AT525139A3 - Verfahren zur Erfassung von Arbeitszeiten - Google Patents

Verfahren zur Erfassung von Arbeitszeiten Download PDF

Info

Publication number
AT525139A3
AT525139A3 ATA50708/2022A AT507082022A AT525139A3 AT 525139 A3 AT525139 A3 AT 525139A3 AT 507082022 A AT507082022 A AT 507082022A AT 525139 A3 AT525139 A3 AT 525139A3
Authority
AT
Austria
Prior art keywords
mobile phone
user
work area
procedure
recording
Prior art date
Application number
ATA50708/2022A
Other languages
English (en)
Other versions
AT525139A2 (de
Inventor
Lakic Mladen
Sistek Ibrahim
Original Assignee
Lakic Mladen
Sistek Ibrahim
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Lakic Mladen, Sistek Ibrahim filed Critical Lakic Mladen
Priority to ATA50708/2022A priority Critical patent/AT525139A3/de
Publication of AT525139A2 publication Critical patent/AT525139A2/de
Publication of AT525139A3 publication Critical patent/AT525139A3/de

Links

Classifications

    • GPHYSICS
    • G07CHECKING-DEVICES
    • G07CTIME OR ATTENDANCE REGISTERS; REGISTERING OR INDICATING THE WORKING OF MACHINES; GENERATING RANDOM NUMBERS; VOTING OR LOTTERY APPARATUS; ARRANGEMENTS, SYSTEMS OR APPARATUS FOR CHECKING NOT PROVIDED FOR ELSEWHERE
    • G07C1/00Registering, indicating or recording the time of events or elapsed time, e.g. time-recorders for work people
    • G07C1/10Registering, indicating or recording the time of events or elapsed time, e.g. time-recorders for work people together with the recording, indicating or registering of other data, e.g. of signs of identity
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Human Resources & Organizations (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Game Theory and Decision Science (AREA)
  • Educational Administration (AREA)
  • Development Economics (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)
  • Theoretical Computer Science (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

Die Erfindung betrifft ein Verfahren zur Erfassung von Arbeitszeiten von Benutzern, denen jeweils ein Mobiltelefon (1) zugeordnet ist, wobei vorab eine Anzahl von geographischen Arbeitsbereichen (A) definiert wird, innerhalb der die einzelnen Benutzer ihre Arbeit verrichten, eine Anzahl von Projekten festgelegt wird, denen jeweils zumindest ein Arbeitsbereich und zumindest ein Benutzer zugeordnet ist, und wobei zur Zeiterfassung laufend oder aufgrund einer Benutzereingabe auf dem Mobiltelefon (1) des Benutzers die jeweilige Position des Mobiltelefons (1) ermittelt wird, überprüft wird, ob sich die derart ermittelte Position (p) innerhalb eines Arbeitsbereichs (A) befindet, falls dies der Fall ist, überprüft wird, ob ein Projekt (P) besteht, dem der dem Mobiltelefon (1) zugeordnete Benutzer sowie der Arbeitsbereich (A), innerhalb dessen sich die Position (p) befindet, besteht, und falls dies der Fall ist, die Zeiterfassung gestartet wird.
ATA50708/2022A 2015-06-19 2015-06-19 Verfahren zur Erfassung von Arbeitszeiten AT525139A3 (de)

Priority Applications (1)

Application Number Priority Date Filing Date Title
ATA50708/2022A AT525139A3 (de) 2015-06-19 2015-06-19 Verfahren zur Erfassung von Arbeitszeiten

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
ATA50708/2022A AT525139A3 (de) 2015-06-19 2015-06-19 Verfahren zur Erfassung von Arbeitszeiten

Publications (2)

Publication Number Publication Date
AT525139A2 AT525139A2 (de) 2022-11-15
AT525139A3 true AT525139A3 (de) 2023-06-15

Family

ID=83995328

Family Applications (1)

Application Number Title Priority Date Filing Date
ATA50708/2022A AT525139A3 (de) 2015-06-19 2015-06-19 Verfahren zur Erfassung von Arbeitszeiten

Country Status (1)

Country Link
AT (1) AT525139A3 (de)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04209098A (ja) * 1990-11-30 1992-07-30 Aisin Seiki Co Ltd 移動局位置モニタリングシステム
GB2320973A (en) * 1997-01-07 1998-07-08 Hi Key Ltd Alarm apparatus for determining if a vehicle is moved
US20080246661A1 (en) * 2007-04-09 2008-10-09 Seiko Epson Corporation First output position calculation method, storage medium, positioning device, and electronic instrument
JP2009260780A (ja) * 2008-04-18 2009-11-05 Nec Fielding Ltd 携帯端末を使用した情報の自動配信システム及びその方法
WO2011056937A1 (en) * 2009-11-09 2011-05-12 Kone, Inc. Location-based mobile workforce management system
JP2012052905A (ja) * 2010-09-01 2012-03-15 Advanced Telecommunication Research Institute International 位置測定装置、および位置測定方法
WO2014027248A2 (en) * 2012-08-16 2014-02-20 Yougetitback Limited Systems and methods to enhance reliability of measured position data
US20140122150A1 (en) * 2012-10-29 2014-05-01 Moose Loop Holdings, LLC Mobile Device and Task Monitoring

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04209098A (ja) * 1990-11-30 1992-07-30 Aisin Seiki Co Ltd 移動局位置モニタリングシステム
GB2320973A (en) * 1997-01-07 1998-07-08 Hi Key Ltd Alarm apparatus for determining if a vehicle is moved
US20080246661A1 (en) * 2007-04-09 2008-10-09 Seiko Epson Corporation First output position calculation method, storage medium, positioning device, and electronic instrument
JP2009260780A (ja) * 2008-04-18 2009-11-05 Nec Fielding Ltd 携帯端末を使用した情報の自動配信システム及びその方法
WO2011056937A1 (en) * 2009-11-09 2011-05-12 Kone, Inc. Location-based mobile workforce management system
JP2012052905A (ja) * 2010-09-01 2012-03-15 Advanced Telecommunication Research Institute International 位置測定装置、および位置測定方法
WO2014027248A2 (en) * 2012-08-16 2014-02-20 Yougetitback Limited Systems and methods to enhance reliability of measured position data
US20140122150A1 (en) * 2012-10-29 2014-05-01 Moose Loop Holdings, LLC Mobile Device and Task Monitoring

Also Published As

Publication number Publication date
AT525139A2 (de) 2022-11-15

Similar Documents

Publication Publication Date Title
Shirali et al. Assessing resilience engineering based on safety culture and managerial factors
Udo et al. Effect of lack of adequate attention to safety measures on construction sites in Akwa Ibom State, Nigeria
EP4233666A3 (de) Verfahren zum betreiben eines reinigungssystems, basisstation und filtereinrichtung
WO2020202164A3 (en) Construction project tracking
EP4249938A3 (de) Verfahren und vorrichtung zur verfolgung von objekten, insbesondere sich bewegenden objekten, in den dreidimensionalen raum von abbildenden radarsensoren
AT525139A3 (de) Verfahren zur Erfassung von Arbeitszeiten
ZA202200905B (en) Anti-egfr/anti-4-1bb bispecific antibody and use thereof
Skorupka et al. Identification of risk factors of development and operation of roads in the light of surveying work
AT516698A3 (de) Verfahren für die Abfuhr von Bearbeitungsabfällen aus einer Plattensäge
AT515767A3 (de) Materialprüfungsverfahren, Verwendung einer Ziehsteinanordnung und Ziehsteinanordnung
Lee et al. Impact of Workers' Perceptions of the Safety Climate on Job Satisfaction and Intention to Turnover in the Manufacturing Industry
Winkler Conditions for implementing organizational changes
Kyaw et al. Knowledge, Attitude and Practice on safety measures of occupational hazards among constructional workers at Bayint Naung Bridge Construction Site in Yangon Region
NL2020335B1 (nl) Werkwijze en systeem voor het verbeteren van een competentie van een gebruiker
New Kansas City Plant Work Group Teleconference October 26, 2015
EP3424297A8 (de) Verfahren zum assistieren beim ausführen einer schnittfolge in einen baum und system zum assistieren beim ausführen einer schnittfolge in einen baum
DIAS This is an experience report about the implementation of a Regional Reference Center on alcohol and other drugs in a municipality in the state of Goiás.
Карева et al. FORCED LABOUR IN ITS CLOSE INTERRELATION WITH THE ILLEGAL MIGRATION PHENOMENON
AT517787A3 (de) Verwendung von Aryloxyphenoxypropionsäure-Herbiziden zum Schutz für Bauwerksabdichtungen und diese enthaltende Bitumenbahnen
안재찬 et al. Public Servants’ Perception of a Maintenance Project for Natural Disaster-Prone Areas
Towart Basic income or job guarantee: What is to be done?
Joo et al. Does Mentoring Program have Impact on The Structural Relationship regarding Job Satisfaction in HRD field?
Sharma Anuj Pathak Returns to India
Shin et al. Analysis on Current State on Safety Education of Korean Construction Sites in Overseas
Update Teleconference Meeting September 17, 2014