AR101281A1 - Optimización de diseño de fracturación hidráulica de múltiples etapas en función de mecánica de daño continuo tridimensional (3d) - Google Patents
Optimización de diseño de fracturación hidráulica de múltiples etapas en función de mecánica de daño continuo tridimensional (3d)Info
- Publication number
- AR101281A1 AR101281A1 ARP150102331A ARP150102331A AR101281A1 AR 101281 A1 AR101281 A1 AR 101281A1 AR P150102331 A ARP150102331 A AR P150102331A AR P150102331 A ARP150102331 A AR P150102331A AR 101281 A1 AR101281 A1 AR 101281A1
- Authority
- AR
- Argentina
- Prior art keywords
- hydraulic fracturing
- model
- global
- optimization
- function
- Prior art date
Links
- 238000005457 optimization Methods 0.000 title 1
- 230000015572 biosynthetic process Effects 0.000 abstract 2
- 239000004215 Carbon black (E152) Substances 0.000 abstract 1
- 239000012530 fluid Substances 0.000 abstract 1
- 229930195733 hydrocarbon Natural products 0.000 abstract 1
- 150000002430 hydrocarbons Chemical class 0.000 abstract 1
- 238000002347 injection Methods 0.000 abstract 1
- 239000007924 injection Substances 0.000 abstract 1
- 238000000034 method Methods 0.000 abstract 1
- 238000004088 simulation Methods 0.000 abstract 1
- 230000000638 stimulation Effects 0.000 abstract 1
Classifications
-
- G01V20/00—
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B41/00—Equipment or details not covered by groups E21B15/00 - E21B40/00
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
- G01V1/00—Seismology; Seismic or acoustic prospecting or detecting
- G01V1/28—Processing seismic data, e.g. analysis, for interpretation, for correction
- G01V1/282—Application of seismic models, synthetic seismograms
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/04—Directional drilling
- E21B7/046—Directional drilling horizontal drilling
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
- G01V2210/00—Details of seismic processing or analysis
- G01V2210/60—Analysis
- G01V2210/64—Geostructures, e.g. in 3D data cubes
- G01V2210/646—Fractures
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F2113/00—Details relating to the application field
- G06F2113/08—Fluids
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
- G06F30/23—Design optimisation, verification or simulation using finite element methods [FEM] or finite difference methods [FDM]
Abstract
Se proporcionan sistemas y métodos para optimizar el diseño de fracturación hidráulica de múltiples etapas en función de la mecánica de daño continuo tridimensional (3D). Se genera un modelo global 3D de un campo de yacimientos de hidrocarburos. Se realiza un análisis de elemento finito del modelo global 3D para calcular valores de una o más variables mecánicas para el campo. Se genera un submodelo 3D de menor escala de una parte seleccionada del campo del modelo global 3D en función de los valores calculados de las variables mecánicas. Los efectos de fracturación hidráulica de estimulación de inyección de fluido dentro de la formación de yacimiento dirigida se simulan aplicando uno o más modelos de daño numérico al submodelo. Se determinan parámetros de diseño óptimos para fracturación hidráulica de múltiples etapas de la formación de yacimiento dirigida con una pluralidad de pozos horizontales en función de resultados numéricos de la simulación.
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/US2014/053171 WO2016032489A1 (en) | 2014-08-28 | 2014-08-28 | Optimizing multistage hydraulic fracturing design based on three-dimensional (3d) continuum damage mechanics |
Publications (1)
Publication Number | Publication Date |
---|---|
AR101281A1 true AR101281A1 (es) | 2016-12-07 |
Family
ID=55400201
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
ARP150102331A AR101281A1 (es) | 2014-08-28 | 2015-07-22 | Optimización de diseño de fracturación hidráulica de múltiples etapas en función de mecánica de daño continuo tridimensional (3d) |
Country Status (6)
Country | Link |
---|---|
US (1) | US9836561B2 (es) |
EP (1) | EP3186477A4 (es) |
AR (1) | AR101281A1 (es) |
AU (1) | AU2014404414B2 (es) |
CA (1) | CA2955920C (es) |
WO (1) | WO2016032489A1 (es) |
Families Citing this family (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP3493074A1 (en) | 2006-10-05 | 2019-06-05 | Splunk Inc. | Time series search engine |
US10225136B2 (en) | 2013-04-30 | 2019-03-05 | Splunk Inc. | Processing of log data and performance data obtained via an application programming interface (API) |
US10346357B2 (en) | 2013-04-30 | 2019-07-09 | Splunk Inc. | Processing of performance data and structure data from an information technology environment |
US10353957B2 (en) | 2013-04-30 | 2019-07-16 | Splunk Inc. | Processing of performance data and raw log data from an information technology environment |
US10607170B1 (en) | 2015-06-08 | 2020-03-31 | DataInfoCom USA, Inc. | Systems and methods for analyzing resource production |
CN106321057B (zh) * | 2016-11-02 | 2018-10-02 | 广东石油化工学院 | 水平井压裂裂缝井网模型设计方法 |
US10605054B2 (en) | 2017-02-15 | 2020-03-31 | General Electric Co. | System and method for generating a schedule to extract a resource from a reservoir |
CA3062854A1 (en) * | 2017-05-02 | 2019-11-29 | Schlumberger Canada Limited | Method for predicting of hydraulic fracturing and associated risks |
CN107237616A (zh) * | 2017-07-21 | 2017-10-10 | 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 | 一种水平井体积压裂簇间距优化方法 |
EP3768939A4 (en) * | 2018-03-21 | 2021-12-29 | Resfrac Corporation | Systems and methods for hydraulic fracture and reservoir simulation |
CN111829887B (zh) * | 2019-04-22 | 2023-07-04 | 中国石油化工股份有限公司 | 一种基于高压压汞的岩石压裂模拟实验方法 |
CN111335866B (zh) * | 2020-02-26 | 2022-06-03 | 中国石油天然气股份有限公司 | 一种致密砂岩气藏低品质储层水平井优选方法 |
US11873709B2 (en) * | 2020-10-07 | 2024-01-16 | Saudi Arabian Oil Company | Log based diagenetic rock typing and sweet spot identification for tight gas sandstone reservoirs |
US11391135B1 (en) | 2021-01-04 | 2022-07-19 | Saudi Arabian Oil Company | Fracturing a subsurface formation based on the required breakdown pressure |
WO2023006164A1 (en) * | 2021-07-26 | 2023-02-02 | Leonid Surguchev | Process of hydrogen production in hydrocarbon fields without greenhouse emissions |
Family Cites Families (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20060015310A1 (en) | 2004-07-19 | 2006-01-19 | Schlumberger Technology Corporation | Method for simulation modeling of well fracturing |
US7925482B2 (en) | 2006-10-13 | 2011-04-12 | Object Reservoir, Inc. | Method and system for modeling and predicting hydraulic fracture performance in hydrocarbon reservoirs |
US8548782B2 (en) * | 2007-08-24 | 2013-10-01 | Exxonmobil Upstream Research Company | Method for modeling deformation in subsurface strata |
US8494827B2 (en) * | 2009-09-25 | 2013-07-23 | Exxonmobil Upstream Research Company | Method of predicting natural fractures and damage in a subsurface region |
US8386226B2 (en) | 2009-11-25 | 2013-02-26 | Halliburton Energy Services, Inc. | Probabilistic simulation of subterranean fracture propagation |
US8731889B2 (en) * | 2010-03-05 | 2014-05-20 | Schlumberger Technology Corporation | Modeling hydraulic fracturing induced fracture networks as a dual porosity system |
US9164192B2 (en) * | 2010-03-25 | 2015-10-20 | Schlumberger Technology Corporation | Stress and fracture modeling using the principle of superposition |
RU2561114C2 (ru) | 2010-12-30 | 2015-08-20 | Шлюмбергер Текнолоджи Б.В. | Система и способ для выполнения операций интенсификации добычи в скважине |
US10260317B2 (en) * | 2011-09-20 | 2019-04-16 | Bp Corporation North America Inc. | Automated generation of local grid refinement at hydraulic fractures for simulation of tight gas reservoirs |
NO345808B1 (no) * | 2012-12-27 | 2021-08-16 | Geoquest Systems Bv | Flersegmentsprekker |
-
2014
- 2014-08-28 AU AU2014404414A patent/AU2014404414B2/en not_active Expired - Fee Related
- 2014-08-28 EP EP14900346.9A patent/EP3186477A4/en not_active Withdrawn
- 2014-08-28 CA CA2955920A patent/CA2955920C/en not_active Expired - Fee Related
- 2014-08-28 US US14/770,076 patent/US9836561B2/en not_active Expired - Fee Related
- 2014-08-28 WO PCT/US2014/053171 patent/WO2016032489A1/en active Application Filing
-
2015
- 2015-07-22 AR ARP150102331A patent/AR101281A1/es unknown
Also Published As
Publication number | Publication date |
---|---|
US20170169137A1 (en) | 2017-06-15 |
AU2014404414A1 (en) | 2017-02-02 |
US9836561B2 (en) | 2017-12-05 |
CA2955920A1 (en) | 2016-03-03 |
CA2955920C (en) | 2019-06-11 |
EP3186477A4 (en) | 2018-03-28 |
AU2014404414B2 (en) | 2020-01-02 |
WO2016032489A1 (en) | 2016-03-03 |
EP3186477A1 (en) | 2017-07-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
AR101281A1 (es) | Optimización de diseño de fracturación hidráulica de múltiples etapas en función de mecánica de daño continuo tridimensional (3d) | |
AR114711A1 (es) | Sistemas y métodos de simulación de fracturación hidráulica y de yacimiento | |
AR102682A1 (es) | Sistemas y métodos para optimizar operaciones de fracturación en una formación | |
AR113194A1 (es) | Sistemas y métodos para estimar una probabilidad de productividad de un reservorio como función de la posición en un volumen de subsuelo de interés | |
AR084654A1 (es) | Modelado de fracturas hidraulicas | |
GB2550820A (en) | Enhanced oil recovery(EOR)chemical coreflood simulation study workflow | |
CL2019001428A1 (es) | Métodos para el análisis de aumento de presión de cierre. | |
MX2018005522A (es) | Sistemas y metodos para evaluar y optimizar eficiencia de estimulacion utilizando desviadores. | |
FI20125644L (fi) | Tietokoneavusteinen mallintaminen | |
MX2016014138A (es) | Modelo computacional y metodos de impresion tridimensional (3d). | |
MX2016013490A (es) | Inversion rapida de campo de ondas completo viscoacustico y viscoelastico. | |
AR103542A1 (es) | Perforación con presión controlada con modelado hidráulico que incorpora un modelo inverso | |
AR113152A1 (es) | Sistemas y métodos para estimar la productividad de un reservorio como una función de la profundidad en un volumen subsuperficial de interés | |
AR113195A1 (es) | Sistemas y métodos para estimar la productividad de un reservorio como función de la posición en un volumen de subsuelo de interés | |
MY192410A (en) | Velocity model update with an inversion gradient | |
AR100325A1 (es) | Control de tubería elástica con perforación de presión controlada | |
NO20140209A1 (no) | Hydraulisk kutteverktøy, system og fremgangsmåte for styrt hydraulisk kutting gjennom en rørvegg i en brønn, samt anvendelser av kutteverktøyet og systemet | |
AR093475A1 (es) | Sistema, metodo y producto de programa de computacion para un grafico de interpolacion en aplicaciones de geonavegacion | |
EA201591343A1 (ru) | Система и способ вычислительной геологии | |
AR097725A1 (es) | Operaciones de perforaciones de pozos que involucran métodos computacionales que producen perfiles de depresión | |
MX2016011021A (es) | Modelado total de recursos con modelos de recursos integrados y modelos de recursos persistentes. | |
AR103563A1 (es) | Apuntalantes de baja energía para operaciones en fondo de pozo | |
MX2015014246A (es) | Modelado de cuencas para yacimientos. | |
AR120003A1 (es) | Sistemas y métodos para estimar valores de productividad de reservorio refinada en función de la posición en un volumen subterráneo de interés | |
GB2535362A (en) | Drilling engineering analysis roadmap builder |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
FB | Suspension of granting procedure |