AU2011269138A1 - Method for fighting an oilspill in the aftermath of an underwater oil well blowout and installation for carrying out the method - Google Patents
Method for fighting an oilspill in the aftermath of an underwater oil well blowout and installation for carrying out the method Download PDFInfo
- Publication number
- AU2011269138A1 AU2011269138A1 AU2011269138A AU2011269138A AU2011269138A1 AU 2011269138 A1 AU2011269138 A1 AU 2011269138A1 AU 2011269138 A AU2011269138 A AU 2011269138A AU 2011269138 A AU2011269138 A AU 2011269138A AU 2011269138 A1 AU2011269138 A1 AU 2011269138A1
- Authority
- AU
- Australia
- Prior art keywords
- support structure
- foil
- oil
- pumping
- oil well
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 238000000034 method Methods 0.000 title claims abstract description 30
- 238000009434 installation Methods 0.000 title claims abstract description 28
- 239000003129 oil well Substances 0.000 title claims abstract description 24
- 239000003305 oil spill Substances 0.000 title description 4
- 239000011888 foil Substances 0.000 claims abstract description 91
- 239000003921 oil Substances 0.000 claims abstract description 46
- 238000005086 pumping Methods 0.000 claims abstract description 41
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 15
- 239000007788 liquid Substances 0.000 claims abstract description 13
- 230000002706 hydrostatic effect Effects 0.000 claims abstract description 8
- 239000010779 crude oil Substances 0.000 claims abstract description 5
- 229910000831 Steel Inorganic materials 0.000 claims description 36
- 239000010959 steel Substances 0.000 claims description 36
- 238000010438 heat treatment Methods 0.000 claims description 5
- 230000008014 freezing Effects 0.000 claims description 3
- 238000007710 freezing Methods 0.000 claims description 3
- 239000004918 carbon fiber reinforced polymer Substances 0.000 claims 2
- 239000011796 hollow space material Substances 0.000 abstract 1
- 239000013535 sea water Substances 0.000 description 8
- 239000012530 fluid Substances 0.000 description 7
- 230000015572 biosynthetic process Effects 0.000 description 5
- 238000005755 formation reaction Methods 0.000 description 5
- 239000004567 concrete Substances 0.000 description 4
- 230000006378 damage Effects 0.000 description 3
- 238000005553 drilling Methods 0.000 description 3
- VNWKTOKETHGBQD-UHFFFAOYSA-N methane Chemical compound C VNWKTOKETHGBQD-UHFFFAOYSA-N 0.000 description 3
- 239000007789 gas Substances 0.000 description 2
- 229930195733 hydrocarbon Natural products 0.000 description 2
- 150000002430 hydrocarbons Chemical class 0.000 description 2
- 229920000049 Carbon (fiber) Polymers 0.000 description 1
- 230000009172 bursting Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000003247 decreasing effect Effects 0.000 description 1
- 238000005474 detonation Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000004880 explosion Methods 0.000 description 1
- 239000004744 fabric Substances 0.000 description 1
- 230000004907 flux Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 239000003345 natural gas Substances 0.000 description 1
- 239000003208 petroleum Substances 0.000 description 1
- 238000003825 pressing Methods 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 230000006641 stabilisation Effects 0.000 description 1
- 238000011105 stabilization Methods 0.000 description 1
- 230000003068 static effect Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/01—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells specially adapted for obtaining from underwater installations
- E21B43/0122—Collecting oil or the like from a submerged leakage
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/01—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells specially adapted for obtaining from underwater installations
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/02—Surface sealing or packing
- E21B33/03—Well heads; Setting-up thereof
- E21B33/06—Blow-out preventers, i.e. apparatus closing around a drill pipe, e.g. annular blow-out preventers
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/12—Methods or apparatus for controlling the flow of the obtained fluid to or in wells
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Fluid Mechanics (AREA)
- Environmental & Geological Engineering (AREA)
- Physics & Mathematics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Chemical & Material Sciences (AREA)
- Oil, Petroleum & Natural Gas (AREA)
- Earth Drilling (AREA)
- Cleaning Or Clearing Of The Surface Of Open Water (AREA)
- Professional, Industrial, Or Sporting Protective Garments (AREA)
Abstract
The method for pumping away the oil in the aftermath of a blow out in an offshore oil well, comprises the steps of.putting a support structure (4) with surrounding foil (1) over the leaking oil well or pipe (26), in order to create a hollow space overhead the leaking spot on the sea bottom (10), 2.pumping water and oil through the top of the support structure (4) and thereby creating an underpressure below the foil (1) so the foil (1) will be pressed onto the sea bottomdue to hydrostatic pressure of the outside water; 3.continuously pumping away the liquid below the foil (1) from within the support structure (4) until it is pure crude oil,and collecting the same. The installation comprises a support structure (4) with an enclosure (12), in order to provide a hollow room overhead a leaking spot or oil pipe (26), and a reinforced foil (1) having such size that it extends at least 10 meters into the surrounding of the support structure (4). The reinforced foil (1) is tightly attached to the lower edge (33) of the enclosure (12) of the support structure (4). At least one pumping pipe (6,7) connectable to the top of the support structure (4) in order to pump liquid from within the support structure (4) and lower side of the foil (1).
Description
WO 2011/160999 1 PCT/EP2011/060016 Method for fighting an oilspill in the aftermath of an underwater oil well blowout and installation for carrying out the method [0001] This invention concerns a method for fighting oil spills in the aftermath of a blowout, and also an installation for carrying out the method. A blowout is the uncontrolled release of crude oil or natural gas or a mixture of the two from a well, typically for petroleum production, after pressure control systems have failed. When such an incident occurs, formation fluids begin to flow into the wellbore and up the annulus and/or inside the drill pipe, and this is commonly called a kick. If the well is not shut in (common term for the closing of the blow-out preventer valves), a kick can quickly escalate into a blowout when the formation fluids reach the surface, especially when the fluid is a gas which rapidly expands as it flows up the wellbore, further decreasing the effective weight of the fluid, and accelerates to near the speed of sound. The gas and other hydrocarbons commonly ignite during a blow-out, creating explosions and vigorous fires which are difficult to extinguish. Blowouts can cause significant damage to drilling rigs, injuries or fatalities to rig personnel, and significant damage to the environment if hydrocarbons are spilled. Prior to the development of blow-out preventers, blowouts were common during drilling operations, and were referred to as gushers. Sometimes, blowouts can be so forceful that they cannot be directly brought under control from the surface, particularly if there is so much energy in the flowing zone that it does not deplete significantly over the course of a blowout. In such cases, other wells (called relief wells) may be drilled to intersect the well or pocket, in order to allow kill-weight fluids to be introduced at depth. Contrary to what might be inferred from the term, such wells generally are not used to help WO 2011/160999 2 PCT/EP2011/060016 relieve pressure using multiple outlets from the blowout zone. [0002] An "underground blowout" is a special situation where fluids from high pressure zones flow uncontrolled to lower pressure zones within the open-hole portion of the wellbore. Usually they come up the wellbore to shallower formations (typically near the last casing shoe) that have been fractured from the overall effect of hydrostatic mud head plus casing pressure imposed at the time of the initial kick. Underground blowouts can be very difficult to bring under control although there is no outward flow at the drill site itself. However, if left unchecked, in time the fluids may find their way to the surface elsewhere in the vicinity (possibly "cratering" the rig), or may pressurize other zones, leading to problems when drilling subsequent wells. [0003] A very major blowout occurred on April 20, 2010 approx. 135 sea miles (250km) south east of New Orleans in the Mexican Gulf. And it was a very special case since the blowout occurred very deep in the sea, and oil leaked out of the hole in a depth of 5000 ft or approx. 1500 meters. It is estimated that up to 10 million litres or 10'000 m 3 of oil per day were being spilled into the ocean from underground or from broken drill pipes near the hole, which caused a dramatic disaster for the environment of an entire large region. [0004] There are no experienced and demonstrated techniques available in order to stop such an enormous spill of oil and the obstacles to stop such uncontrolled flow of oil are tremendous since the leaks are located 1500m below sea level on the hole. The oil formations from where the oil was taken out are located approx. 18'000 ft or approx. 5'500m below sea level, that is some 13'000 ft or approx. 4'000m below hole in the underground. Relief borings from the side have been brought down in order to reach the leaking oil well pipe, open it there and pump great amounts of mud at high pressure into it in order to block it by the weight of this pumped in material. However, to bring down such relief borings is time consuming. And even if the mud would arrive at the leaking oil pipe, the mud could not prevent a leaking that occurs through slits and cracks around the pipe WO 2011/160999 3 PCT/EP2011/060016 and up the annulus or through natural cracks in the formation which may have occurred due to detonations in the underground. [0005] Another proposal was to put a domelike shell made of steel or reinforced concrete on top of the leaking points and evacuate their content and thereby creating a big pressure onto the outer side of the shell and keep it in place, and then continuously pump the inflowing oil to the surface. However, underground streams and waves created heavy problems for this undertaking, and due to the low temperatures, freezing of valves created severe problems. [0006] The purpose of this invention is to present a method by which such a leaking of oil from the hole and from well pipes can be fought successfully so that the oil spill into the water can be stopped and prevent devastating consequences for the environment. A further purpose is to teach an installation which allows it to carry out this method even at greath depths, that is deep in the sea on the hole. [0007] The method according to claim 1 and the installation according to claim 5 are being presented in the following, by the example of the recent heavy blowout in the Mexican gulf. The method comprises several steps and is promising for successfully deal with that enormous problem and get the oil leaking into the water eventually stopped completely. [0008] 1 '000m 3 of oil per day equals to roughly 375 tons per hour, or 104 kg per second. This is the proximate mass flow that has to be dealt with. But this method has the potential to keep up with an even substantially greater flux of oil. In the accident in the Mexican gulf, the oil has an initial temperature of approx. 800C and originates from sea bottom at depths of approx. 18'000ft or 5500m below sea level. At such depths there is an enormous hydrostatic pressure of approx. 550bar or even more acting. Apparently, there were several leaks - such ones in the collapsed oil well pipes - and further leaks of oil in the hole where the oil escapes through several cracks.
WO 2011/160999 4 PCT/EP2011/060016 [0009] This present method is in essence a low tech method, and therefore quickly to apply, at low cost, and it does prevent the further spilling of oil into the sea water. With the exception of some rare special cases, this method will allow to pump pure crude oil after an initial phase of executing the method. Although the method is not thought to be a permanent solution, it can be in operation several months in order to bridge the time it takes to bring down release borings and put them in operation. [0010] The installation for execution of the method is suitable to serve as an emergency equipment and may be built in advance for future incidents should they ever occur. There are hundreds of deep sea borings in operation and therefore, a situation as the one which occurred in the Gulf of Mexico might occur on other sites in the future. [0011] The method can be carried out no matter whether the leaking of the oil is from a broken pipe over the hole or comes out of the sea bottom through open cracks. The method will now be described and its operation explained by reference to the accompanying drawings. These figures show: Figure 1 : The overall situation of a underwater oil spill with the installation for executing the method; Figure 2 : The three-leg pyramid-like steel support; Figure 3 : A section view of the three-leg support structure and the adjacent covering foil on the sea bottom, with the detail of its attachment to the support; Figure 4 : The stabilization of the three-leg support and foil on the sea bottom, seen from above; Figure 5 : The connection of the pumping pipe with the top of the WO 2011/160999 5 PCT/EP2011/060016 support structure; Figure 6 A side view of several steps to lowering down the foil and the support structure to the sea bottom; Figure 7 A side view of an alternative method for lowering down the support structure and foil to the sea bottom. [0012] This method is suitable for leaking pipes over the level of the sea bottom as well as for situations where the oil is leaking out of the sea bottom through cracks since a pipe did break below sea bottom or there was a bursting out of oil through natural channels. The method does make use of the hydrostatic pressure difference between the static pressure at the sea bottom and the reduced pressure in a hollow room created at the sea bottom of which liquid is pumped out. If oil and water is being pumped out of such an artificially created hollow room over the sea bottom, at a pressure drop of merely 50kPa (0.5 bar), the pressure from outside will amount to 50 kN/m2 [0013] For realizing this method, a support structure or bearing support together with a reinforced foil are the key elements of the installation. The entire installation is shown in figure 1. The support structure 4 is a steel construction in the form of a three-leg pyramid-like steel structure which is covered and completely enclosed by strong steel plates 17 and this support structure 4 or support structure has three legs 2 so it always stands safely and in a definite position on any ground 10. The legs 2 are equipped each with a foot 3 that can swivel in any direction around the leg 2 end so the feet 3 will adapt to any underground surface and provide stability for the entire structure. The three legs 2 keep the entire support structure in a stable position so it can carry much load. The size of this support structure 4 may vary according the situation on site, e.g. the legs 2 stand on a circle of several meters in diameter, at least large enough in order to completely enclose the leaking spot, that is e.g. a crack 19 in the sea bottom, or a pipe 26 that was broken. The height of this support structure 4 WO 2011/160999 6 PCT/EP2011/060016 measures anything between approx. 3 and 15 meters, in special cases the height may be even higher, and the side length at the bottom will be approx. 10 meters. In any case, the most important point is that this support structure 4 will cover the entire spot where oil is leaking out into the sea water. [0014] On this support structure 4, a strong reinforced, water tight, oil and sea water resistant foil 1 is being connected along the lower edge 33 of the pyramid like structure 4. The foil 1 can be composed of a number of strips that are being welded or glued together along their edges. The foil 1 is reincored by a steel fabric or by a carbon-fabric in its interior. This foil 1 is finally lying on the sea bottom around the support structure 4. The foil 1 has in its center a hole of triangular shape which is being put over the neck of the support structure 4 so the inner edge of said hole will fit to the lower edge 33 of steel plates 17 on the structure. The foil 1 is securely attached on the lower edge 33 of the steel plates 17 that cover the structure and hence the foil 1 covers the entire surroundings of the structure. At its periphery or outer edge, a surrounding frame 5 made of strong steel tubes or profiles is being placed in order to keep the position of the foil 1 on the sea bottom 10 and to keep it stretched. This frame 5 can form a circle, a square, a triangle or have a rectangular shape when seen from above. Alternatively, blocks 34 of concrete can be placed, one after the other, in a row along the outer edge of the foil 1, as shown in figure 4. [0015] A pipe 6,7 coming from a tanker ship 9 on the surface of the sea can be connected with a pipe neck that is extending out of the top of the support structure 4 and once the connection is established, liquid can be pumped from below the structure 4 and foil 1 to the sea surface into tanks of a tanker ship 9. Since the depth at which the installation is being placed may be several hundred or even thousand meters deep, several underwater pumps 8 will be used since sucking is only possible over somewhat less than 10 meters height. The power of these pumps 8 are regulated by their revolution per minute, according to the difference between the pressure inside and outside the support structure 4 and to keep that difference constant in a certain range. By using underwater pumps 8, the liquid WO 2011/160999 7 PCT/EP2011/060016 can be pressed with high pressures onto the surface of the sea. Several pumps 8 can be installed over the entire distance which even act parallel in order to establish a redundancy. As soon as the pressure within that pipe 6,7 and hence in the room within the support structure 4 is dropped to a pressure lower than the pressure acting outside of the foil and structure, the foil 1 is being pressed with enormous forces to the sea bottom and also the support structure 4 is being pressed onto the sea bottom since the hydrostatic pressure of the sea water will cause that pressing force. If the pressure within the support structure 4 and underneath the foil 1 is merely lowered at around 0.5 bar, the pressure which then acts from outside is about 50 kN/m2 and this pressure causes the foil 1 to be pressed to the sea bottom and the pressure also acts on the plates 17 which enclose the entire support structure 4. This will keep the structure 4 and adjacent foil 1 in place no matter what happens. The foil 1 and support structure 4 will even resist substantial underground streams. The foil 1 is likewise pressed onto the sea bottom 10 and hence follows the form and shape of its surface. Even if some water is leaking from the outer edge underneath the foil 1 toward its center, the force which does press the foil 1 onto the sea bottom is substantial, although it does slightly decrease toward the outer edge of the foil 1. At all times the pressure within the support structure 4 and underneath the foil 1 will be kept lower than the outside acting water pressure. This will cause the entire installation to rest absolutely stable on the sea bottom. [0016] In Figure 2, the support structure 4 on the sea bottom 10 is shown in a perspective view. Reinforcement struts 20 or bars are welded into the lower side of the bearing support 4 in order to strengthen its load capacity and in order to provide a support structure for the steel plates 17 to be fixed around the support structure 4 so they will completely enclose it and ultimately form the outer side of the structure. The lower edge of the steel plates 17 will be positioned approx. 0.5m to 1.5m above sea ground 10 so it will not touch it even if the sea bottom is uneven. The foil 1 will be connected tightly to the lower edge of the steel plates 17 and from there extend on to the surrounding sea bottom 10. On the top of the structure, the neck 21 is shown which does communicate with the inner side of the WO 2011/160999 8 PCT/EP2011/060016 support structure 4. [0017] In Figure 3, further details of the support structure 4 and foil 1 are being shown. The structure 4 may be equipped with an electrical heating installation 30 in order to keep the seawater which is mixing with the spilled oil warm enough for pumping. On the lower edge 33 of the steel plates 17, the foil 1 is tightly attached. This is shown here on the left side of the structure by way of example. As shonw in the respective enlarged view, a clamping device 35 holds a steel plate 32 which is slightly bent upwards. Along the lower surface of this steel plate 32, the foil 1 will smoothly adapt when the entire structure and attached foil will be lowered down onto the sea bottom as will be explained later. Underneath this bent steel plate 32, there is a flexible deflecting steel plate 31 which is bent toward the sea bottom. Between these two steel plates 31,32, the reinforced foil 1 is clamped by the clamping device 35 and thereby securely attached to the structure 4. When the structure 4 is lowered from a ship down to the sea bottom, the surrounding flexible steel plates 31 adapt to the uneven sea bottom and there outer edge will lay on the sea bottom. The outer edge of the foil 1 is attached to a frame 5 made of strong steel pipes or profiles. This frame 5 forms a circle with a radius of approx. 10 meters, or a square, triangle or rectangle with a side length of approx. 20 meters around the entire support structure 4 and the attached foil 1 and keeps the foil 1 stretched at all times. [0018] In Figure 4, the support structure 4, foil 1 and the surrounding frame 5 are shown from above, laying on the sea bottom. The corners of the frame 5 are stabilized by cables 36 which are attached to concrete blocks 34 positioned on the sea bottom. Further blocks 18 can be put onto the edge of the foil 1. In Figure 5, the connection of the pumping pipe 6 with the top of the foil 1 on the support structure 4 or support structure is shown. The neck 21 comes through the steel plate 17 on top of the structure 4. A conical connecting piece 16 is put over the neck 21 and will be sucked onto the steel plate 17 once the pressure within the support structure 4 is lower than the outside pressure of the seawater. The connecting piece is followed by a pipe with a flange 14 at its end. To this flange WO 2011/160999 9 PCT/EP2011/060016 14, another one is fixed which is connected to a strong rubber bellow 15 which provides a certain flexibility. This rubber bellow pipe 15 may have a steel spring in its interior in order to withstand the pressure difference between outside and inside. The pumping pipe 6 is connected to the upper flange 13 of the rubber bellow 15. The pumping pipe 6 can therefore move a certain distance in any direction and also its direction may vary from the straight upward direction. This pumping pipe 6 may be equipped with electrical heating means, e.g. a heating coil surrounding the pipe 6 over the initial section in order to prevent a freezing of the pumped liquids due to the lowered pressure and the low temperature of the surrounding sea water. [0019] Figure 6 does show in a schematic view how the reinforced foil 1 with the support structure 4 being attached to it is brought down onto the sea bottom. Typically, three or even four or more ships are being used which do cooperate with each other. They are equipped with winches with long steel cables 22. The ends of these steel cables 22 are fixed to the frame 5 with the reinforced foil 1 attached to it and the entire installation will be lowered down within the sea in a generally horizontal position. Therefore the ships must pull their cables radially away from a definite center and contemporarily lowering their cables from their winches. A strong steel cable 24 may be used as a guiding cable so the structure 4 hanging on the foil 1 will be directed to the spilling spot on the sea bottom. The cable 24 hangs on a swimmer 23 and the edge of the hole 25 in the structure 4 is made of a strong steel ring in order to prevent the structure 4 to be damaged. At the lower end, the cable 24 is fixed on a concrete block that has been positioned in advance. Therefore, the structure 4 and foil 1 will be perfectly guided with the central hole 25 of the structure. Once, the structure 4 and foil 1 are positioned on the sea bottom, the pumping pipe will be directed with its conical connecting piece 16 over the neck 21. Then, the pumping can start which will help cause the foil 1 to be sucked tightly around the support structure 4 and onto the sea bottom. The pumping pipe 6 and its connecting piece may likewise be put over the neck 21 by using guiding cables which are fixed on top of the support structure 4.
WO 2011/160999 1 0 PCT/EP2011/060016 [0020] Figure 7 shows an alternate way to bring down the support structure 4 and the foil 1. Four or even more ships are being used which do cooperate with each other. They first lower down heavy weights 27 hanging on a loose roll 28. This weights may be concrete blocks 27 of several tons of weight. These weights 27 are being positioned exactly around the spot where the support structure 4 needs to be positioned on the sea bottom 10. They then have a definite distance from that selected spot. Once the weights 27 are in position, the cables 29 going around the loose rolls 28 on the weights 27 will serve as guiding cables for lowering down the support structure 4 and the foil 1. E.g. for such weights and guiding strings can be used, or even more which are positioned overhead the edge of the foil 1 when it is finally down on the bottom of the sea. The support structure 4 can fixed to the foil 1 so it will furtheron hang on the center of the foil 1. The connection to the pumping pipe 6 is then already established. The foil 1 can then be lowered down, contemporarily with the support structure 4 hanging on it. One pipe piece of the pumping pipe after the other will be installed as the lowering down proceeds. The frame 5 around the foil 1 is attached via holding elements which are fixed on the cables 29 of each guiding string. By this, the foil 1 can be held almost horizontal and stretched and can be lowered down in completely controlled manner. This also facilitates the task to bring the support structure 4 exactly over the leaking pipe on the sea bottom since the foil and the support structure 4 are precisely guided along the stretched vertical cables 29 going down do definite points. Once the support structure 4 is close to the leaking spot, e.g. several meters, the pumps are activated and start to pump liquid from the interior of the support structure. Once the support structure 4 is layed onto the sea bottom and finds a definite stand, the foil 1 is completely lowered down on the sea bottom as well and the pumping out of liquid through the top neck of the support structure 4, the foil 1 will be tightly sucked to the outer surface of the support structure and also to the surrounding sea bottom. [0021] Once the pumps are active, the pressure in the interior of the support structure 4 and underneath the foil 1 will at all times be kept lower than the outside water pressure. This will keep the structure and foil 1 in place and the oil WO 2011/160999 11 PCT/EP2011/060016 is being sucked out of the created hollow room and pumped to the surface. A further spilling of oil into the sea water is prevented and time is gained for bringing release borings down and eventually shut down the well in a conventionally and approved manner.
Claims (13)
1. Method for pumping away the oil in the aftermath of a blow out in an offshore oil well, comprising the steps of a) putting an installation made of a support structure (4) with enclosure (12) and an attached reinforced foil (1) which extends horizontally into its surrounding, over the leaking oil well or pipe (26), b) pumping water and oil out of the interior of the support structure (4) and thereby creating an underpressure underneath support structure (4) and the covering foil (1) so the support structure (4) and foil (1) will be pressed onto the sea bottom (10) due to hydrostatic pressure of the outside water; c) continuously pumping away liquid from the interior of the support structure (4) and therefore from below the foil (1) until it is pure crude oil, and collecting the same in tank ships (9).
2. Method for pumping away the oil in the aftermath of a blow out in an offshore oil well, comprising the steps of a) putting a support structure (4) with an enclosure (12) and an reinforced foil (1) attached to its lower edge (33) and which foil (1) and is surrounded by a frame (5) to which it is fixed, over the leaking oil well or pipe (26), whereby the support structure (4) and the foil (1) with its frame (5) are lowered down contemporarily along at least one guiding string (24) which leads to weights positioned on the sea bottom, b) pumping water and oil through the reinforced foil (1) and thereby creating an underpressure underneath the foil (1) so the foil (1) will be pressed onto the support structure (4) and the sea bottom (10) due to hydrostatic pressure of the outside water; c) continuously pumping away liquid from the interior of the support structure (4) and therefore from below the foil (1) until it is pure crude oil, and collecting the same in tank ships (9). WO 2011/160999 PCT/EP2011/060016 13
3. Method for pumping away the oil in the aftermath of a blow out in an offshore oil well according to claim 1, and further comprising the steps of al) putting a weight block on a guiding string (24) on the leaking oil well or pipe (26) to serve as a guide for lowering an installation down onto the sea bottom, a2) lowering the installation made of a support structure (4) with enclosure (12) and an attached reinforced foil (1) which extends horizontally to a frame (5) over the leaking oil well or pipe (26) along the guiding string (24) by at least three ships with the frame (5), foil (1) and support structure (4) hanging on steel cables (22) attached to the frame (5), while the cables (22) come from winches installed on these ships, while the ships pull in a radial direction from a center overhead the support structure (4) on the sea bottom (10), and the support structure (4) being guided by at least one guiding cable (24) fixed on a weight block on the sea bottom and hanging on a swimmer (23), b) putting the pumping pipe (6,7) with its conical connecting piece (16) over the neck (21) on the support structure (4) and then pumping water and oil through the top of support structure (4) and from underneath the reinforced foil (1) and thereby creating an underpressure underneath the foil (1) so the foil (1) will be pressed onto the sea bottom (10) due to hydrostatic pressure of the outside water; c) continuously pumping away the liquid from the interior of the support structure (4) and therefore from below the foil (1) until the oil well pipe (26) is blocked by conventional means.
4. Method for pumping away the oil in the aftermath of a blow out in an offshore oil well according to any one of the preceding claims, characterized in that the lowering of the frame (5), the foil (1) with support structure (4), and the connecting of the pumping pipe (6,7) is enabled by guiding cables (24) stretched between the weight block and a swimmer (23) on top of the sea along which the entire installation and the pumping pipe (6,7) are being guided when lowered down and until put in operation. WO 2011/160999 PCT/EP2011/060016 14
5. Installation for pumping away the oil in the aftermath of a blow out in an offshore oil well, comprising a support structure (4) with an enclosure (12), in order to provide a hollow room overhead a leaking spot or oil pipe (26), and a reinforced foil (1) having such size that it extends at least 10 meters into the surrounding of the support structure (4) and is tightly attached to the lower edge (33) of the enclosure (12) of the support structure (4), and at least one pumping pipe (6,7) connectable to the top of the support structure (4) in order to pump liquid from within the support structure (4) and lower side of the foil (1).
6. Installation for pumping away the oil in the aftermath of a blow out in an offshore oil well according to claim 5, characterized in that the support structure (4) is enclosed with an enclosure (12) made of steel plates (17), the steel plates (17) fixed on the support structure (4) and on several struts (20) which reinforce the support structure (4) and provide a structure for fixing these steel plates (17).
7. Installation for pumping away the oil in the aftermath of a blow out in an offshore oil well according to any one of the claims 5 to 6, characterized in that the support structure (4) has at least three legs (2) and each one is equipped with a swivelable foot (3).
8. Installation for pumping away the oil in the aftermath of a blow out in an offshore oil well according to any one of the claims 5 to 7, characterized in that the support structure (4) is equipped with a neck (21) extending upwards from its top for establishing a connection to a pumping pipe (6,7).
9. Installation for pumping away the oil in the aftermath of a blow out in an offshore oil well according to any one of the claims 5 to 8, characterized in that the reinforced foil (1) is of circular or square shape and is made of a steel- or carbon-fiber reinforced plastic foil (1). WO 2011/160999 PCT/EP2011/060016 15
10. Installation for pumping away the oil in the aftermath of a blow out in an offshore oil well according to any one of the claims 5 to 9, characterized in that the reinforced foil (1) is a steel- or carbon-fiber reinforced plastic foil (1), with a further reinforced edge, and a frame (5) surrounding the foil (1) and on which frame (5) made of steel pipes or profiles, the outer edge of the foil (1) is securely attached to said frame (5).
11. Installation for pumping away the oil in the aftermath of a blow out in an offshore oil well according to any one of the claims 5 to 10, characterized in that the lower edge (33) of the steel plate enclosure (12) of the support structure (4) is equipped with clamping devices (35), clamping a steel plate which extends horizontally from the support structure (4) and are being bent upwards, and further clamping flexible steel plates (31) bent downwards in order to adapt to the sea bottom, and between these steel plates (31,32) clamping the reinforced foil (1).
12. Installation for pumping away the oil in the aftermath of a blow out in an offshore oil well according to any one of the claims 5 to 11, characterized in that the pumping pipe (6,7) is equipped on its lower end with a flexible reinforced rubber bellow pipe (15) for a flexible connection to the neck (21) on the support structure (4), and is further equipped with heating means in order to prevent a freezing of the pumped liquid.
13. Installation for pumping away the oil in the aftermath of a blow out in an offshore oil well according to any one of the claims 5 to 12, characterized in that the interior of the support structure (4) is equipped with an electrical heating installation (30).
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP10166808 | 2010-06-22 | ||
EP10166808.5 | 2010-06-22 | ||
PCT/EP2011/060016 WO2011160999A2 (en) | 2010-06-22 | 2011-06-16 | Method for fighting an oilspill in the aftermath of an underwater oil well blowout and installation for carrying out the method |
Publications (1)
Publication Number | Publication Date |
---|---|
AU2011269138A1 true AU2011269138A1 (en) | 2013-01-24 |
Family
ID=44627062
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
AU2011269138A Abandoned AU2011269138A1 (en) | 2010-06-22 | 2011-06-16 | Method for fighting an oilspill in the aftermath of an underwater oil well blowout and installation for carrying out the method |
Country Status (11)
Country | Link |
---|---|
US (1) | US20130126178A1 (en) |
EP (1) | EP2585676A2 (en) |
JP (1) | JP2013529729A (en) |
KR (1) | KR20140005840A (en) |
CN (1) | CN103080466A (en) |
AU (1) | AU2011269138A1 (en) |
BR (1) | BR112012033171A2 (en) |
CA (1) | CA2804737A1 (en) |
EA (1) | EA201300012A1 (en) |
MX (1) | MX2013000006A (en) |
WO (1) | WO2011160999A2 (en) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US9145308B2 (en) | 2012-01-13 | 2015-09-29 | Fluor Technologies Corporation | Oil spill cleanup from water |
US9719331B2 (en) | 2012-05-13 | 2017-08-01 | Alexander H. Slocum | Method and apparatus for bringing under control an uncontrolled flow through a flow device |
US20130272792A1 (en) * | 2013-04-22 | 2013-10-17 | Steve Cordell | Process and Apparatus for Sealing Wellhead Leaks Underwater or On Land |
JP6565226B2 (en) * | 2015-03-06 | 2019-08-28 | 宇部興産株式会社 | Submarine resource mining method and submarine resource mining slurry |
US10036135B2 (en) * | 2015-10-23 | 2018-07-31 | Philip S. Dunlap | Methods and systems to contain pollution and hazardous environments (CPHE) |
CN105840147B (en) * | 2016-03-24 | 2019-01-01 | 西南石油大学 | Suspend the sea-bottom natural gas collection device and method of the heating of buoyancy tank helical pipe |
Family Cites Families (34)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3548605A (en) * | 1969-05-07 | 1970-12-22 | Texaco Development Corp | Submergible vehicle for emergency offshore gas leakage |
US3653215A (en) * | 1969-06-04 | 1972-04-04 | Cerebro Dynamics Inc | Method and apparatus for confining and collecting oil leakage |
US3664136A (en) * | 1969-11-28 | 1972-05-23 | Laval Claude C | Collecting device for submarine oil leakage |
US3724662A (en) * | 1971-03-12 | 1973-04-03 | A Ortiz | Control of oil pollution at sea, apparatus and method |
US3879951A (en) * | 1973-06-25 | 1975-04-29 | Sun Oil Co | Underwater drilling pollution control curtain |
US4220421A (en) * | 1978-11-27 | 1980-09-02 | Fmc Corporation | Subsea wellhead protective enclosure |
US4318442A (en) * | 1979-09-27 | 1982-03-09 | Ocean Resources Engineering, Inc. | Method and apparatus for controlling an underwater well blowout |
FR2473615A1 (en) | 1979-11-16 | 1981-07-17 | Inst Francais Du Petrole | ANTI-POLLUTION DEVICE FOR IMMERSE OIL WELL, COMPRISING AN ORGAN ADAPTED TO COME TO COIFFER THE HEAD OF THE WELL |
US4290714A (en) * | 1979-12-03 | 1981-09-22 | Western Geophysical Co. Of America | Marine oil leak containment and recovery apparatus |
US4358218A (en) * | 1979-12-17 | 1982-11-09 | Texaco Inc. | Apparatus for confining the effluent of an offshore uncontrolled well |
US4323118A (en) * | 1980-02-04 | 1982-04-06 | Bergmann Conrad E | Apparatus for controlling and preventing oil blowouts |
US4373834A (en) * | 1980-12-01 | 1983-02-15 | Grace Frederick J | Portable off shore well installation apparatus |
US4382716A (en) * | 1981-03-02 | 1983-05-10 | Troy Miller | Blowout recovery system |
US4456071A (en) * | 1981-10-16 | 1984-06-26 | Massachusetts Institute Of Technology | Oil collector for subsea blowouts |
FR2518639A1 (en) * | 1981-12-21 | 1983-06-24 | Inst Francais Du Petrole | PROCESS FOR RECOVERING POLYMETALLIC COMPOUNDS REJECTED BY AN UNDERWATER HYDROTHERMAL SOURCE AND DEVICES FOR IMPLEMENTING THE SAME |
US4358219A (en) * | 1982-02-08 | 1982-11-09 | Texaco Development Corporation | Method for confining an uncontrolled flow of hydrocarbon liquids |
US4421436A (en) * | 1982-07-06 | 1983-12-20 | Texaco Development Corporation | Tension leg platform system |
DE3730671A1 (en) * | 1987-09-12 | 1989-04-13 | Ksb Ag | DEVICE FOR UNDERGROUND PRODUCTION OF PETROLEUM AND NATURAL GAS |
FR2627542A1 (en) * | 1988-02-24 | 1989-08-25 | Coflexip | DEVICE FOR TRANSFERRING FLUID BETWEEN THE SUB-MARINE BOTTOM AND THE SURFACE |
US5582252A (en) * | 1994-01-31 | 1996-12-10 | Shell Oil Company | Hydrocarbon transport system |
BR9600248A (en) * | 1996-01-29 | 1997-12-23 | Petroleo Brasileiro Sa | Method and apparatus for draining subsea oil production with primary gas separation |
NO307210B1 (en) * | 1996-11-27 | 2000-02-28 | Norske Stats Oljeselskap | Oil or gas extraction system |
US5885028A (en) * | 1996-12-10 | 1999-03-23 | American Oilfield Divers, Inc. | Floating systems and method for storing produced fluids recovered from oil and gas wells |
CN1104358C (en) * | 1997-12-18 | 2003-04-02 | 美国油田钻探公司 | Offshore production and storage facility and method of installing same |
NO991282D0 (en) * | 1999-03-17 | 1999-03-17 | Bj Rn Grinde | Method and apparatus for collecting oil from discharges under water |
US6192691B1 (en) * | 1999-09-20 | 2001-02-27 | Taiyo Kogyo Corporation | Method of collecting methane hydrate gas and apparatus therefor |
US6299256B1 (en) * | 2000-05-15 | 2001-10-09 | The United States Of America As Represented By The Department Of Energy | Method and apparatus for recovering a gas from a gas hydrate located on the ocean floor |
DE10323556B4 (en) * | 2003-05-26 | 2008-03-20 | Thomas Schwalb | Method and arrangement for catching submerged media |
MY139416A (en) * | 2005-09-06 | 2009-09-30 | Alpha Perisai Sdn Bhd | Containerised modular processing system |
CN200985784Y (en) * | 2006-07-21 | 2007-12-05 | 中国石油天然气股份有限公司 | Recovery device for oilfield sewage water floating oil |
NO325582B1 (en) * | 2006-10-27 | 2008-06-23 | Norsk Hydro As | Research process system |
WO2011137535A1 (en) * | 2010-05-04 | 2011-11-10 | Oxus Recovery Solutions Inc. | Submerged hydrocarbon recovery apparatus |
US20110274493A1 (en) * | 2010-05-07 | 2011-11-10 | Justin Bredar Cutts | Moored Wellhead Effluent Capture and Concrete Application Apparatus |
EP2569510A2 (en) * | 2010-05-10 | 2013-03-20 | Steven G. Dvorak | Undersea leak remediation device and method |
-
2011
- 2011-06-16 MX MX2013000006A patent/MX2013000006A/en not_active Application Discontinuation
- 2011-06-16 CA CA2804737A patent/CA2804737A1/en not_active Abandoned
- 2011-06-16 CN CN2011800405002A patent/CN103080466A/en active Pending
- 2011-06-16 BR BR112012033171A patent/BR112012033171A2/en not_active IP Right Cessation
- 2011-06-16 EA EA201300012A patent/EA201300012A1/en unknown
- 2011-06-16 EP EP11725463.1A patent/EP2585676A2/en not_active Withdrawn
- 2011-06-16 US US13/806,503 patent/US20130126178A1/en not_active Abandoned
- 2011-06-16 JP JP2013515815A patent/JP2013529729A/en not_active Withdrawn
- 2011-06-16 KR KR1020137001172A patent/KR20140005840A/en not_active Application Discontinuation
- 2011-06-16 AU AU2011269138A patent/AU2011269138A1/en not_active Abandoned
- 2011-06-16 WO PCT/EP2011/060016 patent/WO2011160999A2/en active Application Filing
Also Published As
Publication number | Publication date |
---|---|
WO2011160999A2 (en) | 2011-12-29 |
BR112012033171A2 (en) | 2017-03-01 |
WO2011160999A3 (en) | 2012-10-26 |
US20130126178A1 (en) | 2013-05-23 |
EA201300012A1 (en) | 2013-06-28 |
JP2013529729A (en) | 2013-07-22 |
EP2585676A2 (en) | 2013-05-01 |
MX2013000006A (en) | 2013-06-05 |
KR20140005840A (en) | 2014-01-15 |
CA2804737A1 (en) | 2011-12-29 |
CN103080466A (en) | 2013-05-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20130126178A1 (en) | Method for fighting an oilspill in the aftermath of an underwater oil well blowout and installation for carrying out the method | |
US7987903B1 (en) | Apparatus and method for containing oil from a deep water oil well | |
US8950500B2 (en) | Suction pile wellhead and cap closure system | |
US4456071A (en) | Oil collector for subsea blowouts | |
US8684630B2 (en) | Underwater reinforced concrete silo for oil drilling and production applications | |
US10968707B2 (en) | Subsea methane hydrate production | |
EP0039699A1 (en) | Method and column for collection and separation of oil, gas and water from blowing wells at the sea bed | |
US8967271B2 (en) | Subsea overpressure relief device | |
US9080411B1 (en) | Subsea diverter system for use with a blowout preventer | |
US10753058B2 (en) | Containment unit and method of using same | |
US9038728B1 (en) | System and method for diverting fluids from a wellhead by using a modified horizontal christmas tree | |
US9033051B1 (en) | System for diversion of fluid flow from a wellhead | |
US4358219A (en) | Method for confining an uncontrolled flow of hydrocarbon liquids | |
NO338609B1 (en) | System and method for retaining an exploration and production system below the surface | |
US3401746A (en) | Subsea production satellite system | |
US8911176B2 (en) | Subsea crude oil and/or gas containment and recovery system and method | |
US20150060081A1 (en) | Capping stack for use with a subsea well | |
US20120027519A1 (en) | Method and a device for sealing and/or securing a borehole | |
US9045959B1 (en) | Insert tube for use with a lower marine riser package | |
US20140090852A1 (en) | Temporary Cap for a Blownout Subsea Wellhead | |
NO318212B1 (en) | Underwater recovery device | |
CA2809627A1 (en) | Textile oil containment sleeve |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
MK1 | Application lapsed section 142(2)(a) - no request for examination in relevant period |