AU2003229361C1 - Scheduling method for rail networks - Google Patents

Scheduling method for rail networks Download PDF

Info

Publication number
AU2003229361C1
AU2003229361C1 AU2003229361A AU2003229361A AU2003229361C1 AU 2003229361 C1 AU2003229361 C1 AU 2003229361C1 AU 2003229361 A AU2003229361 A AU 2003229361A AU 2003229361 A AU2003229361 A AU 2003229361A AU 2003229361 C1 AU2003229361 C1 AU 2003229361C1
Authority
AU
Australia
Prior art keywords
train
trains
moving
lateness
given set
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
AU2003229361A
Other versions
AU2003229361A1 (en
AU2003229361B2 (en
Inventor
Philip George Howlett
Peter John Pudney
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ttg Holdings Pty Ltd
Original Assignee
Ttg Holdings Pty Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from AUPS2410A external-priority patent/AUPS241002A0/en
Application filed by Ttg Holdings Pty Ltd filed Critical Ttg Holdings Pty Ltd
Priority to AU2003229361A priority Critical patent/AU2003229361C1/en
Publication of AU2003229361A1 publication Critical patent/AU2003229361A1/en
Assigned to TMG RAIL TECHNOLOGY PTY LIMITED reassignment TMG RAIL TECHNOLOGY PTY LIMITED Request for Assignment Assignors: TMG INTERNATIONAL HOLDINGS PTY LIMITED
Application granted granted Critical
Publication of AU2003229361B2 publication Critical patent/AU2003229361B2/en
Assigned to AUSRAIL TECHNOLOGIES PTY LIMITED reassignment AUSRAIL TECHNOLOGIES PTY LIMITED Alteration of Name(s) in Register under S187 Assignors: TMG RAIL TECHNOLOGY PTY LIMITED
Publication of AU2003229361C1 publication Critical patent/AU2003229361C1/en
Assigned to TTG (Holdings) Pty Ltd reassignment TTG (Holdings) Pty Ltd Request for Assignment Assignors: AUSRAIL TECHNOLOGIES PTY LIMITED
Anticipated expiration legal-status Critical
Expired legal-status Critical Current

Links

Landscapes

  • Train Traffic Observation, Control, And Security (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

00 -1 TITLE: SCHEDULING METHOD FOR RAIL NETWORKS o FIELD OF THE INVENTION The present invention provides a method for calculating a plan for moving trains on a network. The invention is useful for timetable development, for real-time dynamic rescheduling of the trains on a network, and for assessing proposed changes to network Sinfrastructure.
BACKGROUND TO THE INVENTION Any discussion of the prior art throughout the specification should in no way be Sconsidered as an admission that such prior art is widely known or forms part of common general knowledge in the field.
In order for a scheduling tool to be useful as a realistic model of railway operations it should have the following features: The capability of representing a wide range of railway configurations including uni- and bi-directional track, junctions, branches, refuging or cross facilities etc.
9 The ability to handle same direction overtakes.
0 A check of the length of a train against the length of the crossing loop before allowing a cross to occur.
0 The ability to take into account the characteristics of the signalling and safeworking systems.
0 The ability to accommodate all safety margins between the crossing and overtaking of trains to allow for signal changes.
The ability to allow trains to follow one another onto single line segments as governed by the signalling system in place.
It is an object of the present invention to provide a method for calculating a plan for moving trains on a network to overcome or ameliorate at least one of the disadvantages of the prior art, or to provide a useful alternative.
SUMMARY OF THE INVENTION The invention provides a method for determining the efficient movement of trains on a network.
A further aspect of the invention provides methods for infrastructure planning, timetable planning and dynamic rescheduling.
00 -2- One aspect of the present invention provides a method of moving a given set of trains from their respective origins to their respective destinations on a rail network, said o method comprising: forming a schedulable set of trains consisting of all trains not at their destination that have at least one unoccupied link; (ii) selecting the train from said schedulable set with the earliest start time
IND
from its current location, wherein said selected train is to travel from station Si to station (C1 Si; (iii) forming a contender set of trains consisting of all trains that have as their ,I 10 next move a dispatch from station S i to S and vice-versa; (iv) selecting the train from said contender set with the earliest arrival time at its successor station (either station Si to S for said selected train invoking a deadlock avoidance procedure, wherein if said procedure accepts the train then go to step or if the train is rejected then remove it from the schedulable set and if the schedulable set is not empty then return to step (ii) otherwise go to step (vii); (vi) scheduling said selected train over its chosen link to its successor station; (vii) return to step until all trains are at their destination or the schedulable set is empty to create a possible schedule; (viii) assessing said possible schedule by means of an objective function; (ix) repeating steps to (viii) to create N possible schedules; and selecting a desired schedule from said N possible schedules on the basis of said objective function and moving said set of trains from their respective origins to their respective destinations on the rail network in accordance with said desired schedule.
Preferably, the objective function used to evaluate each schedule is the sum of the lateness of each train, wherein the lateness of each train is given by the function: Z(aid 0 aid <a, aid a aid a where aid is the actual arrival time of train i at is destination while ai* is the desired arrival time.
00 Preferably, track capacity constraints are included in the objective function by means of langrange multipliers.
O Preferably, a heuristic method is used to remove any infeasible train movements.
Preferably, perturbations of train start times, sti, and train finish times,fti are made thereby enabling the generation of a plurality of different sequences of dispatch O decisions.
INO
Preferably, the size of the perturbation C added to the train start and finish times is governed by the parameter a and is given by C a. U(O, 1) CI 10 where U(O,1) is a uniformly distributed random variable on the interval Typically the invention is implemented in the form of computer software operable to provide an operator of a train network with data for reducing the cost of delays or late running.
BRIEF DESCRIPTION OF THE DRAWINGS A preferred embodiment of the invention will now be described, by way of example only, with reference to the accompanying drawings in which: FIG. 1 is a schematic view of a plurality of track segments; FIG. 2 illustrates a network model showing segments and stations enclosed by broken lines; FIG. 3 illustrates histogram results of a railway corridor; FIG. 4 illustrates histogram results of another railway corridor; FIG. 5 illustrates a crossing schedule for a rail corridor; and FIG. 6 illustrates a crossing schedule for another rail corridor.
DETAILED DESCRIPTION OF INVENTION Modelling a Rail Network Consider a railway system with the rail tracks modelled as a set of junctions and sections of rail joining them. The basic network unit of track is called a segment, defined below, and illustrated in Figures 1 and 2.
Track Segment: A track segment is a length of track which cannot be occupied by opposing trains. It is eliminated by either track junctions or signal points. A 00 -1+ diamond crossing is a segment. Track segments have a length and a default direction.
By assigning a default direction to segments, this model of a rail track system is a O directed graph. In the present invention, an aggregated model of this directed graph is employed where these basic segments are partitioned into functional stations and links between them. The station definition includes physical stations but extends to any O segment where a train may be scheduled to stop in our scheduling procedure. For
IND
example a crossing loop becomes a functional station for our purposes, because we may hold a train on the loop to enable another train to pass. Trains are moved strictly from station to station in our scheduling procedure.
,I 10 Station: A station is a subset of track segments, at one geographical location, where trains may make scheduled stops and whence despatch decisions are made.
Stations are connected to each other by sequences of track segments with each feasible alternative sequence defining a path. A feasible path joining two stations is referred to as a link.
Link: A link is a sequence of track segments joining two stations in the track graph. The first and last segment in a link between stations si and sj must be a track segment in station si and sj respectively.
Although the track graph is a directed graph, by virtue of the assigned default directions, any (undirected) path is admitted as a link. It is possible and sometimes desirable, to route a train on a link traversing some segments in reverse direction.
Trains are superimposed onto the track digraph to model an operating railway system as a train network.
Train Network: A train network is a track digraph, a set of trains and a set of mappings relating to train dynamics through the network. A train is an object with attributes such as direction of travel, length, station of origin and destination station.
The state of the network is a representation of the location of each train in the system. The scheduling process is represented by the changing state of the system at a sequence of discrete timepoints or stages when decisions are made.
Trains may leave and enter the system during the scheduling planning horizon.
Trains yet to be introduced into the system are located at a virtual source station and transfer trains exiting the network are allocated to a virtual sink station.
The normal scheduling task is to move each train through the network from its origin to destination. A train moves from station to station on a sequence of links 00 (i joining intermediate stations on its selected path. The goal is to develop a scheduling procedure which optimises some objective measure of system performance. One aspect o of the present invention provides a procedure aimed at minimising aggregate train lateness or a class of similar performance measures.
Train Movements While a track segment can only accommodate one train at a time for trains N, travelling in opposite directions, if a track segment has internal signalling then it may be able to accommodate more than one train moving in the same direction. These NI 10 following trains must be kept separated from each other by some minimum distance or time. This is achieved by having a following clearance time which governs the minimum separation between the front of following trains at entry and exit from a segment. This following clearance time will be a function of such things as train speed, the signalling system used, safety margins required and train length. An opposing clearance time is also needed to govern the minimum time separation between the front of one train leaving a segment and a train travelling in the reverse direction seeking to gain access to the same segment.
Deadlock The issue of potential deadlock complicates the dispatch of trains particularly along single line corridors with passing loops. A feasible schedule requires that all trains can reach their destination without any train backing up.
Deadlock: A rail network is defined to be deadlocked if at least one train cannot reach its destination without one or more trains backing up.
In the present invention only a limited deadlock avoidance protocol is implemented. The first advantage is that it is possible to retain a rich set of potential schedules only discarding them at deadlock or near certain deadlock states. The second advantage is that the avoidance procedure is computationally efficient and speed of schedule generation is a requirement of the system. The problem space search method used to construct the schedules randomly perturbates segment running times of individual trains to influence the order in which trains are dispatched. With this randomised search procedure it is good enough to reduce the occurrence of deadlock and simply throw away schedules that terminate in deadlock. The only small disadvantage is 00 the loss of some computational efficiency because some potential schedules are pursued further than necessary.
0 Optimisation One aim of the present invention is to provide a method for constructing a \O timetable that minimises the operating costs of the rail network. These costs could
IND
include costs associated with: CI delays at crossing loops 0 lateness at key locations along a train's route C-K, Mixed Integer Programming In the present invention, the modelling of the problem as a mathematical program was inspired by the observation that this scheduling problem could (almost) be formulated as a job-shop problem, with track segments corresponding to machines and train journeys corresponding to sequences ofjob operations. A key difference between the scheduling problem for trains on a track network and the standard job-shop problem is that whereas jobs can be removed from one machine and put into a queue for the next machine, trains cannot be removed from the track after completing one track segment but before starting the next.
The track is assumed to be a sequence of track segments, numbered 1 n in the outbound direction. Stations between adjacent segments are assumed to have unlimited capacity.
T is the set of trains i is an index for outbound trains j is an index for inbound trains Plk is the time taken for train I to traverse segment k tlk is the time train l starts segment k We define the function dk =Iif train I crosses segment k before train m t0 otherswise 00 0 The following precedence constraints ensure that the trains remain on each Ssection of track for their minimum traversal time and are then allowed to proceed onto O the next segment of track on their journey: tik Ph t t j Pjk ND The following interference constraints ensure that no two trains occupy a single section of track at the same time: Stk tk Md,,k Pk Vl, m T,l m tmk t lk +M[1-dmk Pk l,m ET, m M is a large number.
We minimise the sum of the arrival times of individual trains. Minimising the make span allows non-critical trains to run slowly.
This mixed integer formulation has been implemented in GAMS and can solve larger problems than our initial formulation, described below. It has been used to solve problems with 14 trains and 10 track segments. The main problem with this formulation is that it is for a single line track only, and assumes infinite capacity at stations.
However, for such problems it generates optimal solutions that can be used to check the results of other timetabling methods.
The second mixed integer program models a single line railway corridor with stations connected by sections of track. Both the stations and the track sections are considered as machines and the trains as jobs. Each machine has a given maximum capacity. The stations are considered as a single unit with capacity equal to the sum of the number of crossing loops and mainline track segments at each station. It is assumed that each train can use any track segment in a station.
Aij arrival time of train i at machinej.
Di departure time of train i from machinej.
P
i y minimum time train i takes on machinej.
C capacity of machinej.
6ijt indicator function which is equal to 1 if train i is on machinej at time t.
00 -8-
O
O
N Sequencing equations 0 A. for all outbound trains Vj 0 In A, Di, for all inbound trains Vj Location indicator Indicator to determine to location of train i at time time t.
Cc. t D,, 0 otherwise.
C 1 t A.
O 0 otherwise.
The location indicator 6ij, is produced by the following five equations: t A, MS,, t-A t D M t-D, 2-M(1-8 Capacity constraints C V j, Minimum processing time constraints D, AY PU Vi The objective used is to minimise the makespan of the scheduling tasks. This second formulation is a non-linear program with discontinuous constraints.
Lagrangian relaxation Lagrangian relaxation has long been recognised as an effective solution method for constrained optimisation. Many computationally hard problems complicated by a set of difficult constraints can be decomposed into problems with a simpler structure. In our 00 railway scheduling model the track capacity constraints are removed from the constraint set and placed in the objective function by the use of lagrange multipliers. These O multipliers can be interpreted as the cost for using the track at a particular time. The higher the price on a track segment at a particular time the less likely it is to be used by trains at that time. This relaxed for of the scheduling problem allows us to reduce the problem to a series of shortest path problems for individual trains on the network.
Trains are scheduled through the rail network one at a time through the matrix of prices N (Lagrange multipliers) along their least cost path irrespective of other trains in the network. The solution of the relaxed problem with section capacity constraints removed 10 may result in an infeasible schedule. A heuristic method must then be employed to remove the infeasible train movements and produce a feasible schedule.
The Lagrangian relaxation method is a common approach for solving large scale integer programs and is based on computing the solution to the dual problem. The optimal value for the dual problem provides a lower bound to the optimal value to the original problem. The upper bound together with the solution to the dual can be used to provide a good approximate solution to the original problem.
This method is successful for solving large problems provided the difference between the optimal values of the primal and dual is small and the method for solving the dual provides sufficient information for generating a nearly optimal feasible solution to the primal problem.
The main advantage of the lagrangean relaxation approach is that it produces both upper and lower bounds on the value of the objective function.
Using this Lagrangian relaxation method on several test problems it was found that the Lagrange multipliers oscillated and hence the primal and dual solutions did not converge or become sufficiently close at any iteration.
Problem Space Search A heuristic is a technique which seeks good (near optimal) solutions to a problem at a reasonable computational cost without being able to guarantee optimality or state how close to optimally a feasible solution is. A heuristic can be thought of as a set of rules defining decision priorities. The dispatch procedure used is a greedy heuristic which builds a schedule by selecting which train to move next based only on local information.
00 Our solution method here uses the technique of problem space search. The problem space search technique is effective in a range of combinatorial optimisation 0 problems including job shop scheduling and resource constrained project scheduling.
The Problem Space Search method takes a fast problem specific heuristic and embeds it within a local search procedure. The definition of a search neighborhood is based on a Sheuristic problem pair p) where h is the fast heuristic and p represents the problem
IND
data upon which decisions are made. Since a heuristic h is a mapping from a problem to a solution the pair p) is an encoding of a particular solution. By perturbing the problem data p the dispatch procedure will generate alternative solutions within a ,I 10 neighbourhood governed by the size of the perturbations made to the problem data. In the construction of solutions built by the base heuristic from perturbed data we must use the original problem data. That is the perturbed data is used only to alter the decision process made by the dispatch procedure.
Below is described the dispatch procedure which moves a given set of trains from origin to destination minimising an objective function that is related to the delays experienced by the trains in the network.
I. Form a schedulable set of trains consisting of all trains not at their destination that have at least one unoccupied link.
2. From this schedulable set pick the train with the earliest start time from its current location. Assume this selected train is travelling from station Si to station Si.
3. From a contender set of trains consisting of all trains that have as their next move a dispatch from station Si to S and vice-versa.
4. From this contender set select the train with the earliest arrival time at its successor station (either station Si to Sj).
For the selected train invoke the deadlock avoidance procedure. If this procedure accepts the train then go on to step 6. If the train is rejected then remove it from the schedulable set. If the schedulable set is not empty then return to step 2 otherwise go to 7.
6. Schedule the selected train over its chosen link to its successor station.
7. Return to step 1 until all trains are at their destination or the schedulable set is empty.
00 -11- In the search for the optimal schedule we use a two phase approach. We first implement a simple problem space search by making perturbations on the variables start O time, st,, and finish time, fti. A train's start time st, is the time at which it is able to be scheduled from its current location in the schedule. Like the start time the finish time is a dynamic variable associated with each train. It is equal to the time that train i may O arrive at its next station if dispatched next over its preferred available link. This value is
IND
a lower bound on a set of possible finish times for train i with the system in its current state.
SIn the second phase we use a population of the best solutions from the first phase ,I 10 to help direct the search towards refining low cost solutions found in the first phase.
The start time is used by the dispatch procedure to determine which two stations we schedule between. The finish time is then used to determine which train will be dispatched next between these chosen stations. In phase I of the solution process we perturb these two variables enabling the dispatch procedure to generate many different sequences of dispatch decisions. The size of e of the perturbations added to the start and finish times is governed by the parameter a and is given by C a. U(O, I) where U(O, I) is a uniformly distributed random variable on the interval At each decision point it is possible for any train with a start time within the interval [stmin, Stmin where stmi, is the minimum of the start times of all trains not a there destination, to be selected as the next dispatch. Thus by increasing the size of the parameter a we also increase the size of the set of possible next moves. By using a large value for a less importance is placed on the locally optimal decision and the size of the solution space the procedure is able to explore in increased. On the other hand using a too small value for a restricts the alternative solutions that the procedure is capable of generating. Small values for a are not likely to alter the decision making data sufficiently to generate a different solution sequence. Through experimentation we have found an appropriate value for a to be half the average inter station running time for all trains on the network.
In the second phase of the search process we take the best n schedules and examine them in sufficient detail to identify the good decisions in each. We have determined that a key aspect of the performance of good schedules is whether they incorporate the best passing rules at each station. We therefore bias the search towards 00 -12- ,IC pairwise passing strategies at each station which yield schedules with good global 0 performance.
Long-haul examples The problem space search dispatcher has been tested on two Australian railway networks. The objective function is that is used to evaluate each schedule is the sum of
IND
the lateness of each train. The lateness of each train is given by the function CI 0 ai a* 0.
aid -a i aid ai where aid is the actual arrival time of train i at is destination while ai* is the desired arrival time.
The first of the test problems is the Australian North Coast Railway which runs from Maitland to Murwillumbah. This track consists of a single line corridor which 68 crossing loops and covers a distance of some 750km. Forty two trains are to be schedules over the corridor twenty one north bound and twenty one south bound.
Some trains traverse the entire length of the railway corridor while others use varying portions of it.
A histogram of the results from both phase I and phase II of the problem space search can be found in figure 3. In both phases 3000 feasible schedules were constructed and the histograms have been plotted using buckets of 1000 seconds. The lowest cost schedule found in phase I had a cost of 152000 seconds while the overall best solution was found in phase II with a cost of 145000 seconds. As can be seen in Figure 3 of the phase II distribution of solution costs has been significantly skewed towards the low cost end when compared with the results from phase I. The best solution found is represented as a train graph in figure 5. Current best practice for this same actual scheduling task on the North Coast line is 205000 seconds. This is shown as the vertical line in figure 3. Our procedure is therefore generating a raft of better schedules, the best being approximately 30% lower than current practice.
The second test problem is the Sydney to Melbourne corridor running between Campbelltown Sydney and Spencer Street Melbourne. The track from Campbelltown to Junee is double line track with crossing loops to allow overtaking while the section from Junee to Spencer Street is single line track with crossing loops. The track covers a 00 -13- 0 distance of 750km and has 59 crossing loops. Daily, 118 trains are to be scheduled through various lengths of the railway corridor.
O The results from both phases of the problem space search are presented in figure 4. Once again 3000 feasible schedules were constructed in both phases with the best schedule being found in phase II. The minimum cost schedule found in phase I was \O 53660 seconds while in phase II the best one found had a cost of 52945 seconds. Note
INO
the effect of the weights in skewing the histogram in phase II towards the low cost region. Figure 6 shows the train graph of the best found solution. Current best practice for the Sydney to Melbourne scheduling task has a cost of 85000 seconds which is C 10 shown as the vertical line in Figure 4.
In both of the above examples solutions within 10% of the best one found were generated in under 2 minutes.
Whilst the invention has been described with reference to a number of specific examples, it will be appreciated by those skilled in the art that the invention may be embodied in many other forms.

Claims (11)

  1. 2. The method of moving a given set of trains from their respective origins to their respective destinations on a rail network as claimed in claim 1, wherein said objective function used to evaluate each schedule is the sum of the lateness of each train, wherein the lateness of each train is given by the function: Zi;aid O aid <a* aid a i aid >a i 00 ,IC where aid is the actual arrival time of train i at is destination while ai* is the desired O arrival time.
  2. 3. The method of moving a given set of trains from their respective origins to their respective destinations on a rail network as claimed in claim 1 or 2, wherein track IDcapacity constraints are included in the objective function by means of langrange multipliers.
  3. 4. The method of moving a given set of trains from their respective origins to (i 10 their respective destinations on a rail network as claimed in claim 1, wherein a heuristic method is used to remove any infeasible train movements. The method of moving a given set of trains from their respective origins to their respective destinations on a rail network as claimed in claim 1, wherein perturbations of train start times, sti, and train finish times,ft are made thereby enabling the generation of a plurality of different sequences of dispatch decisions.
  4. 6. The method of moving a given set of trains from their respective origins to their respective destinations on a rail network as claimed in claim 5, wherein the size of the perturbation C added to the train start and finish times is governed by the parameter a and is given by C a. U(O, 1) where U(O, I) is a uniformly distributed random variable on the interval
  5. 7. The method of moving a given set of trains from their respective origins to their respective destinations on a railway network as claimed in claim 1, wherein said objective function is the sum of the lateness costs of each train, wherein the lateness cost of each train is zero if the train arrives at its destination before the desired arrival time, and some train dependent multiple of the lateness if the train arrives after the desired arrival time.
  6. 8. A method of moving a given set of trains from their respective origins to their respective destinations on a rail network, said method comprising: 00 -16- forming a schedulable set of trains consisting of every train not at its destination; O (ii) removing from said schedulable set any train whose next movement may result in the network becoming deadlocked; (iii) generating a dispatch decision time for each of the trains remaining in the O schedulable set after having trains removed in step wherein the dispatch decision IND time is somewhere between the earliest time the train can start a next movement and the Searliest time the train can complete its next movement; (iv) generating a perturbed dispatch decision time for each of the trains S 10 remaining in the schedulable set after having trains removed in step (ii) by adding a random perturbation to the dispatch decision time of each train; selecting a train from said schedulable set with the earliest perturbed dispatch decision time; (vi) scheduling said selected train over its chosen movement to its successor station; (vii) repeating steps to (vi) until the schedulable set is empty to create a possible schedule; (viii) assessing said possible schedule by means of an objective function; (ix) repeating steps to (viii) to create N possible schedules; and selecting a desired schedule from said N possible schedules on the basis of said objective function and moving said set of trains from their respective origins to their respective destinations on the rail network in accordance with said desired schedule.
  7. 9. The method of moving a given set of trains from their respective origins to their respective destinations on a rail network as claimed in claim 8, wherein said objective function used to evaluate each schedule is the sum of the lateness of each train, wherein the lateness of each train is given by the function: Z (aid) 0 aid a' Laid aid a where aid is the actual arrival time of train i at the destination while ai* is the desired arrival time. 00 -17- The method of moving a given set of trains from their respective origins to their respective destinations on a rail network as claimed in claim 9, wherein track capacity constraints are included in the objective function by means of lagrange multipliers.
  8. 11. The method of moving a given set of trains from their respective origins to their Srespective destinations on a rail network as claimed in claim 10, wherein track capacity IND constraints are included in the objective function by means of lagrange multipliers. C',
  9. 12. The method of moving a given set of trains from their respective origins to their S 10 respective destinations on a rail network as claimed in claim 9, wherein a heuristic method is used to remove any infeasible train movements.
  10. 13. The method of moving a given set of trains from their respective origins to their respective destinations on a rail network as claimed in claim 8, wherein the size of the perturbation e added to the dispatch decision time is governed by the parameter a and is given by C a. U(O, 1) where U(O, ])is a uniformly distributed random variable on the interval
  11. 14. The method of moving a given set of trains from their respective origins to their respective destinations on a railway network as claimed in claim 8, wherein said objective function is the sum of the lateness costs of each train, wherein the lateness cost of each train is zero if the train arrives at its destination before the desired arrival time, and some train dependent multiple of the lateness if the train arrives after the desired arrival time. A method of moving a given set of trains from their respective origins to their respective destinations on a rail network, substantially as herein described with reference to any one of the embodiments of the invention illustrated in the accompanying drawings and/or examples.
AU2003229361A 2002-05-20 2003-05-20 Scheduling method for rail networks Expired AU2003229361C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
AU2003229361A AU2003229361C1 (en) 2002-05-20 2003-05-20 Scheduling method for rail networks

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
AUPS2410A AUPS241002A0 (en) 2002-05-20 2002-05-20 Scheduling method and system for rail networks
AUPS2410 2002-05-20
AU2003229361A AU2003229361C1 (en) 2002-05-20 2003-05-20 Scheduling method for rail networks
PCT/AU2003/000605 WO2003097425A1 (en) 2002-05-20 2003-05-20 Scheduling method and system for rail networks

Publications (3)

Publication Number Publication Date
AU2003229361A1 AU2003229361A1 (en) 2003-12-02
AU2003229361B2 AU2003229361B2 (en) 2007-08-09
AU2003229361C1 true AU2003229361C1 (en) 2009-03-26

Family

ID=34218709

Family Applications (1)

Application Number Title Priority Date Filing Date
AU2003229361A Expired AU2003229361C1 (en) 2002-05-20 2003-05-20 Scheduling method for rail networks

Country Status (1)

Country Link
AU (1) AU2003229361C1 (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6154735A (en) * 1994-09-01 2000-11-28 Harris Corporation Resource scheduler for scheduling railway train resources
WO2001049550A1 (en) * 1999-12-30 2001-07-12 Ge Harris Railway Electronics, L.L.C. A train corridor scheduling process
WO2001062573A1 (en) * 2000-02-25 2001-08-30 Siemens Schweiz Ag Method and system for preventing the congestion of a railtrack system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6154735A (en) * 1994-09-01 2000-11-28 Harris Corporation Resource scheduler for scheduling railway train resources
WO2001049550A1 (en) * 1999-12-30 2001-07-12 Ge Harris Railway Electronics, L.L.C. A train corridor scheduling process
WO2001062573A1 (en) * 2000-02-25 2001-08-30 Siemens Schweiz Ag Method and system for preventing the congestion of a railtrack system

Also Published As

Publication number Publication date
AU2003229361A1 (en) 2003-12-02
AU2003229361B2 (en) 2007-08-09

Similar Documents

Publication Publication Date Title
US7428452B2 (en) Scheduling method and system for rail networks
Cacchiani et al. An overview of recovery models and algorithms for real-time railway rescheduling
Fang et al. A survey on problem models and solution approaches to rescheduling in railway networks
Harrod A tutorial on fundamental model structures for railway timetable optimization
Lamorgese et al. Optimal train dispatching by Benders’-like reformulation
D’ariano et al. A branch and bound algorithm for scheduling trains in a railway network
Brännlund et al. Railway timetabling using Lagrangian relaxation
Lusby et al. Railway track allocation: models and methods
Mu et al. Scheduling freight trains traveling on complex networks
Törnquist Computer-based decision support for railway traffic scheduling and dispatching: A review of models and algorithms
Murali et al. Modeling strategies for effectively routing freight trains through complex networks
Corman Real-time Railway Traffic Management: Dispatching in complex, large and busy railway networks
Radtke et al. Automated planning of timetables in large railway networks using a microscopic data basis and railway simulation techniques
Liu et al. A decomposition based hybrid heuristic algorithm for the joint passenger and freight train scheduling problem
Manino Real-time traffic control in railway systems
König A review on railway delay management
Xu et al. An efficient train scheduling algorithm on a single-track railway system
Blum et al. Enhancing intelligent agent collaboration for flow optimization of railroad traffic
Tomii et al. Depot shunting scheduling using combined genetic algorithm and PERT
Shakibayifar et al. An integrated train scheduling and infrastructure development model in railway networks
Abbink Crew management in passenger rail transport
Hao et al. A train timetabling and stop planning optimization model with passenger demand
Wilson et al. Mathematical and simulation techniques for modelling urban train networks
AU2003229361C1 (en) Scheduling method for rail networks
Barman et al. Automated train scheduling system using genetic algorithm

Legal Events

Date Code Title Description
PC1 Assignment before grant (sect. 113)

Owner name: TMG RAIL TECHNOLOGY PTY LIMITED

Free format text: FORMER APPLICANT(S): TMG INTERNATIONAL HOLDINGS PTY LIMITED

FGA Letters patent sealed or granted (standard patent)
DA2 Applications for amendment section 104

Free format text: THE NATURE OF THE AMENDMENT IS AS SHOWN IN THE STATEMENT(S) FILED 15 OCT 2008.

DA3 Amendments made section 104

Free format text: THE NATURE OF THE AMENDMENT IS AS SHOWN IN THE STATEMENT(S) FILED 15 OCT 2008

PC Assignment registered

Owner name: TTG (HOLDINGS) PTY LTD

Free format text: FORMER OWNER(S): AUSRAIL TECHNOLOGIES PTY LIMITED

MK14 Patent ceased section 143(a) (annual fees not paid) or expired