AR099617A1 - SYSTEM FOR THE CONDUCT OF OPERATIONS RELATED TO THE EXPLOITATION OF CELLS OF AN ALUMINUM PRODUCTION INSTALLATION BY ELECTROLISIS - Google Patents
SYSTEM FOR THE CONDUCT OF OPERATIONS RELATED TO THE EXPLOITATION OF CELLS OF AN ALUMINUM PRODUCTION INSTALLATION BY ELECTROLISISInfo
- Publication number
- AR099617A1 AR099617A1 ARP150100632A ARP150100632A AR099617A1 AR 099617 A1 AR099617 A1 AR 099617A1 AR P150100632 A ARP150100632 A AR P150100632A AR P150100632 A ARP150100632 A AR P150100632A AR 099617 A1 AR099617 A1 AR 099617A1
- Authority
- AR
- Argentina
- Prior art keywords
- cells
- electrolisis
- exploitation
- conduct
- operations related
- Prior art date
Links
Classifications
-
- C—CHEMISTRY; METALLURGY
- C25—ELECTROLYTIC OR ELECTROPHORETIC PROCESSES; APPARATUS THEREFOR
- C25C—PROCESSES FOR THE ELECTROLYTIC PRODUCTION, RECOVERY OR REFINING OF METALS; APPARATUS THEREFOR
- C25C3/00—Electrolytic production, recovery or refining of metals by electrolysis of melts
- C25C3/06—Electrolytic production, recovery or refining of metals by electrolysis of melts of aluminium
- C25C3/22—Collecting emitted gases
-
- C—CHEMISTRY; METALLURGY
- C25—ELECTROLYTIC OR ELECTROPHORETIC PROCESSES; APPARATUS THEREFOR
- C25C—PROCESSES FOR THE ELECTROLYTIC PRODUCTION, RECOVERY OR REFINING OF METALS; APPARATUS THEREFOR
- C25C3/00—Electrolytic production, recovery or refining of metals by electrolysis of melts
- C25C3/06—Electrolytic production, recovery or refining of metals by electrolysis of melts of aluminium
- C25C3/08—Cell construction, e.g. bottoms, walls, cathodes
Abstract
El sistema (50) está destinado a estar montado en una unidad móvil de la instalación para poder desplazarse encima de las células. Comprende: un soporte (51) destinado a estar montado en la unidad; un brazo (52) articulado montado en el soporte; un dispositivo prensor (60) de al menos una cubierta (33), diseñado para poder acoplarse a un primer extremo (53) del brazo; y un dispositivo de almacenamiento (55) temporal de al menos una cubierta, el correspondiente dispositivo de almacenamiento, montado en el soporte, es apto para recibir al menos una cubierta transportada por el brazo equipado con el dispositivo prensor y para que el correspondiente brazo equipado con el dispositivo prensor pueda volver a agarrar al menos una cubierta previamente colocada en el dispositivo de almacenamiento.The system (50) is intended to be mounted on a mobile unit of the installation to be able to move on top of the cells. It comprises: a support (51) intended to be mounted on the unit; an articulated arm (52) mounted on the support; a clamping device (60) of at least one cover (33), designed to be able to be coupled to a first end (53) of the arm; and a temporary storage device (55) of at least one cover, the corresponding storage device, mounted on the support, is suitable for receiving at least one cover carried by the arm equipped with the pressing device and for the corresponding arm equipped With the clamping device, you can grab at least one cover previously placed in the storage device.
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FR1400540A FR3018283B1 (en) | 2014-03-05 | 2014-03-05 | SYSTEM FOR CARRYING OUT OPERATIONS RELATING TO THE OPERATION OF CELLS OF AN ALUMINUM PRODUCTION FACILITY BY ELECTROLYSIS |
Publications (1)
Publication Number | Publication Date |
---|---|
AR099617A1 true AR099617A1 (en) | 2016-08-03 |
Family
ID=50829032
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
ARP150100632A AR099617A1 (en) | 2014-03-05 | 2015-03-03 | SYSTEM FOR THE CONDUCT OF OPERATIONS RELATED TO THE EXPLOITATION OF CELLS OF AN ALUMINUM PRODUCTION INSTALLATION BY ELECTROLISIS |
Country Status (8)
Country | Link |
---|---|
EP (1) | EP3114257B1 (en) |
CN (1) | CN106460209B (en) |
AR (1) | AR099617A1 (en) |
AU (1) | AU2015226002B2 (en) |
CA (1) | CA2938716C (en) |
FR (1) | FR3018283B1 (en) |
RU (1) | RU2699600C2 (en) |
WO (1) | WO2015132479A2 (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2606991A (en) | 2021-03-31 | 2022-11-30 | Alumatlq As | Electrolytic cell lid handling system and method of use |
EP4174216A1 (en) | 2021-10-27 | 2023-05-03 | Dubai Aluminium PJSC | Protection device for anodes of an electrolytic cell, comprising movable panels, and its implementation method |
EP4293141A1 (en) | 2022-06-13 | 2023-12-20 | Dubai Aluminium PJSC | Anode servicing assembly for an aluminium electrolysis plant, and methods for operating the same |
Family Cites Families (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3935090A (en) * | 1974-03-15 | 1976-01-27 | Dmitry Pavlovich Petrusenko | Covering of an aluminum-producing electrolysis cell |
US4136003A (en) * | 1975-03-10 | 1979-01-23 | Swiss Aluminum Ltd. | Cell for fused-salt electrolysis with gas collecting means |
IT1221994B (en) * | 1987-07-09 | 1990-08-31 | Techmo Car Spa | EQUIPMENT FOR THE MECHANIZED CHANGE OF THE ANODES IN THE ELECTROLYTIC CELLS FOR THE PRODUCTION OF ALUMINUM |
IT1263968B (en) * | 1993-02-25 | 1996-09-05 | Gianfranco Zannini | AUTOMATED EQUIPMENT FOR THE CHANGE OF THE ELECTROLYTIC CELL ANODES FOR THE PRODUCTION OF ALUMINUM |
DE69909231D1 (en) * | 1999-02-12 | 2003-08-07 | Reel Sa | Lifting device for replacing anodes in electrolysis furnaces for aluminum production |
FR2801295B1 (en) * | 1999-11-19 | 2001-12-21 | Reel Sa | LOAD LIFTING AND HANDLING UNIT WITHIN AN IGNATED ELECTROLYSIS ALUMINUM PRODUCTION INSTALLATION AND INSTALLATION USING SUCH A UNIT |
FR2806742B1 (en) | 2000-03-24 | 2002-05-03 | Pechiney Aluminium | INSTALLATION OF FACILITIES OF AN ELECTROLYSIS PLANT FOR THE PRODUCTION OF ALUMINUM |
FR2879582B1 (en) * | 2004-12-21 | 2007-01-19 | Ecl Soc Par Actions Simplifiee | DEVICE FOR HANDLING THE HOODS OF A CELL FOR THE PRODUCTION OF ALUMINUM BY ELECTROLYSIS |
NO328467B1 (en) * | 2005-12-09 | 2010-02-22 | Norsk Hydro As | Method and apparatus for encapsulating an electrolysis cell |
US9050726B2 (en) * | 2012-05-16 | 2015-06-09 | Gi 2 Technologies, Llc | Activation control device for robotic auxiliary devices |
-
2014
- 2014-03-05 FR FR1400540A patent/FR3018283B1/en active Active
-
2015
- 2015-02-16 AU AU2015226002A patent/AU2015226002B2/en active Active
- 2015-02-16 EP EP15709216.4A patent/EP3114257B1/en active Active
- 2015-02-16 WO PCT/FR2015/000034 patent/WO2015132479A2/en active Application Filing
- 2015-02-16 CA CA2938716A patent/CA2938716C/en active Active
- 2015-02-16 CN CN201580011921.0A patent/CN106460209B/en active Active
- 2015-02-16 RU RU2016135644A patent/RU2699600C2/en active
- 2015-03-03 AR ARP150100632A patent/AR099617A1/en unknown
Also Published As
Publication number | Publication date |
---|---|
CA2938716A1 (en) | 2015-09-11 |
EP3114257B1 (en) | 2018-08-22 |
EP3114257A2 (en) | 2017-01-11 |
RU2016135644A3 (en) | 2018-10-25 |
FR3018283B1 (en) | 2017-12-22 |
AU2015226002B2 (en) | 2019-04-04 |
CA2938716C (en) | 2021-11-09 |
WO2015132479A3 (en) | 2016-03-24 |
FR3018283A1 (en) | 2015-09-11 |
WO2015132479A2 (en) | 2015-09-11 |
CN106460209A (en) | 2017-02-22 |
AU2015226002A1 (en) | 2016-09-01 |
RU2016135644A (en) | 2018-04-25 |
RU2699600C2 (en) | 2019-09-06 |
CN106460209B (en) | 2018-11-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CL2018003129A1 (en) | Clamp with earth connection lock. | |
MY188979A (en) | Cell and jig transfer apparatus of tabbing apparatus | |
PE20141604A1 (en) | AN IMPROVED CONTAINER, CONSTRUCTION OF THE CONTAINER, APPARATUS AND METHODS TO HANDLE THEM | |
TW201612446A (en) | Supporting bracket | |
CO7160117A2 (en) | Structural support for perimeter cutting fastener | |
PE20141356A1 (en) | PIPE SUPPORT | |
PH12016501804A1 (en) | Bonds for solar cell metallization | |
AR107498A1 (en) | INSPECTION SYSTEM FOR VEHICLES AND MOBILE CONTAINERS | |
WO2015175779A3 (en) | Roadway delineator and safety system | |
AR099617A1 (en) | SYSTEM FOR THE CONDUCT OF OPERATIONS RELATED TO THE EXPLOITATION OF CELLS OF AN ALUMINUM PRODUCTION INSTALLATION BY ELECTROLISIS | |
CL2015001123A1 (en) | Pinch valve with top and bottom covers, pivotally mounted | |
BR112013005416A2 (en) | method for maneuvering and supporting a panel, and, workpiece support apparatus | |
CL2012003496A1 (en) | Collection and release system comprising a collection mechanism comprising a robot arm, a collection device rotatably mounted on the robot arm, a movable insertion device; and method to take and release an object with a collection system. | |
MX2017000194A (en) | Plastic mounting support for solar panels. | |
AR096880A1 (en) | DEVICE FOR REPLACEMENT OF PULLEY BATTERIES | |
GB2530698A (en) | Lifting device, vessel and method for removal and/or installation of at least one part of a sea platform | |
WO2016202941A3 (en) | Solar device | |
FR3007936B1 (en) | SUPPORT DEVICE FOR THE DISPLACEMENT OF CULTURE BINS | |
MX2017000195A (en) | System and method for expanding flat-stock precursor material. | |
AR098400A1 (en) | ADJUSTABLE HEIGHT DISTRIBUTION SYSTEM FOR AN IMPLEMENT | |
TR201718986A2 (en) | Apparatus and method for mounting a solar energy device. | |
WO2016094735A3 (en) | An illumination device | |
PE20170760A1 (en) | LIFTING SYSTEM AND METHOD FOR CONTROLLING THE LIFTING SYSTEM | |
PL409399A1 (en) | Magnetic-pulse system for hot riveting | |
RU2014150301A (en) | STAND FOR RESEARCH OF ENERGY EXCHANGE DURING MOBILE ROCKS |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
FB | Suspension of granting procedure |