AR119026A1 - Presurizar y proteger un pozo original durante la fracturación de un pozo secundario - Google Patents
Presurizar y proteger un pozo original durante la fracturación de un pozo secundarioInfo
- Publication number
- AR119026A1 AR119026A1 ARP200101503A ARP200101503A AR119026A1 AR 119026 A1 AR119026 A1 AR 119026A1 AR P200101503 A ARP200101503 A AR P200101503A AR P200101503 A ARP200101503 A AR P200101503A AR 119026 A1 AR119026 A1 AR 119026A1
- Authority
- AR
- Argentina
- Prior art keywords
- original
- borehole
- well
- stage
- well stage
- Prior art date
Links
- 238000000034 method Methods 0.000 abstract 2
- 239000012530 fluid Substances 0.000 abstract 1
- 238000005086 pumping Methods 0.000 abstract 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
- E21B43/261—Separate steps of (1) cementing, plugging or consolidating and (2) fracturing or attacking the formation
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/003—Determining well or borehole volumes
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/09—Locating or determining the position of objects in boreholes or wells, e.g. the position of an extending arm; Identifying the free or blocked portions of pipes
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geophysics (AREA)
- Measuring Fluid Pressure (AREA)
Abstract
Un método para proteger un pozo de sondeo incluye identificar un pozo de sondeo original y un pozo de sondeo secundario e identificar una etapa del pozo original a lo largo del pozo de sondeo original que tiene el potencial de interactuar con una etapa del pozo secundario a lo largo del pozo de sondeo secundario mientras la etapa del pozo secundario experimenta fracturación hidráulica. El método incluye, además, bombear un fluido de tratamiento en el fondo del pozo en la etapa del pozo original para presurizar la etapa del pozo original hasta una presión igual o superior a la presión en la etapa del pozo secundario mientras la etapa del pozo secundario experimenta fracturación hidráulica y mantener la presión en la etapa del pozo original que es igual o superior a la presión en la etapa del pozo secundario mientras la etapa del pozo secundario experimenta fracturación hidráulica.
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US16/457,153 US10934825B2 (en) | 2019-06-28 | 2019-06-28 | Pressurizing and protecting a parent well during fracturing of a child well |
Publications (1)
Publication Number | Publication Date |
---|---|
AR119026A1 true AR119026A1 (es) | 2021-11-17 |
Family
ID=74042878
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
ARP200101503A AR119026A1 (es) | 2019-06-28 | 2020-05-28 | Presurizar y proteger un pozo original durante la fracturación de un pozo secundario |
Country Status (4)
Country | Link |
---|---|
US (1) | US10934825B2 (es) |
AR (1) | AR119026A1 (es) |
CA (1) | CA3135104C (es) |
WO (1) | WO2020263382A1 (es) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AU2023229357A1 (en) * | 2022-03-01 | 2024-09-19 | Differential Engineering Inc. | Systems and methods for using external and internal reactors to produce and use a custom treatment fluid to change the internal conditions of piles |
Family Cites Families (21)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3709295A (en) * | 1971-06-24 | 1973-01-09 | Dow Chemical Co | Fracturing of subterranean formations |
US4005750A (en) * | 1975-07-01 | 1977-02-01 | The United States Of America As Represented By The United States Energy Research And Development Administration | Method for selectively orienting induced fractures in subterranean earth formations |
US4724905A (en) * | 1986-09-15 | 1988-02-16 | Mobil Oil Corporation | Sequential hydraulic fracturing |
US4830106A (en) * | 1987-12-29 | 1989-05-16 | Mobil Oil Corporation | Simultaneous hydraulic fracturing |
US4836284A (en) * | 1988-01-26 | 1989-06-06 | Shell Western E&P Inc. | Equilibrium fracture acidizing |
US5261489A (en) * | 1992-09-17 | 1993-11-16 | Mobil Oil Corporation | Two well hydrocarbon producing method |
US5765642A (en) | 1996-12-23 | 1998-06-16 | Halliburton Energy Services, Inc. | Subterranean formation fracturing methods |
US7225869B2 (en) | 2004-03-24 | 2007-06-05 | Halliburton Energy Services, Inc. | Methods of isolating hydrajet stimulated zones |
DE112011103548T5 (de) * | 2010-10-20 | 2013-08-08 | Exxonmobil Upstream Research Co. | Verfahren zum Erzeugen eines Untergrund-Rissnetzwerks |
US8915297B2 (en) | 2011-09-13 | 2014-12-23 | Halliburton Energy Services, Inc. | Methods and equipment to improve reliability of pinpoint stimulation operations |
US9494025B2 (en) * | 2013-03-01 | 2016-11-15 | Vincent Artus | Control fracturing in unconventional reservoirs |
US9410406B2 (en) * | 2013-08-14 | 2016-08-09 | BitCan Geosciences & Engineering Inc. | Targeted oriented fracture placement using two adjacent wells in subterranean porous formations |
US9840900B2 (en) * | 2014-01-25 | 2017-12-12 | Petrovations Llc | Process for inhibiting flow of fracturing fluid in an offset wellbore |
US10683740B2 (en) * | 2015-02-24 | 2020-06-16 | Coiled Tubing Specialties, Llc | Method of avoiding frac hits during formation stimulation |
US9869170B2 (en) | 2015-03-17 | 2018-01-16 | Halliburton Energy Services, Inc. | Methods of controlling water production in horizontal wells with multistage fractures |
US10012064B2 (en) * | 2015-04-09 | 2018-07-03 | Highlands Natural Resources, Plc | Gas diverter for well and reservoir stimulation |
RU2591999C1 (ru) * | 2015-04-21 | 2016-07-20 | Шлюмберже Текнолоджи Б.В. | Способ ориентирования трещин гидравлического разрыва в подземном пласте, вскрытом горизонтальными стволами |
US10309207B2 (en) * | 2015-10-02 | 2019-06-04 | Halliburton Energy Services, Inc. | Methods of controlling well bashing |
US11921248B2 (en) | 2016-06-20 | 2024-03-05 | Schlumberger Technology Corporation | Tube wave analysis of well communication |
US10215014B2 (en) * | 2016-07-03 | 2019-02-26 | Reveal Energy Services, Inc. | Mapping of fracture geometries in a multi-well stimulation process |
US10851643B2 (en) | 2017-11-02 | 2020-12-01 | Reveal Energy Services, Inc. | Determining geometries of hydraulic fractures |
-
2019
- 2019-06-28 US US16/457,153 patent/US10934825B2/en active Active
-
2020
- 2020-04-10 CA CA3135104A patent/CA3135104C/en active Active
- 2020-04-10 WO PCT/US2020/027609 patent/WO2020263382A1/en active Application Filing
- 2020-05-28 AR ARP200101503A patent/AR119026A1/es active IP Right Grant
Also Published As
Publication number | Publication date |
---|---|
CA3135104A1 (en) | 2020-12-30 |
US20200408077A1 (en) | 2020-12-31 |
US10934825B2 (en) | 2021-03-02 |
WO2020263382A1 (en) | 2020-12-30 |
CA3135104C (en) | 2023-09-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CO2021011685A2 (es) | Método de diseño de polímeros para un control eficaz de la pérdida de fluido | |
SA519401475B1 (ar) | نظام لاستخدام مبادل ضغط في استخدام لضخ الطين | |
AR081692A1 (es) | Aditivos tensoactivos utilizados para conservar la producibilidad durante perforaciones | |
AR084368A1 (es) | Completacion de fracturamiento en multiples zonas | |
AR099059A1 (es) | Material de obturación fibroso a base de proteínas y proceso y sistema para tratar un pozo | |
AR099687A1 (es) | Divergencia en campo lejano con apuntalante pulsado en operaciones de fracturación subterránea | |
AR102886A1 (es) | Apuntalante que comprende un agente de recubrimiento para el tratamiento de pozos de petróleo | |
AR101604A1 (es) | Fracturación hidráulica durante la perforación y/o traslado | |
AR104712A1 (es) | Fluidos de fracturamiento con fibras hidrofílicas | |
AR099858A1 (es) | Fluidos de tratamiento para reducir daños en las formaciones subterráneas | |
AR087295A1 (es) | Particulados compuestos y sus metodos para formaciones de alta permeabilidad | |
AR102291A1 (es) | Materiales flexibles a base de carbono como materiales contra la pérdida de circulación y métodos relacionados | |
AR110105A1 (es) | Nanoemulsiones para usar en tratamientos de fracturamiento subterráneo | |
AR106052A1 (es) | Aminas etoxiladas para uso en formaciones subterráneas | |
CL2019003492A1 (es) | Máquina de perforación con martillo de fondo y método para perforar rocas. | |
CO2021000114A2 (es) | Métodos para cementar un pozo con el uso de un elastómero hinchable en aceite | |
AR101947A1 (es) | Optimización de fracturación hidráulica en una formación subterránea | |
AR120351A1 (es) | Método para el fracturamiento hidráulico y la mitigación del contraflujo de apuntalante | |
AR118655A1 (es) | Montaje y herramienta de intervención de bombeo descendente | |
CO2017009122A2 (es) | Metodología de ingeniería para tratar zonas de pérdida grave con un sistema de cemento tixotrópico | |
AR114195A1 (es) | Reversión rápida de la humectabilidad de formaciones subterráneas | |
AR116738A1 (es) | Proceso de fracturamiento de formaciones subterráneas | |
AR119026A1 (es) | Presurizar y proteger un pozo original durante la fracturación de un pozo secundario | |
AR094915A1 (es) | Particulados recubiertos con un adhesivo de acción retardada y métodos relacionados | |
AR099021A1 (es) | Productos de refuerzo para agentes reductores de la viscosidad que contienen compuestos de hierro y sus procedimientos de uso |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
FG | Grant, registration |