AU2010277203A1 - Process and mould assembly for aluminothermic welding of rails with mould having two side moulds, a base and receiving means - Google Patents

Process and mould assembly for aluminothermic welding of rails with mould having two side moulds, a base and receiving means Download PDF

Info

Publication number
AU2010277203A1
AU2010277203A1 AU2010277203A AU2010277203A AU2010277203A1 AU 2010277203 A1 AU2010277203 A1 AU 2010277203A1 AU 2010277203 A AU2010277203 A AU 2010277203A AU 2010277203 A AU2010277203 A AU 2010277203A AU 2010277203 A1 AU2010277203 A1 AU 2010277203A1
Authority
AU
Australia
Prior art keywords
mould
rail
base
receiving
weld material
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
AU2010277203A
Other versions
AU2010277203B2 (en
Inventor
Donald Roderick Macrae
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Electrotherm Pty Ltd
Original Assignee
Electrotherm Pty Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electrotherm Pty Ltd filed Critical Electrotherm Pty Ltd
Publication of AU2010277203A1 publication Critical patent/AU2010277203A1/en
Application granted granted Critical
Publication of AU2010277203B2 publication Critical patent/AU2010277203B2/en
Assigned to ELECTROTHERM (PTY) LIMITED reassignment ELECTROTHERM (PTY) LIMITED Request for Assignment Assignors: MACRAE, DONALD
Ceased legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K23/00Alumino-thermic welding
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D19/00Casting in, on, or around objects which form part of the product
    • B22D19/04Casting in, on, or around objects which form part of the product for joining parts
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B11/00Rail joints
    • E01B11/44Non-dismountable rail joints; Welded joints
    • E01B11/52Joints made by alumino-thermal welding
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • E01B29/42Undetachably joining or fastening track components in or on the track, e.g. by welding, by gluing; Pre-assembling track components by gluing; Sealing joints with filling components
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K2101/00Articles made by soldering, welding or cutting
    • B23K2101/26Railway- or like rails
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K2103/00Materials to be soldered, welded or cut
    • B23K2103/02Iron or ferrous alloys

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Railway Tracks (AREA)
  • Machines For Laying And Maintaining Railways (AREA)

Abstract

The invention concerns a new process and mould assembly for use in aluminothermic intercast welding of rail ends to form substantially continuous railway tracks, the process comprises the steps of aligning the to-be-welded rails (6) so as to define an inter-rail gap between the rail ends (6); providing a mould assembly comprising two upright side moulds (12) that are fitted on either side of the inter-rail gap, each side mould (12) including at least one elongate, open-ended down gate (18) extending between a top part and a bottom part of the side mould (12) and terminating in a down gate well; a base mould (14) adapted for receiving the rail ends (6) and for supporting the side moulds (12) on either side of the inter-rail gap; the arrangement being such that the base mould(14) and side moulds (12) cooperate to define an enclosed mould cavity for receiving molten weld material; and receiving means (16) for receiving molten weld material in at least one of the side moulds (12) and arranged in flow communication with the down gate (18); and side-pouring molten weld material into the receiving means (16) such that the molten weld material is transported from the receiving means (16), down the down gate (18) of the side mould (12) and into the base mould (14) to form a rail foot, from where the molten weld material rises into the inter-rail gap to form the web and rail head of the rail weld.

Description

WO 2011/013078 PCT/IB2010/053426 -1 PROCESS AND MOULD ASSEMBLY FOR ALUMINOTHERMIC WELDING OF RAILS WITH MOULD HAVING TWO SIDE MOULDS, A BASE AND RECEIVING MEANS BACKGROUND TO THE INVENTION The invention relates to fusion welding of rails to form substantially continuous railway tracks. In particular, it concerns a new process and mould assembly for use in aluminothermic intercast welding of rail ends. Fusion welding of rail ends, and in particular aluminothermic welding, is one of the established, internationally accepted procedures for in situ welding of rails and utilises the high affinity of aluminum for oxygen for the reduction of iron oxide. In general, the procedure comprises aligning rails to be joined together, leaving a prescribed inter-rail gap between adjacent rail ends, and fitting preformed refractory moulds around the inter-rail gap between the rail ends to form an enclosed mould cavity. An especially designed preheating burner is used to preheat the refractory moulds and the enclosed mould cavity for removal of all water vapour and to preheat the rail ends. Superheated molten steel is then intercast into the mould cavity from a refractory crucible located above the refractory moulds, and allowed to solidify in the mould cavity to form a rail weld in the inter-rail gap between adjacent rail ends. After solidification, refractory materials and surplus steel are removed from the rail weld, and after further cooling, rail fastenings are replaced and rail heads are grinded back to profile. The quality of the rail weld between the rail ends is of critical importance when it comes to wear resistance of railways and their ability to handle increasing rail traffic and axle loads. In particular, rail welds need to be homogenous, with fine grained, hard weld material concentrated in the rail head, and as little as possible slag-losses of alloying additives. Moreover, WO 2011/013078 PCT/IB2010/053426 -2 intimate thorough mixing of the casting steel within the mould cavity must be avoided at all costs, otherwise a concentration of alloying additives in the rail head cannot be achieved. In some countries, the weld is ultrasonically and radiographically tested. However, radiographic testing of rail welds is not permitted in all countries and in such cases only ultrasonic testing of the rail welds is performed. Most commonly-used processes for aluminothermic welding of rails employ top-pouring refractory moulds having a diverting plug, made from silica sand and bound with sodium silicate. One such a process is described in patent number US 6,227,282, which includes the steps of surrounding to be-welded rail ends with a refractory mould, which includes a diverting plug fitted in an upper region of the mould covering a rail head of the to-be welded rail ends. A metal stream is top-poured from an overhead reaction crucible into the refractory mould over the diverting plug, such that it impinges on the diverting plug. The metal stream is transported into the mould cavity from the top and subsequently fills the mould cavity to form a rail foot, web and rail head, with two risers extending upwardly from the rail foot. Top-pouring processes incorporating a diverting plug suffer from two major disadvantages. The first disadvantage is that during the top-pouring operation the metal stream is dispersed, causing turbulence in the mould cavity. Due to the high temperature of the metal stream, the dispersed liquid metal droplets oxidise. These oxidised liquid metal droplets must then reform a complete metal liquid before arriving at the bottom of the mould cavity, but this often does not happen, resulting in unwanted gas becoming entrapped in the rail weld. This undesirable gas generation resulting from the pouring process can cause gas holes in the weld metal after solidification and leads to ultrasonic and/or radiographic examination failure. After solidification, the refractory moulds and risers are broken away from the rail weld. The next step is to shear off excess riser material from the WO 2011/013078 PCT/IB2010/053426 -3 rail head. The excess material on top of the rail head cannot be removed at the same time when the moulds and risers are broken away because of the particular designs of currently available moulds. It is here where the second disadvantage lies, because of the critical temperature at which the excess material must be sheared. It must be sheared after partial solidification, because the weld material becomes extremely hard and difficult to remove after complete solidification. Expert on-site knowledge is required to know exactly when sufficient partial solidification is achieved for the shearing step of each rail weld. There is therefore a need for an in situ fusion welding process which consists of a single process step characterised in providing metals or metalloids in a controlled manner into the mould cavity with the least amount of turbulence so as to concentrate these alloying additives in a weld head, thereby to produce a rail weld that includes a rail head of hard weld material, and a rail foot that is less prone to breakage. SUMMARY OF THE INVENTION According to the invention there is provided a process for fusion welding rail ends of two adjacent rails, the process comprising the steps of aligning the to-be-welded rails so as to define an inter-rail gap between the rail ends; providing a mould assembly comprising two upright side moulds that are fitted on either side of the inter-rail gap, each side mould including at least one elongate, open-ended down gate extending between a top part and a bottom part of the side mould and terminating in a down gate well; a base mould adapted for receiving the rail ends and for supporting the side moulds on either side of the inter-rail gap; the arrangement being such that the base mould and WO 2011/013078 PCT/IB2010/053426 -4 side moulds cooperate to define an enclosed mould cavity for receiving molten weld material; and receiving means for receiving molten weld material in at least one of the side moulds and arranged in flow communication with the down gate; and side-pouring molten weld material into the receiving means such that the molten weld material is transported from the receiving means, down the down gate of the side mould and into the base mould to form a rail foot, from where the molten weld material rises into the inter-rail gap to form the web and rail head of the rail weld. The receiving means may be a refractory receiving bowl which is removably located in the top part of a side mould and which terminates in a bottom diverting slot. The receiving bowl may be positioned in the side mould such that the diverting slot is arranged directly above the down gate of the side mould. The process may comprise pouring molten weld material from an overhead crucible, which may be positioned above the side mould and off-centre from the rail head, into the receiving bowl, from where the molten weld material may be transported via the down gate into the down gate well, which is located directly below the down gate of the side mould. Upon entering the down gate well, velocity of the molten weld material is reduced, thus allowing the molten weld material to enter the inter-rail gap with reduced velocity and no turbulence. Each side mould includes downwardly depending base mould engaging means extending from the base of the side mould. The base mould engaging means is dimensioned to engage complimentarily dimensioned side mould engaging means, which extend upwardly from the base mould, when the side moulds sit on top of the base mould. The mould assembly is characterised therein that when the side moulds sit on top of the base mould, the base of the side moulds are level with the top of the rail foot. This differs from prior art mould assemblies where the base of the side moulds are usually level with the bottom of the rail foot. The WO 2011/013078 PCT/IB2010/053426 -5 applicant has found that with the new arrangement, improved close fitting is achieved when the two side moulds are clamped together against the rails. The base mould defines a substantially central rail foot well in which molten weld material enters to form the rail foot; at least one down gate well laterally disposed relative to the rail foot well; and side mould engaging means extending upwardly from the base mould and dimensioned to engage complimentarily dimensioned base mould engaging means on the side moulds for supporting the side moulds. The side mould engaging means are positioned on lateral opposite ends of the base mould, which ends extend beyond the rail foot such that the side moulds sit on top of the lateral opposite ends of the base mould. In a preferred embodiment of the invention, the base mould includes two down gate wells located in the lateral opposite ends of the base mould and positioned directly below the down gates of the side moulds. Each down gate well is dimensioned to receive molten weld material from the down gate in the side mould, so as to reduce the velocity of the molten weld material and in turn to direct the stream of molten weld material towards the rail foot well in such a way that it reduces turbulence of the weld material. The inter-rail gap is filled from the bottom upwards, through molten weld material that enters the rail foot well and rises not only to fill the inter-rail gap, but also the down gate of the opposite side mould. The base mould also defines two opposed rail receiving profiles on opposite sides of the base mould for snugly receiving the rail ends of the to be-welded rails. The rail foot well is defined intermediate the down gate wells, the side mould engaging means, and the rail receiving profiles. The base mould further includes a fracture rib between the rail foot well and each of the down gate wells, which allows, after solidification and at black WO 2011/013078 PCT/IB2010/053426 -6 heat, for the down gates and down gate wells to be removed with a hammer. The mould assembly further includes a knock-off core which is removably positioned between the two side moulds and centrally above the rail head and which is adapted to receive molten weld material to form a head metal riser section, the arrangement being such that. the.receiving. bowl at least partially overlaps the knock-off core from above, forcing the knock-off core downwardly towards the rail head. The process includes the steps of preheating the enclosed mould cavity with a preheating burner; inserting the knock-off core between the two side moulds and centrally above the rail head; inserting the receiving bowl in the top part of one of the two side moulds above the knock-off core, such that it at least partially overlaps with the knock-off core from above, thus forcing the knock off core downwardly towards the rail head; side-pouring molten weld material into the receiving bowl such that the molten weld material is transported from the receiving means, down the down gate of the side mould and into the base mould to form a rail foot, from where the molten weld material rises upwardly into the inter-rail gap to form the web and head of the rail weld and at least partially to fill the knock-off core, the arrangement being such that the receiving bowl sits firmly against the knock-off core, holding it in position and preventing the knock-off core from rising when the molten weld material fills the inter-rail gap and the knock-off core. After solidification and when the molten weld material in the inter-rail gap has reached a black heat, the knock-off core is removed with a hammer, together with the down gates and mould refractories. Known fusion welding processes all require a hydraulic rail shearing machine to remove WO 2011/013078 PCT/IB2010/053426 -7 excess head metal from the rail head. With the proposed invention this step is not required. The process includes the further step of sealing the side moulds and base mould where they engage each other and the rails by firmly placing luting putty within luting grooves defined between the side moulds, base mould and the rail ends. The side moulds are further characterised therein that they define a head rising room in an upper part of the side moulds for receiving molten material rising from the inter-rail gap and the down gates. In use, the overhead crucible, containing an aluminothermic welding mixture, is positioned above the top of at least one side mould. Once all the mould parts have been positioned and clamped around the inter-rail gap between the two rails to be welded, and the knock-off core and receiving bowl have been inserted into position, the aluminothermic welding mixture is ignited. After expiration of the appropriate reaction time, molten metal is released from the crucible and directed into the refractory receiving bowl. All the liquid metal falling into the receiving bowl is discharged through the diverting slot into the down gate of the side mould. The metal flow is received in the bottom down gate well of the base mould and is diverted into the inter-rail gap, filling the inter-rail gap from the rail foot well upwards and rising to the rail head and further upwards to fill the knock-off core. Alumina slag, which also forms during the reaction of the aluminothermic welding mixture in the crucible, is discharged from the crucible directly after the discharge of the molten metal. As a result of the lower specific gravity of the alumina slag, liquid alumina slag floats on top of the molten metal after the inter-rail gap and down gates have been filled. The side moulds are so constructed to contain all the alumina slag in the head rising room and on top of the molten metal. This alumina slag acts as WO 2011/013078 PCT/IB2010/053426 -8 an insulator and assists in keeping the top head riser section liquidous for a longer period, thus facilitating progressive solidification to take place from thinner sections in the rail foot through the rail web area and lastly in the thicker rail head. According to a further aspect of the invention there is provided a mould assembly for use in fusion welding rail ends of two adjacent rails, the mould assembly comprising two upright side moulds that are fitted on either side of an inter-rail gap defined between the rail ends, each side mould including at least one elongate, open-ended down gate extending between a top part and a bottom part of the side mould and terminating in a down gate well; a base mould adapted for receiving the rail ends and for supporting the side moulds on either side of the inter-rail gap; the arrangement being such that the base mould and side moulds cooperate to define an enclosed mould cavity for receiving molten weld material; and receiving means for receiving molten weld material in at least one of the side moulds and arranged in flow communication with the down gate. The receiving means may be a refractory receiving bowl which is removably located in the top part of a side mould and which terminates in a bottom diverting slot. Each side mould may include downwardly depending base mould engaging means extending from the base of the side mould and dimensioned to engage complimentarily dimensioned side mould engaging means, which extend upwardly from the base mould, when the side mould sits on top of the base mould. The mould assembly may be characterised therein that when the side moulds sit on top of the base mould, the base of the side moulds are level with the top of the rail foot.
WO 2011/013078 PCT/IB2010/053426 -9 The base mould may define a substantially central rail foot well in which molten weld material enters to form the rail foot; at least one down gate well laterally disposed relative to the rail foot well; and side mould engaging means extending upwardly from the base mould and dimensioned to engage complimentarily dimensioned base mould engaging means on the side moulds for supporting the side moulds. The side mould engaging means may positioned on lateral opposite ends of the base mould, which ends extend beyond the rail foot such that the side moulds sit on top of the lateral opposite ends of the base mould. The base mould also may define two opposed rail receiving profiles on opposite sides of the base mould for snugly receiving the rail ends of the to be-welded rails. The rail foot well may be defined intermediate the down gate wells, the side mould engaging means, and the rail receiving profiles. The base mould further may include a fracture rib between the rail foot well and each of the down gate wells. The mould assembly further may include a knock-off core which is removably positioned between the two side moulds and centrally above the rail head and which is adapted to receive molten weld material to form a head metal riser section, the arrangement being such that the receiving bowl at least partially overlaps the knock-off core from above, forcing the knock-off core downwardly towards the rail head. The side moulds further may be characterised therein that they define a head rising room in an upper part of the side moulds for receiving molten material rising from the inter-rail gap and the down gates.
WO 2011/013078 PCT/IB2010/053426 -10 SPECIFIC EMBODIMENT OF THE INVENTION The invention will now further be described and illustrated with reference to the following non-limiting example only, wherein FIGURE 1 is an exploded perspective view of a mould assembly according to the invention; FIGURE 2 is an assembled perspective view of the mould assembly of Figure 1; FIGURE 3 is the base mould only of the mould assembly; FIGURE 4 illustrates the manner in which the mould assembly of the invention is fitted around an inter-rail gap of two to-be welded rail ends; FIGURE 5 is a sectional view of the mould assembly of Figure 4; FIGURE 6 illustrates the manner in which a side mould and base mould of the mould assembly of the invention is fitted around an inter-rail gap, showing the location of the knock-off core and receiving bowl; and FIGURE 7 is a partially filled mould assembly of Figure 6, illustrating a filled down gate and knock-off core. The invention relates to a new in situ fusion welding process for welding adjacent rail ends [6] to form a substantially continuous railway track, and to a mould assembly for use in such a process. The process consist of a single process step and is aimed at introducing molten welding material into an inter-rail gap [8] between the to-be-welded rails [6], in a controlled manner and with the least amount of turbulence and velocity, so as to concentrate alloying additives in a weld head. The process incorporates the use of a mould assembly [10] which comprises two upright side moulds [12], a base mould [14], and receiving means [16] for receiving molten weld material in at least one of the side moulds [12]. The side moulds [12] are fitted on either side of the inter-rail gap [8], while the base mould [14] is adapted for receiving the rail ends [6] WO 2011/013078 PCT/IB2010/053426 -11 and for supporting the side moulds [12] on either side of the inter-rail gap [8]. The side moulds [12] and base mould [14] cooperate to define an enclosed mould cavity [22] for receiving molten weld material. Each of the side moulds [12] includes at least one elongate, open-ended down gate [18] extending between a top part [12.1] and a bottom part [12.2] of the side mould [12], and terminating in a down gate well [20], which is arranged directly beneath the down gate [18] of the side mould [12]. The receiving means [16], which is a refractory receiving bowl [16], is removably located in the top part [12.1] of a side mould [12] and is arranged in flow communication with the down gate [18]. The receiving means [16] terminates in a bottom diverting slot [24] and is positioned in the side mould [12] such that the diverting slot [24] is arranged directly above the down gate [18] of the side mould [12]. Each side mould [12] includes downwardly depending base mould engaging means [26] extending from the base [12.3] of the side mould [12]. The base mould engaging means [26] is dimensioned to engage complimentarily dimensioned side mould engaging means [28], which extend upwardly from the base mould [14], when the side moulds [12] sit on top of the base mould [14]. The mould assembly [10] is characterised therein that when the side moulds [12] sit on top of the base mould [14], the base of the side moulds [12] are level with the top [32.1] of a rail foot [32]. The side moulds [12] also include a head rising room [46] in an upper part of the side moulds [12] for receiving molten material rising from the inter-rail gap [8] and the down gates [18]. The base mould [14] defines a substantially central rail foot well [30] in which molten weld material enters to form the rail foot [32]; at least one down gate well [20] laterally disposed relative to the rail foot well [30]; and WO 2011/013078 PCT/IB2010/053426 -12 side mould engaging means [28] extending upwardly from the base mould [14] and dimensioned to engage complimentarily dimensioned base mould engaging means [26] on the side moulds [12]. The side mould engaging means [28] are positioned on lateral opposite ends [14.1; 14.2] of the base mould [14], which ends extend beyond the rail foot [32] such that the side moulds [12] sit on top of the lateral opposite ends [14.1; 14.2] of the base mould. In a preferred embodiment of the invention, the base mould [14] includes two down gate wells [20] located in the lateral opposite ends [14.1; 14.2] of the base mould [14] and positioned directly below the down gates [18] of the side moulds [12]. Each down gate well [20] is dimensioned to receive molten weld material from the down gate [18] in the side mould [12], so as to reduce the velocity of the molten weld material and in turn to direct the stream of molten weld material towards the rail foot well [30] in such a way that it reduces turbulence of the weld material. The inter-rail gap [8] is filled from the bottom upwards, through molten weld material that enters the rail foot well [30] and rises not only to fill the inter-rail gap [8], but also the down gate [18] of the opposite side mould [12]. The base mould [14] also defines two opposed rail receiving profiles [34] on opposite sides of the base mould [14] for snugly receiving the rail ends [6] of the to-be-welded rails. The rail foot well [30] is defined intermediate the down gate wells [20], the side mould engaging means [28], and the rail receiving profiles [34]. The base mould [14] further includes a fracture rib [36] between the rail foot well [30] and each of the down gate wells [20], which allows, after solidification and at black heat, for the down gates [18] and down gate wells [20] to be removed with a hammer. The mould assembly [10] further includes a knock-off core [38] which is removably positioned between the two side moulds [12] and centrally above a rail head [40] and which is adapted to receive molten weld material WO 2011/013078 PCT/IB2010/053426 -13 to form a top head metal riser section [38.1], the arrangement being such that the receiving bowl [16] at least partially overlaps the knock-off core [38] from above, forcing the knock-off core [38] downwardly towards the rail head [40]. The process comprises the steps of preheating the enclosed mould cavity [22] with a preheating burner (not shown); inserting the knock off core [38] between the two side moulds [12] and centrally above the rail head [40]; and inserting the receiving bowl [16] in the top part [12.1] of one of the two side moulds [12] above the knock-off core [38], such that it at least partially overlaps with the knock-off core [38] from above. An overhead crucible [42], containing an aluminothermic welding mixture, is positioned above one side mould [12] and off-centre from the rail head [40]. Once all the mould parts are clamped around the inter-rail gap [8] between the two rails to be welded, the aluminothermic welding mixture is ignited. After expiration of the appropriate reaction time, molten metal [46] is released from the crucible [42] and directed into the refractory receiving bowl [16]. All the liquid metal [46] directed into the receiving bowl [16] is discharged through the diverting slot [24] into the down gate [18] of the side mould [12]. The metal flow is received in the bottom down gate well [20] of the base mould [14] and is diverted into the inter-rail gap [8], filling the inter rail gap [8] from the rail foot well [30] upwards and rising to the rail head [40] and further upwards to fill the knock-off core [38]. At the same time the metal flow fills the down gate [18] of the opposite side mould [12], rising from the bottom upwards and into the head rising room [46]. Upon entering the down gate well [20], velocity of the molten weld material [46] is reduced, thus allowing the molten weld material to enter the inter-rail gap [8] with reduced velocity and no turbulence. During the casting process, the receiving bowl [16] remains firmly against the knock-off core [38], holding it in position and preventing the knock-off core [38] from rising when the molten weld material [46] fills the inter-rail gap [8] and the knock-off core [38]. After solidification and when the molten weld material [46] in the inter-rail gap [8] has reached a black heat, the knock-off core [38] is removed with a WO 2011/013078 PCT/IB2010/053426 -14 hammer, together with the down gates [18] and mould refractories. When the mould assembly [10] is hit with a hammer, the side moulds [12] and down gates [18] fracture at the fracture rib [36]. The process includes the further step of sealing the side moulds [12] and base mould [14] where they engage each other and the rails by firmly placing luting putty within luting grooves [44] defined between the side moulds [12], base mould [14] and the rail ends [6]. Alumina slag [48], which also forms during the reaction of the aluminothermic welding mixture in the crucible, is discharged from the crucible [42] directly after discharge of the molten metal [46]. As a result of the lower specific gravity of the alumina slag [48], liquid alumina slag floats on top of the molten metal [46] after the inter-rail gap [8] and down gates [18] have been filled. The side moulds [12] are so constructed to contain all the alumina slag [48] in the head rising room [46] and on top of the molten metal [46]. This alumina slag [48] acts as an insulator and assists in keeping the top head riser section [38.1] liquidous for a longer period, thus facilitating progressive solidification to take place from thinner sections in the rail foot [32] through the rail web [50] and lastly in the thicker rail head [40]. The step of collecting all the alumina slag [48] in the head rising room [46] within a top part of a side mould [12] differs from all other aluminothermic processes, where the liquid alumina slag [48] is channelled off the refractory mould top sections into slag trays. These metal slag trays are attached to a side of the refractory side moulds [12] for receiving the alumina slag [48], and are removed with care after solidification of the alumina slag [48] has taken place. Not only is it safer to have all the alumina slag [48] contained within the top part of the two side moulds, but also less equipment is required and ease of operation is accomplished.
WO 2011/013078 PCT/IB2010/053426 -15 It will be appreciated that other embodiments of the invention may be possible without departing from the spirit or scope of the invention as defined in the claims.

Claims (30)

1. A process for fusion welding rail ends of two adjacent rails, the process comprising the steps of aligning the to-be-welded rails so as to define an inter-rail gap between the rail ends; providing a mould assembly comprising two upright side moulds that are fitted on either side of the inter-rail gap, each side mould including at least one elongate, open-ended down gate extending between a top part and a bottom part of the side mould and terminating in a down gate well; a base mould adapted for receiving the rail ends and for supporting the side moulds on either side of the inter-rail gap; the arrangement being such that the base mould and side moulds cooperate to define an enclosed mould cavity for receiving molten weld material; and receiving means for receiving molten weld material in at least one of the side moulds and arranged in flow communication with the down gate; and side-pouring molten weld material into the receiving means such that the molten weld material is transported from the receiving means, down the down gate of the side mould and into the base mould to form a rail foot, from where the molten weld material rises into the inter-rail gap to form the web and rail head of the rail weld.
2. The process according to claim 1 wherein the receiving means is a refractory receiving bowl which is removably located in the top part of a side mould and which terminates in a bottom diverting slot.
3. The process according to claim 2 wherein the receiving bowl is positioned in the side mould such that the diverting slot is arranged directly above the down gate of the side mould. WO 2011/013078 PCT/IB2010/053426 -17
4. The process according to anyone of claims 1 to 3 comprising the step of pouring molten weld material from an overhead crucible, which is positioned above the side mould and off-centre from the rail head, into the receiving bowl, such that the molten weld material is transported via the down gate into the down gate well, which is located directly below the down gate of the side mould, the mould assembly being dimensioned such that upon entering the down gate well, velocity of the molten weld material is reduced so that the molten weld material enters the inter-rail gap with reduced velocity and no turbulence.
5. The process according to claim 1 wherein each side mould includes downwardly depending base mould engaging means extending from the base of the side mould, the base mould engaging means being dimensioned to engage complimentarily dimensioned side mould engaging means, which extend upwardly from the base mould, when the side moulds sit on top of the base mould.
6. The process according to claim 1 wherein the mould assembly is characterised therein that when the side moulds sit on top of the base mould, the base of the side moulds are level with the top of the rail foot.
7. The process according to claim 1 wherein the base mould defines a substantially central rail foot well in which molten weld material enters to form the rail foot; at least one down gate well laterally disposed relative to the rail foot well; and side mould engaging means extending upwardly from the base mould and dimensioned to engage complimentarily dimensioned base mould engaging means on the side moulds for supporting the side moulds.
8. The process according to claim 7 wherein the side mould engaging means are positioned on lateral opposite ends of the base mould, WO 2011/013078 PCT/IB2010/053426 -18 which ends extend beyond the rail foot such that the side moulds sit on top of the lateral opposite ends of the base mould.
9. The process according to claim 1 wherein the base mould includes two down gate wells located in lateral opposite ends of the base mould and positioned directly below the down gates of the side moulds, each down gate well being dimensioned to receive molten weld material from the down gate in the side mould, to reduce the velocity of the molten weld material and to direct a stream of molten weld material towards the rail foot well in such a way that it reduces turbulence of the weld material, the mould assembly being dimensioned such that the inter-rail gap is filled from the bottom upwards, through molten weld material that enters the rail foot well and rises not only to fill the inter-rail gap, but also the down gate of the opposite side mould.
10. The process according to claim 1 wherein the base mould defines two opposed rail receiving profiles on opposite sides of the base mould for snugly receiving the rail ends of the to-be-welded rails.
11. The process according to claim 7 or claim 10 wherein the rail foot well is defined intermediate the down gate wells, the side mould engaging means, and the rail receiving profiles.
12. The process according to claim 7 wherein the base mould includes a fracture rib between the rail foot well and each of the down gate wells, which allows, after solidification and at black heat, for the down gates and down gate wells to be removed with a hammer.
13. The process according to claim 2 wherein the mould assembly includes a knock-off core which is removably positioned between the two side moulds and centrally above the rail head and which is adapted to receive molten weld material to form a head metal riser section, the mould assembly being dimensioned such that the WO 2011/013078 PCT/IB2010/053426 -19 receiving bowl at least partially overlaps the knock-off core from above, forcing the knock-off core downwardly towards the rail head.
14. The process according to claim 13 including the steps of preheating the enclosed mould cavity with a preheating burner; inserting the knock-off core between the two side moulds and centrally above the rail head; inserting the receiving bowl in the top part of one of the two side moulds above the knock-off core, such that it at least partially overlaps with the knock-off core from above, thus forcing the knock off core downwardly towards the rail head; side-pouring molten weld material into the receiving bowl such that the molten weld material is transported from the receiving means, down the down gate of the side mould and into the base mould to form the rail foot, from where the molten weld material rises upwardly into the inter-rail gap to form the web and head of the rail weld and at least partially to fill the knock-off core, the arrangement being such that the receiving bowl sits firmly against the knock-off core, holding it in position and preventing the knock-off core from rising when the molten weld material fills the inter-rail gap and the knock-off core.
15. The process according to claim 14 including the step of removing the knock-off core with a hammer, together with the down gates and mould refractories, after solidification and when the molten weld material in the inter-rail gap has reached a black heat.
16. The process according to claim 1 including the further step of sealing the side moulds and base mould where they engage each other and the rails by firmly placing luting putty within luting grooves defined between the side moulds, base mould and the rail ends.
17. The process according to claim 1 wherein the side moulds define a head rising room in an upper part of the side moulds for receiving WO 2011/013078 PCT/IB2010/053426 -20 molten material rising from the inter-rail gap and the down gates, the head rising room being dimensioned to contain all slag in the head rising room and on top of the molten weld material.
18. A mould assembly for use in fusion welding rail ends of two adjacent rails, the mould assembly comprising two upright side moulds that are fitted on either side of an inter-rail gap defined between the rail ends, each side mould including at least one elongate, open-ended down gate extending between a top part and a bottom part of the side mould and terminating in a down gate well; a base mould adapted for receiving the rail ends and for supporting the side moulds on either side of the inter-rail gap; the arrangement being such that the base mould and side moulds cooperate to define an enclosed mould cavity for receiving molten weld material; and receiving means for receiving molten weld material in at least one of the side moulds and arranged in flow communication with the down gate.
19. The mould assembly according to claim 18 wherein the receiving means is a refractory receiving bowl which is removably located in the top part of a side mould and which terminates in a bottom diverting slot.
20. The mould assembly according to claim 18 wherein each side mould includes downwardly depending base mould engaging means extending from the base of the side mould and dimensioned to engage complimentarily dimensioned side mould engaging means, which extend upwardly from the base mould, when the side mould sits on top of the base mould. WO 2011/013078 PCT/IB2010/053426 -21
21. The mould assembly according to claim 18 characterised therein that when the side moulds sit on top of the base mould, the base of the side moulds are level with the top of the rail foot.
22. The mould assembly according to claim 18 wherein the base mould defines a substantially central rail foot well in which molten weld material enters to form the rail foot; at least one down gate well laterally disposed relative to the rail foot well; and side mould engaging means extending upwardly from the base mould and dimensioned to engage complimentarily dimensioned base mould engaging means on the side moulds for supporting the side moulds.
23. The mould assembly according to claim 22 wherein the side mould engaging means are positioned on lateral opposite ends of the base mould, which ends extend beyond the rail foot such that the side moulds sit on top of the lateral opposite ends of the base mould.
24. The mould assembly according to claim 18 wherein the base mould defines two opposed rail receiving profiles on opposite sides of the base mould for snugly receiving the rail ends of the to-be-welded rails.
25. The mould assembly according to claim 22 or claim 24 wherein the rail foot well is defined intermediate the down gate wells, the side mould engaging means, and the rail receiving profiles.
26. The mould assembly according to claim 22 wherein the base mould includes a fracture rib between the rail foot well and each of the down gate wells.
27. The mould assembly according to claim 19 wherein the mould assembly includes a knock-off core which is removably positioned between the two side moulds and centrally above the rail head and which is adapted to receive molten weld material to form a head WO 2011/013078 PCT/IB2010/053426 -22 metal riser section, the mould assembly being dimensioned such that the receiving bowl at least partially overlaps the knock-off core from above, forcing the knock-off core downwardly towards the rail head.
28. The mould assembly according to claim 18 wherein the side moulds define a head rising room in an. upper. part of the side moulds for receiving molten material rising from the inter-rail gap and the down gates.
29. A process for fusion welding rail ends of two adjacent rails according to claim 1 substantially as herein described and exemplified.
30. A mould assembly for use in fusion welding rail ends of two adjacent rails according to claim 18, substantially as herein described and exemplified.
AU2010277203A 2009-07-30 2010-07-28 Process and mould assembly for aluminothermic welding of rails with mould having two side moulds, a base and receiving means Ceased AU2010277203B2 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
ZA200905329 2009-07-30
ZA2009/05329 2009-07-30
PCT/IB2010/053426 WO2011013078A1 (en) 2009-07-30 2010-07-28 Process and mould assembly for aluminothermic welding of rails with mould having two side moulds, a base and receiving means

Publications (2)

Publication Number Publication Date
AU2010277203A1 true AU2010277203A1 (en) 2012-03-15
AU2010277203B2 AU2010277203B2 (en) 2014-08-21

Family

ID=43033519

Family Applications (1)

Application Number Title Priority Date Filing Date
AU2010277203A Ceased AU2010277203B2 (en) 2009-07-30 2010-07-28 Process and mould assembly for aluminothermic welding of rails with mould having two side moulds, a base and receiving means

Country Status (3)

Country Link
AU (1) AU2010277203B2 (en)
WO (1) WO2011013078A1 (en)
ZA (1) ZA201201498B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2701528C2 (en) * 2018-02-16 2019-09-27 Общество с ограниченной ответственностью "ПроТермит" Rail joint, method for creation of rail joint by aluminothermic welding by intermediate casting method and casting mold for aluminothermic welding of rails of rails joint by intermediate casting method

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103203538B (en) * 2012-11-30 2015-12-23 中国十九冶集团有限公司南京分公司 A kind of thermite welding method being applied to the rail of pusher machine/charging car/coke guide/coke-quenching vehicle track
WO2015059628A1 (en) * 2013-10-25 2015-04-30 G D Macrae Process and mould assembly for aluminothermic welding of rails
CN104148800B (en) * 2014-07-28 2016-09-07 苏州市华宁机械制造有限公司 High ferro rail is with three mould end templates
CN114951960A (en) * 2022-05-17 2022-08-30 北京中铁科新材料技术有限公司 Aluminothermic welding sand mould riser and preheating test method

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2860254D1 (en) * 1977-07-08 1981-01-29 Delachaux C Mould for the metallothermic welding of metal workpieces
US5419484A (en) * 1993-04-19 1995-05-30 Radulescu; Stefam R. Apparatus and process for aluminothermic welding
DE19637283C3 (en) 1996-09-13 2003-04-03 Elektro Thermit Gmbh & Co Kg Process for aluminothermic intermediate casting welding of rails with alloying of the steel casting in the rail head area
AT411970B (en) * 2002-04-19 2004-08-26 Huette Klein Reichenbach Gmbh LIGHTWEIGHT COMPONENT, METHOD AND DEVICE FOR THE PRODUCTION THEREOF
FR2901495B1 (en) * 2006-05-29 2008-08-22 Railtech Internat Sa MOLD FOR ALUMINO-THERMAL WELDING OF RAILWAY RAILS, ONE OF WHICH IS AT LEAST USED

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2701528C2 (en) * 2018-02-16 2019-09-27 Общество с ограниченной ответственностью "ПроТермит" Rail joint, method for creation of rail joint by aluminothermic welding by intermediate casting method and casting mold for aluminothermic welding of rails of rails joint by intermediate casting method

Also Published As

Publication number Publication date
AU2010277203B2 (en) 2014-08-21
ZA201201498B (en) 2013-05-29
WO2011013078A1 (en) 2011-02-03

Similar Documents

Publication Publication Date Title
AU2010277203B2 (en) Process and mould assembly for aluminothermic welding of rails with mould having two side moulds, a base and receiving means
AU725419B2 (en) Method and system for welding railroad rails
AU700563B2 (en) Method and system for welding railroad rails
CN101868319B (en) Mould for direct-cast aluminothermic welding
US9163360B2 (en) Method and device for the aluminothermic welding of rails
AU733231B2 (en) Method and system for welding steel rails
AU723162B2 (en) Process for the aluminothermic welding of rails with alloying of the weld metal in the rail head region
US5877468A (en) Method and system for welding railroad rails
RU80459U1 (en) CASTING FORM FOR ALUMINUM TERM WELDING OF RAIL RAILS
JP2004500986A (en) Device for thermite welding of two ends of a rail
US6069333A (en) Method and system for welding railroad rails
JP5176310B2 (en) Rail thermite welding method and long rail
JP3901875B2 (en) Tundish, method for producing rare earth element-containing alloy using the tundish, and apparatus for producing rare earth element-containing alloy having the tundish
CN101151499B (en) Method for removing a molten metal main portion from a metal-meting container through an outflow opening embodied in the bottom surface thereof, a metal-melting container and a flowchart of main operation
WO2015059628A1 (en) Process and mould assembly for aluminothermic welding of rails
US4605053A (en) Art of mold welding
RU2088390C1 (en) Method of aluminothermic welding of rails
RU2349433C2 (en) Method of aluminothermal welding of rails
JPH11245056A (en) Mold for two rails end parts intermediate cast welding
JPH07251276A (en) Method for pouring thermite welding metal
RU2006125392A (en) METHOD FOR WELDING RAIL JOINTS, CRUCIBLE AND CASTING FORM FOR IMPLEMENTATION METHOD, WELDED RAIL JOINT
AU8966398A (en) Immersion nozzle for casting steel strip

Legal Events

Date Code Title Description
PC1 Assignment before grant (sect. 113)

Owner name: ELECTROTHERM (PTY) LIMITED

Free format text: FORMER APPLICANT(S): MACRAE, DONALD

FGA Letters patent sealed or granted (standard patent)
MK14 Patent ceased section 143(a) (annual fees not paid) or expired