AU2010314803A1 - Improved slope of an open cut mine - Google Patents

Improved slope of an open cut mine Download PDF

Info

Publication number
AU2010314803A1
AU2010314803A1 AU2010314803A AU2010314803A AU2010314803A1 AU 2010314803 A1 AU2010314803 A1 AU 2010314803A1 AU 2010314803 A AU2010314803 A AU 2010314803A AU 2010314803 A AU2010314803 A AU 2010314803A AU 2010314803 A1 AU2010314803 A1 AU 2010314803A1
Authority
AU
Australia
Prior art keywords
borehole
reinforcing member
batter
crest
face
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
AU2010314803A
Inventor
Andrew Haile
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BHP Billiton SSM Development Pty Ltd
Original Assignee
BHP Billiton SSM Development Pty Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from AU2009905382A external-priority patent/AU2009905382A0/en
Application filed by BHP Billiton SSM Development Pty Ltd filed Critical BHP Billiton SSM Development Pty Ltd
Priority to AU2010314803A priority Critical patent/AU2010314803A1/en
Publication of AU2010314803A1 publication Critical patent/AU2010314803A1/en
Abandoned legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/18Making embankments, e.g. dikes, dams
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/26Methods of surface mining; Layouts therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Remote Sensing (AREA)
  • Geology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Paleontology (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

This invention relates to open cut mines and in particular an improved slope to of an open cut mine. The slope includes a substantially vertical batter face (5) with a plurality of reinforcing members (10) spaced from a crest (7) of the batter face (5).

Description

WO 2011/054035 PCT/AU2010/001459 1 IMPROVED SLOPE OF AN OPEN CUT MINE This invention relates to an improved slope of an open cut mine and a method 5 of forming a reinforced rock slope in an open cut mine. The invention has been developed for an application in an open cut mine and it will be convenient to hereinafter describe the invention with reference to this particular application. It should be appreciated that the invention may have other applications in an open excavation environment, such as a quarry, and the invention is not to be limited 10 to use only in a mine. Mining companies use various methods of extracting ore from the ground, and an open cut mine is one method that requires the removal of a substantial volume of material. The excavation of the material develops a pit with a floor 15 and a slope extending up from the floor. The slope is formed by a series of batters, with berms spacing the batters and providing rockfall catchment or a ramp for mining traffic accessing the pit floor. It is generally desirable to maximise the angle of the slope as it has the potential to minimise the extraction of waste material and maximise the extraction of ore. 20 A batter is generally excavated to an angle that, having regard to the characteristics of the rock, is naturally stable. This is generally no greater than 700 and normally more in the range of 500 to 700. Where the berm at the top of the batter is acting as a ramp, or accommodating other critical mine 25 infrastructure such as vent stacks or pumping stations, it is desirable to decrease the angle to account for the additional load and risk. It ought to be appreciated that any angle other than 900 will typically result in inefficiencies. Where the batter is formed in the ore being mined, a batter of less 30 than 900 will result in ore being left behind to maintain the berm above. Where the batter is to be formed in waste material, a batter of less than 900 may result in waste material being unnecessarily removed, particularly when it is outside the area of the ore deposit. Despite these inefficiencies open cut mines still tend to have batter faces at angles less than 700 to ensure natural stability.
WO 2011/054035 PCT/AU2010/001459 2 A safety issue with open cut mines relates to rocks falling from the face of the batter onto traffic or personal on the berm below. This is exacerbated where the batter is of less than 900 as the rocks bounce off the batter face and project out 5 from the toe of the batter onto the berm, or past the berm and into lower working areas of the mine. It has been found that with a batter angle of about 600, the rocks fall generally between 2m and 9m from the toe of the batter but may well exceed this. This is a wide spread particularly given a berm may be generally around 1 Om. 10 The above discussed is included in the specification solely for the purpose of providing a context for the present invention. It is not suggested or represented that any of these matters form part of the prior art base or the common general knowledge in the field relevant to the present invention as it existed in Australia 15 before the priority date of this invention. Throughout this specification the terms "open pit" and "open cut" may be used interchangeably. According to one aspect of this invention there is provided an improved slope of an open cut mine including a plurality batters with a berm extending from a toe 20 of each batter, each batter having an excavated batter face which is substantially vertical and extends from the toe to a crest of the batter, reinforcing means installed prior to the excavation of the face and spaced from the proposed crest, the reinforcing means including a plurality of reinforcing members each located in a substantially vertical borehole formed at said 25 spacing from the proposed crest, each borehole extends to a depth of at least the distance between the crest and the toe, each reinforcing member extends substantially the depth of the each borehole It is preferred that the depth of each borehole exceeds the distance between the 30 crest and the toe by up to 15%. It is further preferred that each borehole is spaced from an adjacent borehole by between 1000mm and 5000mm. It is still further preferred that each reinforcing member is a bar or cable of a diameter of between 20mm and 100mm. It is preferred that the bar or cable is formed from steel, or alternatively each reinforcing member is formed from fibreglass. It is WO 2011/054035 PCT/AU2010/001459 3 preferred that the reinforcing member is grouted in position in the borehole. It is preferred that the length of the reinforcing member exceeds the depth of the borehole, and in particular the reinforcing member extends out from the borehole to interact with a safety fence extending between the plurality of 5 boreholes. Alternatively the length of the reinforcing member is less than the length of the borehole so that the reinforcing member is countersunk in the borehole. It is preferred that the substantially vertical face is within the range of 750 to 900. It is further preferred that each borehole is spaced from the crest by no less than 800mm. 10 According to another aspect of this invention there is provided a method of forming a reinforced rock slope in an open cut mine including drilling a plurality of vertical boreholes to a borehole depth, locating a reinforcing member in each borehole which is substantially the length of the borehole depth, grouting the 15 reinforcing bar in the hole, locating a crest of a batter which is spaced from the boreholes, excavating a face to the batter which is substantially parallel with the boreholes, the height of the batter face from the crest to a toe is no less than the depth of the borehole adjacent the face, wherein the excavation of the face is performed after the reinforcing member has been grouted in place in the 20 borehole. It is preferred to drill each borehole so that it is no greater than 300 mm in diameter. It is further preferred to space the crest of the batter from each borehole so that the reinforcing member is behind the crest of the batter by no 25 less than 800mm.It is still further preferred to space each borehole from its adjacent borehole at no less than 1 000mm centres. It is still further preferred to provide a reinforcing member in the form of a reinforcing bar is no less than 40mm in diameter. It is still further preferred to drill the borehole depth to exceed the height of the face of the batter by at least 15%. It is still further 30 preferred to provide a length of the reinforcing member that is less than the length of the borehole so that the reinforcing member is countersunk in the borehole. It is still further preferred that the method of excavating the face includes drilling and blasting to produce the substantially vertical face within a range of 750 to 90 0. 35 WO 2011/054035 PCT/AU2010/001459 4 It will be convenient to hereinafter describe the invention in greater detail by reference to the accompanying drawings showing an example embodiment of the invention. The particularity of the drawings and the related detailed 5 description is not to be understood as superseding the generality of the broad definition of the invention as provided by the claims. Figure 1 is a side cross-sectional view of a schematic illustration of an improved slope according to the invention. 10 Figure 2 illustrates a schematic view of an unimproved slope prior to excavation of the batters. Figure 3 illustrates an improved slope with the batter excavated. 15 Referring firstly to Figure 1 that illustrates a natural surface level 1 having been excavated to produce an improved slope 2 of an open cut pit. The improved slope 2 includes a plurality of horizontal berms 3, each spaced by a vertical batter 4. Each batter has a face 5 which extends from a toe 6 of the batter to a 20 crest 7. The slope extends from the natural surface level 1 to the floor 8 of the pit. Referring now to Figure 2 which illustrates a portion of the open cut mine prior to excavation. A crest 7 of the proposed batter 4 is selected, and a series of 25 boreholes 9 spaced from that crest 7 are drilled to a borehole depth. This spacing is preferably no less than 800 mm, however this spacing x is merely preferred. Spacings x of other distances are clearly possible, however it is generally desirable that the spacing x be selected to be sufficient so as to reduce the likelihood that the borehole 9 will be exposed when the batter is 30 excavated. The face 5 of the batter is exposed by a technique of drill and blasting which can cause the crest 7 to crumble. Accordingly it is preferable that the borehole 9 be spaced from the crest by 1500mm to avoid the hole being exposed when blasting.
WO 2011/054035 PCT/AU2010/001459 5 It is preferred that each borehole 9 have a diameter of no greater than 300 mm, however this dimension is merely preferred. The function of the borehole 9 is to accommodate a reinforcing member 10 and therefore the diameter of the borehole 9 is dictated to some extent by the characteristics of the reinforcing 5 member 10. Furthermore, it is preferred that the reinforcing member 10 be grouted in position in the borehole 9, and therefore the diameter of the borehole will need to be selected to satisfy minimum cover requirements, particularly where the reinforcing member 10 is a steel bar. Accordingly, it is to be appreciated that the diameter of the borehole 9 may vary, however it is 10 generally preferred that the diameter be less than 300 mm. Each borehole 9 is preferably drilled behind the crest at a spacing y to space it from an adjacent borehole preferably by no less than 2000 mm, where the berm is not supporting critical mine infrastructure. Where the berm is acting as a 15 ramp, or supporting critical mine infrastructure such as pumping stations or ventilation shafts, the spacing of the boreholes may need to be less than 2000mm. It is more likely that each borehole be spaced y from an adjacent borehole by between 2,000 and 5,000 mm. This spacing y will specifically be dependent on the characteristics of the rock structure being reinforced by the 20 reinforcing member 10 and the desired level of reliability in the slope stability. If for example the rock structure comprises many closely spaced planes of weakness such as a fault, joints or fracture, it may be appropriate to have the spacings y of each adjacent borehole relatively close. In contrast, if the rock structure comprises very few planes of weakness it may be appropriate to have 25 the spacings y relatively further apart. In either case, the spacings y can be set having regard to information revealed in a geological survey and variable between adjacent boreholes 9. The reinforcing member 10 located in each borehole 9 may take any 30 appropriate form. The preferred form of reinforcing member is a bar or cable formed from steel, however as an alternative it may be formed as a fibreglass rod. Where the reinforcing member 10 is a bar of steel, it is preferred that the diameter of the bar be between 20 mm and 100 mm. The diameter of the bar will be selected according to the characteristics of the rock, depth of borehole WO 2011/054035 PCT/AU2010/001459 6 and/or the desired level of reliability in slope stability. The bar is placed in situ and grouted in position. In one preferred embodiment it is preferred that the length of each reinforcing 5 member 10 does not exceed the depth of the borehole 9. It is generally desirable that the reinforcing member 10 and grout are countersunk so as to reduce the likelihood that the top of the reinforcing member 10 is exposed. The top of the reinforcing member 10 might be exposed if the crest 7 crumbles, say as a result of blasting the batter face 5. Accordingly countersinking to a depth of 10 1000mm or greater is desirable. It may however be appropriate in certain applications that the reinforcing member 10 does exceed the depth of the borehole 9 as this enables the reinforcing member 10 to project from the borehole 9. The projecting reinforcing member 10 may be used for any suitable purpose, however it is preferred that it interacts with a safety fence 11 extending 15 between the plurality of adjacent boreholes 9. This alternate embodiment is illustrated in figures 2 and 3. The material 12 beyond the crest 7 that is to be excavated can be excavated by any suitable means. The preferred means illustrated in Figure 2 involves drilling 20 a plurality of additional boreholes 13 at the crest 7 of the batter 4, and beyond the crest 7. Charges can then be placed in the boreholes 13 and the material be moved using drill and blast techniques understood and known by those people operating in this industry. 25 Referring now to Figure 3 which illustrates the improved slope with the exposed batter face 5 extending at 900 to the berm 3 below. The batter face 5 according to this invention is substantially vertical, and it is generally preferred that the substantially vertical face 5 be within the range of 750- 900. 30 The boreholes 9 including the reinforcing member 10 according to the invention extends to a depth at least equal to a distance between the crest 7 and toe 6 of the batter face 5. It can be seen from Figure 3 that it is preferred that the borehole depth extend beyond the toe, and it is particularly preferred that it extend beyond the toe by up to 15%. It has been found that by extending the WO 2011/054035 PCT/AU2010/001459 7 reinforced borehole 9 by this distance reduces the likelihood of shear failure of the batter at the toe of the batter. It ought to be appreciated from the foregoing that an improved slope 2 as 5 hereinbefore described reduces the inefficiencies associated with a slope having a batter angle of less than 700. Furthermore, it will reduce the distance from the toe within which rock fall occurs, providing a safer working environment. Still furthermore, reinforcing the batter 4 before excavating the batter face 5 is considered to be a relatively safe operation. 10 Various alterations, modifications and/or additions may be introduced into the invention without departing from the spirit or ambit as defined in the preceding specification.

Claims (20)

1. An improved slope of an open cut mine including a plurality batters with a berm extending from a toe of each batter, each batter having an 5 excavated batter face which is substantially vertical and extends from the toe to a crest of the batter, reinforcing means installed prior to the excavation of the face and spaced from the proposed crest, the reinforcing means including a plurality of reinforcing members each located in a substantially vertical borehole formed at said spacing from 10 the proposed crest, each borehole extends to a depth of at least the distance between the crest and the toe, each reinforcing member extends substantially the depth of the each borehole
2. An improved slope according to claim 1 wherein the depth of each 15 borehole exceeds the distance between the crest and the toe by up to 15%.
3. An improved slope according to claim 1 or 2 wherein each borehole is spaced from an adjacent borehole by between 1000mm and 5000mm. 20
4. An improved slope according to any one of claims 1 to 3 wherein each reinforcing member is a bar or cable of a diameter of between 20mm and 100mm. 25
5. An improved slope according to claim 4 wherein the bar or cable is formed from steel.
6. An improved slope according to any one of claims 1 to 4 wherein each reinforcing member is formed from fibreglass. 30
7. An improved slope according to any one of claims 1 to 6 wherein the reinforcing member is grouted in position in the borehole.
8. An improved slope according to any one of claims 1 to 7 wherein the 35 length of the reinforcing member exceeds the depth of the borehole. WO 2011/054035 PCT/AU2010/001459 9
9. An improved slope according to claim 8 wherein the reinforcing member extends out from the borehole to interact with a safety fence extending between the plurality of boreholes. 5
10. An improved slope according to any one of claims 1 to 7 wherein the length of the reinforcing member is less than the length of the borehole so that the reinforcing member is countersunk in the borehole.
11. An improved slope according to any one of claims 1 to 9 wherein the 10 substantially vertical face is within the range of 750 to 90 0.
12. An improved slope according to any one of the preceding claims wherein each borehole is spaced from the crest by no less than 800mm. 15
13. A method of forming a reinforced rock slope in an open cut mine including drilling a plurality of vertical boreholes to a borehole depth, locating a reinforcing member in each borehole which is substantially the length of the borehole depth, grouting the reinforcing bar in the hole, locating a crest of a batter which is spaced from the boreholes, 20 excavating a face to the batter which is substantially parallel with the boreholes, the height of the batter face from the crest to a toe is no less than the depth of the borehole adjacent the face, wherein the excavation of the face is performed after the reinforcing member has been grouted in place in the borehole. 25
14. A method according to claim 13 including drilling each borehole so that it is no greater than 300 mm in diameter.
15. A method according to claim 13 or 14 including spacing the crest of the 30 batter from each borehole so that the reinforcing member is behind the crest of the batter by no less than 800mm.
16. A method according to any one of claims 13 to 15 including spacing each borehole from its adjacent borehole at no less than 1000mm 35 centres. WO 2011/054035 PCT/AU2010/001459 10
17. A method according to any one of claims 13 to 16 including providing a reinforcing member in the form of a reinforcing bar is no less than 40mm in diameter. 5
18. A method according to any one of claims 13 to 17 including drilling the borehole depth to exceed the height of the face of the batter by at least 15%.
19. A method according to any one of claims 13 to 18 including providing a 10 length of the reinforcing member that is less than the length of the borehole so that the reinforcing member is countersunk in the borehole.
20. A method according to any one of claims 13 to 19 wherein the method of excavating the face includes drilling and blasting to produce the 15 substantially vertical face within a range of 750 to 90 0.
AU2010314803A 2009-11-04 2010-11-04 Improved slope of an open cut mine Abandoned AU2010314803A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
AU2010314803A AU2010314803A1 (en) 2009-11-04 2010-11-04 Improved slope of an open cut mine

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
AU2009905382A AU2009905382A0 (en) 2009-11-04 Improved Slope Of An Open Cut Mine
AU2009905382 2009-11-04
PCT/AU2010/001459 WO2011054035A1 (en) 2009-11-04 2010-11-04 Improved slope of an open cut mine
AU2010314803A AU2010314803A1 (en) 2009-11-04 2010-11-04 Improved slope of an open cut mine

Publications (1)

Publication Number Publication Date
AU2010314803A1 true AU2010314803A1 (en) 2012-05-31

Family

ID=43969471

Family Applications (1)

Application Number Title Priority Date Filing Date
AU2010314803A Abandoned AU2010314803A1 (en) 2009-11-04 2010-11-04 Improved slope of an open cut mine

Country Status (9)

Country Link
US (1) US20120230776A1 (en)
EP (1) EP2496773A1 (en)
JP (1) JP2013509517A (en)
KR (1) KR20120091288A (en)
CN (1) CN102597379A (en)
AU (1) AU2010314803A1 (en)
CA (1) CA2779674A1 (en)
RU (1) RU2012122782A (en)
WO (1) WO2011054035A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110924398A (en) * 2019-10-28 2020-03-27 中交第二航务工程局有限公司 High-strength rock slope widening excavation construction method under condition of traffic protection

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103133003B (en) * 2013-02-25 2015-10-21 中国矿业大学 Opencut steep end-slope mining method
CN113550334A (en) * 2021-06-30 2021-10-26 中冶成都勘察研究总院有限公司 Arrangement method for stable stair steps of mine side slope

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU735775A1 (en) * 1973-02-12 1980-05-25 Всесоюзный научно-исследовательский институт горной геомеханики и маркшейдерского дела Method of consolidating terraces
US4466669A (en) * 1981-12-18 1984-08-21 Gordon Sellers Method of open cut mining
SU1265331A1 (en) * 1985-04-23 1986-10-23 Свердловский горный институт им.В.В.Вахрушева Trasportation slope of open mine
JPH0874260A (en) * 1994-09-05 1996-03-19 Fujita Corp Cut earth slope reinforcing method by lean type retaining wall
CN1052525C (en) * 1997-10-23 2000-05-17 北京矿冶研究总院 Open-air high-step mining method
RU2127809C1 (en) * 1998-05-12 1999-03-20 Руслан Борисович Юн Method for opencast development of deposits
US6299386B1 (en) * 1999-06-09 2001-10-09 R. John Byrne Method and apparatus for a shoring wall
US6800164B2 (en) * 2000-04-06 2004-10-05 Randel Brandstrom Method of making a fiber reinforced rod
ITMI20032154A1 (en) * 2003-11-07 2005-05-08 Uretek Srl PROCEDURE TO INCREASE THE RESISTANCE OF A VOLUME
CN1217068C (en) * 2004-02-20 2005-08-31 中国科学院力学研究所 Design method of reinfored rift pile for securing slope
RU2294434C1 (en) * 2005-09-27 2007-02-27 Акционерная компания "АЛРОСА" (Закрытое акционерное общество) Method for opencast steep deposit mining
US8424852B2 (en) * 2009-01-28 2013-04-23 Benjamin Anson Kit for a barrier system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110924398A (en) * 2019-10-28 2020-03-27 中交第二航务工程局有限公司 High-strength rock slope widening excavation construction method under condition of traffic protection
CN110924398B (en) * 2019-10-28 2021-07-23 中交第二航务工程局有限公司 High-strength rock slope widening excavation construction method under condition of traffic protection

Also Published As

Publication number Publication date
CA2779674A1 (en) 2011-05-12
KR20120091288A (en) 2012-08-17
EP2496773A1 (en) 2012-09-12
JP2013509517A (en) 2013-03-14
WO2011054035A1 (en) 2011-05-12
US20120230776A1 (en) 2012-09-13
RU2012122782A (en) 2013-12-10
CN102597379A (en) 2012-07-18

Similar Documents

Publication Publication Date Title
CN104790956B (en) It is remotely controlled roadway formula exploitation end and helps coal technique
Singh et al. Coal pillar extraction at deep cover: with special reference to Indian coalfields
WO2011103620A1 (en) A method of reducing subsidence or windblast impacts from longwall mining
Ozturk Support design of underground openings in an asphaltite mine
WO2013163773A1 (en) Hydraulic foliating of ore bodies exploited by block or panel caving mining methods
AU2010314803A1 (en) Improved slope of an open cut mine
RU2443864C1 (en) Method to mine mineral deposits
Reinsalu et al. Geotechnical processes in closed oil shale mines
Handley, MF*, De Lange, JAJ**, Essrich, F.*** & Banning A review of the sequential grid mining method employed at Elandsrand Gold Mine
CA2295230C (en) Method for the combined exploitation of mining fields
Novak et al. Improvement of technological processes for mining solid mineral resources
Judeel et al. Extension of the Cullinan Diamond Mine No. 1 Shaft underneath the existing operating shaft, with emphasis on rock engineering considerations
Bridges An extensional mechanism of instability and failure in the walls of open pit mines
Valgma et al. Low depth mining in Estonian oil shale deposit-Abbau von Ölschiefer in Estland
Karmis et al. A methodology to assess the potential impacts of longwall mining on streams in the Appalachian Basin
Schissler Coal mining, design and methods of
Tapsiev et al. Extraction of gold-bearing ore from under the open pit bottom at the Makmal deposit by room-and-pillar mining with backfill made of production waste
Van Khau Determination of parameters of the underground inclined coal seam mining in Quang Ninh basin under protected objects on the surface
Ombiro Selection of the most appropriate underground mining method for Sareke copper mine
Brady et al. Mining methods and method selection
RU2258811C1 (en) Open-cut mineral deposit mining method
Mandal et al. Technological developments and R&D needs for sustainable underground coal mining in India
Adams et al. On the merits of modified sublevel caving mining method–a case study
Dharmaratne et al. Evaluation of Overhand Cut and Fill Mining Method used in Bogala Graphite Mines, Sri Lanka
Bangar et al. Design of Scamp for Development &Depillaring in Underground Coal Mines

Legal Events

Date Code Title Description
MK4 Application lapsed section 142(2)(d) - no continuation fee paid for the application