AU2012370482B2 - Determining optimal parameters for a downhole operation - Google Patents
Determining optimal parameters for a downhole operation Download PDFInfo
- Publication number
- AU2012370482B2 AU2012370482B2 AU2012370482A AU2012370482A AU2012370482B2 AU 2012370482 B2 AU2012370482 B2 AU 2012370482B2 AU 2012370482 A AU2012370482 A AU 2012370482A AU 2012370482 A AU2012370482 A AU 2012370482A AU 2012370482 B2 AU2012370482 B2 AU 2012370482B2
- Authority
- AU
- Australia
- Prior art keywords
- downhole
- data
- ongoing
- parameter
- downhole operation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B41/00—Equipment or details not covered by groups E21B15/00 - E21B40/00
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B44/00—Automatic control systems specially adapted for drilling operations, i.e. self-operating systems which function to carry out or modify a drilling operation without intervention of a human operator, e.g. computer-controlled drilling systems; Systems specially adapted for monitoring a plurality of drilling variables or conditions
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F3/00—Input arrangements for transferring data to be processed into a form capable of being handled by the computer; Output arrangements for transferring data from processing unit to output unit, e.g. interface arrangements
- G06F3/01—Input arrangements or combined input and output arrangements for interaction between user and computer
- G06F3/048—Interaction techniques based on graphical user interfaces [GUI]
- G06F3/0484—Interaction techniques based on graphical user interfaces [GUI] for the control of specific functions or operations, e.g. selecting or manipulating an object, an image or a displayed text element, setting a parameter value or selecting a range
Landscapes
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Geochemistry & Mineralogy (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Human Computer Interaction (AREA)
- General Physics & Mathematics (AREA)
- Earth Drilling (AREA)
- User Interface Of Digital Computer (AREA)
- Operations Research (AREA)
- Testing And Monitoring For Control Systems (AREA)
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| PCT/US2012/026548 WO2013126074A1 (en) | 2012-02-24 | 2012-02-24 | Determining optimal parameters for a downhole operation |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| AU2012370482A1 AU2012370482A1 (en) | 2014-07-03 |
| AU2012370482B2 true AU2012370482B2 (en) | 2016-06-30 |
Family
ID=49006092
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| AU2012370482A Ceased AU2012370482B2 (en) | 2012-02-24 | 2012-02-24 | Determining optimal parameters for a downhole operation |
Country Status (8)
| Country | Link |
|---|---|
| US (1) | US20140326449A1 (https=) |
| EP (1) | EP2780544B1 (https=) |
| CN (1) | CN104145079A (https=) |
| AU (1) | AU2012370482B2 (https=) |
| CA (1) | CA2863586C (https=) |
| MX (1) | MX2014007972A (https=) |
| NO (1) | NO2780544T3 (https=) |
| WO (1) | WO2013126074A1 (https=) |
Families Citing this family (57)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US9646115B2 (en) * | 2012-04-17 | 2017-05-09 | Schlumberger Technology Corporation | Determining a limit of failure in a wellbore wall |
| US9593566B2 (en) * | 2013-10-23 | 2017-03-14 | Baker Hughes Incorporated | Semi-autonomous drilling control |
| CN105899757A (zh) * | 2013-12-17 | 2016-08-24 | 哈利伯顿能源服务公司 | 包括钻柱伸长和扭转的估计的钻井模型校准 |
| CN103678665B (zh) * | 2013-12-24 | 2016-09-07 | 焦点科技股份有限公司 | 一种基于数据仓库的异构大数据整合方法和系统 |
| US10577918B2 (en) | 2014-02-21 | 2020-03-03 | Gyrodata, Incorporated | Determining directional data for device within wellbore using contact points |
| US10316639B2 (en) * | 2014-02-21 | 2019-06-11 | Gyrodata, Incorporated | System and method for analyzing wellbore survey data to determine tortuosity of the wellbore using displacements of the wellbore path from reference lines |
| US10329896B2 (en) * | 2014-02-21 | 2019-06-25 | Gyrodata, Incorporated | System and method for analyzing wellbore survey data to determine tortuosity of the wellbore using tortuosity parameter values |
| US10323502B2 (en) * | 2014-05-02 | 2019-06-18 | Kongsberg Oil And Gas Technologies As | System and console for monitoring and managing tripping operations at a well site |
| WO2015191095A1 (en) | 2014-06-09 | 2015-12-17 | Landmark Graphics Corporation | Employing a target risk attribute predictor while drilling |
| US11634979B2 (en) | 2014-07-18 | 2023-04-25 | Nextier Completion Solutions Inc. | Determining one or more parameters of a well completion design based on drilling data corresponding to variables of mechanical specific energy |
| CA2959807C (en) * | 2014-10-08 | 2020-08-18 | Landmark Graphics Corporation | Predicting temperature-cycling-induced downhole tool failure |
| CN104453841B (zh) * | 2014-10-23 | 2017-02-15 | 中国石油天然气集团公司 | 钻井节能提速导航优化方法 |
| CA2965645C (en) | 2014-12-02 | 2020-07-14 | Landmark Graphics Corporation | Determining dominant scenarios for slowing down trip speeds |
| WO2016140699A1 (en) | 2015-03-02 | 2016-09-09 | C&J Energy Services, Inc. | Well completion system and method |
| GB2550741B (en) * | 2015-03-04 | 2020-11-11 | Landmark Graphics Corp | Path optimization in production network systems |
| US20240430385A1 (en) * | 2015-04-16 | 2024-12-26 | Offender Smartphone Monitoring, LLC | Monitoring process |
| CN104806226B (zh) * | 2015-04-30 | 2018-08-17 | 北京四利通控制技术股份有限公司 | 智能钻井专家系统 |
| AU2015397939B2 (en) * | 2015-06-10 | 2019-03-28 | Halliburton Energy Services, Inc. | Apparatus and methods to manage wellbore fluid properties |
| US20170044896A1 (en) * | 2015-08-12 | 2017-02-16 | Weatherford Technology Holdings, Llc | Real-Time Calculation of Maximum Safe Rate of Penetration While Drilling |
| WO2017034586A1 (en) | 2015-08-27 | 2017-03-02 | Halliburton Energy Services, Inc. | Predicting wellbore operation parameters |
| AU2015406995B2 (en) | 2015-08-27 | 2020-12-24 | Halliburton Energy Services, Inc. | Tuning predictions of wellbore operation parameters |
| AU2015406996B2 (en) * | 2015-08-27 | 2020-12-24 | Halliburton Energy Services, Inc. | Determining sources of erroneous downhole predictions |
| CN105401935B (zh) * | 2015-11-30 | 2018-04-06 | 中国石油天然气集团公司 | 一种钻井钻压计算方法、装置及钻压指示设备 |
| CA3014293C (en) * | 2016-04-14 | 2019-11-19 | Landmark Graphics Corporation | Parameter based roadmap generation for downhole operations |
| US9792571B1 (en) * | 2016-04-14 | 2017-10-17 | Nabors Drilling Technologies Usa, Inc. | Efficiency tracking system for a drilling rig |
| EP3443198A4 (en) * | 2016-04-15 | 2020-02-19 | Landmark Graphics Corporation | OPTIMIZATION AND REAL-TIME VISUALIZATION OF PARAMETERS FOR DRILLING OPERATIONS |
| US20190114553A1 (en) * | 2016-07-18 | 2019-04-18 | Halliburton Energy Services, Inc. | Methods for modeling dogleg severity of a direction drilling operation |
| CN106649181B (zh) * | 2016-09-29 | 2019-09-13 | 中法渤海地质服务有限公司 | 一种用于钻完井现场同时集成wits数据和witsml数据的方法 |
| CA3037480C (en) * | 2016-12-07 | 2021-05-04 | Halliburton Energy Services, Inc. | Measuring invisible lost time in drilling operations |
| AU2018317919A1 (en) * | 2017-08-18 | 2020-01-30 | Landmark Graphics Corporation | Rate of penetration optimization for wellbores using machine learning |
| US10954772B2 (en) | 2017-09-14 | 2021-03-23 | Baker Hughes, A Ge Company, Llc | Automated optimization of downhole tools during underreaming while drilling operations |
| US10920562B2 (en) | 2017-11-01 | 2021-02-16 | Schlumberger Technology Corporation | Remote control and monitoring of engine control system |
| US11268888B1 (en) * | 2017-12-19 | 2022-03-08 | University Of South Florida | Systems and methods for determining concrete strength |
| EP4600462A3 (en) | 2017-12-23 | 2025-10-29 | Noetic Technologies Inc. | System and method for optimizing tubular running operations using real-time measurements and modelling |
| EP3765708B1 (en) * | 2018-03-13 | 2024-05-08 | AI Driller, Inc. | Drilling parameter optimization for automated well planning, drilling, and guidance systems |
| US10705499B2 (en) | 2018-03-30 | 2020-07-07 | Schlumberger Technology Corporation | System and method for automated shutdown and startup for a network |
| CN108678725A (zh) * | 2018-04-27 | 2018-10-19 | 中国石油集团川庆钻探工程有限公司 | 井下摩阻和扭矩实时监测分析方法 |
| US11215033B2 (en) | 2018-05-16 | 2022-01-04 | Saudi Arabian Oil Company | Drilling trouble prediction using stand-pipe-pressure real-time estimation |
| CN108756848B (zh) * | 2018-05-21 | 2019-05-21 | 北京四利通控制技术股份有限公司 | 一种智能钻井控制云平台及智能钻井控制系统 |
| US10557345B2 (en) | 2018-05-21 | 2020-02-11 | Saudi Arabian Oil Company | Systems and methods to predict and inhibit broken-out drilling-induced fractures in hydrocarbon wells |
| US10753203B2 (en) | 2018-07-10 | 2020-08-25 | Saudi Arabian Oil Company | Systems and methods to identify and inhibit spider web borehole failure in hydrocarbon wells |
| WO2020139345A1 (en) * | 2018-12-27 | 2020-07-02 | Halliburton Energy Services, Inc. | Real-time decision engine |
| NO20220121A1 (en) * | 2019-08-26 | 2022-01-21 | Landmark Graphics Corp | Mechanical and hydromechanical specific energy-based drilling |
| WO2021194494A1 (en) * | 2020-03-26 | 2021-09-30 | Landmark Graphics Corporation | Physical parameter projection for wellbore drilling |
| US11193364B1 (en) * | 2020-06-03 | 2021-12-07 | Schlumberger Technology Corporation | Performance index using frequency or frequency-time domain |
| US11697989B2 (en) | 2020-08-27 | 2023-07-11 | Landmark Graphics Corporation | Micro invisible lost time in drilling operations |
| US11675105B2 (en) * | 2020-08-27 | 2023-06-13 | Saudi Arabian Oil Company | System and method for configuring a logging module |
| GB2615696B (en) * | 2020-11-05 | 2024-09-11 | Baker Hughes Oilfield Operations Llc | Predictive models and multi-objective constraint optimization algorithm to optimize drilling parameters of a wellbore |
| US12540518B2 (en) * | 2021-01-29 | 2026-02-03 | Schlumberger Technology Corporation | Controlling drilling fluid composition using an inverted multi-variable drilling fluid additive model |
| US12044124B2 (en) | 2021-02-05 | 2024-07-23 | Saudi Arabian Oil Company | Method and system for real-time hole cleaning using a graphical user interface and user selections |
| US12292543B2 (en) | 2021-02-12 | 2025-05-06 | Saudi Arabian Oil Company | Method and system for determining permeability and lost circulation |
| WO2023086089A1 (en) * | 2021-11-11 | 2023-05-19 | Halliburton Energy Services, Inc. | Extracting video clips from videos for use in training a machine-learning model |
| US12037857B2 (en) | 2021-11-30 | 2024-07-16 | Saudi Arabian Oil Company | Method and system for determining hole cleaning efficiency based on wellbore segment lengths |
| CN114352191B (zh) * | 2022-01-11 | 2023-11-21 | 北京三一智造科技有限公司 | 一种地层弱化预处理方法及成孔方法 |
| US12264572B2 (en) * | 2022-03-29 | 2025-04-01 | Saudi Arabian Oil Company | System and method to predict and optimize drilling activities |
| CN115749730B (zh) * | 2022-11-10 | 2023-10-20 | 中国石油天然气集团有限公司 | 一种随钻岩石力学参数预测方法和系统 |
| WO2024151305A1 (en) * | 2023-01-09 | 2024-07-18 | Landmark Graphics Corporation | Borehole operation system with automated model calibration |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US6343656B1 (en) * | 2000-03-23 | 2002-02-05 | Intevep, S.A. | System and method for optimizing production from a rod-pumping system |
| US20020165671A1 (en) * | 2001-04-24 | 2002-11-07 | Exxonmobil Upstream Research Company | Method for enhancing production allocation in an integrated reservoir and surface flow system |
| US20040010373A1 (en) * | 2002-07-11 | 2004-01-15 | Smits Jan W. | Intelligent diagnosis of environmental influence on well logs with model-based inversion |
| US20100200224A1 (en) * | 2007-09-11 | 2010-08-12 | Emmanuel Toguem Nguete | Hydrocarbons production installation and method |
Family Cites Families (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US5941305A (en) * | 1998-01-29 | 1999-08-24 | Patton Enterprises, Inc. | Real-time pump optimization system |
| EP1917619B1 (en) * | 2005-07-27 | 2016-08-17 | Exxonmobil Upstream Research Company | Well modeling associated with extraction of hydrocarbons from subsurface formations |
| CA2671822C (en) * | 2006-12-07 | 2013-08-27 | Nabors Global Holdings, Ltd. | Automated mse-based drilling apparatus and methods |
| US8121971B2 (en) * | 2007-10-30 | 2012-02-21 | Bp Corporation North America Inc. | Intelligent drilling advisor |
| US8140310B2 (en) * | 2007-11-01 | 2012-03-20 | Schlumberger Technology Corporation | Reservoir fracture simulation |
| US7845404B2 (en) | 2008-09-04 | 2010-12-07 | Fmc Technologies, Inc. | Optical sensing system for wellhead equipment |
-
2012
- 2012-02-24 NO NO12869095A patent/NO2780544T3/no unknown
- 2012-02-24 AU AU2012370482A patent/AU2012370482B2/en not_active Ceased
- 2012-02-24 WO PCT/US2012/026548 patent/WO2013126074A1/en not_active Ceased
- 2012-02-24 CA CA2863586A patent/CA2863586C/en active Active
- 2012-02-24 MX MX2014007972A patent/MX2014007972A/es unknown
- 2012-02-24 CN CN201280070508.8A patent/CN104145079A/zh active Pending
- 2012-02-24 US US14/364,936 patent/US20140326449A1/en not_active Abandoned
- 2012-02-24 EP EP12869095.5A patent/EP2780544B1/en active Active
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US6343656B1 (en) * | 2000-03-23 | 2002-02-05 | Intevep, S.A. | System and method for optimizing production from a rod-pumping system |
| US20020165671A1 (en) * | 2001-04-24 | 2002-11-07 | Exxonmobil Upstream Research Company | Method for enhancing production allocation in an integrated reservoir and surface flow system |
| US20040010373A1 (en) * | 2002-07-11 | 2004-01-15 | Smits Jan W. | Intelligent diagnosis of environmental influence on well logs with model-based inversion |
| US20100200224A1 (en) * | 2007-09-11 | 2010-08-12 | Emmanuel Toguem Nguete | Hydrocarbons production installation and method |
Also Published As
| Publication number | Publication date |
|---|---|
| EP2780544A1 (en) | 2014-09-24 |
| EP2780544B1 (en) | 2017-12-20 |
| CA2863586A1 (en) | 2013-08-29 |
| US20140326449A1 (en) | 2014-11-06 |
| WO2013126074A1 (en) | 2013-08-29 |
| MX2014007972A (es) | 2014-11-25 |
| CN104145079A (zh) | 2014-11-12 |
| CA2863586C (en) | 2018-05-15 |
| NO2780544T3 (https=) | 2018-05-19 |
| RU2014138507A (ru) | 2016-04-10 |
| EP2780544A4 (en) | 2016-04-13 |
| AU2012370482A1 (en) | 2014-07-03 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| AU2012370482B2 (en) | Determining optimal parameters for a downhole operation | |
| US12601251B2 (en) | Rig operations information system | |
| US11319793B2 (en) | Neural network models for real-time optimization of drilling parameters during drilling operations | |
| US10185306B2 (en) | Utilizing look-up tables representing all models in an automation control architecture to independently handle uncertainties in sensed data in oil and gas well construction | |
| US10934813B2 (en) | Method to optimize oilfield operations based on large and complex data sets | |
| CN106156389A (zh) | 用于自动执行的井规划 | |
| US12428946B2 (en) | Method and system for active learning and optimization of drilling performance metrics | |
| EP4256174B1 (en) | Rig operations controller | |
| Wallace et al. | A system for real-time drilling performance optimization and automation based on statistical learning methods | |
| WO2021040829A1 (en) | Active reinforcement learning for drilling optimization and automation | |
| Zhdaneev et al. | Predictive systems for the well drilling operations | |
| WO2024077538A1 (en) | Methods and systems for predicting lithology and formation boundary ahead of the bit | |
| US12524821B2 (en) | Method and system for determining predicted contract data using machine learning | |
| Popp et al. | Prescriptive data analytics to optimize casing exits | |
| US12098631B2 (en) | Process-mining software for generating a process flow for forming a wellbore | |
| RU2588526C2 (ru) | Определение оптимальных параметров для забойной операции | |
| Summersgill et al. | Enhancing Automated Sliding Performance Through the Integration of Physics Models and Machine Learning Algorithms | |
| Cao et al. | Real-Time Drilling and Completion Analytics: From Cloud Computing to Edge Computing and Their Machine Learning Applications | |
| WO2025155501A1 (en) | Ai-enabled unconfined compressive strength (ucs) real-time prediction utilizing logging-while-drilling measurements |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| DA3 | Amendments made section 104 |
Free format text: THE NATURE OF THE AMENDMENT IS: AMEND THE NAME OF THE INVENTOR TO READ SAMUEL, ROBELLO; GERMAIN, OLIVIER ROGER; SINGH, AMIT KUMAR; MARLAND, CHRISTOPHER NEIL AND ADARI, NARESH |
|
| FGA | Letters patent sealed or granted (standard patent) | ||
| MK14 | Patent ceased section 143(a) (annual fees not paid) or expired |