AU2010289487A1 - Tender assisted production structures - Google Patents

Tender assisted production structures Download PDF

Info

Publication number
AU2010289487A1
AU2010289487A1 AU2010289487A AU2010289487A AU2010289487A1 AU 2010289487 A1 AU2010289487 A1 AU 2010289487A1 AU 2010289487 A AU2010289487 A AU 2010289487A AU 2010289487 A AU2010289487 A AU 2010289487A AU 2010289487 A1 AU2010289487 A1 AU 2010289487A1
Authority
AU
Australia
Prior art keywords
drilling
floating
production structure
floating production
tender vessel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
AU2010289487A
Inventor
Stephen Craig Bultema
Keith Marvin Craik
You Sun Li
Joao Paulo Juliao Mastsuura
Arno Laurentius Michael Van Den Haak
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shell Internationale Research Maatschappij BV
Original Assignee
Shell Internationale Research Maatschappij BV
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shell Internationale Research Maatschappij BV filed Critical Shell Internationale Research Maatschappij BV
Publication of AU2010289487A1 publication Critical patent/AU2010289487A1/en
Abandoned legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B21/00Tying-up; Shifting, towing, or pushing equipment; Anchoring
    • B63B21/50Anchoring arrangements or methods for special vessels, e.g. for floating drilling platforms or dredgers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B21/00Tying-up; Shifting, towing, or pushing equipment; Anchoring
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • B63B35/44Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices

Abstract

A floating offshore system in a body of water, comprising a floating production structure; at least one anchor connected to a bottom of the body of water; a line connected to the anchor and the floating production structure; a floating drilling tender vessel adjacent to the floating structure, the drilling tender vessel comprising a dynamic positioning system.

Description

WO 2011/028854 PCT/US2010/047601 TENDER ASSISTED PRODUCTION STRUCTURES Background of Invention Field of the Invention [0001] The present invention is directed to floating offshore production 5 structures. [0002] Background Art [0003] U.S. Patent Number 4,156,577 discloses a self-propelled drilling tender having mounted therewith a drilling rig and a jack-up platform adapted to be mounted on the drilling tender or ship for transportation from 10 one drilling site to another site. Thereafter drilling operations occur with the drilling on the ship thus enabling the ship to operate as a drilling ship or the platform legs can be lowered to jack the platform off the ship to thereby enable the platform to operate independently as a drilling platform. Further, if desired, the rig can be disassembled or lifted from the drilling 15 platform and moved to land operations adjacent or in the vicinity of the drilling platform and ship to thereby enable land drilling operations to occur. U.S. Patent Number 4,156,577 is herein incorporated by reference in its entirety. [0004] U.S. Patent Number 5,423,632 discloses an improved method for 20 conducting offshore well operations in which a compliant platform is installed adjacent a selected well site and an auxiliary vessel is temporarily docked to the compliant platform to provide for support for the well operations which will be produced through the compliant platform. In the practice of the improved method, the compliant platform is isolated from 25 vertical loads upon the auxiliary vessel docked thereto during the performance of well operations conducted for the compliant platform by the offshore auxiliary vessel. Another aspect disclosed is an improved system for restraining an offshore drilling vessel temporarily to a compliant platform which uses a slide-connection for isolating the compliant platform 30 from vertical loads upon the offshore drilling vessel during the well 1 WO 2011/028854 PCT/US2010/047601 operations. U.S. Patent Number 5,423,632 is herein incorporated by reference in its entirety. [0005] U.S. Patent Number 5,558,037 discloses a drilling tender having a pair of laterally spaced buoyant hulls with ballast chambers to permit the 5 hulls to be moved between a submerged condition and a surface floating condition. Each hull supports a row of columns. The columns support a working platform including a main deck and a pipe rack deck above the main deck. A bow deck above a forward portion of the pipe rack deck has mounted on a corner portion thereof a main heavy duty crane. The support 10 structure for the crane extends downwardly through the decks and down into one of the columns. Between the main and pipe rack decks, the support structure is formed by a plurality of bulkheads. These bulkheads have portions extending down into the column to transmit forces created by operation of the crane to the column. A personnel bridge is pivotably 15 mounted on the bow deck to allow its free end to be pivoted onto a fixed position work platform being serviced by the tender. An auxiliary crane is mounted on the pipe rack deck rearwardly of and laterally opposite the main crane. U.S. Patent Number 5,558,037 is herein incorporated by reference in its entirety. 20 [0006] U.S. Patent Number 6,092,483 discloses a method for reducing VIV for a spar platform having a deck, a cylindrical hull having a buoyant tank assembly, a counterweight and an counterweight spacing structure. The overall aspect ratio of the hull is reduced by providing one or more abrupt changes in hull diameter below the waterline. U.S. Patent Number 25 6,092,483 is herein incorporated by reference in its entirety. [0007] U.S. Patent Number 6,463,870 discloses a mooring system for a semisubmersible tender which comprises a deck, a shape that results in a combined environmental load of less than 1000 kips in a 100-year extreme weather condition, a plurality of supports connected to the deck, a plurality 30 of pontoons connecting to the supports, at least two hawsers for connecting the tender to a production platform, each having adequate elasticity to accommodate the wave frequency between the production 2 WO 2011/028854 PCT/US2010/047601 platform and the tender, and adequate stiffness to synchronize the average and low frequency movement between the production platform and the tender under an environmental load produced during a storm having a designation of up to a 10-year storm in the tendering position, 5 connectors securing each hawser, a hawser guidance system; and an at least 8-point mooring system with each mooring lines consisting of: a first length of steel wire rope; a length of polymer rope secured to the first length of steel wire rope; a second length of steel wire rope secured to the polymer rope; and creating global equilibrium between the production 10 platform's mooring system and the at least 8 point mooring system of the tender. U.S. Patent Number 6,463,870 is herein incorporated by reference in its entirety. [0008] U.S. Patent Number 6,601,649 discloses a semisubmersible multipurpose unit (MPU) having a deck, a multipurpose tower secured to 15 the deck, supports, pontoons connected to the supports with each pontoon adapted for ballast transfer, at least two hawsers connected to the MPU for connecting the MPU to an object at sea having a mooring system, a hawser guidance system to direct each hawser to the object at sea, a crane secured to the deck of a semisubmersible MPU, and at least an 6 20 point mooring system, wherein the combination of the semisubmersible MPU, hawsers and 6-point mooring system create a global equilibrium between the mooring system of an object at sea and the at least 6-point mooring system and the hawsers have both an elasticity sufficient to accommodate the wave frequency between the object at sea and the MPU 25 and a stiffness adequate to synchronize the average and low frequency movements during a 10-year storm. U.S. Patent Number 6,601,649 is herein incorporated by reference in its entirety. [0009] U.S. Patent Number 7,383,784 discloses a system for lashing a tender assist drilling unit (TADU) to a floating production platform including 30 a plurality of winches on the forward end of the TADU, a plurality of sheaves on the upper portion of the hull of the platform, a plurality of connection devices on the lower portion of the hull of the platform, and a 3 WO 2011/028854 PCT/US2010/047601 set of lashing lines, each of which extends from one of the winches, through a corresponding one of the sheaves, and vertically down alongside the platform hull to a corresponding one of the connection devices to which it is attached. The winches are operable to reel in and to 5 pay out the lashing lines to control the separation distance so as to maintain an optimal operational separation distance during normal environmental conditions, while allowing the separation distance to be increased in severe conditions. U.S. Patent Number 7,383,784 herein incorporated by reference in its entirety. 10 [0010] The prior art describes large floating drilling and production systems such as spars, tension leg platforms, and FPSO's. Usually such systems have weights in excess of 20-30 thousand metric tons. These systems have been used to drill and produce large reservoirs in the 500 million to 1 billion or more BOE (barrels of oil equivalent) recoverable volumes. With 15 such large reservoirs the large expenditures to manufacture, install, and operate these systems has been justified. Unfortunately, more than 90% of the newly discovered deepwater discoveries have less than 250 million BOE recoverable volumes. As such, smaller and more economical drilling and production systems are needed to drill and produce these smaller 20 deepwater fields. [0011] The prior art also describes floating production systems that are moored to the sea floor that are connected by one or more hawsers to a drilling tender vessel such as a semi-submersible that is also moored to the sea floor. These floating production systems connected to a drilling 25 tender vessel also have a large cost and weight. In addition, in the event of a hurricane or other large storm, there is the danger to crew and equipment of the two floating structures crashing into or otherwise interfering with each other. [0012] There is a need in the art for one or more of the following: 30 [0013] An improved system and method of operating two floating structures in a body of water; 4 WO 2011/028854 PCT/US2010/047601 [0014] An improved system and method of operating two floating structures that provides for drilling and producing deepwater oil and gas reservoirs; [0015] An improved system and method of providing a connection of a drilling tender and a spar; and 5 [0016] An improved system and method to provide for engagement of two floating structures. SUMMARY OF INVENTION [0017] In one aspect of the invention, there is disclosed a floating offshore system in a body of water, comprising a floating production structure; at 10 least one anchor connected to a bottom of the body of water; a line connected to the anchor and the floating production structure; a floating drilling tender vessel adjacent to the floating structure, the drilling tender vessel comprising a dynamic positioning system. [0018] Advantages of the invention may include one or more of the 15 following: [0019] An improved system and method of operating two floating structures in a body of water; [0020] An improved system and method of operating two floating structures that provides for drilling and producing deepwater oil and gas reservoirs; 20 [0021] An improved system and method of providing a connection of a drilling tender and a spar; and [0022] An improved system and method to provide for engagement of two floating structures. BRIEF DESCRIPTION OF DRAWINGS 25 [0023] Figure 1 shows a prior art drilling and production structure. [0024] Figures 2A, and 2B show a floating vessel located adjacent a floating production structure. 5 WO 2011/028854 PCT/US2010/047601 [0025] Figure 3 shows a floating vessel located adjacent to multiple floating production structures in accordance with embodiments of the present disclosure. DETAILED DESCRIPTION 5 [0026] In one aspect, embodiments of the present disclosure generally relate to a platform for offshore drilling operations, for example a spar platform. In particular, embodiments of the present disclosure relate to a spar platform including a tender assisted drilling platform. Typically, a selection of platforms are available for offshore drilling operations (e.g., 10 fixed platform, tension leg platforms, etc.). Spar platforms are one type of platform that may be used, particularly, in ultra-deepwater environments. The spar platform includes a large cylinder that floats in the water and is tethered to the seafloor by a series of lines comprizing chains, cables, synthetic ropes or combinations thereof. Because the spar platform is a 15 floating platform that is not attached to the seafloor, it is able to move in the water when affected by winds, waves and currents in the sea or even to absorb a hurricane. The drilling spar of the present disclosure may be intended to be deployed across a range of water depths, extending at least from 1,000 to 10,000 feet (300 to 3000 m). 20 [0027] Embodiments of the present disclosure include a drilling tender vessel that is used with a production spar. A drilling tender vessel is typically a support vessel that serves in support of a drilling rig. The drilling tender vessel acts as storage for supplies and is stationed alongside the drilling rig from which the rig will work off of to reduce the 25 loads on the actual rig. Drilling tender vessels can be jack-up style (like a lift boat), semisubmersible, barge or ship-shaped . By using a drilling tender vessel, a majority of drilling equipment, consumables and services may be carried onboard the drilling tender vessel during drilling operations, which allows the spar to be optimized according to its 30 "permanent" functional requirements (e.g., operating as a wellhead platform, with or without production equipment, quarters etc.). 6 WO 2011/028854 PCT/US2010/047601 Figure 1: [0028] Referring to Figure 1, prior art system 100 is shown. System 100 includes a floating structure 102 connected to the sea floor by multiple mooring or anchor lines 112. Floating structure 102 includes drilling rig 5 110 to drill wells in the sea floor 108. Floating structure 102 is connected to a wellhead 106 by riser 104. After well 120 has been drilled and completed, drilling rig 110 may be used to drill other wells. Produced fluids from well 120 may be transported to floating structure 102 for production processes as are known in the art prior to being shipped, 10 pipelined, or otherwise transported to shore. [0029] In general, floating structure 102 is permanently moored on location and is not moved until the field has been exhausted. Floating structure 102 has a weight of at least 20,000 metric tons. Figures 2a & 2b: 15 [0030] Referring to Figure 2A, a drilling and production system 200 is shown in accordance with embodiments of the present disclosure. The tender assisted drilling and production system 200 includes production structure 202, such as a TLP, FPSO, or spar. System 200 also includes a drilling tender vessel 203. The drilling tender vessel 203 floats in the water and 20 may be characterized as a semisubmersible, barge or ship-shaped unit or rig. The drilling tender vessel 203 includes a dynamic positioning (DP) system with thrusters or other propulsion mechanisms 212 to keep vessel 203 on station at a desired location. U.S. Patents 6,840,322, 6,799,528, 6,378,450, 6,257,165, and 6,247,421 disclose suitable dynamic 25 positioning (DP) systems which can be used with drilling tender vessel 203. U.S. Patents 6,840,322, 6,799,528, 6,378,450, 6,257,165, and 6,247,421 are herein incorporated by reference in their entirety. [0031] In some embodiments, the drilling tender vessel 203 may be kept on station at a location from about 10 meters to about 25 meters from 30 production structure 202, for example about 15 meters. 7 WO 2011/028854 PCT/US2010/047601 [0032] In some embodiments, the drilling tender vessel 203 may have a length from about 50 to about 200 meters, for example from about 100 to about 150 meters. [0033] In some embodiments, the drilling tender vessel 203 may have a 5 weight from about 5,000 to about 20,000 metric tons, for example from about 10,000 to about 15,000 metric tons. [0034] In some embodiments, the drilling tender vessel 203 may have cruising speed of at least 8 knots, for example from about 10 to about 20 knots. 10 [0035] In some embodiments, the production structure 202 may have a weight from about 3,000 to about 15,000 metric tons, for example from about 5,000 to about 10,000 metric tons. [0036] Further, drilling tender vessel 203 may include drilling rig 210, accommodation 214 for all required personnel, a pipe storage and 15 handling system 216, mud storage 218, and one or more cranes 222. Other storage 220 may also be provided. [0037] Production structure 202 may be connected to the sea floor 208 by multiple mooring or anchor lines (not shown). Floating structure 202 is connected to a subsea structure 206 by riser 204. 20 [0038] Referring to Figure 2A, drilling tender vessel 203 is moved adjacent to production structure 202. [0039] Referring to Figure 2B,once drilling tender vessel 203 is on station, drilling rig 210 is moved from drilling tender vessel 203 to production structure 202 with crane 222. Likewise, pipe 216 can be moved to 25 production structure 202 or back to drilling tender vessel 203 with crane 222. [0040] Rig 210 may be used to drill multiple wells from production structure 202. Mud tank and pump system 218 may be connected to production structure 202 with hose or line 224 to assist with drilling operations. Mud 30 return line 226 is used to return mud from production structure 202 to mud 8 WO 2011/028854 PCT/US2010/047601 tank and pump system 218. Other drilling operations and functions may be divided between production structure 202 and drilling tender vessel 203 as desired. [0041] In some embodiments, pipe handling system 216 allows drillpipe to 5 be transferred from the production structure 202 to the drilling tender vessel 203, or vice versa, as needed. Similarly, the power, cement, and mud lines 224, 226 provide electrical communication, cement for setting casing, and drilling mud, respectively to the production structure 202 or drilling tender vessel 203. 10 [0042] Additionally, the production structure 202 includes gang plank 228 that allows personnel to walk between drilling tender vessel 203 and production structure 202. Figure 3: [0043] Referring to Figure 3, system 300 is illustrated including production 15 structure 302 and drilling tender vessel 303 which may be substantially the same as production structure 202 and drilling tender vessel 203 described above with reference to Figure 2b. [0044] System 300 also includes production structures 332 and 342. Production structure 332 is connected to subsea equipment 336 such as a 20 wellhead, separator, manifold on the sea floor 308 by riser 334. Production structure 342 is connected to subsea equipment 346 such as a wellhead, separator, manifold on the sea floor 308 by riser 344. [0045] Production structure 332 is a distance d2 352 from production structure 302. Production structure 342 is a distance d1 350 from 25 production structure 302. Distance d1 350 and d2 352 may be from about 2 to about 200 kilometers, for example from about 3 to about 100, from about 4 to about 50, or from about 5 to about 10 kilometers. 9 WO 2011/028854 PCT/US2010/047601 Operation [0046] In operation, production structure 302 is installed in a body of water. Drilling tender vessel 303 is located alongside production structure 302, and drilling rig 310 and possibly other equipment is installed from drilling 5 tender vessel 303 to production structure 302. The two vessels are used together to drill multiple wells which are connected back to production structure 302. At the completion of the drilling campaign, drilling rig 310 and possibly other equipment is removed from production structure 302 and placed back on drilling tender vessel 303. Produced fluids from the 10 wells are then piped to production structure 302. [0047] Sometime prior to completion of the production structure 302 drilling campaign, production structure 332 is installed in a body of water. Drilling tender vessel 303 is located alongside production structure 332, and drilling rig 310 and possibly other equipment is installed from drilling 15 tender vessel 303 to production structure 332. The two vessels are used together to drill multiple wells which are connected back to production structure 332. At the completion of the drilling campaign, drilling rig 310 and possibly other equipment is removed from production structure 332 and placed back on drilling tender vessel 303. Produced fluids from the 20 wells are then piped to production structure 332. [0048] Sometime prior to completion of the production structure 332 drilling campaign, production structure 342 is installed in a body of water. Drilling tender vessel 303 is located alongside production structure 342, and drilling rig 310 and possibly other equipment is installed from drilling 25 tender vessel 303 to production structure 342. The two vessels are used together to drill multiple wells which are connected back to production structure 342. At the completion of the drilling campaign, drilling rig 310 and possibly other equipment is removed from production structure 342 and placed back on drilling tender vessel 303. Produced fluids from the 30 wells are then piped to production structure 342. [0049] At the completion of the production structure 342 drilling campaign, drilling tender vessel 303 may be used to support workovers of production 10 WO 2011/028854 PCT/US2010/047601 structures 302, 332, and/or 342, and/or drilling tender vessel 303 may be used to support drilling campaigns for other production structures (not shown). [0050] Advantageously, embodiments of the present disclosure provide a 5 drilling tender vessel that carries the majority of drilling equipment, consumables and services needed during drilling operations, allowing the production structure to be optimized according to more permanent functional requirements, such as production. This reduces development costs in comparison to a production structure designed to provide an 10 integral drilling capability. Additionally, embodiments disclosed herein may reduce costs of newly built drilling tender vessels while also allowing existing shallow water drilling tender units to be economically modified to operate in deep water (e.g., by eliminating the need to upgrade the mooring system of the drilling tender). Finally, embodiments disclosed 15 herein may provide a drilling tender vessel capable of being redeployed multiple times and being used across multiple well locations, which reduces day rates and lowers overall well costs. Illustrative Embodiments: [0051] In one embodiment, there is disclosed a floating offshore system in a 20 body of water, comprising a floating production structure; at least one anchor connected to a bottom of the body of water; a line connected to the anchor and the floating production structure; a floating drilling tender vessel adjacent to the floating structure, the drilling tender vessel comprising a dynamic positioning system. In some embodiments, the 25 floating production structure comprises a cylindrical hull. In some embodiments, the floating production structure comprises a spar. In some embodiments, the floating drilling tender vessel comprises a drilling derrick movable to the floating production structure. In some embodiments, the floating production structure comprises a weight less than about 20,000 30 metric tons. In some embodiments, the floating production structure comprises a drill floor. In some embodiments, the floating production structure comprises a moonpool. In some embodiments, the floating 11 WO 2011/028854 PCT/US2010/047601 production structure comprises a plurality of drillstrings extending from the floating structure to the bottom of the body of water. In some embodiments, the system comprises a plurality of floating production structures. In some embodiments, the system comprises at least two 5 floating production structures within a distance of 10 kilometers of each other. [0052] In one embodiment, there is disclosed a method of exploiting an offshore oil and gas reservoir, comprising installing a first floating production structure in a body of water; locating a drilling tender vessel 10 adjacent the first floating production structure; moving a drilling rig from the drilling tender vessel to the first floating production structure; drilling a plurality of wells from the first floating production structure with the drilling rig; moving the drilling rig back to the drilling tender vessel; installing a second floating production structure in a body of water; locating a drilling 15 tender vessel adjacent the second floating production structure; moving a drilling rig from the drilling tender vessel to the second floating production structure; and drilling a plurality of wells from the second floating production structure with the drilling rig. In some embodiments, the method comprises keeping the drilling tender vessel on station adjacent 20 the first floating production structure with a dynamic positioning system. [0053] In one embodiment, there is disclosed a method of exploiting an offshore oil and gas reservoir, comprising installing a first floating production structure in a body of water; locating a drilling tender vessel adjacent the first floating production structure; moving a drilling rig from 25 the drilling tender vessel to the first floating production structure; drilling a plurality of wells from the first floating production structure with the drilling rig; sensing a hurricane or other severe storm near the first floating production structure; and moving the drilling tender vessel away from the first floating production structure during the storm. 30 [0054] While the invention has been described with respect to a limited number of embodiments, those skilled in the art, having benefit of this disclosure, will appreciate that other embodiments can be devised which 12 WO 2011/028854 PCT/US2010/047601 do not depart from the scope of the invention as disclosed herein. Accordingly, the scope of the invention should be limited only by the attached claims. 13

Claims (13)

1. A floating offshore system in a body of water, comprising: a floating production structure; at least one anchor connected to a bottom of the body of water; a line connected to the anchor and the floating production structure; a floating drilling tender vessel adjacent to the floating structure, the drilling tender vessel comprising a dynamic positioning system.
2. The floating offshore system of claim 1, wherein the floating production structure comprises a cylindrical hull.
3. The floating offshore system of one or more of claims 1-2, wherein the floating production structure comprises a spar.
4. The floating offshore system of one or more of claims 1-3, wherein the floating drilling tender vessel comprises a drilling derrick movable to the floating production structure.
5. The floating offshore system of one or more of claims 1-4, wherein the floating production structure comprises a weight less than about 20,000 metric tons.
6. The floating offshore system of one or more of claims 1-5, wherein the floating production structure comprises a drill floor.
7. The floating offshore system of one or more of claims 1-6, wherein the floating production structure comprises a moonpool. 14 WO 2011/028854 PCT/US2010/047601 TH3883-PCT
8. The floating offshore system of one or more of claims 1-7, wherein the floating production structure comprises a plurality of drillstrings extending from the floating structure to the bottom of the body of water.
9. The floating offshore system of one or more of claims 1-8, further comprising a plurality of floating production structures.
10.The floating offshore system of one or more of claims 1-8, further comprising at least two floating production structures within a distance of 10 kilometers of each other.
11. A method of exploiting an offshore oil and gas reservoir, comprising: installing a first floating production structure in a body of water; locating a drilling tender vessel adjacent the first floating production structure; moving a drilling rig from the drilling tender vessel to the first floating production structure; drilling a plurality of wells from the first floating production structure with the drilling rig; moving the drilling rig back to the drilling tender vessel; installing a second floating production structure in a body of water; locating a drilling tender vessel adjacent the second floating production structure; moving a drilling rig from the drilling tender vessel to the second floating production structure; and drilling a plurality of wells from the second floating production structure with the drilling rig.
12. The method of claim 11, further comprising keeping the drilling tender vessel on station adjacent the first floating production structure with a dynamic positioning system. 15 WO 2011/028854 PCT/US2010/047601 TH3883-PCT
13. A method of exploiting an offshore oil and gas reservoir, comprising: installing a first floating production structure in a body of water; locating a drilling tender vessel adjacent the first floating production structure; moving a drilling rig from the drilling tender vessel to the first floating production structure; drilling a plurality of wells from the first floating production structure with the drilling rig; sensing a hurricane or other severe storm near the first floating production structure; and moving the drilling tender vessel away from the first floating production structure during the storm. 16
AU2010289487A 2009-09-04 2010-09-02 Tender assisted production structures Abandoned AU2010289487A1 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
US24011509P 2009-09-04 2009-09-04
US61/240,115 2009-09-04
PCT/US2010/047601 WO2011028854A1 (en) 2009-09-04 2010-09-02 Tender assisted production structures

Publications (1)

Publication Number Publication Date
AU2010289487A1 true AU2010289487A1 (en) 2012-03-01

Family

ID=43649629

Family Applications (1)

Application Number Title Priority Date Filing Date
AU2010289487A Abandoned AU2010289487A1 (en) 2009-09-04 2010-09-02 Tender assisted production structures

Country Status (4)

Country Link
AU (1) AU2010289487A1 (en)
GB (1) GB2484052A (en)
NO (1) NO20120146A1 (en)
WO (1) WO2011028854A1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105143037B (en) * 2013-04-25 2017-06-23 吉宝岸外与海事技术中心 System and method for dynamically positioning pontoon beside turret mooring pontoon

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4156577A (en) * 1977-04-15 1979-05-29 Mcmakin Robert G Onshore/offshore method and apparatus for drilling
MY131437A (en) * 1993-01-29 2007-08-30 Minnesota Mining & Mfg Flexible circuit connector
US6092483A (en) * 1996-12-31 2000-07-25 Shell Oil Company Spar with improved VIV performance
US6575111B2 (en) * 2001-05-01 2003-06-10 Drillmar, Inc. Method for tendering
US6799528B1 (en) * 2002-12-23 2004-10-05 Joannes Raymond Mari Bekker Portable dynamic positioning system with self-contained diesel hydraulic thrusters

Also Published As

Publication number Publication date
GB2484052A (en) 2012-03-28
WO2011028854A1 (en) 2011-03-10
NO20120146A1 (en) 2012-02-08
GB201201834D0 (en) 2012-03-21

Similar Documents

Publication Publication Date Title
US4966495A (en) Semisubmersible vessel with captured constant tension buoy
US4995762A (en) Semisubmersible vessel with captured constant tension buoy
US7934462B2 (en) Offshore floating structure with motion dampers
EP2726362B1 (en) Offshore platform with outset columns
US8616806B2 (en) Riser support system for use with an offshore platform
US8707882B2 (en) Offshore platform with outset columns
US5159891A (en) Adjustable boat mooring system for a flexibly-supported tension leg platform
US6453838B1 (en) Turret-less floating production ship
GB2110602A (en) Semi-submersible drilling vessel
US20040182297A1 (en) Riser pipe support system and method
Sharma et al. Issues in offshore platform research-Part 1: Semi-submersibles
US20160101831A1 (en) Taut Inverted Catenary Mooring System
KR20150099062A (en) Mobile type tension leg platform
US20120114421A1 (en) Semi-submersible floating structure
AU2011101650A4 (en) Self installing tension leg platform and subsea storage tank
AU2010289487A1 (en) Tender assisted production structures
Halkyard Large spar drilling and production platforms for deep water oil and gas
WO2011059918A1 (en) Tender assisted drilling spar
Bennett Proven Alternative Hull Designs for Surface Drilling/Production Systems
Sablok et al. EDP Buoy
KR20160078164A (en) Subsea Bridge System
KR20160115537A (en) Blow out preventer install structure and drill ship having the blow out preventer install structure
KR20160004519U (en) marine structure
KR20220137987A (en) Spread mooring vessel with riser moonpool
KR20160003472A (en) Maintenance system of thruster motor and method using the same

Legal Events

Date Code Title Description
MK4 Application lapsed section 142(2)(d) - no continuation fee paid for the application