AT388249B - Method and device for checking the completeness of the grouting of cavities and their localization in artificially produced bodies - Google Patents

Method and device for checking the completeness of the grouting of cavities and their localization in artificially produced bodies

Info

Publication number
AT388249B
AT388249B AT253081A AT253081A AT388249B AT 388249 B AT388249 B AT 388249B AT 253081 A AT253081 A AT 253081A AT 253081 A AT253081 A AT 253081A AT 388249 B AT388249 B AT 388249B
Authority
AT
Austria
Prior art keywords
cavities
grouting
guide tube
measuring probe
completeness
Prior art date
Application number
AT253081A
Other languages
German (de)
Other versions
ATA253081A (en
Inventor
Theodor Dipl Ing Eder
Harald Dr Roetzer
Roland Dipl Ing Travnicek
Original Assignee
Oesterr Forsch Seibersdorf
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Oesterr Forsch Seibersdorf filed Critical Oesterr Forsch Seibersdorf
Priority to AT253081A priority Critical patent/AT388249B/en
Publication of ATA253081A publication Critical patent/ATA253081A/en
Application granted granted Critical
Publication of AT388249B publication Critical patent/AT388249B/en

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N29/00Investigating or analysing materials by the use of ultrasonic, sonic or infrasonic waves; Visualisation of the interior of objects by transmitting ultrasonic or sonic waves through the object
    • G01N29/44Processing the detected response signal, e.g. electronic circuits specially adapted therefor
    • G01N29/4409Processing the detected response signal, e.g. electronic circuits specially adapted therefor by comparison
    • G01N29/4436Processing the detected response signal, e.g. electronic circuits specially adapted therefor by comparison with a reference signal
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/12Mounting of reinforcing inserts; Prestressing
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N23/00Investigating or analysing materials by the use of wave or particle radiation, e.g. X-rays or neutrons, not covered by groups G01N3/00 – G01N17/00, G01N21/00 or G01N22/00
    • G01N23/20Investigating or analysing materials by the use of wave or particle radiation, e.g. X-rays or neutrons, not covered by groups G01N3/00 – G01N17/00, G01N21/00 or G01N22/00 by using diffraction of the radiation by the materials, e.g. for investigating crystal structure; by using scattering of the radiation by the materials, e.g. for investigating non-crystalline materials; by using reflection of the radiation by the materials
    • G01N23/203Measuring back scattering
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N29/00Investigating or analysing materials by the use of ultrasonic, sonic or infrasonic waves; Visualisation of the interior of objects by transmitting ultrasonic or sonic waves through the object
    • G01N29/22Details, e.g. general constructional or apparatus details
    • G01N29/30Arrangements for calibrating or comparing, e.g. with standard objects
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N33/00Investigating or analysing materials by specific methods not covered by groups G01N1/00 - G01N31/00
    • G01N33/38Concrete; Lime; Mortar; Gypsum; Bricks; Ceramics; Glass
    • G01N33/383Concrete or cement
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N2291/00Indexing codes associated with group G01N29/00
    • G01N2291/04Wave modes and trajectories
    • G01N2291/044Internal reflections (echoes), e.g. on walls or defects

Landscapes

  • Chemical & Material Sciences (AREA)
  • Health & Medical Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Pathology (AREA)
  • General Health & Medical Sciences (AREA)
  • Physics & Mathematics (AREA)
  • Immunology (AREA)
  • General Physics & Mathematics (AREA)
  • Analytical Chemistry (AREA)
  • Biochemistry (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Signal Processing (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Crystallography & Structural Chemistry (AREA)
  • Ceramic Engineering (AREA)
  • Food Science & Technology (AREA)
  • Medicinal Chemistry (AREA)
  • Investigating Or Analyzing Materials By The Use Of Ultrasonic Waves (AREA)

Abstract

The invention relates in particular to grouting tension channels in prestressed concrete components, with the materials provided for the purpose, in particular with grouting mortar. The invention provides that, before the production of the body containing one or more cavities, in shuttering required to produce this body, one or more guide tubes, advantageously with a circular cross section, suitable to accommodate measuring probes, are incorporated for the cavities, approximately equidistantly from the shuttering, and that, after the production of the body and after the filling of the cavities in a manner known per se, by means of measuring probes moved in the guide tubes, in particular by means of gamma back - scatter measuring methods or ultrasound methods, the completeness of the grouting or the presence, the position and the spatial extent of any faults is determined, in particular by means of comparison with a control measurement carried out before the grouting.

Description

  

   <Desc/Clms Page number 1> 
 



   Die Erfindung betrifft ein Verfahren zum Prüfen der Vollständigkeit der Verpressung von Hohlräumen und deren Lokalisierung in künstlich hergestellten Körpern, insbesondere von Spannkanälen in Spannbetonbauteilen, mit den dafür vorgesehenen Materialien, insbesondere mit Ver-   pressmörtel.   



   In Spannbetonbauwerken werden Spannkanäle verlegt, um darin die Spannkabel einzuziehen. Nach dem Verspannen eines Spannkabels muss der im Spannkanal noch freie Raum vollständig mit Verpressmörtel verfüllt werden, was sowohl in Hinblick auf den Verbund der Spannkabel mit dem umgebenden Beton als auch zum Schutz des Spannkabels vor Korrosion erforderlich ist. 



   Es kann vorkommen, dass eine vollständige Verfüllung nicht erreicht wird und lufterfüllte Hohlräume zurückbleiben. Wegen der stets vorhandenen Feuchtigkeit wird an diesen Punkten eine Korrosion der Spannkabel auftreten, die schliesslich zu deren Bruch führen kann, so dass das Tragvermögen des entsprechenden Bauteiles vermindert wird oder ein Versagen der gesamten Konstruktion eintritt. 



   Es sind Verfahren bekannt, die eine möglichst gute Verfüllung ermöglichen,   z. B.   in DE-PS Nr. 1684437, bei welchen der Leerraum zwischen Spannkanal und Spannkabel vor dem Verfüllen evakuiert wird, um Lufteinschlüsse zu vermeiden. Auch bei diesem Verfahren ist jedoch keine Garantie für die vollständige Verfüllung gegeben, so dass es notwendig ist zu beweisen, dass der Leerraum tatsächlich vollständig mit Verpressmörtel ausgefüllt ist, damit das betreffende Spannglied, entsprechend der Berechnung, als wirksam vorausgesetzt werden kann. 



   Zur Überprüfung der Vollständigkeit der Verfüllung ist eine Methode bekannt (DE-OS 2210226B2), bei der das freie Volumen im Spannkanal nach dem Evakuieren mit Gas gefüllt und die dazu erforderliche Gasmenge, die im wesentlichen gleich dem zu verfüllenden Volumen ist, gemessen wird. Nach abermaligem Evakuieren wird mit Verpressmörtel verfüllt, wobei das benötigte Volumen des Verpressmörtels ebenfalls bestimmt wird. Aus dem Vergleich des Gasvolumens und des Mörtelvolumens kann man feststellen, ob der Spannkanal vollständig verfüllt ist. Falls das aufgewendete Mörtelvolumen kleiner ist als das gemessene Gasvolumen, kann man auf das Vorhandensein von Hohlräumen, nicht jedoch auf den Ort schliessen.

   Da eine Reparatur durch nachträgliches Verfüllen dieser Hohlräume nur dann durchführbar ist, wenn eine genaue Lokalisierung der Hohlräume möglich ist, kann dieser gesamte Spannkanal inklusive Spannkabel für die Berechnung der Tragfähigkeit nicht mehr herangezogen werden. Weitere Nachteile der Methode bestehen darin, dass die Spannkanäle gasdicht sein müssen und dass die Abhängigkeit des Gasvolumens von der Temperatur, die im Beton und in der Umgebungsluft meist verschieden ist, Probleme mit der Messgenauigkeit schafft. 



   Es sind Verfahren bekannt, vorhandene Hohlräume mittels Durchstrahlungsradiographie bzw. mittels Ultraschallverfahren (Stahl und Eisen, Band 93,1978, Nr. 17) zu bestimmen. Wegen der starken Absorption der für die Radiographie verwendeten Strahlung in Beton ist dieses Verfahren wegen der erforderlichen langen Belichtungszeit für den Registrierfilm nur für Betonstärken bis zu 55 cm praktisch anwendbar. Auch bei geringeren Dicken der Betonkörper ist wegen der langen Belichtungszeiten eine routinemässige Überprüfung sämtlicher Spannkabel über deren gesamte Länge zu aufwendig. Ausserdem müssen bei Messungen nach dem Durchstrahlungs- 
 EMI1.1 
 



   Die Erfindung hat das Ziel eine einfache, rasche Kontrolle sämtlicher Spannkanäle unter Vermeidung der oben genannten Nachteile zu ermöglichen, um möglichst bald nach dem Verpressen, insbesondere vor dem Erstarren des Verpressmörtels eventuell vorhandene schädliche Hohlräume festzustellen und zu lokalisieren, so dass eine Reparatur möglich ist.

   Dies wird bei einem Verfahren der eingangs genannten Art erfindungsgemäss dadurch erzielt, dass vor der Herstellung des einen oder mehrere Hohlräume enthaltenden Körpers in einer zur Herstellung dieses Körpers erforderlichen Schalung ein oder mehrere für die Aufnahme von Messsonden geeignete Führungsrohre, vorteilhafterweise mit kreisförmigem Querschnitt, in etwa äquidistant zu der Schalung für die Hohlräume eingebaut werden und dass nach der Herstellung des Körpers und nach dem Verfüllen der Hohlräume in an sich bekannter Weise mittels in den Führungsrohren bewegten 

 <Desc/Clms Page number 2> 

 
 EMI2.1 
 

 <Desc/Clms Page number 3> 

 beispielen näher erläutert.

   Es zeigen   Fig. la, lb, Ic, Id   verschiedene Führungsrohre, Fig. 2 bis 4 ein verschiedenen Anzahlen von Spannkanälen zugeordnetes Führungsrohr und Fig. 5 bis 7 in einen Spannkanal integrierte Führungsrohre. 



   Fig. la zeigt den Querschnitt eines runden   Führungsrohres--l-mit   drei Vorsprüngen   - -2--.   Die   Messsonde --3-- wird   durch an ihr befindliche Nuten --4-- in ihrer Lage im Führungsrohr so fixiert, dass die   Messrichtung --5-- der   Messsonde auf den zu überprüfenden Spannkanal   orientiert ist. In. Fig. 1b   ist die gleiche Ausführungsform gezeigt, jedoch ist die   Messrichtung--5--   der Messsonde, durch um zirka 120  verdrehtes Einsetzen der Messsonde in das Führungsrohr, auf einen andern in dieser Richtung befindlichen Spannkanal orientiert. 



   Fig. 1c zeigt den Querschnitt eines runden   Führungsrohres-l--mit   einem Vorsprung   - -2--.   Die   Messsonde --3-- wird   durch eine in ihr befindlichen Nut --4-- so fixiert, dass die   Messrichtung --5-- ständig   auf den zu untersuchenden Spannakanl orientiert ist. In   Fig. 1d   ist die gleiche Ausführungsform eines Führungsrohres mit einem Vorsprung gezeigt, jedoch wird die   Messrichtung --5-- der   Messsonde verändert, je nachdem in welche der,   z. B. drei,   Nuten der Messsonde der Vorsprung eingreift. 



   Fig. 2 zeigt ein   Führungsrohr-l-und   einen Spannkanal --6--. Im Spannkanal ist beispielsweise die Lage der   Spannkabel --7-- gezeigt.   Wie aus der Fig. 2 ersichtlich, ist mittels einer speziell ausgebildeten Befestigungseinrichtung --8-- das Führungsrohr so mit dem Spannkanal verbunden, dass die durch den Vorsprung bzw. die Nut vorgegebene Messrichtung --5-- der Messsonde --3-- stets auf den Spannkanalmittelpunkt gerichtet ist und der Abstand der Messsonde zum Spannkanal konstant gehalten wird. 



   Fig. 3 zeigt eine Anordnung eines   Führungsrohres --1--,   welches die Überprüfung zweier   Spannkanäle --6-- auf   vollständige Verdünnung mit Verpressmörtel gestattet. Die beiden Spannkanäle werden gemeinsam mit dem speziellen   Führungsrohr-l-mittels   des Distanzhalters bzw. der besonders ausgebildeten Befestigungseinrichtung --8-- vor der Verlegung zusammengespannt und anschliessend gemeinsam verlegt. Nach dem Einführen und Vorspannen der Spanndrähte - und der Verfüllung mit Verpressmörtel wird zunächst,   z. B.   der rechte Spannkanal überprüft, wobei die   Messrichtung --5-- der Messsonde --3-- durch   die   Vorsprünge --2-- und   durch die zwei ausgewählten Nuten --4-- vorgegeben ist.

   In einer weiteren Messung wird der zweite Spannkanal überprüft, wobei die Messrichtung der Messsonde durch Verdrehen der Messsonde und Verwendung der beiden andern Nuten der Messsonde in Richtung auf den zweiten Spannkanal gewährleistet wird. 



   Fig. 4 zeigt die Ausbildung eines für die Überprüfung von vier Spannkanälen ausgebildeten Führungsrohres mit vier Vorsprüngen und dessen Anordnung gegenüber von vier Spannkanälen, wobei diese durch eine Befestigungseinrichtung --8-- zueinander fixiert sind. Durch Drehung der   Messsonde --3-- wird   unter jeweiliger Verwendung einer andern Nut-Vorsprung-Kombination die   Messrichtung --5-- jeweils   auf einen andern Spannkanal gerichtet und dieser   z. B.   mittels   Y-Rückstreutechnik   überprüft. 



   Fig. 5 zeigt den Querschnitt eines   Spannkanals --6-- sowie   eine   Messsonde --3-- mit   einem Vorsprung --2-- mit einem in den   Spannkanal --4-- integrierten Führungsrohr --1-- mit   einer Nut --4--. Die Herstellung dieser Kombination erfolgt,   z. B.   dadurch, dass zunächst das Führungsrohr, mit in entsprechenden Abständen montierten selbstklemmenden   Schutzdistanzstücken --9--   in einen, insbesondere runden Spannkanal --6-- eingebracht und anschliessend durch Quetschen,   z. B.   mittels eines geeigneten Formstückes, im Spannkanal fixiert wird. 



   Fig. 6 zeigt die Anordnung eines wie in Fig. 5 dargestellten in den Spannkanal integrierten Führungsrohres, jedoch mit zwei   Vorsprüngen --2--,   einer Messsonde mit drei Nuten --4-- und zwei weiteren Spannkanälen. Durch Verdrehen der   Messsonde --3-- wird,   unter Verwendung jeweils einer andern Nut-Vorsprung-Kombination, die   Messrichtung --5-- auf   den jeweils zu überprüfenden Spannkanal --6-- orientiert. 



   Fig. 7 zeigt die Anordnung eines wie gemäss Fig. 5 in den Spannkanal integrierten Führungsrohres --1--, jedoch hat der Spannkanal ebenso wie das   Führungsrohr-l-einen   in etwa viereckigen Querschnitt. Durch den rechteckigen Querschnitt des Führungsrohres sind zusätzliche Führungshilfen zur Ausrichtung der   Messsonde --2-- in Messrichtung --5-- auf   den Spannkanal- 

 <Desc/Clms Page number 4> 

 mittelpunkt nicht erforderlich. 



    PATENTANSPRÜCHE :    
1. Verfahren zum Prüfen der Vollständigkeit der Verpressung von Hohlräumen und deren Lokalisierung in künstlich hergestellten Körpern, insbesondere von Spannkanälen in Spannbetonbauteilen, mit den dafür vorgesehenen Materialien, insbesondere mit Verpressmörtel, dadurch gekennzeichnet, dass vor der Herstellung des einen oder mehrere Hohlräume enthaltenden Körpers in einer zur Herstellung dieses Körpers erforderlichen Schalung ein oder mehrere für die Aufnahme von Messsonden geeignete Führungsrohre, vorteilhafterweise mit kreisförmigem Querschnitt, in etwa äquidistant zu der Schalung für die Hohlräume, eingebaut werden und dass nach der Herstellung des Körpers und nach dem Verfüllen der Hohlräume in an sich bekannter Weise mittels in den Führungsrohren bewegten Messsonden,

   insbesondere mittels   y-Rückstreumessverfahren   oder   Ultraschallverfahren,   die Vollständigkeit der Verpressung bzw. das Vorhandensein, die Lage und die räumliche Ausdehnung eventueller Fehlstellen, insbesondere durch Vergleich mit einer vor dem Verpressen durchgeführten Kontrollmessung, bestimmt wird.



   <Desc / Clms Page number 1>
 



   The invention relates to a method for checking the completeness of the compression of cavities and their localization in artificially produced bodies, in particular of prestressing channels in prestressed concrete components, with the materials provided for this, in particular with grout.



   In prestressed concrete structures, prestressing ducts are laid in order to pull in the prestressing cables. After tensioning a tensioning cable, the space that is still free in the tensioning channel must be completely filled with grout, which is necessary both with regard to the connection of the tensioning cable with the surrounding concrete and to protect the tensioning cable against corrosion.



   It can happen that a full backfill is not achieved and air-filled cavities remain. Because of the moisture that is always present, corrosion of the tensioning cables will occur at these points, which can ultimately lead to their breakage, so that the load-bearing capacity of the corresponding component is reduced or the entire construction fails.



   Methods are known which enable the best possible backfilling, e.g. B. in DE-PS No. 1684437, in which the empty space between the tensioning channel and tensioning cable is evacuated before filling in order to avoid air pockets. However, even with this method there is no guarantee of complete backfill, so it is necessary to prove that the empty space is actually completely filled with grout so that the tendon in question can be assumed to be effective, according to the calculation.



   To check the completeness of the backfilling, a method is known (DE-OS 2210226B2) in which the free volume in the clamping channel is filled with gas after evacuation and the amount of gas required for this, which is essentially equal to the volume to be backfilled, is measured. After evacuation again, grouting is carried out, whereby the required volume of grouting is also determined. By comparing the gas volume and the mortar volume, you can determine whether the clamping channel is completely filled. If the volume of mortar used is smaller than the measured gas volume, one can conclude that voids are present, but not the location.

   Since repairs can only be carried out by backfilling these cavities if precise localization of the cavities is possible, this entire clamping channel including the clamping cable can no longer be used to calculate the load-bearing capacity. Further disadvantages of the method are that the clamping channels must be gas-tight and that the dependence of the gas volume on the temperature, which is usually different in the concrete and in the ambient air, creates problems with the measuring accuracy.



   Methods are known for determining existing cavities by means of radiography or by means of ultrasound methods (steel and iron, volume 93, 1978, no. 17). Because of the strong absorption of the radiation used for radiography in concrete, this method can only be used for concrete thicknesses of up to 55 cm because of the long exposure time required for the recording film. Even with smaller thicknesses of the concrete body, a routine inspection of all tensioning cables over their entire length is too complex due to the long exposure times. In addition, measurements after radiography must
 EMI1.1
 



   The aim of the invention is to enable a simple, rapid control of all tensioning channels while avoiding the disadvantages mentioned above, in order to identify and locate any harmful cavities as soon as possible after the grouting, in particular before the grout has solidified, so that a repair is possible.

   This is achieved according to the invention in a method of the type mentioned at the outset in that, before the production of the body containing one or more cavities, one or more guide tubes, advantageously with a circular cross section, are suitable in a formwork required for the production of this body, advantageously with a circular cross section be installed equidistant to the formwork for the cavities and that after the production of the body and after the filling of the cavities in a known manner by means of moving in the guide tubes

 <Desc / Clms Page number 2>

 
 EMI2.1
 

 <Desc / Clms Page number 3>

 examples explained in more detail.

   FIGS. 1 a, 1 b, 1 c, 1 d show different guide tubes, FIGS. 2 to 4 guide tubes assigned to different numbers of clamping channels and FIGS. 5 to 7 guide tubes integrated in one clamping channel.



   Fig. La shows the cross section of a round guide tube - l-with three projections - -2--. The measuring probe --3-- is fixed in position in the guide tube by grooves --4-- on it so that the measuring direction --5-- of the measuring probe is oriented towards the clamping channel to be checked. In. 1b shows the same embodiment, but the measuring direction - 5-- of the measuring probe is oriented towards another clamping channel located in this direction by inserting the measuring probe into the guide tube rotated by approximately 120.



   Fig. 1c shows the cross section of a round guide tube-l - with a projection - -2--. The measuring probe --3-- is fixed in its groove --4-- in such a way that the measuring direction --5-- is always oriented towards the clamping channel to be examined. In Fig. 1d the same embodiment of a guide tube with a projection is shown, but the measuring direction --5-- of the measuring probe is changed, depending on which of the z. B. three, grooves of the probe engages the projection.



   Fig. 2 shows a guide tube l and a clamping channel --6--. The position of the tensioning cables --7-- is shown in the tensioning channel, for example. As can be seen from FIG. 2, the guide tube is connected to the tensioning channel by means of a specially designed fastening device --8-- in such a way that the measuring direction --5-- of the measuring probe --3-- specified by the projection or the groove is always directed towards the center of the span and the distance between the probe and the span is kept constant.



   Fig. 3 shows an arrangement of a guide tube --1--, which allows the checking of two clamping channels --6-- for complete dilution with grout. The two clamping channels are clamped together with the special guide tube-l-by means of the spacer or the specially designed fastening device --8-- before laying and then laid together. After inserting and prestressing the tension wires - and backfilling with grout, the first step is e.g. B. the right clamping channel is checked, whereby the measuring direction --5-- of the measuring probe --3-- is specified by the projections --2-- and by the two selected grooves --4--.

   In a further measurement, the second clamping channel is checked, the measuring direction of the measuring probe being ensured by turning the measuring probe and using the two other grooves of the measuring probe in the direction of the second clamping channel.



   Fig. 4 shows the formation of a guide tube designed for checking four clamping channels with four projections and its arrangement opposite four clamping channels, these being fixed to one another by a fastening device. By rotating the measuring probe --3--, using a different groove-projection combination, the measuring direction --5-- is directed towards a different clamping channel. B. checked by means of Y backscattering technology.



   Fig. 5 shows the cross-section of a clamping channel --6-- and a measuring probe --3-- with a projection --2-- with a guide tube --1-- integrated in the clamping channel --4-- with a groove - -4--. The production of this combination takes place, for. B. by first introducing the guide tube with self-clamping protective spacers --9-- installed in appropriate intervals into a, in particular round, clamping channel --6-- and then by squeezing, e.g. B. is fixed by means of a suitable fitting in the clamping channel.



   FIG. 6 shows the arrangement of a guide tube integrated into the tensioning channel as shown in FIG. 5, but with two projections --2--, a measuring probe with three grooves --4-- and two further tensioning channels. By turning the measuring probe --3--, using a different groove-projection combination, the measuring direction --5-- is oriented towards the respective clamping channel --6-- to be checked.



   FIG. 7 shows the arrangement of a guide tube --1-- integrated into the tensioning channel as shown in FIG. 5, but the tensioning channel, like the guide tube-1-, has an approximately square cross section. Due to the rectangular cross-section of the guide tube, additional guide aids for aligning the measuring probe --2-- in the measuring direction --5-- on the clamping channel-

 <Desc / Clms Page number 4>

 center point not required.



    PATENT CLAIMS:
1. A method for checking the completeness of the compression of cavities and their localization in artificially produced bodies, in particular of prestressing channels in prestressed concrete components, with the materials provided for this, in particular with grout, characterized in that before the production of the body or cavities containing one in a formwork required for the production of this body, one or more guide tubes suitable for receiving measuring probes, advantageously with a circular cross section, approximately equidistant from the formwork for the cavities, and that after the production of the body and after the filling of the cavities in at known way by means of measuring probes moving in the guide tubes,

   The completeness of the pressing or the presence, the position and the spatial extent of any defects, in particular by comparison with a control measurement carried out before pressing, is determined in particular by means of the y backscatter measuring method or ultrasonic method.

 

Claims (1)

2. Einrichtung zum Prüfen der Vollständigkeit der Verpressung von Hohlräumen und deren Lokalisierung in künstlich hergestellten Körpern, insbesondere von Spannkanälen in Spannbetonbauteilen, mit den dafür vorgesehenen Materialien, insbesondere mit Verpressmörtel, zur Durchführung des Verfahrens nach Anspruch 1, dadurch gekennzeichnet, dass in dem mindestens einen verpressten Hohlraum enthaltenden Körper in etwa äquidistant zu dem Hohlraum ein oder mehrere EMI4.1  2. Device for checking the completeness of the pressing of cavities and their localization in artificially produced bodies, in particular of prestressing channels in prestressed concrete components, with the materials provided for this, in particular with grout, for carrying out the method according to claim 1, characterized in that in the at least a pressed cavity containing body approximately equidistant to the cavity one or more  EMI4.1   3. Einrichtung nach Anspruch 2, dadurch gekennzeichnet, dass zwischen der Messsonde (3) und dem die Messsonde (3) umgebenden Führungsrohr (1) mindestens eine axial verlaufende Führung (2, 4) in Form einer an der Wand eines der beiden Teile vorgesehenen Nut (4) und eines dieser zugeordneten in die Nut (4) eingreifenden, am andern Teil befindlichen Vorsprunges (2) angeordnet ist.  3. Device according to claim 2, characterized in that between the measuring probe (3) and the measuring probe (3) surrounding the guide tube (1) at least one axially extending guide (2, 4) provided in the form of on the wall of one of the two parts Groove (4) and one of these associated in the groove (4) engaging, located on the other part projection (2) is arranged. 4. Einrichtung nach Anspruch 2 oder 3, dadurch gekennzeichnet, dass die äquidistante Fixierung der Führungsrohre (1) zu den zu überprüfenden Spannkanälen (6) durch als Distanzhalter (8, 9) ausgebildete Befestigungseinrichtungen erfolgt.  4. Device according to claim 2 or 3, characterized in that the equidistant fixation of the guide tubes (1) to the clamping channels (6) to be checked is carried out by means of fastening devices designed as spacers (8, 9). 5. Einrichtung nach einem der Ansprüche 2 bis 4, dadurch gekennzeichnet, dass die Zahl der Nuten (4) grösser ist als die Zahl der Vorsprünge (2), wobei die Winkel zwischen den Nuten (4) den zwischen den Vorsprüngen (2) liegenden Winkeln angepasst sind, um eine Verdrehung der Messsonde (3) gegen das Führungsrohr (1) zu ermöglichen.  5. Device according to one of claims 2 to 4, characterized in that the number of grooves (4) is greater than the number of projections (2), the angle between the grooves (4) lying between the projections (2) Angles are adjusted to allow the measuring probe (3) to be rotated against the guide tube (1). 6. Einrichtung nach einem der Ansprüche 2 bis 5, dadurch gekennzeichnet, dass das Führungsrohr (1) als Teil des Spannkanals (6) ausgebildet ist oder mit diesem mittels spezieller Befestigungseinrichtungen, die vorzugsweise als selbstklemmende Schutzdistanzstücke (9) ausgebildet sind, fix verbunden ist.  6. Device according to one of claims 2 to 5, characterized in that the guide tube (1) is formed as part of the clamping channel (6) or with this by means of special fastening devices, which are preferably designed as self-locking protective spacers (9), fixedly connected .
AT253081A 1981-06-05 1981-06-05 Method and device for checking the completeness of the grouting of cavities and their localization in artificially produced bodies AT388249B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
AT253081A AT388249B (en) 1981-06-05 1981-06-05 Method and device for checking the completeness of the grouting of cavities and their localization in artificially produced bodies

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
AT253081A AT388249B (en) 1981-06-05 1981-06-05 Method and device for checking the completeness of the grouting of cavities and their localization in artificially produced bodies

Publications (2)

Publication Number Publication Date
ATA253081A ATA253081A (en) 1988-10-15
AT388249B true AT388249B (en) 1989-05-26

Family

ID=3535929

Family Applications (1)

Application Number Title Priority Date Filing Date
AT253081A AT388249B (en) 1981-06-05 1981-06-05 Method and device for checking the completeness of the grouting of cavities and their localization in artificially produced bodies

Country Status (1)

Country Link
AT (1) AT388249B (en)

Also Published As

Publication number Publication date
ATA253081A (en) 1988-10-15

Similar Documents

Publication Publication Date Title
DE2624559C2 (en) Mountain anchor
DE3218517C2 (en) Tubbing lining for tunnels, galleries or the like. and measuring device for checking the joint width of such a segment construction
DE2920886C2 (en) Method and device for determining displacements in the ground, in rock, in structures and the like
AT388249B (en) Method and device for checking the completeness of the grouting of cavities and their localization in artificially produced bodies
EP0260220A1 (en) Method of placing pipes into a pipeline
DE2500091A1 (en) METHOD AND DEVICE FOR DETERMINING MATERIAL DEFECTS AND INHOMOGENITIES IN THE AREA OF A TEST BORE
DE102008035119B3 (en) Functionality testing device for radiation therapy probe, has movable positioning system provided with receiving device for receiving radiation therapy probe or for receiving radiation source
EP0188798A2 (en) Method for the assembling of a tubing for measuring purposes
DE3047792A1 (en) METHOD FOR PRE-DETERMINING THE REMAINING LIFE OF A COMPONENT
DE2550742B2 (en) Procedure for leak testing of the joining points of pipes
DE202020102257U1 (en) Experimental arrangement for a compression sealing profile
EP0181945A1 (en) Method of sealing a tube or a rod in an opening of a construction element
DE3823220A1 (en) Method for the location of hollow spaces or the like in concrete structures and concrete prefabrications, especially in prestressed concrete structures
DE19751812A1 (en) Adjustment element for coordinate measuring machines
DD293884A5 (en) DEVICE FOR DETERMINING THE FRESH SUPPLEMENT OF REINFORCING STEEL
DE19647749A1 (en) Building brick or stone water take-up measurement
DE102021131022B4 (en) Method and device for verifying a watertight connection between a light well and a structure
DE2158905C3 (en) Measuring anchor for measuring changes in a rock body surrounding a mining cavity
AT283011B (en) Method and device for measuring tensile forces in tensioning cables and ground anchors with prestressed prestressing steels
EP4039885A1 (en) Method and device for thermal monitoring of a structure of a material which sets in response to temperature change
DE202017006047U1 (en) Remote control with tube bridge tripod
DE1059687B (en) Dynamometric device for measuring the average tension of parallel tensioned wires
AT388615B (en) DEVICE FOR MEASURING THE CUT SIZE IN TUNNEL LINING
DE1225895B (en) Method and device for testing the circumferential weld seam of pipes for leaks
DE1634357C (en) Process for producing a tie rod and device for carrying out this process

Legal Events

Date Code Title Description
ELJ Ceased due to non-payment of the annual fee