AU2005333509B2 - Tunnel barrier - Google Patents

Tunnel barrier Download PDF

Info

Publication number
AU2005333509B2
AU2005333509B2 AU2005333509A AU2005333509A AU2005333509B2 AU 2005333509 B2 AU2005333509 B2 AU 2005333509B2 AU 2005333509 A AU2005333509 A AU 2005333509A AU 2005333509 A AU2005333509 A AU 2005333509A AU 2005333509 B2 AU2005333509 B2 AU 2005333509B2
Authority
AU
Australia
Prior art keywords
tunnel
tunnel barrier
barrier
front wall
void
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
AU2005333509A
Other versions
AU2005333509A1 (en
Inventor
Heinrich Jan Roelofs
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
M2p Engineering Pty Ltd
Original Assignee
M2p Eng Pty Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from AU2005903250A external-priority patent/AU2005903250A0/en
Application filed by M2p Eng Pty Ltd filed Critical M2p Eng Pty Ltd
Priority to AU2005333509A priority Critical patent/AU2005333509B2/en
Priority claimed from PCT/AU2005/001546 external-priority patent/WO2006135951A1/en
Publication of AU2005333509A1 publication Critical patent/AU2005333509A1/en
Application granted granted Critical
Publication of AU2005333509B2 publication Critical patent/AU2005333509B2/en
Assigned to M2P Engineering Pty Ltd reassignment M2P Engineering Pty Ltd Request for Assignment Assignors: TAGFILM PTY LIMITED
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Description

"Tunnel Barrier" Field of the Invention The present invention relates to a barrier suitable for use in a mine tunnel. It has several applications, one of which concerns the blocking of a mine tunnel to 5 restrict airflow and another concerns the filling of a stope void after mining of a stope block has been completed. Background Art Throughout the specification the term "tunnel" shall be taken as including any form of underground passage either natural or man-made with a significant 10 horizontal component which shall be taken as including tunnels, inclines, declines and the like. Also, throughout the specification, unless the context requires otherwise, the word "comprise" or variations such as "comprises" or "comprising", will be understood to imply the inclusion of a stated integer or group of integers but not the exclusion of any other integer or group of integers. 15 There are many occasions in underground mining where it is necessary to seal off a mine tunnel in a temporary basis. One reason for doing this is to provide ventilation control, for example where tunnel routes are changed when a new body of ore is opened. In such applications, it is usual to block the tunnel by building a wall from concrete. When the need for blocking the tunnel has passed, 20 it is then necessary to demolish the wall. Both processes are relatively expensive and time consuming to undertake. Another reason for blocking a tunnel is to control emergency situations, for instance a fire in the mine where it is necessary to quickly prevent the distribution of smoke. In such situations it is often necessary block the tunnel very quickly to be effective. 25 A further need for temporary blocking of a tunnel concerns the filling of a stope void. Underground mining processes are often undertaken by removal of a segment of ore body known as a stope block. A typical stope block might be -2 approximately 100m in length, 20m in width and 60m in height. After mining of one stope block is completed, it is necessary to fill the void created before mining can commence on adjacent ore. In normal operations, the void is filled with one of the following filling means: paste fill, cement aggregate rock fill (CAF) or 5 cement rock fill (CRF). Prior to the filling of a void, it is necessary to seal any tunnels entering the void so that filling material does not travel into and interfere with the tunnel. Again, the sealing of a tunnel for this purpose has usually been achieved by erecting a barrier concrete wall, which sometimes must be demolished 10 immediately after the void is filled. Of course, a concrete wall is not re-usable, as, once erected, it cannot be moved to another location. Disclosure of the Invention Accordingly, the invention resides in a tunnel barrier adapted to seal a tunnel, the tunnel barrier comprising an inflatable bladder having a front wall, a rear wall and 15 a side wall and being adapted to be inflated by a suitable gas, wherein the side wall is adapted to contact the tunnel walls, including the roof and floor to thereby seal the tunnel, the front and rear walls being interconnected by a at least one restraining element which extends through the bladders and serves to connect the front and rear walls at a position located intermediate of the connection of the 20 front and rear walls to the side wall to limit the relative movement of the front and rear walls away from each other. According to a preferred feature of the invention the at least one restraining element comprises at least one flexible, substantially inextensible connection extending between the front wall and rear wall. According to a preferred feature 25 of the invention the at least one restraining element comprises at least one elongate cord-like elements. According to a preferred feature of the invention the at least one restraining element comprises a webbing material.
-3 According to a preferred feature of the invention, the base of the tunnel barrier is substantially square. According to a preferred feature of the invention, the tunnel barrier has a generally cubic shape. 5 According to a preferred feature of the invention, the cross-section of the tunnel barrier through the side walls when inflated substantially conforms to the cross section of the tunnel. According to a preferred feature of the invention in use the tunnel barrier is adapted to seal a tunnel during the partial filling of an adjacent void to prevent fill 10 material from the void entering the tunnel beyond the barrier, whereby, the front wall defines a face of the void. According to a preferred feature of the invention, the tunnel barrier is re-usable. According to a preferred feature of the invention, the tunnel barrier is inflatable via an inflation port in the rear wall, 15 According to a preferred embodiment, the bladder is manufactured from fibre reinforced PVC. According to a preferred embodiment, the bladder is manufactured from a woven polyester 8 x 8.5 incorporating tear stop threads in both directions, PVC coated with acrylic lacquer on the top surface or a similar material. 20 According to a preferred embodiment, the bladder is manufactured from a Panama woven polyester, 12 x 12 PVC coated with Acrylic lacquer on both sides or a similar material. According to a further aspect, the invention resides in a method of temporarily erecting a barrier in a tunnel to thereby seal the tunnel during the partial filling of 25 an adjacent void to prevent void fill material from entering the tunnel beyond the -4 barrier, the method comprising the steps of positioning an inflatable tunnel barrier of the type as previously described in a desired location in a tunnel proximate to the void, and inflating the tunnel barrier to cause the side walls of the barrier to contact and thereby seal the tunnel, whereby the front wall is caused to act as a 5 barrier to said fill material. According to a preferred feature of the invention, the void is filled in a plurality of filling operations wherein in the first filling operation the fill material is added to the void to first level whereafter the fill material is allowed to cure before a subsequent fill operation is undertaken. 10 According to a preferred feature of the invention, the front wall is covered by a layer to prevent fill material from adhering to the front wall. According to a preferred embodiment, the layer comprises a grease-like or wax-like material covering the front wall. According to a preferred embodiment, the layer comprises a sacrificial lining to prevent cured fill material from adhering to the 15 front wall. According to a preferred embodiment, the sacrificial lining comprises a sheet of fabric or plastics material. According to a preferred embodiment, the front wall is protected by a physical barrier capable of withstanding the impact of fill material. The invention will be more fully understood in the light of the following description 20 of two specific embodiments. Brief Description of the Drawings The description is made with reference to the accompanying drawings of which: Figure 1 is an isometric view of a tunnel barrier according to the first embodiment, the tunnel barrier shown in a deflated condition; 25 Figure 2 is an isometric view of a tunnel barrier of Figure 1, the tunnel barrier shown in an inflated condition; -5 Figure 3 is a diagrammatic elevation of an inflated tunnel barrier according to Figure 1; the tunnel barrier being located with a mine tunnel; Figure 4 is an isometric view of a tunnel barrier according to the second embodiment, the tunnel barrier shown in an inflated condition; 5 Figure 5 is a diagrammatic elevation of an inflated tunnel barrier according to Figure 4; the tunnel barrier being located with a mine tunnel; Figure 6 is a diagrammatic elevation view of a mine portion representing two tunnel barriers of Figure 4 in position in a mine, the left barrier being partially inflated and the right barrier being fully inflated; 10 Figure 7 is a diagrammatic elevation view of a mine portion of Figure 6 after fill material has been deposited in the void; Figure 8 is an isometric view of the inflation port of the embodiments showing a venturi air amplifier attached for inflation of the tunnel barrier; Figure 9 is an isometric view of the inflation port of the embodiments showing the 15 standard air supply attached to maintain inflation of the tunnel barrier; Figure 10 is an isometric view of the inflation port of the embodiments showing a venturi air amplifier in detached positioned, prior to attachment for deflation; and Figure 11 is an isometric drawing of the inflation port of the embodiments showing a venturi air amplifier attached for deflation of the tunnel barrier. 20 Detailed Description of Specific Embodiment The embodiments of the invention are directed to an inflatable tunnel barrier adapted to be installed in a mine tunnel. The tunnel barrier when installed is adapted to seal a tunnel.
-6 The first embodiment is described with reference to Figures 1 to 3. The embodiment is a tunnel barrier 11 which comprises an inflatable bladder having a front wall 14, a rear wall 15 and a side wall 16 of flexible, substantially airtight material. Reinforced PVC sheeting has been found to be particularly 5 suitable for this application although other materials will also fulfil the function. One material found particularly suitable comprises a Panama woven polyester, 12 x 12 PVC coated with Acrylic lacquer on both sides. This product is marketed under the trade mark "COMPLAS 300" Fabric. An alternative material is a woven polyester 8 x 8.5 incorporating tear stop threads in both directions, PVC coated 10 with acrylic lacquer on the top surface. This product is marketed under the trade mark "TARPOL". It will be appreciated that a range of such fabrics are available and alternative similar products may also be used. The material can be selected more particularly for the application according to its properties, particularly to provide suitable strength and weight characteristics. 15 The tunnel barrier 11, when inflated as described below, expands to fill a portion of the tunnel with the side wall 16 of the tunnel barrier 11 contacting and pressing against the tunnel walls, including the roof and the floor of the tunnel. The cross section of the tunnel barrier through the side wall is configured when inflated to conform substantially with cross section of the tunnel and has a length 20 comparable to the width of the tunnel. A tunnel barrier for a typical mine has a generally cube shape when inflated with the dimensions of the order of 6m. However, the configuration may be varied where the tunnel profile differs from the typical tunnel mentioned above. Nevertheless, it is necessary that the tunnel barrier must extend along the length of the tunnel sufficiently to ensure adequate 25 sealing and also to provide sufficient stability during inflation. It has been found that attempts to provide a inflatable tunnel barrier of generally spherical shape have been unsuccessful, because of the relatively short length of contact with mine walls and roof. Because of the irregular surface typical of a mine tunnel, it has been found that the tunnel barrier must contact the tunnel walls and roof for a 30 substantial length to provide a seal, as there are portions of the contact area that will not provide sealing. With sufficient length of contact area, the non-contact -7 zones become irrelevant as the required seal is provided by another zone. As well there is another issue which concerns he length of the tunnel barrier. If the tunnel barrier is too short, so that the base is of a rectangular shape with the narrow sides of the rectangle adjacent the tunnel walls, the tunnel barrier may 5 tend to fall either forwardly or rearwardly during inflation, and jam prematurely in an orientation that does not provide proper sealing. This is a particular problem in mines as there is usually a substantial airflow through the mine tunnels for ventilation purposes and the semi-limp character of the tunnel barrier during inflation is very susceptible to being displaced by the moving air during inflation. 10 It has been found that a tunnel barrier with a base of approximately square shape generally provides an optimum configuration. In certain applications the tunnel barrier 11 may be provided with anchor points. The anchor points are typically loops of fabric material used for the wall of tunnel barrier and secured to the wall by adhesive, stitching, welding or a combination of 15 these methods. Anchoring points may be useful for providing support during inflation especially in the event that a draft is present in the tunnel. They may also be used for applying ropes, lines or the like to the bladder to enable precise positioning of the tunnel barrier prior to and during inflation. However, in many applications it is found that anchor points would not be necessary. 20 The rear wall 15 is provided with an inflation port 21 by which a suitable inflating gas, usually air, can be inserted into the bladder for inflating the tunnel barrier 11 or released from the bladder to deflate the tunnel barrier 11. While many conventional styles of inflation ports are possible, the embodiment advantageously utilizes a port 21 comprising an aperture 31 within the bladder 25 wall surrounded by flanged rim 32. The inflation means is shown in more detail in Figures 8 to 11. The aperture 31 has a typical size of about 20 cm diameter. As shown in Figure 9, an air source 33 is adapted to be connected to the flanged rim by the clamping of a cooperating outlet 34 of the air source to the flanged rim 31 by means of a suitable bracket 35. Two types of air supplies are made available. 30 The first, as shown in Figure 9, comprises a conventional regulated supply 33 fed from the distributed air supply within the mine. This supply is used to replace any -8 minor air leakage that may occur as a result of punctures or the like. It provides an air supply regulated to the required pressure but capable of only a modest flow rate. The second air supply makes use of a venturi air amplifier 36 for rapid inflation of the bladder during installation, as shown in Figure 8, or by reversing 5 the assembly, or deflation, upon removal, as shown in Figures 10 and 11. Venturi air amplifiers are available which are connectable to the standard pressurised air supply (approx 100 psi.) 37 which amplify the air flow by a factor in the order of 30 : 1. Such a device is very suitable for the present application as air at only a low pressure is required to inflate the tunnel barrier, but the quantity 10 of air required to be pumped into the bladder is substantial. The venturi air amplifier supplies air in this way, Its use is particularly important where the tunnel barrier is used for an emergency purpose where rapid inflation from a portable air supply such as a small compressor or bottle of compressed gas may be used, where time of inflation may be a vital safety factor, for example, when trying to 15 restrict the spread of smoke in a tunnel and when the air supply mains may not be available. Thus the tunnel barrier is initially inflated by the venturi supply then the regulated supply is connected and the pressure maintained. The venturi air amplifier is adapted to have an inlet flange 38 at both the inlet end and the outlet end 20 In some adaptations of the embodiment, an inflation port is provided in both the front and rear wall. Once installed, an air supply is maintained to the tunnel barrier while it is erected. This supply is only required to supply leakage from the bladder which is normally virtually non-existent. However the supply ensures that the tunnel barrier will 25 remain inflated even if punctured inadvertently. As mentioned above, in use, the tunnel barrier requires inflation to only a very low pressure in the vicinity of 4 to 20 kpa (0.5 to 2.5 psi) the pressure may depend upon the material being used. This pressure is too low for the tunnel barrier to be regarded as a pressure vessel, and thus it is not necessary to address the safety issues that inure to such devices.
-9 This low pressure does cause the front wall and rear wall to bow out, somewhat, typically in the order of 0.5 to 1 metre for a 6 metre cube. This bowing out is not a matter of concern for the device for normal sealing uses. The tunnel barrier of the embodiment has several advantages. It is light in weight 5 (typically less than 200 kg) and can be stored in its deflated form as a compact package. It is therefore easy to transport to the location required for use. This is especially important in an emergency. It is easy too erect by inflation from normally available air supplies and can be deflated and stored for reuse when its use has finished. Its cost is relatively low and installation costs are very low. The 10 use of the venturi port enables very rapid inflation. Once inflated, the large area of contact, even though only at very low pressure ensures that the tunnel barrier is held in place very securely and provides a positive seal to the tunnel. The second embodiment is directed to a tunnel barrier adapted to seal a tunnel during the partial filling of an adjacent void to prevent void fill material from 15 entering the tunnel beyond the barrier. The embodiment is described with reference to Figures 4 to 7. The second embodiment is similar to the first embodiment and so in the drawings like numerals are used to depict like parts. The second embodiment is constructed from similar material to that of the first embodiment. 20 The tunnel barrier 11 of the second embodiment, has a rear wall 15 and a front wall 14 and a side wall 16 which includes the roof and the floor. An inflation port is provide in the rear wall, but not in the front wall. The tunnel barrier of the second embodiment 11 is particularly directed to being used as a barrier wall in a tunnel and is erected prior to the filling of a void 22 as described above. In such 25 an application, the tunnel barrier is positioned to have the front wall approximately 5 metres from the commencement of the void 22, as depicted in Figures 3 and 4. This is standard practice with existing barrier walls for safety reasons, - 10 Again, in use, the tunnel barrier requires inflation to only a very low pressure in the vicinity of 4 to 20 kpa (0.5 to 2.5 psi) the pressure may depend upon the fill material being used. For highly viscous materials such as paste fill, the pressure required is very low. Because of the properties of the paste fill, when the fill is 5 inserted into the void, it flows only as an ooze and solidifies relatively quickly. The amount of fill input in the first filling stage is to a level only just above the level of the tunnel, the pressure to be resisted is small and thus low inflation and pressure is quite satisfactory for the application. For less viscous fill materials, a higher pressure may be needed. Nevertheless, the pressures are still sufficiently 10 low as to have no significant safety issues associated with them. In general it is a characteristic of the fill materials used that they will tend to adhere to the surface of most materials. Therefore, in use, the front wall of the tunnel barrier is usually covered with a layer to prevent such sticking. In certain applications, it may be practical to use a grease-like or wax-like layer for this 15 purpose but usually the layer comprises a sacrificial layer of fabric, cloth or plastics sheet. When a layer of this type is used it will adhere to the surface of the fill material but will prevent the fill material from actually contacting the front wall 14 of the tunnel barrier 11. When the tunnel barrier is removed after use, the sacrificial layer will remain attached to the cured fill material. This is of no 20 consequence as the sacrificial layer comprises an inexpensive material. In this way, the tunnel barrier of the embodiment is easily removed after use in a way that leaves it capable of re-use. This is in contrast to existing concrete barrier walls which cannot be reused. Where certain types of fill are being used to fill the void, it may be necessary to 25 also provide a barricade between the tunnel barrier and the fill material which provides physical protection to the front wall of the tunnel barrier. This may be necessary particularly when rock fill is used to prevent a rock ricocheting into the front wall in a way which will puncture it. A suitable barrier is a panel of steel, chipboard or plywood mounted across the tunnel. The panel 25 can be 30 assembled from a plurality of sub-panels in a way which can be disassembled easily after use for re-use. The panel needs only to be held in place during - 11 erection of the inflatable tunnel barrier and to prevent the panel falling forward of the tunnel barrier prior to or during the initial stages of filling of the void. It is desirable that the panel can move rearwardly a small extent relative to the tunnel barrier to thereby be supported by the tunnel barrier during impact by a rock so 5 that the shock loading can be transmitted to some degree into the inflated tunnel barrier. Where such a panel 25 is used, it will be appreciated that it is appropriate to apply an appropriate non-stick layer to prevent the adherence of the fill material between the fill material and the panel 25. 10 The second embodiment is directed a particular use wherein the bowing out of the front wall has some significance. Because the rockfill face in the tunnel will take the profile of front wall 14 of the tunnel barrier where no barricade is provided, it is desirable to restrict the bowing of the front face to a reasonable degree. Therefore the tunnel barrier of the second embodiment further 15 comprises a plurality of restraining straps 26 extending internally within the tunnel barrier. The restraining straps are formed from substantially inextensible material, typically webbing of the type used for motor vehicle seat belts or similar. The restraining straps are installed internally within the tunnel barrier and sewn to the front and rear wall during construction. When the tunnel barrier is inflated, the 20 tension is applied to the restraining straps to restrict the extent to which the front and rear panels can bow out. It should be appreciated that the scope of the present invention need not be limited to the particular scope of the embodiment described above. All such adaptations are intended to be included within the scope of the invention. 25

Claims (27)

1. A tunnel barrier adapted to seal a mine tunnel, the tunnel barrier comprising an inflatable bladder having a front wall, a rear wall and a side wall and being adapted to be inflated by a suitable gas, wherein the side wall is adapted to 5 contact the tunnel walls, including the roof and floor to thereby seal the tunnel, the front and rear walls being interconnected by at least one restraining element which extends through the bladders and serves to connect the front and rear walls at a position located intermediate of the connection of the front and rear walls to the side wall to limit the relative movement of the front and rear walls 10 away from each other.
2. A tunnel barrier as claimed at claim 1 wherein the at least onerestraining element comprises at least one flexible, substantially inextensible connection extending between the front wall and rear wall.
3. A tunnel barrier as claimed at claim 2 wherein the aty least one restraining 15 element comprises at least one elongate cord-like elements.
4. A tunnel barrier as claimed at claim 2 or 3 wherein the at least one restraining element comprises a webbing material.
5. A tunnel barrier as claimed at any one of the preceding claims wherein the base of the tunnel barrier is substantially square. 20
6. A tunnel barrier as claimed at claim 5 wherein the tunnel barrier has a generally cubic shape when inflated.
7. A tunnel barrier as claimed at any one of the previous claims wherein the cross-section of the tunnel barrier when inflated conforms to the cross-section of the tunnel to thereby seal the tunnel. - 13
8. A tunnel barrier as claimed at any one of the previous claims wherein the tunnel barrier is re-usable.
9. A tunnel barrier as claimed at any one of the previous claims wherein the bladder is manufactured from fibre-reinforced polyvinylchloride. 5
10. A tunnel barrier as claimed at any one of the previous claims wherein the bladder is manufactured from a woven polyester 8 x 8.5 incorporating tear stop threads in both directions, PVC coated with acrylic lacquer on the top surface or a similar material.
11. A tunnel barrier as claimed at any one of claims 1 to 8 wherein the bladder 10 is manufactured from a Panama woven polyester, 12 x 12 PVC coated with Acrylic lacquer on both sides or a similar material.
12. A tunnel barrier as claimed at any one of the previous claims wherein the tunnel barrier is inflatable via an inflation port in the rear wall.
13. A tunnel barrier as claimed at any one of the previous claims wherein the 15 tunnel barrier is inflatable via an inflation port in the front wall.
14. A tunnel barrier as claimed at either of claims 12 or 13 wherein the inflation port comprises a rimmed aperture in the wall of the bladder, the rimmed aperture being in use intended to be connected to a forced air supply,
15. A tunnel barrier as claimed at any one of the previous claims wherein in use 20 the tunnel barrier is adapted to seal a tunnel during the partial filling of an adjacent void to prevent fill material from the void entering the tunnel beyond the barrier, whereby, the front wall defines a face of the void.
16. A tunnel barrier as claimed at claim 15 wherein the front wall is covered by a layer to prevent fill material from adhering to the front wall. - 14
17. A tunnel barrier as claimed at claim 16 wherein the layer comprises a grease-like or wax-like material covering the front wall.
18. A tunnel barrier as claimed at claim 16 wherein the layer comprises a sacrificial lining to prevent cured fill material from adhering to the front wall. 5
19. A tunnel barrier as claimed at claim 18 wherein the sacrificial lining comprises a sheet of fabric or plastics material.
20. A tunnel barrier as claimed at any one of claims 16 to 19 wherein the front wall is protected by a physical barrier capable of withstanding the impact of fill material. 10
21. A tunnel barrier substantially as herein described with reference to the accompanying drawings
22. A method of sealing a tunnel during the partial filling of an adjacent void to prevent fill material from entering the tunnel beyond the barrier, the method comprising the steps of positioning an inflatable tunnel barrier as claimed at any 15 one of claims 1 to 21 in a desired location in a tunnel proximate to the void, and inflating the tunnel barrier to cause the side walls of the barrier to contact and thereby seal the tunnel, whereby the front wall is caused to act as a barrier to said fill material during partial filling of the void.
23. A method of sealing a tunnel as claimed at claim 22 wherein the void is 20 filled in a plurality of filling operations wherein in the first filling operation the fill material comprises a settable composition and the fill is added to the void to a first level and the fill material is allowed to cure before a subsequent fill operation is undertaken.
24. A method of sealing a tunnel as claimed at claim 22 or claim 23 wherein a 25 non-stick layer is applied over the front wall prior to filling of the void to prevent fill material from adhering to the front wail. - 15
25. A method of sealing a tunnel as claimed at any one of claims 22 to 23 wherein a sacrificial lining is placed over the front of the front wall to prevent cured fill material from adhering to the front wall.
26. A method of sealing a tunnel as claimed at any one of claims 22 or 23 5 wherein the method further comprises the step of installing a physical barrier in front of the front wall to protect the front wall from the impact by the fill material.
27. A method of sealing a tunnel substantially as herein described with reference to the accompanying drawings.
AU2005333509A 2005-06-21 2005-10-07 Tunnel barrier Active AU2005333509B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
AU2005333509A AU2005333509B2 (en) 2005-06-21 2005-10-07 Tunnel barrier

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
AU2005903250 2005-06-21
AU2005903250A AU2005903250A0 (en) 2005-06-21 Tunnel Barrier
PCT/AU2005/001546 WO2006135951A1 (en) 2005-06-21 2005-10-07 Tunnel barrier
AU2005333509A AU2005333509B2 (en) 2005-06-21 2005-10-07 Tunnel barrier

Publications (2)

Publication Number Publication Date
AU2005333509A1 AU2005333509A1 (en) 2006-12-28
AU2005333509B2 true AU2005333509B2 (en) 2009-12-10

Family

ID=38961280

Family Applications (1)

Application Number Title Priority Date Filing Date
AU2005333509A Active AU2005333509B2 (en) 2005-06-21 2005-10-07 Tunnel barrier

Country Status (1)

Country Link
AU (1) AU2005333509B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
PL243241B1 (en) * 2018-03-02 2023-07-24 Hyper Poland Spolka Z Ograniczona Odpowiedzialnoscia Lock with pneumatic diaphragm for the vacuum railway system
CN113914930B (en) * 2021-10-29 2024-04-05 成都未来智隧科技有限公司 Tunnel smoke and dust treatment facility and system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4036024A (en) * 1974-06-12 1977-07-19 Bergwerksverband Gmbh Device for closing off a mine gallery especially for use to prevent spreading of underground explosions
US4072015A (en) * 1976-12-30 1978-02-07 The United States Of America As Represented By The Secretary Of The Interior Borehole aerostatic ground support system
US5469920A (en) * 1993-11-08 1995-11-28 The United States Of America As Represented By The Secretary Of The Interior Inflatable partition for fighting mine fires
US6779601B2 (en) * 2002-01-16 2004-08-24 Weatherford/Lamb, Inc. Inflatable packing element

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4036024A (en) * 1974-06-12 1977-07-19 Bergwerksverband Gmbh Device for closing off a mine gallery especially for use to prevent spreading of underground explosions
US4072015A (en) * 1976-12-30 1978-02-07 The United States Of America As Represented By The Secretary Of The Interior Borehole aerostatic ground support system
US5469920A (en) * 1993-11-08 1995-11-28 The United States Of America As Represented By The Secretary Of The Interior Inflatable partition for fighting mine fires
US6779601B2 (en) * 2002-01-16 2004-08-24 Weatherford/Lamb, Inc. Inflatable packing element

Also Published As

Publication number Publication date
AU2005333509A1 (en) 2006-12-28

Similar Documents

Publication Publication Date Title
CA2612553C (en) Tunnel barrier
US8424973B2 (en) Collapsible cushion
US8851804B2 (en) Pumpable support with cladding
JPH03501830A (en) Improved manufacturing method for expandable products
US20150011147A1 (en) Inflatable ventilation life curtain
AU2005333509B2 (en) Tunnel barrier
WO1991006746A1 (en) A method of sealing an opening
CN111119998A (en) Underwater tunnel prevents gushing water installation fast
AU2005333890B2 (en) Shaft plugging system
US6547492B1 (en) Inflatable mine support
JP3818985B2 (en) Blasting protection device and method of use
US9440174B2 (en) Silica reduction cover
CN104775850A (en) Downhole rapid expansion sealing wall
CA2690233A1 (en) Drift saver
GB2322653A (en) Ventilation seals and stoppings
US20100144264A1 (en) Underground mine ventilation curtain or barrier
WO1998046859A1 (en) Device for sealing an opening
CN211737212U (en) Underwater tunnel prevents gushing water installation fast
CN212250147U (en) Mining quick airtight capsule device
CN211975058U (en) Mining air bag type quick closing device
CN217462259U (en) Water-bursting sand-bursting blocking escape-assisting device
AU744219B2 (en) Device for sealing an opening
WO2003085234A1 (en) Inflatable mine support pack
JPH10220166A (en) Fall prevention equipment for face ground
CN111365074A (en) Mining rapid capsule sealing device and using method

Legal Events

Date Code Title Description
FGA Letters patent sealed or granted (standard patent)
PC Assignment registered

Owner name: M2P ENGINEERING PTY LTD

Free format text: FORMER OWNER(S): TAGFILM PTY LIMITED