AT521093A1 - Power plant with high pressure compressor, high pressure accumulator and folding system - Google Patents

Power plant with high pressure compressor, high pressure accumulator and folding system Download PDF

Info

Publication number
AT521093A1
AT521093A1 ATA93/2018A AT932018A AT521093A1 AT 521093 A1 AT521093 A1 AT 521093A1 AT 932018 A AT932018 A AT 932018A AT 521093 A1 AT521093 A1 AT 521093A1
Authority
AT
Austria
Prior art keywords
water
pressure
piston
folding system
compressed air
Prior art date
Application number
ATA93/2018A
Other languages
German (de)
Inventor
Wilhelm Kirchmayr Mag
Original Assignee
Wilhelm Kirchmayr Mag
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wilhelm Kirchmayr Mag filed Critical Wilhelm Kirchmayr Mag
Priority to ATA93/2018A priority Critical patent/AT521093A1/en
Publication of AT521093A1 publication Critical patent/AT521093A1/en

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/16Mechanical energy storage, e.g. flywheels or pressurised fluids

Abstract

Ein Kraftwerk mit nicht stationärem Hochdruckkompressor (1) presst die komprimierte Luft in zwei Hochdruckluftspeicher (2) hinein, Stahlzylinder (3) wobei einer nicht ganz voll mit Wasser ist, dies geschieht mit Wasserpumpe (9), drückt den Kolben (4) und das zusammengedrückt Faltsystem (14) nach oben, Hochdruckspeicher (2) presst mittels Hochdruckventile (12) die komprimierte Luft in Faltsystem auseinandergedrückt (14a), Kolben (4) drückt Wasser (13) mit Absperrklappe offen (11) zum Wasserlauf (5), zur Düse (6), zur Pelton-Turbine (7) und Generator (8),der Strom erzeugt, abgebremstes Wasser (13) wird in den zweiten Stahlzylinder (3) und Absperrklappe offen (11) hineingedrückt, bei vollem Hochdruckspeicher (2) wird das Faltsystem (14a) mittels Hochdruckventil offen (12) mit Druckluft auseinandergedrückt, Kolben (4) drückt das Wasser (13) mit Absperrklappe offen (11) im zweiten Wasserlauf (5) zur Düse (6), Pelton-Turbine (7) und Generator (8), der Strom erzeugt, abgebremstes Wasser (13) wird zum Wasserlauf (5) mit Absperrklappe offen (11) hochgedrückt, komprimierte Luft gelangt mittels Hochdruckventile (12) zum Hochdruckspeicher (2), dieser Vorgang wird ständig wiederholt.A power plant with non-stationary high-pressure compressor (1) presses the compressed air into two high-pressure accumulators (2), steel cylinder (3) one is not quite full of water, this is done with water pump (9), presses the piston (4) and the Pressed folding system (14) upwards, high - pressure accumulator (2) presses compressed air in folding system (14a) by means of high - pressure valves (12), piston (4) pushes water (13) with shut - off flap open (11) to watercourse (5) Nozzle (6), to the Pelton turbine (7) and generator (8), which generates power, braked water (13) is pressed into the second steel cylinder (3) and shut-off valve (11), with full high-pressure accumulator (2) the folding system (14a) by means of high-pressure valve open (12) pressed apart with compressed air, piston (4) pushes the water (13) with shut-off valve open (11) in the second watercourse (5) to the nozzle (6), Pelton turbine (7) and Generator (8) generating electricity, braked Wa sser (13) is pushed up to the watercourse (5) with shut-off flap (11), compressed air passes through high-pressure valves (12) to the high-pressure accumulator (2), this process is repeated continuously.

Description

ZusammenfassungSummary

Ein Kraftwerk mit nicht stationärem Hochdruckkompressor (1) presst die komprimierte Luft in zwei Hochdruckluftspeicher (2) hinein, Stahlzylinder (3) wobei einer nicht ganz voll mit Wasser ist, dies geschieht mit Wasserpumpe (9), drückt den Kolben (4) und das zusammengedrückt Faltsystem (14) nach oben, Hochdruckspeicher (2) presst mittels Hochdruckventile (12) die komprimierte Luft in Faltsystem auseinandergedrückt (14a), Kolben (4) drückt Wasser (13) mit Absperrklappe offen (11) zum Wasserlauf (5), zur Düse (6), zur PeltonTurbine (7) und Generator (8),der Strom erzeugt, abgebremstes Wasser (13) wird in den zweiten Stahlzylinder (3) und Absperrklappe offen (11) hineingedrückt, bei vollem Hochdruckspeicher (2) wird das Faltsystem (14a) mittels Hochdruckventil offen (12) mit Druckluft auseinandergedrückt, Kolben (4) drückt das Wasser (13) mit Absperrklappe offen (11) im zweiten Wasserlauf (5) zur Düse (6), PeltonTurbine (7) und Generator (8), der Strom erzeugt, abgebremstes Wasser (13) wird zum Wasserlauf (5) mit Absperrklappe offen (11) hochgedrückt, komprimierte Luft gelangt mittels Hochdruckventile (12) zum Hochdruckspeicher (2), dieser Vorgang wird ständig wiederholt.A power plant with non-stationary high-pressure compressor (1) presses the compressed air into two high-pressure accumulators (2), steel cylinder (3) one is not quite full of water, this is done with water pump (9), presses the piston (4) and the Pressed folding system (14) upwards, high - pressure accumulator (2) presses compressed air in folding system (14a) by means of high - pressure valves (12), piston (4) presses water (13) with shut - off flap open (11) to watercourse (5) Nozzle (6), to the Pelton turbine (7) and generator (8), which generates electricity, braked water (13) is pressed into the second steel cylinder (3) and shut-off flap open (11), with full high-pressure accumulator (2) becomes the folding system (14a) by means of high-pressure valve open (12) pressed apart with compressed air, piston (4) pushes the water (13) with shut-off valve open (11) in the second watercourse (5) to the nozzle (6), PeltonTurbine (7) and generator (8) generating electricity, slowed down water he (13) is pushed up to the watercourse (5) with shut-off flap (11), compressed air passes by high-pressure valves (12) to the high-pressure accumulator (2), this process is repeated continuously.

/ 11 • ·/ 11 • ·

Die Erfindung besteht darin, dass ein Kraftwerk durch einen nicht stationären Hochdruckkompressor die komprimierte Luft in zwei Hochdruckspeicher, dann in zwei Faltsysteme und wieder zurück in den Hochdruckspeicher presst. Mehrere Hochdruckluftleitungen, mehrere doppelt wirkende Hochdruckventile, vier Absperrklappen. Zwei Zylinder, wobei ein Zylinder nicht ganz voll mit Wasser ist, zwei Kolben mit Kolbenringe und zwei Faltsysteme. Zwei Wasserläufe, zwei PeltonTurbinen und zwei Generatoren, der Strom erzeugt.The invention is that a power plant by a non-stationary high-pressure compressor, the compressed air in two high-pressure accumulator, then pressed into two folding systems and back into the high-pressure accumulator. Several high-pressure air lines, several double-acting high-pressure valves, four butterfly valves. Two cylinders, one cylinder not quite full of water, two pistons with piston rings and two folding systems. Two watercourses, two Pelton turbines and two generators generating electricity.

Druckluftspeicherkraftwerke sind Speicherkraftwerke, in denen Druckluft als Energiespeicher verwendet wird. Sie dienen zur Netzregelung wie beispielsweise der Bereitstellung von Regelleistung: Wenn mehr Strom produziert als verbraucht wird, wird mit der überschüssigen Energie Luft unter Druck in einen Speicher gepumpt; bei Strombedarf wird mit der Druckluft in einer Gasturbine Strom produziert. (Huntorf, Norton Ohio)Compressed air storage power plants are storage power plants in which compressed air is used as energy storage. They serve to regulate the grid such as the provision of control power: If more electricity is produced than consumed, excess energy is used to pump air under pressure into a storage tank; When electricity is required, electricity is produced by compressed air in a gas turbine. (Huntorf, Norton Ohio)

Aufgabe der Erfindung ist es, ein Kraftwerk der eingangs erwähnten Art zu schaffen, dass Sicherheit und umweltfreundlich ist und dass die erforderliche Luft bzw. komprimierte Luft und das Wasser, wobei ein Stahlzylinder nicht ganz voll mit Wasser sein muss, immer verfügbar ist. Durch diese Erfindung können von Kleinstädten bis Großstädten und Industrien, sowie von PKW bis LKW und dergleichen profitieren. Außerdem benötigt man keine Hochspannungsleitungen mehr. Die Herstellungskosten und die Betriebskosten in Bezug auf Kilowattleistung sind sehr gering.The object of the invention is to provide a power plant of the type mentioned that safety and environmentally friendly and that the required air or compressed air and water, with a steel cylinder is not quite full of water, is always available. This invention can benefit from small towns to large cities and industries, as well as from cars to trucks and the like. In addition, you no longer need high-voltage power lines. The manufacturing costs and operating costs in terms of kilowatts are very low.

Zur Lösung dieser Aufgabe wird erfindungsgemäß vorgeschlagen, dass durch einen nicht stationären Hochdruckkompressor komprimierte Luft in einen Hochdruckspeicher ca. 160 bis 500 bar hineingepresst wird. Da / 11To achieve this object, the invention proposes that compressed air is pressed into a high-pressure accumulator about 160 to 500 bar by a non-stationary high-pressure compressor. Da / 11

die komprimierte Luft ca. 800 bis 900 Grad hat, erfolgt die Abkühlung auf die dafür erforderliche Zeit. Zwei Stahlzylinder, wobei ein Zylinder nicht ganz voll mit Wasser ist, dies geschieht mit Wasserpumpe (ca. 10 bar), drückt den Kolben und Kolbenringe leicht nach oben, ebenso das Faltsystem. Damit das Wasser nicht gefriert, wird ein Frostschutzmittel (Glysafor EVO N) zugeführt. Der Hochdruckspeicher presst mittels Hochdruckventile die komprimierte Luft in das auseinandergedrückt Faltsystem (Kevlar, Carbon) und dadurch drückt der Kolben mit Kolbenringe das Wasser mit hohem Druck und Absperrklappe offen zum Wasserlauf und zur Düse und zur Pelton-Turbine und dadurch erzeugt der Generator Strom. Das abgebremst Wasser wird in den zweiten Stahlzylinder und Absperrklappe offen hineingedrückt, wodurch das Wasser und der Kolben mit Kolbenringe leicht hochgedrückt und das Faltsystem zusammengerückt wird und die komprimierter Luft mittels Hochdruckventile in den Hochdruckspeicher zurückgeführt wird. Wenn der Hochdruckspeicher voll ist, wird das Faltsystem mit Druckluft auseinandergedrückt, wodurch der Kolben mit Kolbenringe mit hohem Druck auf das Wasser gedrückt wird, wodurch das Wasser mit Absperrklappe offen im zweiten Wasserlauf, zur Düse, zur PeltonTurbine und zu Generator weitergeleitet wird und dadurch Strom erzeugt wird. Das abgebremste Wasser wird zum Wasserlauf hochgedrückt, wodurch der Kolben mit Kolbenringe hochgedrückt wird und die komprimierte Luft mittels Hochdruckventile zum Hochdruckspeicher gelangt.The compressed air has about 800 to 900 degrees, the cooling takes place on the required time. Two steel cylinders, with one cylinder not quite full of water, this is done with water pump (about 10 bar), pushes the piston and piston rings slightly upwards, as well as the folding system. To prevent the water from freezing, an antifreeze (Glysafor EVO N) is added. The high-pressure accumulator presses the compressed air into the forced-out folding system (Kevlar, Carbon) by means of high-pressure valves and thereby the piston with piston rings pushes the water with high pressure and shut-off valve open to the watercourse and to the nozzle and the Pelton turbine and thus the generator generates electricity. The braked water is pushed open into the second steel cylinder and butterfly valve, whereby the water and the piston with piston rings is slightly pushed up and the folding system is brought together and the compressed air is returned by high pressure valves in the high-pressure accumulator. When the high-pressure accumulator is full, the folding system is forced apart with compressed air, whereby the piston is pressed with high pressure piston rings on the water, whereby the water with butterfly valve open in the second water, to the nozzle, the Pelton turbine and generator is forwarded and thereby electricity is produced. The braked water is pushed up to the watercourse, whereby the piston with piston rings is pushed up and the compressed air passes through high-pressure valves to the high-pressure accumulator.

Nachstehend ist die Erfindung mit ihren wesentlichen Einzelheiten anhand von Zeichnungen noch näher erläutert.The invention with its essential details is explained in more detail with reference to drawings.

/ 11/ 11

Es zeigt:It shows:

Fig. 1 die Anlagen in GrundrissFig. 1 the plants in plan

Fig.2 die Anlagen im Aufriss2 shows the plants in elevation

Die Figur 1 zeigt einen nicht stationären Hochdruckkompressor 1 mit Hochdruckluftleitung 16, der komprimierte Luft in einen Hochdruckspeicher 2 presst. Mehrere Hochdruckluftleitungen 16 und mehrere Ventile 12 pressen die Luft in das Faltsystem 14, Stahlzylinder 3, Kolben 4, Wasserlauf 5, Düse 6, Pelton-Turbine 7 und Generator 8 erzeugen Strom.FIG. 1 shows a non-stationary high-pressure compressor 1 with high-pressure air line 16, which presses compressed air into a high-pressure accumulator 2. Several high-pressure air lines 16 and a plurality of valves 12 press the air into the folding system 14, steel cylinder 3, piston 4, watercourse 5, nozzle 6, Pelton turbine 7 and generator 8 generate electricity.

Die Figur 2 zeigt zwei Stahlzylinder 3, zwei Kolben 4, zwei Kolbenringe 4a, Wasserlauf 5, Düse 6, Pelton-Turbine 7, Generator 8, Wasserpumpe 9, Ventil geschlossen 10, Ventil offen 11, Wasser 13, Faltsystem zusammengedrückt 14, Faltsystem auseinandergedrückt 14a, Ringe 15, Hochdruckluftleitung 16.FIG. 2 shows two steel cylinders 3, two pistons 4, two piston rings 4a, watercourse 5, nozzle 6, Pelton turbine 7, generator 8, water pump 9, valve closed 10, valve open 11, water 13, folding system compressed 14, folding system pushed apart 14a, rings 15, high-pressure air line 16.

/ 11 • ·/ 11 • ·

Ansprücheclaims

1. Ein Kraftwerk mit nicht stationärem Hochdruckkompressor (1), presst die komprimierte Luft in zwei Hochdruckspeicher (2) hinein, dadurch gekennzeichnet, dass zwei Stahlzylinder (3), wobei einer nicht ganz voll mit Wasser (13) ist, dies geschieht mit Wasserpumpe (9), den Kolben (4) und Kolbenringe (4a) leicht nach oben drücken, ebenso das zusammengedrückt Faltsystem (14), bei vollem Hochdruckspeicher (2) presst mittels Hochdruckventile (12) die komprimierte Luft in auseinandergedrücktes Faltsystem (14a), Kolben (4) mit Kolbenringe (4a) drücken Wasser (13) mit hohem Druck mit Absperrklappe offen (11) zum Wasserlauf (5), zur Düse (6), zur Pelton-Turbine (7) und dadurch der Generator (8) Strom erzeugt, Faltsystem auseinandergedrückt (14a) presst die Luft mittels Hochdruckventile (12) in den Hochdruckspeicher (2) zurück, abgebremstes Wasser (13) wird in den zweiten Stahlzylinder (3) und Absperrklappe offen (11) hineingedrückt, Wasser (13) und Kolben (4) mit Kolbenringe (4a) wird leicht hochgedrückt, davor presst das zusammengedrückt e Faltsystem (14) die Luft mittels Hochdruckventile (12) in einen Hochdruckspeicher (2) zurück, bei vollem Hochdruckspeicher (2) wird das Faltsystem (14a) mittels Hochdruckventil offen (12) mit Druckluft auseinandergedrückt, Kolben (4) mit Kolbenringe (4a) drücken mit hohem Druck auf das Wasser (13),1. A power plant with non-stationary high-pressure compressor (1), presses the compressed air into two high-pressure accumulator (2), characterized in that two steel cylinders (3), one is not quite full of water (13), this is done with a water pump (9), push the piston (4) and piston rings (4a) slightly upwards, as well as the compressed folding system (14), with full high-pressure accumulator (2) presses the compressed air by means of high-pressure valves (12) into pressed-out folding system (14a), piston (4) with piston rings (4a) press water (13) at high pressure with shut-off valve open (11) to the watercourse (5), the nozzle (6), the Pelton turbine (7) and thereby the generator (8) generates electricity Pressed folding system (14a) presses the air by means of high-pressure valves (12) in the high-pressure accumulator (2), braked water (13) is pressed into the second steel cylinder (3) and the butterfly valve open (11), water (13) and piston ( 4) with piston rings (4a) slightly pressed up, in front of the compressed e folding system (14) by means of high pressure valves (12) in a high-pressure accumulator (2) back at full high pressure accumulator (2), the folding system (14a) by means of high pressure valve open (12) pressed apart with compressed air, piston (4) Press with piston rings (4a) at high pressure on the water (13),

Wasser (13) mit Absperrklappe offen (11) wird im zweiten Wasserlauf (5) zur Düse (6), Pelton-Turbine (7) und Generator (8) ,der Strom erzeugt, weitergeleitet, abgebremstes Wasser (13) wird zum Wasserlauf (5) mit Absperrklappe offen (11) hochgedrückt, Kolben (4) mit Kolbenringe (4a) wird hochgedrückt, dieser Vorgang wird ständig wiederholt.Water (13) with shut-off valve open (11) is in the second watercourse (5) to the nozzle (6), Pelton turbine (7) and generator (8), the power generated forwarded, braked water (13) is the watercourse ( 5) with the butterfly valve open (11) pushed up, piston (4) with piston rings (4a) is pushed up, this process is repeated constantly.

/ 11/ 11

2. Ein Kraftwerk mit nicht stationärem Hochdruckkompressor (1),presst die komprimierte Luft in zwei Hochdruckspeicher (2) hinein , nach Anspruch 1, dadurch gekennzeichnet, dass zwei Wasserlauf (5) diagonal angesetzt wird, wobei die Düse (6) und Absperrklappe (11) offen ist und andererseits die Düse (6) und Absperrklappe (10) geschlossen ist, wobei nur einmal die Pelton-Turbine (7) und nur einmal der Generator (8) Strom erzeugen.2. A power plant with non-stationary high-pressure compressor (1), presses the compressed air into two high pressure accumulator (2), according to claim 1, characterized in that two watercourse (5) is applied diagonally, wherein the nozzle (6) and shut-off valve ( 11) is open and on the other hand, the nozzle (6) and shut-off valve (10) is closed, wherein only once the Pelton turbine (7) and only once the generator (8) generate electricity.

3. Ein Kraftwerk mit nicht stationärem Hochdruckkompressor (1) presst die komprimierte Luft in zwei Hochdruckspeicher (2) hinein, nach Anspruch 1 und 2 dadurch gekennzeichnet, dass ein Hochdruckspeicher (2) aus mehreren Hochdruckspeicher (2) besteht, wobei die komprimierte Luft mindestens gleich ist wie das Faltsystem auseinandergedrückt (14a) aufnehmen kann.3. A power plant with non-stationary high-pressure compressor (1) presses the compressed air into two high-pressure accumulator (2), according to claim 1 and 2 characterized in that a high-pressure accumulator (2) consists of several high-pressure accumulator (2), wherein the compressed air at least the same as the folding system is pressed apart (14a) can record.

4. Ein Kraftwerk mit nicht stationärem Hochdruckkompressor (1) presst die komprimierte Luft in zwei Hochdruckspeicher (2) hinein, nach Anspruch 1 , 2 oder 3 dadurch gekennzeichnet, dass ein gas- und flüssig Wärmetauscher nach dem nicht stationärem Hochdruckkompressor (2) eingebaut wird.4. A power plant with non-stationary high-pressure compressor (1) presses the compressed air into two high-pressure accumulator (2), according to claim 1, 2 or 3, characterized in that a gas and liquid heat exchanger after the non-stationary high-pressure compressor (2) is installed ,

/ 11 ········· · · • · · · · ·· ··· · · • · · · ·· ·· ···· ···· ····· ·/ 11 ········· ···················································································

F1G.1 / 11 • · · • · · • · · ·· *· ·· ·· • · · · · ·· ··· · · • · · · ··· • · · · ·F1G.1 / 11 · · · · · · · · · ··············································································

FIG. 2 / 11FIG. 2/11

Recherchenbericht zu A 93/2018 österreichischesSearch report on A 93/2018 Austrian

PatentamtPatent Office

Klassifikation des Anmeldungsgegenstands gemäß IPC: F03B 13/06 (2006.01); F03B 17/00 (2006.01); F03B 17/04 (2006.01); F02C 1/02 (2006.01); E02B 9/00 (2006.01) Classification of the subject of the application according to IPC: F03B 13/06 (2006.01); F03B 17/00 (2006.01); F03B 17/04 (2006.01); F02C 1/02 (2006.01); E02B 9/00 (2006.01) Klassifikation des Anmeldungsgegenstands gemäß CPC: F03B 13/06 (2013.01); F03B 17/005 (2013.01); F03B 17/04 (2013.01); F02C 1/02 (2013.01); E02B 9/00 (2013.01) Classification of the subject of the application according to CPC: F03B 13/06 (2013.01); F03B 17/005 (2013.01); F03B 17/04 (2013.01); F02C 1/02 (2013.01); E02B 9/00 (2013.01) Recherchierter Prüfstoff (Klassifikation): F03B, F02C, E02B Researched test substance (classification): F03B, F02C, E02B Konsultierte Online-Datenbank: TXTN Consulted online database: TXTN Dieser Recherchenbericht wurde zu den am 06.04.2018 eingereichten Ansprüchen 1-4 erstellt. This search report was prepared for claims 1-4 filed on 06.04.2018. Kategorie*) Category*) Bezeichnung der Veröffentlichung: Ländercode, Veröffentlichungsnummer, Dokumentart (Anmelder), Veröffentlichungsdatum, Textstelle oder Figur soweit erforderlich Name of publication: Country code, publication number, document type (applicant), publication date, text or figure as required Betreffend Anspruch Concerning claim X X A X X A DE 102011106040 Al (DADGAR) 27. Dezember 2012 (27.12.2012) Figuren la und lb; Absätze [0010, 0021-0024]; Ansprüche 1, 2 und 7 WO 2015043747 Al (EMIL BÄCHLI ENERGIETECHNIK AG) 02. April 2015 (02.04.2015) Figuren 2a und 2b; Seite 15, Zeile 14 - Seite 16, Zeile 26; Seite 4, Zeilen 28 und 29; Ansprüche 1, 2, 4, 16 und 17 WO 9518301 Al (ROMECO ANSTALT) 06. Juli 1995 (06.07.1995) Figuren 1 und 7a DE 102011106040 Al (DADGAR) December 27, 2012 (27.12.2012) Figures 1a and 1b; Paragraphs [0010, 0021-0024]; Claims 1, 2 and 7 WO 2015043747 A1 (EMIL BÄCHLI ENERGIETECHNIK AG) 02. April 2015 (02.04.2015) FIGS. 2a and 2b; Page 15, line 14 - page 16, line 26; Page 4, lines 28 and 29; Claims 1, 2, 4, 16 and 17 WO 9518301 A1 (ROMECO ANSTALT) 06. July 1995 (06.07.1995) Figures 1 and 7a 1-4 1-4 1-4 1-4 1-4 1-4 Datum der Beendigung der Recherche: „ .. . . Prüfer(in): 16.11.2018 beite Ί von Ί RIEDER Wolfgang Date of completion of the search: "... , Auditors (in): 16.11.2018 ite by Ί RIEDER Wolfgang *> Kategorien der angeführten Dokumente: A Veröffentlichung, die den allgemeinen Stand der Technik definiert. X Veröffentlichung von besonderer Bedeutung: der Anmeldungs- P Dokument, das von Bedeutung ist (Kategorien X oder Y), jedoch nach gegenständ kann allein aufgrund dieser Druckschrift nicht als neu bzw. auf dem Prioritätstag der Anmeldung veröffentlicht wurde. erfinderischer Tätigkeit beruhend betrachtet werden. E Dokument, das von besonderer Bedeutung ist (Kategorie X), aus dem Y Veröffentlichung von Bedeutung: der Anmeldungsgegenstand kann nicht ein „älteres Recht“ hervorgehen könnte (früheres Anmeldedatum, jedoch als auf erfinderischer Tätigkeit beruhend betrachtet werden, wenn die nachveröffentlicht, Schutz ist in Österreich möglich, würde Neuheit in Frage Veröffentlichung mit einer oder mehreren weiteren Veröffentlichungen stellen). dieser Kategorie in Verbindung gebracht wird und diese Verbindung für & Veröffentlichung, die Mitglied der selben Patentfamilie ist. einen Fachmann naheliegend ist. *> Categories of listed documents: A Publication that defines the general state of the art. X publication of particular importance: the application P document that matters (categories X or Y), but after Subject matter of this document may not be published as new or on the priority date of the application. innovative activity. E document that is of particular importance (category X), from the Y Publication of importance: the subject of the application can not be an "older right" (earlier filing date, however Being regarded as being based on inventive step, if the republished, protection is possible in Austria, novelty would be in question Publish with one or more other publications). This category is associated with this publication and publication, which is a member of the same patent family. a person skilled in the obvious.

9/119.11

Claims (4)

1. Kraftwerk mit nicht stationärem Hochdruckkompressor (1), welcher komprimierte Luft in zwei Hochdruckspeicher (2) hineinpresst, dadurch gekennzeichnet, dass zwei Stahlzylinder (3) mit je einem Druck auf Wasser (13) ausübenden Kolben (4) mit Kolbenringen (4a) und mit je einem an den Kolben anschließenden, an den zugeordneten Hochdruckspeicher (2) angeschlossenen, Faltsystem (14) vorgesehen sind, wobei der Stahlzylinder (3) mit einer Wasserpumpe (9) unter einer nach oben Verlagerung des Kolbens (4) und unter einem Zusammendrücken des Faltsystems (14) mit Wasser (13) beschickbar ist, wobei einerseits die komprimierte Luft aus dem zugeordneten Hochdruckspeicher (2) über Hochdruckventile (12) unter einem auseinanderdrücken des Faltsystems (14) in das Faltsystem (14) des ersten Stahlzylinders (3) einbringbar ist, womit der mit Kolbenringen (4a) ausgestattete Kolben (4) das Wasser (13) mit hohem Druck durch eine offene Absperrklappe (11) über einen ersten Wasserlauf (5) zu einer Düse (6) und in weiterer Folge zu einer Pelton-Turbine (7) leitet und dabei mit einem Generator (8) Strom erzeugt, wobei an der Pelton-Turbine (7) abgebremstes Wasser (13) in den zweiten Stahlzylinder (3) über eine offene Absperrklappe (11) einbringbar ist, wobei das Wasser (13) den Kolben (4) mit den Kolbenringen (4a) in diesem Stahlzylinder (3) unter einem zusammendrücken des Faltsystems (14) und unter einem zusammenpressen der Luft im Faltsystem (14) nach oben verlagert und wobei anderseits die komprimierte Luft aus dem zugeordneten Hochdruckspeicher (2) über Hochdruckventile (12) unter einem auseinanderdrücken des Faltsystems (14) in das Faltsystem (14) des zweiten Stahlzylinders (3) einbringbar ist, womit der mit Kolbenringen (4a) ausgestattete Kolben (4) das Wasser (13) mit hohem Druck durch eine offene Absperrklappe (11) über einen zweiten Wasserlauf (5) zu einer 10 / 11 [ ZULETZT VORGELEGTE ANSPRÜCHE]1. power plant with non-stationary high-pressure compressor (1), which compresses compressed air into two high-pressure accumulator (2), characterized in that two steel cylinders (3) each with a pressure on water (13) performing piston (4) with piston rings (4a) and with one of the piston subsequent, to the associated high-pressure accumulator (2) connected, folding system (14) are provided, wherein the steel cylinder (3) with a water pump (9) under an upward displacement of the piston (4) and under a Compressing the folding system (14) with water (13) can be charged, on the one hand, the compressed air from the associated high pressure accumulator (2) via high pressure valves (12) under a press apart of the folding system (14) in the folding system (14) of the first steel cylinder (3 ) can be introduced, whereby the piston (4) equipped with piston rings (4) the water (13) at high pressure through an open butterfly valve (11) via a first water passage (5) to a nozzle e (6) and subsequently to a Pelton turbine (7) conducts and thereby generates electricity with a generator (8), wherein at the Pelton turbine (7) braked water (13) in the second steel cylinder (3) via an open butterfly valve (11) can be introduced, wherein the water (13) the piston (4) with the piston rings (4a) in this steel cylinder (3) under a compressing the folding system (14) and compressing the air in the folding system (14 ) and on the other hand, the compressed air from the associated high pressure accumulator (2) via high pressure valves (12) under a press apart of the folding system (14) in the folding system (14) of the second steel cylinder (3) can be introduced, whereby the piston rings ( 4a) equipped piston (4) the water (13) at high pressure through an open shut-off valve (11) via a second stream (5) to a 10/11 [LAST PRODUCED CLAIMS] Düse (6) und in weiterer Folge zu einer zur Pelton-Turbine (7) leitet und dabei mit einem Generator (8) Strom erzeugt, wobei an der Pelton-Turbine (7) abgebremstes Wasser (13) in den ersten Stahlzylinder (3) über eine offene Absperrklappe (11) einbringbar ist, womit das Wasser (13) den Kolben (4) mit den Kolbenringen (4a) in diesem Stahlzylinder (3) unter einem zusammendrücken des Faltsystems (14) und unter einem zusammenpressen der Luft im Faltsystem (14) nach oben verlagert.Nozzle (6) and subsequently to a Pelton turbine (7) conducts and thereby generates electricity with a generator (8), wherein at the Pelton turbine (7) braked water (13) in the first steel cylinder (3) via an open butterfly valve (11) can be introduced, whereby the water (13) the piston (4) with the piston rings (4a) in this steel cylinder (3) under a compressing the folding system (14) and compressing the air in the folding system ( 14) shifted upwards. 2. Kraftwerk mit nicht stationärem Hochdruckkompressor (1) nach Anspruch 1, dadurch gekennzeichnet, dass der erste und der zweite Wasserlauf (5) in entgegengesetzter Richtung verlaufen, wobei die beiden Wasserläufe abwechselnd von Wasser durchströmt sind.Second power plant with non-stationary high-pressure compressor (1) according to claim 1, characterized in that the first and the second watercourse (5) extend in the opposite direction, wherein the two watercourses are alternately flowed through by water. 3. Kraftwerk mit nicht stationärem Hochdruckkompressor (1) nach Anspruch 1, dadurch gekennzeichnet, dass mehrere Hochdruckspeicher (2) vorgesehen sind.3. power plant with non-stationary high-pressure compressor (1) according to claim 1, characterized in that a plurality of high-pressure accumulator (2) are provided. 4. Kraftwerk mit nicht stationärem Hochdruckkompressor (1) nach einem der Ansprüche 1 bis 3 dadurch gekennzeichnet, dass nach dem nicht stationären Hochdruckkompressor (2) zur Kühlung der mit dem Hochdruckkompressor (2) verdichteten Luft ein flüssigkeitsgekühlter Wärmetauscher vorgesehen ist.4. power plant with non-stationary high-pressure compressor (1) according to one of claims 1 to 3, characterized in that after the non-stationary high-pressure compressor (2) for cooling the compressed air with the high-pressure compressor (2), a liquid-cooled heat exchanger is provided.
ATA93/2018A 2018-04-06 2018-04-06 Power plant with high pressure compressor, high pressure accumulator and folding system AT521093A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
ATA93/2018A AT521093A1 (en) 2018-04-06 2018-04-06 Power plant with high pressure compressor, high pressure accumulator and folding system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
ATA93/2018A AT521093A1 (en) 2018-04-06 2018-04-06 Power plant with high pressure compressor, high pressure accumulator and folding system

Publications (1)

Publication Number Publication Date
AT521093A1 true AT521093A1 (en) 2019-10-15

Family

ID=68159817

Family Applications (1)

Application Number Title Priority Date Filing Date
ATA93/2018A AT521093A1 (en) 2018-04-06 2018-04-06 Power plant with high pressure compressor, high pressure accumulator and folding system

Country Status (1)

Country Link
AT (1) AT521093A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114016479A (en) * 2021-11-10 2022-02-08 成都蜂装钢构集团有限公司 Implementation method and device of compressed air water-pushing energy storage power station

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1995018301A1 (en) * 1993-12-24 1995-07-06 Romeco Anstalt Process for generating a flow
DE102011106040A1 (en) * 2011-06-25 2012-12-27 Armin Dadgar pumped storage power plant
WO2015043747A1 (en) * 2013-09-25 2015-04-02 Emil Bächli Energietechnik Ag Method and system for combined pump water pressure-compressed air energy storage at constant turbine water pressure

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1995018301A1 (en) * 1993-12-24 1995-07-06 Romeco Anstalt Process for generating a flow
DE102011106040A1 (en) * 2011-06-25 2012-12-27 Armin Dadgar pumped storage power plant
WO2015043747A1 (en) * 2013-09-25 2015-04-02 Emil Bächli Energietechnik Ag Method and system for combined pump water pressure-compressed air energy storage at constant turbine water pressure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114016479A (en) * 2021-11-10 2022-02-08 成都蜂装钢构集团有限公司 Implementation method and device of compressed air water-pushing energy storage power station
CN114016479B (en) * 2021-11-10 2023-01-17 成都蜂装钢构集团有限公司 Implementation method and device of compressed air water-pushing energy storage power station

Similar Documents

Publication Publication Date Title
EP2574739A1 (en) Assembly for storing thermal energy and method for its operation
DE102013018741A1 (en) Device unit and method for energy storage and recovery
EP3006682B1 (en) Device and method for operating a heating distribution station
DE102014003283A1 (en) METHOD AND APPARATUS FOR ACHIEVING A HIGH EFFICIENCY IN AN OPEN GAS TURBINE (COMBI) PROCESS
AT521093A1 (en) Power plant with high pressure compressor, high pressure accumulator and folding system
DE102013008445A1 (en) Heat storage plant
DE102011117982A1 (en) Inoperative power plant, particularly nuclear power plant for temporary storage of energy, has components for energy conversion, energy storage and power distribution
DE102014004237A1 (en) Device for generating an electric current
DE102012013364A1 (en) Energy generation plant has energy conversion unit and energy storage system, which are designed such that they operate together in island operation without connection to public power network in self-sufficient manner
DE102019007317A1 (en) Pressure power plant
DE102019001613A1 (en) Method for supplying air to a stationary fuel cell system
DE202011110127U1 (en) Pressure reduction of gaseous working fluids
DE102018124621A1 (en) Device for generating electrical energy
DE102017006100A1 (en) pumped storage power plant
DE102019213748A1 (en) System for generating compressed air
DE102008009005B3 (en) Thermodynamic energy transformation device i.e. cogeneration unit, for power generation to e.g. operate electric motor of motor vehicle, has piston provided with piston heads, and skirts extending in direction of cylinder heads
DE102018125871A1 (en) System and method for lifting water
Scheuing et al. The coordination of climate protection goals. Analysis of the climate protection law and implementing laws using the example of the EEG. Short expert opinion
Schalkowski et al. Drinking-water-driven power station in Weesen-Feasibility study; Machbarkeitsstudie Trinkwasserkraftwerk Waldrueti, Weesen. Programm Kleinwasserkraftwerke
Frondel et al. Germany’s Energy Transition: A Market-Based Instrument for the Promotion of Renewables
Haas et al. Economic and energetic aspects of long term storages for electricity
Wachsmuth et al. Gas roadmap for energy transition. Sustainable contribution to climate change by the gas sector
DE102019219066A1 (en) Cooling system
Kretschmer Storage of compressed air. A possibility for an enhanced utilization of wind energy?; Druckluftspeicherung. Ein Weg zur verstaerkten Windenergienutzung?
Thomé-Kozmiensky et al. Erneuerbare Energien

Legal Events

Date Code Title Description
REJ Rejection

Effective date: 20220615