Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Required Length Orto Cutout Rail Orin Overlapping Arrangement Rod To Length And Then Thereis Work Of Inthe Accompanying Drawings Fixing Brackets Which Calls For Some Fig Iis A Plan View Ofan Extendible Skill Further Ifa Pel
Original Assignee
Required Length Orto Cutout Rail Orin Overlapping Arrangement Rod To Length And Then Thereis Work Of Inthe Accompanying Drawings Fixing Brackets Which Calls For Some Fig Iis A Plan View Ofan Extendible Skill Further Ifa Pel
Filing date
Publication date
Application filed by Required Length Orto Cutout Rail Orin Overlapping Arrangement Rod To Length And Then Thereis Work Of Inthe Accompanying Drawings Fixing Brackets Which Calls For Some Fig Iis A Plan View Ofan Extendible Skill Further Ifa PelfiledCriticalRequired Length Orto Cutout Rail Orin Overlapping Arrangement Rod To Length And Then Thereis Work Of Inthe Accompanying Drawings Fixing Brackets Which Calls For Some Fig Iis A Plan View Ofan Extendible Skill Further Ifa Pel
Application grantedgrantedCritical
Publication of AU131600B2publicationCriticalpatent/AU131600B2/en
Publication of AU286546ApublicationCriticalpatent/AU286546A/en