Prior art keywords
footing
mould
fence
concrete
opening
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
AU2004208695A
Other versions
AU2004208695A1 (en
Inventor
Guido Calkoen
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BROOKWAY PTY Ltd
Original Assignee
BROOKWAY Pty Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from AU2003904843A external-priority patent/AU2003904843A0/en
Application filed by BROOKWAY Pty Ltd filed Critical BROOKWAY Pty Ltd
Priority to AU2004208695A priority Critical patent/AU2004208695B2/en
Publication of AU2004208695A1 publication Critical patent/AU2004208695A1/en
Priority to AU2006225199A priority patent/AU2006225199A1/en
Priority to AU2006100837A priority patent/AU2006100837B4/en
Application granted granted Critical
Publication of AU2004208695B2 publication Critical patent/AU2004208695B2/en
Priority to AU2010201241A priority patent/AU2010201241A1/en
Ceased legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Fencing (AREA)

Description

AUSTRALIA
Patents Act 1990 COMPLETE SPECIFICATION Invention Title: IMPROVEMENTS IN TEMPORARY FENCING The invention is described in the following statement: IMPROVEMENTS IN TEMPORARY FENCING FIELD OF THE INVENTION The invention relates to temporary fences, barriers and the like, and particularly to footings for such structures.
BACKGROUND
A common requirement is to erect a temporary structure such as an elongate fence or barrier. For example, temporary fencing is often erected to provide access control at building sites for both security and safety, or to places where events are taking place so that admission charges to the events can be made and the general public excluded from them. Such applications are typified by a requirement that the fencing or barrier be quick, safe and inexpensive to erect, reasonably difficult to breach, overturn or move without authorization, and quick, safeand inexpensive to remove when their purpose has been served.
Other typical requirements are ease of handling and storage of fence or barrier components when they are not in use.
A typical form of temporary fence includes footings (anchoring weights) and fence modules. An often-encountered type of fencing module consists of uprights at each of two ends, horizontal members secured to the uprights and extending between them, and a wire mesh panel secured to the uprights and horizontal members. The uprights and horizontal members are typically formed of steel tubing. Footings used with such modules consist of substantial components (formed of cast concrete, iron or steel, or less commonly consisting of a container that can be filled with water to add weight), having one or two sockets for receiving uprights of two fence modules in close proximity to each other. An erected fence then includes of,a row of fence modules placed end to end, with lower ends of the adjoining uprights of each pair of adjacent modules received in the socket (or sockets) of a footing placed on the ground (or some other supporting surface). The members of each pair of adjoining uprights are secured together at one or more locations above their associated weight, by for example loops of wire or suitable brackets. For adequate stability of the completed fence against overturning, the footings are often made elongate in a direction that on completion of the fence is at least approximately perpendicular to the direction of the fence.
06/04/2007 13:50 +613-9699-9886 D SHANKS ASSOCS PAGE 05/22 2
O
O Footings as described above may be used with other types of fence or a barrier.
Erection and dismantling of temporary fences and barriers of the above o types involves the lifting of substantial weights, namely the fence or barrier modules and the footings themselves, and are not always suited to the use of mechanical aids, such as cranes. Handling of the modules and footings at 0storage depots also involves much lifting. A problem with this is unwillingness
LO
OO by many workers to lift substantial weights, and the danger of injury (eg to 0workers' backs) that the lifting presents. The results are often manifest as low o 10 productivity and higher costs. The anchoring footings in particular must be of o substantial weight to do what is required of them and must be lowered to ground level, positioned to receive the fence or barrier modules, and later lifted from ground level to a vehicle's load-carrying surface.
The present invention alleviates these problems by providing multi-part footings whose parts are individually lighter than that of the completed footing.
The invention further provides for easy assembly of the footings from their several parts, so that little if any time is lost in the assembly process.
Similarly disassembly is achieved in a simple way with little or no loss of time.
SUMMARY OF THE INVENTION In a first aspect, the invention provides a footing for use in temporary fencing said footing including first and second elongate footing components and wherein: each footing component has an opening adapted to receive at least one depending part of a fence module, and is positionable in contact with the other footing component with the respective openings of said footing components aligned with each other so that said at least one depending part can extend through the opening of one footing component and into the opening of the other footing component; and a said footing component includes a mould containing concrete an outer surface of said mould defining a portion only of an outer surface of that footing component.
It is preferred that said first and second footing components are of substantially equal weight, to ease the manual work involved in assembling footings according to the invention.
COMS ID No: SBMI-06914231 Received by IP Australia: Time 12:45 Date 2007-04-06 06/04/2007 13:50 +513-9S99-9086 D SHANKS ASSOCS PAGE 06/22 3 o Preferably, the mould includes a vessel with a mould opening for placement of said concrete into said mould. It is further preferred that: said mould opening is surrounded by a peripheral edge; 2 5 said peripheral edge lies in a plane; and ~concrete in the mould has an external surface that lies in the plane and is surrounded by said edge.
It is particularly preferred that that portion of said footing component IND defined by the outer surface of said mould is shaped to cooperatingly engage o the other footing component at lengthwise positions remote from the openings so as to limit relative rotation of the two footing components. The importance o of this is that the two footing components both move together so as to avoid deformation of footing component parts as described below.
In one embodiment: the mould includes a main portion having a further opening and a separate insert portion that is received in and that closes said further opening; said insert portion is retained in said further opening by concrete in the mould; and said insert portion is shaped to define a projection on the footing component including the mould that is received in a cooperating recess in the other footing componen t in use of the footing.
Said projection may extends outwardly of a planar surface that in use of the footing abuts a planar surface of the other footing component.
Preferably, said at least one footing component includes a reinforcing element within said concrete.
The said opening of a said footing component including a mould may be an opening formed in a footing part separate from said mould and that is partially outside said outer surface of said mould.
Said footing part may extend through said mould and be secured within said concrete.
The said opening of each footing component may be adapted to receive therein in addition to a depending part of a first fence module a depending part of a second fence module adjoining said first fence module.
In one embodiment, described herein, in use of the footing on a flat surface said first and second footing components lie on said flat surface.
COMS ID No: SBMI-06914231 Received by 113 Australia: Time 12:45 Date 2007-04-06 06/04/2007 13:50 +613-9599-9886 D SHANKS ASSOCS PAGE 07/22 4 0 o It is preferred that each of said first and second footing components includes a mould and wherein in use of said footing said moulds lie alongside each other.
Conveniently, the or each said mould may include a plastics material.
Preferably, each footing component includes a mould containing concrete an outer surface of said mould defining a portion only of an outer surface of the footing component in which the mould is included.
NMore preferably: 00 o each footing component includes a mould containing concrete an outer 10 surface of said mould defining a portion only of an outer surface of the footing 0 ocomponent in which the mould is included; and the moulds are identical to each other.
In a further aspect, the invention provides a temporary fence including: a plurality of fence modules each having first and second ends and at each said end a depending part; and a plurality of footings as described herein, wherein said fence modules are arranged end-to-end and secured to each other and wherein received in said openings of said first and second footing components of each said footing is a said depending part of at least one said fence module.
In a still further aspect, the invention provides a method for erecting a temporary fence including the steps of: providing a plurality of fence modules each having first and second ends and at each said end a depending part; assembling a plurality of footings as described herein by positioning the first and second footing components of each said footing so that said footing components' respective openings are aligned with each other; placing into said openings of said first and second footing components of each said footing a said depending part of at least one said fence module; and securing each fence module to at least one other of said fence modules so that said fence modules are arranged end-to-end.
COMS ID No: SBMI-06914231 Received by IP Australia: Time 12:45 Date 2007-04-06 06/04/2007 13:50 +613-9699-9886 D SHANKS ASSOCS PAGE 08/22
O
o. In yet a further aspect, the invention provides a method for erecting a Ntemporary fence including the steps of: providing a plurality of fence modules each having first and second ends and at each said end a depending part; providing a plurality of footings adapted for use with said fence modules including at least one footing as described herein, and where in particular two fence module depending parts can pass through each IN footing component opening, assembled by positioning In abutment with oeach other said first and second footing components thereof so that their respective openings are aligned with each other; and o supporting said fence modules in end-to-end configuration on said footings, including by placement into said openings of said first and second footing components of the or at least one said footing depending parts of two adjoining said fence modules.
Also within the scope of the invention is a mould adapted for use in footings as described herein.
More particularly there is provided a mould for a footing for use in temporary fencing as described herein including an elongate shell having an opening so as to form when inverted a vessel adapted to receive settable concrete through the opening.
Said opening may be substantially rectangular and elongate in a direction that is lengthwise in the said footing.
The mould may have means for supporting in said mould a reinforcing bar so that said reinforcing bar while settable concrete is placed in the mould.
Preferred embodiments of the invention will now be non-limitingly described by reference to the attached Figures, of which: Figure 1 is a side elevation of a part of a temporary fence according to the invention; Figure 2 is a perspective view of a part of the fence shown in Figure 1, being that part indicated in Figure 1 at Figure 3 is a bottom view of a half mould for use in making a footing according to the invention (where "bottom" refers to the bottom of the half mould when it is in use for moulding footing halves); COMS ID No: SBMI-06914231 Received by IP Australia: Time 12:45 Date 2007-04-06 06/04/2007 13:50 +613-9699-9886 D SHANKS ASSOCS PAGE 09/22 0 o Figure 4 is a side elevation of the half mould shown in Figure 3; cFigure 5 is an end elevation of the half mould shown in Figure 3; SFigure 6 is a plan view of the half mould shown in Figure 3; Figure 7 is a cross-sectional view of the half mould shown in Figure 6, taken at Station "BB" and excluding all detail beyond Station "CC"; Figure 8 is a cross-sectional view of the half mould shown in Figure 6, t l n taken at Station "DD"; -1 Figure 9 is an end elevation of a former for use in making a footing Saccording to the invention; 10 Figure 10 is a plan view of the former shown in Figure 9; o Figure 11 is a side view of the former shown in Figure 9: Figure 12 Is a plan view of a sleeve assembly being a part of a footing according to the invention; Figure 13 is a side view of the sleeve assembly shown in Figure 12; Figure 14 is a plan view of a mould assembly prepared for making a pair of co-operating footing halves according to the invention; COMS ID No: SBMI-06914231 Received by IP Australia: Time 12:45 Date 2007-04-06 Figure 15 is a cross-sectional view through the prepared mould assembly shown in Figure 14, the cross-section being taken at station "EE" of Figure 14 and excluding all detail beyond station "FF"; Figure 16 is a perspective view of two footing halves according to the invention; Figure 17 is a perspective view of a further footing according to the invention; Figure 18 is a perspective view of a footing half of the footing shown in Figure 17; Figure 19 is a side view (partially cut away) of two halves of the footing shown in Figure 17, positioned for assembly of that footing; Figure 20 is a side view (partially cut away) of the footing shown in Figure 17.
DETAILED DESCRIPTION OF PREFERRED EMBODIMENTS The preferred embodiment of the invention will be described by reference to a temporary fence 1, but it is to be understood that the invention is also applicable to other types of fences barriers and similar temporary structures.
Referring to Figure 1, fence 1 includes a plurality of fence modules 2 arranged end-to-end. Each fence module 2 has a stile 3 at its left end and a stile 4 at its right end (in both cases as seen in Figure upper and lower horizontal members 5, 6 respectively, and a panel 7 of wire netting secured to the stiles 3, 4 and to the members 5, 6. At each junction between adjacent fence modules 2, a footing 8 is provided to support the fence 1 on the ground or other surface 9.
Footing 8, as shown in Figure 2, includes two footing halves 10, 11 which are secured together in a manner disclosed below. Footing 8 has a slot 12 transverse to its length and in which are received depending lower ends 13 and 14 of adjoining stiles 4 and 3 respectively.
Footing halves 10 and 11 are each of substantially the same weight, so that footing 8 when assembled has twice the weight of either footing half 10 or 11.
Footing 8 is elongate, as shown in Figure 2, for stability of the assembled fence 1.
To assemble fence 1, pairs of footing halves 10 and 11 are placed in abutting and co-operating relationship with each other on the ground or other surface 9, as shown in Figure 2, with successive pairs being spaced apart by about the length of each fence module 2. There is no need for lifting of the full weight of a footing 8. At this stage, the two halves 10 and 11 of each intended footing 8, although abutting each other, are not finally secured together. Next, each fence module 2 is positioned over two successive footings 8, and each of its stiles 3 and 4 is entered into the slot 12 of one of the two successive footings 8.
Since the fence modules 2 are arranged end-to-end, the result of this step is that each slot 12 receives the lower end 13 of a right-end stile 4 and the lower end 14 of a left-end stile 3. In a manner described below, the act of placing the lower ends 13 and 14 of adjoining stiles 3 and 4 in slot 12 of each footing 8 causes its two halves 10 and 11 to be locked together, thus becoming effectively a single assembly, i.e. footing 8. Downward movement of the lower ends 13 and 14 of the stiles 3 and 4 is limited by the lower horizontal bars or members 6 engaging with the top surface of the footings 8.
To complete erection of the fence 1, each fence module 2 is preferably joined to its adjoining module(s) 2 above the level of footings 8. For example, suitable brackets or clamps (not shown) may be provided to secure adjacent stiles 3 and 4 of adjoining modules 2 together or they may simply be bound together with lengths of wire (not shown) looped around them. Joining of the modules 2 above footings 8 is not of the essence of the invention, and any suitable method may be used, many suitable methods being known in the art.
Slot 12 of each footing 8 allows a degree of rotation of the stile lower ends 13 and 14 received therein, so that the fence 1 is not required to be straight. The lower ends 13 and 14 are held close together in slot 12 without any substantial gap, so that fence 1 is accordingly more difficult to breach.
When the fence 1 is to be disassembled, each module 2 is disconnected from its neighbouring module(s) 2 and is then simply lifted out of the slots 12 of its associated two footings 8. As described below, this act renders the two halves and 11 of each footing 8 separable from each other, so that the halves 10 and 11 can be pulled apart and then handled separately, again without any need to lift the full weight of a footing 8 at any one time.
Figure 16 shows footing halves 10 and 11 separate from each other as they would be prior to being abutted (as shown in Figure 2) when assembling footing 8. When halves 10 and 11 are aligned with their lengths parallel to each other and brought into co-operating engagement with each other, a tapered projection 70 on footing half 10 enters a co-operating recess 81 in a face 76 of footing half 11 and a tapered projection 71 on footing half 11 enters a cooperating recess 80 in a face 75 of footing half 10. In addition, a sleeve 72 partly protruding from footing half 10 enters a co-operating slot 86 in footing half 11 and a sleeve 73 partly protruding from footing half 11 enters a co-operating slot 85 in footing half 10. Sleeve 72 defines an open-topped and open-bottomed internal space 87 and sleeve 73 defines an open-topped and open-bottomed internal space 88. When footing halves 10 and 11 are pushed fully into engagement with each other, faces 75 and 76 come into contact with each other, and sleeve 72 is positioned directly above sleeve 73, so that spaces 87 and 88 in combination define the slot 12 of assembled footing 8. Slot 12 has a depth of not less than the combined heights of sleeves 72 and 73.
Openings 87 and 88, and therefore slot 12, are sized and shaped to receive two stiles 3 and 4 side by side (with a suitable amount of clearance for ease of assembly). Since sleeves 72 and 73 are themselves parts of footing halves 10 and 11 respectively, the effect of placing stiles 3 and 4 in slot 12 of footing 8 is that the footing halves 10 and 11 become locked together until stiles 3 and 4 are withdrawn from slot 12, because sleeves 72 and 73 surround both stiles 3 and 4. The effect of projections 70 and 71 respectively being received in recesses 81 and 80 is to improve the locking together of halves 10 and 11, and in particular to help limit any relative rotation of footing halves 10 and 11 in a vertical plane, which would tend to deform sleeves 72 and 73..
Halves 10 and 11 are cut away at each of their ends to form convenient lifting handles 77.
There will now be described a preferred embodiment of footing 8.
Conveniently, the two halves 10 and 11 of footing 8 can be made by casting concrete (not shown) in a mould assembly 100 shown in Figures 14 and Mould assembly 100 includes two identical mould halves 20 and 21 that respectively correspond to footing halves 10 and 11, two identical formers 40 and 41 and two identical sleeve assemblies 60 and 61. Figures 3 8 show mould half casing 20, and figures 9 11 show former 40, and Figures 12 and 13 show sleeve assembly Mould halves 20 and 21 and formers 40 and 41 are preferably but not essentially formed as unitary injection mouldings in a suitable plastic such as polypropylene. Sleeve assemblies 60 and 61 are preferably fabricated using a metal such as steel.
Referring to Figures 3 8, mould halves 20 and 21 will be described using mould half 20 as representative of both. Relevant item numbers when followed by an are to be taken to refer to mould half 21. Mould half 20 has a base and upstanding therefrom sidewalls 91 and 92 and endwalls 93. Endwalls 93 are shaped to form external ribs 94 that in the completed footing half 10 become handles 77. Wall 92 is shaped to define an external slot Extending inwards from walls 91 and 92 are ribs 95 with edge stiffeners 96. Between edge stiffeners 96 there are defined slots 97. Note that a web 112 is left in a lower part of each slot 97. Those ribs 95 that extend inwardly from wall 91 have shaped cut-outs 98 as shown in Figure 7.
Wall 92 has two rectangular openings 99 formed in it (between pairs of ribs and, within slot 85, two slot-type openings 101.
Formers 40 and 41 are identical and will now be described by reference to former 40. Relevant item numbers when followed by an are to be taken to refer to former 41. Former 40 can be positioned and retained in one of the openings 99 of mould half 20, and defines the boundary of projection 70. Former has a flange 102, a bathtub-shaped hollow formation 103 and a stiffening formation 104 that allows concrete to flow into a space 105 inside formation 103.
When former 40 is positioned in opening 99, flange 102 lies internally of mould half 20 and against wall 92, with formation 103 extending externally of mould half 20. Two of ribs 95 are provided with formations 106 that bear on flange 102 to hold former 40 in place during placement of concrete in mould half Formations 106 permit "snap fitting" of former 40 into position in opening 99.
Sleeve assemblies 60 and 61 will be described by reference to sleeve assembly 60 only which is identical to sleeve assembly 61. Relevant item numbers in this paragraph by an are to be taken to refer to sleeve assembly- 61. Referring to Figures 12 and 13, sleeve assembly 60 includes a sleeve 72, open at both ends and defining internal space 87, and a tab 110 welded to sleeve 72. Sleeve 72 is shaped so that two stile lower ends 13 and 14 can be neatly received therein, as shown in Figure 12 by dotted lines. Tab 110 has a slot 111 extending parallel to the direction between the open ends of sleeve 72, as shown in Figure 13.
Referring now to Figures 14 and 15, mould assembly 100 is shown fully prepared for pouring of concrete into mould halves 20 and 21 to make footing halves 10 and 11 respectively. Mould halves 20 and 21 are abutted with their respective walls 92and 92a in contact (or at least closely adjacent to each other).
Former 40 is located and retained within an opening 99 of wall 92 of mould half with its formation 103 extending through the adjacent opening 99a of mould half 21 and into the interior of mould half 21. Former 41 shown in Figure 14 is oppositely positioned, being retained in mould half 21 and extending into the interior of mould half 20 through the second opening 99 of mould half Sleeve members 60 and 61 are positioned one above the other in slots and 85. Tab 110 of sleeve member 60 extends through slot 101 into mould half 20, and tab 1 Oa of sleeve member 61 extends through slot 101a into mould half 21. Slots 111 and l1 la are then in alignment with slots 97 and 97a as best seen in Figure 15. To positively retain sleeve assemblies 60 and 61 in mould halves 20 and 21 respectively, and also to reinforce completed footing halves and 11, reinforcing bars 120 and 121 are placed in slots 97 and 97a and extend longitudinally along mould halves 20 and 21 as shown in Figure 14. For further reinforcement of completed footing halves 10 and 11, a reinforcing bar 122 is placed in cut-outs 98 of mould half 20, and a reinforcing bar 123 is placed in slot 97a, being supported horizontally there during casting by webs 112a. Webs 112 support reinforcing bar 120 and ribs 95 support reinforcing bar 122 horizontally during casting. Reinforcing bar 121 is preferably supported in a horizontal position during casting by suitable spacers (not shown) placed and extending between reinforcing bars 123 and 121.
Preferably, a suitably shaped plug (not shown) is threaded through both sleeves 72 and 73 during casting of the concrete. Sufficient concrete is used to fill the mould halves to about the level indicated by line 130 in Figure 15. Once casting is complete, the plug may be removed and the two completed footing halves 10 and 11 separated.
Alternatively, the two mould halves 20 and 21 may be kept separate during casting. Assuming mould half 21 is supported on a horizontal surface during casting, it is in this case desirable to support sleeve 73 at its correct height until some setting of the concrete occurs.
Whether moulding is done with the mould halves 20 and 21 locked together or not, mould halves 20 and 21 and formers 40 and 41 are not separated from the concrete after setting. Instead, they are left in place to form an external skin that is captive on the completed footing halves 10 and 11, (except on their bottom surfaces). Thus, ribs 94 and 94a of the mould halves 20 and 21 become pleasant-to-grip external coverings for handles 77.
A further embodiment of the invention will now be described. A disadvantage of footing 8 is that its footing halves 10 and 11 are not identical.
Although procedures used by temporary fencing contractors are such that this is not necessarily a disadvantage in practice, it is in possible with the invention to provide a footing 200 having two halves 201 and 202 that are identical. Figure 17 shows such a footing 200 and Figure 18 shows one of its halves, namely footing half 201. Figure 19 is a side view of footing halves 201 and 202 positioned ready for locking together. In the following description, item numbers followed by the letter are for parts of footing 202 corresponding to similar parts of footing 201.
Footing 202 is lowered onto footing 201 until hooks 203 and 203a enter recesses 204a and 204 respectively. Then footings 201 and 202 are moved longitudinally relative to each other so that hooks 203 and 203a engage under plates 205a and 205 respectively. At this point, shown in Figures 17 and sleeves 206 and 206a align with each other to form a slot 207 in footing 200. Stile lower ends 213 and 214 (analogous to 13 and 14) may be may then be placed into slot 207 (exactly as stile lower ends 13 and 14 are placed into slot 12 of footing Stile lower ends 213 and 214 are received with clearance in slot 207 that allows them to be rotated as required, but that is small enough for disengagement of hooks 203 and 203a to be prevented. That is, placing stile lower ends 213 and 214 in slot 207 locks the two halves 201 and 202 together.
The reverse of the above process is used for dismantling.
Footing halves 201 and 202, being identical are each half the weight of the completed footing 200. They are made of concrete with hooks 203, 203a and plates 205, 205a being of steel suitably anchored in the concrete.
In Figures 19 and 20, footing halves 201 and 202 are shown as cut away around recesses 204 and 204a and plates 205 and 205a, but no details of the method of anchoring plate 205 in footing half 201 are shown. Suitable ways will readily suggest themselves to persons skilled in the art of reinforced concrete.
Preferably plate 205 and hook 203 are secured to, or at least partly prevented from pullout by, internal reinforcement in footing 201.
Footing halves 201, 202 may be made with a captive plastics mould or half mould (not shown) in a way analogous to that described above for footing halves and 11, so that when completed they have a plastics external surface on all except the surfaces 208, 208a. Alternatively, a more conventional reusable mould (not shown) may be used so that a concrete external surface is obtained.
Many variations may be made to these non-limiting embodiments without departing from the spirit of scope of the invention. The attached claims cover at least some of the inventive concepts disclosed herein.

Claims (18)

  1. 2. A footing according to claim 1 wherein the mould includes a vessel with a mould opening for placement of said concrete into said mould.
  2. 3. A footing according to claim 2 wherein: said mould opening is surrounded by a peripheral edge; said peripheral edge lies in a plane; and concrete in the mould has an external surface that lies in the plane and is surrounded by said edge.
  3. 4. A footing according claim 2 or 3 wherein that portion of said footing component defined by the outer surface of said mould is shaped to cooperatingly engage the other footing component at lengthwise positions remote from the openings so as to limit relative rotation of the two footing components.
  4. 5. A footing according to claim 4 wherein: the mould includes a main portion having a further opening and a separate insert portion that is received in and that closes said further opening; COMS ID No: SBMI-06914231 Received by IP Australia: Time 12:45 Date 2007-04-06 06/84/2007 13:50 +613-9599-9886 D SHANKS ASSOCS PAGE 11/22 14 o said insert portion is retained in said further opening by concrete in the mould; and e said insert portion is shaped to define a projection .on the footing component including the mould that is received in a cooperating recess in the other footing component in use of the footing. t 6. A footing according to claim 5 wherein said projection extends IN outwardly of a planar surface that in use of the footing abuts a planar 00 osurface of the other footing component.
  5. 7. A footing according to any one of claims 1 to 6 wherein said at least one footing component includes a reinforcing element within said concrete.
  6. 8. A footing according to any one of claims 1 to 7 wherein the said opening of a said footing component including a mould is an opening formed in a footing part separate from said mould and that is partially outside said outer surface of said mould.
  7. 9. A footing according to claim 8 wherein said footing part extends through said mould and is secured within said concrete. A footing according to any one of claims I to 9 wherein the said opening of each footing component is adapted to receive therein in addition to a depending part of a first fence module a depending part of a second fence module adjoining said first fence module.
  8. 11. A footing according to any one of claims 1 to 10 wherein in use of the footing on a flat surface said first and second footing components lie on said flat surface.
  9. 12. A footing according to any one of claims 1 to 11 wherein each of said first and second footing components includes a mould and wherein in use of said footing said moulds lie alongside each other. COMS ID No: SBMI-06914231 Received by IP Australia: Time 12:45 Date 2007-04-06 06/04/2007 13:50 +613-9699-9886 D SHANKS ASSOCS PAGE 12/22 0
  10. 13. A footing according to any one of claims 1 to 12 wherein said first and e second footing components are of substantially equal weight. 0
  11. 14. A footing according to any one of claims 1 to 13 wherein the or each said. mould includes a plastics material.
  12. 15. A footing according to any one of claims 1 to 14 wherein each footing 00 o component includes a mould containing concrete an outer surface of 0 said mould defining a portion only of an outer surface of the footing ocomponent in which the mould is included.
  13. 16. A footing according to claim 5 wherein: each footing component includes a mould containing concrete an outer surface of said mould defining a portion only of an outer surface of the footing component in which the mould is included; and the moulds are identical to each other.
  14. 17. A temporary fence including: a plurality of fence modules each having first and second ends and at each said end a depending part; and a plurality of footings according to any one of claims 1 to 16, wherein said fence modules are arranged end-to-end and secured to each other and wherein received in said openings of said first and second footing components of each said footing is a said depending part of at least one said fence module.
  15. 18. A method for erecting a temporary fence including the steps of: providing a plurality of fence modules each having first and second ends and at each said end a depending part; assembling a plurality of footings according to any one of claims 1 to 16 by positioning the first and second footing components of each COMS ID No: SBMI-06914231 Received by IP Australia: Time 12:45 Date 2007-04-06 06/04/2007 13:50 +613-9699-9886 D SHANKS ASSOCS PAGE 13/22 16 0 o said footing so that said footing components' respective openings are aligned with each other; placing into said openings of said first and second footing components of each said footing a said depending part of at least one fence module; and securing each fence module to at least one other of said fence modules so that said fence modules are arranged end-to-end. VO 00 S19. A method for erecting a temporary fence including the steps of: providing a plurality offence modules each having first and o second ends and at each said end a depending part; providing a plurality of footings adapted for use with said fence modules including at least one footing according to claim 10 assembled by positioning in abutment with each other said first and second footing components thereof so that their respective openings are aligned with each other; and supporting said fence modules in end-to-end configuration on said footings, including by placement into said openings of said first and second footing components of the or at least one said footing depending parts of two adjoining said fence modules. A mould for a footing for use in temporary fencing according to any one of claims 1 to 16 including an elongate shell having an opening so as to form when inverted a vessel adapted to receive settable concrete through the opening.
  16. 21. A mould according to claim 20 wherein said opening is substantially rectangular and elongate in a direction that is lengthwise in the said footing.
  17. 22. A mould according to claim 20 or 21 having means for supporting in said mould a reinforcing bar so that said reinforcing bar while settable concrete is placed in the mould. COMS ID No: SBMI-06914231 Received by IP Australia: Time 12:45 Date 2007-04-06 06/04/2007 13:50 +6~13-9699-9886 D SHANKS ASSUCS PAGE 14/22 17
  18. 23., A mould main portion for a footing component substantially as described herein by reference to Figures 3, 4, 5, 5, 7 and 8. 24, A footing for use in temporary fencing substantially as described herein by reference to Figures 1 to 16. 00 COMS ID No: SBMI-06914231 Received by IP Australia: Time 12:45 Date 2007-04-06
AU2004208695A 2003-09-05 2004-09-06 Improvements in temporary fencing Ceased AU2004208695B2 (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
AU2004208695A AU2004208695B2 (en) 2003-09-05 2004-09-06 Improvements in temporary fencing
AU2006225199A AU2006225199A1 (en) 2003-09-05 2006-10-02 Improvements in Temporary Fencing
AU2006100837A AU2006100837B4 (en) 2003-09-05 2006-10-03 Improvements in temporary fencing
AU2010201241A AU2010201241A1 (en) 2003-09-05 2010-03-27 Improvements in Temporary Fencing

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
AU2003904843 2003-09-05
AU2003904843A AU2003904843A0 (en) 2003-09-05 Improvements in temporary fencing
AU2004208695A AU2004208695B2 (en) 2003-09-05 2004-09-06 Improvements in temporary fencing

Related Child Applications (2)

Application Number Title Priority Date Filing Date
AU2006225199A Division AU2006225199A1 (en) 2003-09-05 2006-10-02 Improvements in Temporary Fencing
AU2006100837A Division AU2006100837B4 (en) 2003-09-05 2006-10-03 Improvements in temporary fencing

Publications (2)

Publication Number Publication Date
AU2004208695A1 AU2004208695A1 (en) 2005-03-24
AU2004208695B2 true AU2004208695B2 (en) 2007-05-17

Family

ID=34423806

Family Applications (1)

Application Number Title Priority Date Filing Date
AU2004208695A Ceased AU2004208695B2 (en) 2003-09-05 2004-09-06 Improvements in temporary fencing

Country Status (1)

Country Link
AU (1) AU2004208695B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012000020A1 (en) * 2010-06-28 2012-01-05 Wood, Stephen Raymond Temporary fence base
WO2015033135A1 (en) * 2013-09-05 2015-03-12 Oxford Plastic Systems Limited Supporting temporary barriers

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7631409B2 (en) 2007-03-28 2009-12-15 Kelvindale Products Pty. Ltd. Method of batch assembly of temporary fence panels and anchor blocks
FR2936540B1 (en) * 2008-09-26 2016-12-30 Elyssa SUBMASTER MODULE FOR THE CONSTRUCTION OF A CLOSURE
CN115874859B (en) * 2022-11-10 2024-06-11 中交二公局第三工程有限公司 Municipal road foundation pit safety device

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0196327A (en) * 1987-10-08 1989-04-14 Daido Steel Co Ltd Fluidized bed furnace for metal heat-treatment
GB2252775A (en) * 1991-02-18 1992-08-19 Sgb Holdings Ltd Modular temporary fence
US5161784A (en) * 1989-04-13 1992-11-10 Sader Stephen M Knock-down barrier for preventing admittance into an area
NL9401555A (en) * 1994-09-23 1996-05-01 Heras Holding Device for holding a fence upright

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0196327A (en) * 1987-10-08 1989-04-14 Daido Steel Co Ltd Fluidized bed furnace for metal heat-treatment
US5161784A (en) * 1989-04-13 1992-11-10 Sader Stephen M Knock-down barrier for preventing admittance into an area
GB2252775A (en) * 1991-02-18 1992-08-19 Sgb Holdings Ltd Modular temporary fence
NL9401555A (en) * 1994-09-23 1996-05-01 Heras Holding Device for holding a fence upright

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012000020A1 (en) * 2010-06-28 2012-01-05 Wood, Stephen Raymond Temporary fence base
WO2015033135A1 (en) * 2013-09-05 2015-03-12 Oxford Plastic Systems Limited Supporting temporary barriers
US10214935B2 (en) 2013-09-05 2019-02-26 Oxford Plastic Systems Limited Supporting temporary barriers

Also Published As

Publication number Publication date
AU2004208695A1 (en) 2005-03-24

Similar Documents

Publication Publication Date Title
US7631409B2 (en) Method of batch assembly of temporary fence panels and anchor blocks
US4888931A (en) Insulating formwork for casting a concrete wall
US5402609A (en) Concrete building block system
CA2676369C (en) Wall with decorative facing
CA2038524C (en) Form and method of constructing a wall from pourable concrete material
US8181415B2 (en) Modular construction block
US20090272876A1 (en) Modular formwork wall with dovetail joint connectors
CA1304952C (en) Insulating formwork for concrete wall
AU2004208695B2 (en) Improvements in temporary fencing
JP2000192516A (en) Filler for storage and infiltration facility of rainwater or the like
US8418414B2 (en) Swimming pool brace assembly
DE69813809T2 (en) HEDGE WALL SYSTEM
AU2006100837B4 (en) Improvements in temporary fencing
US3999735A (en) Concrete pouring forms for uniting building units
US9725873B2 (en) Secondary containment system
JP2008175036A (en) Concrete foundation beam member and method for constructing mat foundation by connecting concrete foundation beam connecting members
JP3435611B2 (en) How to build an underground storage tank
CA1294144C (en) Building foundation form work
CA1043953A (en) Swimming pool construction
AU2017200139A1 (en) Fence Anchor Block
JP2022126280A (en) Flask material for concrete block molding, flask set for concrete block molding and concrete block molding method
KR102361122B1 (en) Bonding Spacing Material, Reinforcement Spacing Structures and Construction Methods Using it
AU647783B2 (en) Improved building techniques
JPS631718Y2 (en)
JP3011337U (en) Concrete block body

Legal Events

Date Code Title Description
CB Opposition lodged by

Opponent name: KELVINDALE PRODUCTS PTY LTD

CH Opposition withdrawn

Opponent name: KELVINDALE PRODUCTS PTY LTD

FGA Letters patent sealed or granted (standard patent)
MK14 Patent ceased section 143(a) (annual fees not paid) or expired
TH Corrigenda

Free format text: IN VOL 25, NO 13, PAGE(S) 1527 UNDER THE HEADING APPLICATIONS LAPSED, REFUSED OR WITHDRAWN, PATENTSCEASED OR EXPIRED - 2004 DELETE ALL REFERENCE TO 2004208695.