AU2003212018A1 - Technology for the prevention of river flooding with particular application to the case of a proposal for the suspended lower course of the Yellow River - Google Patents

Technology for the prevention of river flooding with particular application to the case of a proposal for the suspended lower course of the Yellow River Download PDF

Info

Publication number
AU2003212018A1
AU2003212018A1 AU2003212018A AU2003212018A AU2003212018A1 AU 2003212018 A1 AU2003212018 A1 AU 2003212018A1 AU 2003212018 A AU2003212018 A AU 2003212018A AU 2003212018 A AU2003212018 A AU 2003212018A AU 2003212018 A1 AU2003212018 A1 AU 2003212018A1
Authority
AU
Australia
Prior art keywords
river
technology
case
prevention
proposal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
AU2003212018A
Inventor
Siang-Chung Yu
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tong Zhong Yu
Xue Shicheng
Original Assignee
Tong Zhong Yu
Xue Shicheng
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from AU2002950069A external-priority patent/AU2002950069A0/en
Application filed by Tong Zhong Yu, Xue Shicheng filed Critical Tong Zhong Yu
Priority to AU2003212018A priority Critical patent/AU2003212018A1/en
Publication of AU2003212018A1 publication Critical patent/AU2003212018A1/en
Abandoned legal-status Critical Current

Links

Landscapes

  • Revetment (AREA)

Description

AUSTRALIA
Patent Act 1990 COMPLETE SPECIFICATION STANDARD PATENT Technology for the Prevention of River Flooding with Particular Application to the Case of a Proposal for the Suspended Lower Course of the Yellow River The following statement is a full description of this invention, including the best method of performing it known to me: Technology for the Prevention of River Flooding with Particular Application to the Case of a Proposal for the Suspended Lower Course of the Yellow River 1 Introduction Floods, with particular reference to those caused by the over flowing of rivers, have been the cause of tragic calamitiesin the world's history since time immemorial, inflicting untold damage to humans, other living beings, as well as the environment.
As a consequence, since ancient times man has in various countries endeavored to find means of preventing or mitigating floods.
The particular case of a river whose flooding has been especially disastrous over the ages is that of the Yellow River in China, known as China's "mother river" and the cradle of Chinese civilisation,. but due to the catastrophes that it brought to China over thousands of years of its history, it is also symbolized as China's frustration and sorrow. Particularly in its lower reaches, it is like a runaway horse: shifting and uncontrollable, the turbulent and silt-laden stream often overflows its banks and sends floodwaters across the North China plain.
The extremely high silt content combined with the radical topographic changes from the mountainous upper reaches to the flat plains of its lower course have become the legend of the Yellow River. Because of the resulting decrease in stream gradient and reduced velocity in the lower course, the Yellow River deposits an enormous amount of silt, sand and gravel in its riverbed, which in turn builds up ata rate of 10 centimeters every year.
Through the centuries, hundreds of kilometres of levees have been built to stabilize the course of the river and to protect the population against flooding. However, the building-up of levees could only delay the floods and has resulted in elevating the riverbed continuously. Consequently, the lower course of the Yellow River is now a suspended river: in many places, its riverbed lies above the surrounding land, its level being up to metres higher than the land. There is thus the potential for disaster to erupt in the lower course of the Yellow River. The resolution of this suspension crisis has become the most urgent task in the control and reclamation of the Yellow River, with various proposals having been advanced over the past decade, such as: re-opening the old river course (to the south of Shandong Peninsula) in addition to the current course which is north of Shandong; or transporting water to add to the river's upper stream in order to increase the flow rate in the lower course, etc. Many of them do have some good features, but lack overall strategy and/or feasibility.
2: Proposed technology A new technological scheme is proposed for the purpose of achieving complete prevention of flooding by rivers especially, but not exclusively, due to the silting up and raising of their river beds, thus resulting in overflowing with or without protection by dykes.
The technology consists in essence of the construction of one or more canal courses which are generally in line with to and alongside the existing course of the river* but, depending on circumstances, may be diverted to a different route.
Ultilisation of the existing river course is discontinued and it is converted to useful productive dry land. The canal courses are provided with water resistant beds and walls, their depth and width may be varied according to the requirements of each case, with much less resulting deposition of silt, but which nonetheless can periodically be removed by "cleaning" with much greater facility than is the case with the existing river course.
The application of this technology has been studied more thoroughly with a view to its application to the Yellow River. This is demonstrated in detail in the example submitted hereunder.
*The river course is defined as the space between the dykes constructed on either side of the river, determining the maximum width of the river when it normally attains its peak level.
AU2003212018A 2002-07-09 2003-07-09 Technology for the prevention of river flooding with particular application to the case of a proposal for the suspended lower course of the Yellow River Abandoned AU2003212018A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
AU2003212018A AU2003212018A1 (en) 2002-07-09 2003-07-09 Technology for the prevention of river flooding with particular application to the case of a proposal for the suspended lower course of the Yellow River

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
AU2002950069 2002-07-09
AU2002950069A AU2002950069A0 (en) 2002-07-09 2002-07-09 New idea for resolving the suspended lower course of the yellow river in china
AU2003212018A AU2003212018A1 (en) 2002-07-09 2003-07-09 Technology for the prevention of river flooding with particular application to the case of a proposal for the suspended lower course of the Yellow River

Publications (1)

Publication Number Publication Date
AU2003212018A1 true AU2003212018A1 (en) 2004-01-29

Family

ID=34218833

Family Applications (1)

Application Number Title Priority Date Filing Date
AU2003212018A Abandoned AU2003212018A1 (en) 2002-07-09 2003-07-09 Technology for the prevention of river flooding with particular application to the case of a proposal for the suspended lower course of the Yellow River

Country Status (1)

Country Link
AU (1) AU2003212018A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110378024A (en) * 2019-07-22 2019-10-25 四川大学 Utilize the method for flow quantity self-adjusting section hydrocone type construction diversion pipe manufacture river dry work condition

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110378024A (en) * 2019-07-22 2019-10-25 四川大学 Utilize the method for flow quantity self-adjusting section hydrocone type construction diversion pipe manufacture river dry work condition

Similar Documents

Publication Publication Date Title
Gregory River channels
Abbe et al. Patterns and processes of wood debris accumulation in the Queets river basin, Washington
Roeland et al. Dynamic preservation of the coastline in the Netherlands
Emmett et al. Downstream pattern of river-bed scour and fill
Sinha On the controls of fluvial hazards in the north Bihar plains, eastern India
Sestini Land subsidence and sea-level rise: the case of the Po Delta region, Italy
AU2003212018A1 (en) Technology for the prevention of river flooding with particular application to the case of a proposal for the suspended lower course of the Yellow River
Kondolf Hydrologic and channel stability considerations in stream habitat restoration
Bruun et al. Stability of tidal inlets: Use of hydraulic pressure for channel and bypassing stability
Legowo Volcanic debris control applied in Indonesia
Rimkus et al. Possible ways to improve sediment deposition in the Nemunas delta
Gilja et al. Erosion of the Sava riverbed in Croatia and its foreseeable consequences
Freyer et al. An exception to island loss in the engineered Upper Mississippi River: History of land growth in Pool 6 and implications for restoration
Vandermeulen et al. Geomorphological alteration of a heavily oiled saltmarsh (Ile Grande, France) as a result of massive cleanup
Zavadskii et al. The evolution of the Kolpashevskaya meaner of the Ob’and ongoing hazardous manifestations of channel processes
Blaskey Modeling of Distributary Channels Formed by a Large Sediment Diversion in Broken Marshland
Ashmore Sediment delivery in large prairie river basins, western Canada
Wang et al. Flood defense and water/sediment management—With particular reference to the Yellow River
Yorke Impact assessment of water resource development activities: a dual matrix approach
Magner et al. Minnesota agricultural ditch reach assessment for stability (MADRAS): A decision support tool
Lamplugh Physiographical Notes. II. On the Taming of Streams (Continued)
Bhowmik et al. Integrated management of the Illinois River with an emphasis on the ecosystem
Pagliara et al. Urban stream restoration structures
Harrison The New" Mississippi Problem"
THOMPSON et al. SHELL ISLAND RESTORATION–COMPARING THE USE OF DIFFERENT SEDIMENT TYPES IN BARRIER ISLAND CONSTRUCTION

Legal Events

Date Code Title Description
MK1 Application lapsed section 142(2)(a) - no request for examination in relevant period