedule (arrival time) while using the least fuel possible, desphe sources of variabilky.
I
BRIEF DESCRPTION Embodiments of the invenion disclose a system for operating a train having one or more locomotive consists with each locomotivt consist Comprisng one or more locomotives in an exemplary embodiment, the system comprses a locator element to detenine a location of the train, A track characterization element to provide information about a track is also provided. The system also has a pacessor operable to receive information from the locator element, and the track characterizing element Art dagorithm is also provided which is embodied within the processor having access to the information to create a tWp plan that optimizes perfonance of the locomotive consist in accordance with one or more operational criteria for the train. An exemplary embodiment of the present invention also discloses a medod for operating a train having one or more locomotive consists with each locomotive consist comprising one or mor locomotives The method comprises deteraning a location of the train on a track, The method also deternites a characteristic of the track . The method further creates a trip plan based on the location of the train, the characteristic of the track, and the operating condition of the locomotive consist in accordance with at least one operational criteria for the train. An exemplary embodiment of te present invention also discloses a computer software code for operating a trai having a computer processor and one or more locomotive consists with each locomotive consist comprising one or more locomotives., The computer software code comprises a software modnie for creating a trip plan based on the location of the train, the characteristic of the track, and the operating condition of the locomotive consist in accordance with at least one operational criteria for the train. An exemplary embodiment of the present invention further discloses a method for operating a train having one or more locomotive consists with each locomotive consist comprising one or more locomotives where a trip plan has been devised for the train. The method compises determining a power setting for the locomotive consist based on the trp plan, The method also operates the locomotive consist at the 2 power setting. Actual speed of the train, actual power setting of the locomotive consist, and/or a location of the train is collected Actual speed of the train, actual ,power setting of the locomotive consist, and/or a location of the train is compared to the power setting. Another exemplary embodiment of the present invention further discloses a method fOr operating a train having one or more locomotive consists with each locomotive consist comprising one or more locomotives where a tip plan has been devised for the train based on assumed operating parameters for the train and/or the locomotive consist. The method comprises estimating train operating parameters and/or locomotive operating parameters. The method further comprises comparing the estimated train operating parameters and/or the locomotive consist operating parameters to the assumed train operating parameters and/or the locomotive consist operating parameters. Another exemplary embodiment of the present invention further discloses a method for operating a train having one or mome locomotive consists with each locomotive consist comprising one or more locomotives where a trip plan has been devised for the train based on a desired parameter. The method comprises determining operational parameters of the train and/or the locomotive consist, determining a desired parameter based on determined operational parameters, and comparing the determined parameter to the opermtional parameters, If a difference exists from comparing the determined parameter to the operational parameters, the method furtber comprises adjusting the trip plan, An exemplary embodiment of the present invention further discloses a method for operating a rail system having one or more locomotive consists with each locoraotive consist comprising one or more locomotives. The method comprises determining a location of the train on a track and determining a characteristic of the track. The method father comprises generating a driving plan for at least one of the locomotives based on the locations of the rail system, the characteristic of the track, and/or the operating condition of the locomotive consist, in order to minimize fuel consumption by the rail system. 3 Another exemplary embodiment of the present invention further discloses a method for operating a rail system having one or more locomotive consists with each locomotive consist comprising one or more locomotives. Towards this end the method comprises determining a location of the train on a track, and determining a characteristic of the track. The method further comprises providing propulsion control for the locomotive consist in order to minimize fuel consumption by the rail system. In one aspect there is a method for operating a train having one or more locomotive consists with each locomotive consist including one or more locomotives, the method including: receiving route data and train data, wherein the route data includes data relating to one or more characteristics of a track on which the train is to travel along a route and data relating to at least one speed limit along the route, and wherein the train data relates to one or more characteristics of the train; creating on-board the train a trip plan at any time during travel of the train along the route, wherein the trip plan is created at a first point along the route based on the received data and covers at least a segment of the route extending to a second point further along the route than the first point, the trip plan designating operational settings of the train as a function of at least one of distance or time along the route; and automatically controlling the train according to the trip plan as the train travels along the route segment, said trip plan being configured for increasing efficiency of the train by at least one of reducing fuel use of the train and reducing emissions produced by the train along the segment of the route; measuring actual efficiency of the train during travel of the train according to the trip plan; and updating the trip plan during travel of the train based on the actual efficiency that is measured. 4 DRAWINGS A more particular description of examples of the invention briefly described above will be rendered by reference to specific embodiments thereof that are illustrated in the appended drawings. Understanding that these drawings depict only typical embodiments of the invention and are not therefore to be considered to be limiting of its scope, the invention will be described and explained wit additional specificity and detail through the use of the accompanying drawings in which: FIG. I depicts an exemplary illustration of a flow chart of an exemplary embodiment of the present invention; FIG. 2 depicts a simplified model of the train that may be employed; FIG, 3 depicts an exemplary embodiment of elements of an exemplary embodiment of the present invention; FIG. 4 depicts an exemplary embodiment of a fuel-use/travel time curve; FIG. $ depicts an exemplary embodiment of segmentation decomposition for trip planning; FIG. 6 depicts an exemplary embodimem of a segmentation exaniple; FIG. 7 depicts an exemplary flow chart of an exemplary embodiment of the present invention; FIG. 8 depicts an exemplary illustration of a dynamic display ori use by the operator; 4A FIG. 9 depicts another exemplary illustration of a dynamic display for use by the operator; and FIG, 10 depicts another exemplary illustration of a dynamic display for use by the operator, DETAILED DESCRIPTION Reference will now be made in detail to the embodiments consistent with the invention, examples of which are illustrated in the accompanying drawings. Wherever possible, the same reference numerals used throughout the drawings refer to the same or like parts. Exemplary embodiments of the present invention seek to address problems in the art by providing a system, method, and computer implemented method for determining and implementing a driving strategy of a train having a locomotive consist determining an approach to monitor and control a train's operations to improve certain objective operating criteria parameter requirements while satisfying schedule and speed constraints. Throughout this disclose the tern "present invention" or "invention" is used. Even through the term "exemplary embodiment(s)" does not immediately proceed the above cited term, the intent of "present invention" or "invention" is read to mean "exemplary embodiment(s) of the present invention." The present invention is also operable when the locomotive consist is in distributed power operations. Persons skilled in the art will recognize that an apparatus, such as a data processing system including a CPU. memory, I/O, program storage, a connecting bus, and other appropriate components, could be programmed or otherwise designed to facilitate the practice of the method of the invention. Such a system would include appropriate program means for executing the method of the invention. Also, an article of manufacture, such as a prerecorded disk or other similar computer program product, for use with a data processing system, could include a storage medium and program means recorded thereon. for directing the data processing system to facilitate the practice of the method of the invention. Such apparatus and articles of manufacture also fall within the spirit and scope of the invention.
Broadly speaking, the technical effect is detenining and implementing a driving strategy of a train having a locomotive consist determining an approach to monitor and control a traiW's operations to improve certain objective operating criteria parameter requirements while satisfying schedule and speed constraints. To facilitate an understanding of the present invention, it is described heminafter with reference to specific implementations thereof: The invention is described ina the general context of computer-executable instmctions, such as program mo&dles, being executed by a computer; Generally, program modules include routines, programs, objects, components, data strctures, etc dat perfoun particular tasks or implement particular abstract data types, For example, the software programs that underlie the invention can be coded in different languages, for use wit different plaforns. in the description that follows, examples of the invention are described in the context of a web portal that employs a web browser. It will be appreciated. however, that tie principles tat underle the invention can be implemented with other types of computer software technologies as well. Moreover, those killed in the art will appreciate that the invention may be practiced with other computer system contigurations, including hand-held devices, multiprocessor systems, micoprocessor-based or programmable consumer electronics, minicomputers, mainframe computers, and the gke. The invention may also be practiced in distributed computing environments where tasks are performed by remote processing devices that are linked through a communications network, la a distributed computing environment, program modues may be located in both local and remote computer storage media including memory storage devices- These local andI mmote computing emironments may be contained entirely within the locomotive. or adjacent loconotives in consistor off-board an wayside or central offices where wireless communication is used. Throughout this document the term locomotive consist is used As used herein a locomotive consist may be described as having one or more locomotives in succession, connected together so as to provide motoring and/or braking capability. The locomotives are connected together where no train cars are in between the locomotives, The traln can have more than one consist in its composition. 6 Specifically, there can be a lead consist, and more than one remote consists, such as midway in the line of cars and another remote consist at the end of the train Bach locomotive consist may have a first locomotive and trail loomnotive(s). Though a consist is usually viewed as successive locomotives, those skAted in the art wiFN readily recognize that a consist group of locomotives may also be recognized as a consist even when at least a car separates the locomotives, such as when the consist is configured for distributed power operation, wherein throttle and braking commands are relayed from the lead locomotive to the remote trails by a radio link or physical cable, Towards this end, the term locomotive consist should be not be considered a limiting factor when discussing multiple locomotives within the same train, Referring now to the drawings, embodiments of the present invention will be described. The invention can be implemented in numerous ways, including as a system (including a computer processing system), a method (including a computerized method), an apparatus, a computer readable medium, a computer program product, a graphical user interface, including aweb portalor a data structure tangibly fixed in a computer readable memory. Several embodimrents of the invention are discussed below. FIG. 1 depicts an exemplary illustration of a flow chat of the present invention, As illustrated, instmctions are input specific to planning a trip either on board or from a remote location, such as a dispatch center 10, Such input infonnation includes, but is not limited to, train position, consist description (such as locomotive models), locomotive power description, performance of locomotive traction transmission, consumpption of engine fuel as a function of output power, cooling characteristics, the intended trip route (effective track grade and curvature as function of milepost or an "effective grade" component to reflect curvature following standard railroad practices), the train represented by car makeup and loading together with effective &ag coefficients, trip desired parameters including, but not limited to, start time and location, end location, desired travel time, crew (user andar operator) identification, crew shift expiration time, and route.
This data may be provided to the locomotive 42 in a number of ways, such as but not limited to, an operator manually entering this data into the locomotive 42 via n onboard display, inserting a memory device such as a hard card and/or USB drive containing the data into a receptacle aboard the locomotive, and transmitting the information via wireless communication from a central or wayside location 41, such as a track signaling device and/or a wayside device, to the locomotive 42. Locomotive 42 and train 31 load characteristics (eg., drag ) may also change over the route (egt with altitude, ambient temperature and condition of the rails and rail cars), and the plan may be updated to reflect such changes as needed by any of the methods discussed above and/or by real-time autonomous collection of locomotive/train conditions. This includes for example, changes in locomotive or train characteristics detected by monitoring equipment on or off board the locomotive(s) 42. The track signal system determines the allowable speed of the train. There are many types of track signal systems and the operating rules associated with each of the signals. For example, some signals have a single light (on/off) some signals have a single lens with multiple colors, and some signals have multiple lights and colots& These signals can indicate the track is clear and the train may proceed at max allowable speed. They can also indicate a reduced speed or stop is required. This reduced speed may need to be achieved immediately, or at a certain location (e g, prior to the next signal or crossing). The signal status is communicated to the train and/or operator through various means, Some systems have circuits in the track and inductive pick-up coils on the locomotives. Other systems have wireless communications systems. Signal systems can also require the operator to visually inspect the signal and take the appropriate actions. The signaling system may interface with the on-board signal system and adjust the locomotive speed according to the inputs and the appropriate operating rles For signal systems that require the operator to visually inspect the signal status, the operator screen will present the appropriate signal options for the operator to enter 8S based on the traia's location. The type of signal systems and operating rules. as a function of location, may be stored in an onboard database 63 Based on the specification data input into the present invention, an optimal plan which mimiuzes fuel use and/or emissions produced subject to speed limit constraints along the route with desired start and end times is computed to produce a trip profile 12; The profile contains the optimal speed ad power (notch) settings the train is to follow, expressed as a function of distance and/or time, and such train operating limits, including but not limited tot the maximum notch power and brake settings and speed limits as a function of location, and the expected fuel used and emissions generated. In an exemplary embodiment, the value for the north setting is selected to obtain throttle change decisions about once every 10 to 30 seconds. Those skilled in the art will readily recognize that the throttle dange decisions may occur at a longer or shorter duration, if needed and/or desired to follow an optimal speed profile. in a broader sense, It should be evident to ones skilled in the art the profdies provides power settings for the train either at the train level, consist level and/or individual train level Power comprises braking power, motoring power, and airbrake power. In another preferred embodiment, instead of operating at the traditional discrete notch power settings, the present invention is able to select a continuous power setting determined as optimal for the profile selected. Thus, for example, if an optinal profile specifies a notch setting of 6,, instead of operating at notch setting 7, the locomotive 42 can operate at 6.8, Allowing such intermediate power settings may bring additional efficiency benefits as described below. The procedure used to compute the optimal profile can be any number of me.hods for computing a power sequence that drives the twain 31 to minimize fuel and/or emissions subject to locomotive operating and schedule constraints as smnmamized below, In some cases the required optimal profile may he close enough to one previously deterred, owing to the similaity of the train configuration, route and environmental conditions, lI these cases it may be sufficient to look up the dIving trajectory within a database 63 and attempt to follow it. When no previously computed plan is suitable, methods to compute a new one inchlde, but are not limited to, direct calculation of the optimal profile using differential equation models which 9 approximate the train physics of motion, The setup involves selection of a quantitative objective function, commonly a weighted sum (integral) of model variables that correspond to rate of fuel consumption and emissions generation Plus a term to penalize excessive throttle variation. An optimal control formulation is set up to minimize the quantitative objective function subject to constraints including but not limited to, speed Ilints and minimum and maximum power (throttle) settings, Depending on planning objectives at any time, the problem may be setup flexibly to minimize fuel subject to constraints on emissions and speed limits, or to minimize emissions, subject to constraints on fuel use and arrival time It is also possible to setup, for example, a goal to minimize the total travel time without constraints on total emissions or fuel use where such relaxation of constraints would be permitted or required for the mission Mathematically, the problem to be solved may be stated more precisely. The basic physics are expressed by: A- = v;x(0) =0OAx(T)=D di -' dv -=T&u,v) C(x)-R(v);v()=0,0;v(T,)=00 Where x is the position of the train, v its velocity and t is time (in. miles miles per hour and minutes or hours as appropriate) and u is the notch (throttle) command input, Further, D denotes the distance to be traveled, ;T the desired anival time at distanceD along the track, T, is the tractive effort produced by the locomotive consist, G, is the gravitational drag which depends on the tain length, train makeup and terrain on which the train is located, R is the net speed dependent drag of the locomotive consist and train combination, Theinitial and final speeds can also be specified, but without loss of generality are taken to be zero here (train stopped at beginning and end). Finally, the model is readily modified to include other important dynamics such the lag between a change in throttle, u, and the resulting tractive effort or braking. Using this model an optimal control formulation is set up to minimize the quantitative objective function subject to constraints including but not limited tot speed limits and 10 minimum and maximum power (throttle) settings. Depending on planning objectives at any time, the problem may be setup flexibly to minimize fuel subject to constrints on emissions and speed limits, or to minimize emissions, subject to constraints on fuel use and arrival time. It is also possible to setup, for example, a goal to minimize the totai travel time without constaints on total emissions or fuel use where such relaxation of constraints would be permitted or required for the mission. All these performance measures can be expressed as a linear combination of any of the following: Min fF(u())d - Minimize total fuel consumption mina7 - Minimize Travel Tie min~(P t b g)" ~ Minimize notch jockeying (piecewise constant input) Min f(du 1dt Minimizenotch jockeying (coninuous input 4. Replace the fuel term F in (1) with a termi corresponding to emissions production. A connonly used and representative objective function is thus 7. 4f a+ a, f(u()d+a,+a 2 (du I difldt (OP) The coefficients of the linear combination will depend on the importance weight0) given for each of the tenms. ote that in equation (OP), i(t) is the optimizing variable which is the continuous notch position, if discrete notch is required, eg for older locomotives, the solution to equation (OP) would be discreized, which may result in le- fu-l Faving.nding a minimum time solution (a and %, set to zero) is used to 11 find a lower bound on, the preferred embodiment is to solve the equation (OP) for various values of Tf with a set to zero. For those familiar with solutions to such optimal problems, it may be necessary to adjoin constraints, e.g. the speed limits along the path: 0 v SL(x) Or when using minimum time us the objecive, that an end point constraint must hold, e~g, total fuel consumed must be less than what is in the tank, eg. via 0 < F(u(O))dt 5W, Where Wp is the fuel remaining in the tank at T. Those skilled in the at will readily recognize that equation (OP) can be in other fons as well and that what is presented above is aneemplary equation fr use in the present invention. Reference to emissions in the context of the pmsent invention is actually directed towards cumulative emissons produced in the form of oxides of nitrogen (NOX), unburned hydrocarbons, and particulates. By design, every locomotive must be compliant to EPA standards for brake-specific emissions, and thus when emissions are optimized in the present inventionthis would be mission total emissions on which there is no specification today. At all times, opeations would be compliant with federal EPA mandates, If a key objective during a trp mission is to reduce emissions, the optimal control formulation, equation (OP), would be amended to consider this trip bective. A key flexibility in the optimization setup is that any or all of the trip objectives can vary by geographic region or mission, For example, for a high priority train, inimnumr time may be the only objective an one route because it is high priority traffic. In another example emission output could vary from state to state along the planned train route. To solve the resulting optimization problem, in an exemplary embodiment the present invention transcribes a dynamic optimal control problem in the time domain to an equivalent static mathematical programming problem wit N decision variables, 12 where the number "N' depends on the frequency at whict throttle and braking adjustments are made and the duration of the trip. For typical problems, tids N can be in the thousands, For example in an exemplary embodiment, suppose a train is traveling a 172-mile stretch of track in the southwest United States. Utilizing the present invention, an exemplary 7.6% saving in fuel used may be realized when comparing a trip determined and followed using the present invention versus an actual driver throttle/speed history where the trip was determined by an operator. The improved savings is realized because the optimization realized by using the present invention produces a driving strategy with both less drag loss and Itle or no braking less compared to the trip plan of the operator. To make the optimization described above computationally tractable, a simplified model of the train may be employed, such as illustrated in FIG. 2 and the equations discussed above. A key refinement to the optimal profile is produced by driving a more detailed model with the optimal power sequence generated, to test if other thermaL, electrical and mechanical constraints are violated, leading to a modified profile with speed versus distance that is closest to a rn that can be achieved without haming locomotive or train equipment, i.e. satisfying additional hplied constraints such thermal and electrical limits on the locomotive and inte-car forces in the train. Referring back to FIG. 1, once the trip is started 12, power commands are generated 14 to put the plan in motion. Depending on the operational set-up of the present invention, one comnand is for the locomotive to follow the optimized power command 16 so as to achieve the optimal speed. The present invention obtains actual speed and power information from the locomotive consist of the train 18. Owing to the inevitable approximtions in the models used for the optimization, a closed-loop calculation of corrections to optimized power is obtained to track the desired optimal speed Such corrections of train operating limits can be made automatically or by the operator, who always has ultimate control of the train. hi some cases, the model used in the optimization my differ significantly from the actual train. This can occur for many reasons, including but not limited to, extra cargo pickups or setouts, locomotives that fail in route, and errors in the initial database 63 13 or data entry by the operator. For these reasons a monitorng system is in place that uses realtime train data to estimate locomotive and/or train parmeters in eal P ine 20. The estimated parameters are then compared to the assumed parameters used when the trip was initially created 22. Based on any differences in the assumed and estimated values, the trip may be re-planned 24, should large enough savings accrue from a new plan. Other reasons a trip may be re-planned include directives from a remote location, such as dispatch and/or the operator requesting a change in objectives to be consistent with more global movement planning objectives. More global movement planning objectives may include, but are not limited to, other train schedule, allowing exhaust to dissipate from a tunnel, maintenance operations, etc. Another reason may be due to an onboard failure of a component. Strategies for re-planning may be grouped into incremental and major adjustments depending on the seveity of the disruption, as discussed in more detail below. In general, a "new* plan must be derived from a solution to the optimization problem equation (OP) described above, but frequently faster approximate solutions can be found, as descdbed herein. In operation, the locomotive 42 will continuouly monitor system efficiency and continuously update the trip plan based on the actual efficiency measured, whenever such an update would improve trp performance. Re-planning computations may be carried out entirely within the locomotive(s) or fully or pardally moved to a. remote location, such as dispatch or wayside processing facilities where wireless technology is used to communicate the plans to the locomotive 42. The present invention may also generate efficiency trends that can be used to deveIop locomotive fleet data regarding efficiency transfer fnctions. The fleetawide data may be used when determining the initial trip plan, and may be used for network-wide optimization tradeoff when considering locatins of a pliurality of trains. For example, the travel time fuel use tradeoff curve as illustrated in FIG. 4 reflects a capability of a train on a particular route at a current time, updated from ensemble averages collected for unany similar trains on the same route. Thus, a centaldispatch facility collecting curves like FIG. 4 from many locomotives could use that information to better coordinate overall tain movements to achieve a system-wide advantage in fuel use or thought 14 May events in daily operations can lead to a need to generate or modify a curently executing plan, where it desired to keep the same trip objectives, for when a train is not on schedule for planned meet or pass with another trin and it needs to make up time. Using the actual speed, power and location of the lccomotive, a comparison is made between a planned arrival time and the currency estimated (predicted) arrival time 25. Based on a difference in the times, as wall as the difference in parameters (detected or changed by dispatch or the operator), the plan is adjusted 26, This adjustment may be made automatically following araikoad company's desire for how such departures from plan shold be handled or manually propose alternatives for the on-board operator and dispatcher to jointly decide the best way to get back on phn, Whenever a plan is updated but where the original objectives, such as but not limited to arrival time remain the same; additional changes may be factored in concurrently eag, new itre speed limit changes, which could affect the feasibility of ever recovering the original plan, In such instances if the odgina trip plan carot be, maintained, or in other words the train is unable to meet the original trip plan objectives, as discussed herein other trip plans) may be presented to the operator and/or remote facility, or dispatch, A re-plan may also be made when it is desired to hange the original objectives Such re-pIlaming can be done at either fixed preplanned tines, manually at the discretion of the operator or dispatcher, or autnoinously when predefined Emits, such a train operating limits, are exceeded. For example, if the current pian execution is running late by more than a specified threshold, such as thirty mtes, the present invention can re-plan the trip to accommodate the delay at expense of increased fui as described above or to alert the operator and dispatcher how much of the time can be rnadc tup at all (io. what rininum time to go or the maxinmm fue that can be saved within a time constraint). Other triggers for re-plan can also be envisioned based on fuel consumed or the health of the power consist, including but not limited time of arrival, loss of horsepower due to equipment failure and/or equipment temporary malfunction (such as operating too hot or too cold), and/or detection of gross setup errors, Such in the assumed train load. That is, if the change reflects imparment bn 15 the locomotive performance for the current trip, these may be factored into the models and/or equations used in the optimization. Changes in plan objectives can also arise from a need to coordinate events where the plan for one train compromises the ability of another train to meet objectives and abitration at a different level, eg. the dispatch office is required. For example, the coordination of meets and passes may be further optimized through train-to-train communications, Thus, as an example, if a train knows that it is behind in reaching a location for a meet and/ar pass, communications from the other train can notify the late train (and/or dispatch), The operator can then enter information pertaining to being late into the present invention wherein the present invention will recalculate the traln's trip plan. The present invention can also be used at a high level, or network level, to allow a dispatch to determine which train should slow down or speed up should a scheduled meet and/or pass time constraint may not be met As discussed herein, this is accomplished by trains transmitting data to the dispatch to prioritize how each train should change its planning objective. A choice could depend either from schedule or fbel saving benefits, depending on the situation For any of the manually or automatically initiated re-plans, the present invention may present more than one trip plan to the operator. In an ex mpiary embodiment the present invention will present different profiles to the operator, allowing the operator to select the arrival time and understand the cornsponding fuel and/or enission impact Such information can also be provided to the dispatch for similar consideration, either as a simple list of alternative or as a plurality of tradeoff curves such as illustrated in FIG 4, The present invention has the ability of leading and adapting to key changes in the train and power consist which can be incorporated either in the current plan and/or for future plans, For example, one of the triggers discussed above is loss of horsepower. When building up horsepower over time, either after a loss of horsepower or when beginning a trip, transition logic is utilized to determine when desired horsepower is achieved. This infonnation can be saved in the locomotive database 61 for use in 16 optimizing either futme trips or the current trip should loss of horsepower occur again. FIGC 3 depicts an exemplary embodiment of elements of the present invention, A locator element 30 to determine a location of the trin 31 is provided The locator element 30 can be a GPS sensor, or a system of sensors, that detemine a location of the train 31. Examples of such other systems may include, bu are not limited to, wayside devices, such as radio frequency automatic equipment identification (RF AE) Tags, dispatch, and/or video detennination. Another system may include the tachometer(s) aboard a locomotive and distance calculatiow hon a reference point. As discussed previously, a wireless communication system 47 may alo be provided to allow for communications between trains and/or with a remote location, such as dispatch, Infornation about travel locations may also be transferred from other trains. A track characterization element 33 to provide information about a track, principaly grade and elevation and curvature information, is also provided. The track characterization element 33 may include an on-board track integrity database 3X Sensors 38 are used to measure a tractive effort 40 being hauled by the locomotive consist 42, throttle setting of the locomotive consist 42, locomotive consist 42 configuration information, speed of the locomotive consist 42, individual locomotive configuration, individual locomotive capability, etcr In. an exemplary embodiment the locomotive consist 42 configuration information may be loaded without the use of a sensor 38, but is input by other approaches as discussed above. Frthermorw the health of the locomotives in the consist may also be considered For example, if one locomotive in the consist is unable to operate above power notch level 5, this information is used when optimizing the trip plan. Information from the locator element may also be used to determine an appropriate arrival time of the train 3 L For example, if there is a train 31 moving along a track 34 towards a destination and no train is following behind it, and the train has no fixed arrival deadline to adhere to, the locator elernent, including but not limited to radio frequency automaie equipment identification (RF AEI) Tags, dispatch, ad/or video determination, may be used to gage the eox act location of ft train 3L urthermore, 17 inputs from these signaling systems may be used to adjust the train speed. Using the on-board track database, discussed below, and the locator element, such as GPS, the present invention can adjust the operator interface to reflect the signaling system state at the given locomotive location, i a situation where signal states would indicate restrictive speeds ahead, the planner may elect to slow the train to conserve fuel consumption; Information from the locator element 30 may also be used to change planning objectives as a function of distance to destination. For example, owing to inevitable uncertainties about congestion along the route, "Taster" time objectives on the early part of a route may be employed as hedge against delays that statistically occur later. If it happens on a particular trip that delays do not occur, the objectives on a latter part of the jouray can be modified to exploit the built-in slack time that was banked earlier, and thereby recover some fuel efficiency. A similar strategy could be invoked with respect to emissions restrictive objectives, e,g, approaching an urban area. As an example of the hedging strategy, if a trip is planned from New York to Chicago, the system may have an option to operate the train slower at either the beginning of the trip or at the middle of the trip or at the end of the trip. Te present invention would optimize the trip plan to allow for slower operation at the end of the trip since unknown constraints, such as but not limited to weather conditions, tack maintenance, ete,, may develop and become known during the trip. As another consideration, if traditionally congested areas are kmowm the plan is developed with an option to have more flexibility around these traditionally congested regions. Therefore, the present invention may also consider weighting/penalty as a fimdotion of time/distance into the future and/or based on known/past experience. Those skilled in the art wUl readily recognize that such planning and re-planning to take into consideration weather conditions, track conditions, other trains on the track, etcmay be taking into consideration at any time during the trip wherein the trip plan is adjust accordingly FIG 3 further discloses other elements that may be part of the present invention. A processor 44 is provided that is operable to receive information from the locator 18 element 30, track characterizing element 33, and sensors 38, An algorithm 46 operates within the processor 44. The algorithm 46 is used to compute an optimized trip plan based on parameterns involving the locomotive 42, train 31, track 34, and objectives of the mission as describedabove. In an exemplary embodiment, the trip plan. is established based on models for train behavior as the train 31 moves along the track 34 as a solution of nonlinear differential equations derived front physics with simplifying assumptions that are provided in the algodthm. The algorithm 46 has access to the information from the locator element 30, track characterizing element 33 and/or sensors 38 to create a trip plan rmitimizing fuel consumption of a locomotive consist 42, minimizing emissions of a locomotive consist 42, establishing a desired tip time, and/or ensuring proper crew operating time aboard the locomotive consist 42, In an exemplary embodiment, a driver, or controller element, 51 is also provided, As discussed herein the controller element 51 is used for controlling the train as it follows the trip plan, In an exemplary embodiment discussed father herein, the controller element 51 makes train operating decisions autonomously. In another exemplary embodiment the operator may be involved with directing the train to follow the trip Plan, A requirement of the present invention is the ability to initially create and quickly modify on the fly any plan that is being executed. This includes creating the initial plan when a long distance is involved, owing to the complexity of the plan optimization algorithm. When a total length of a trip profile exceeds a given distance, an algorithm 46 may be used to segment the mission wherein the mission may be divided by waypoints'Phiough only a single algorithm 46 is discused, those skilled in the art will readily recognize that more than one algorithm may be used where the algorithms may be connected together. The waypoint may include natural locations where the train 31 stops, such as, but not limited to, sidings where a meet with opposing traffic, or pass with a train behind the current train is scheduled to occur on single-track rail, or aL yard sidings or industry where cars are to be picked up and set out, and locations of plamned wod. At such waypoints, the train 31 may be required to be at the location at a scheduled time and be stopped or moving with speed in a 19 specified raage. The time duration fon rival to departure at waypoints is called dwell time. In an exemplary embodiment, the present invention is able to break down a longer trip into smaller segments in a special systematic way, Each segment can be somevat arbitrary in length, but is typically picked at a natnaW location such as a stop or significant speed restriction, or at key mileposts that definme tions with other rutes Given a partition, or segment, selected in this way, a driving profile is created for each segment of track as a function of travel time taken as an independent variable, such as shown in Figure 4. The fuel usedftraveltdme tradeoff associated with each segment can be computed prior to the train 31 reaching that segment of track A total trip plan can be created from the driving profiles coated fA' each segment The invention distributes travel tine amongst all the segments of the trip in an optimal hay so that the total tip time required is satisfied and total fuel consumed over al the segments is as small as possible. An exemplary 3 segment trip is disclosed in MG, and discussed below. Those skilled in the art will reaognize however, through segments are discuss, the trip plan may comprise a single segment representing the complete trip FIG, 4 depicts an exemplar embodiment of a fue4asetravei time cirve As mentioned previously, such a curve 50 is created when calculating an optmatrp profile for various travel times for each segment That isfor a given travel time 49, fuel used 53 is the result of a detailed driving profile computed as deserted above. Once travel times for each segment are allocated, a power/speed plan is determined for each segment from the previously computed solutions f there are any waypoint constraints on speed between the segments, such as, but not limited to, a change in a speed limit, they are matched up during creation af the optimal trip profile. If speed restrictions change in only a singl segment, the fuel useAravektne curve 50 has to be re-computed for only the segment changed. This reduces time for having to re calculate more parts, or segments, of the tuip If the locomotive consist or train changes significantly along the route, e from loss of a locomotive or pikcup or sev out of ca, then driving profiles for all subsequent segmets must be recomputed 20 creating new instances of the curve 50. These new curves 50 would then be used along with new schedule objectives to plan the remaining trip. Once a trip plan is created as discussed above, a trajectory of speed and power versus distance is used to reach a destination with minimum 'fuel and/or emissions at the required trip time. There are several ways in which to execute the trip plan. As provided below in more detail, in one exemplary embodiment, a coaching mode tbe present invention displays information to the operator for the operator to Bollow to achieve the required power and speed determined according to the optimal trip plan. In this mode, the operating information is suggested operating conditions that Ithe operator should use, n another exemplary embodiment, acceleration and maintaining a constant speed are performed by the present invention. However, when the train 31 must be slowed, the operator is responsible 'for applying a braking system 52. In another exemplary embodiment, the present invention commands power and braking as required to follow the desired speed-distance path. Feedback control strategies are used to provide corrections to the power control sequence in the profile to correct for such events as, but not limited to, train load variations caused by fluctuating head winds and/or tail winds. Another auch error may be caused by an error in train parameters, such as! but not limited to, train mass and/or drag, when compared to assumptions in the optimized trip plan, A third type of error may occur with information contained in the track database 36, Another possible eror may involve un-modeled per fonnance differences due to the locomotive engine, traction motor thermal deration and/or other factors, Feedback control strategies compare the actual speed as a function of position to the speed in the desired optimal profile. Dased on this difference, a correction to the optimal power profile is added to drive the actual velocity toward the optimal profile. To assure stable regulation, a compensation algorithm may be provided which filters the feedback speeds into power corrections to assure ciosedperformance stability is assured. Compensation may include standard dynamic compensation as used by those skilled in the art of control system design to meet performance objectives. 21 The present invention allows the simplest amd therefore fastest means to accommodate changes iA trip objectives, which is the rLde, rather than the exception in railroad operation In an exemplary embodiment to determine the fheloptiial tdp m point A to point B where there are stops along the way, and for updating the trp for the remainder of the tdp once the trip has begun, a sub-optimd decomposition method is usable for finding an optimal trip profile. Using modeling methods the computation nethod can find the trip plan with specified travel time and initial and final speeds. so as to satisfy all the speed limits and locomotive capability constrAints when there are stops. Though the following discussion is directed towards optimizing fuel use, it can also be applied to optmize other factors, such as, but not liIted to, emisions, schedule, crew comfort, and load impact. The method may be used at the outset in deveIoping a trip plan, and more importantly to adapting to changes in objectives after initiating a trip. As discussed herein, the present invention may employ a semp s illustrated in the exemplary now chart depicted in FIG 5, and as an exemplary 3 segment example depicted in detail in IIGS,6, As illustrated, the trip may be broken into two or mOre segments, TI, T2, and T3. Though as discussed herein, it is possible to consider the tip as a single segment, As discussed herein, the segment boundaries may not reit in ega segments Instead the segments use natural or mission specific boundaries, Optimal trip plans are pre-computed for each segment. If fuel use versus trip tlm is the tip object to be met, fuel versus tip time cmves are built for each segment As discussed herein, the curves may be based on other factors, wherein the factors are objectives to be met with a trip plan. Wen. trp time is the parameter being determined, trp time for each segment is computed while satisfying the overall trip time constraints. PIG, 6 illustrates speed liirrts for an exemplary 3 segment 200 ile trip 97, Further illustrated are grade changes over the 200 mile trip 98 A combined chart 99 illustrating cuves for each segment of the trip of fuel used over the travel time is also shown Using the optimal control setup described previously, the present computation method can find the trip plan with specified travel time and initial and fmal speeds so as to satisfy all the speed limits and locomotive capability constraints when there are stops 22 Though the following detailed discussion is directed towards optimizing fuel use, it can also be applied to optimize other factors as discussed herein, such as, but not limited to, emissions. A key flexibility is to accommodate desired dwell tune at stops and to consider constraints on earliest arrival and departure at a location as may be required, for example, in single-track operations where the time to be in or get by a siding is critical The present invention finds a fuel-optimal trip from distance Do to DM, traveled in time T, with M-1 intennediate stops at DO. and with the arrival and departure times at these stops constrained by t 5 (i) (D): ,t(i) - At, y,(D,)+Ag s g,(D) igi) >t...M -I where t, (D), t do, (D), and Arl are the arrival, departure, and minhnmn stop time at the i stop, respectively. Assuming that fuel-optimality implies minimizing stop ime 4 therefore r(D, )=t(D,) + At, which eliminates the second inequality above. Suppose for each i=l 4 ,,M, the fuel-optimal trip from Di to Di for travel time t, T (I): t T,(i) is known. Let F, (t) be the fuel-use corresponding to this trip. If the travel time from Dy to Dis denoted T 3 . then the arrival time at D! is given by t,(D) = Y(T +A ) where At. is defined to be zero, The fueboptimal trip from Do to DM for travel time T is then obtained by finding i, i=,1-M, which minnize F(T) T! (i) T; (i) subject to 23 S(T, + Ty) T Once a trip is underlay; the issue is re-determining the fuel-optimal solution for the remainder of a trip (originally from Do to D% in time T) as the trip is traveled, but where disturbances preclude following the fuel-optimal solution. Let the current distance and speed be x and Y, respectively, where Dt 3 <x; D) Aho, let the current tine since the beginning of the trip be t. Then the fuel-optimal solution for the remainder of the trip from x to D , which retains the original arrival time at DM, is obtained by finding 7'T,j +i +-M which minimize F, (T x)+ F (T7) subject to yot) t+T ( i 1(k} :5 + (T+t)t k)M ki+ M 1 jxc4+1 + + j(T + = T Here f(t x, v) is the fuelAUsed of the optimal trip from x to D, traveled in time t, with initial speed at x of v. As discussed above, an exemplary way to enable more efficient re-planning is to construct the optimal solution for a stop-to-stop trip from partitioned segments. For the Itrip from Dj to DI, with travel time T, choose a set of intermediate points D tj=1,,NJi, Let Do= Dt and D' = D Then express the fuel-se for the optimal trip from DbI to DI as 24 Where f (4 v v ) is the fuel-use fox the optimal trip from Djj, to Dtiavaed in time t, vith initial and final speeds of vi. and v . Furthermore, tij is the time in the optimal trip corresponding to distance D 1 , By definition, -tj =4 Since the train s stopped at Di and D i, v, 4) The above expression enables the function Fi(t) to be alternatively determined by fast determining the functions 4 (')J j1 then finding roj; 41 N and v, 5 j<N,. which minimize subject tw (.j) 5V< v,; v(i, j) j=Ng -I By choosing Du (e.g, at speed restrictions or meeting points), v (4 j)-v (i j)can be min iMized, thus minimizing the domain over which fij9 needs to be known, Based on the partitioning above, a simpler suboptimal re-planning approach than that described above is to restrict re-planning to times when the train is at distance points DMJ i5,1M - j 5 N, At point D, the new optimal trip from D to D c-an be determined by finding jA -No v4 j<k <N , and i<: M M1ls, n N,,,, v, i <at A1,l n< N? 4 , which minimize 25 A V~k + f , V m iD?"" subject to X'p~ t E(n) I t 0 + ,, + £(±at,, .. ) 4t(n)a4t, n= k~j4 Mi~ where A further simplification is obtained by waiting on the re-computation of , i<m!5 M , until distance point DI is reached In this way, at points Dj between Daf and Di, lie minimization above needs only be performed over v4,j <k N, v14 <N 1 T, is increased as needed to acconunodate any longer actual travel time from D 4 to DU than planned. This increase is later compensated, if possible, by the re-computation of T, I< in M , at distance point Dj. With respect to the closed-loop configuration disclosed above, the total input energy required to move a train 31 from point A to point B consists of the sum of four components, specifically difference in kinetic energy between points A and B; difference in potential energy between points A and B; energy loss due to friction and other drag losses; and energy dissipated by the application of brakes Assuming the start and end speeds to be equal (eig., stationary), the first component is zero, 26 Furthermore, the second component is independent of driving strategy. Thus, it suffices to minimize the sun of the last two components. Following a constant speed profile minimizes drag loss, Following a constant speed profile also minimizes total energy input when braking is not needed to maintain constant speed, However, if braking is required to maintain constant speed, applying braking just to maintain constant speed will most likely increase total required energy because of the need to replenish the energy dissipated by the brakes, A possibility exists that some braking may actually reduce total energy usage if the additional brake os is more than offset by the resultant decrease in drag loss caused by braking, by reducing speed variation. After completing a re-plan from the collection of events described above, the new opdmal notch /speed plan can be followed using the closed loop control described herein. However, in some situations there may not be enough time to carry out the segment decomposed planning described above, and particulaly when there are critical speed restrictions that must be respected, an aternative is needed. The present invention accomplishes this with an algodthm refered to as "smart cruise control" The smart Cruise control algcithn is an efficient way to generate' on the fly, an energy-efficient (hence fuel-efficient) sub-optimal prescription for driving the train 31 over a known terrain, This algorithm assumes knowledge of the position of the train 31 along the track 34 at all times, as well as knowledge of the grade and curvature of the track versus position. The method relies on a point-mass model for the motion of the train 31, whose parameters may be adaptively estimated from online measurements of train motion as described earlier. The smart cmise control algorithm has three principal components, specifically a modified speed limit profile that serves as an energy-efficient guide around speed imit reductions; an ideal throttle or dynamni brake setting profile that attempts to balance between minimizing speed variation and braking; and a mechanics for combining the latter two components to produce a notch command, employing a speed feedback loop to compensate for mismatches of modeled parameters when compared to reality parameters, Smart cruise control can accommodate strategies in 27 the present invention that do no active breaking (ie the driver is signaled and assumed to provide the requisite braldig) or a variant that does active braking; With respect to the cruise control algorithm that does not control dynamic braking, the three exemplary components are a modified speed limit profile that serves as an energy-efficient guide around speed limit reductions, a notification signal directed to notify the operator when braking should be applied, an ideal throttle profile that attempts to balance between minimizing speed variations and notifying the operator to apply braking, a mechanism employing a feedback loop to compensate for mismatches of model parameters to reality parameters. Also included in the present invention is an approach to identify key parameter values of the train 31, For example, with respect to estimating train mass, a Kalman filter ard a recursive least-squares approach may be utilized to detect errors that may develop over time. FIG, depicts an exemplary flow chart of the present invention. As discussed previously, a remote facility, such as a dispatch 60 can provide information to the present invention. As illustrated, such information is provided to an executive control element 62. Also supplied to the executive control element 62 is locomotive modeling information database 63 information from a track database 36 such as, but not limited to, track grade information and speed limit information, estimated train parameters such as, but not limited to, train weight and drag coefficients, and fuel rate tables from a fuel rate estimator 64 The execmive control element 62 supplies information to the planner 12, which is disclosed in more detail in FIG 1. Once a trip plan has been calculated, the plan is supplied to a driving advisor, driver or controller element 51. The trip plan is also supplied to the executive control element 62so that it can compare the trip when other new data is provided. As discussed above, the driving advisor 51 can automatically set a notch power ether a pre-established notch setting or an optimun continuous notch power. III addition to supplying a speed command to the locomotive 31, a display 68 is provided so that the operator can view what the planner has recommended. The operator also has access 28 to a control pane 69, Through the control panel 69 the operator can decide viether to apply the notch power recommended. Towards this end, the operator may limit a targeted or recommended power. That is, at ay time the operator always has final authority over what power setting the locomotive consist will operate at. This includes deciding whether to apply braking if the trip plan recommends slowing the train 31. For example, if operating in dark territory, or where information from wayside equipment cannot electronically transmit information to a train and instead the operator views visual signals from the wayside equipment, the operator inputs commands based on information contained in track database and visual signals from the wayside equipment Based on how the train 31 is functioning, information regarding fuel measurement is supplied to the fuel rate estimator 64, Since diret measurement of fuel flows is not typically available in a locomotive consist, all information on fuel consumed so far within a trip and projectiona into the ftMum following optimal plans is carried out using calibrated physics models such as those used it developing the optimal plans, For example, such predictions may include but am not limited to, the use of measured gross horsepower and known fi characteristls to derive the cumulative fuel used. The train 31 also has a locator device 30 sadt as a GPS sensor, as discussed above. Information is supplied to the train parameters estimator 65. Such information may include, but is not limited to, GPS sensor data tractivelbraking effort data, braking status data, speed and any changes in speed data. Wih information regarding grade and speed lirit information, train weight and drag coefficient information is supplied to the executive control clement 62, The present invention may also allow for the use of contimously variable power throughout the optimization planning and closed loop control implemention. n a conventional locomotive, power is typically quantized to eight discrete levels Moden locomotives can realize continuous variation in horsepower whim may be incorporated into the previously described optimization methods. With continuous power, the locomotive 42 can further optimize operating conditions, e.g, by minimizing anxiliary loads and power transmission losses , and fine tuning engine horsepower rgions of optimum efficiency, or to points of increased emissions 29 margins, Example include, but are not limited to, minimizing cooling system losses, adjusting alternator voltages, adjusting engine speeds, and reducing number of powered axles. Further, the locomotive 42 may use the on-board track database 36 ad the forecasted performance requirements to minimze auxiliary loads and power transmission losses to provide optimum efficiency for the target fael consumption/emissions. Examples include, but are not limited to, reducing a number of powered axles on flat terrain and pre-cooing the locomotive engine pior to entering a tunnel. The present invmtion may also use the on-board track database 36 and the ftrecasted performance to adjust the locomotive performance, such as to insure that the tain has sufficient speed as it approaches a hil! andior tunneL For example, this could be expressed as a speed constraint at a particular location that becomes part of the optimal plan generation created solving the equation (UP). Additionally, the present invention may incorporate train.handling riles, such as, but not limited to, tractive effort ramp raes, maximum braking effort ramp rates. These may incorporated directly into the formulation for optimum trip profile or alteratively incorporated into the closed loop regulator used to control power application to achieve the target speed; h a preferred embodiment the present invention is only installed on a lead locomotive of the train consist. Even though the present invention is not dependant on data or intemactions wit other locomotives, it may be integrated with a consist manager, as disclosed in U.S. Patent No. 6,691,957 and Patent Application No, 10/429,596 ( owned by the Assignee and both incorporated by eferene), factionality and/or a consist optimizer functionality to improve effICiency. Tnteraction with multiple trains is not preoluded as illustrated by the example of dispatch arbitrating two "independently optimized" trains described herein. Trains with distributed power systems can be operated in different modes. One mode is where ail locomotives in the train operate at the same notch command. So if the lead locomotive is commanding motoring - NS, all units in the train will be commanded to generate motoring - Ng power. Another mode of operation is 30 "independent" control. In this mode, locomotives or sets of locomotives distributed throughout the train can be operated at different motoring or braking powers. For example, as a train crests a mountaintop, the lead locomotives (on the down slope of mountain) may be giaced in braking, while the locomotives in the middle or at the end of the train (on the up slope of mountain) may be in motoring. This is done to minimize tensile forces on the mechanical couplers that connect the railcars and locomotives. Traditionally, operating the distributed power system in 'Independent" mode required the operator to manually command each remote locomotive or set of locomotives via a display in the lead locomotive Using the physics based planning model, train set-up information, on-board track database, on-board operating rules, location detennination system, real-time closed loop power/brake control, and sensor feedback, the system shall automatically operate the distributed power system in "independent' mode. When operating in distributed power, the operator in a lead locomotive can control operating functions of remote locomotives in the remote consists via a control system, such as a distributed power control element. Thus when operating in distributed power, the operator can command each locomotive consist to operate at a different notch power level (or one consist could be in motoring and other could be in braking) wherein each individual locomotive in the locomotive consist operates at the same notch power. In an exemplary embodiment, with the present invention installed on the train, preferably in communication with the distributed power control element, when a notch power level for a remote locomotive consist is desired as recommended by the optimized trip plan, the present invention will communicate this power setting to the remote locomotive consists for implementation. As discussed below, the same is trae regarding braking. The present invention may be used with consists in which the locomotives are not contiguous, e.g, with 1 or more locomotives up front, others in the middle and at the rear for train. Such configurations are called distributed power wherein the standard connection between the locomotives is replaced by radio lirk or auxiliary cable to link the locomotives externally. When operating in distributed power, the operator in a lead locomotive can control operating functions of remote locomotives in the consist 31 via a control system, such as a distributed power control element. In particular, when operating in distributed power, the operator can command each locomotive consist to operate at a different notch power level (or one consist could be in motoring and other could be in braking) wherein each individual in the locomotve consist operates at the same notch power, In an exemplary embodiment, with the present invention installed on the train, preferably in communication with the distributed power control element, when a notch power leve for a remote locomotive consist is desired as recommended by the optimized trip plan, the present invention will communicate this power setting to the remote locomotive consists for ipleimentation. As discussed below, the same is true regarding braking. When operating with distributed power, the optimization problem previously described can be enhanced to allow additional degrees of freedom, in that each of the remote units can be independently controlled from the lead unit The value of this is tat additional objectives or constrMints relating to in-train forces may be incorporated into the performance function, assuming the modd to rflect the in train forces is also included. Thus the present invention may include the use of multiple throttle controls to better manage in-train forces as well as fuel consumption and emissions. In a train utilizing a consist manager, the lead locomotive in a locomotive consist may operate at a different notch power setting than other locomotives in that consist The other locomotives in the consist operate at the same notch power setting. 'The present invention may be utilized in conjunction with the consist manager to command notch power settings for the locomotives in the consist Thus based on the present invention, since the consist manager divides a locomotive consist into two groups, lead locomotive and trail units, the lead locomotive will be commanded to operate at a certain notch power and the trail locomotives are commanded to operate at another certain notch power. In an exemplary embodiment the distributed power control element may be the system and/or apparatus where this operation is housed, Likewise, when a consist optimizer is used wih a locomotive consist, the present invention can be used in conjunction with the consist optimizer to determine notch power for each locomotive in the locomotive consist. For example, suppose that a trip plan recommends a notch power setting of 4 for the locomotive consist. Based on the location of the train, the consist optimizer will take this information and then determine the notch power setting for each locomotive in the consist In this implementation, the efficiency of setting notch power settings over intra-train communication channels is improved. Furthennore, as discussed above, implementation of this configuration may be peformed utilizing the distributed control system. Furthernore, as discussed previously, the present invention may be used for continuous corrections and rb-planning with respect to when the train consist uses braking based on upcoming items of interest, such as but not limited to railroad crossings, grade changes, approaching sidings, approaching depot yards, and approaching fuel stations where each locomotive in the consist may require a different braking option. For example, if the train is coming over a hill, the lead locomotive may have to enter a baking condition whereas the remote locomotives, having not reached the peak of the hill may have to remain in a motoring state. FIGS. 8, 9 and 10 depict exemplary illustrations of dynamic displays for use by the opemtor. As provided, FIG, 8, a trip profile is provided 72. Within the profile a location 73 of the locomotive is provided, Such information as train length 105 and the number of cars 106 in the train is provided. Elements are also provided regarding track grade 107, curve and wayside elements 108 including bridge location 109, and train speed 110, The display 68 allows the operator to view such information and also see where the train is along, the route. Information pertaining to distance and/or estimate time of arrival to such locations as crossings 112, signals 114, speed changes 116, landnmks 118, and destinations 120 is provided. An arrival time management tool 125 is also provided to allow the user to determine the fuel savings that is being realized during the trip. The operator has the ability to vary arrival times 127 and witness how this affects the fuel savings As discussed heein those skilled in the art will recogaize that fuel saving is an exemplary example of only one objective that can be reviewed with a management tool, Towards this end, depending on the parameter being viewed, other parameters, discussed herein can be viewed and evaluated with a 33 management tool that is visible to the operator The operator is also provided information about how long the crew has been operating the train, In exemplary embodiments time and distance information may either be illustrated as the time and/or distance until a particular event and/or location or it may provide a total elapsed time. As illustrated in FIG 9 an exemplary display provides information about consist data 130, an events and situation graphic 132, an arrival time management tool 134, ad action keys 136. Similar information as discussed above is provided in this display as well. This display 68 aLso provides action keys 138 to allow the operator to re-plan as well as to disengage 140 the present invention. FIG. 10 depicts another exemplary embodiment of the display. Data typical of a modern locomotive including air-brake status 72, analog speedometer with digital inset 74, and information about tractive effort in pounds force (or traction amps for DC locomotives) is visible. An indicator 74 is rIovied to show the current optimal speed in the plan being executed as well as an accelerometer graphic to supplement the readout in mph/minute. Important new data fm optimal plan execution is in the center of the screen, including a rolling strip graphic 76 with optimal speed andt notch setting versus distance compared to the curet history of thse variables. . In this exemplary embodiment, location of the train is derived using the locator element, As lustrated, the location is provided by identifying how far he train is away frm its final destination, an absolute position, an initial destination, an intermediate point, and/cc an operator input The strip chart provides a look-ahead to changes in speed required to follow the optimal plan, which is useful in manual control, and monitors plan versus actual during automatic control As discussed herein, such as when in the coaching mode, the operator can either follow the notch or speed suggested by the present invention The vertical bar gives a graphic of desired and actual notch, which are also displayed digitally below the strip chart. When continuous notch power is utilized, as discussed above the display will shnply round to closest discrete equivalent, the display may be 34 an analog display so that an analog equivalent or a percentage or actual horse power/tractive effort is displayed. Critical iriormation on trip status-is displayed on the seen, and shows the tentrat grade the train is encountering 88, either by the lead locomotive, a location elsewhere along the train or an average over the train length, A distance traveled so far in the plan 90, cumulative fuel used 92, where or the distance away the next stop is planned 94, cent and projected arrival time 96 expected time to be at next stop are also disclosed, The display 68 also shows the maximum possible time to destination possible with the computed plans available. If a later arrival was requirex, a re-plan would be carried out. Delta plan data shows status for fuel and schedule ahead ox behind the Current optimal plan. Negative numbers mean less fuel or eady compared to plan, positive numbers men more fuel or late compared to plan, and typially trade-off in opposite directions (slowing down to save fuel makes the train late and conversely), At alu times these displays 68 gives the opemtor a snapshot of where he stands with respect to the currently instituted driving plan. This display is for illustrative purpose only as there are many other ways of displaying/eonveying this information to the operator and/or dispatch Towards this end, the information disclosed above could be intermixed to provide a display different than the ones disclosed Other features that may be included in the present invention include, bat are not limited to, allowing for the generating of data logs and sports. This information may be stored on the train and downloaded to an off-board system at some point in time. The downloads may occur via manual and/or wireless transmission, This information may also be viewalle by the operator via the locomotive display The data may include such. information as, but not limited to, operator inputs, time system is operational, fuel saved, fuel imbalance across locomotives in the train, train journey off course system diagnostic issues such as if GPS sensor is rnlfunctioning Since tip plans must also take into consideration allowable crew operation time, the present invention. may take such information into consideration as a trp is planned 35 For example, if the maximum time a crew may operate is eight hours, then the trip shall be fashioned to include stopping location for a new crew to take the place of the present cremw. Such specified stopping locations may include, but are not limited to rai yards meejsslocations etcIf, as the trip progresses, the trip time may be exceeded, the present invention may be overridden by the operator to meet criteria as deteamined by the operator, Ultimately, regardless of the operating conditions of the train, such as but not limited to high load, low speed, train stretch conditions, etc., the operator remains in control to command a speed and/or operating condition of the train. Usig the present invention, the train may operate in a plurality of operations. In one operational concept, the present invention may provide commands for commanding propulsion, dynamic braking. The operator then candles al other train functions. In another operational concept, the present invention may provide commands for commanding propulsion only, The operator then handles dynamic braking and all other train functions. In yet another operational concept, the present invention tmay provide commands for commanding propulsion, dynarnic braking and application of the airbrake. The operator then handles all other train functions, The present invention may also be used by notify the operator of upcoming items of interest of actions to be taken. Specifically, the forecasting logic of the present invention, the continuous connections and re-planning to the optimized trip plan, the track database, the operator can be notified of upcorming crossings, signal, grade changes, brake actions, sidings, rail yards, fIel stations, etc. This nodfication may occur audibly and/or through the operator interface. Specifically using the physics based planning mode, train set-up information, on board track database, on-board operating rales, location detj. nination system, real time closed loop powedbrake control, and sensor feedback, the system shall present and/or notify the operator of required actions. The notification can be visual and/or audible, Examples include notifying of crossings that require the operator activate the locomotive horn and/or bell, notifying of "silent" crossings that do not require the operator activate the locomotive horn or bell 36 In another exemplary embodiment, using the physics based planning model discussed above, train set-up information, on-board track database, on-board operating tales, location determination system, real-time closed power/brake control, and sensor feedback, the risent invention may present the operator information (e. a gauge on display) that allows the. operator to see when the train will aive at various locations as illustrated in FIG. 9, The system shall allow the operator to adjust the trip plan (target arrival time), This information (actual estimated arrival time or information needed to derive off-board) can also be communicated to the dispatch center to allow the dispatcher or dispatch system to adjust the target arrival times. TiS allows the system to quickly adjust and optimize for the appropriate target function (for example trading off speed and fhel usage) Based on the information provided above, exemplary embodrnents of the invention may be used to determine a location of the train 31 on a tmck, step 18 A determination of the track characteristic may also be accomplished, such as by using the train parameter estimator 65. A trip plan may be created based on the location of the train, the characteristic of the track, and an operating condition of at least one locomotive of the train, Furthermore, an optimal power requirement may be communicated to train wherein the train operator may be directed to a locomotive, locomotive consist and/or tmin in accordance with the optimal power, such as through the wireless cormnunication system 47. In another example instead of directing the train operator, the train 31, locomotive consist 18, and/or locomotive may be automatically operated based on the optimal power setting. Additionally a method may also involve determining a power setting or power commands 14, for the locomotive consist 18 based on the trip plan. The locomotive consist 18 is then operated at the power setting. Operating parameters of the train and/or locomotive consist may be collected, such as but not limited to actual speed of the train, actual power setting of the locomotive consist, ad a location of the train. At least one of these parameters can be compared to the power setting the locomotive consist is commanded to operated at, 37 In another embodiment, a method may involve determining operational parameters 62 of the train and/or locomotive consist. A desired operational parameter is determined based on determined operational parameters. The determined parameter is compared to the operational parameter. If a difference is detected, the trip plan is adjusted, step 24. Another embodiment may entail a method where a location of the train 31 on the track 34 is determined. A characteristic of the track 34 is also determined, A trip plan, or drive plan, is developed, or generated in order to minimize fuel consumption. The trip ph may be generated based on the location of the train, the characteristic of the track, and/or the operating condition of the locomotive consist 18 and/or train 31. In a similar method, once a location of the train is determined on the track and a characteristic of the track is knonn, propulsion control and/or notch commands are provided to minimize fuel consumption. Throughout this specification and the claims which follow, unless the context requires otherwise, the word "comprise, and variations such as "comprises" or "comprising", will be understood to imply the inclusion of a stated integer or step or group of integers or steps but not the exclusion of any other integer or step or group of integers or steps. The reference in this specification to any prior publication (or information derived from ), or to any matter which is known, is not, and should not be taken as, an acknowledgement or admission. or any fbrm of suggestion that that prior publication (or information derived from it) or known matter forms part of the common general knowledge in the field of endeavour to which this specification relates. 38

Claims (14)

1. A method for operating a train having one or more locomotive consists with each locomotive consist including one or more locomotives, the method including: receiving route data and train data, wherein the route data includes data relating to one or more characteristics of a track on which the train is to travel along a route and data relating to at least one speed limit along the route, and wherein the train data relates to one or more characteristics of the train; creating on-board the train a trip plan at any time during travel of the train along the route, wherein the trip plan is created at a first point along the route based on the received data and covers at least a segment of the route extending to a second point further along the route than the first point, the trip plan designating operational settings of the train as a function of at least one of distance or tinme along the route; and automatically controlling the train according to the trip plan as the train travels along the route segment, said trip plan being configured for increasing efficiency of the train by at least one of reducing fuel use of the train and reducing emissions produced by the train along the segment of the route; measuring actual efficiency of the train during travel of the train according to the trip plan; and updating the trip plan during travel of the train based on the actual efficiency that is measured,
2. The method of claim 1 further including revising the trip plan based on at least one of new route data and train data received as the train travels along the route.
3. The method of claim I further including manually iiing a speed of the train,
4. The method of claim I further including creating a separate trip plans for each of a plurality of segments of the route, wherein at least one of the multiple segments is determined by a natural location along the trip, a siding where a meet and pass may occur, a yard siding, or a waypoint, 39 . The method of claim 2 wherein the trip plan is further created based on current operational information of the train, and wherein the trip plan is revised into a revised trip plan based on new or updated current operational information of the train as the train travels along the route.
6. The method of claim 4 further including combining trip plan optimization of the separate trip plans created for the plurality of route segments.
7. The method of claim 5 wherein creating the trip plan and revising the trip plan further includes factoring in environmental conditions into the revised trip plan.
8. The method of claim I further including implementing train handling rules to control a power setting of the one or more locomotive consists to achieve a target speed.
9. The method of claim I anther including determining a power setting for each locomotive in the one or more locomotive consists to optimize the train speed based on the trip plan and a location of the train. 10 The method of claim I further comprising determining several trip plans that include the trip plan for the at least a segment of the route and presenting the several tip plans to a user to allow the user to select a trip plan to execute. 11, The method of claim 1 wherein the user may decide when to control at least one of a propulsion system and braking system of the train.
12. The method of claim I wherein the trip plan includes a slack time period based on at least one of a confidence and probability of occurrence of an unplanned delay in the trip plan,
13. The method of claim I further including monitoring efficiency of the train and updating the trip plan based on the actual efficiency measured. 40 14, The method according to claim 1 further including updating the trip plan based on a predetermined plan parameter, wherein the plan parameter is at least one of a track condition, a request by dispatch, a change in conditions of the one or more locomotives, track speed limits, and operator input.
15. The method according to claim 1, wherein creating the trip plan includes arrival time management,
16. The method according to claim 1, further including communicating information related to at least one of the trip plan and an updated trip plan to an operator. 17, The method according to claim 1, further including logging and reporting performance of the train versus the trip plan. I8. The method according to claim 1, further including using the trip plan to coach an operator of the train.
19. The method according to claim 1, further including coiniunicating an optimal power requirement; and operating the train or a locomotive or locomotive consist in the train in accordance with the optimal power, 20, The method according to claim 19, further including directing an operator to opera t e at least one of the train, the locomotive consist and one or more locomotives in the train in accordance with the optimal power requirement.
21. The method according to claim 1, further including communicating an optimal throttle setting; and automatically operating at least one of the train or a locomotive or locomotive consist in the train in accordance with the optimal throttle setting 41
AU2016201882A 2006-03-20 2016-03-24 Trip optimization system and method for a train Active AU2016201882B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
AU2016201882A AU2016201882B2 (en) 2006-03-20 2016-03-24 Trip optimization system and method for a train

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
US11/385,354 2006-03-20
AU2007202928A AU2007202928A1 (en) 2006-03-20 2007-01-18 Trip optimization system and method for a train
AU2012261786A AU2012261786A1 (en) 2006-03-20 2012-12-17 Trip optimization system and method for a train
AU2016201882A AU2016201882B2 (en) 2006-03-20 2016-03-24 Trip optimization system and method for a train

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
AU2012261786A Division AU2012261786A1 (en) 2006-03-20 2012-12-17 Trip optimization system and method for a train

Publications (2)

Publication Number Publication Date
AU2016201882A1 true AU2016201882A1 (en) 2016-04-21
AU2016201882B2 AU2016201882B2 (en) 2018-04-05

Family

ID=55806036

Family Applications (1)

Application Number Title Priority Date Filing Date
AU2016201882A Active AU2016201882B2 (en) 2006-03-20 2016-03-24 Trip optimization system and method for a train

Country Status (1)

Country Link
AU (1) AU2016201882B2 (en)

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5828979A (en) * 1994-09-01 1998-10-27 Harris Corporation Automatic train control system and method
CA2453754A1 (en) * 2002-12-20 2004-06-20 Cattron Intellectual Property Corporation Remote control system for a locomotive
US7127336B2 (en) * 2003-09-24 2006-10-24 General Electric Company Method and apparatus for controlling a railway consist

Also Published As

Publication number Publication date
AU2016201882B2 (en) 2018-04-05

Similar Documents

Publication Publication Date Title
US9733625B2 (en) Trip optimization system and method for a train
US8630757B2 (en) System and method for optimizing parameters of multiple rail vehicles operating over multiple intersecting railroad networks
AU2007333518C1 (en) Method, system and computer software code for trip optimization with train/track database augmentation
US7974774B2 (en) Trip optimization system and method for a vehicle
US9266542B2 (en) System and method for optimized fuel efficiency and emission output of a diesel powered system
US8676410B2 (en) System and method for pacing a plurality of powered systems traveling along a route
US20070225878A1 (en) Trip optimization system and method for a train
US20080312775A1 (en) System, method, and computer software code for optimizing speed regulation of a remotely controlled powered system
AU2007289021A1 (en) Method and apparatus for optimizing railroad train operation for a train including multiple distributed-power locomotives
CA2622514A1 (en) Method and apparatus for optimizing railroad train operation for a train including multiple distributed-power locomotives
WO2008073547A2 (en) Trip optimization system and method for a diesel powered system
AU2012261786A1 (en) Trip optimization system and method for a train
AU2013206474A1 (en) Method and apparatus for optimizing railroad train operation for a train including multiple distributed-power locomotives
AU2016201882A1 (en) Trip optimization system and method for a train
AU2016202936B2 (en) Method and apparatus for optimizing railroad train operation for a train including multiple distributed-power locomotives
AU2007289022B2 (en) Trip optimization system and method for a train
MX2008003359A (en) System and method for optimizing parameters of multiple rail vehicles operating over multiple intersecting railroad networks

Legal Events

Date Code Title Description
FGA Letters patent sealed or granted (standard patent)