AU2011251674B2 - Method and system for treating a subterranean formation - Google Patents
Method and system for treating a subterranean formation Download PDFInfo
- Publication number
- AU2011251674B2 AU2011251674B2 AU2011251674A AU2011251674A AU2011251674B2 AU 2011251674 B2 AU2011251674 B2 AU 2011251674B2 AU 2011251674 A AU2011251674 A AU 2011251674A AU 2011251674 A AU2011251674 A AU 2011251674A AU 2011251674 B2 AU2011251674 B2 AU 2011251674B2
- Authority
- AU
- Australia
- Prior art keywords
- nth
- fluid
- zone
- stimulation fluid
- subterranean formation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
- 238000000034 method Methods 0.000 title claims abstract description 43
- 230000015572 biosynthetic process Effects 0.000 title claims abstract description 39
- 239000012530 fluid Substances 0.000 claims abstract description 166
- 239000000700 radioactive tracer Substances 0.000 claims abstract description 46
- 230000035699 permeability Effects 0.000 claims abstract description 12
- 230000000638 stimulation Effects 0.000 claims description 92
- 238000004519 manufacturing process Methods 0.000 claims description 14
- 239000011159 matrix material Substances 0.000 claims description 3
- 230000004936 stimulating effect Effects 0.000 claims description 3
- 238000010306 acid treatment Methods 0.000 claims 2
- 239000003795 chemical substances by application Substances 0.000 abstract 1
- 239000000126 substance Substances 0.000 description 12
- 239000000203 mixture Substances 0.000 description 11
- 238000002347 injection Methods 0.000 description 9
- 239000007924 injection Substances 0.000 description 9
- 206010017076 Fracture Diseases 0.000 description 8
- 230000008569 process Effects 0.000 description 8
- 208000010392 Bone Fractures Diseases 0.000 description 7
- 230000003750 conditioning effect Effects 0.000 description 6
- 238000005070 sampling Methods 0.000 description 5
- 230000008901 benefit Effects 0.000 description 4
- 238000013461 design Methods 0.000 description 4
- 230000006870 function Effects 0.000 description 4
- 238000004458 analytical method Methods 0.000 description 3
- 238000005259 measurement Methods 0.000 description 3
- 238000004364 calculation method Methods 0.000 description 2
- 238000011161 development Methods 0.000 description 2
- 239000010459 dolomite Substances 0.000 description 2
- 229910000514 dolomite Inorganic materials 0.000 description 2
- 238000012544 monitoring process Methods 0.000 description 2
- 238000005086 pumping Methods 0.000 description 2
- 238000010200 validation analysis Methods 0.000 description 2
- BVKZGUZCCUSVTD-UHFFFAOYSA-L Carbonate Chemical compound [O-]C([O-])=O BVKZGUZCCUSVTD-UHFFFAOYSA-L 0.000 description 1
- 235000019738 Limestone Nutrition 0.000 description 1
- 208000006670 Multiple fractures Diseases 0.000 description 1
- 230000004075 alteration Effects 0.000 description 1
- 230000003466 anti-cipated effect Effects 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000011156 evaluation Methods 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 230000005764 inhibitory process Effects 0.000 description 1
- 239000006028 limestone Substances 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 229910001425 magnesium ion Inorganic materials 0.000 description 1
- 239000000463 material Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
- E21B43/267—Methods for stimulating production by forming crevices or fractures reinforcing fractures by propping
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/10—Locating fluid leaks, intrusions or movements
- E21B47/11—Locating fluid leaks, intrusions or movements using tracers; using radioactivity
Landscapes
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Geochemistry & Mineralogy (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- Geophysics (AREA)
- Sampling And Sample Adjustment (AREA)
- Physical Or Chemical Processes And Apparatus (AREA)
- General Preparation And Processing Of Foods (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
- Analysing Materials By The Use Of Radiation (AREA)
- Processing Of Solid Wastes (AREA)
- Measuring Volume Flow (AREA)
Abstract
A method and apparatus to treat a subterranean formation comprising a wellbore including introducing a tool to a wellbore in a region of low permeability or damage, treating the region of low permeability or damage with a fluid, simultaneously measuring a fluid pressure drop and volume of fluid flow in a particular region, and moving the tool to another region. A method and apparatus to treat a subterranean formation comprising a wellbore including introducing to a wellbore a tool in a region of low permeability or damage, treating the region of low permeability or damage with a fluid, introducing a diversion agent, and moving the tool to another region wherein the fluid comprises a tracer.
Description
METHOD AND SYSTEM FOR TREATING A SUBTERRANEAN FORMATION BACKGROUND 5 [0001] Hydraulic fracturing and/or matrix acidizing oil and gas wells are often used to stimulate production out of more than one layer in the same wellbore. There are many techniques used to insure that the stimulation treatment is isolated from the other layer(s). These techniques have various levels of cost, complexity, reliability, and time consumption. 10 The limited entry technique is less than optimum as it involves placing entry points in the formation without validation of fluid placement efficiency prior to stimulating. FIGURES [0002] Figure 1 is a sectional view of a tool in a wellbore. 15 [0003] Figure 2 is a sectional view of a tool in a wellbore. [0004] Figure 3 is a plot of pressure as a function of injection rate. [0005] Figure 4 is a sectional view of a tool in a wellbore. 20 [0006] Figure 5 is a sectional view of a wellbore. [0007] Figure 6 is a plot of pressure as a function of injection rate. [0008] Figure 7 is a sectional view of a tool in a wellbore. 25 [0009] Figure 8 is a sectional view of a wellbore. SUMMARY 30 [0010] Embodiments of the invention relate to a method to treat a subterranean formation comprising a wellbore, comprising: perforating a first zone of the subterranean formation; treating the first zone of the subterranean formation with a first stimulation fluid; 35 measuring a first fluid pressure drop and first volume of fluid flow in the first zone resulting in a first plot of the of the first fluid pressure drop versus the first volume of fluid flow; perforating a second zone of the subterranean formation; treating the first and second zones of the subterranean formation with a second stimulation fluid introduced through the wellbore; 1 6599469_1 (GHMatters) P91879.AU JINGT measuring a second fluid pressure drop and second volume of fluid flow in the combined first and second zones resulting in a second plot of the second fluid pressure drop versus the second volume of fluid flow; utilizing the first and second plots to determine the volume of the second stimulation fluid 5 introduced to each of the first and second zones. Embodiments of the invention relate to a method to treat a subterranean formation comprising a wellbore, comprising: perforating a first zone of the subterranean formation; treating the first zone of the subterranean formation with a first stimulation fluid; flowing back a first flow back stimulation fluid from the first zone of the subterranean 10 formation; measuring a first flow back stimulation fluid pressure differential and first volume of first flow back stimulation fluid flow in the first zone resulting in a first plot of the first flow back stimulation fluid pressure differential and the first volume of first flow back stimulation fluid flow; 15 perforating a second zone of the subterranean formation; treating the first and second zones of the subterranean formation with a second stimulation fluid introduced through the wellbore; flowing back a second flow back stimulation fluid from the first and second zones of the subterranean formation; 20 measuring a second flow back stimulation fluid pressure differential and second volume of second flow back stimulation fluid flow in the combined first and second zones resulting in a second plot of the second flow back stimulation fluid pressure differential and second volume of second flow back stimulation fluid flow; 2 6599469_1 (GHMatters) P91879.AU JINGT utilizing the first and second plots to determine the volume of the second stimulation fluid introduced to each of the first and second zones. DESCRIPTION 5 [0011] At the outset, it should be noted that in the development of any such actual embodiment, numerous implementation-specific decisions must be made to achieve the developer's specific goals, such as compliance with system related and business related constraints, which will vary from one implementation to another. Moreover, it will be appreciated that such a development 10 effort might be complex and time consuming but would nevertheless be a routine undertaking for those of ordinary skill in the art having the benefit of this disclosure. In addition, the composition used/disclosed herein can also comprise some components other than those cited. In the summary of the invention and this detailed description, each numerical value should be read once as modified by the term "about" (unless already expressly so modified), and then read 15 again as not so modified unless otherwise indicated in context. Also, in the summary of the invention and this detailed description, it should be understood that a concentration range listed or described as being useful, suitable, or the like, is intended that any and every concentration within the range, including the end points, is to be considered as having been stated. For example, "a range of from I to 10" is to be read as indicating each and every possible number 20 along the continuum between about 1 and about 10. Thus, even if specific data points within the range, or even no data points within the range, are explicitly identified or refer to only a few specific, it is to be understood that inventors appreciate and understand that any and all data points within the range are to be considered to have been specified, and that inventors possessed knowledge of the entire range and all points within the range. The statements made herein 25 merely provide information related to the present disclosure and may not constitute prior art, and may describe some embodiments illustrating the invention. [0012] Embodiments of the invention may make a system where multiple zones can be treated with less wellbore operations, more reliable and predictable, and all along at less cost and time 30 using the limited entry technique. Embodiments of the invention are an improvement on the established process of limited entry zone stimulation and resolve the disadvantages of 2A 6599469_1 (GHMatters) P91879.AU JINGT WO 2011/141875 PCT/IB2011/052060 unpredictability, efficiency, and validation of multiple zones being stimulated. This is a method where each entry point can be tested for fluid acceptance quickly, reliably, and inexpensively. [0013] This is a method to simultaneously stimulate and/or acidize multiple zones or multiple fractures in the same zone. The process involves a zone well that will have each zone or several grouped zones to be treated together so that the treatment is isolated and not going to the previously treated/ perforated zones. This gives more control over how each zone will deliver its production. 1. The process will start out as a conventional limited entry design to determine the proper and optimum amount of stimulations per fracture to be created. 2. Then, the initial entry hole or slot will into one zone. Ideally, this will be at in the zone of lowest fracture pressure to be treated. However it is effective in any potential fracture point where it is desirable to restrict the flow. This entry will then be created at some point equal to or less in entrance area than the design for this point. (Figure 1). Some embodiments may benefit from the use of a tracer during this step. 3. The perforating or jetting device will be left in the hole to continue operations (Figure 2), while pumping at various rates and pressure is observed and recorded. This will give the entry rates into the fracture verses pressure (Figure 3) for calibration of the fracture created with real time rates as a function of time. The pressures should be in the operating range of the anticipated treatment for maximum accuracy. 4. Next, the perforating or slotting device is moved to the second fracture point and the process (steps 2- and 3) is repeated. This time the rates are increased to achieve the same pressure range (figures 4, 5, 6). The difference in the rates at same pressures (first rates from second) is the fluid rate going into the second zone. That is, the difference indicates real time fluid behavior. Some embodiments may perform a perforation step, then an injection step. Some additional embodiments may perform an injection step, followed by a perforation step. 5. The process can be repeated in more zones until the maximum allowable rate is achieved for the zones. Some embodiments may benefit from the use of a diverter treatment step. 6. If it is desirable to put a larger portion of the treatment in a zone verses another then with the slotting or perforating device still in the wellbore, add another entry point(s). 3 WO 2011/141875 PCT/IB2011/052060 7. If it is determined that the limited number of entry points for treatment, would restrict oil or gas production, then with the perforating or slotting device already in the wellbore, add holes. 8. The achieve a lower surface treating pressure the perforating or slotting device maybe removed from the well during the main fracture treatment. Also, Figure 7 illustrates how the tool may be sized to facilitate fluid flow through the wellbore. Figure 8 illustrates a clean-up step for some embodiments of the invention. 9. If maximum rate is achieved and there are intervals still needing to be fractured or stimulated, then the conventional diversion or plugging materials, packers, or bridge plugs can be used to isolate these zones. 10. To expedite the process, the steps 2 through 5 can be made without stopping the pumping or fracturing treatment. In this version the initial holes are generated, the allowable treating pressure is met, holes in other (or same zone) are placed while maintaining pressure. The difference is the rate at the new holes. Process is repeated until desired all zones are treating properly or maximum rate is achieved. [0014] Embodiments of the present invention also allow measurement of a diverter's effectiveness in diverting stimulation and scale treatment fluids from a high permeability layer to a low permeability layer, or from a high pressure zone to a low pressure zone, or from a layer which has a higher fluid mobility to a layer which has a lower fluid mobility. Embodiments of the invention can also be used to evaluate the effectiveness or a diverter to place the injected chemicals more evenly across layers which have different properties and can affect chemical placement. The method allows calculation of volume of fluid injected in the low perm layer vs. the high perm layer, or in the high pressure zone vs. low pressure zone, or in the layer where the fluid has a higher mobility vs. layer where fluid has a lower mobility, and the extent of clean-up, or flow back after the well is put back on production. That is, the different pressure profiles as illustrated by Figures 3 and 6 show how more perforations and/or fractures influence the resulting observed pressure and provide a way to estimate flow profile and pressure along the wellbore. [0015] The method allows calculation of volume of fluid injected in the low permeability layer vs. the high permeability layer and the extent of clean-up after the well is put back on 4 WO 2011/141875 PCT/IB2011/052060 production. Consider a stimulation treatment designed for two reservoir zones intersected by a wellbore. Assume that the top zone is a high perm zone (or a low pressure zone, or a zone where fluid mobility is higher) and the bottom zone is a low perm zone (or a high pressure zone, or a zone where fluid mobility is lower). The objective is to measure the volume of stimulation fluid, or scale inhibition fluid that is injected in the both zones (evaluate diverter efficiency) and to determine the effectiveness of clean-up during flow back. Also, this method allows an alternative to the conventional method using distributed temperature sensors (DTS). [0016] To verify the effectiveness of this system (or the limited entry technique), consider a stimulation treatment designed for two reservoir zones intersected by a wellbore. Assume that the top zone is a high perm zone and the bottom zone is a low perm zone. The objective is to measure the volume of stimulation fluid that is injected in the low perm zone (to evaluate diverter efficiency) and to determine the effectiveness of clean-up during flow back. The evaluation as per embodiments of the present invention would comprise of the following steps: 1. Inject stimulation fluid SI with tracer T1. 2. Inject diverter stage. 3. Inject stimulation fluid S2 with tracer T2. 4. Position downhole sampling device, such as compact production sampler cartridge with multiple sample bottles, between top and the bottom zone. 5. Flow back the well and collect surface samples and downhole samples during flow back and record flow rate during flow back. 6. Analyze composition of the surface and downhole samples. 7. Determine volume of stimulation fluid injected in the lower zone during the first stage (SI fluid) by analyzing the tracer TI concentration in the surface sample vs. the downhole sample. 8. Determine volume of stimulation fluid injected during the second stimulation stage (S2 fluid) by analyzing the tracer concentration in the surface sample vs. the downhole sample for Tracer T2. 9. Integrate the flow rates to compute fluid volumes. 10. Compare results from 7 to 9 to determine the effectiveness of diverter stage. 5 WO 2011/141875 PCT/IB2011/052060 11. Determine the clean-up efficiency of each zone by integrating flow rate of retrieved stimulation fluid from each zone. [0017] The tracer concentrations can be measured by monitoring a fluid property related to the concentration, such as, pH, resistivity, density, color etc. The measurements can be made at a single point or at multiple points in the flow path. They can be made in real-time and used in improving the design of the treatment or they can be stored to memory and analyzed later for improving future designs. [0018] The tracer used in monitoring diversion can come from the formation itself. For example, it is possible that in a carbonate reservoir the low permeability zones have more dolomite CaMg(C0 3 ), while the high permeability zones have more limestone (CaCO 3 ). In this case the, Ca and Mg can serve as tracers and their concentrations in the flow back fluid can be used to determine the diverter efficiency. [0019] Once the measurement of the tracer concentration is made, the methods of United States Patent Number 7658226 which is incorporated by reference herein in its entiretycan be used to calculate the diverter efficiency. Additional embodiments may benefit from the alternatives described in United States Patent Application Number 12/635,002, filed December 10, 2009, entitled, "Method of Determining End Member Concentrations," and incorporated by reference herein in its entirety.An alternative method for computing diversion efficiency is by simulating the entire process by assuming a certain diverter efficiency and then comparing the calculated concentrations against the measured values and then iteratively adjusting the diverter efficiency until a good match is obtained between the calculated and measured values. [0020] ---- Variation 1 Can combine the above with a PLT positioned above the lower zone. [0021] ---- Variation 2 1) Inject stimulation fluid Si with tracer Ti 2) Inject stimulation fluid mixed with diverted stage S2 with tracer T2 6 WO 2011/141875 PCT/IB2011/052060 3) Position downhole sampling device, such as compact production sampler cartridge with multiple sample bottles, between top and the bottom zone. 4) Flow back the well and collect surface samples and downhole samples during flow back and record flow rate during flow back. 5) Analyze composition of the surface and downhole samples 6) Determine volume of stimulation fluid injected in the lower zone during the first stage (SI fluid) by analyzing the tracer T 1 concentration in the surface sample vs. the downhole sample. 7) Determine volume of stimulation fluid injected during the second stimulation stage (S2 fluid) by analyzing the tracer concentration in the surface sample vs. the downhole sample for Tracer T2. 8) Integrate the flow rates to compute fluid volumes. 9) Compare results from 6 to 8 to determine the effectiveness of diverter stage. 10) Determine the clean-up efficiency of each zone by integrating flow rate of retrieved stimulation fluid from each zone. [0022] ---- Variation 3 Can combine the above (variation 2) with a PLT positioned above the lower zone. [0023] ---- Variation 4 1) Inject stimulation fluid which has been mixed with diverter chemical SI with tracer TI 2) Inject post stimulation fluid S2 (e.g. displacement fluid, post flush fluid, overflush fluid) with tracer T2 3) Position downhole sampling device, such as compact production sampler cartridge with multiple sample bottles, between top and the bottom zone. 4) Flow back the well and collect surface samples and downhole samples during flow back and record flow rate during flow back. 5) Analyze composition of the surface and downhole samples 7 WO 2011/141875 PCT/IB2011/052060 6) Determine volume of stimulation fluid injected in the both zones during the first stage (SI fluid) by analyzing the tracer T 1 concentration in the surface sample vs. the downhole sample. 7) Determine volume of post stimulation fluid injected during the second stage (S2 fluid) by analyzing the tracer concentration in the surface sample vs. the downhole sample for Tracer T2. 8) Integrate the flow rates to compute fluid volumes. 9) Compare results from 6 to 8 to determine the effectiveness of diverter chemicals. 10) Determine the clean-up efficiency of each zone by integrating flow rate of retrieved stimulation fluid from each zone. [0024] ---- Variation 5 Can combine the above (variation 4) with a PLT positioned above the lower zone. [0025] ---- Variation 6 1) Inject pre stimulation fluid SI (e.g. reservoir conditioning or pre-conditioning fluid) with tracer T1 2) Inject the main stimulation fluid mixed with chemical diverter S2 with tracer T2 3) Position downhole sampling device, such as compact production sampler cartridge with multiple sample bottles, between top and the bottom zone. 4) Flow back the well and collect surface samples and downhole samples during flow back and record flow rate during flow back. 5) Analyze composition of the surface and downhole samples 6) Determine volume of pre stimulation fluid injected in the lower zone during the first stage (S1 fluid) by analyzing the tracer TI concentration in the surface sample vs. the downhole sample. 7) Determine volume of main stimulation fluid injected during the second injection stage (S2 fluid) by analyzing the tracer concentration in the surface sample vs. the downhole sample for Tracer T2. 8) Integrate the flow rates to compute fluid volumes. 8 WO 2011/141875 PCT/IB2011/052060 9) Compare results from 6 to 8 to determine the effectiveness of chemical diverter which was mixed with the main treatment fluid. 10) Determine the clean-up efficiency of each zone by integrating flow rate of retrieved stimulation fluid from each zone. [0026] ---- Variation 7 Can combine the above (variation 4) with a PLT positioned above the lower zone. [0027] ---- Variation 8 Can combine steps 1 to 2 in Variations 2, 4 and 6 above with the following: 3. Flow back the well and collect surface samples during flow back and record flow rate during flow back. 4. Analyze composition of the surface samples 5. Determine volume of stimulation fluid injected in the lower zone during the first stage (SI fluid) by analyzing the tracer T1 concentration in the surface sample 6. Determine volume of post stimulation fluid injected during the second stage (S2 fluid) by analyzing the tracer concentration in the surface sample for Tracer T2. 7. Integrate the flow rates to compute fluid volumes. 8. Compare results from 5 to 7 to determine the effectiveness of diverter chemicals. 9. Determine the clean-up efficiency of each zone by integrating flow rate of retrieved stimulation fluid from each zone. [0028] ---- Variation 9 1) Inject pre stimulation fluid SI (e.g. reservoir conditioning or pre-conditioning fluid) with tracer T1 2) Inject the main stimulation fluid mixed with chemical diverter S2 with tracer T2 3) Inject post stimulation fluid S3 (e.g. reservoir conditioning or pre-conditioning fluid) with tracer T3 9 WO 2011/141875 PCT/IB2011/052060 4) Position downhole sampling device, such as compact production sampler cartridge with multiple sample bottles, between top and the bottom zone. 5) Flow back the well and collect surface samples and downhole samples during flow back and record flow rate during flow back. 6) Analyze composition of the surface and downhole samples 7) Determine volume of pre stimulation fluid injected in the lower zone during the first stage (Sl fluid) by analyzing the tracer TI concentration in the surface sample vs. the downhole sample. 8) Determine volume of main stimulation fluid injected during the second injection stage (S2 fluid) by analyzing the tracer concentration in the surface sample vs. the downhole sample for Tracer T2. 9) Determine volume of post stimulation fluid injected during the third injection stage (S3 fluid) by analyzing the tracer concentration in the surface sample vs. the downhole sample for Tracer T3. 10) Integrate the flow rates to compute fluid volumes. 11) Compare results from 7 to 10 to determine the effectiveness of chemical diverter which was mixed with the main treatment fluid. 12) Determine the clean-up efficiency of each zone by integrating flow rate of retrieved stimulation fluid from each zone. [0029] ---- Variation 10 Can combine steps 1 to 3 in Variation 9 above with the following: 4. Flow back the well and collect surface samples during flow back and record flow rate during flow back. 5. Analyze composition of the surface samples 6. Determine volume of pre stimulation fluid injected in the lower zone during the first stage (Sl fluid) by analyzing the tracer TI concentration in the surface sample vs. the downhole sample. 10 WO 2011/141875 PCT/IB2011/052060 7. Determine volume of main stimulation fluid injected during the second injection stage (S2 fluid) by analyzing the tracer concentration in the surface sample vs. the downhole sample for Tracer T2. 8. Determine volume of post stimulation fluid injected during the third injection stage (S3 fluid) by analyzing the tracer concentration in the surface sample vs. the downhole sample for Tracer T3. 9. Integrate the flow rates to compute fluid volumes. 10. Compare results from 6 to 9 to determine the effectiveness of diverter chemicals. 11. Determine the clean-up efficiency of each zone by integrating flow rate of retrieved stimulation fluid from each zone. [0030] ---- Variation 11 Can combine the above (Variation 9 and variation 10) with a PLT positioned above the lower zone. [0031] ---- Variation 12 Can combine all the above, with chemical return profile analyses usually sampled at topside to evaluate diverter efficiency and treatment efficiency. [0032] ---- Variation 13 Can combine all the above with flowback properties (rates and concentration) and flow profile of tagged chemicals that may be present in the pre, main and / or post treatment fluid to evaluate diverter efficiency and treatment efficiency over the long term. [0033] Also, when the composition of the downhole fluid sample and the surface fluid sample is analyzed one should analyze the full composition. For example, in addition to looking for TI and T2, one should look for Ca, Mg ions as well as any component from the diverter stage. Most likely the low perm formation will be different in composition (may contain more dolomite) then analysis of Ca/Mg concentration would allow one to calculate the flow rate from the low perm zone without the need for a PLT. The analysis for the components of the diverter may also lead to a similar result. The concentration of TI and T2 does not have to be constant. The use of 11 step, or a ramp in TI and T2 concentration is also possible. The use of mass balance tracer T3 can also be used to confirm the amount of stimulation fluid produced back. [0034] The preceding description has been presented with reference to some illustrative 5 embodiments of the Inventors' concept. Persons skilled in the art and technology to which this invention pertains will appreciate that alterations and changes in the described structures and methods of operation can be practiced without meaningfully departing from the principle, and scope of this invention. Accordingly, the foregoing description should not be read as pertaining only to the precise structures described and shown in the accompanying drawings, but rather 10 should be read as consistent with and as support for the following claims, which are to have their fullest and fairest scope. [0035] Furthermore, none of the description in the present application should be read as implying that any particular element, step, or function is an essential element which must be 15 included in the claim scope: the scope of patented subject matter is defined only by the allowed claims. Moreover, none of these claims are intended to invoke paragraph six of 35 USC §112 unless the exact words "means for" are followed by a participle. The claims as filed are intended to be as comprehensive as possible, and no subject matter is intentionally relinquished, dedicated, or abandoned. 20 [0036] It is to be understood that, if any prior art publication is referred to herein, such reference does not constitute an admission that the publication forms a part of the common general knowledge in the art, in Australia or any other country. 25 [0037] In the claims which follow and in the preceding description of the invention, except where the context requires otherwise due to express language or necessary implication, the word "comprise" or variations such as "comprises" or "comprising" is used in an inclusive sense, i.e. to specify the presence of the stated features but not to preclude the presence or addition of further features in various embodiments of the invention. 30 12 6599469_1 (GHMatters) P91879.AU JINGT
Claims (15)
1. A method to treat a subterranean formation comprising a wellbore, comprising: perforating a first zone of the subterranean formation; treating the first zone of the subterranean formation with a first stimulation fluid; measuring a first fluid pressure drop and first volume of fluid flow in the first zone resulting in a first plot of the of the first fluid pressure drop versus the first volume of fluid flow; perforating a second zone of the subterranean formation; treating the first and second zones of the subterranean formation with a second stimulation fluid introduced through the wellbore; measuring a second fluid pressure drop and second volume of fluid flow in the combined first and second zones resulting in a second plot of the second fluid pressure drop versus the second volume of fluid flow; utilizing the first and second plots to determine the volume of the second stimulation fluid introduced to each of the first and second zones.
2. The method of claim 1, wherein the perforations of the first and second zones are performed using a tool selected from a perforating device and a jetting device.
3. The method of either claim 1 or 2, wherein the treating of the first zone and the treating of the second zone each comprise a treatment selected from the group consisting of a matrix acid treatment, a hydraulic fracturing treatment, introducing proppant, stimulating the region, or a combination thereof
4. The method of any one of the preceding claims, further comprising introducing a first tracer with the first stimulation fluid and a second tracer with the second stimulation fluid; and measuring the concentrations of the first and second tracers in the fluids to estimate the permeabilities of the first and second zones.
5. The method of any one of the preceding claims, further comprising: perforating an nth zone of the subterranean formation; treating the first through nth zones of the subterranean formation with an nth stimulation fluid introduced through the wellbore; 13 6601024 1 (GHMatters) P91879.AU PCABRAL measuring an nth fluid pressure drop and an nth volume of fluid flow in the combined first through nth zones resulting in an nth plot of the nth fluid pressure drop versus the nth volume of fluid flow; utilizing the first through nth plots to determine the volume of the nth stimulation fluid introduced to each of the first through nth zones.
6. The method of claim 2, wherein the tool has dimensions to allow fluid flow through the wellbore.
7. The method of any one of the preceding claims wherein the first stimulation fluid is introduced to the first zone by: i) a coil tubing, ii) a coil tubing disposed in the annulus of a production tubing present in the wellbore, or iii) the wellbore; and wherein the second stimulation fluid is introduced to the subterranean formation by: i) a coil tubing, ii) a coil tubing disposed in the annulus of a production tubing present in the wellbore, or iii) the wellbore.
8. A method to treat a subterranean formation comprising a wellbore, comprising: perforating a first zone of the subterranean formation; treating the first zone of the subterranean formation with a first stimulation fluid; flowing back a first flow back stimulation fluid from the first zone of the subterranean formation; measuring a first flow back stimulation fluid pressure differential and first volume of first flow back stimulation fluid flow in the first zone resulting in a first plot of the first flow back stimulation fluid pressure differential and the first volume of first flow back stimulation fluid flow; perforating a second zone of the subterranean formation; treating the first and second zones of the subterranean formation with a second stimulation fluid introduced through the wellbore; flowing back a second flow back stimulation fluid from the first and second zones of the subterranean formation; measuring a second flow back stimulation fluid pressure differential and second volume of second flow back stimulation fluid flow in the combined first and second zones resulting in a second plot of the second flow back stimulation fluid pressure differential and second volume of second flow back stimulation fluid flow; utilizing the first and second plots to determine the volume of the second stimulation fluid introduced to each of the first and second zones.
9. The method of claim 8, wherein the perforations of the first and second zones are performed using a tool selected from a perforating device and a jetting device. 14 6601024 1 (GHMatters) P91879.AU PCABRAL
10. The method of either claim 8 or 9, wherein the treating of the first zone and the treating of the second zone each comprise a treatment selected from the group consisting of a matrix acid treatment, a hydraulic fracturing treatment, introducing proppant, stimulating the region, or a combination thereof
11. The method of any one of claims 8 to 10, further comprising introducing a first tracer with the first stimulation fluid and a second tracer with the second stimulation fluid; and measuring the concentrations of the first and second tracers in the fluids to estimate the permeabilities of the first and second zones.
12. The method of any one of claims 8 to 11, further comprising: perforating an nth zone of the subterranean formation; treating the first through nth zones of the subterranean formation with an nth fluid introduced through the wellbore; flowing back an nth flow back stimulation fluid from the first through nth zones of the subterranean formation; measuring an nth flow back stimulation fluid pressure differential and nth volume of nth flow back stimulation fluid flow in the combined first through nth zones resulting in an nth plot of the nth flow back stimulation fluid pressure differential and the nth volume of nth flow back stimulation fluid flow; and utilizing the first through nth plots to determine the volume of the nth fluid introduced to each of the first through nth zones.
13. The method of claim 9, wherein the tool has dimensions to allow fluid flow through the wellbore.
14. The method of any one of claims 8 to 13 wherein the first stimulation fluid is introduced to the first zone by: i) a coil tubing, ii) a coil tubing disposed in the annulus of a production tubing present in the wellbore, or iii) the wellbore; and the second stimulation fluid is introduced to the subterranean formation by: i) a coil tubing, ii) a coil tubing disposed in the annulus of a production tubing present in the wellbore, or iii) the wellbore.
15. A method to treat a subterranean formation comprising a wellbore substantially as herein described with reference to the accompanying drawings. 15 6601024 1 (GHMatters) P91879.AU PCABRAL
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
AU2016204275A AU2016204275A1 (en) | 2010-05-11 | 2016-06-23 | Method and system for treating a subterranean formation |
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US33346810P | 2010-05-11 | 2010-05-11 | |
US61/333,468 | 2010-05-11 | ||
PCT/IB2011/052060 WO2011141875A2 (en) | 2010-05-11 | 2011-05-10 | Method and system for treating a subterranean formation |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
AU2016204275A Division AU2016204275A1 (en) | 2010-05-11 | 2016-06-23 | Method and system for treating a subterranean formation |
Publications (2)
Publication Number | Publication Date |
---|---|
AU2011251674A1 AU2011251674A1 (en) | 2012-12-06 |
AU2011251674B2 true AU2011251674B2 (en) | 2016-03-24 |
Family
ID=44914767
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
AU2011251674A Ceased AU2011251674B2 (en) | 2010-05-11 | 2011-05-10 | Method and system for treating a subterranean formation |
AU2016204275A Abandoned AU2016204275A1 (en) | 2010-05-11 | 2016-06-23 | Method and system for treating a subterranean formation |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
AU2016204275A Abandoned AU2016204275A1 (en) | 2010-05-11 | 2016-06-23 | Method and system for treating a subterranean formation |
Country Status (8)
Country | Link |
---|---|
US (1) | US20140166276A1 (en) |
EP (1) | EP2564020A4 (en) |
CN (1) | CN103003520B (en) |
AU (2) | AU2011251674B2 (en) |
CA (1) | CA2799098A1 (en) |
EA (1) | EA025825B1 (en) |
MX (1) | MX2012013138A (en) |
WO (1) | WO2011141875A2 (en) |
Families Citing this family (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP3597720A3 (en) * | 2011-11-22 | 2020-04-22 | Baker Hughes Incorporated | Method of using controlled release tracers |
US9850714B2 (en) * | 2015-05-13 | 2017-12-26 | Baker Hughes, A Ge Company, Llc | Real time steerable acid tunneling system |
CA3003421A1 (en) * | 2015-11-03 | 2017-05-11 | Weatherford Technology Holdings, Llc | Systems and methods for evaluating and optimizing stimulation efficiency using diverters |
US9810063B2 (en) | 2015-11-12 | 2017-11-07 | King Fahd University Of Petroleum And Minerals | Method for evaluating the effectiveness of matrix acidizing in a subterranean formation |
CN108222922B (en) * | 2016-12-14 | 2021-06-01 | 中国石油天然气股份有限公司 | Oil-gas well reservoir productivity evaluation method based on temporary blocking diversion fracturing technology |
CN108756841B (en) * | 2018-04-18 | 2020-03-24 | 中国科学院武汉岩土力学研究所 | Shale repeated fracturing treatment method |
CN113530509A (en) * | 2020-04-15 | 2021-10-22 | 中国石油天然气股份有限公司 | Continuous separate-layer fracturing method for small well and fracturing pipe column |
RU2750004C1 (en) * | 2020-11-20 | 2021-06-21 | Публичное акционерное общество «Татнефть» имени В.Д. Шашина | Method for completing and intensifying inflow of well with carbonate reservoirs |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4901563A (en) * | 1988-09-13 | 1990-02-20 | Atlantic Richfield Company | System for monitoring fluids during well stimulation processes |
US6367548B1 (en) * | 1999-03-05 | 2002-04-09 | Bj Services Company | Diversion treatment method |
US20100032156A1 (en) * | 2008-08-08 | 2010-02-11 | Alta Rock Energy, Inc. | Method for testing an engineered geothermal system using one stimulated well |
Family Cites Families (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4867241A (en) * | 1986-11-12 | 1989-09-19 | Mobil Oil Corporation | Limited entry, multiple fracturing from deviated wellbores |
US5141054A (en) * | 1991-03-13 | 1992-08-25 | Mobil Oil Corporation | Limited entry steam heating method for uniform heat distribution |
MY132567A (en) * | 2000-02-15 | 2007-10-31 | Exxonmobil Upstream Res Co | Method and apparatus for stimulation of multiple formation intervals |
CA2325120C (en) * | 2000-11-06 | 2005-10-25 | L. Murray Dallas | Method and apparatus for perforating and stimulating oil wells |
US20080041594A1 (en) * | 2006-07-07 | 2008-02-21 | Jeanne Boles | Methods and Systems For Determination of Fluid Invasion In Reservoir Zones |
CN101418680B (en) * | 2007-10-23 | 2011-12-14 | 王长俊 | Gas lift unblocking technology by chemical method |
CN101560879B (en) * | 2008-04-15 | 2013-06-19 | 中国石油大学(北京) | Well test analysis control method for low permeability gas reservoir and method thereof |
US8191416B2 (en) * | 2008-11-24 | 2012-06-05 | Schlumberger Technology Corporation | Instrumented formation tester for injecting and monitoring of fluids |
US8952319B2 (en) * | 2010-03-04 | 2015-02-10 | University Of Utah Research Foundation | Downhole deployable tools for measuring tracer concentrations |
-
2011
- 2011-05-10 EP EP11780291.8A patent/EP2564020A4/en not_active Withdrawn
- 2011-05-10 MX MX2012013138A patent/MX2012013138A/en unknown
- 2011-05-10 CA CA2799098A patent/CA2799098A1/en not_active Abandoned
- 2011-05-10 CN CN201180034234.2A patent/CN103003520B/en not_active Expired - Fee Related
- 2011-05-10 WO PCT/IB2011/052060 patent/WO2011141875A2/en active Application Filing
- 2011-05-10 US US13/697,460 patent/US20140166276A1/en not_active Abandoned
- 2011-05-10 AU AU2011251674A patent/AU2011251674B2/en not_active Ceased
- 2011-05-10 EA EA201291215A patent/EA025825B1/en not_active IP Right Cessation
-
2016
- 2016-06-23 AU AU2016204275A patent/AU2016204275A1/en not_active Abandoned
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4901563A (en) * | 1988-09-13 | 1990-02-20 | Atlantic Richfield Company | System for monitoring fluids during well stimulation processes |
US6367548B1 (en) * | 1999-03-05 | 2002-04-09 | Bj Services Company | Diversion treatment method |
US20100032156A1 (en) * | 2008-08-08 | 2010-02-11 | Alta Rock Energy, Inc. | Method for testing an engineered geothermal system using one stimulated well |
Also Published As
Publication number | Publication date |
---|---|
EP2564020A4 (en) | 2017-07-19 |
MX2012013138A (en) | 2012-12-17 |
CN103003520A (en) | 2013-03-27 |
EP2564020A2 (en) | 2013-03-06 |
CA2799098A1 (en) | 2011-11-17 |
CN103003520B (en) | 2015-05-13 |
EA025825B1 (en) | 2017-02-28 |
EA201291215A1 (en) | 2013-06-28 |
AU2016204275A1 (en) | 2016-07-14 |
WO2011141875A2 (en) | 2011-11-17 |
US20140166276A1 (en) | 2014-06-19 |
AU2011251674A1 (en) | 2012-12-06 |
WO2011141875A3 (en) | 2012-02-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
AU2011251674B2 (en) | Method and system for treating a subterranean formation | |
US9822626B2 (en) | Planning and performing re-fracturing operations based on microseismic monitoring | |
US10753194B2 (en) | Determining diverter effectiveness in a fracture wellbore | |
Shah et al. | A comprehensive overview on recent developments in refracturing technique for shale gas reservoirs | |
Kumar et al. | Well interference diagnosis through integrated analysis of tracer and pressure interference tests | |
US7658226B2 (en) | Method of monitoring fluid placement during stimulation treatments | |
US8794316B2 (en) | Refracture-candidate evaluation and stimulation methods | |
US8418546B2 (en) | In-situ fluid compatibility testing using a wireline formation tester | |
WO2007042759A1 (en) | Methods and systems for determining reservoir properties of subterranean formations with pre-existing fractures | |
US10240436B2 (en) | Method of treating subterranean formation | |
US9045969B2 (en) | Measuring properties of low permeability formations | |
US20230184097A1 (en) | Surveillance Using Particulate Tracers | |
CN110939438A (en) | Method for evaluating after-pressure by using pressure drop of main fracturing pump stopping | |
US20090260807A1 (en) | Selective zonal testing using a coiled tubing deployed submersible pump | |
AlAbbad et al. | A step change for single-well chemical-tracer tests: Field pilot testing of new sets of novel tracers | |
CA2916740C (en) | Method for monitoring a flow using distributed acoustic sensing | |
Retnanto et al. | Managing uncertainty of reservoir heterogeneity and optimizing acid placement in thick carbonate reservoirs | |
Martin et al. | A Method to perform multiple diagnostic fracture injection tests simultaneously in a single wellbore | |
Deminova et al. | Production Characterization and Enhancement Screening in Biogenic Gas Tight Formations | |
Volkov et al. | Pre-and Post Stimulation Diagnostics using Spectral Noise Logging. Case Study. | |
Fu | Flowback Data Analysis for Evaluating Multi-fractured Horizontal Wells Completed in Unconventional Reservoirs | |
US6273202B1 (en) | Swab test for determining relative formation productivity |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
FGA | Letters patent sealed or granted (standard patent) | ||
MK14 | Patent ceased section 143(a) (annual fees not paid) or expired |