AR077885A1 - Metodo para mejorar el comportamiento de inundacion de agua usando fracturas de barrera y dispositivos de control de afluencia - Google Patents

Metodo para mejorar el comportamiento de inundacion de agua usando fracturas de barrera y dispositivos de control de afluencia

Info

Publication number
AR077885A1
AR077885A1 ARP100103037A ARP100103037A AR077885A1 AR 077885 A1 AR077885 A1 AR 077885A1 AR P100103037 A ARP100103037 A AR P100103037A AR P100103037 A ARP100103037 A AR P100103037A AR 077885 A1 AR077885 A1 AR 077885A1
Authority
AR
Argentina
Prior art keywords
reservoir
well
substantially horizontal
production
behavior
Prior art date
Application number
ARP100103037A
Other languages
English (en)
Original Assignee
Halliburton Energy Serv Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Halliburton Energy Serv Inc filed Critical Halliburton Energy Serv Inc
Publication of AR077885A1 publication Critical patent/AR077885A1/es

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/12Methods or apparatus for controlling the flow of the obtained fluid to or in wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/30Specific pattern of wells, e.g. optimising the spacing of wells
    • E21B43/305Specific pattern of wells, e.g. optimising the spacing of wells comprising at least one inclined or horizontal well

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Production Of Liquid Hydrocarbon Mixture For Refining Petroleum (AREA)

Abstract

La presente se dirige a un método de produccion de hidrocarburos desde un reservorio de hidrocarburos. El método comprende la provision de un pozo sustancialmente horizontal que tiene por lo menos un intervalo de produccion dentro de un reservorio de hidrocarburos, y la formacion de por lo menos una fractura transversal no conductora en el reservorio, a lo largo del pozo sustancialmente horizontal. Se provee además un pozo de inyeccion. Se inyecta un fluido en el reservorio a través del pozo de inyeccion, a fin de desplazar los hidrocarburos dentro del reservorio hacia una porcion de produccion del pozo sustancialmente horizontal. Los hidrocarburos son drenados del reservorio hacia por lo menos un intervalo de produccion del pozo sustancialmente horizontal. La produccion de fluido de por lo menos uno de los intervalos de produccion hacia el pozo sustancialmente horizontal fluye a través de un dispositivo de control de afluencia que puede restringir el flujo de fluido. Una fractura transversal no conductora puede formar una barrera dentro del reservorio, de manera de desviar los fluidos inyectados a fin de incrementar la eficiencia de barrido y reducir la afluencia de fluidos inyectados en el intervalo de produccion.
ARP100103037A 2009-08-20 2010-08-19 Metodo para mejorar el comportamiento de inundacion de agua usando fracturas de barrera y dispositivos de control de afluencia AR077885A1 (es)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US12/583,441 US8104535B2 (en) 2009-08-20 2009-08-20 Method of improving waterflood performance using barrier fractures and inflow control devices

Publications (1)

Publication Number Publication Date
AR077885A1 true AR077885A1 (es) 2011-09-28

Family

ID=43604374

Family Applications (1)

Application Number Title Priority Date Filing Date
ARP100103037A AR077885A1 (es) 2009-08-20 2010-08-19 Metodo para mejorar el comportamiento de inundacion de agua usando fracturas de barrera y dispositivos de control de afluencia

Country Status (5)

Country Link
US (2) US8104535B2 (es)
EP (1) EP2467573A2 (es)
AR (1) AR077885A1 (es)
CA (1) CA2770177C (es)
WO (1) WO2011020998A2 (es)

Families Citing this family (38)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8439116B2 (en) 2009-07-24 2013-05-14 Halliburton Energy Services, Inc. Method for inducing fracture complexity in hydraulically fractured horizontal well completions
US8960292B2 (en) 2008-08-22 2015-02-24 Halliburton Energy Services, Inc. High rate stimulation method for deep, large bore completions
US8887803B2 (en) 2012-04-09 2014-11-18 Halliburton Energy Services, Inc. Multi-interval wellbore treatment method
US9796918B2 (en) 2013-01-30 2017-10-24 Halliburton Energy Services, Inc. Wellbore servicing fluids and methods of making and using same
US9016376B2 (en) 2012-08-06 2015-04-28 Halliburton Energy Services, Inc. Method and wellbore servicing apparatus for production completion of an oil and gas well
US8631872B2 (en) 2009-09-24 2014-01-21 Halliburton Energy Services, Inc. Complex fracturing using a straddle packer in a horizontal wellbore
US8104535B2 (en) * 2009-08-20 2012-01-31 Halliburton Energy Services, Inc. Method of improving waterflood performance using barrier fractures and inflow control devices
US8700371B2 (en) * 2010-07-16 2014-04-15 Schlumberger Technology Corporation System and method for controlling an advancing fluid front of a reservoir
US8672034B2 (en) * 2011-04-19 2014-03-18 Saudi Arabian Oil Company Well system with lateral main bore and strategically disposed lateral bores and method of forming
US9200502B2 (en) 2011-06-22 2015-12-01 Schlumberger Technology Corporation Well-based fluid communication control assembly
US20140054050A1 (en) * 2012-08-24 2014-02-27 Halliburton Energy Services, Inc. Gas Fracture Injection to Overcome Retrograde Condensation in Gas Wells
CA2820742A1 (en) * 2013-07-04 2013-09-20 IOR Canada Ltd. Improved hydrocarbon recovery process exploiting multiple induced fractures
MX2015017430A (es) * 2013-08-01 2016-07-26 Landmark Graphics Corp Algoritmo para configuracion optima de icd mediante el uso de un modelo acoplado de pozo-yacimiento.
WO2015073031A1 (en) * 2013-11-15 2015-05-21 Landmark Graphics Corporation Optimizing flow control device properties for accumulated liquid injection
CN105899756A (zh) * 2013-11-15 2016-08-24 界标制图有限公司 优化耦接的注入井-生产井液体驱油体系中的生产井和注入井两者上的流量控制装置性质
CA2930235C (en) * 2013-11-15 2018-09-04 Landmark Graphics Corporation Optimizing flow control device properties on a producer well in coupled injector-producer liquid flooding systems
SG11201603268VA (en) * 2013-11-15 2016-05-30 Landmark Graphics Corp Optimizing flow control device properties on injector wells in liquid flooding systems
US10337307B2 (en) * 2014-01-24 2019-07-02 Landmark Graphics Corporation Optimized acidizing of a production well near aquifer
US10233727B2 (en) * 2014-07-30 2019-03-19 International Business Machines Corporation Induced control excitation for enhanced reservoir flow characterization
WO2017023278A1 (en) * 2015-07-31 2017-02-09 Landmark Graphics Corporation System and method to reduce fluid production from a well
CN105587300B (zh) * 2015-12-31 2019-10-11 中国石油天然气股份有限公司 用于水平井的采油方法
CA2939679A1 (en) * 2016-08-18 2018-02-18 Velvet Energy Ltd. Fracture length increasing method
CA3035243A1 (en) 2016-09-02 2018-03-08 Saudi Arabian Oil Company Controlling hydrocarbon production
US10246981B2 (en) 2016-09-23 2019-04-02 Statoil Gulf Services LLC Fluid injection process for hydrocarbon recovery from a subsurface formation
US10246980B2 (en) 2016-09-23 2019-04-02 Statoil Gulf Services LLC Flooding process for hydrocarbon recovery from a subsurface formation
US11274538B2 (en) 2017-07-10 2022-03-15 Texas Tech University System Methods and systems for ballooned hydraulic fractures and complex toe-to-heel flooding
CA3085002A1 (en) * 2017-12-13 2019-06-20 Source Rock Energy Partners Inc. Inflow testing systems and methods for oil and/or gas wells
US11499423B2 (en) 2019-05-16 2022-11-15 Saudi Arabian Oil Company Automated production optimization technique for smart well completions using real-time nodal analysis including comingled production calibration
US11441395B2 (en) 2019-05-16 2022-09-13 Saudi Arabian Oil Company Automated production optimization technique for smart well completions using real-time nodal analysis including real-time modeling
US11326423B2 (en) 2019-05-16 2022-05-10 Saudi Arabian Oil Company Automated production optimization technique for smart well completions using real-time nodal analysis including recommending changes to downhole settings
US11821289B2 (en) 2019-11-18 2023-11-21 Saudi Arabian Oil Company Automated production optimization technique for smart well completions using real-time nodal analysis
US11066909B2 (en) 2019-11-27 2021-07-20 Halliburton Energy Services, Inc. Mechanical isolation plugs for inflow control devices
US11248455B2 (en) 2020-04-02 2022-02-15 Saudi Arabian Oil Company Acoustic geosteering in directional drilling
WO2021240196A1 (en) 2020-05-26 2021-12-02 Saudi Arabian Oil Company Water detection for geosteering in directional drilling
WO2021240197A1 (en) 2020-05-26 2021-12-02 Saudi Arabian Oil Company Geosteering in directional drilling
WO2021240195A1 (en) 2020-05-26 2021-12-02 Saudi Arabian Oil Company Instrumented mandrel for coiled tubing drilling
US11692417B2 (en) * 2020-11-24 2023-07-04 Saudi Arabian Oil Company Advanced lateral accessibility, segmented monitoring, and control of multi-lateral wells
US12024985B2 (en) 2022-03-24 2024-07-02 Saudi Arabian Oil Company Selective inflow control device, system, and method

Family Cites Families (29)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3878884A (en) * 1973-04-02 1975-04-22 Cecil B Raleigh Formation fracturing method
US4390067A (en) * 1981-04-06 1983-06-28 Exxon Production Research Co. Method of treating reservoirs containing very viscous crude oil or bitumen
US4476932A (en) * 1982-10-12 1984-10-16 Atlantic Richfield Company Method of cold water fracturing in drainholes
US5025859A (en) * 1987-03-31 1991-06-25 Comdisco Resources, Inc. Overlapping horizontal fracture formation and flooding process
US5074360A (en) * 1990-07-10 1991-12-24 Guinn Jerry H Method for repoducing hydrocarbons from low-pressure reservoirs
US5183109A (en) * 1991-10-18 1993-02-02 Halliburton Company Method for optimizing hydraulic fracture treatment of subsurface formations
US5249628A (en) * 1992-09-29 1993-10-05 Halliburton Company Horizontal well completions
US5325923A (en) * 1992-09-29 1994-07-05 Halliburton Company Well completions with expandable casing portions
US5396957A (en) * 1992-09-29 1995-03-14 Halliburton Company Well completions with expandable casing portions
US5533571A (en) * 1994-05-27 1996-07-09 Halliburton Company Surface switchable down-jet/side-jet apparatus
US5499678A (en) * 1994-08-02 1996-03-19 Halliburton Company Coplanar angular jetting head for well perforating
US6047773A (en) * 1996-08-09 2000-04-11 Halliburton Energy Services, Inc. Apparatus and methods for stimulating a subterranean well
US5765642A (en) * 1996-12-23 1998-06-16 Halliburton Energy Services, Inc. Subterranean formation fracturing methods
NO320593B1 (no) * 1997-05-06 2005-12-27 Baker Hughes Inc System og fremgangsmate for produksjon av formasjonsfluid i en undergrunnsformasjon
US6119776A (en) * 1998-02-12 2000-09-19 Halliburton Energy Services, Inc. Methods of stimulating and producing multiple stratified reservoirs
US6095244A (en) * 1998-02-12 2000-08-01 Halliburton Energy Services, Inc. Methods of stimulating and producing multiple stratified reservoirs
US6016867A (en) * 1998-06-24 2000-01-25 World Energy Systems, Incorporated Upgrading and recovery of heavy crude oils and natural bitumens by in situ hydrovisbreaking
US6167966B1 (en) * 1998-09-04 2001-01-02 Alberta Research Council, Inc. Toe-to-heel oil recovery process
US6364015B1 (en) * 1999-08-05 2002-04-02 Phillips Petroleum Company Method of determining fracture closure pressures in hydraulicfracturing of subterranean formations
GB2373520B (en) * 2000-02-18 2004-11-24 Halliburton Energy Serv Inc Downhole drilling apparatus and method for use of same
US6644412B2 (en) * 2001-04-25 2003-11-11 Weatherford/Lamb, Inc. Flow control apparatus for use in a wellbore
US6814141B2 (en) * 2001-06-01 2004-11-09 Exxonmobil Upstream Research Company Method for improving oil recovery by delivering vibrational energy in a well fracture
US6938690B2 (en) * 2001-09-28 2005-09-06 Halliburton Energy Services, Inc. Downhole tool and method for fracturing a subterranean well formation
US6662874B2 (en) * 2001-09-28 2003-12-16 Halliburton Energy Services, Inc. System and method for fracturing a subterranean well formation for improving hydrocarbon production
US7228908B2 (en) * 2004-12-02 2007-06-12 Halliburton Energy Services, Inc. Hydrocarbon sweep into horizontal transverse fractured wells
US20070284107A1 (en) * 2006-06-02 2007-12-13 Crichlow Henry B Heavy Oil Recovery and Apparatus
US20090101354A1 (en) * 2007-10-19 2009-04-23 Baker Hughes Incorporated Water Sensing Devices and Methods Utilizing Same to Control Flow of Subsurface Fluids
US8631877B2 (en) * 2008-06-06 2014-01-21 Schlumberger Technology Corporation Apparatus and methods for inflow control
US8104535B2 (en) * 2009-08-20 2012-01-31 Halliburton Energy Services, Inc. Method of improving waterflood performance using barrier fractures and inflow control devices

Also Published As

Publication number Publication date
US8104535B2 (en) 2012-01-31
CA2770177C (en) 2015-04-21
US20120160484A1 (en) 2012-06-28
WO2011020998A3 (en) 2011-06-16
WO2011020998A2 (en) 2011-02-24
CA2770177A1 (en) 2011-02-24
EP2467573A2 (en) 2012-06-27
US20110042083A1 (en) 2011-02-24
US8307893B2 (en) 2012-11-13

Similar Documents

Publication Publication Date Title
AR077885A1 (es) Metodo para mejorar el comportamiento de inundacion de agua usando fracturas de barrera y dispositivos de control de afluencia
AR080474A1 (es) Metodos relacionados con la modificacion de patrones de flujo usando barreras in situ
AR120535A2 (es) Barreras fibrosas y despliegue en pozos subterráneos
CO2017006514A2 (es) Composiciones y métodos para mejorar una red de fracturas hidráulicas
EA200870228A1 (ru) Способ и устройство ствола скважины для заканчивания, добычи и нагнетания
WO2010123886A3 (en) Method and apparatus to enhance oil recovery in wells
AR078110A1 (es) Metodos mejorados de desviacion y colocacion de fluidos en formaciones subterraneas
AR104826A2 (es) Un método para mezclar un fluido de fracturación para suministrarlo a un pozo de perforación a ser fracturado, módulo eléctrico de mezclado y sistema para mezclar
AR106771A1 (es) Sistema de gel débil para recuperación de petróleo mejorada química
CO6630114A2 (es) Cable de derivación y método para el ingreso controlado de una sarta de tuberia y un cable adyacente a la misma
AR090762A1 (es) Sistemas y metodos para tratar las formaciones subsuperficiales que contienen fracturas
EA201301286A1 (ru) Способы обработки стенки ствола скважины
EA201400880A1 (ru) Способ извлечения нефти
AR094475A1 (es) Ruptor de baja temperatura para fluidos de pozo con su viscosidad aumentada por una poliacrilamida
ECSP109893A (es) Máquina hidráulica tipo pelton que incluye medios de inyección de un flujo extraído de un flujo principal
PA8621801A1 (es) Separacion de petroleo crudo en el cabezal del pozo
EA201692171A1 (ru) Способ добычи углеводородов
EA200970423A1 (ru) Подводная система для добычи нефти и/или газа
AR113499A1 (es) Prelavado para espumantes de petróleo
EA201101204A1 (ru) Способ секвестрации флюидов в геологических формациях
AR092091A1 (es) Inyeccion de gas en fracturas para resolver la condensacion retrograda en pozos de gas
DK201670938A1 (en) Method and apparatus for retrieving a tubing from a well
AR087073A1 (es) Unidad de floculacion de inyeccion y extraccion de agua por compresion para el control de solidos y manejo de fluidos de perforacion, y metodos relacionados
AR092740A1 (es) Formulacion de un tensioactivo para la liberacion de fluidos fosiles subterraneos
RU2010151397A (ru) Способ разработки нефтяной залежи в карбонатных коллекторах трещинно-порового типа

Legal Events

Date Code Title Description
FG Grant, registration
FD Application declared void or lapsed, e.g., due to non-payment of fee