AU2012249236A1 - Public sector value model - Google Patents

Public sector value model Download PDF

Info

Publication number
AU2012249236A1
AU2012249236A1 AU2012249236A AU2012249236A AU2012249236A1 AU 2012249236 A1 AU2012249236 A1 AU 2012249236A1 AU 2012249236 A AU2012249236 A AU 2012249236A AU 2012249236 A AU2012249236 A AU 2012249236A AU 2012249236 A1 AU2012249236 A1 AU 2012249236A1
Authority
AU
Australia
Prior art keywords
organization
performance
public sector
value
public
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
AU2012249236A
Inventor
Greg Beales
George F. Chaplin
Jonathan Garbutt
Sajaad Jetha
Emma Jones
Christopher Lane
Thomas P. Leary
Nicholas Marren
Lisa H. Neuberger
Timothy P. Rogers
Fiona Sharples
Nicholas Martin Stevens
Greg Wilkinson
Mark Younger
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Accenture Global Services Ltd
Original Assignee
Accenture Global Services Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from AU2010202773A external-priority patent/AU2010202773A1/en
Application filed by Accenture Global Services Ltd filed Critical Accenture Global Services Ltd
Priority to AU2012249236A priority Critical patent/AU2012249236A1/en
Publication of AU2012249236A1 publication Critical patent/AU2012249236A1/en
Priority to AU2015203158A priority patent/AU2015203158A1/en
Abandoned legal-status Critical Current

Links

Abstract

A method and system for evaluating a public sector organization includes identifying at least one outcome measure and at least one cost-effectiveness measure 5 for a public sector organization; obtaining measurements associated with the measure; and determining a relative public performance measure of the public sector organization based on the measurements.

Description

-2 Public Sector Value Model TECHNICAL FIELD 5 This invention relates to a public sector value model. BACKGROUND A private sector organization typically produces outputs, such as products and/or services, using resources such as capital. For example, an automobile manufacturer produces 10 automobiles using invested capital represented by share capital and debt. A shareholder value model is a traditional means of evaluating the performance of the organization. The shareholder model approximates the value of the organization by evaluating two components of shareholder value: (1) the ability of the organization to generate a return over and above that required by its shareholders and (2) the extent to which the organization can grow the 15 amount of the investment. The present application is a divisional application of Australian Patent Application No. 2003288677, the disclosures of which are herein incorporated by reference. 20 SUMMARY The present invention provides a system, method and apparatus, including computer program products, for evaluating public sector organizations. In one aspect, the present invention provides a computer system configured to determine relative performance of an organization, the computer system including at least one 25 computer, a network interface coupled to the at least one computer, and a computer-readable medium coupled to the at least one computer including instructions stored thereon which, when executed by the at least one computer, cause the at least one computer to perform operations including receiving outcomes, on the network interface, from an organization that measures outcomes of benefit achieved by the organization, the outcomes a consequence of 30 an organization's operation that impact pre-existing realities, determining a performance value for the organization, the determination including weighting of the received outcomes, determining an effectiveness value as a ratio of the determined performance value and an operating cost of the organization, determining, using the determined performance value and the determined effectiveness value, a relative performance measure for the organization that 35 reflects performance of the organization relative to at least one of the organization's past -3 performance and performance of other organizations, and providing output, via a computer interface, based on the determined relative performance measure for the organization. Embodiments of these aspects of the invention may include one or more of the following features. 5 In one embodiment, determining the relative performance of an organization includes determining values, outcomes and cost for a public sector organization. Weighting outcomes that are a consequence of the public sector organization's operation and that impact pre-existing social realities includes positively weighting outcomes that are a consequence of the public sector organization's operation and that positively impact pre-existing social realities and 10 negatively weighting outcomes that are a consequence of the public sector organization's operation and that negatively impact pre-existing social realities. The relative public performance measure of the public sector organization is compared with performance patterns of other public sector organizations. Recommendations to the public sector organization relating to how the public sector organization can improve the 15 determined relative public performance measure of the public sector organization are made on the basis of the comparison. The impact of exogenous factors associated with an outcome measure that impacts pre-existing social realities by accounting for a relationship between key socioeconomic factors and the pre-existing social realities is removed. Alternatively, or additionally, the impact of exogenous factors associated with an outcome measure that 20 impacts pre-existing social realities by accounting for a relationship between key socioeconomic factors and the pre-existing social realities by grouping public sector organizations together based on common socioeconomic factors and producing a baseline for each group is removed, thereby excluding exogenous factors. In a further embodiment, determining the relative public performance measure for the 25 public sector organization includes accessing past performance values for the public sector organization, each past performance value corresponding to a particular period of time in the past, computing an average performance value for the public sector organization based on the past performance values, accessing past cost-effectiveness values for the public sector organization, each past cost-effectiveness value corresponding to a particular period of time in 30 the past, computing an average cost-effectiveness value for the public sector organization based on the past cost-effectiveness values and determining the relative public performance measure for the public sector organization based on the determined performance value, the computed average performance value for the public sector organization, the determined cost effectiveness value, and the computed average cost-effectiveness value for the public sector 35 organization.
-4 In another embodiment, determining the relative public performance measure for the public sector organization includes accessing performance values for other public sector organizations, each performance value corresponding to a particular public sector organization that is different than the public sector organization, computing an average 5 performance value for a public sector industry based on the accessed performance values, accessing cost-effectiveness values for the other public sector organizations, each cost-effectiveness value corresponding to a particular public sector organization that is different than the public sector organization, computing an average cost-effectiveness value for the public sector industry based on the accessed cost-effectiveness values and determining 10 the relative public performance measure for the public sector organization based on the determined performance value, the computed average performance value for the public sector industry, the determined cost-effectiveness value, and the computed average cost-effectiveness value for the public sector industry. In one embodiment, providing output based on the determined relative public 15 performance measure for the public sector organization includes generating, based on the determined relative public performance measure of the public sector organization, a public sector value matrix that graphically reflects the determined performance value for the public sector organization relative to an average performance value of at least one of the public sector organization's past performance and performance of other public sector organizations and that 20 graphically reflects the determined cost-effectiveness value for the public sector organization relative to an average cost-effectiveness value of at least one of the public sector organization's past performance and performance of other public sector organizations. In one embodiment, determining the cost-effectiveness value as a ratio of the determined performance value and the operating cost of the public sector organization 25 includes computing a cost-effectiveness value by dividing a first value that represents a total of beneficial outcomes achieved by the public sector organization by a second value computed as a sum of annual expenditure of the public sector organization minus capital expenditure of the public sector organization and annual capital charge of the public sector organization. The determined cost-effectiveness value as a ratio of the determined 30 performance value and the determined operating cost is based on variable costs, fixed costs, and available assets of the public sector organization. In another aspect, the present invention provides a computer implemented method of determining relative performance of an organization including receiving, on a network interface, outcomes that are a consequence of the organization's operation and that impact pre 35 existing realities, from an organization that measures outcomes of benefit achieved by the -5 organization, determining, on a computer processor, a performance value for the organization, the determination including weighting of the outcomes, determining, on a computer processor, an effectiveness value as a ratio of the determined performance value and an operating cost of the organization, determining, on a processor, using the determined 5 performance value and the determined effectiveness value, a relative performance measure for the organization that reflects performance of the organization relative to at least one of the organization's past performance and performance of other organizations and providing output based on the determined relative performance measure for the organization. In one embodiment, the method of determining the relative performance of an 10 organization includes determining values, outcomes and cost for a public sector organization. Weighting outcomes that are a consequence of the public sector organization's operation and that impact pre-existing social realities includes positively weighting outcomes that are a consequence of the public sector organization's operation and that positively impact pre-existing social realities and negatively weighting outcomes that are a consequence of the public sector 15 organization's operation and that negatively impact pre-existing social realities. The method includes relative public performance measure of the public sector organization being compared with performance patterns of other public sector organizations. Recommendations to the public sector organization relating to how the public sector organization can improve the determined relative public performance measure of the public 20 sector organization are made on the basis of the comparison. The impact of exogenous factors associated with an outcome measure that impacts pre-existing social realities by accounting for a relationship between key socioeconomic factors and the pre-existing social realities is removed. Alternatively, or additionally, the impact of exogenous factors associated with an outcome measure that impacts pre-existing social realities by grouping public sector 25 organizations together based on common socioeconomic factors and producing a baseline for each group is removed, thereby excluding exogenous factors. In one embodiment, the method of determining the relative public performance measure for the public sector organization includes accessing past performance values for the public sector organization, each past performance value corresponding to a particular period of time 30 in the past, computing an average performance value for the public sector organization based on the past performance values, accessing past cost-effectiveness values for the public sector organization, each past cost-effectiveness value corresponding to a particular period of time in the past, computing an average cost-effectiveness value for the public sector organization based on the past cost-effectiveness values and determining the relative public performance 35 measure for the public sector organization based on the determined performance value, the -6 computed average performance value for the public sector organization, the determined cost effectiveness value, and the computed average cost-effectiveness value for the public sector organization. In another embodiment, the method of determining the relative public performance 5 measure for the public sector organization includes accessing performance values for other public sector organizations, each performance value corresponding to a particular public sector organization that is different than the public sector organization, computing an average performance value for a public sector industry based on the accessed performance values, accessing cost-effectiveness values for the other public sector organizations, each 10 cost-effectiveness value corresponding to a particular public sector organization that is different than the public sector organization, computing an average cost-effectiveness value for the public sector industry based on the accessed cost-effectiveness values and determining the relative public performance measure for the public sector organization based on the determined performance value, the computed average performance value for the public sector 15 industry, the determined cost-effectiveness value, and the computed average cost-effectiveness value for the public sector industry. In yet another aspect, the present invention provides a computer storage medium encoded with a computer program, the program comprising instructions that when executed by data processing apparatus cause the data processing apparatus to perform operations 20 including determining a performance value for an organization that measures outcomes of benefit achieved by the organization, the determination including weighting outcomes that are a consequence of the organization's operation and that impact pre-existing realities, determining an effectiveness value as a ratio of the determined performance value and an operating cost of the organization, determining, using the determined performance value and 25 the determined effectiveness value, a relative performance measure for the organization that reflects performance of the organization relative to at least one of the organization's past performance and performance of other organizations, and providing, via a computer interface, output based on the determined relative performance measure for the organization. The relative performance measure can be used to perform a correlation analysis between 30 the relative performance measure and a particular outcome measure or a particular cost-effectiveness measure. The techniques and systems disclosed above may provide one or more of the following advantages. The public sector value (based on the Public Sector Value model) may be used for valuation, comparison, diagnosing, and understanding value drivers within the 35 organizations examined. The analysis of value drivers may be driven by the performance of -7 the organization in terms of meeting outcome targets and levels of cost-effectiveness. The techniques may allow further diagnosis to be undertaken. For example, an organization at one point in the model may find that it needs to concentrate on improving cost effectiveness, whereas an organization at another point may need to concentrate on improving outcomes. 5 The approach to improving performance may vary for each organization. An organization that is not cost effective but produces a high level of outcomes may have its budget reduced and measures taken to improve cost effectiveness. On the other hand, an organization with low outcomes, but which is relatively cost effective may actually be given more funds to improve the level of outcomes generated. 10 Through the use of detailed research and value trees, the above techniques may allow an organization to ascertain what specific actions the organization needs to take in order to create greater value. When these actions are identified, it may become clear what services and offerings the organization may require to help create greater value. A public sector organization using the model according to the present invention may 15 enable the organization to measure and compare performance based on value (e.g. between business units, and internationally), and guide performance improvement in areas such as target setting, performance assessment, and resource allocation. The invention can be implemented in digital electronic circuitry, or in computer hardware, firmware, software, or in combinations of them. The invention can be implemented 20 as a computer program product, i.e., a computer program tangibly embodied in an information carrier, e.g., in a machine-readable storage device or in a propagated signal, for execution by, or to control the operation of, data processing apparatus, e.g., a programmable processor, a computer, or multiple computers. A computer program can be written in any form of programming language, including compiled or interpreted languages, and it can be deployed 25 in any form, including as a stand-alone program or as a module, component, subroutine, or other unit suitable for use in a computing environment. A computer program can be deployed to be executed on one computer or on multiple computers at one site or distributed across multiple sites and interconnected by a communication network. Method steps of the invention can be performed by one or more programmable 30 processors executing a computer program to perform functions of the invention by operating on input data and generating output. Method steps can also be performed by, and apparatus of the invention can be implemented as, special purpose logic circuitry, e.g., an FPGA (field programmable gate array) or an ASIC (application-specific integrated circuit). Processors suitable for the execution of a computer program include, by way of 35 example, both general and special purpose microprocessors, and any one or more processors - 7a of any kind of digital computer. Generally, a processor will receive instructions and data from a read-only memory or a random access memory or both. The essential elements of a computer are a processor for executing instructions and one or more memory devices for storing instructions and data. Generally, a computer will also include, or be operatively 5 coupled to receive data from or transfer data to, or both, one or more mass storage devices for storing data, e.g., magnetic, magneto-optical disks, or optical disks. Information carriers suitable for embodying computer program instructions and data include all forms of nonvolatile memory, including by way of example semiconductor memory devices, e.g., EPROM, EEPROM, and flash memory devices; magnetic disks, e.g., internal hard disks or 10 removable disks; magneto-optical disks; and CD-ROM and DVD-ROM disks. The processor and the memory can be supplemented by, or incorporated in special purpose logic circuitry. The invention can be implemented in a computing system that includes a back-end component, e. g., as a data server, or that includes a middleware component, e.g., an application server, or that includes a front-end component, e.g., a client computer having a 15 graphical user interface or a Web browser through which a user can interact with an implementation of the invention, or any combination of such back-end, middleware, or front end components. The components of the system can be interconnected by any form or medium of digital data communication, e.g., a communication network. Examples of communication networks include a local area network ("LAN") and a wide area network 20 ("WAN"), e.g., the Internet. The computing system can include clients and servers. A client and server are generally remote from each other and typically interact through a communication network. The relationship of client and server arises by virtue of computer programs running on the respective computers and having a client-server relationship to each other. 25 The details of one or more embodiments of the invention are set forth in the accompanying drawings and the description below. Other features, objects, and advantages of the invention will be apparent from the description and drawings, and from the claims. BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a diagram of a shareholder model for a private sector organization. 30 FIG. 2 is a diagram of a public sector value model according to an implementation of the invention. FIG. 3 illustrates a methodology for developing an outcome model. FIG. 4 is graph showing an organization's performance over time in comparison to an overall average performance.
-7b FIG. 5 is compass representation illustrating various outcome and cost effectiveness vectors. FIG. 6 is graph showing both outcome and cost effectiveness for a time series/single organization matrix. 5 FIG. 7 is a graph showing the outcome performance alone, of the organization, over a period of time relative to its average score. FIG. 8 is a graph showing an organization's cost effectiveness performance over a period of time relative to its average score. FIG. 9 is a graph showing an organization's outcomes and the cost effectiveness score 10 relative to the average organizations performance within a particular year. FIG. 10 is a graph showing the outcome performance for a number of organizations relative to the average organizations performance within a particular year. FIG. I1 is a graph showing, the cost effectiveness performance for a number of organizations relative to the average organizations performance within a particular year. 15 FIG. 12 is a graph showing the outcome and cost effectiveness performance for a number of organizations relative to the average organizations performance over multiple years, here three years. FIG. 13 is a graph showing the outcome performance for a number of organizations relative to the average organizations over a period of time relative to the average score. 20 FIG. 14 is a graph showing the cost effectiveness performance for a number of organizations relative to the average organizations over a period of time relative to the average score. FIGS. 15A- 15F are diagrams of a public sector value model of public sector organizations according to an implementation of the invention. 25 FIG. 16 is a graph of a plot of an industry analysis according to an implementation of the invention. FIG. 17 is a block diagram of a computer system for implementing a method of producing a public sector value according to an implementation of the invention. FIG. 18 illustrates a methodology for developing a public sector value model. 30 Like reference symbols in the various drawings indicate like elements.
DETAILED DESCRIPTION Referring to FIGS. I and 2, diagrams of a shareholder model for a private sector organization and for a public sector organization are shown. The shareholder value model 50 represents a means of approximating the true value of commercial 5 organizations. Commercial organizations exist in order to create value for their shareholders. This is the basis for the shareholder value model 50. It should be noted that although the true value of a commercial organization may have a strong bearing on its actual value (i.e. share price), it does not necessarily follow, since a variety of factors might affect a commercial organization's share price in a manner which may 10 cause a deviation from true value (such as overly optimistic or pessimistic expectations of future performance). As a context for developing a public sector value (PSV) model 60, a commercial sector organization has some distinct advantages over that of the public sector which make valuation easier to apply. 15 First, value is a readily identifiable starting point for commercial considerations. The commercial model can start from a consideration of what factors affect the basic measure of value - share price. The fact that a measure of value already exists for shareholders suggests that private sector value can be both understood and ultimately tested. The axes of the private sector model are the two 20 key levers of shareholder value - the ability of the organization to generate a return over and above that required by its shareholders and the extent to which the organization can grow the absolute size of the investment. It should be noted that the value provided to other private sector stakeholder groups (such as employees) is actually more difficult to measure and in fact far more akin to the public sector in 25 terms of a poorly defined understanding of value. Second, the shareholder value model 50 may provide an advantage over any public sector equivalent because its core currency of value is in the form of money. The commercial sector can specify inputs and outputs all in terms of monetary value and consequently the issues of comparability which plague any public sector model 8 are avoided. Examples include public sector outcomes such as improved health or reduced levels of crime, which do not have inherent and obvious financial values. However, despite these differences, the shareholder value model 50 represents a useful starting position for developing a PSV model 60. The shareholder value 5 model 50 suggests that anything that affects the true value of an organization to its owners will be reflected on one of the axes. Therefore, it must be the case that the axes in the PSV model 60 reflect all public sector value. It may not be possible to suggest an organization that is delivering value to the public in a way that is not reflected within the model. 10 The shareholder value model 50 measures the value of commercial organizations in terms of value to owners. This is not the only way of understanding value. Value, even in a commercial context, can be measured from the point of view of other stakeholders, such as employees, suppliers, customers or communities in which organizations are based. 15 Outcome vs. Outputs The achievements of public sector organizations may be understood in terms of outcomes of social benefit. That the end result of the activity of a public sector organization is beneficial to some group of society who deserve that outcome is a 20 justification for that public sector organization. Thus, socially beneficial outcomes can be used as measure of the value of public sector organizations. There is a distinction between outcomes and outputs - a distinction familiar within the realm of performance measurement. Outcomes in this context are the achievements of organizations in terms of affecting pre-existing social realities. 25 Outputs, however, are the end result of organizational processes. For example, an output of a police organization might include an arrest. An outcome of the police organization (and indeed an outcome of this particular output) might be the avoidance of criminal activities that would have been carried out by the arrested individual. 9 Outcomes can be used as a direct lever of public sector value, whereas outputs are only valuable in as much as they deliver outcomes. An organization might be very good at delivering outputs that are of no consequence in terms of any outcome. This would not represent public sector value. Therefore, the PSV model 60 seeks to 5 measure outcomes rather than outputs. Changes in total outcomes may be associated with the shareholder value model 50 in terms of growth in revenue. However, a shareholder may be interested only in the growth of revenue after they become a shareholder (as this increases the value of their investment - assuming spread remains constant). However, in the 10 public sector, growth is not as significant a lever of value as total level of outcomes generated. Citizens may be interested primarily in the level of service provided, and not specifically in whether there has been an increase. For example, a police force which has consistently provided a very high level of service is of equal value to one which has matched its performance through spectacular growth (even though 15 management in the latter might be said to have achieved a more significant task). Measurement of the change to social outcomes is to some extent a practice already familiar within the public sector. To some extent, government performance is seen to be related to the levels of key outcome indicators for public services (such as levels of crime or education). 20 The measurement process includes the task of separating outcomes from outputs such that only outcomes are being measured. To apply this principle to any government industry requires the identification of the outcomes of that industry. This process can be performed through background research as well as consultation with experts and practitioners. 25 One approach for defining outcomes is to begin with a consideration of the very high level goals of any public sector organization. This is termed 'first level outcomes'. In some cases this will be a list of three or four. In the case of the public health, for example, it would include prevention of ill health and the correction of ill health through treatment. 10 In addition to these outcomes, the application of the PSV model 60 should also include a "Meeting Public Expectations" first level outcome. This outcome would be in addition to any others identified and would encompass all measures of service provision which are ultimately valued by the public, whether or not they are in fact 5 core to the organization's fundamental goals. It may also be necessary to make an analysis of any outcomes, which are a consequence of the organization's operation, whether beneficial or otherwise. Such outcomes may need to be taken into account when determining the total outcome of an organization's operation and in some cases may need to be negatively weighted 10 such that their occurrence causes a reduction in the value of the organization. For example, such an outcome may include interference with free trade generated through port controls. Having identified these first level outcomes, there can be a translation into lower level outcomes which together aggregate to the first level outcomes described. 15 In the case of the correction of ill health, this list would include increased 'health' through surgical work and increased 'health' through medicine. Further breaking down of outcomes may be required until the point at which they can be effectively measured and weighted. However, the PSV model 60 is focused on outcomes and not outputs. It should be noted that the measure of health might still need to be defined. 20 For example, in public health context, this would likely be by the commonly used QUALY (quality adjusted life year). It might then be necessary to sub-divide first or second level outcomes down even further. The key-determining factor in producing this analysis is the need to measure performance of an outcome. (See block 104 in FIG. 2) In some cases only a 25 small amount of breakdown might be required. In other cases much more complex outcomes might be measured only through 4 or 5 levels of outcomes. To apply such a valuation model as a performance measurement tool within public sector organizations, it may be possible to define new measures of outcomes. However, it is more likely current and publicly available data will be used to conduct I I the analysis. In many cases, this data will be available only for outputs and in such cases this will mean using output measures as proxy indicators of the actual outcome. To use output data in this manner, outputs should be applied to (and weighted within) outcomes, as they are understood to deliver that particular outcome. Although 5 not ideal, this approach should allow judgments relating to value to be made in cases where outcomes simply are not measured. However, when doing this analysis, use of output measures as proxies for outcomes should be clearly stated. This is important, as later value level analysis will be limited in specific areas by the fact that outputs have been used to measure delivery of outcomes during the analysis. 10 In some cases, there may be some outcomes in any analysis, which cannot be successfully measured, even through the use of proxy output measures. In such circumstances, there are three choices, both of which should probably be used to produce alternative analyses. First, the model can ignore the areas, which cannot be measured. This may not be ideal. Second, the model can give organizations within 15 the comparison equal performance within the outcome. This is preferable to giving all organizations no value in an outcome and such a practice would distort any overall analysis of value towards that which could be measured (something which is a common problem amongst public sector services). Lastly, organizations may be producing a particular outcome based on the level of funds spent on that area (as 20 provided by the cost analysis within the model). This will only be possible where some sort of activity-based costing is available and will not always be appropriate, but it avoids the difficulty of scoring all organizations equally when some might be legitimately more focused on providing value in that area. A main problem is that expenditure is not a measure of outcomes 25 Accurate measurement of outcomes can be improved by excluding exogenous factors which might affect outcomes quite significantly, but which are not in any way the responsibility of a public sector organization. Exogenous factors may vary depending upon the services being provided. For example, in social services, this may include local levels of unemployment, drug abuse or incidence of English as the first 3o language. 12 Exogenous factors may have a significant impact on the levels of some outcomes, and in some cases this might even have a greater impact than the public service organization being measured. Given such circumstances, removing the impact of exogenous factors may be important in understanding actual performance. There 5 may be two solutions to deal with this issue. First, through analysis and expert/practitioner input, an understanding of the relationship between key socio economic factors and the outcomes selected could be understood and these could therefore be taken into account in developing a final performance score for each outcome. Second, by grouping organizations together based on common socio 10 economic factors, it may be possible (through making an assumption that all groups would, on the whole, perform at about the same level) to produce a baseline for each group and thereby exclude exogenous factors. A requirement for being able to weight outcomes includes normalizing the scale on which they are measured. For example, in certain implementations, where a is particular outcome is measured 'by household' and another is measured 'per population', the data might be normalized so as a fair comparison can be made. Once accurate measures of outcomes have been calculated, it may be necessary to articulate the relative significance of each outcome. This may be important to produce a single comparable outcome score. Thus, weightings may have to be applied to performance 20 in achieving each outcome such that, for example, it is possible to compare the value of a particular burglary rate, with the value of a particular murder rate. Possible techniques for performing such a weighting system may include, for example, surveying the public, examining the social and/or economic cost of each outcome or asking government industries to indicate their preference, or other techniques. 25 One approach would include initially conducting an analysis of work done in this area. In particular, this would focus on examining academic work on economic and social cost - which is used widely within central government. Having conducted this analysis, it would then be necessary to apply some judgment and consult widely with experts and practitioners before finalizing the weightings. 13 Thus, the PSV model 60 is based on outcomes delivered as a driver of public value. In addition, the PSV model 60 includes another measure based on the private sector model - return on the investment. The PSV model can be applied to public sector organizations such as public 5 health, revenue service, educational, police, fire, defense, public welfare or other organizations. For example, in the police organization context, an outcome can include public satisfaction with the police organization, reduction of crime, solving crimes, public served; whereas cost-effectiveness can include reduction of variable cost, reduction of fixed cost, and increase in asset efficiency. In a public health 10 organization context, an outcome can include improved health care, reduced errors in prescriptions; whereas cost-effectiveness can include reduction of variable cost, reduction of fixed cost, and increase in asset efficiency. Similarly, in a revenue service organization context, an outcome can include improved tax compliance and citizen satisfaction; whereas cost-effectiveness can include reduction of variable cost, 15 reduction of fixed cost, and increase in asset efficiency. Outcome Model Methodology Selection of the correct outcomes is important to the effective construction of a PSV analysis. To derive the appropriate outcomes for a government agency, the 20 value of the agency needs to be considered from two perspectives: * What is the purpose of the agency - its reason for being? e What are citizens' expectations of the agency as it delivers services? Referring to FIG. 3, a recommended approach for identifying outcomes for a public sector organization is to follow a four step iterative process. In step (1), 25 industry experts are consulted to develop hypotheses of industry outcomes. The experts use industry knowledge to create a preliminary model and can propose suggested outcomes, metrics, and corresponding weightings. In step (2) the outcomes are tested with an appropriate industry organization. For example, to the extent possible, external experts are leveraged for model validation. The outcomes, metrics, 14 and weightings representing what is valued in the industry are confirmed. In step (3) the outcomes are tested with the client. In particular, a Public Sector Value team can propose preliminary outcome model to client and solicit feedback on the outcome model, metrics, and weightings. In step (4) the original outcomes are refined based 5 on the feedback. For example, the outcome models can be customized based on client and geographic considerations. The client's input can also be used to refine model for future PSV engagements. The changes are then communicated to internal experts. To start the outcome identification process, a synthesis of publicly available information such as an organization's targets and performance objectives (PSAs in the 10 UK), annual reports, national statistical agencies, academic research publications will provide a baseline. As illustrated from the iterative approach shown in FIG. 3, the process undertaken whereby outcomes are selected will depend upon whether the prospective client is involved or not. Ideally outcome selection is performed in conjunction with 15 senior client personnel. Where this is not possible any of these methods can be employed: - Consulting industry experts. . Analysing organisation targets and performance objectives * Annual reports, national statistical agencies, academic research 20 publications * Discussion with senior client personnel. Different stakeholders value different outcomes as they have differing priorities which can also change over a period of time due to political pressures and media influence. For instance a revenue agency may choose at different times to 25 focus more upon maximising revenue than on providing a service for the customer depending upon the political mandate. It is important to concentrate on the purpose for the organisations existence and its objectives. For example an objective of an education establishment would be to maximise the education of the students. 15 There is no fixed number of outcomes which should be selected although the outcomes chosen should focus on the core function of that agency. Therefore an outcome which measured only a very small percentage of that organisation's activity would not be appropriate. However, more than 6 or 7 outcomes may prove to be 5 unwieldy whilst less than 3 or 4 may be misleading. There may not be sufficient data available for a particular outcome /outcome metric to produce a score. In this situation, the outcome should still be included but the weighting (explained in detail further) should be set to zero. If relevant data in the future becomes available to measure the outcome, perhaps through a change in the 10 organisation's performance measurement system, a weighting would be applied to the outcome. It is possible that the outcomes selected may not always match the measurements by which the organization is currently evaluated. In this way PSV can demonstrate to senior client personnel an alternative perspective as to the performance 15 of the organization. The PSV model 60 can be used to measure and graphically represent the value created or destroyed by a public sector organization. The PSV model 60 measures value along two dimensions: "Outcomes" and "Cost effectiveness" and is constructed to compare either one or a group of organizations' performance over time. 20 The PSV model 60 allows multiple organizations to be compared across multiple time periods. For many applications, the comparison of organizations may only be valid if these organizations are in a similar industry and have relatively similar attributes and functions. The PSV model 60 can also be used to compare one or more organizations outcome scores and its Cost Effectiveness scores. 25 Referring to Fig.4, a PSV matrix 100 illustrates how an organization has performed over a period of years in comparison to its overall average performance or against the average organizations performance. The plot of an organization on the PSV matrix measures the organizations performance in particular whether the most recent years indicate an organization is so outperforming/underperforming its outcomes or outperforming/underperforming its 16 cost effectiveness over the time period of the analysis. It is important to note that the matrix represents an organizations performance relative to the average and not whether an absolute high level of achievement or a poor level of achievement has been obtained. 5 PSV is an effective tool for determining whether an organization's policies are having the desired effect in improving outcome performance or /as well as improving the cost effectiveness of the organization over a period of time, or benchmarked against other organizations. 10 Interpreting a PSV Matrix and Graph A public sector organization's position on a PSV matrix determines one of the following: . How the organization has performed over a period of time against the average 15 - How the organization's performance has changed from one year to the next * How the organization has performed against on average alongside all organizations compared The average score (i.e., the point where the Outcome score and Cost 20 Effectiveness axes intersect) represents the average outcome and cost effectiveness score for the data selected. Therefore any data which does not lie on the average will either have a higher/lower outcome score than the average or a higher/lower cost effectiveness score than the average. For example, referring to Fig. 5, a compass representation 200 illustrates the 25 various outcome and cost effectiveness vectors. . Vector 202 (Movement to the North East) Where an organization's score for a particular year or against the benchmark lies to the north east of the average score, the organization has created value relative to its average performance (measured by increasing its outcomes and cost effectiveness). This is due to an 17 increase in outcomes and a possible decrease in cost. Further investigation needs to be conducted, through analysis of the data to establish whether organizations costs have decreased. This is the most desirable area relative to the average score. - Vector 204 (Movement to the North) Where an organization's score 5 for a particular year or against the benchmark lies to the north of the average score, the organization has a greater outcome score relative to the average score but the same cost effectiveness score. Remembering that cost effectiveness is equal to Outcomes/Cost, this therefore means that cost has increased in direct proportion to the overall outcomes. 10 - Vector 206 (Movement to the North West) Where an organization's score for a particular year or against the benchmark lies to the north west of the average score, the organization has a greater outcome score relative to the average score but a lower cost effectiveness score. Remembering that cost effectiveness is equal to Outcomes/Cost, this therefore means that cost has increased at a greater rate 15 than the increase in outcomes relative to the average - Vector 208 (Movement to the West) Where an organization's score for a particular year or against the benchmark lies to the west of the average score, the organization has the same outcome score relative to the average score but a lower cost effectiveness score. Remembering that cost effectiveness is equal to Outcomes/Cost, 20 this therefore means that cost is greater than that of the average cost for that data point. - Vector 210 (Movement to the South West) Where an organization's score for a particular year or against the benchmark lies to the south west of the average score, the organization has a lower outcome score relative to the average 25 score and a lower cost effectiveness score relative to the average. Further investigation needs to be conducted to establish whether an organization's costs have increased through analysis of the data. This is the least desirable area of the matrix relative to the average score. . Vector 212 (Movement to the South) Where an organization's score 30 for a particular year or against the benchmark lies to the south of the average score, 18 the organization has a lower outcome score relative to the average score but the same cost effectiveness score. Remembering that cost effectiveness is equal to Outcomes/Cost, this therefore means that cost has decreased in direct proportion to the overall outcomes decrease. 5 - Vector 214 (Movement to the South East) Where an organization's score for a particular year or against the benchmark lies to the south east of the average score, the organization has a lower outcome score relative to the average score and a greater cost effectiveness score relative to the average. Remembering that cost effectiveness is equal to Outcomes/Cost, this therefore means that cost has 10 decreased at a greater proportion than the outcomes decrease. - Vector 216 (Movement to the East) Where an organization's score for a particular year or against the benchmark lies to the east of the average score, the organization has the same outcome score relative to the average score but a greater cost effectiveness score than the average. Remembering that cost effectiveness is 15 equal to Outcomes/Cost, this therefore means that cost is less than that of the average cost for that data point. It is important to appreciate that these scores are not absolute scores but are relative to the average score. Therefore, it is not possible to say that any point on the matrix represents poor/good performance in absolute terms. However, it is possible to 20 say that relative to the average an organization has outperformed or underperformed in a particular year. It is also possible to plot a trend line determining whether an organizations performance is improving or is deteriorating year on year. In addition, it is important to note that the concept of the moving average applies to this analysis. Therefore a PSV analysis covering 5 years or 5 organizations 25 would present a different average to a PSV analysis covering 10 years of 10 organizations. In this respect, if an organization were consistently producing increasing outcome scores and cost effectiveness scores the average would be constantly moving towards a northeasterly direction. The moving average can be monitored to see if there is an overall trend in averages. The moving average can be 30 monitored to see if there is an overall trend in averages. 19 These vectors can be super imposed upon any PSV matrix to explain the meaning of each data point and whether it represents an improvement or decline in outcomes and cost effectiveness. 5 Graphical representation of outcomes and cost effectiveness Once the outcomes and cost effectiveness have been calculated the results can be presented through a series of graphical plots. The graphical plots show relative scores, rather than absolute scores. Thus, the scores can be used to benchmark, to rank and prioritise, to identify patterns and trends, and to compare against average 10 performance over time and other organizations. Referring to FIG. 6, a revenue example shows both the Outcome and the Cost Effectiveness scores for a Time Series/Single Organization matrix. The matrix demonstrates two measurements of performance alongside each other. FIG. 6 represents the organizations performance over both Outcomes and Cost 15 Effectiveness relative to the average and as such represents an effective method of assessing an organizations performance over a period of time. This example matrix shows that 2001 was the highest performing year for that organization as it was the year that the cost effectiveness and Outcome score were furthest above the average. In 1995 the Outcomes were above average but the Cost Effectiveness score was below 20 average. In 1993 and 1994 the Cost Effectiveness and the Outcome scores were above average. Referring to FIG. 7, the outcome performance alone, of the organization, over a period of time relative to its average score is shown. A score of 0% represents the average performance for all years. Therefore 1996 performed close to the average 25 performance whilst 1994 underperformed the average score by 3%. The graph demonstrates that 2001 and 2001 was the highest performing year with 1997 and 1998 the lowest performing year. Referring to FIG. 8, an organization's cost effectiveness performance over a period of time relative to its average score is shown. A score of 0 / represents the 20 average performance for all years. Therefore 1997 performed close to the average performance whilst 1994 underperformed the average score by 15%. The graph demonstrates that 2001 was the highest performing year outperforming the average by almost 20%. Overall the graph illustrates an improving cost effectiveness trend. 5 The revenue examples shown above in conjunction with FIGS. 9-14 show one organization's performance over multiple years. Other matrix analyses can benchmark multiple organizations performances within a particular year. For example, referring to FIG. 9, an organization's outcomes and the cost effectiveness score relative to the average organizations performance within a particular year is 10 shown. It is important to appreciate that the matrix is not portrayed as a graph whereby the two axes are related to each other. Rather, the matrix demonstrates two performance measurements of the organizations selected. Fig. 9 shows that Organization I was the highest performing organization as it obtained the highest cost effectiveness and outcome score. In contrast particular attention should be given to 15 organization A and B as both outcomes and cost effectiveness are well below the average. Referring to FIG. 10, the outcome performance for a number of organizations is shown relative to the average organizations performance within a particular year. The graph demonstrates that organization I was the highest performing organization, 20 outperforming the average by 4% whilst the lowest performance was organization's B underperforming the average by 3%. Referring to FIG. 11, the cost effectiveness performance for a number of organizations is shown relative to the average organizations performance within a particular year. The graph demonstrates that organization I was the most cost 25 effective organization, outperforming the average by 20% whilst the least cost effective organization was organization's A and B underperforming the average around 15%. Referring to FIG. 12, the outcome and cost effectiveness performance for a number of organizations is shown relative to the average organizations performance 30 over multiple years, here three years. 21 This matrix demonstrates two measurements of performance of the organizations selected. In particular, the matrix represents the organizations performance over both outcomes and cost effectiveness relative to its average score over a number of years and as such represents an effective method of assessing an 5 organizations performance in comparison to the average organizational performance over a period of time. This example matrix shows that Organization C in 1999 and 2000 was the highest performing organization as it obtained the highest cost effectiveness and outcome score. In contrast organization A for 1999 and 2000 underperformed the average in both measurements of performance, Outcome and 10 Cost effectiveness. Referring to FIG. 13, the outcome performance for a number of organizations is shown relative to the average organizations over a period of time relative to the average score. The graph shows that Organization A has improved its performance and has consistently outperformed the average. The highest performance was in 2001 15 when organization A outperformed the average by 4%. In contrast organization B performance has declined in comparison to the average year on year. Referring to FIG. 14, the cost effectiveness performance for a number of organizations is shown relative to the average organizations over a period of time relative to the average score. The graph shows that organization B in comparison to 20 the average organizations performance has consistently underperformed by up to 15%. Organization A and C have consistently outperformed the average performance. The highest performance was Organization A in 2001, which outperformed the average by 15%. Note that each graph and matrix has its own benefits and limitations. The 25 matrix allows the categorisation of organizations in comparison to the average performance whilst individual graphs provide more detail as to an organizations performance. The public who may benefit from public sector outcomes are also the taxpayers who fund them and users of other public services. The model of public 30 sector value should consider the cost of achieving outcomes, both financial and in 22 terms of the opportunity costs. It is of value to the public if the organization providing outcomes does so in a cost-effective manner. If there is another organization which might deliver similar outcomes but through the use of less resources, then the citizen would have a vested interest in using the latter 5 organization, either to allow for the raising of less taxation or for the greater delivery of beneficial outcomes from the finite resources available. It should be noted that although not all of the public are taxpayers, they are all benefactors of monies raised through taxation and consequently. This may be true even if they are not personally funding any public sector organization they still have a vested interest in ensuring that 10 money is spent effectively as this would negatively impact their capacity to benefit from that money. Calculating Shareholder Value and Public Sector Value The shareholder value model 50 includes a consideration of the risk involved 15 in making an investment decision. A high-risk investment (i.e. one which has a lower probability of delivering a return to the investor) is represented in the model by deducting the Weighted Average Cost of Capital from the Return on Capital Employed to derive Spread. It may be argued that risk also exists in public sector investment decisions. For example, a government organization may traditionally 20 deliver a varying level of return for the funds provided, and so is said to be more risky than a government industry for which, over time, the delivery of returns are more consistent. There is value inherent within this consistency. Given two government projects where the expected return was equal, the government and the public would be more likely to grant the funds to the project where the variance in return (i.e. risk) is 25 lower. Risk may be determined by a combination of organizational- and industry specific factors. Two organizations within the same industry may differ in their respective risk levels due to management quality or organizational characteristics. In addition, two government industries, such as health and policing, may differ in risk 3o due to factors inherent within the service they are providing. 23 The PSV model 60 is most likely to be applied in comparing business units within the same government industry. Therefore industry-specific factors become irrelevant. It can be assumed that within these government industries the degree of risk between each organization (e.g. different police forces) is likely to be marginal 5 because each business unit is involved in the same sorts of activities and operates in a similar political and legislative environment. Furthermore, within the public sector organizations within the same industry (particularly within the same country) tend to be structured in a similar manner. In addition, developing a mechanism for accurately measuring risk in the 10 public sector may be difficult for several reasons. For example, it may be difficult to realistically measure past performance and past performance may not be a meaningful indicator of future risk. Therefore, risk may be ignored in the PSV model 60. The PSV model 60 is based on outcomes and cost- effectiveness as the two key measures of public value. As shown, organizations that can, over time, move in a 15 positive direction along either the horizontal or vertical axes can increase their value to the public. Ideally, organizations would be able to improve their performance on both axes and move in a Northeasterly direction, as indicated. The PSV model 60 provides an approximation of value - which is an inherently more difficult concept to determine in the public sector context. However, 20 the approximation of value may allow an understanding of the value levers in the public sector as a whole, in order to derive the levers of value within a specific government industry. As a practical point, it may be important to enable the software used to calculate the value, to have weightings adjusted relatively easily. This may allow 25 quick updating of weightings, which may be a contentious part of any analysis. It would also be important to view the impact of changing weightings. For example, it may provide an indication of whether services which are good in one area in fact good in all areas. In another example, it may show whether public value is significantly affected by priority, given different outcomes. This is a factor that can be addressed 30 on an industry-by-industry basis through this model. 24 The PSV model 60 includes the use of outcomes and cost-effectiveness for delivering these outcomes as the two levers. These two levers represent an increase in the volume of benefits to society, at a lower cost to government, to drive overall public sector value. The derivation of an outcome driver was described above. The 5 following describes the derivation of cost effectiveness as a driver. In the shareholder value model (i.e. private sector context), the calculation used for Spread is: Spread = Return on Capital Employed (ROCE) - Weighted Average Cost of Capital 1o Where ROCE is calculated thus: ROCE = Free Cash Flow Total Capital Employed And where WACC is calculated thus: 15 WACC = D x Ce, X (-t) + E x Ceguty D+E D+E Where (in the above equation): D = Debt to equity ratio D+E 20 t = Tax rate Cdet = Cost of debt (e.g. credit rating from Std & Poors) Czy= Capital Asset Pricing Model (reflects the risk or beta associated with investing in the particular sector) The shareholder value model 50 measures Spread, which represents a measure of 25 financial return. This gives the return to shareholders as a percentage of the capital invested. The point is to measure the return provided on the funds that the shareholder has put at risk by investing in the company. A shareholder is only asked 25 to invest funds when they initially invest. Therefore, invested capital is represented by share capital and debt. In the PSV model 60, the concepts of ROCE and WACC need to be developed, in line with the differences between private and public sector investment 5 decisions. ROCE is the return the investor would expect to receive, as a percentage of their initial investment. This measures how well an organization uses assets to generate profit. In the public sector, the return is outcomes. However, the PSV model 60 does not attempt to measure how well a public sector organization has used assets 10 to generate profit. Outcomes represent the gross product of activity. Cost Effectiveness is calculated as the outcomes generated as a proportion of the resources consumed in producing these outcomes. This is a conceptually different ratio to ROCE, but one, which measures the effectiveness with which an organization uses the resources available to it. 15 Within public sector organizations additional funds are provided each year (Annual Expenditure). In addition, the asset base (e.g. property) remains within the organization, although the value of this asset base will vary over time. The organization needs to justify holding these assets, which could be used elsewhere within the public sector, including to pay-off public borrowing. In order to reflect this 20 opportunity cost the cost of debt is used to produce a notional cost; the Annual Capital Charge. Therefore in order to represent the funds consumed by a public sector organization both annual expenditure and the capital charge must be included. Cost Effectiveness is calculated as: Cost Effectiveness = Total Beneficial Outcomes (Annual Expenditure - Capital Expenditure) + Annual Capital Charge 25 Expenditure, also known as operating expenses, is defined as the annual operating costs (salary, rent, etc.) that are used to generate outcomes. This expenditure is normally available on a public sector organization's income statement. 26 The capital charge represents the opportunity cost of holding capital (property, equipment, cash reserves, etc.) which could be used elsewhere within the public sector. This opportunity cost is reflected by the following equation [(cost of capital) * (total assets - current liabilities)] where the cost of capital equals the cost of debt 5 (government bond rate) and total assets minus current liabilities equals the organization's true level of assets. In order for a PSV analysis to measure the organizations cost effectiveness accurately, the correct accounting treatments must have been applied to the organizations accounts to ensure that the expenditure and the capital charge is 10 properly reflected within the selected year. In addition, where a PSV analysis compares an organization over time or benchmarks organizations against each other, it is generally important that the same accounting standards have been applied to the organizations accounts in order to ensure fair comparisons. 15 Unfortunately different public sector organizations and countries have varying accounting standards which can negate the effective comparison of cost effectiveness unless action to standardize expenditure and the capital charge is implemented. . WACC is an important factor within the Shareholder Value model. Shareholders expect a certain level of return on their investment and the expectations 20 of shareholders are largely driven by the perceived risk of the company in which they are investing. This is because investors must be given an incentive to invest in more risky operations through the prospect of greater returns than those available from less risky investments. In order to gain funds equal to that of a less risky company, a more risky 25 organization needs to promise a greater return on the investment - increasing its WACC. The Shareholder Value model reflects this use of risk within investor decision-making by adjusting the WACC on the basis of the beta value of companies. When applied to the private sector, WACC is calculated, at a basic level, by analysing the ratio of debt (multiplied by the cost of debt and the effect of any tax 30 benefits to the company) and equity (multiplied by the level of risk, referred to as 27 beta, associated with investment in a particular market). For example telecommunications may be seen as a more risky investment than retail. Within a given government, the cost of debt in the public sector is constant as this controlled by a treasury department (this reflects the cost of borrowing for the 5 government as a whole). The model already reflects the cost of debt in the Annual Capital Charge. The remaining factor is the cost of equity, directly derived from the beta value i.e. the risk associated with investing in one particular area of government, over and above an alternative. However, as discussed above, risk is not include in the public sector analysis, 10 and in any case, the primary application of the model is in comparing business units within the same government industry where the impact of risk across business units is likely to be marginal. Therefore, Cost Effectiveness is calculated thus: Cost Effectiveness Total Beneficial Outcomes 15 (Annual Expenditure - Capital Expenditure) + Annual Capital Charge The PSV model 60 should address the issue of whether pension cost should be included in the model. For example, pension costs in a particular country may be considered to be non-controllable within the public sector, due in large part to their non-funded nature. This is part of the cost base that cannot be influenced by 20 management and therefore should not be included in any assessment of performance or value added. However, pension costs cannot be excluded without distorting the model. For example, it might distort any comparison between a capital intensive and labor intensive organization (it would make the labor intensive appear more efficient than it 25 actually is by reducing the relative cost of labor artificially). Therefore, a mechanism for including pension costs in an equitable way is required. This issue may require further assessment, but a percentage added to labor costs representing the actuarial pensions liability of employing current employees in the current year is the likely way forward. 28 Application of the Public Sector Model Referring to FIGS. 15A to 15F, an example of the PSV model applied to particular public sector organizations, in this case, the police organization is 5 described. It should be understood that the PSV model 60 might be applied to other public sector organizations such as public health, revenue service, educational, fire, defense, public welfare, or other organizations and other non-profit organizations. FIG. 15A is a diagram 200 of outcomes drivers of a public sector organization according to an implementation of the invention. In the police organization example, 10 the PSV model 60 identifies outcomes that are relevant to the organization such as "public satisfaction with the police", "crime prevented", "justice", and "public served (non-crime)". Each outcome can be further subdivided, for example, the outcome related to "public satisfaction with police" may include sub-outcomes such as "increase public confidence and trust", "reduce public fear of crime", and "increase 15 direct customer satisfaction." Once the outcomes have been identified, the model 60 provides a measure for each outcome (and sub-outcome) which can be obtained from one or more sources. For example, a measure of the sub-outcome "increase public confidence and trust" can be obtained by "feedback from citizens" obtained from the "Police Force Survey." A total outcome is calculated for one or more police forces in 20 a geographic area such as a country, region, city, or other geographic area. FIG. 15B is a plot diagram 210 of a PSV model 60 of one or more public sector organizations according to an implementation of the invention. The plot has a vertical axis labeled "Outcomes" representing outcomes produced by police organizations and a horizontal axis labeled "Cost effectiveness" representing the cost 25 effectiveness of achieving the outcomes. In this example, the public value of approximately 18 police organizations have been calculated and plotted. For example, "Police A" appears to have a relatively good level of outcomes, but has an opportunity to improve cost-effectiveness. In contrast, "Police B" appears to have low level of outcomes so it may have to focus on improving its weighted basket of 30 outcomes. 29 FIG. 15C is a block diagram 220 of analysis of a PSV model 60 of one public sector organization ("Police A") according to an implementation of the invention. The PSV model 60 reveals that "Police A" may need to focus on increasing cost-effectives by, for example, reducing expenditure per outcome generated. The model 60 5 identifies cost-effectiveness drivers such as "reduce variable costs", "reduce fixed costs", and "increase asset efficiency". Performance data based on the public value data of the organizations is analyzed to determine a potential opportunity for improvement in public value. For example, labor costs for "Police A" appear to be higher than the group of organizations and the sample average. In fact, labor costs 10 appear to be the highest of all police organizations analyzed in this example. With respect, to supplies and services costs, "Police A" is also higher than the group and the sample average. Thus, "Police A" can improve its public value by reducing expenditures. Specifically, "Police A" can focus on reducing variable costs including labor costs and/or reducing supplies and services costs. 15 FIG. 15D is a block diagram 230 of analysis of a PSV model 60 of one public sector organizations according to an implementation of the invention. Once the PSV model 60 has identified outcomes and/or cost-effectiveness drivers that can be improved, then the model identifies one or market offerings that can improve a particular driver to improve public value of an organization. In this example, "Police 20 A" can improve its public value by reducing variable cost. This may be achieved by obtaining consulting services and/or solutions such as "Human Performance", "Integrate Web Services", "Procurement Process Enhancement", "eProcurement", "Supplier Managed Procurement." In addition, the PSV model 60 identifies other offerings to reduce fixed cost and increase asset efficiency. 25 FIG. 15E is a block diagram 240 of analysis of a PSV model 60 of another public sector organization ("Police B") according to an implementation of the invention. The PSV model 60 reveals that "Police B" may need to focus on increasing outcomes. The model 60 identifies outcomes such as, for example, "Public Satisfaction with Performance", "Crime Reduction", "Crimes Solved", and "Public 3o Served." Relative Performance data based on the public value data of the organizations is analyzed to determine any potential opportunity for improvement in 30 public value. For example, in the context of "public satisfaction with performance", the data suggests that "Police B" performs poorly relative to the group average. Likewise, "Police B" appears to perform very poorly relative to the sample average. In contrast, "Police B" performs significantly better than others in the group. Thus, 5 "Police B" can improve its public value by increasing outcomes. Specifically, "Police B" can focus on improving "Public Satisfaction with Performance" and/or "crimes solved." FIG. 15F is a block diagram 250 of analysis of a PSV model 60 of a public sector organization ("Police B") according to an implementation of the invention. 10 Once the PSV model 60 has identified outcomes and/or cost-effectiveness drivers that can be improved, then the model identifies one or market offerings that can improve a particular driver to improve public value of an organization. In this example, "Police B" can improve its public value by increasing its "public satisfaction with performance". This may be achieved by obtaining consulting services and/or 15 solutions such as "Market Strategy", "Customer Relationship Management." In addition, the PSV model 60 identifies other offerings for "Crime Reduction" and "Crimes Solved." FIG. 16 represents a graph 290 of a plot of an industry analysis. This analysis includes identifying one or more critical drivers (i.e. determinants such as labor costs, 20 IT costs, HR costs) of value within a particular industry. An objective of the analysis is to identify one or more means of improving the public value by improving/investing in a particular driver. For example, focusing in on the cost effectiveness driver of PSV model 60, a reduction in HR costs (or overhead costs) may be a value driver (the curve should be downward sloping). In another example, 25 on the outcome driver side of the PSV model 60 focused in the public health industry, health outcomes may be driven by proactive health advice rather than treatment, and therefore, more funds should be invested prevention rather than a cure. In another example, on the outcome driver side of the PSV model 60 in the public welfare industry, expenditure on advertising to notify fraud detection may be more effective 30 than fraud inspection/audit, and therefore funds may be shifted from inspection to advertising. 31 System Implementation FIG. 17 is a block diagram of a computer system 300 for implementing a PSV model 60 according to an implementation of the invention. A standard computer system (e.g. client/server configuration, personal computer) can be used to implement 5 the functions of the system 10 shown in FIG. 1. Such a system 300 may include a computer 302 having a processor 304 and memory 306 capable of executing one or more programs to perform the functions of the method 20 and a database 24 for managing data associates with method. The database 24 can be stored for example in hard disk or other suitable storage. 10 The computer system can include a network interface (not shown) having hardware and software components to allow users access to the system 10 over a network such as the World Wide Web using, for example, Web pages. The network interface may allow the system 300 to receive information such as outcome measures and cost-effectiveness measures related to a public sector organization 12. A keyboard 15 310 can be used to input information to the computer 300 and a computer screen 312 can be used to display information from the computer. Referring to FIG. 18, the methodology for developing a public sector value (PSV) model is summarized. In Phase 1, the model is tailored to reflect the focus of the agency based on 20 available data. At this phase, the role of the PSV team is to conduct an initial "kick off" meeting with the client. The PSV team can obtain the client's perspective on model outcomes, metrics, etc. During this phase, a member of the Client team can introduce the PSV concept to other employees of the client and provides client background information to the PSV team. 25 In Phase 2, the PSV model is populated with client data. The role of the PSV team is to work with the client to collect appropriate data (with the assistance of the Client team). The PSV team also makes adjustments to budget data for calculating the capital charge (if necessary) and runs the PSV model. In Phase 3, findings from the PSV model are validated. In particular, the 30 trends in the analysis are confirmed and a storyline is developed. In particular, the 32 -33 analysis, performance trends, and performance are validated by the Client team, the industry experts, and by the client in general, in that order. In Phase 4, final recommendations to the client are made based on data trends. For example, the findings from Phase 3 are used to identify recommendations for addressing 5 problems. The PSV model is then finalized. In Phase 5, the final recommendations are used to determine possible client business opportunities. In particular, the findings from the PSV model can be matched with services and products offered by, for example, the industry experts. A number of embodiments of the invention have been described. Nevertheless, it 10 will be understood that various modifications may be made without departing from the spirit and scope of the invention. For example, the functionality of the method 10 can be implemented using one or more computers distributed across a network. Accordingly, other embodiments are within the scope of the following claims. Throughout this specification and the claims which follow, unless the context 15 requires otherwise, the word "comprise", and variations such as "comprises" and "comprising", will be understood to imply the inclusion of a stated integer or step or group of integers or steps but not the exclusion of any other integer or step or group of integers or steps. The reference to any prior art in this specification is not, and should not, be taken 20 as an acknowledgment or any form or suggestion that the prior art forms part of the common general knowledge in Australia. 25

Claims (23)

1. A computer system configured to determine relative performance of an organization, the computer system including: at least one computer; a network interface coupled to the at least one computer; and a computer readable medium coupled to the at least one computer including instructions stored thereon which, when executed by the at least one computer, cause the at least one computer to perform operations including: receiving outcomes, on the network interface, from an organization that measures outcomes of benefit achieved by the organization, the outcomes a consequence of an organization's operation that impact pre-existing realities; determining a performance value for the organization, the determination including weighting of the received outcomes; determining an effectiveness value as a ratio of the determined performance value and an operating cost of the organization; determining, using the determined performance value and the determined effectiveness value, a relative performance measure for the organization that reflects performance of the organization relative to at least one of the organization's past performance and performance of other organizations; and providing output, via a computer interface, based on the determined relative performance measure for the organization.
2. A computer system according to claim I wherein, determining the performance value for the organization that measures outcomes of benefit achieved by the organization includes: determining a performance value for a public sector organization that measures outcomes of social benefit achieved by the public sector organization; weighting outcomes that are a consequence of the organization's operation and that impact pre existing realities includes: weighting outcomes that are a consequence of the public sector organization's operation and that impact pre existing social realities; determining the effectiveness value as a ratio of the determined performance value and the operating cost of the organization includes: -35 determining a cost effectiveness value as a ratio of the determined performance value and an operating cost of the public sector organization; determining, using the determined performance value and the determined effectiveness value, the relative performance measure for the organization that reflects performance of the organization relative to at least one of the organization's past performance and performance of other organizations includes: determining, using the determined performance value and the determined cost effectiveness value, a relative public performance measure for the public sector organization that reflects performance of the public service organization relative to at least one of the public sector organization's past performance and performance of other public sector organizations; and providing output, via a computer interface, based on the determined relative performance measure for the organization includes: providing output, via a computer interface, based on the determined relative public performance measure for the public sector organization.
3. A computer system according to claim 2, wherein weighting outcomes that are a consequence of the public sector organization's operation and that impact pre existing social realities includes: positively weighting outcomes that are a consequence of the public sector organization's operation and that positively impact pre existing social realities; and negatively weighting outcomes that are a consequence of the public sector organization's operation and that negatively impact pre existing social realities.
4. A computer system according to either claim 2 or claim 3, wherein the computer readable medium has instructions stored thereon which, when executed by the at least one computer, cause the at least one computer to perform operations further including: comparing the determined relative public performance measure of the public sector organization against performance patterns of other public sector organizations; and identifying at least one recommendation on how the public sector organization can improve the detennined relative public performance measure of the public sector organization based on the comparison, and wherein providing output based on the - 36 determined relative public performance measure for the public sector organization includes: providing output based on the at least one recommendation identified.
5. A computer system according to any one of claims 2 to 4, wherein determining the performance value for the public sector organization that measures outcomes of social benefit achieved by the public sector organization includes: removing impact of exogenous factors on the outcomes that impact pre existing social realities by accounting for a relationship between key socioeconomic factors and the pre existing social realities.
6. A computer system according to any one of claims 2 to 4, wherein determining the performance value for the public sector organization that measures outcomes of social benefit achieved by the public sector organization includes: removing impact of exogenous factors on the outcomes that impact pre, existing social realities by grouping public sector organizations together based on common socioeconomic factors and producing a baseline for each group, thereby excluding exogenous factors.
7. A computer system according to any one of claims 2 to 6, wherein determining the relative public performance measure for the public sector organization includes: accessing past performance values for the public sector organization, each past performance value corresponding to a particular period of time in the past; computing an average performance value for the public sector organization based on the past performance values; accessing past cost effectiveness values for the public sector organization, each past cost effectiveness value corresponding to a particular period of time in the past; computing an average cost effectiveness value for the public sector organization based on the past cost effectiveness values; and determining the relative public performance measure for the public sector organization based on the determined performance value, the computed average performance value for the public sector organization, the determined cost- - 37 effectiveness value, and the computed average cost effectiveness value for the public sector organization.
8. A computer system according to any one of claims 2 to 7, wherein determining the relative public performance measure for the public sector organization includes: accessing performance values for other public sector organizations, each performance value corresponding to a particular public sector organization that is different than the public sector organization; computing an average performance value for a public sector industry based on the accessed performance values; accessing cost effectiveness values for the other public sector organizations, each cost effectiveness value corresponding to a particular public sector organization that is different than the public sector organization; computing an average cost effectiveness value for the public sector industry based on the accessed cost effectiveness values; and determining the relative public performance measure for the public sector organization based on the determined performance value, the computed average performance value for the public sector industry, the determined cost effectiveness value, and the computed average cost effectiveness value for the public sector industry.
9. A computer system according to any one of claims 2 to 8, wherein providing output based on the determined relative public performance measure for the public sector organization includes: generating, based on the determined relative public performance measure of the public sector organization, a public sector value matrix that graphically reflect the determined performance value for the public sector organization relative to an average performance value of at least one of the public sector organization's past performance and performance of other public sector organizations and that graphically reflects the determined cost effectiveness value for the public sector organization relative to an average cost effectiveness value of at least one of the public sector organization's past performance and performance of other public sector organizations; and - 38 providing output, via a computer interface, based on the public sector value matrix.
10. A computer system according to any one of claims 2 to 9, wherein determining the cost effectiveness value as a ratio of the determined performance value and the operating cost of the public sector organization includes: computing a cost effectiveness value by dividing a first value that represents a total of beneficial outcomes achieved by the public sector organization by a second value computed as a sum of annual expenditure of the public sector organization minus capital expenditure of the public sector organization and annual capital charge of the public sector organization.
11. A computer system according to any one of claims 2 to 10, wherein determining the cost effectiveness value as a ratio of the determined performance value and the operating cost of the public sector organization includes: determining the cost effectiveness value as a ratio of the determined performance value and an operating cost determined based on variable costs, fixed costs, and available assets of the public sector organization.
12. A computer implemented method of determining relative performance of an organization including: receiving, on a network interface, outcomes that are a consequence of the organization's operation and that impact pre-existing realities, from an organization that measures outcomes of benefit achieved by the organization; determining, on a computer processor, a performance value for the organization, the determination including weighting of the outcomes; determining, on a computer processor, an effectiveness value as a ratio of the determined performance value and an operating cost of the organization; determining, on a computer processor, using the determined performance value and the determined effectiveness value, a relative performance measure for the organization that reflects performance of the organization relative to at least one of the organization's past performance and performance of other organizations; and providing output based on the determined relative performance measure for the organization. - 39
13. A computer implemented method according to claim 12 wherein determining the performance value for the organization that measures outcomes of benefit achieved by the organization includes: determining, on a computer processor, a performance value for a public sector organization that measures outcomes of social benefit achieved by the public sector organization; weighting, on a computer processor, outcomes that are a consequence of the organization's operation and that impact pre existing realities includes: weighting, on a computer processor, outcomes that are a consequence of the public sector organization's operation and that impact pre existing social realities; determining, on a computer processor, the effectiveness value as a ratio of the determined performance value and the operating cost of the organization includes: determining, on a computer processor, a cost effectiveness value as a ratio of the determined performance value and an operating cost of the public sector organization; determining, on a computer processor, using the determined performance value and the determined effectiveness value, the relative performance measure for the organization that reflects performance of the organization relative to at least one of the organization's past performance and performance of other organizations includes: determining, on a computer processor, using the determined performance value and the determined cost effectiveness value, a relative public performance measure for the public sector organization that reflects performance of the public service organization relative to at least one of the public sector organization's past performance and performance of other public sector organizations; and providing output, via a computer interface, based on the determined relative performance measure for the organization includes: providing output, via a computer interface, based on the determined relative public performance measure for the public sector organization.
14. A computer implemented method according to claim 13, wherein weighting outcomes that are a consequence of the public sector organization's operation and that impact pre- existing social realities includes: -40 positively weighting, on a computer processor, outcomes that are a consequence of the public sector organization's operation and that positively impact pre existing social realities; and negatively weighting, on a computer processor, outcomes that are a consequence of the public sector organization's operation and that negatively impact pre existing social realities.
15. A method according to either claim 13 or claim 14 further including: comparing, on a computer processor, the determined relative public performance measure of the public sector organization against performance patterns of other public sector organizations; and identifying, on a computer processor, at least one recommendation on how the public sector organization can improve the determined relative public performance measure of the public sector organization based on the comparison, wherein providing output based on the determined relative public performance measure for the public sector organization includes: providing output, via a computer interface, based on the at least one recommendation identified.
16. A computer implemented method according to any one of claims 13 to 15, wherein determining the performance value for the public sector organization that measures outcomes of social benefit achieved by the public sector organization includes: removing, on a computer processor, an impact of exogenous factors on the outcomes that impact pre-existing social realities by accounting for a relationship between key socioeconomic factors and the pre existing social realities.
17. A computer implemented method according to any one of claims 13 to 16, wherein determining the performance value for the public sector organization that measures outcomes of social benefit achieved by the public sector organization includes: removing, on a computer processor, an impact of exogenous factors on the outcomes that impact pre-existing social realities by grouping public sector -41 organizations together based on common socioeconomic factors and producing a baseline for each group, thereby excluding exogenous factors.
18. A computer implemented method according to any one of claims 13 to 17, wherein determining the relative public performance measure for the public sector organization includes: accessing, on a computer processor, past performance values for the public sector organization, each past performance value corresponding to a particular period of time in the past; computing, on a computer processor, an average performance value for the public sector organization based on the past performance values; accessing, on a computer processor, past cost effectiveness values for the public sector organization, each past cost effectiveness value corresponding to a particular period of time in the past; computing, on a computer processor, an average cost effectiveness value for the public sector organization based on the past cost effectiveness values; and determining, on a computer processor, the relative public performance measure for the public sector organization based on the determined performance value, the computed average performance value for the public sector organization, the determined cost effectiveness value, and the computed average cost effectiveness value for the public sector organization.
19. A computer implemented method according to any one of claims 13 to 18, wherein determining the relative public performance measure for the public sector organization includes: accessing, on a computer processor, performance values for other public sector organizations, each performance value corresponding to a particular public sector organization that is different than the public sector organization; computing, on a computer processor, an average performance value for a public sector industry based on the accessed performance values; accessing, on a computer processor, cost effectiveness values for the other public sector organizations, each cost effectiveness value corresponding to a particular public sector organization that is different than the public sector organization; computing an average cost effectiveness value for the public sector - 42 industry based on the accessed cost effectiveness values; and determining the relative public performance measure for the public sector organization based on the determined performance value, the computed average performance value for the public sector industry, the determined cost effectiveness value, and the computed average cost effectiveness value for the public sector industry.
20. A computer storage medium encoded with a computer program, the program comprising instructions that when executed by data processing apparatus cause the data processing apparatus to perform operations including: determining a performance value for an organization that measures outcomes of benefit achieved by the organization, the determination including weighting outcomes that are a consequence of the organization's operation and that impact pre, existing realities; determining an effectiveness value as a ratio of the determined performance value and an operating cost of the organization; determining, using the determined performance value and the determined effectiveness value, a relative performance measure for the organization that reflects performance of the organization relative to at least one of the organization's past performance and performance of other organizations; and providing output, via a computer interface, based on the determined relative performance measure for the organization.
21. A computer system according to claim 1, substantially as hereinbefore described with reference to the accompanying figures.
22. A computer implemented method according to claim 12, substantially as hereinbefore described with reference to the accompanying figures.
23. A computer storage medium encoded with a computer program according to claim 20, substantially as hereinbefore described with reference to the accompanying figures.
AU2012249236A 2002-11-15 2012-11-14 Public sector value model Abandoned AU2012249236A1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
AU2012249236A AU2012249236A1 (en) 2002-11-15 2012-11-14 Public sector value model
AU2015203158A AU2015203158A1 (en) 2002-11-15 2015-06-12 Public sector value model

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
US60/426,503 2002-11-15
US10/664,797 2003-09-16
AU2010202773A AU2010202773A1 (en) 2002-11-15 2010-06-30 Public sector value model
AU2012249236A AU2012249236A1 (en) 2002-11-15 2012-11-14 Public sector value model

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
AU2010202773A Division AU2010202773A1 (en) 2002-11-15 2010-06-30 Public sector value model

Related Child Applications (1)

Application Number Title Priority Date Filing Date
AU2015203158A Division AU2015203158A1 (en) 2002-11-15 2015-06-12 Public sector value model

Publications (1)

Publication Number Publication Date
AU2012249236A1 true AU2012249236A1 (en) 2012-12-06

Family

ID=47326755

Family Applications (1)

Application Number Title Priority Date Filing Date
AU2012249236A Abandoned AU2012249236A1 (en) 2002-11-15 2012-11-14 Public sector value model

Country Status (1)

Country Link
AU (1) AU2012249236A1 (en)

Similar Documents

Publication Publication Date Title
US8195491B2 (en) Determining relative performance
Lieser et al. The determinants of international commercial real estate investment
Rayan Financial leverage and firm value
US8086509B2 (en) Determining commercial share of wallet
He et al. The impact of CEO turnover on property–liability insurer performance
KR20040019378A (en) System and method for providing financial planning and advice
Grassa et al. Is bank creditworthiness associated with risk disclosure behavior? Evidence from Islamic and conventional banks in emerging countries
Garel et al. Engaging employees for the long run: Long-term investors and employee-related CSR
US20030055758A1 (en) Method and apparatus for identifying investor profile
Lau Measurement uncertainty and management bias in accounting estimates: the perspective of key audit matters reported by Chinese firms' auditors
Cheikh et al. Do sovereign credit ratings matter for corporate credit ratings?
Adem Determinants of credit risk in Ethiopian banking industry: Does political stability matter?
Naim et al. What does compensation of portfolio managers tell us about mutual fund industry? Evidence from Israeli tax records
Folta et al. Market versus managerial valuations of real options
Gallagher et al. Style factor timing: An application to the portfolio holdings of US fund managers
Jakobsson et al. The effect of ESG performance on share price volatility
Çam et al. A Detailed Investigation of the Effects of Human Capital on Firm Value: An Application on Bist
AU2012249236A1 (en) Public sector value model
Sekyere Empirical Forecasting of Returns during the Great Recession through Economic Value Added
AU2015203158A1 (en) Public sector value model
Bimala Determinant of stock price of non-life insurance companies
Ruotimo The Valuation of Company X as a Going Concern
KANGOGO FINANCIAL DISTRESS AND PERFORMANCE OF SELECTED FIRMS LISTED AT NAIROBI SECURITIES EXCHANGE, KENYA.
Amaral The Impact of Marketing on the Financial Services Sector: An Empirical Investigation
Verma The influence of working capital management on the performance of Indian companies’ stock market value

Legal Events

Date Code Title Description
MK5 Application lapsed section 142(2)(e) - patent request and compl. specification not accepted