Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Siemens AgfiledCriticalSiemens Ag
Application grantedgrantedCritical
Publication of AT168111BpublicationCriticalpatent/AT168111B/de
H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
H02J3/00—Circuit arrangements for AC mains or AC distribution networks
H02J3/12—Circuit arrangements for AC mains or AC distribution networks for adjusting voltage in AC networks by changing a characteristic of the network load
H02J3/14—Circuit arrangements for AC mains or AC distribution networks for adjusting voltage in AC networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading
H02J2105/52—
Landscapes
Engineering & Computer Science
(AREA)
Power Engineering
(AREA)
AT168111D1949-05-121949-05-12Verfahren zur Kontrolle des Verbrauches an elektrischer Energie od. dgl.
AT168111B
(de)