Strom durchführung für Elektrodendampfkessel.
EMI1.1
**WARNUNG** Ende DESC Feld kannt Anfang CLMS uberlappen**.
<Desc / Clms Page number 1>
Power feedthrough for electrode steam boiler.
EMI1.1
** WARNING ** End of DESC field may overlap beginning of CLMS **.
Claims (1)
<Desc/Clms Page number 2>
<Desc / Clms Page number 2>
3. Stromdurchführung nach Anspruch 1 und 2, dadurch gekennzeichnet, dass die eine Stopfbüchse mittels einer zweckmässig aus Handrad, Schraubenspindel und Winkelhebel bestehenden Verstelleinrichtung gegen die andere Stopfbüchse verschiebbar ist.
EMI2.1
3. Current feedthrough according to claim 1 and 2, characterized in that the one stuffing box can be displaced against the other stuffing box by means of an adjusting device consisting of a handwheel, screw spindle and angle lever.
EMI2.1
AT109926D1927-01-201927-01-20
Power feedthrough for electrode steam boiler.
AT109926B
(en)