WO2023005737A1 - Schedule management method and terminal device - Google Patents

Schedule management method and terminal device Download PDF

Info

Publication number
WO2023005737A1
WO2023005737A1 PCT/CN2022/106487 CN2022106487W WO2023005737A1 WO 2023005737 A1 WO2023005737 A1 WO 2023005737A1 CN 2022106487 W CN2022106487 W CN 2022106487W WO 2023005737 A1 WO2023005737 A1 WO 2023005737A1
Authority
WO
WIPO (PCT)
Prior art keywords
schedule
task
information
scheduled
time
Prior art date
Application number
PCT/CN2022/106487
Other languages
French (fr)
Chinese (zh)
Inventor
郝增光
Original Assignee
花瓣云科技有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 花瓣云科技有限公司 filed Critical 花瓣云科技有限公司
Publication of WO2023005737A1 publication Critical patent/WO2023005737A1/en

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F9/00Arrangements for program control, e.g. control units
    • G06F9/06Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
    • G06F9/44Arrangements for executing specific programs
    • G06F9/451Execution arrangements for user interfaces
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/02Reservations, e.g. for tickets, services or events
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/109Time management, e.g. calendars, reminders, meetings or time accounting

Definitions

  • the present application relates to the field of electronic technology, and in particular to a schedule management method and a terminal device.
  • the mobile phone has become an indispensable device in people's daily life, and many applications (applications, APPs) are usually installed on the mobile phone, which makes people now extremely dependent on the mobile phone.
  • the presentation method of the content in the APP is mainly the information flow, and the information flow can be refreshed infinitely.
  • APPs with characteristics of information flow, such as information APPs, video APPs, and shopping APPs. That is to say, such APPs will constantly present new content for users to watch, so as to ensure that users use the APP to browse new content for a long time.
  • the user browses the content presented by the APP without stopping for a long time, it will easily disrupt the user's original plan and reduce the user's self-discipline.
  • schedule management apps to record the user's schedule
  • such apps require users to manually add schedule information in different usage scenarios, which is very inconvenient to use, so there is an urgent need for a unified
  • the method of schedule management performs schedule management on the above-mentioned APP with information flow characteristics.
  • the embodiment of the present application provides a schedule management method, in which a user can directly add a new schedule task through a schedule management button in the information flow application, so that the user can use time more effectively and improve the user's self-discipline.
  • a schedule management method is provided, and the method can be applied to an information flow application in a terminal device.
  • the information flow application has a schedule management button.
  • Information streaming applications may include shopping applications, video applications, music playing applications, information applications, reading applications, and the like.
  • the method may include: acquiring a new schedule task instruction generated by a user through a schedule management button in the information flow application. Afterwards, the newly added task information may be determined according to the newly added schedule task instruction. Then, the newly added task information is input into the schedule task time prediction model, so as to determine the forecast schedule time period. Then determine the execution time of the schedule according to the predicted schedule time period. Afterwards, the new scheduled task may be determined according to the newly added task information and the scheduled execution time.
  • the newly added scheduled task includes the newly added task information and the scheduled execution time.
  • the user can directly add a schedule task through the schedule management button in the information flow application, which ensures that the user can use time more effectively and improves the self-discipline of the user.
  • the method may further include: displaying the schedule execution time. Afterwards, the modification instruction sent by the user is received. Then adjust the execution time of the schedule plan according to the modification instruction.
  • the application can also display the schedule time so that the user can manually adjust to a more suitable time.
  • the newly added task information may include user information.
  • the method may further include: if the execution time of other scheduled tasks overlaps with the scheduled execution time, inputting user information into the execution preference prediction model to determine the user's execution preference of the scheduled task. Afterwards, the execution sequence of other scheduled tasks and the newly added scheduled task is determined according to the scheduled task execution preference.
  • This application can also determine the order of execution according to the user's preference when there is an execution time conflict between the newly added schedule task and other schedule tasks, thereby ensuring that the user can use time more effectively and improving the self-discipline of the user.
  • the method may further include: recording behavior information of the scheduled task after the scheduled task is executed.
  • the behavior information of the scheduled task may include the actual execution time of the scheduled task and the task information of the scheduled task.
  • a schedule task may include other schedule tasks and/or newly added schedule tasks.
  • the schedule time prediction model can be updated according to the behavior information of the schedule task.
  • the application can also record the behavior information of the scheduled task after the scheduled task is executed, and update the schedule time prediction model according to the behavior information, so that the predicted schedule time period of the newly added scheduled task can be predicted more accurately later.
  • the method may further include: recording behavior information of the scheduled task after the scheduled task is executed.
  • the behavior information of the scheduled task may include user information corresponding to the scheduled task and category information of the scheduled task.
  • Scheduled tasks include other scheduled tasks and/or newly added scheduled tasks.
  • the execution preference prediction model can be updated according to the behavior information of the scheduled tasks.
  • the present application can also record the behavior information of the scheduled task after the scheduled task is executed, and update the execution preference prediction model according to the behavior information, so that the user's preference can be predicted more accurately later.
  • the method may further include: if the time difference between the last execution time of the scheduled task and the current time is greater than or equal to a preset time threshold, acquiring user information.
  • the schedule task may include other schedule tasks and/or newly added schedule tasks.
  • the user information can be input into the execution preference prediction model to determine the user's schedule task execution preference.
  • a recommended schedule task is determined according to the user's schedule task execution preference, and the recommended schedule task is used as a new schedule task.
  • the present application can also automatically generate a schedule task that the user is interested in according to the user's preference when the user has not performed the schedule task for a period of time, which enriches the user experience.
  • adding the recommended schedule task as a newly added schedule task may include: displaying the recommended schedule task. Then, a confirmation instruction from the user is received. Then use the recommended schedule task as a new schedule task according to the confirmation instruction.
  • the present application can also determine whether to use the recommended schedule task as a new schedule task according to the actual needs of the user, which enriches the user experience.
  • the method may further include: adding a new schedule task to a schedule management application in the terminal device.
  • This application can also synchronize the newly added schedule tasks to the schedule management application of the terminal device, so that the user can plan the schedule tasks more conveniently and enrich the user experience.
  • a schedule management terminal device includes an information flow application, the information flow application has a schedule management button, and the information flow application includes a shopping application, a video application, a music playing application, an information application and a reading application,
  • the terminal device includes: the processor is used for coupling with the memory, and reads and executes the instructions stored in the memory; when the processor is running, the instructions are executed, so that the processor is used to obtain the new schedule task instruction, and the new schedule task instruction is for the user to pass Triggered by the schedule management button in the information flow application; determine the new task information according to the new schedule task instruction; input the new task information into the schedule task time prediction model to determine the forecast schedule time period; determine according to the forecast schedule time period schedule execution time; determine the new schedule task, wherein the new schedule task includes the new task information and the schedule execution time.
  • the user can directly add a schedule task through the schedule management button in the information flow application, which ensures that the
  • the terminal device further includes a schedule management application; the processor is further configured to: obtain the execution time of at least one other schedule task in the schedule management application; , to determine the schedule execution time.
  • the scheduled execution time of the newly added scheduled task may also be determined in combination with the execution time of other scheduled tasks. In this way, execution time conflicts between various scheduled tasks are avoided.
  • the processor is further configured to: control the display to display the schedule execution time; receive a modification instruction sent by the user; and adjust the schedule execution time according to the modification instruction.
  • the application can also display the schedule time so that the user can manually adjust to a more suitable time.
  • the processor is further configured to: control the display to add task information including user information to the scheduled execution time; the processor is also configured to: if the execution time of other scheduled tasks overlaps with the scheduled execution time , input user information into the execution preference prediction model to determine the user's schedule task execution preference; determine the execution order of other schedule tasks and newly added schedule tasks according to the schedule task execution preference.
  • This application can also determine the order of execution according to the user's preference when there is an execution time conflict between the newly added schedule task and other schedule tasks, thereby ensuring that the user can use time more effectively and improving the self-discipline of the user.
  • the processor is further configured to: record the behavior information of the scheduled task after the scheduled task is executed, and the behavior information of the scheduled task includes the actual execution time of the scheduled task and the task information of the scheduled task, wherein, the schedule The tasks include other scheduled tasks and/or new scheduled tasks; the schedule time prediction model is updated according to the behavior information of the scheduled tasks.
  • the application can also record the behavior information of the scheduled task after the scheduled task is executed, and update the schedule time prediction model according to the behavior information, so that the predicted schedule time period of the newly added scheduled task can be predicted more accurately later.
  • the processor is further configured to: record the behavior information of the scheduled task after the scheduled task is executed, and the behavior information of the scheduled task includes user information corresponding to the scheduled task and category information of the scheduled task, wherein, the scheduled task The tasks include other scheduled tasks and/or newly added scheduled tasks; the execution preference prediction model is updated according to the behavior information of the scheduled tasks.
  • the present application can also record the behavior information of the scheduled task after the scheduled task is executed, and update the execution preference prediction model according to the behavior information, so that the user's preference can be predicted more accurately later.
  • the processor is further configured to: if the time difference between the time when the last scheduled task was executed and the current moment is greater than or equal to a preset time threshold, obtain user information, where the scheduled task includes other scheduled tasks and /or add a new schedule task; input user information into the execution preference prediction model to determine the user's schedule task execution preference; determine the recommended schedule task according to the user's schedule task execution preference, and use the recommended schedule task as a new schedule task.
  • the present application can also automatically generate a schedule task that the user is interested in according to the user's preference when the user has not performed the schedule task for a period of time, which enriches the user experience.
  • the processor is further configured to: control the display to display the recommended schedule task; receive a confirmation instruction from the user; and use the recommended schedule task as a new schedule task according to the confirmation instruction.
  • the present application can also determine whether to use the recommended schedule task as a new schedule task according to the actual needs of the user, which enriches the user experience.
  • the processor is further configured to: add a new schedule task to a schedule management application in the terminal device.
  • This application can also synchronize the newly added schedule tasks to the schedule management application of the terminal device, so that the user can plan the schedule tasks more conveniently and enrich the user experience.
  • a computer-readable storage medium In a third aspect, a computer-readable storage medium is provided. Instructions are stored in the computer-readable storage medium, and it is characterized in that, when the instructions are run on a terminal, the terminal is made to execute any one of the methods in the first aspect.
  • a computer device containing instructions is provided, and when it is run on a terminal, it causes the terminal to execute any one of the methods in the first aspect.
  • a computer program product containing instructions, which, when run on a computer, cause the computer to execute any one of the methods in the first aspect.
  • This application discloses a schedule management method.
  • the user can directly click the schedule management button to add a new schedule task when using the information flow application, so that the user can use the schedule more effectively. Time to improve user self-discipline.
  • FIG. 1 is a schematic diagram of an application scenario provided by an embodiment of the present application
  • Fig. 2 is a schematic diagram of a video APP new movie reservation
  • Fig. 3 is a schematic diagram of weekly update table of video APP animation
  • Fig. 4 is a schematic diagram of a video APP collection interface
  • Fig. 5 is a schematic diagram of a sports event arrangement of a video APP
  • Figure 6a is a schematic diagram of a shopping APP product reservation
  • Figure 6b is a schematic diagram of another shopping APP product reservation
  • Fig. 7 is a schematic diagram of a schedule management APP interface
  • FIG. 8 is a schematic diagram of a schedule management architecture provided by an embodiment of the present application.
  • FIG. 9 is a schematic diagram of an information flow APP interface provided by an embodiment of the present application.
  • FIG. 10 is a flow chart of a schedule management method provided in an embodiment of the present application.
  • FIG. 11 is a flow chart of another schedule management method provided in the embodiment of the present application.
  • FIG. 12 is a flow chart of another schedule management method provided in the embodiment of the present application.
  • FIG. 13 is a flow chart of another schedule management method provided in the embodiment of the present application.
  • FIG. 14 is a schematic diagram of time segment division provided by the embodiment of the present application.
  • FIG. 15 is a schematic diagram of an interface for user modification and confirmation of adding a new schedule task provided by the embodiment of the present application.
  • Fig. 16 is a schematic diagram of an interface prompting that a newly added schedule task is successfully added provided by the embodiment of the present application;
  • Fig. 17 is a schematic diagram of a schedule management device provided by an embodiment of the present application.
  • FIG. 18 is a schematic diagram of a terminal device provided by an embodiment of the present application.
  • FIG. 1 shows video APPs as examples.
  • users browse this kind of APP with the characteristics of information flow they can usually obtain a large amount of information flow. This makes users extremely susceptible to being influenced by the large amount of information obtained, causing users' original plans to be put on hold and disrupted.
  • the video APP as an example, the user may pre-plan to open the video APP to watch a certain TV series.
  • the homepage of the video APP is usually filled with a large number of recommended videos, most of them follow current events or meet the user’s hobbies. , so users tend to be attracted to and watch these videos.
  • the user watches the recommended video of the video APP for a long time it will eventually cause the user's plan to watch TV dramas to be delayed.
  • the current information flow APP usually does not have the function of adding a schedule task, nor can it effectively manage the schedule task.
  • some of the video apps on terminal devices currently have the function of booking new movies.
  • the schedule task of watching a new movie is added to the schedule management application of the system, such as a calendar APP.
  • corresponding notification reminders can be made according to the schedule tasks to remind the user to watch the reserved new movie.
  • the user clicks the "reserve" button of a movie and then the terminal device displays the schedule interface shown on the right side of FIG. 2 .
  • This interface includes information such as the execution time of the schedule and the source of the video. At the same time, reminder information is also included, so as to remind the user to watch in the corresponding time period.
  • reminder information is usually limited to new film reservations, and for videos that have already been released or short videos, etc., it is not possible to add reservations for viewing.
  • some video apps provide the function of weekly animation schedule.
  • This type of function is mainly for animation videos, and the table uses weeks as the time unit to list the animations updated on each day of the week.
  • this function is to adapt to the animation video that is updated once a week. This makes it easy for users to check.
  • the user can view the updated animations of this week through the weekly animation update list of the video APP, for example, the updated animations can be divided according to different days. For example, XXX and XXX were updated on Monday, and XXX, XXX, and XXX were updated on Tuesday.
  • this kind of function is also limited to the animation videos updated weekly.
  • this method only prompts when a certain animation will be updated, and does not provide targeted reminders.
  • this kind of animation weekly update table is very important for users. It is not targeted, that is to say, it will not be reminded only for the anime that the user likes.
  • some video apps also provide the function of video collection. For example, there are some videos that the user wants to watch, but the user may not be able to watch them due to some reasons at this time, you can bookmark the videos you want to watch, so that you can find the videos you want to watch in the favorites later. For example, as shown in FIG. 4 , it can be seen that the user can check and watch the previously favorited videos through "My Favorites" during free time.
  • this kind of method only realizes collection, not a daily task, and obviously does not remind users to watch at a certain point in time. This method requires users to consult and watch in their free time.
  • some video apps also provide some live events, so in some cases, video apps that include live events can provide a list of event schedules.
  • This type of list usually arranges the games to be played within a period of time in chronological order, and there may be games that have ended, games that are in progress, and games that will be played in the future.
  • the user can view various sports events within a period of time through the event arrangement, and the event arrangement can arrange the various sports events in chronological order.
  • the user can watch the corresponding event at the corresponding time point by checking the running time of the corresponding event.
  • the user can also add a game reminder, which is used to remind the user to watch the game when it is about to start.
  • the live broadcast of such events often defaults to reminding a certain time before the start of the game, and users usually cannot set the schedule tasks for this reminder.
  • Fig. 6a is a shopping interface for a certain commodity, and the user can make an appointment by clicking the "reservation" button, so as to remind the user to make a purchase at the corresponding rush-purchase time.
  • FIG. 6 b shows a reservation list, and the reservation list includes information of commodities that the user has successfully reserved.
  • Such solutions currently only involve purchase scenarios and are not applicable to other scenarios.
  • the reminder is often given a certain time before the start of the purchase by default, and the user usually cannot set the schedule task for this reminder.
  • an independent schedule management APP is provided, and users manage their own schedule tasks by using such APP.
  • the user can manually add various schedule tasks and set corresponding parameter information, such as title, execution time, reminder information, and the like.
  • the independent schedule management APP and the information flow APP are completely independent and different APPs, when users use the information flow APP, if they want to create a schedule task, they need to re-enter the schedule management APP and perform manual settings. . This makes for a very poor user experience.
  • schedule management solutions are only designed for some scenarios, and more usage scenarios, such as short videos and videos that have already been launched, do not have corresponding schedule management functions.
  • schedule management functions such as scheduled viewing and scheduled purchase, users cannot edit and modify their schedule tasks, which has a certain impact on user use, resulting in users being unable to use time reasonably and reducing user experience.
  • the present application provides a schedule management method.
  • the user can directly add new schedule tasks through the schedule management button when using the information flow application. It ensures that users can use time more effectively and improves user self-discipline.
  • FIG. 8 is a schematic diagram of a schedule management architecture provided by an embodiment of the present application.
  • terminal devices may include, but are not limited to, mobile phones, smart TVs, smart speakers, wearable devices, tablet computers, desktop computers, personal computers (personal computers, PCs), all-in-one computers, handheld computers, notebook computers, Ultra-mobile personal computer (UMPC), netbook, personal digital assistant (personal digital assistant, PDA), laptop computer (laptop), mobile computer, augmented reality (augmented reality, AR) device, virtual reality ( Any terminal equipment or portable terminal equipment such as virtual reality (VR) equipment, artificial intelligence (AI) equipment and/or vehicle-mounted equipment.
  • UMPC Ultra-mobile personal computer
  • PDA personal digital assistant
  • laptop computer laptop
  • mobile computer augmented reality (augmented reality, AR) device
  • Any terminal equipment or portable terminal equipment such as virtual reality (VR) equipment, artificial intelligence (AI) equipment and/or vehicle-mounted equipment.
  • the terminal device may include an application layer, a framework layer and a kernel layer.
  • the information flow APP may be an information flow APP, a video APP, a shopping APP, a music playing APP, and a reading APP, etc., which have characteristics of information flow.
  • this application does not limit the specific information flow APP.
  • the information flow APP in this application has a schedule management button. As shown in FIG. 9 , taking the information flow APP as a video APP as an example, this application adds a schedule management button 901 on the page of the information flow APP. Users can directly add schedule tasks through the schedule management button when using the information flow APP.
  • the information flow APP calls the schedule management service in the framework layer through a dedicated application programming interface (application programming interface, API), so as to realize the user's schedule task Add, modify, delete and other operations.
  • a dedicated application programming interface application programming interface, API
  • a schedule management button 901 may be added behind each video.
  • a schedule management button 901 can be added behind each piece of music; Schedule management button 901; or, if the information flow APP is an information APP, you can add a schedule management button 901 behind each article or push; or, if the information flow APP is a reading APP, you can add a schedule management button 901 in each book A schedule management button 901 is added behind the work.
  • the schedule management button 901 can be added at the corresponding position according to the field targeted by the actual information flow APP, which is not limited in this application.
  • the application layer of the terminal device may also have a schedule management APP.
  • the schedule management APP is an independent schedule management APP, for example, it may be a calendar APP built in the system or any third-party schedule management APP.
  • the framework layer may also include a schedule task storage service corresponding to the schedule management APP.
  • the schedule task storage service can store one or more schedule tasks manually added by the user in the daily management APP.
  • the schedule management service in the framework layer can also call the schedule task storage service, so that the information flow APP can obtain one or more schedule tasks stored in the schedule management APP.
  • the schedule tasks stored in the schedule management APP may be obtained by prompting the user whether to authorize the information flow APP. When the user selects yes or agrees, the schedule management service is allowed to call the schedule task storage service; otherwise, the schedule management service is refused to call the schedule task storage service.
  • FIG. 10 is a flowchart of a schedule management method provided by an embodiment of the present application.
  • the present application provides a schedule management method, which can be applied to the terminal devices involved in the above-mentioned Figures 8 to 9, where the information flow APP is installed on the terminal equipment, and the information flow APP can be the above mentioned Apps with information flow characteristics such as information apps, video apps, shopping apps, music playback apps, and reading apps.
  • the information flow APP has a schedule management button, and the schedule management button can enable the user to manage the schedule tasks in the process of using the information flow APP.
  • the method may include the steps of:
  • the terminal device When using the information flow APP of the terminal device, when the user wants to add a certain schedule task, he can directly add it by clicking the schedule management button located in the information flow APP. When the user clicks the schedule management button, the terminal device may be triggered to generate a new schedule task command, and the new schedule task command is used to add a new schedule task. It can be understood that the newly added schedule task is a schedule task newly added by the user. In other words, the scheduled tasks include newly added scheduled tasks.
  • the information flow APP of the terminal device determines the newly added task information of the newly added schedule task according to the newly added schedule task instruction generated in S1001.
  • the added task information may include user information and detailed information.
  • the user information may include account information for logging into the information flow APP, for example, including various attributes such as user name, gender, age, and region.
  • the detailed information may be video information, music information, article information, shopping information, and so on.
  • the information flow APP is an information APP
  • the detailed information can be article information
  • the information flow APP is a video APP
  • the detailed information can be video information
  • the information flow APP is a shopping APP
  • the detailed information can be Shopping information
  • the information streaming APP is a music player APP
  • the detailed information can be music information
  • the information streaming APP is a reading APP
  • the detailed information can be novel information or article information, etc.
  • video information may include information such as video title, video classification, video label, and video duration
  • shopping information may include information such as product name, product price, and product classification. It can be understood that, the foregoing description is only an example, and the present application does not limit specific user information and detailed information.
  • the information flow APP of the terminal device inputs the new task information determined in S1003 into the pre-trained schedule task time prediction model, so as to determine the corresponding forecast schedule time period.
  • the predicted schedule time period is used to indicate a time period that is more suitable for executing the newly added schedule task.
  • the time period may be divided according to actual conditions, for example, a day may be roughly divided into two time periods, namely daytime and night. It can also be divided into 4 time periods of morning, afternoon, evening and night in more detail. Especially, the division of time periods can be reasonably divided based on experience, and the start time and end time of each time period can also be divided according to experience, which is not limited in this application. Of course, in one example, a more specific way of dividing time periods is provided, which is only an exemplary description. For example, 8 time periods can be divided, namely, 00:00-05:00 in the morning, and 05:00-05:00 in the morning. 06:00, 06:00-08:00 in the morning, 08:00-11:00 in the morning, 11:00-13:00 in the afternoon, 13:00-17:00 in the afternoon, 17:00-18:00 in the evening and evening 18:00 ⁇ 00:00 the next day.
  • the information flow APP of the terminal device inputs the user information and detailed information into the pre-trained schedule task time prediction model, and obtains the predicted schedule time period output by the schedule task time prediction model, for example, the above-mentioned 8 divisions Take the time period as an example, assuming the output is 13:00-17:00 pm, it means that the new schedule task is suitable for execution during the time period of 13:00-17:00 pm.
  • the information flow APP of the terminal device further determines the execution time of the schedule according to the predicted schedule time period determined in S1003.
  • the schedule execution time includes a schedule start time and a schedule end time.
  • the information flow APP of the terminal device may directly default the predicted schedule time period as the schedule execution time.
  • the start time of the predicted schedule time period is used as the schedule start time
  • the end time of the predicted schedule time period is used as the schedule end time.
  • the information flow APP can also display the predicted schedule time period, the user can refer to the predicted schedule time period obtained in S1003, and select a specific schedule execution time in this time period, that is, in S1003
  • the specific schedule start time and schedule end time are determined in the obtained predicted schedule time period.
  • the terminal device may receive a modification instruction from the user to modify the start time of the schedule and the end time of the schedule, so as to determine the modified execution time of the schedule. For example, the user clicks on the predicted schedule time period displayed on the terminal device, thereby modifying the specific time.
  • the schedule execution time may partially overlap, completely overlap or not overlap with the predicted schedule time period obtained in S1003.
  • a schedule management APP may also be installed in the terminal device, wherein the information flow APP may also obtain some information read from the schedule management APP, such as other schedule tasks. It can be understood that other schedule tasks are schedule tasks stored in the schedule management APP.
  • the information flow APP reads at least one other schedule task of the schedule management APP. It may be that the information flow APP is authorized to read the information of the schedule management APP. APP information". When the user selects "Yes" or other equivalent operations, the permission of the information flow APP to read the information of the schedule management APP is enabled. After the information flow APP obtains the permission to read the information of the schedule management APP, it can obtain the execution time of at least one other schedule task stored in the schedule management APP.
  • the execution time of at least one other scheduled task is combined with the predicted schedule time period obtained to determine the scheduled execution time.
  • the predicted schedule time period is 13:00-17:00 in the afternoon
  • other acquired schedule information is 15:00-15:30 for schedule task A
  • the information flow APP can determine the appropriate schedule execution time according to the execution time of the newly added schedule task. Assuming that the execution time of the new scheduled task is 50 minutes, it is obvious that the new task cannot be completed during the idle period from 15:30 to 15:50. And the idle period between 13:00 and 15:00 obviously satisfies the execution time of the newly added schedule task. Therefore, it can be determined that the schedule execution time is 13:00-15:00. That is, the schedule start time is 13:00, and the schedule end time is 15:00. Of course, if there is no information about the execution duration of the added schedule task, the longest idle period can be used as the scheduled execution time.
  • a more accurate schedule end time can also be determined according to the execution duration of the newly added schedule task and the start time of the schedule. For example, the predicted schedule time period is from 13:00 to 17:00 in the afternoon, and the execution duration of the newly added schedule task is 50 minutes. If the start time of the schedule is determined to be 13:00, the execution duration of the newly added schedule task can be 50 minutes. , determine that the scheduled end time of the schedule is 13:50.
  • the information flow APP of the terminal device determines the execution time of the schedule in S1004, it may combine the newly added task information to determine the newly added schedule task.
  • the newly added schedule task includes newly added task information and schedule execution time.
  • the information flow APP has obtained the permission to read the information of the schedule management APP, after the new schedule task is determined, it can also be executed according to the schedule execution time of the new schedule task and the information read from the schedule management APP.
  • the execution time of at least one other scheduled task determines whether there is an execution time conflict between the newly added scheduled task and other scheduled tasks. Obviously, if there is an intersection of different scheduled tasks in execution time, it means that these scheduled tasks conflict in execution time.
  • the user information in the newly added task information can be input into the pre-trained execution preference prediction model, so that The schedule task execution preference of the user corresponding to the user information is determined.
  • the information flow APP can adjust the execution sequence of multiple scheduled tasks that overlap in execution time according to the obtained schedule task execution preference.
  • the scheduled execution time of the confirmed new schedule task is 13:00 ⁇ 13:50
  • the acquired schedule A task is 15:00 ⁇ 15:30
  • the B schedule task is 15:50 ⁇ 17:00
  • the C schedule task is The task is from 13:00 to 13:30.
  • the information flow APP detects that there is a conflict between the execution time of the newly added schedule task and the C schedule task.
  • the user information of the newly added task information in the newly added schedule task can be input into the pre-trained execution preference prediction model for prediction, and the obtained The schedule task execution preference of the user corresponding to the above user information.
  • the newly added schedule tasks and other schedule tasks may include tags, which are used to classify the tasks.
  • tags can be used to distinguish the content to be watched by different schedule tasks. Video categories such as Thriller Movies, Anime, Reality TV, Sports, etc.
  • the label can be such as European and American music, Mandarin music, etc.; or, rock music, rap music, pop music, etc.; or, XX star, certain star, etc.
  • the above description is only an example, and the specific label can be set according to the actual situation, which is not limited in this application.
  • the obtained user’s schedule task execution preference can be expressed as the degree of interest in different tags, such as 80% for A tag, 10% for B tag, 5% for C tag, 3% for D tag and 2% for E tag.
  • the task corresponds to the A label
  • the C schedule task corresponds to the D label.
  • scores can also be used to indicate the degree of interest of different tags, such as a 100-point system, a 10-point system, a 5-point system, etc., and of course there is no upper limit on the scores, which is not limited in this application.
  • the execution time of the schedule plan when there are multiple schedule tasks stored in a certain time period and sorted according to the above method, if there is another new schedule task to be added and the execution time of the schedule plan is determined, multiple schedules in the same time period need to be considered at the same time The execution time of the task. For example, still taking the execution conflict between the newly added schedule task and the C schedule task at 13:00 as an example, assuming that the execution time of the newly added schedule task is 50 minutes, and the execution time of C schedule task is 30 minutes, at 13:00, it will be executed first The order in which C schedule tasks are executed after adding schedule tasks. At this time, if a new scheduled task is added again, for example, it is called new scheduled task 2 .
  • the scheduled execution time of the newly added schedule task 2 assuming that it is still in the time period from 13:00 to 17:00 p.m., the execution time of the newly added schedule task is 50 minutes and the execution time of schedule task C is 30 minutes. :00 ⁇ 14:20 to remove. In other words, the scheduled start time of the new scheduled task 2 can only start from 14:20 at the earliest.
  • the multiple scheduled tasks may also be displayed for easy reference by the user. Then, the sorting information input by the user is received, so as to sort the multiple scheduled tasks with execution time conflicts according to the order manually sorted by the user, so as to facilitate subsequent users to execute multiple scheduled tasks according to the sorted order.
  • the information flow APP of the terminal device may save the newly added schedule task. For example, save to the information flow APP.
  • the new schedule task can be added to the schedule management APP for storage. In this way, the process of synchronizing the newly added schedule tasks is realized.
  • the schedule management method by adding a schedule management button in the information flow APP, the user can directly click the schedule management button to add a new schedule task when using the information flow application, so that the user can use the schedule more effectively. Time to improve user self-discipline.
  • FIG. 11 is a flow chart of another schedule management method provided by the embodiment of the present application.
  • the present application also provides a flow chart of another schedule management method.
  • This method is mainly used to update the schedule task time prediction model and execution preference prediction model mentioned in Fig. 10 .
  • the method may include the steps of:
  • the information flow APP of the terminal device can record the behavior information of the completed scheduled task after executing the scheduled task.
  • the behavior information may include the actual execution time of the scheduled task and task information of the scheduled task, and the behavior information may also include user information corresponding to the scheduled task and category information of the scheduled task.
  • the behavior information of the user using the information flow APP can also be continuously recorded. Obviously, if the user does not set a schedule and task, but still uses the information flow APP, the behavior information of the user's usual use of the information flow APP can also be recorded. Of course, in some examples, the user may be prompted whether to allow access to the behavior information of using the information flow APP, and after the user clicks a button with a similar function such as "confirm” or "allow", the behavior information of using the information flow APP shall be recorded.
  • the completed schedule task may be the newly added schedule task mentioned in FIG. 10 , or may be other schedule tasks in the schedule management APP. That is to say, S1101 may be executed after S1006, or may be executed before S1006, or may be executed simultaneously with S1006.
  • the information flow APP of the terminal device can update the schedule time prediction model according to the behavior information of the schedule task recorded in S1101, so that the predicted schedule time of the newly added schedule task can be predicted more accurately through the updated schedule time prediction model. part.
  • the schedule time prediction model can be updated by using part of the behavior information, for example, the schedule time prediction model can be updated by using the real execution time of the schedule task and the task information of the schedule task. to update.
  • a supervised learning method can be used, in which the task information can carry the label of the schedule task, so that the updated schedule time prediction model can output the optimal execution time period corresponding to the schedule task of a certain type of label, that is, Forecast schedule timeslots.
  • the information flow APP of the terminal device can update the execution preference prediction model according to the behavior information of the schedule task recorded in S1101, so that the user's behavior preference can be predicted more accurately through the updated execution preference prediction model.
  • the execution preference prediction model can be updated with some information in the behavior information, for example, the user information corresponding to the scheduled task and the category information of the scheduled task are used to update the execution preference prediction model. to update.
  • a supervised learning method can be used, and the updated execution preference prediction model can output the scores of the category information corresponding to different schedule tasks of a certain user information, so as to indicate the preference degree of the user information for different categories of schedule tasks.
  • S1102 can be executed first and then S1103 can be executed, or S1103 can be executed first and then S1102 can be executed.
  • S1102 and S1103 can also be executed at the same time, which is not limited in this application.
  • update schedule time prediction model and the update execution preference prediction model described in FIG. 11 of the present application may be updated in real time or periodically, for example, every day, every three days, or every Monday.
  • the update frequencies of different prediction models may be the same or different, and may be set according to actual conditions, which is not limited in this application.
  • This application can also update the schedule time prediction model and execution preference prediction model described in Figure 10 according to a certain frequency, so as to ensure that the results of the prediction model are more accurate, help users manage schedule tasks, and use time more reasonably , improve user self-discipline.
  • FIG. 12 is a flow chart of another schedule management method provided by the embodiment of the present application.
  • this application also provides another schedule management method, which is suitable for users who have not used the information flow APP for a long time. At this time, the information flow APP can automatically generate recommended schedule tasks, so as to realize the personalization of users recommend.
  • the method may also include the steps of:
  • the information flow APP of the terminal device can also monitor in real time the time difference between the time when the last scheduled task was executed and the current time.
  • the end time of the last scheduled task execution can be used as the start time of the time difference. For example, assuming that the current time is 14:00 on X, 23rd, and the end time of the last scheduled task execution is 23:00 on X, 21st: 00. Then it can be determined that the time difference is 39 hours. Afterwards, it is judged whether the time difference is greater than or equal to a preset time threshold. Assuming that the time threshold is 24 hours, obviously 39 hours is greater than 24 hours, then S1202 may be executed.
  • the process can be ended directly.
  • the scheduled task executed last time may include other scheduled tasks and/or newly added scheduled tasks described in FIG. 10 and FIG. 11 .
  • current user information may be acquired.
  • it may be user information who has logged into the information flow APP.
  • the information flow APP of the terminal device may input the user information obtained in S1202 into the execution preference prediction model, so as to obtain the schedule task execution preference of the user corresponding to the user information.
  • the information flow APP of the terminal device may determine a recommended schedule task according to the user's schedule task execution preference determined in S1203. For example, if the user's schedule task preference is 90% for watching XX animation, 8% for watching X variety show, and 2% for watching XXX TV series, watch XX animation as the recommended schedule task.
  • the recommended schedule task of watching XX animation and user information can be input into the schedule time prediction model together, and the schedule execution time corresponding to the recommended schedule task can be obtained.
  • the information flow APP of the terminal device may use the recommended schedule task determined in S1204 as a newly added schedule task, and then save it in the information flow APP.
  • the recommended schedule task can also be added as a new schedule task and saved in the schedule management APP at the same time.
  • the recommended scheduled task may also be displayed. Then receive a confirmation instruction from the user. Hence, the confirmation instruction is the user's permission to save the recommended schedule task as a newly added schedule task. Afterwards, according to the received confirmation instruction, the recommended schedule task is saved as a newly added schedule task.
  • This application can also provide the function of intelligently recommending schedule tasks, improve user experience, help users use time more effectively, and improve user self-discipline.
  • all the schedule tasks saved by the information flow APP in Fig. 8 to Fig. 13 can be uploaded to the cloud server for cloud storage, and at the same time, information such as user information can also be uploaded to the cloud server for storage.
  • the above-mentioned schedule prediction model and execution preference prediction model may be located in the server, and the terminal device may send the input model information to the cloud server, so that the cloud server can make predictions based on the input information. Afterwards, the model prediction results are sent to the information flow APP of the terminal device for the follow-up process.
  • FIG. 13 is a flow chart of another schedule management method provided by the embodiment of the present application.
  • the present application also provides another schedule management method, which is described by taking the information flow APP as a video APP as an example.
  • the method runs on a terminal device installed with a video APP, and the video APP can be further divided into a video APP client and a video APP server.
  • the terminal device may also include a system default schedule management APP.
  • the video APP client can be understood as the front end of the video APP, that is, the part that interacts with the user
  • the video APP server can be understood as the back end of the video APP, that is, the underlying implementation part.
  • the method may include the steps of:
  • the user adds information such as videos and bloggers to the schedule management of the video APP.
  • the user can add a new schedule task through the schedule management button of the video APP, that is, add a new schedule task.
  • the schedule management button 901 can be regarded as an entry for the user to add videos or bloggers to personal schedule video management.
  • the personal schedule video management can be regarded as a database used to save schedule tasks in a video APP, for example, it can be stored in the form of a table.
  • bloggers can also be called uploaders (uploaders, UP masters), that is, people who upload video and audio files on video websites, forums, and file transfer protocol (file transfer protocol, ftp) sites.
  • the server of the video APP will obtain the video information or UP main information that needs to be added. In some examples, such information can be used to populate the title of a newly added calendar task.
  • the server of the video APP obtains user information, and the user information may be information of a user who has logged into the video APP.
  • the user information may be information of a user who has logged into the video APP.
  • the output of the schedule time prediction model is obtained, that is, the predicted schedule time period.
  • the predicted schedule time period may also be referred to as the best viewing time period in video APPs.
  • the video information may be detailed information in the newly added task information mentioned above in FIG. 8 to FIG. 12 .
  • information such as video titles, video categories, and video tags may be included.
  • the user information is the user information in the newly added task information mentioned above in FIGS. 8 to 12 , and may include information such as gender, age, and region, for example.
  • the time period divided in Figure 14 can include 00:00-5:00 in the morning and 05:00-06 in the morning. :00, morning 06:00 ⁇ 08:00, morning 08:00 ⁇ 11:00, noon 11:00 ⁇ 13:00, afternoon 13:00 ⁇ 17:00, evening 17:00 ⁇ 18:00, evening 18 :00 ⁇ 24:00. It is understandable that since different users have different work and rest time, users can also customize personalized time divisions and time ranges for each time period.
  • the server side of the video APP can further determine the user's best viewing time according to the optimal viewing time period, that is, the schedule execution time mentioned above in Figures 8 to 12 .
  • the optimal viewing time includes viewing start time and viewing end time. It can be understood that the movie viewing start time and movie viewing end time respectively correspond to the schedule start time and schedule end time mentioned above in FIGS. 8 to 12 .
  • the server side of the video APP may use the best movie viewing time period as the user's best movie watching time. That is, the movie viewing start time is set as the start time of the best movie viewing time period, and the movie viewing end time is set as the end time of the best movie viewing time period.
  • the video information may include the playing duration of the video, that is, the execution duration of the newly added schedule task mentioned above in FIGS. 8 to 12 .
  • the server side of the video APP can determine a more accurate viewing end time according to the playing time of the video. That is, the viewing end time is obtained by extending the playback duration of the video after the viewing start time.
  • the video APP can also read other schedule tasks in the schedule management APP, that is, execute S1305. Afterwards, the video APP removes the execution time corresponding to all other scheduled tasks in the best viewing time period. That is to say, it is necessary to ensure that the viewing time of the newly added video needs to avoid all other schedule tasks.
  • the video APP removes the execution time corresponding to all other scheduled tasks in the best viewing time period. That is to say, it is necessary to ensure that the viewing time of the newly added video needs to avoid all other schedule tasks.
  • only execution times corresponding to other scheduled tasks on the same day as the best movie viewing time period may be considered.
  • the best viewing time is 13:00-17:00, and the playing time of the video is 50 minutes, and other schedule tasks such as the F schedule task are 14:00-16:30
  • the free time slots in the segment are 13:00-14:00 and 16:30-17:00.
  • the playing time of the video is 50 minutes, it can be determined that 13:00-14:00 is the most suitable free time period, so it can be determined that the viewing start time is 13:00, and the viewing end time is 13:50.
  • other schedule tasks such as G schedule tasks are 14:00-15: 30.
  • the preset rule may be, for example, to select the free time period with the shortest time interval, and use the start time of the free time period as the movie viewing start time. Such rules can integrate spare time as much as possible, which is beneficial for users to use time more reasonably.
  • the preset rule may also be to select the free time period with the longest time interval and use the start time of the free time period as the movie viewing start time.
  • the video APP server may directly execute S1307 after determining the user's best movie viewing time, or may display the determined best movie watching time so that the user can confirm whether the user's needs are met. That is, execute S1306.
  • the video APP server can also combine information such as the title of the schedule task and the schedule reminder method to determine the final new schedule task.
  • the newly added schedule task includes information such as the start time of movie viewing, the end time of movie viewing, the title of the schedule task, and the reminder method.
  • the video APP of the terminal device can obtain the user's schedule tasks stored in the schedule management APP, that is, other schedule tasks mentioned in Figure 8 to Figure 12 above, so that It is used to predict the schedule start time of the newly added schedule task, that is, the movie viewing start time.
  • the video APP server can display the best viewing time, so that users can confirm whether their needs are met.
  • information such as the title of the new scheduled task and the way of reminding the schedule can also be displayed together.
  • buttons with similar functions such as “confirm” and “yes” may be clicked to perform subsequent steps.
  • buttons with similar functions such as “cancel”, “no” and “delete” to cancel adding the schedule task and end the process.
  • the user can also click on the best viewing time to modify the best viewing time. After the modification is completed, the user can click other positions on the page, or click a button with a similar function such as "Confirm" to complete the modification of the best viewing time.
  • a possible user modification interface shown in FIG. 15 for confirming the addition of a scheduled task includes a video title, a video subtitle 1501 , a viewing start time, a viewing end time, a reminder mode and a synchronization schedule button 1502 .
  • the reminder method may include an alarm clock reminder or a push (push) reminder, and the like, and if an alarm clock reminder is selected, it may further include a reminder time and a reminder ringtone.
  • the specific setting of the reminder method may be a default setting, or a setting modified by the user last time. In some examples, it may also include whether the reminder is repeated or not.
  • Video subtitle 1501 it can be understood that if a certain type of video has multiple episodes, such as TV, animation, and variety shows. A video subtitle 1501 may then be included. For relatively independent videos such as movies and short videos, the video subtitle 1501 may not be included, for example, the video subtitle 1501 is not displayed or the video subtitle 1501 is grayed out (that is, cannot be edited or operated).
  • the sync schedule button 1502 if the video APP has obtained the permission to read the schedule management APP information, the user can click this button to enable the synchronization function, so as to save the newly added schedule tasks to the schedule management APP, that is, execute S1308. If the video APP does not have the permission to read the information of the schedule management APP, the sync schedule button 1502 can be permanently off, for example grayed out (that is, cannot be edited or operated).
  • the video APP server can add the confirmed new schedule tasks to the personal video schedule. For example, you can click " ⁇ " in the upper right corner of Figure 15 or buttons with similar functions, such as “confirm” and "yes”.
  • S1307 is mainly used for saving the newly added schedule task in the video APP, for example, in the background database of the video APP.
  • the video APP server can also save the newly added schedule tasks to the database in the schedule management APP.
  • the database in the schedule management APP can become a "personal schedule ".
  • the server side of the video APP determines whether there is a conflict between the newly added schedule task and other schedule tasks.
  • the client side of the video APP may notify the user that the video schedule is added successfully, that is, the newly added schedule task is added successfully. For example, a prompt message indicating that the addition is successful may be displayed. As shown in FIG. 16 , it can be seen that 1601 is a prompt message indicating that the addition is successful.
  • the video APP can also display all the scheduled tasks, such as 1602 in FIG. 16 .
  • This area displays all schedule tasks added by users to watch videos. It can be understood that when the new schedule task is successfully added, it will also be displayed in this part.
  • information such as the video to be watched and the start time of viewing can be displayed. It is convenient for users to view and manage.
  • the user can directly delete or modify the added schedule task in 1602 through some preset gesture operation. Wherein, all scheduled tasks for watching videos can be displayed according to the timeline.
  • all scheduled tasks for watching videos added by the user may also be displayed in the form of a list.
  • the user can also delete or modify the added schedule tasks in this list, which is not limited in this application.
  • the client side of the video APP can query the user's viewing preference.
  • the viewing preference can be the type or tag of the video, and the corresponding score or proportion.
  • the score or proportion is used to indicate the user's preference for the type or label, and the higher the score or proportion, the more interested the user is in the type or label.
  • the process of querying the user's movie viewing preference may be to input the user information into the execution preference prediction model for prediction, and the output result is that the user information corresponds to the user's schedule task execution preference, as indicated by various types or tags. Corresponding scores or proportions. After that, it can be sorted from high to low according to the obtained scores or proportions, so as to determine which types or tags the user is more interested in. Afterwards, the newly added scheduled task and at least one other scheduled task may be sorted according to the type or label, so that the user executes the scheduled task sequentially according to this order.
  • S1310 may be executed to notify the user that the video schedule is added successfully.
  • the video APP can also record the user's playback records at any time, so as to update the schedule time prediction model mentioned in the above S1303 and the execution preference prediction model mentioned in the above S1311. Therefore, the method can also include the following steps:
  • Video apps can continuously record the user's playback records.
  • the user can choose whether to enable the function of updating the model, and record the user's playback record after receiving an authorization instruction from the user.
  • the act of recording the user's play records may also be referred to as marking the user's play records. Dot can be understood as recording a certain playback record, for example, it can include viewing start time, viewing end time, video identification (identification, ID), playback duration, playback progress, video title, video category or label, actor information, etc. wait.
  • the play record may also include user information, such as the user's account, gender, age, region, model of the terminal device, and the like.
  • the above playback records of the user can be saved in the background database of the video APP.
  • the background database can be located on the terminal device, or on a cloud server.
  • the user's playback records stored in the background database can be classified by day.
  • the video APP can update the user's schedule time prediction model according to the user's playback records recorded in S1312.
  • the user information, video ID, playback duration, video title, video category or tag, actor information, movie viewing start time and movie viewing end time, etc. in the user's playback records can be stored.
  • the time period between the movie viewing start time and the movie viewing end time can be used as a label to carry out supervised learning on the schedule time prediction model, and update the corresponding parameters in the schedule time prediction model, so as to realize the schedule time prediction model update.
  • only the user's play records of the previous day may be selected to update the user's schedule time prediction model.
  • the user's play record within a certain period of time may be selected to update the user's schedule prediction model.
  • the best viewing time period can be predicted, that is, the predicted schedule time period.
  • the video APP may also update the user's execution preference prediction model according to the user's playback records recorded in S1312.
  • user information, video category or label, actor information and other information in the user's playback record can be used to perform supervised learning on the execution preference prediction model, wherein the video category or label can be used as the data label during training, Or use the actor information as a label to update the corresponding parameters in the execution preference prediction model in supervised learning, so as to realize the update of the execution preference prediction model.
  • only the user's playback records of the previous day may be selected to update the user's execution preference prediction model.
  • the user's playback records within a certain period of time may be selected to update the user's execution preference prediction model.
  • the movie viewing type preference of the user corresponding to the user information can be predicted.
  • the video APP can obtain the user's viewing type preference by inputting user information according to the updated execution preference prediction model.
  • the output of the schedule time prediction model in S1313 can be used as the input of the next S1303, that is, the updated schedule time prediction model can be used in subsequent S1303 to predict the best viewing time period.
  • the output of the execution preference prediction model in S1314 can be used as the input of the next S1311, that is, the updated execution preference prediction model can be used to predict the user's viewing type preference in the subsequent S1311.
  • Scenario 1 it can be that the user is "addicted” to watching dramas and unlimited viewing of short videos, small videos, etc., causing the planned plan to be put on hold.
  • the video app can add an entry for "add to personal video schedule management" for videos that are already online or are being updated, that is, the aforementioned schedule management button.
  • a schedule display interface may be jumped or popped up to determine the new schedule task, as shown in FIG. 15 .
  • the user can be reminded to watch it through reminders such as an alarm clock or push.
  • users can improve the efficiency of time utilization and enhance user self-discipline by planning viewing schedules for different videos.
  • Scenario 2 There are too many video UP masters that the user cares about and the update time of different UP masters is relatively scattered, and the update time for one UP master is also relatively scattered.
  • the user sees the push notification of a certain UP master update, he may not be able to resist opening Watch short videos, small videos, etc., and a situation similar to scene 1 will appear.
  • the schedule management button After the user clicks the schedule management button, he can follow the UP master, and jump or pop up the schedule display interface to confirm the new schedule task, as shown in Figure 15.
  • the user can improve the efficiency of time utilization and enhance the user's self-discipline by planning the viewing schedule of different videos.
  • an unwatched video collection can be set for each UP master, which stores the unwatched videos of the UP master, and the viewing time set can be the viewing time period, such as the above-mentioned predicted schedule time period Or the best viewing time period.
  • the system will not notify the first time, but add the video to the unwatched video collection of the corresponding UP master, and then use the unwatched video collection to determine the corresponding new Add a schedule task, so that when the schedule task is about to be executed, the user can be reminded to watch the unwatched video collection of the UP master through reminders such as alarm clock or push.
  • Scenario 3 The user exits the video while watching the video.
  • the user may quit watching the video in the middle.
  • the video app can pop up a window to notify the user whether to add the unwatched game to the schedule management, that is, whether to add a new schedule task.
  • the video APP can generate a new schedule task at this time.
  • the video APP can determine the unwatched time in the video, and determine the schedule execution time of the newly added schedule task.
  • Scenario 4 the user is watching a drama or making an appointment to watch a video.
  • the video APP can obtain the drama calendar of the drama. Afterwards, the best viewing time after each episode update can be determined through the schedule time prediction model. Of course, in some examples, the corresponding schedule end time can also be determined according to the schedule start time of each schedule customized by the user. Then save the generated one or more new schedule tasks.
  • the video APP can obtain the online time of the video. Then the best viewing time after the video goes online can be determined through the schedule time prediction model.
  • the corresponding schedule end time can also be determined according to the schedule start time customized by the user. Then save the generated new schedule task.
  • Scenario 5 the user has not watched the video for a while.
  • the video APP can have the switch of "add personalized recommendation to the video schedule", and the user can realize the function of personalized video recommendation for the user by selecting whether to enable or disable it. For example, when the user chooses to enable this function, the video APP will identify whether the user has not watched the video within a certain period of time. According to the user's viewing preferences, suitable videos are recommended and saved as new schedule tasks. Wherein, the user's viewing preference can be determined by executing a preference prediction model.
  • Figure 13 and the above five scenarios are only described by taking the information streaming APP as a video APP as an example. Of course, it can also be replaced by other information streaming APPs, such as information APPs, music playing APPs, and reading APPs.
  • the added new schedule task can also be replaced with a suitable schedule task, such as adding a certain article, adding a certain music, etc., which is not limited in this application.
  • FIG. 17 is a schematic diagram of a schedule management device provided by an embodiment of the present application.
  • the present application also provides a schedule management device 1700 .
  • the apparatus 1700 may be a terminal device, where the apparatus 1700 may include an information flow APP and a schedule management APP.
  • the information flow APP may include an information flow APP front end and an information flow APP back end. It can be understood that the front end of the information flow APP is the video APP client described in FIG. 13 , and the back end of the information flow APP is the video APP server described in FIG. 13 .
  • the front end of the information flow APP may include a user configuration module 1701 and a page display module 1702 .
  • the information flow APP front-end is mainly used to realize some functions of interacting with users.
  • the user configuration module 1701 is used to obtain information input by the user, such as setting and adjusting various parameters of the newly added schedule management.
  • the page display module 1702 is used to display specific information, such as displaying new daily management pages, displaying prompt information, and so on.
  • the information flow APP backend may include a content management module 1703 , a storage module 1704 and a schedule management module 1705 .
  • the content management module 1703 may be responsible for functions such as uploading of schedule tasks, codec, user personalized data processing, and schedule task recommendation.
  • the storage module 1704 is used for storing new scheduled tasks and other possible scheduled tasks.
  • the schedule management module 1705 can be used to display all the schedule tasks of the user, schedule management buttons, schedule edit pages, and the like.
  • the schedule management module 1705 can also be used for editing schedule tasks, including title, schedule execution time, etc., as well as for saving user schedule tasks, reading other schedule tasks in other schedule management APPs, and saving new schedule tasks to the schedule
  • the management APP is medium.
  • the schedule management APP may include other schedule management modules 1706 . It can be understood that the other schedule management module 1706 is used to store one or more other schedule tasks in the schedule management APP.
  • the schedule management APP can be the default schedule management APP of the system, a third-party schedule management APP installed on the terminal device, etc., and can serve the schedule management module in the information flow APP.
  • This application mainly adds the schedule management module to the information flow APP.
  • schedule management buttons to all items in the information flow APP (including online and offline long videos and short videos, up hosts, various articles, various audios, etc.).
  • the schedule management button When the user clicks the schedule management button to confirm the new schedule task, and at the same time determine the title of the schedule task, schedule execution time, priority ranking, etc.
  • the newly added schedule tasks will be saved and/or synchronized to the schedule management APP. It improves the user's time utilization efficiency and enhances the user's self-discipline.
  • This application is an integrated schedule management module for long videos, short videos, various articles, and various audios that have already been launched in the information flow APP. At the same time, it enriches the user's use scenarios and improves the user experience. Taking the information flow APP as a video APP as an example, the following new scenarios are added:
  • the information flow APP in this application supports complete personal schedule management.
  • users can add online videos and up masters to the schedule management, and can set the time to watch them. This enables the user to use time efficiently and improves the user's self-discipline. It also enriches the functions of chasing dramas and booking videos, so that it can set the time to watch by itself through schedule management. Furthermore, in scenarios where the user has not watched the video recently and the user quits watching the video midway, the user's viewing experience is improved.
  • this application also provides an infringement certification method. If there are new schedule tasks added to the above-mentioned five scenarios in the information flow APP, the infringement can be determined.
  • the information flow APP includes but is not limited to the information flow APP on terminal devices such as mobile phones, PCs, PADs, and smart TVs.
  • the above-mentioned schedule management method in FIG. 8 to FIG. 17 of the present application may specifically be a software development kit (software development kit, SDK) integrated in any information flow APP.
  • SDK software development kit
  • the original information flow APP on the terminal device can be updated by releasing a new version, so that the updated information flow APP can realize the above-mentioned Figure 8 to Either of the methods in Figure 17.
  • FIG. 18 is a schematic diagram of a terminal device provided by an embodiment of the present application.
  • the present application also provides a terminal device 1800 .
  • the device terminal device 1800 may be the terminal device described above in FIG. 1 to FIG. 17 .
  • the terminal device 1800 may include: a processor 1810, an external memory interface 1820, an internal memory 1821, a universal serial bus (universal serial bus, USB) interface 1830, a charging management module 1840, a power management module 1841, a battery 1842, an antenna 1, Antenna 2, mobile communication module 1850, wireless communication module 1860, display screen 1870, etc.
  • the terminal device 1800 may include more or fewer components than shown, or combine some components, or separate some components, or arrange different components.
  • the illustrated components can be realized in hardware, software or a combination of software and hardware.
  • the processor 1810 may be a processor with architectures such as advanced reduced instruction set computing machines (ARM), X86, and microprocessor without interlocked piped stages (MIPS).
  • Processor 1810 may include one or more processing units, for example: application processor (application processor, AP), modem processor, GPU, image signal processor (image signal processor, ISP), controller, video codec device, digital signal processor (digital signal processor, DSP), baseband processor and/or neural network processor (neural-network processing unit, NPU), etc. Wherein, different processing units may be independent devices, or may be integrated in one or more processors.
  • the controller can generate an operation control signal according to the instruction opcode and timing signal, and complete the control of fetching and executing the instruction.
  • a memory may also be provided in the processor 1810 for storing instructions and data.
  • the memory in processor 1810 is a cache memory.
  • the memory may hold instructions or data that the processor 1810 has just used or recycled. If the processor 1810 needs to use the instruction or data again, it can be directly recalled from the memory. Repeated access is avoided, and the waiting time of the processor 1810 is reduced, thus improving the efficiency of the system.
  • processor 1810 may include one or more interfaces.
  • the interface may include an integrated circuit (inter-integrated circuit, I2C) interface, an integrated circuit built-in audio (inter-integrated circuit sound, I2S) interface, a pulse code modulation (pulse code modulation, PCM) interface, a universal asynchronous transmitter (universal asynchronous receiver/transmitter, UART) interface, mobile industry processor interface (mobile industry processor interface, MIPI), general-purpose input and output (general-purpose input/output, GPIO) interface, subscriber identity module (subscriber identity module, SIM) interface and / Or a universal serial bus (universal serial bus, USB) interface, etc.
  • I2C integrated circuit
  • I2S integrated circuit built-in audio
  • PCM pulse code modulation
  • PCM pulse code modulation
  • UART universal asynchronous transmitter
  • MIPI mobile industry processor interface
  • GPIO general-purpose input and output
  • subscriber identity module subscriber identity module
  • SIM subscriber identity module
  • USB universal serial bus
  • the operating system of the terminal device of the present application is stored in the memory, and the processor 1810 implements the methods described above in FIG. 8 to FIG. 17 by calling the operating system stored in the memory.
  • the charging management module 1840 is used for receiving charging input from the charger.
  • the charger may be a wireless charger or a wired charger.
  • the charging management module 1840 can receive charging input from a wired charger through the USB interface 1830 . In some wireless charging embodiments, the charging management module 1840 may receive wireless charging input through the wireless charging coil of the terminal device 1800 . While the charging management module 1840 is charging the battery 1842 , it can also supply power to the terminal device 1800 through the power management module 1841 .
  • the wireless communication function of the terminal device 1800 may be implemented by the antenna 1, the antenna 2, the mobile communication module 1850, the wireless communication module 1860, a modem processor, a baseband processor, and the like.
  • the mobile communication module 1850 can provide wireless communication solutions including 2G/3G/4G/5G/6G applied on the terminal device 1800 .
  • the wireless communication module 1860 can provide wireless local area networks (wireless local area networks, WLAN), bluetooth (bluetooth, BT), global navigation satellite system (global navigation satellite system, GNSS), frequency modulation (frequency modulation, FM), near field communication (near field communication, NFC), Zigbee (zigbee) and infrared technology (infrared, IR) and other wireless communication solutions.
  • the WLAN may be, for example, a wireless fidelity (wireless fidelity, Wi-Fi) network.
  • the external memory interface 1820 may be used to connect an external memory card, such as a Micro SD card, to expand the storage capacity of the terminal device 1800.
  • the external memory card communicates with the processor 1810 through the external memory interface 1820 to realize data storage function.
  • the internal memory 1821 may be used to store computer-executable program codes including instructions.
  • the internal memory 1821 may include an area for storing programs and an area for storing data. Wherein, the stored program area can store an operating system, an application program required by at least one function, and the like.
  • the storage data area can store data created during the use of the terminal device 1800 and the like.
  • the internal memory 1821 may include a high-speed random access memory, and may also include a non-volatile memory, such as at least one magnetic disk storage device, flash memory device, universal flash storage (universal flash storage, UFS) and the like.
  • the processor 1810 executes various functional applications and data processing of the terminal device 1800 by executing instructions stored in the internal memory 1821 and/or instructions stored in a memory provided in the processor.
  • the terminal device 1800 provided in this application can implement any one of the methods described in FIG. 8 to FIG. 17 , and the specific implementation manner can refer to the corresponding descriptions in FIG. 8 to FIG. 17 , which will not be repeated here.

Abstract

A schedule management method applied to an information flow application having a schedule management button in a terminal device. The method comprises: acquiring a new schedule task instruction generated by a user by triggering a schedule management button in an information flow application; determining new task information according to the new schedule task instruction; then inputting the new task information to a schedule task time prediction model to determine a predicted schedule time period; and then determining a planned schedule execution time according to the predicted schedule time period. Then a new schedule task can be determined according to the new task information and the planned schedule execution time, and it could be understood that the new schedule task comprises the new task information and the planned schedule execution time. According to the present application, a schedule management button is added to an information flow application, so that a user can directly add a schedule task by means of the schedule management button in the information flow application, thereby ensuring that a user can utilize time more efficiently, and improving the self-discipline of a user.

Description

一种日程管理方法及终端设备A schedule management method and terminal device
本申请要求于2021年7月30日提交中国国家知识产权局、申请号为202110874437.8、申请名称为“一种日程管理方法及终端设备”的中国专利申请的优先权,其全部内容通过引用结合在本申请中。This application claims the priority of a Chinese patent application filed with the State Intellectual Property Office of China on July 30, 2021, with application number 202110874437.8, and application title "A Schedule Management Method and Terminal Device", the entire contents of which are incorporated by reference in In this application.
技术领域technical field
本申请涉及电子技术领域,尤其涉及一种日程管理方法及终端设备。The present application relates to the field of electronic technology, and in particular to a schedule management method and a terminal device.
背景技术Background technique
当前,手机已经成为人们日常生活中必不可少的设备,通常手机上也会安装众多的应用(application,APP),这使得现在的人们对手机有着极强的依赖性。其中,APP中内容的呈现方式主要是信息流,而信息流可以无限刷新。其中,具有信息流特点的APP有很多种,例如资讯类APP、视频类APP、购物类APP等。也就是说,此类APP会不断呈现新的内容给用户观看,以保证用户长时间使用APP浏览新内容。但是用户长时间不停止的浏览APP呈现的内容,将会极易打乱用户原有计划,并降低用户的自律性。At present, the mobile phone has become an indispensable device in people's daily life, and many applications (applications, APPs) are usually installed on the mobile phone, which makes people now extremely dependent on the mobile phone. Among them, the presentation method of the content in the APP is mainly the information flow, and the information flow can be refreshed infinitely. Among them, there are many kinds of APPs with characteristics of information flow, such as information APPs, video APPs, and shopping APPs. That is to say, such APPs will constantly present new content for users to watch, so as to ensure that users use the APP to browse new content for a long time. However, if the user browses the content presented by the APP without stopping for a long time, it will easily disrupt the user's original plan and reduce the user's self-discipline.
目前,虽然也具有一些日程管理类APP以记录用户的日程安排,但是此类APP在不同的使用场景下均需要用户手动自行添加日程信息,使用起来十分不方便,因此亟需一种可以进行统一日程管理的方式对上述具有信息流特点的APP进行日程管理。At present, although there are some schedule management apps to record the user's schedule, such apps require users to manually add schedule information in different usage scenarios, which is very inconvenient to use, so there is an urgent need for a unified The method of schedule management performs schedule management on the above-mentioned APP with information flow characteristics.
发明内容Contents of the invention
本申请实施例提供了一种日程管理方法,用户可以通过信息流应用中的日程管理按钮直接添加新增日程任务,以便用户可以更有效地利用时间,提高用户的自律性。The embodiment of the present application provides a schedule management method, in which a user can directly add a new schedule task through a schedule management button in the information flow application, so that the user can use time more effectively and improve the user's self-discipline.
第一方面,提供了一种日程管理方法,该方法可以应用于终端设备中的信息流应用。其中,信息流应用具有日程管理按钮。信息流应用可以包括购物应用、视频应用、音乐播放应用、资讯类应用和读书类应用等。该方法可以包括:获取用户通过信息流应用中的日程管理按钮触发生成的新增日程任务指令。之后,可以根据新增日程任务指令确定新增任务信息。然后,将新增任务信息输入至日程任务时间预测模型,以便确定出预测日程时间段。再根据预测日程时间段确定出日程计划执行时间。之后,可以根据新增任务信息和日程计划执行时间确定新增日程任务,可以理解的是,新增日程任务包括新增任务信息和日程计划执行时间。本申请通过在信息流应用中增加日程管理按钮,使得用户可以通过信息流应用中的日程管理按钮直接添加日程任务,保障了用户可以更有效地利用时间,并提高用户的自律性。In a first aspect, a schedule management method is provided, and the method can be applied to an information flow application in a terminal device. Wherein, the information flow application has a schedule management button. Information streaming applications may include shopping applications, video applications, music playing applications, information applications, reading applications, and the like. The method may include: acquiring a new schedule task instruction generated by a user through a schedule management button in the information flow application. Afterwards, the newly added task information may be determined according to the newly added schedule task instruction. Then, the newly added task information is input into the schedule task time prediction model, so as to determine the forecast schedule time period. Then determine the execution time of the schedule according to the predicted schedule time period. Afterwards, the new scheduled task may be determined according to the newly added task information and the scheduled execution time. It can be understood that the newly added scheduled task includes the newly added task information and the scheduled execution time. In this application, by adding a schedule management button in the information flow application, the user can directly add a schedule task through the schedule management button in the information flow application, which ensures that the user can use time more effectively and improves the self-discipline of the user.
在一个可能的实施方式中,终端设备中还可以包括日程管理应用。根据预测日程时间段确定日程计划执行时间,可以包括:获取日程管理应用中至少一个其它日程任务的执行时间。然后,根据预测日程时间段与至少一个其它日程任务的执行时间,确定日程计划执行时间。本申请中,还可以结合其它日程任务的执行时间,确定出新增日程任务的日程计划执行时间。从而避免各个日程任务之间存在执行时间冲突。In a possible implementation manner, the terminal device may further include a schedule management application. Determining the schedule execution time according to the predicted schedule time period may include: obtaining the execution time of at least one other schedule task in the schedule management application. Then, the schedule execution time is determined according to the predicted schedule time period and the execution time of at least one other schedule task. In this application, the scheduled execution time of the newly added scheduled task may also be determined in combination with the execution time of other scheduled tasks. In this way, execution time conflicts between various scheduled tasks are avoided.
在一个可能的实施方式中,在根据预测日程时间段确定日程计划执行时间之后,该 方法还可以包括:将日程计划执行时间进行显示。之后,接收用户发出的修改指令。再根据修改指令对日程计划执行时间进行调整。本申请还可以将日程计划时间进行显示,以便用户手动调整为更合适的时间。In a possible implementation manner, after the schedule execution time is determined according to the predicted schedule time period, the method may further include: displaying the schedule execution time. Afterwards, the modification instruction sent by the user is received. Then adjust the execution time of the schedule plan according to the modification instruction. The application can also display the schedule time so that the user can manually adjust to a more suitable time.
在一个可能的实施方式中,新增任务信息可以包括用户信息。在确定新增日程任务之后,该方法还可以包括:若其它日程任务的执行时间与日程计划执行时间存在交集,可以将用户信息输入至执行偏好预测模型,从而确定出用户的日程任务执行偏好。之后,根据日程任务执行偏好确定其它日程任务与新增日程任务的执行顺序。本申请还可以在新增日程任务与其它日程任务存在执行时间冲突时,根据用户的偏好确定执行先后顺序,从而保障了用户可以更有效地利用时间,并提高用户的自律性。In a possible implementation manner, the newly added task information may include user information. After the new scheduled task is determined, the method may further include: if the execution time of other scheduled tasks overlaps with the scheduled execution time, inputting user information into the execution preference prediction model to determine the user's execution preference of the scheduled task. Afterwards, the execution sequence of other scheduled tasks and the newly added scheduled task is determined according to the scheduled task execution preference. This application can also determine the order of execution according to the user's preference when there is an execution time conflict between the newly added schedule task and other schedule tasks, thereby ensuring that the user can use time more effectively and improving the self-discipline of the user.
在一个可能的实施方式中,该方法还可以包括:当日程任务执行完毕后,记录日程任务的行为信息。其中,日程任务的行为信息可以包括日程任务的真实执行时间和日程任务的任务信息。日程任务可以包括其它日程任务和/或新增日程任务。之后,可以根据日程任务的行为信息对日程时间预测模型进行更新。本申请还可以在执行完日程任务后记录日程任务的行为信息,并根据该行为信息对日程时间预测模型进行更新,以便后续可以更加准确的预测新增日程任务的预测日程时间段。In a possible implementation manner, the method may further include: recording behavior information of the scheduled task after the scheduled task is executed. Wherein, the behavior information of the scheduled task may include the actual execution time of the scheduled task and the task information of the scheduled task. A schedule task may include other schedule tasks and/or newly added schedule tasks. Afterwards, the schedule time prediction model can be updated according to the behavior information of the schedule task. The application can also record the behavior information of the scheduled task after the scheduled task is executed, and update the schedule time prediction model according to the behavior information, so that the predicted schedule time period of the newly added scheduled task can be predicted more accurately later.
在一个可能的实施方式中,该方法还可以包括:当日程任务执行完毕后,记录日程任务的行为信息。其中,日程任务的行为信息可以包括日程任务对应的用户信息和日程任务的类别信息。日程任务包括其它日程任务和/或新增日程任务。之后,可以根据日程任务的行为信息对执行偏好预测模型进行更新。本申请还可以在执行完日程任务后记录日程任务的行为信息,并根据该行为信息对执行偏好预测模型进行更新,以便后续可以更加准确的预测用户的偏好。In a possible implementation manner, the method may further include: recording behavior information of the scheduled task after the scheduled task is executed. The behavior information of the scheduled task may include user information corresponding to the scheduled task and category information of the scheduled task. Scheduled tasks include other scheduled tasks and/or newly added scheduled tasks. Afterwards, the execution preference prediction model can be updated according to the behavior information of the scheduled tasks. The present application can also record the behavior information of the scheduled task after the scheduled task is executed, and update the execution preference prediction model according to the behavior information, so that the user's preference can be predicted more accurately later.
在一个可能的实施方式中,该方法还可以包括:若上一次执行日程任务的时间与当前时刻之间的时间差大于或等于预设时间阈值,则可以获取用户信息。其中,日程任务可以包括其它日程任务和/或新增日程任务。之后,可以将用户信息输入至执行偏好预测模型确定用户的日程任务执行偏好。然后,根据用户的日程任务执行偏好确定推荐日程任务,并将该推荐日程任务作为新增日程任务。本申请还可以在用户一段时间未执行日程任务时,根据用户的偏好自动生成用户感兴趣的日程任务,丰富了用户的使用体验。In a possible implementation manner, the method may further include: if the time difference between the last execution time of the scheduled task and the current time is greater than or equal to a preset time threshold, acquiring user information. Wherein, the schedule task may include other schedule tasks and/or newly added schedule tasks. Afterwards, the user information can be input into the execution preference prediction model to determine the user's schedule task execution preference. Then, a recommended schedule task is determined according to the user's schedule task execution preference, and the recommended schedule task is used as a new schedule task. The present application can also automatically generate a schedule task that the user is interested in according to the user's preference when the user has not performed the schedule task for a period of time, which enriches the user experience.
在一个可能的实施方式中,将推荐日程任务作为新增日程任务可以包括:将推荐日程任务进行显示。然后,接收用户的确认指令。再根据确认指令将推荐日程任务作为新增日程任务。本申请还可以根据用户的实际需求确定是否将推荐日程任务作为新增日程任务,丰富了用户的使用体验。In a possible implementation manner, adding the recommended schedule task as a newly added schedule task may include: displaying the recommended schedule task. Then, a confirmation instruction from the user is received. Then use the recommended schedule task as a new schedule task according to the confirmation instruction. The present application can also determine whether to use the recommended schedule task as a new schedule task according to the actual needs of the user, which enriches the user experience.
在一个可能的实施方式中,该方法还可以包括:将新增日程任务添加至终端设备中的日程管理应用中。本申请还可以将新增日程任务同步至终端设备的日程管理应用中,以便用户可以更加方便的规划日程任务,丰富用户的使用体验。In a possible implementation manner, the method may further include: adding a new schedule task to a schedule management application in the terminal device. This application can also synchronize the newly added schedule tasks to the schedule management application of the terminal device, so that the user can plan the schedule tasks more conveniently and enrich the user experience.
第二方面,提供了一种日程管理终端设备,终端设备包括信息流应用,信息流应用具有日程管理按钮,信息流应用包括购物应用、视频应用、音乐播放应用、资讯类应用和读书类应用,终端设备包括:处理器用于与存储器耦合,以及读取并执行存储在存储器中的指令;当处理器运行时执行指令,使得处理器用于获取新增日程任务指令,新增日程任务指令为用户通过信息流应用中的日程管理按钮触发生成的;根据新增日程任务指令,确 定新增任务信息;将新增任务信息输入至日程任务时间预测模型,确定预测日程时间段;根据预测日程时间段确定日程计划执行时间;确定新增日程任务,其中,新增日程任务包括新增任务信息和日程计划执行时间。本申请通过在信息流应用中增加日程管理按钮,使得用户可以通过信息流应用中的日程管理按钮直接添加日程任务,保障了用户可以更有效地利用时间,并提高用户的自律性。In the second aspect, a schedule management terminal device is provided, the terminal device includes an information flow application, the information flow application has a schedule management button, and the information flow application includes a shopping application, a video application, a music playing application, an information application and a reading application, The terminal device includes: the processor is used for coupling with the memory, and reads and executes the instructions stored in the memory; when the processor is running, the instructions are executed, so that the processor is used to obtain the new schedule task instruction, and the new schedule task instruction is for the user to pass Triggered by the schedule management button in the information flow application; determine the new task information according to the new schedule task instruction; input the new task information into the schedule task time prediction model to determine the forecast schedule time period; determine according to the forecast schedule time period schedule execution time; determine the new schedule task, wherein the new schedule task includes the new task information and the schedule execution time. In this application, by adding a schedule management button in the information flow application, the user can directly add a schedule task through the schedule management button in the information flow application, which ensures that the user can use time more effectively and improves the self-discipline of the user.
在一个可能的实施方式中,终端设备还包括日程管理应用;处理器还用于:获取日程管理应用中至少一个其它日程任务的执行时间;根据预测日程时间段与至少一个其它日程任务的执行时间,确定日程计划执行时间。本申请中,还可以结合其它日程任务的执行时间,确定出新增日程任务的日程计划执行时间。从而避免各个日程任务之间存在执行时间冲突。In a possible implementation, the terminal device further includes a schedule management application; the processor is further configured to: obtain the execution time of at least one other schedule task in the schedule management application; , to determine the schedule execution time. In this application, the scheduled execution time of the newly added scheduled task may also be determined in combination with the execution time of other scheduled tasks. In this way, execution time conflicts between various scheduled tasks are avoided.
在一个可能的实施方式中,处理器还用于:控制显示器将日程计划执行时间进行显示;接收用户发出的修改指令;根据修改指令对日程计划执行时间进行调整。本申请还可以将日程计划时间进行显示,以便用户手动调整为更合适的时间。In a possible implementation manner, the processor is further configured to: control the display to display the schedule execution time; receive a modification instruction sent by the user; and adjust the schedule execution time according to the modification instruction. The application can also display the schedule time so that the user can manually adjust to a more suitable time.
在一个可能的实施方式中,处理器还用于:控制显示器将日程计划执行时间进行新增任务信息包括用户信息;处理器还用于:若其它日程任务的执行时间与日程计划执行时间存在交集,将用户信息输入至执行偏好预测模型以确定用户的日程任务执行偏好;根据日程任务执行偏好确定其它日程任务与新增日程任务的执行顺序。本申请还可以在新增日程任务与其它日程任务存在执行时间冲突时,根据用户的偏好确定执行先后顺序,从而保障了用户可以更有效地利用时间,并提高用户的自律性。In a possible implementation, the processor is further configured to: control the display to add task information including user information to the scheduled execution time; the processor is also configured to: if the execution time of other scheduled tasks overlaps with the scheduled execution time , input user information into the execution preference prediction model to determine the user's schedule task execution preference; determine the execution order of other schedule tasks and newly added schedule tasks according to the schedule task execution preference. This application can also determine the order of execution according to the user's preference when there is an execution time conflict between the newly added schedule task and other schedule tasks, thereby ensuring that the user can use time more effectively and improving the self-discipline of the user.
在一个可能的实施方式中,处理器还用于:当日程任务执行完毕后,记录日程任务的行为信息,日程任务的行为信息包括日程任务的真实执行时间和日程任务的任务信息,其中,日程任务包括其它日程任务和/或新增日程任务;根据日程任务的行为信息对日程时间预测模型进行更新。本申请还可以在执行完日程任务后记录日程任务的行为信息,并根据该行为信息对日程时间预测模型进行更新,以便后续可以更加准确的预测新增日程任务的预测日程时间段。In a possible implementation manner, the processor is further configured to: record the behavior information of the scheduled task after the scheduled task is executed, and the behavior information of the scheduled task includes the actual execution time of the scheduled task and the task information of the scheduled task, wherein, the schedule The tasks include other scheduled tasks and/or new scheduled tasks; the schedule time prediction model is updated according to the behavior information of the scheduled tasks. The application can also record the behavior information of the scheduled task after the scheduled task is executed, and update the schedule time prediction model according to the behavior information, so that the predicted schedule time period of the newly added scheduled task can be predicted more accurately later.
在一个可能的实施方式中,处理器还用于:当日程任务执行完毕后,记录日程任务的行为信息,日程任务的行为信息包括日程任务对应的用户信息和日程任务的类别信息,其中,日程任务包括其它日程任务和/或新增日程任务;根据日程任务的行为信息对执行偏好预测模型进行更新。本申请还可以在执行完日程任务后记录日程任务的行为信息,并根据该行为信息对执行偏好预测模型进行更新,以便后续可以更加准确的预测用户的偏好。In a possible implementation manner, the processor is further configured to: record the behavior information of the scheduled task after the scheduled task is executed, and the behavior information of the scheduled task includes user information corresponding to the scheduled task and category information of the scheduled task, wherein, the scheduled task The tasks include other scheduled tasks and/or newly added scheduled tasks; the execution preference prediction model is updated according to the behavior information of the scheduled tasks. The present application can also record the behavior information of the scheduled task after the scheduled task is executed, and update the execution preference prediction model according to the behavior information, so that the user's preference can be predicted more accurately later.
在一个可能的实施方式中,处理器还用于:若上一次执行日程任务的时间与当前时刻之间的时间差大于或等于预设时间阈值,获取用户信息,其中,日程任务包括其它日程任务和/或新增日程任务;将用户信息输入执行偏好预测模型,以确定用户的日程任务执行偏好;根据用户的日程任务执行偏好确定推荐日程任务,并将推荐日程任务作为新增日程任务。本申请还可以在用户一段时间未执行日程任务时,根据用户的偏好自动生成用户感兴趣的日程任务,丰富了用户的使用体验。In a possible implementation manner, the processor is further configured to: if the time difference between the time when the last scheduled task was executed and the current moment is greater than or equal to a preset time threshold, obtain user information, where the scheduled task includes other scheduled tasks and /or add a new schedule task; input user information into the execution preference prediction model to determine the user's schedule task execution preference; determine the recommended schedule task according to the user's schedule task execution preference, and use the recommended schedule task as a new schedule task. The present application can also automatically generate a schedule task that the user is interested in according to the user's preference when the user has not performed the schedule task for a period of time, which enriches the user experience.
在一个可能的实施方式中,处理器还用于:控制显示器将推荐日程任务进行显示;接收用户的确认指令;根据确认指令将推荐日程任务作为新增日程任务。本申请还可以根据用户的实际需求确定是否将推荐日程任务作为新增日程任务,丰富了用户的使用体验。In a possible implementation manner, the processor is further configured to: control the display to display the recommended schedule task; receive a confirmation instruction from the user; and use the recommended schedule task as a new schedule task according to the confirmation instruction. The present application can also determine whether to use the recommended schedule task as a new schedule task according to the actual needs of the user, which enriches the user experience.
在一个可能的实施方式中,处理器还用于:将新增日程任务添加至终端设备中的日程管理应用中。本申请还可以将新增日程任务同步至终端设备的日程管理应用中,以便用户可以更加方便的规划日程任务,丰富用户的使用体验。In a possible implementation manner, the processor is further configured to: add a new schedule task to a schedule management application in the terminal device. This application can also synchronize the newly added schedule tasks to the schedule management application of the terminal device, so that the user can plan the schedule tasks more conveniently and enrich the user experience.
第三方面,提供了一种计算机可读存储介质,计算机可读存储介质中存储有指令,其特征在于,当指令在终端上运行时,使得终端执行第一方面中任意一项的方法。In a third aspect, a computer-readable storage medium is provided. Instructions are stored in the computer-readable storage medium, and it is characterized in that, when the instructions are run on a terminal, the terminal is made to execute any one of the methods in the first aspect.
第四方面,提供了一种包含指令的计算机设备,当其在终端上运行时,使得终端执行第一方面中的任意一项的方法。In a fourth aspect, a computer device containing instructions is provided, and when it is run on a terminal, it causes the terminal to execute any one of the methods in the first aspect.
第五方面,提供了一种包含指令的计算机程序产品,当其在计算机上运行时,使得计算机执行第一方面中任意一项的方法。In a fifth aspect, there is provided a computer program product containing instructions, which, when run on a computer, cause the computer to execute any one of the methods in the first aspect.
本申请公开了一种日程管理方法,通过在信息流应用中添加日程管理按钮,使得用户可以直接在使用信息流应用时,点击该日程管理按钮添加新增日程任务,使得用户可以更有效地利用时间,提高用户的自律性。This application discloses a schedule management method. By adding a schedule management button in the information flow application, the user can directly click the schedule management button to add a new schedule task when using the information flow application, so that the user can use the schedule more effectively. Time to improve user self-discipline.
附图说明Description of drawings
图1为本申请实施例提供的一种应用场景示意图;FIG. 1 is a schematic diagram of an application scenario provided by an embodiment of the present application;
图2为一种视频类APP新片预约示意图;Fig. 2 is a schematic diagram of a video APP new movie reservation;
图3为一种视频类APP动漫周更表示意图;Fig. 3 is a schematic diagram of weekly update table of video APP animation;
图4为一种视频类APP收藏界面示意图;Fig. 4 is a schematic diagram of a video APP collection interface;
图5为一种视频类APP体育赛事安排示意图;Fig. 5 is a schematic diagram of a sports event arrangement of a video APP;
图6a为一种购物类APP商品预约示意图;Figure 6a is a schematic diagram of a shopping APP product reservation;
图6b为另一种购物类APP商品预约示意图;Figure 6b is a schematic diagram of another shopping APP product reservation;
图7为一种日程管理类APP界面示意图;Fig. 7 is a schematic diagram of a schedule management APP interface;
图8为本申请实施例提供的一种日程管理架构示意图;FIG. 8 is a schematic diagram of a schedule management architecture provided by an embodiment of the present application;
图9为本申请实施例提供的一种信息流APP界面示意图;FIG. 9 is a schematic diagram of an information flow APP interface provided by an embodiment of the present application;
图10为本申请实施例提供的一种日程管理方法流程图;FIG. 10 is a flow chart of a schedule management method provided in an embodiment of the present application;
图11为本申请实施例提供的另一种日程管理方法流程图;FIG. 11 is a flow chart of another schedule management method provided in the embodiment of the present application;
图12为本申请实施例提供的又一种日程管理方法流程图;FIG. 12 is a flow chart of another schedule management method provided in the embodiment of the present application;
图13为本申请实施例提供的再一种日程管理方法流程图;FIG. 13 is a flow chart of another schedule management method provided in the embodiment of the present application;
图14为本申请实施例提供的一种时间段划分示意图;FIG. 14 is a schematic diagram of time segment division provided by the embodiment of the present application;
图15为本申请实施例提供的一种用户修改确认新增日程任务界面示意图;FIG. 15 is a schematic diagram of an interface for user modification and confirmation of adding a new schedule task provided by the embodiment of the present application;
图16为本申请实施例提供的一种新增日程任务添加成功界面提示示意图;Fig. 16 is a schematic diagram of an interface prompting that a newly added schedule task is successfully added provided by the embodiment of the present application;
图17为本申请实施例提供的一种日程管理装置示意图;Fig. 17 is a schematic diagram of a schedule management device provided by an embodiment of the present application;
图18为本申请实施例提供的一种终端设备示意图。FIG. 18 is a schematic diagram of a terminal device provided by an embodiment of the present application.
具体实施方式Detailed ways
下面将结合本申请实施例中的附图,对本申请实施例中的技术方案进行描述。The technical solutions in the embodiments of the present application will be described below with reference to the drawings in the embodiments of the present application.
本申请主要应用于用户浏览终端设备上具有信息流特点的APP的场景。例如图1所示出的场景示意图,终端设备通常都安装有具有信息流特点的APP,例如资讯类APP、视频类APP、购物类APP等,图1则以视频类APP为示例进行展示。用户在浏览此类具有信 息流特点的APP时,通常可以获取大量的信息流。这使得用户极其容易被获取到的大量信息流影响,导致用户原有的计划被搁置、打乱。以视频类APP为例,用户可能预先计划打开视频类APP观看某部电视剧,然而由于视频类APP主页上通常充斥着大量的推荐视频,大部分都是紧跟时事热点或者符合用户兴趣爱好的视频,因此用户往往会被这些视频所吸引并进行观看。当用户长时间观看视频类APP的推荐视频,最终将会导致用户观看电视剧的计划被耽搁。This application is mainly applied to the scenario where a user browses an APP with information flow characteristics on a terminal device. For example, in the schematic diagram of the scene shown in Figure 1, terminal devices are usually installed with APPs with characteristics of information flow, such as information APPs, video APPs, shopping APPs, etc. Figure 1 shows video APPs as examples. When users browse this kind of APP with the characteristics of information flow, they can usually obtain a large amount of information flow. This makes users extremely susceptible to being influenced by the large amount of information obtained, causing users' original plans to be put on hold and disrupted. Taking the video APP as an example, the user may pre-plan to open the video APP to watch a certain TV series. However, since the homepage of the video APP is usually filled with a large number of recommended videos, most of them follow current events or meet the user’s hobbies. , so users tend to be attracted to and watch these videos. When the user watches the recommended video of the video APP for a long time, it will eventually cause the user's plan to watch TV dramas to be delayed.
目前的信息流APP通常不具有添加日程任务的功能,也无法对日程任务进行有效的管理。仍以视频类APP为例,目前终端设备上的视频类APP,部分具有新片预约功能。例如,通过用户点击“预约”按钮,从而将观看新片的日程任务添加至系统的日程管理应用中,如日历APP。之后,当该新片临近上线时,可以根据日程任务进行相应的通知提醒,以提醒用户观看预约的新片。例如图2示出的,用户通过点击某部影片的“预约”按钮,之后终端设备显示图2右侧示出的日程界面。该界面包括有日程的执行时间、视频来源等信息。同时还包括提醒信息,以便在相应的时间段对用户进行提醒观看。但是,此类功能通常仅局限于新片预约,对于已经上映的视频或者短视频等,则无法添加预约进行观看。The current information flow APP usually does not have the function of adding a schedule task, nor can it effectively manage the schedule task. Still taking video apps as an example, some of the video apps on terminal devices currently have the function of booking new movies. For example, when the user clicks the "reserve" button, the schedule task of watching a new movie is added to the schedule management application of the system, such as a calendar APP. Afterwards, when the new movie is about to go online, corresponding notification reminders can be made according to the schedule tasks to remind the user to watch the reserved new movie. For example, as shown in FIG. 2 , the user clicks the "reserve" button of a movie, and then the terminal device displays the schedule interface shown on the right side of FIG. 2 . This interface includes information such as the execution time of the schedule and the source of the video. At the same time, reminder information is also included, so as to remind the user to watch in the corresponding time period. However, such functions are usually limited to new film reservations, and for videos that have already been released or short videos, etc., it is not possible to add reservations for viewing.
另外,部分视频类APP提供有动漫周更表的功能。此类功能主要针对动漫视频,该表以周为时间单位,列出一周内各天更新的动漫。显然,此功能是为了适应更新频率为一周更新一次的动漫视频。从而方便用户进行查阅。例如图3所示出的,用户可以通过视频APP自带的动漫周更表查看本周更新的动漫,例如可以按照不同天对更新的动漫进行划分。如周一更新了XXX和XXX,周二更新了XXX、XXX和XXX等。显然,此类功能也近局限于周更的动漫视频,同时,此类方法仅提示某部动漫在哪天会进行更新,并不会有针对性的进行提醒,以及,此类动漫周更表对于用户而言不具有针对性,也就是说,不会仅针对用户喜爱的动漫进行提醒。In addition, some video apps provide the function of weekly animation schedule. This type of function is mainly for animation videos, and the table uses weeks as the time unit to list the animations updated on each day of the week. Obviously, this function is to adapt to the animation video that is updated once a week. This makes it easy for users to check. For example, as shown in Figure 3, the user can view the updated animations of this week through the weekly animation update list of the video APP, for example, the updated animations can be divided according to different days. For example, XXX and XXX were updated on Monday, and XXX, XXX, and XXX were updated on Tuesday. Obviously, this kind of function is also limited to the animation videos updated weekly. At the same time, this method only prompts when a certain animation will be updated, and does not provide targeted reminders. Moreover, this kind of animation weekly update table is very important for users. It is not targeted, that is to say, it will not be reminded only for the anime that the user likes.
在一些情况下,部分视频类APP还提供了视频收藏的功能。例如,存在部分视频是用户想要观看的,但是用户此时可能由于一些原因无法进行观看,则可以通过将想要观看的视频进行收藏,以便后续再通过收藏夹中寻找想要观看的视频。例如图4所示出的,可以看到用户在空闲时间可以通过“我的收藏”查阅之前收藏过的视频,并进行观看。但是此类方式仅仅实现了收藏,并不是日程任务,显然不会在某个时间点提醒用户需要观看。该方式需要用户自己在空闲时间去进行查阅和观看。In some cases, some video apps also provide the function of video collection. For example, there are some videos that the user wants to watch, but the user may not be able to watch them due to some reasons at this time, you can bookmark the videos you want to watch, so that you can find the videos you want to watch in the favorites later. For example, as shown in FIG. 4 , it can be seen that the user can check and watch the previously favorited videos through "My Favorites" during free time. However, this kind of method only realizes collection, not a daily task, and obviously does not remind users to watch at a certain point in time. This method requires users to consult and watch in their free time.
在又一些情况下,部分视频类APP还会提供一些赛事直播,因此在一些例子中,包含赛事直播的视频类APP可以提供赛事日程列表。此类列表通常是将一段时间内要进行的比赛按照时间顺序进行排列,其中可以有已经结束的赛事、正在进行的赛事以及未来即将进行的赛事。例如图5所示出的,用户可以通过赛事安排查看在一段时间内的各个体育赛事,该赛事安排可以按照时间顺序将各个体育赛事进行排列。用户通过查看相应赛事的进行时间,以便在对应的时间点进行观看。用户还可以添加赛事提醒,用于在该赛事临近开始时提醒用户进行观看。此类赛事直播往往默认距离比赛开始前一定时间进行提醒,用户通常无法对本次提醒的日程任务进行设定。In some cases, some video apps also provide some live events, so in some cases, video apps that include live events can provide a list of event schedules. This type of list usually arranges the games to be played within a period of time in chronological order, and there may be games that have ended, games that are in progress, and games that will be played in the future. For example, as shown in FIG. 5 , the user can view various sports events within a period of time through the event arrangement, and the event arrangement can arrange the various sports events in chronological order. The user can watch the corresponding event at the corresponding time point by checking the running time of the corresponding event. The user can also add a game reminder, which is used to remind the user to watch the game when it is about to start. The live broadcast of such events often defaults to reminding a certain time before the start of the game, and users usually cannot set the schedule tasks for this reminder.
针对上述情况,可以看出目前视频类APP具有日程管理的场景并不多,并且不同场景的日程管理方式大不相同,可见目前视频类APP并不具有真正的日程管理模块用于管理用户的日程任务。无法帮助用户合理规划时间,也无法提高用户的自律性。In view of the above situation, it can be seen that there are not many scenarios where video APPs have schedule management, and the schedule management methods of different scenarios are quite different. It can be seen that current video APPs do not have a real schedule management module to manage users' schedules Task. It cannot help users plan their time reasonably, nor can it improve users' self-discipline.
针对购物类APP,目前的一些方案中提供了预约购买的功能。用户通过对某个商品进行预约,以便在开始抢购的时候可以提醒用户进行购买。例如图6a和图6b所示出的,其中,图6a为某个商品购物界面,用户可以通过点击“预约”按钮进行预约,以便在相应的抢购时间提醒用户进行购买。当用户预约完毕后,图6b示出了预约列表,该预约列表中则包含用户已经预约成功的商品信息。此类方案目前仅涉及购买场景,并不适用于其它的场景。同时与视频APP中的赛事直播场景类似,往往默认距离购买开始前一定时间进行提醒,用户通常无法对本次提醒的日程任务进行设定。For shopping apps, some current plans provide the function of making an appointment to purchase. The user makes an appointment for a certain product, so that the user can be reminded to make a purchase when the panic buying starts. For example, as shown in Fig. 6a and Fig. 6b, among them, Fig. 6a is a shopping interface for a certain commodity, and the user can make an appointment by clicking the "reservation" button, so as to remind the user to make a purchase at the corresponding rush-purchase time. After the user completes the reservation, FIG. 6 b shows a reservation list, and the reservation list includes information of commodities that the user has successfully reserved. Such solutions currently only involve purchase scenarios and are not applicable to other scenarios. At the same time, similar to the live event scene in the video APP, the reminder is often given a certain time before the start of the purchase by default, and the user usually cannot set the schedule task for this reminder.
而针对上述情况,在一些方案中提供了独立的日程管理类APP,用户通过使用此类APP对自己的日程任务进行管理。例如图7所示出的,用户可以手动添加各种日程任务,并设置相应的参数信息,例如标题、执行时间、提醒信息等。但是,由于独立的日程管理类APP与信息流APP是完全独立的不同APP,这使得用户在使用信息流APP时,若想要创建日程任务,需要重新进入日程管理类APP后进行手动设置才可以。这使得用户体验非常差。In view of the above situation, in some solutions, an independent schedule management APP is provided, and users manage their own schedule tasks by using such APP. For example, as shown in FIG. 7 , the user can manually add various schedule tasks and set corresponding parameter information, such as title, execution time, reminder information, and the like. However, since the independent schedule management APP and the information flow APP are completely independent and different APPs, when users use the information flow APP, if they want to create a schedule task, they need to re-enter the schedule management APP and perform manual settings. . This makes for a very poor user experience.
可见,针对目前市面上的各种信息流APP中仅针对部分场景单独设计了日程管理方案,更多的使用场景例如短视频、已经上线的视频等则没有相应的日程管理功能。同时,对于部分提供了预约观看、预约购买等功能,用户也无法对其日程任务进行编辑和修改,对用户使用上造成了一定的影响,导致用户并不能合理利用时间,降低了用户的使用体验。It can be seen that among the various information flow apps currently on the market, schedule management solutions are only designed for some scenarios, and more usage scenarios, such as short videos and videos that have already been launched, do not have corresponding schedule management functions. At the same time, for some functions such as scheduled viewing and scheduled purchase, users cannot edit and modify their schedule tasks, which has a certain impact on user use, resulting in users being unable to use time reasonably and reducing user experience. .
因此,本申请提供了一种日程管理方法,通过在信息流APP中新增一个日程管理按钮,使得用户在使用信息流应用时,可以通过该日程管理按钮直接添加新增日程任务。保障了用户可以更有效地利用时间,提高用户的自律性。Therefore, the present application provides a schedule management method. By adding a schedule management button in the information flow APP, the user can directly add new schedule tasks through the schedule management button when using the information flow application. It ensures that users can use time more effectively and improves user self-discipline.
下面将结合本申请实施例中的附图,对本申请实施例中的技术方案进行详细描述。The technical solutions in the embodiments of the present application will be described in detail below with reference to the drawings in the embodiments of the present application.
图8为本申请实施例提供的一种日程管理架构示意图。FIG. 8 is a schematic diagram of a schedule management architecture provided by an embodiment of the present application.
如图8所示,本申请提供了一种日程管理架构,该架构可以应用于终端设备上。在一个例子中,终端设备可以包括但不限于手机、智能电视、智能音响、可穿戴设备、平板电脑、桌面型计算机、个人电脑(personal computer,PC)、电脑一体机、手持计算机、笔记本电脑、超级移动个人计算机(ultra-mobile personal computer,UMPC)、上网本、个人数字助理(personal digitalassistant,PDA)、膝上型计算机(laptop)、移动电脑、增强现实(augmented reality,AR)设备、虚拟现实(virtual reality,VR)设备、人工智能(artificial intelligence,AI)设备和/或车载设备等任意终端设备或便携式终端设备。As shown in FIG. 8 , the present application provides a schedule management framework, which can be applied to a terminal device. In one example, terminal devices may include, but are not limited to, mobile phones, smart TVs, smart speakers, wearable devices, tablet computers, desktop computers, personal computers (personal computers, PCs), all-in-one computers, handheld computers, notebook computers, Ultra-mobile personal computer (UMPC), netbook, personal digital assistant (personal digital assistant, PDA), laptop computer (laptop), mobile computer, augmented reality (augmented reality, AR) device, virtual reality ( Any terminal equipment or portable terminal equipment such as virtual reality (VR) equipment, artificial intelligence (AI) equipment and/or vehicle-mounted equipment.
可以看出,终端设备可以包括应用层、框架层和内核层。其中,应用层中可以具有信息流APP,该信息流APP可以是资讯类APP、视频类APP、购物类APP、音乐播放APP、和读书类APP等具有信息流特点的APP。可以理解的是,本申请对具体的信息流APP不做限定。同时,本申请中的信息流APP是具有日程管理按钮的。如图9所示出的,以信息流APP为视频APP为例,本申请在信息流APP的页面上添加了日程管理按钮901。用户可以直接通过该日程管理按钮在使用信息流APP时添加日程任务。当用户点击应用层中信息流APP的日程管理按钮后,信息流APP通过专属的应用程序接口(application programming interface,API)调用处于框架(framework)层中的日程管理服务,从而实现用户对日程任务的新增、修改、删除等操作。It can be seen that the terminal device may include an application layer, a framework layer and a kernel layer. Wherein, there may be an information flow APP in the application layer, and the information flow APP may be an information flow APP, a video APP, a shopping APP, a music playing APP, and a reading APP, etc., which have characteristics of information flow. It can be understood that this application does not limit the specific information flow APP. At the same time, the information flow APP in this application has a schedule management button. As shown in FIG. 9 , taking the information flow APP as a video APP as an example, this application adds a schedule management button 901 on the page of the information flow APP. Users can directly add schedule tasks through the schedule management button when using the information flow APP. When the user clicks the schedule management button of the information flow APP in the application layer, the information flow APP calls the schedule management service in the framework layer through a dedicated application programming interface (application programming interface, API), so as to realize the user's schedule task Add, modify, delete and other operations.
在一个例子中,例如图9所示出的,可以在每个视频后方添加日程管理按钮901。当然,在另一些例子中,若信息流APP为音乐播放APP,则可以在每首音乐后方添加日程管理按钮901;又或者,若信息流APP为购物类APP,则可以在每件商品后方添加日程管理按钮901;又或者,若信息流APP为资讯类APP,则可以在每篇文章或推送后方添加日程管理按钮901;又或者,若信息流APP为读书类APP,则可以在每本书籍作品后方添加日程管理按钮901。当然可以理解的是,可以根据实际信息流APP所针对的领域在相应的位置添加日程管理按钮901,本申请不做限定。In one example, as shown in FIG. 9 , a schedule management button 901 may be added behind each video. Of course, in some other examples, if the information flow APP is a music playing APP, a schedule management button 901 can be added behind each piece of music; Schedule management button 901; or, if the information flow APP is an information APP, you can add a schedule management button 901 behind each article or push; or, if the information flow APP is a reading APP, you can add a schedule management button 901 in each book A schedule management button 901 is added behind the work. Of course, it can be understood that the schedule management button 901 can be added at the corresponding position according to the field targeted by the actual information flow APP, which is not limited in this application.
在另一个例子中,终端设备的应用层中还可以具有日程管理APP。可以理解的是,该日程管理APP为独立的日程管理APP,例如可以是系统自带的日历APP或任意一款第三方日程管理APP。framework层中还可以包括与日程管理APP相对应的日程任务存储服务。该日程任务存储服务可以存储日常管理APP中用户手动添加的一条或多条日程任务。framework层中的日程管理服务还可以调用日程任务存储服务,以便信息流APP获取到日程管理APP中存储的一条或多条日程任务。当然,在一些例子中,可以通过提示用户是否授权信息流APP获取日程管理APP中存储的日程任务。当用户选择是或者同意时,则允许日程管理服务调用日程任务存储服务,否则拒绝日程管理服务调用日程任务存储服务。In another example, the application layer of the terminal device may also have a schedule management APP. It can be understood that the schedule management APP is an independent schedule management APP, for example, it may be a calendar APP built in the system or any third-party schedule management APP. The framework layer may also include a schedule task storage service corresponding to the schedule management APP. The schedule task storage service can store one or more schedule tasks manually added by the user in the daily management APP. The schedule management service in the framework layer can also call the schedule task storage service, so that the information flow APP can obtain one or more schedule tasks stored in the schedule management APP. Certainly, in some examples, the schedule tasks stored in the schedule management APP may be obtained by prompting the user whether to authorize the information flow APP. When the user selects yes or agrees, the schedule management service is allowed to call the schedule task storage service; otherwise, the schedule management service is refused to call the schedule task storage service.
图10为本申请实施例提供的一种日程管理方法流程图。FIG. 10 is a flowchart of a schedule management method provided by an embodiment of the present application.
如图10所示,本申请提供了一种日程管理方法,该方法可以应用于上述图8至图9所涉及的终端设备,该终端设备上安装有信息流APP,信息流APP可以是上述提到的资讯类APP、视频类APP、购物类APP、音乐播放APP、和读书类APP等具有信息流特点的APP。该信息流APP具有日程管理按钮,该日程管理按钮可以使得用户在使用信息流APP的过程中对日程任务进行管理。该方法可以包括以下步骤:As shown in Figure 10, the present application provides a schedule management method, which can be applied to the terminal devices involved in the above-mentioned Figures 8 to 9, where the information flow APP is installed on the terminal equipment, and the information flow APP can be the above mentioned Apps with information flow characteristics such as information apps, video apps, shopping apps, music playback apps, and reading apps. The information flow APP has a schedule management button, and the schedule management button can enable the user to manage the schedule tasks in the process of using the information flow APP. The method may include the steps of:
S1001,根据用户点击终端设备的信息流APP中的日程管理按钮,获取新增日程任务指令。S1001. Obtain an instruction to add a new schedule task according to the user clicking a schedule management button in the information flow APP of the terminal device.
用户在使用终端设备的信息流APP时,当想要添加某个日程任务时,可以通过点击位于信息流APP中的日程管理按钮,直接进行添加。当用户点击了该日程管理按钮后,可以触发终端设备产生新增日程任务指令,该新增日程任务指令用于添加新增日程任务。可以理解的是,新增日程任务为用户新增的日程任务。换句话说,日程任务包括新增日程任务。When using the information flow APP of the terminal device, when the user wants to add a certain schedule task, he can directly add it by clicking the schedule management button located in the information flow APP. When the user clicks the schedule management button, the terminal device may be triggered to generate a new schedule task command, and the new schedule task command is used to add a new schedule task. It can be understood that the newly added schedule task is a schedule task newly added by the user. In other words, the scheduled tasks include newly added scheduled tasks.
S1002,根据新增日程任务指令,确定新增任务信息。S1002. Determine newly added task information according to the newly added schedule task instruction.
之后,终端设备的信息流APP根据S1001生成的新增日程任务指令,确定新增日程任务的新增任务信息。Afterwards, the information flow APP of the terminal device determines the newly added task information of the newly added schedule task according to the newly added schedule task instruction generated in S1001.
在一个例子中,新增任务信息可以包括用户信息和详情信息。其中,用户信息可以包括登录信息流APP的账户信息,例如包括用户名、性别、年龄、地域等多种属性。而根据使用场景的不同,详情信息可以是视频信息、音乐信息、文章信息、购物信息等等。在一个例子中,若信息流APP为资讯类APP,详情信息可以是文章信息;若信息流APP为视频类APP,详情信息可以是视频信息;若信息流APP为购物类APP,详情信息可以是购物信息;若信息流APP为音乐播放APP,详情信息可以是音乐信息;若信息流APP为读书类APP,详情信息可以是小说信息或者文章信息等。可以理解的是,针对不同情况详情信息的具体内容可以完全相同、部分不同或者完全不同。例如,视频信息可以包括视频标题、 视频分类、视频标签、视频时长等信息;而购物信息则可以包括商品名称、商品价格、商品分类等信息。可以理解的是,上述仅作为示例性进行描述,本申请并不对具体的用户信息和详情信息进行限定。In an example, the added task information may include user information and detailed information. Wherein, the user information may include account information for logging into the information flow APP, for example, including various attributes such as user name, gender, age, and region. According to different usage scenarios, the detailed information may be video information, music information, article information, shopping information, and so on. In one example, if the information flow APP is an information APP, the detailed information can be article information; if the information flow APP is a video APP, the detailed information can be video information; if the information flow APP is a shopping APP, the detailed information can be Shopping information; if the information streaming APP is a music player APP, the detailed information can be music information; if the information streaming APP is a reading APP, the detailed information can be novel information or article information, etc. It can be understood that the specific content of the detailed information for different situations may be completely the same, partially or completely different. For example, video information may include information such as video title, video classification, video label, and video duration; while shopping information may include information such as product name, product price, and product classification. It can be understood that, the foregoing description is only an example, and the present application does not limit specific user information and detailed information.
S1003,将新增任务信息输入至日程任务时间预测模型,确定预测日程时间段。S1003. Input the newly added task information into the schedule task time prediction model to determine the forecast schedule time period.
终端设备的信息流APP将S1003确定的新增任务信息输入至预先训练好的日程任务时间预测模型,从而确定出相应的预测日程时间段。其中,该预测日程时间段用于指示较为适合执行新增日程任务的时间段。The information flow APP of the terminal device inputs the new task information determined in S1003 into the pre-trained schedule task time prediction model, so as to determine the corresponding forecast schedule time period. Wherein, the predicted schedule time period is used to indicate a time period that is more suitable for executing the newly added schedule task.
在一个例子,时间段可以根据实际情况进行划分,例如可以粗略的划分一天为2个时间段,即白天和夜晚。也可以更细致的划分为上午、下午、晚上和夜间4个时间段。显然,时间段的划分可以根据经验进行合理的划分,同时每个时间段的起始时间和结束时间也可以根据经验进行划分,本申请并不做限定。当然,在一个例子中,提供了一种较为具体的时间段划分方式,该划分仅为示例性描述,例如可以划分8个时间段,即凌晨00:00~05:00、清晨05:00~06:00、早晨06:00~08:00、上午08:00~11:00、中午11:00~13:00、下午13:00~17:00、傍晚17:00~18:00和晚上18:00~次日00:00。In one example, the time period may be divided according to actual conditions, for example, a day may be roughly divided into two time periods, namely daytime and night. It can also be divided into 4 time periods of morning, afternoon, evening and night in more detail. Apparently, the division of time periods can be reasonably divided based on experience, and the start time and end time of each time period can also be divided according to experience, which is not limited in this application. Of course, in one example, a more specific way of dividing time periods is provided, which is only an exemplary description. For example, 8 time periods can be divided, namely, 00:00-05:00 in the morning, and 05:00-05:00 in the morning. 06:00, 06:00-08:00 in the morning, 08:00-11:00 in the morning, 11:00-13:00 in the afternoon, 13:00-17:00 in the afternoon, 17:00-18:00 in the evening and evening 18:00~00:00 the next day.
在一个例子中,终端设备的信息流APP将用户信息和详情信息输入至预先训练好的日程任务时间预测模型,得到该日程任务时间预测模型输出的预测日程时间段,例如以上述划分的8个时间段为例,假设输出为下午13:00~17:00,则表示新增日程任务适合在下午13:00~17:00这一时间段执行。In one example, the information flow APP of the terminal device inputs the user information and detailed information into the pre-trained schedule task time prediction model, and obtains the predicted schedule time period output by the schedule task time prediction model, for example, the above-mentioned 8 divisions Take the time period as an example, assuming the output is 13:00-17:00 pm, it means that the new schedule task is suitable for execution during the time period of 13:00-17:00 pm.
S1004,根据预测日程时间段确定日程计划执行时间。S1004. Determine the schedule execution time according to the predicted schedule time period.
终端设备的信息流APP根据S1003确定的预测日程时间段,进一步确定日程计划执行时间。其中,日程计划执行时间包括日程计划起始时间和日程计划结束时间。The information flow APP of the terminal device further determines the execution time of the schedule according to the predicted schedule time period determined in S1003. Wherein, the schedule execution time includes a schedule start time and a schedule end time.
在一个例子中,终端设备的信息流APP可以直接默认预测日程时间段为日程计划执行时间。即将预测日程时间段的起始时间作为日程计划起始时间,以及将预测日程时间段的结束时间作为日程计划结束时间。In an example, the information flow APP of the terminal device may directly default the predicted schedule time period as the schedule execution time. The start time of the predicted schedule time period is used as the schedule start time, and the end time of the predicted schedule time period is used as the schedule end time.
在另一个例子中,信息流APP还可以将预测日程时间段进行显示,用户可以参考S1003中得到的预测日程时间段,并在该时间段中选择出具体的日程计划执行时间,即在S1003中得到的预测日程时间段中确定出具体的日程计划起始时间和日程计划结束时间。在一个例子中,终端设备可以接收到用户发出的修改指令,以修改日程计划起始时间和日程计划结束时间,从而确定修改后的日程计划执行时间。例如用户点击终端设备上显示的预测日程时间段,从而修改具体的时间。显然,由于日程计划执行时间是用户手动输入确认的,因此日程计划执行时间可能与S1003中得到的预测日程时间段部分重叠、完全重叠或者完全不重叠。In another example, the information flow APP can also display the predicted schedule time period, the user can refer to the predicted schedule time period obtained in S1003, and select a specific schedule execution time in this time period, that is, in S1003 The specific schedule start time and schedule end time are determined in the obtained predicted schedule time period. In an example, the terminal device may receive a modification instruction from the user to modify the start time of the schedule and the end time of the schedule, so as to determine the modified execution time of the schedule. For example, the user clicks on the predicted schedule time period displayed on the terminal device, thereby modifying the specific time. Apparently, since the schedule execution time is manually input and confirmed by the user, the schedule execution time may partially overlap, completely overlap or not overlap with the predicted schedule time period obtained in S1003.
在又一个例子中,终端设备中还可以安装有日程管理APP,其中,信息流APP还可以获得读取日程管理APP的部分信息,例如其它日程任务。可以理解的是,其它日程任务是存储在日程管理APP中的日程任务。在一个例子中,信息流APP读取日程管理APP的至少一个其它日程任务,可以是信息流APP被授权了读取日程管理APP信息,例如终端设备可以通过显示屏提示用户“是否授权获取日程管理APP的信息”。当用户选择“是”或者其它等效的操作后,开启信息流APP读取日程管理APP信息的权限。信息流APP在获得读取日程管理APP信息的权限后,可以获取存储在日程管理APP中的至少一个其它日程任务的 执行时间。之后,在S1003得到的预测日程时间段中结合至少一个其它日程任务的执行时间,确定出日程计划执行时间。例如,预测日程时间段为下午13:00~17:00,获取到的其它日程信息为A日程任务15:00~15:30,B日程任务为15:50~17:00。信息流APP可以根据新增日程任务的执行时长确定出合适的日程计划执行时间。假设新增日程任务执行时长为50分钟,显然,15:30~15:50这一空闲时段是无法完成新增任务的。而13:00~15:00的空闲时段显然满足新增日程任务的执行时长。因此,可以确定日程计划执行时间为13:00~15:00。即日程计划起始时间为13:00,以及日程计划结束时间为15:00。当然,若增日程任务没有执行时长的信息,则可以将最长的空闲时段作为日程计划执行时间。In yet another example, a schedule management APP may also be installed in the terminal device, wherein the information flow APP may also obtain some information read from the schedule management APP, such as other schedule tasks. It can be understood that other schedule tasks are schedule tasks stored in the schedule management APP. In an example, the information flow APP reads at least one other schedule task of the schedule management APP. It may be that the information flow APP is authorized to read the information of the schedule management APP. APP information". When the user selects "Yes" or other equivalent operations, the permission of the information flow APP to read the information of the schedule management APP is enabled. After the information flow APP obtains the permission to read the information of the schedule management APP, it can obtain the execution time of at least one other schedule task stored in the schedule management APP. Afterwards, in S1003, the execution time of at least one other scheduled task is combined with the predicted schedule time period obtained to determine the scheduled execution time. For example, the predicted schedule time period is 13:00-17:00 in the afternoon, other acquired schedule information is 15:00-15:30 for schedule task A, and 15:50-17:00 for schedule task B. The information flow APP can determine the appropriate schedule execution time according to the execution time of the newly added schedule task. Assuming that the execution time of the new scheduled task is 50 minutes, it is obvious that the new task cannot be completed during the idle period from 15:30 to 15:50. And the idle period between 13:00 and 15:00 obviously satisfies the execution time of the newly added schedule task. Therefore, it can be determined that the schedule execution time is 13:00-15:00. That is, the schedule start time is 13:00, and the schedule end time is 15:00. Of course, if there is no information about the execution duration of the added schedule task, the longest idle period can be used as the scheduled execution time.
当然,进一步的,若新增任务信息中包含新增日程任务执行时长,还可以根据新增日程任务执行时长和日程计划起始时间,确定出更为准确的日程计划结束时间。例如,预测日程时间段为下午13:00~17:00,新增日程任务执行时长为50分钟,若确定日程计划起始时间为13:00,则可以根据新增日程任务执行时长为50分钟,确定出日程计划结束时间为13:50。Of course, further, if the newly added task information includes the execution duration of the newly added schedule task, a more accurate schedule end time can also be determined according to the execution duration of the newly added schedule task and the start time of the schedule. For example, the predicted schedule time period is from 13:00 to 17:00 in the afternoon, and the execution duration of the newly added schedule task is 50 minutes. If the start time of the schedule is determined to be 13:00, the execution duration of the newly added schedule task can be 50 minutes. , determine that the scheduled end time of the schedule is 13:50.
S1005,确定新增日程任务。S1005. Determine a new scheduled task.
终端设备的信息流APP在S1004中确定出日程计划执行时间后,可以结合新增任务信息确定出新增日程任务。其中,新增日程任务中包括有新增任务信息和日程计划执行时间。After the information flow APP of the terminal device determines the execution time of the schedule in S1004, it may combine the newly added task information to determine the newly added schedule task. Wherein, the newly added schedule task includes newly added task information and schedule execution time.
在一个例子中,若信息流APP获得了读取日程管理APP信息的权限,则在确定出新增日程任务后,还可以根据新增日程任务的日程计划执行时间以及从日程管理APP读取的至少一个其它日程任务的执行时间,确定新增日程任务与其它日程任务是否存在执行时间冲突。显然若存在不同的日程任务在执行时间上存在交集,则说明这些日程任务在执行时间上冲突,此时可以将新增任务信息中的用户信息输入至预先训练好的执行偏好预测模型中,从而确定出该用户信息所对应用户的日程任务执行偏好。之后,信息流APP可以根据得到的日程任务执行偏好,调整在执行时间上存在交集的多个日程任务的执行顺序。例如,确定的新增日程任务的日程计划执行时间为13:00~13:50,获取到的A日程任务15:00~15:30、B日程任务为15:50~17:00、C日程任务为13:00~13:30。信息流APP检测到新增日程任务与C日程任务存在执行时间的冲突,此时可以将新增日程任务中新增任务信息的用户信息输入至预先训练好的执行偏好预测模型中进行预测,得到上述用户信息所对应用户的日程任务执行偏好。可以理解的是,新增日程任务和其它日程任务可以包括标签,该标签用于对任务进行分类,例如,若信息流APP为视频类APP时,则标签可以用于区分不同日程任务所要观看的视频类别,如惊悚电影、动漫、真人秀、体育比赛等。若信息流APP为音乐播放类APP时,则标签可以如欧美音乐、国语音乐等;或者,摇滚音乐、说唱音乐、流行音乐等;又或者,XX明星、某某明星等。显然上述仅作为示例性进行描述,具体的标签可以根据实际情况进行设定,本申请不做限定。In one example, if the information flow APP has obtained the permission to read the information of the schedule management APP, after the new schedule task is determined, it can also be executed according to the schedule execution time of the new schedule task and the information read from the schedule management APP. The execution time of at least one other scheduled task determines whether there is an execution time conflict between the newly added scheduled task and other scheduled tasks. Obviously, if there is an intersection of different scheduled tasks in execution time, it means that these scheduled tasks conflict in execution time. At this time, the user information in the newly added task information can be input into the pre-trained execution preference prediction model, so that The schedule task execution preference of the user corresponding to the user information is determined. Afterwards, the information flow APP can adjust the execution sequence of multiple scheduled tasks that overlap in execution time according to the obtained schedule task execution preference. For example, the scheduled execution time of the confirmed new schedule task is 13:00~13:50, the acquired schedule A task is 15:00~15:30, the B schedule task is 15:50~17:00, and the C schedule task is The task is from 13:00 to 13:30. The information flow APP detects that there is a conflict between the execution time of the newly added schedule task and the C schedule task. At this time, the user information of the newly added task information in the newly added schedule task can be input into the pre-trained execution preference prediction model for prediction, and the obtained The schedule task execution preference of the user corresponding to the above user information. It can be understood that the newly added schedule tasks and other schedule tasks may include tags, which are used to classify the tasks. For example, if the information flow APP is a video APP, the tags can be used to distinguish the content to be watched by different schedule tasks. Video categories such as Thriller Movies, Anime, Reality TV, Sports, etc. If the information streaming APP is a music playing APP, the label can be such as European and American music, Mandarin music, etc.; or, rock music, rap music, pop music, etc.; or, XX star, certain star, etc. Apparently, the above description is only an example, and the specific label can be set according to the actual situation, which is not limited in this application.
显然,得到的用户的日程任务执行偏好可以表示为不同标签的感兴趣程度,如A标签80%、B标签10%、C标签5%、D标签3%和E标签2%,假设新增日程任务对应A标签、C日程任务对应D标签。可以根据得到的用户的日程任务执行偏好,确定先执行新增日程任务,后执行C日程任务。当然,在一些例子中,还可以用分数表示不同标签的感兴趣程度,可以采用100分制、10分制、5分制等,当然还可以不设定分数上限,本申请不做限定。Obviously, the obtained user’s schedule task execution preference can be expressed as the degree of interest in different tags, such as 80% for A tag, 10% for B tag, 5% for C tag, 3% for D tag and 2% for E tag. The task corresponds to the A label, and the C schedule task corresponds to the D label. According to the obtained user's schedule task execution preference, it may be determined that the new schedule task is executed first, and then the C schedule task is executed. Of course, in some examples, scores can also be used to indicate the degree of interest of different tags, such as a 100-point system, a 10-point system, a 5-point system, etc., and of course there is no upper limit on the scores, which is not limited in this application.
在一些例子中,当存在某个时间段存多个日程任务按照上述方式排序后,若再次存在添加新增日程任务,并确定日程计划执行时间时,需要同时考虑同一时间段内的多个日程任务的执行时长。例如,仍以新增日程任务与C日程任务在13:00存在执行冲突为例,假设新增日程任务执行时长为50分钟,C日程任务执行时长为30分钟,在13:00时按照先执行新增日程任务后执行C日程任务的顺序。此时若再次添加新增日程任务,例如称为新增日程任务2。则在确定新增日程任务2的日程计划执行时间时,假设仍然在下午13:00~17:00时间段,则需要根据新增日程任务执行时长50分钟和C日程任务执行时长30分钟将13:00~14:20去除。换句话说,新增日程任务2的日程计划起始时间最早只能从14:20开始。In some examples, when there are multiple schedule tasks stored in a certain time period and sorted according to the above method, if there is another new schedule task to be added and the execution time of the schedule plan is determined, multiple schedules in the same time period need to be considered at the same time The execution time of the task. For example, still taking the execution conflict between the newly added schedule task and the C schedule task at 13:00 as an example, assuming that the execution time of the newly added schedule task is 50 minutes, and the execution time of C schedule task is 30 minutes, at 13:00, it will be executed first The order in which C schedule tasks are executed after adding schedule tasks. At this time, if a new scheduled task is added again, for example, it is called new scheduled task 2 . Then, when determining the scheduled execution time of the newly added schedule task 2, assuming that it is still in the time period from 13:00 to 17:00 p.m., the execution time of the newly added schedule task is 50 minutes and the execution time of schedule task C is 30 minutes. :00~14:20 to remove. In other words, the scheduled start time of the new scheduled task 2 can only start from 14:20 at the earliest.
在又一些例子中,若在某个时间段存多个日程任务在执行时间上冲突,还可以将多个日程任务进行显示,以便用户查阅。然后接收用户输入的排序信息,以便按照用户手动排序的顺序对存在执行时间冲突的多个日程任务进行排序,方便后续用户按照该排序顺序执行多个日程任务。In some other examples, if there are multiple scheduled tasks conflicting in execution time during a certain period of time, the multiple scheduled tasks may also be displayed for easy reference by the user. Then, the sorting information input by the user is received, so as to sort the multiple scheduled tasks with execution time conflicts according to the order manually sorted by the user, so as to facilitate subsequent users to execute multiple scheduled tasks according to the sorted order.
S1006,将新增日程任务进行保存。S1006, saving the newly added schedule task.
终端设备的信息流APP在S1005中确定出新增日程任务后,可以将新增日程任务进行保存。例如保存至信息流APP中。After the information flow APP of the terminal device determines the newly added schedule task in S1005, it may save the newly added schedule task. For example, save to the information flow APP.
在一些例子中,若信息流APP获得了读取日程管理APP信息的权限,则还可以在确定出新增日程任务后,将该新增日程任务添加至日程管理APP中进行保存。从而实现了将新增日程任务同步的过程。In some examples, if the information flow APP has obtained the permission to read the information of the schedule management APP, after the new schedule task is determined, the new schedule task can be added to the schedule management APP for storage. In this way, the process of synchronizing the newly added schedule tasks is realized.
本申请提供的一种日程管理方法,通过在信息流APP中添加日程管理按钮,使得用户可以直接在使用信息流应用时,点击该日程管理按钮添加新增日程任务,使得用户可以更有效地利用时间,提高用户的自律性。In the schedule management method provided by this application, by adding a schedule management button in the information flow APP, the user can directly click the schedule management button to add a new schedule task when using the information flow application, so that the user can use the schedule more effectively. Time to improve user self-discipline.
图11为本申请实施例提供的另一种日程管理方法流程图。FIG. 11 is a flow chart of another schedule management method provided by the embodiment of the present application.
如图11所示,本申请还提供了另一种日程管理方法流程图。该方法主要用于对图10中提到的日程任务时间预测模型和执行偏好预测模型进行模型更新。该方法可以包括以下步骤:As shown in FIG. 11 , the present application also provides a flow chart of another schedule management method. This method is mainly used to update the schedule task time prediction model and execution preference prediction model mentioned in Fig. 10 . The method may include the steps of:
S1101,当日程任务执行完毕后,记录日程任务的行为信息。S1101. After the scheduled task is executed, record the behavior information of the scheduled task.
终端设备的信息流APP可以在执行完日程任务后,记录执行完毕的日程任务的行为信息。其中,该行为信息可以包括日程任务的真实执行时间和日程任务的任务信息,该行为信息还可以包括日程任务对应的用户信息和日程任务的类别信息。The information flow APP of the terminal device can record the behavior information of the completed scheduled task after executing the scheduled task. Wherein, the behavior information may include the actual execution time of the scheduled task and task information of the scheduled task, and the behavior information may also include user information corresponding to the scheduled task and category information of the scheduled task.
当然在一些例子中,还可以不断记录用户使用该信息流APP的行为信息。显然,若用户并未设定日程任务,但仍使用信息流APP时,也可以将用户平时使用该信息流APP的行为信息进行记录。当然,在一些例子中可以提示用户是否允许获取使用信息流APP的行为信息,并在用户点击“确认”或“允许”等功能类似的按钮后,对使用信息流APP的行为信息进行记录。Of course, in some examples, the behavior information of the user using the information flow APP can also be continuously recorded. Obviously, if the user does not set a schedule and task, but still uses the information flow APP, the behavior information of the user's usual use of the information flow APP can also be recorded. Of course, in some examples, the user may be prompted whether to allow access to the behavior information of using the information flow APP, and after the user clicks a button with a similar function such as "confirm" or "allow", the behavior information of using the information flow APP shall be recorded.
可以理解的是,执行完毕的日程任务可以是图10中提到的新增日程任务,也可以是日程管理APP中的其它日程任务。也就是说S1101可以在S1006之后执行,也可以在S1006之前执行,还可以与S1006同时执行。It can be understood that the completed schedule task may be the newly added schedule task mentioned in FIG. 10 , or may be other schedule tasks in the schedule management APP. That is to say, S1101 may be executed after S1006, or may be executed before S1006, or may be executed simultaneously with S1006.
S1102,根据日程任务的行为信息对日程时间预测模型进行更新。S1102, updating the schedule time prediction model according to the behavior information of the schedule task.
终端设备的信息流APP可以根据S1101中记录的日程任务的行为信息,对日程时间预测模型进行更新,以使得后续可以通过更新后的日程时间预测模型更加精准的预测新增日程任务的预测日程时间段。The information flow APP of the terminal device can update the schedule time prediction model according to the behavior information of the schedule task recorded in S1101, so that the predicted schedule time of the newly added schedule task can be predicted more accurately through the updated schedule time prediction model. part.
在一个例子中,若对日程时间预测模型进行更新,则可以采用行为信息中的部分信息对日程时间预测模型进行更新,例如采用日程任务的真实执行时间和日程任务的任务信息对日程时间预测模型进行更新。例如可以采用有监督学习的方式,其中任务信息中可以携带有该日程任务的标签,以使得更新后的日程时间预测模型可以输出某类标签的日程任务所对应的最优执行时间段,即得到预测日程时间段。In one example, if the schedule time prediction model is updated, the schedule time prediction model can be updated by using part of the behavior information, for example, the schedule time prediction model can be updated by using the real execution time of the schedule task and the task information of the schedule task. to update. For example, a supervised learning method can be used, in which the task information can carry the label of the schedule task, so that the updated schedule time prediction model can output the optimal execution time period corresponding to the schedule task of a certain type of label, that is, Forecast schedule timeslots.
S1103,根据日程任务的行为信息对执行偏好预测模型进行更新。S1103, updating the execution preference prediction model according to the behavior information of the scheduled tasks.
终端设备的信息流APP可以根据S1101中记录的日程任务的行为信息,对执行偏好预测模型进行更新,以使得后续可以通过更新后的执行偏好预测模型更加精准的预测用户的行为偏好。The information flow APP of the terminal device can update the execution preference prediction model according to the behavior information of the schedule task recorded in S1101, so that the user's behavior preference can be predicted more accurately through the updated execution preference prediction model.
在一个例子中,若对执行偏好预测模型进行更新,则可以采用行为信息中的部分信息对执行偏好预测模型进行更新,例如采用日程任务对应的用户信息和日程任务的类别信息对执行偏好预测模型进行更新。例如可以采用有监督学习的方式,更新后的执行偏好预测模型可以输出某用户信息对应各个不同的日程任务的类别信息的分值,以表示该用户信息对不同类别的日程任务的偏好程度。In one example, if the execution preference prediction model is updated, the execution preference prediction model can be updated with some information in the behavior information, for example, the user information corresponding to the scheduled task and the category information of the scheduled task are used to update the execution preference prediction model. to update. For example, a supervised learning method can be used, and the updated execution preference prediction model can output the scores of the category information corresponding to different schedule tasks of a certain user information, so as to indicate the preference degree of the user information for different categories of schedule tasks.
可以理解的是,S1102和S1103在执行上并无严格的先后顺序,可以先执行S1102后执行S1103,也可以先执行S1103后执行S1102,当然还可以同时执行S1102和S1103,本申请不做限定。It can be understood that there is no strict order in the execution of S1102 and S1103. S1102 can be executed first and then S1103 can be executed, or S1103 can be executed first and then S1102 can be executed. Of course, S1102 and S1103 can also be executed at the same time, which is not limited in this application.
同时,本申请图11所描述的更新日程时间预测模型和更新执行偏好预测模型可以是实时更新,也可以是周期性更新,例如按照每天一更新、三天一更新或者每周一更新等。同时,不同的预测模型的更新频率可以相同或者不同,可以根据实际情况进行设定,本申请不做限定。Meanwhile, the update schedule time prediction model and the update execution preference prediction model described in FIG. 11 of the present application may be updated in real time or periodically, for example, every day, every three days, or every Monday. Meanwhile, the update frequencies of different prediction models may be the same or different, and may be set according to actual conditions, which is not limited in this application.
本申请还可以对图10所描述的日程时间预测模型和执行偏好预测模型按照一定频率进行更新,从而保证预测模型结果更为精准,有助于用户对日程任务进行管理,并更加合理的利用时间,提高用户的自律性。This application can also update the schedule time prediction model and execution preference prediction model described in Figure 10 according to a certain frequency, so as to ensure that the results of the prediction model are more accurate, help users manage schedule tasks, and use time more reasonably , improve user self-discipline.
图12为本申请实施例提供的又一种日程管理方法流程图。FIG. 12 is a flow chart of another schedule management method provided by the embodiment of the present application.
如图12所示,本申请还提供了又一种日程管理方法,该方法适用于用户长时间未使用信息流APP,此时信息流APP可以自动生成推荐日程任务,从而实现对用户进行个性化推荐。该方法还可以包括以下步骤:As shown in Figure 12, this application also provides another schedule management method, which is suitable for users who have not used the information flow APP for a long time. At this time, the information flow APP can automatically generate recommended schedule tasks, so as to realize the personalization of users recommend. The method may also include the steps of:
S1201,确定上一次执行日程任务的时间与当前时刻之间的时间差是否大于或等于预设时间阈值。S1201. Determine whether the time difference between the last execution time of the scheduled task and the current time is greater than or equal to a preset time threshold.
终端设备的信息流APP还可以实时监测上一次执行日程任务的时间与当前时刻之间的时间差。在一个例子中,可以以上一次执行日程任务的结束时间作为时间差的起始时间,例如,假设当前时刻为X月23日14:00,上一次执行日程任务的结束时间为X月21日23:00。则可以确定出时间差为39个小时。之后,判断该时间差是否大于或等于预设的时间阈值。假设时间阈值为24小时,显然39小时大于24小时,则可以执行S1202。The information flow APP of the terminal device can also monitor in real time the time difference between the time when the last scheduled task was executed and the current time. In an example, the end time of the last scheduled task execution can be used as the start time of the time difference. For example, assuming that the current time is 14:00 on X, 23rd, and the end time of the last scheduled task execution is 23:00 on X, 21st: 00. Then it can be determined that the time difference is 39 hours. Afterwards, it is judged whether the time difference is greater than or equal to a preset time threshold. Assuming that the time threshold is 24 hours, obviously 39 hours is greater than 24 hours, then S1202 may be executed.
在一个例子中,若上一次执行日程任务的时间与当前时刻之间的时间差小于预设时 间阈值,则可以直接结束流程。In one example, if the time difference between the time when the scheduled task was executed last time and the current time is smaller than the preset time threshold, the process can be ended directly.
可以理解的是,上一次执行的日程任务,可以包括图10和图11中所描述的其它日程任务和/或新增日程任务。It can be understood that the scheduled task executed last time may include other scheduled tasks and/or newly added scheduled tasks described in FIG. 10 and FIG. 11 .
S1202,获取用户信息。S1202. Obtain user information.
当S1201中确定上一次执行日程任务的时间与当前时刻之间的时间差大于或等于预设时间阈值时,可以获取当前的用户信息。在一个例子中,例如可以是登录了信息流APP的用户信息。When it is determined in S1201 that the time difference between the last execution time of the scheduled task and the current time is greater than or equal to a preset time threshold, current user information may be acquired. In an example, for example, it may be user information who has logged into the information flow APP.
S1203,将用户信息输入执行偏好预测模型,以确定用户的日程任务执行偏好。S1203. Input the user information into the execution preference prediction model to determine the user's schedule task execution preference.
终端设备的信息流APP可以将S1202中获取到的用户信息输入至执行偏好预测模型中,从而得到该用户信息所对应用户的日程任务执行偏好。The information flow APP of the terminal device may input the user information obtained in S1202 into the execution preference prediction model, so as to obtain the schedule task execution preference of the user corresponding to the user information.
S1204,根据所述用户的日程任务执行偏好确定推荐日程任务。S1204. Determine a recommended schedule task according to the schedule task execution preference of the user.
之后,终端设备的信息流APP可以根据S1203确定的用户的日程任务执行偏好,确定推荐日程任务。例如若用户的日程任务偏好是观看XX动漫为90%、观看X综艺节目为8%、观看XXX电视剧为2%,此时可以将观看XX动漫作为推荐日程任务。在一个例子中,可以将观看XX动漫这一推荐日程任务和用户信息共同输入至日程时间预测模型,并得到推荐日程任务对应的日程计划执行时间。Afterwards, the information flow APP of the terminal device may determine a recommended schedule task according to the user's schedule task execution preference determined in S1203. For example, if the user's schedule task preference is 90% for watching XX animation, 8% for watching X variety show, and 2% for watching XXX TV series, watch XX animation as the recommended schedule task. In one example, the recommended schedule task of watching XX animation and user information can be input into the schedule time prediction model together, and the schedule execution time corresponding to the recommended schedule task can be obtained.
S1205,将推荐日程任务作为新增日程任务并进行保存。S1205. Save the recommended schedule task as a newly added schedule task.
终端设备的信息流APP可以将S1204中确定的推荐日程任务作为新增日程任务,然后保存至信息流APP中。The information flow APP of the terminal device may use the recommended schedule task determined in S1204 as a newly added schedule task, and then save it in the information flow APP.
当然在一些例子中,若信息流APP获得了读取日程管理APP信息的权限,则还可以将推荐日程任务作为新增日程任务,同时保存至日程管理APP中。Of course, in some examples, if the information flow APP has obtained the permission to read the information of the schedule management APP, the recommended schedule task can also be added as a new schedule task and saved in the schedule management APP at the same time.
在一个例子中,在将推荐日程任务作为新增日程任务进行保存之前,还可以将推荐日程任务进行显示。然后接收用户的确认指令。显然该确认指令是用户允许将推荐日程任务作为新增日程任务进行保存。之后,根据接收到的确认指令,将推荐日程任务作为新增日程任务进行保存。In an example, before the recommended scheduled task is saved as a newly added scheduled task, the recommended scheduled task may also be displayed. Then receive a confirmation instruction from the user. Apparently, the confirmation instruction is the user's permission to save the recommended schedule task as a newly added schedule task. Afterwards, according to the received confirmation instruction, the recommended schedule task is saved as a newly added schedule task.
可以理解的是,S1205在将推荐日程任务作为新增日程任务进行保存时,同时保存了推荐日程任务对应的日程计划执行时间。It can be understood that, when saving the recommended schedule task as a newly added schedule task in S1205, the schedule execution time corresponding to the recommended schedule task is also stored.
本申请还可以提供智能推荐日程任务的功能,提升用户使用体验,帮助用户更有效地利用时间,提高用户的自律性。This application can also provide the function of intelligently recommending schedule tasks, improve user experience, help users use time more effectively, and improve user self-discipline.
可以理解的是,图8至图13中信息流APP所保存的日程任务均可以上传至云端服务器进行云存储,同时,还可以将用户信息等信息上传至云端服务器进行存储。在一些例子中,上述提到的日程时间预测模型和执行偏好预测模型可以位于服务器中,终端设备可以将输入模型的信息发送至云端服务器,以便云端服务器根据输入的信息进行预测。之后将模型预测结果发送至终端设备的信息流APP中,以进行后续过程。It can be understood that all the schedule tasks saved by the information flow APP in Fig. 8 to Fig. 13 can be uploaded to the cloud server for cloud storage, and at the same time, information such as user information can also be uploaded to the cloud server for storage. In some examples, the above-mentioned schedule prediction model and execution preference prediction model may be located in the server, and the terminal device may send the input model information to the cloud server, so that the cloud server can make predictions based on the input information. Afterwards, the model prediction results are sent to the information flow APP of the terminal device for the follow-up process.
图13为本申请实施例提供的再一种日程管理方法流程图。FIG. 13 is a flow chart of another schedule management method provided by the embodiment of the present application.
如图13所示,本申请还提供了再一种日程管理方法,该方法以信息流APP为视频类APP为例进行描述。该方法运行在安装有视频类APP的终端设备中,视频类APP可以进一步划分为视频类APP客户端、视频类APP服务端。终端设备中还可以包括系统默认的日程管理APP。其中,视频类APP客户端可以理解为视频类APP的前端,即与用户进行互动的 部分,视频类APP服务端可以理解为视频类APP的后端,即底层实现部分。该方法可包括以下步骤:As shown in FIG. 13 , the present application also provides another schedule management method, which is described by taking the information flow APP as a video APP as an example. The method runs on a terminal device installed with a video APP, and the video APP can be further divided into a video APP client and a video APP server. The terminal device may also include a system default schedule management APP. Among them, the video APP client can be understood as the front end of the video APP, that is, the part that interacts with the user, and the video APP server can be understood as the back end of the video APP, that is, the underlying implementation part. The method may include the steps of:
S1301,用户将视频、博主等信息添加至视频类APP的日程管理。S1301. The user adds information such as videos and bloggers to the schedule management of the video APP.
首先用户在使用视频类APP时,可以通过视频类APP所具有的日程管理按钮,添加新的日程任务,即新增日程任务。例如用户点击如图9所示出的日程管理按钮901。显然,该日程管理按钮901可以认为的用户添加视频或博主至个人日程视频管理的入口。其中,个人日程视频管理可以认为是视频类APP内用于保存日程任务的数据库,例如可以是以表格形式存储的。在一些情况中,博主也可以称为上传者(uploader,UP主),即在视频网站、论坛、文件传输协议(file transfer protocol,ftp)站点上传视频音频文件的人。Firstly, when using a video APP, the user can add a new schedule task through the schedule management button of the video APP, that is, add a new schedule task. For example, the user clicks the schedule management button 901 as shown in FIG. 9 . Apparently, the schedule management button 901 can be regarded as an entry for the user to add videos or bloggers to personal schedule video management. Among them, the personal schedule video management can be regarded as a database used to save schedule tasks in a video APP, for example, it can be stored in the form of a table. In some cases, bloggers can also be called uploaders (uploaders, UP masters), that is, people who upload video and audio files on video websites, forums, and file transfer protocol (file transfer protocol, ftp) sites.
S1302,获取视频或博主信息。S1302. Obtain video or blogger information.
之后,视频类APP的服务端将获取需要添加的视频信息或者UP主信息。在一些例子中,此类信息可以用于填充新增日程任务的标题。After that, the server of the video APP will obtain the video information or UP main information that needs to be added. In some examples, such information can be used to populate the title of a newly added calendar task.
S1303,预测用户的最佳观影时间段。S1303. Predict the user's best viewing time period.
视频类APP的服务端获取用户信息,该用户信息可以是登录了该视频类APP的用户信息。同时,将S1302中获取到的视频信息或UP主信息,以及用户信息输入至预先训练好的日程时间预测模型中进行预测。之后得到日程时间预测模型的输出,即预测日程时间段。该预测日程时间段在视频类APP中还可以称为最佳观影时间段。The server of the video APP obtains user information, and the user information may be information of a user who has logged into the video APP. At the same time, input the video information or UP main information and user information obtained in S1302 into the pre-trained schedule time prediction model for prediction. Afterwards, the output of the schedule time prediction model is obtained, that is, the predicted schedule time period. The predicted schedule time period may also be referred to as the best viewing time period in video APPs.
在一个例子中,视频信息可以上述图8至图12中提到的新增任务信息中的详情信息。例如可以包括视频的标题、视频分类、视频标签等信息。用户信息即上述图8至图12中提到的新增任务信息中的用户信息,例如可以包括性别、年龄、地域等信息。In an example, the video information may be detailed information in the newly added task information mentioned above in FIG. 8 to FIG. 12 . For example, information such as video titles, video categories, and video tags may be included. The user information is the user information in the newly added task information mentioned above in FIGS. 8 to 12 , and may include information such as gender, age, and region, for example.
对于最佳观影时间段,可以是表示用户观看视频的起始时间所在的时间段,可以例如图14所划分的时间段,可以包括凌晨00:00~5:00、清晨05:00~06:00、早晨06:00~08:00、上午08:00~11:00、中午11:00~13:00、下午13:00~17:00、傍晚17:00~18:00、晚上18:00~24:00。可以理解的是,由于不同的用户其作息时间并不完全相同,因此用户还可以自定义个性化的时间划分,以及每个时段的时间范围。For the best viewing time period, it can be the time period at which the user watches the video starting time. For example, the time period divided in Figure 14 can include 00:00-5:00 in the morning and 05:00-06 in the morning. :00, morning 06:00~08:00, morning 08:00~11:00, noon 11:00~13:00, afternoon 13:00~17:00, evening 17:00~18:00, evening 18 :00~24:00. It is understandable that since different users have different work and rest time, users can also customize personalized time divisions and time ranges for each time period.
S1304,确定用户最佳观影时间。S1304. Determine the best viewing time for the user.
视频类APP的服务端可以根据最佳观影时间段,进一步确定用户的最佳观影时间,即上述图8至图12中提到的日程计划执行时间。其中,最佳观影时间包括观影起始时间和观影结束时间。可以理解的是,观影起始时间和观影结束时间分别对应上述图8至图12中提到的日程计划起始时间和日程计划结束时间。The server side of the video APP can further determine the user's best viewing time according to the optimal viewing time period, that is, the schedule execution time mentioned above in Figures 8 to 12 . Wherein, the optimal viewing time includes viewing start time and viewing end time. It can be understood that the movie viewing start time and movie viewing end time respectively correspond to the schedule start time and schedule end time mentioned above in FIGS. 8 to 12 .
在一个例子中,视频类APP的服务端可以将最佳观影时间段作为用户的最佳观影时间。即将观影起始时间设定为最佳观影时间段的起始时间,以及将观影结束时间设定为最佳观影时间段的结束时间。当然,在另一个例子中,视频信息可以包括视频的播放时长,也就是上述图8至图12中提到的新增日程任务执行时长。视频类APP的服务端可以根据视频的播放时长,确定出更为精准的观影结束时间。即观影起始时间往后延长视频的播放时长后,得到观影结束时间。In an example, the server side of the video APP may use the best movie viewing time period as the user's best movie watching time. That is, the movie viewing start time is set as the start time of the best movie viewing time period, and the movie viewing end time is set as the end time of the best movie viewing time period. Of course, in another example, the video information may include the playing duration of the video, that is, the execution duration of the newly added schedule task mentioned above in FIGS. 8 to 12 . The server side of the video APP can determine a more accurate viewing end time according to the playing time of the video. That is, the viewing end time is obtained by extending the playback duration of the video after the viewing start time.
在又一个例子中,若视频类APP获得了读取日程管理APP信息的权限,则视频类APP还可以读取日程管理APP中的其它日程任务,即执行S1305。之后,视频类APP在最佳观影时间段中将所有其它日程任务对应的执行时间去除。也就是说,需要保证新增的视频的 观看时间需要避开所有其它日程任务。当然,应当理解的是,可以仅考虑与最佳观影时间段处于同一天的其它日程任务对应的执行时间。假设最佳观影时间段为13:00~17:00,该视频的播放时长为50分钟,其它日程任务如F日程任务为14:00~16:30,则可以确定在最佳观影时间段中的空余时间段为13:00~14:00以及16:30~17:00。此时结合视频的播放时长为50分钟,可以确定空余时间段为13:00~14:00最为合适,因此可以确定观影起始时间为13:00,以及观影结束时间为13:50。在另一种情况下,仍以最佳观影时间段为13:00~17:00,该视频的播放时长为50分钟为例,若其它日程任务如G日程任务为14:00~15:30。此时可以确定出在最佳观影时间段中的空余时间段为13:00~14:00以及15:30~17:00,显然两个空余时间均满足视频的播放时长为50分钟,此时可以按照预设规则选择合适的观影起始时间。预设规则例如可以是选择时间间隔最短的空余时间段,并将该空余时间段的起始时间作为观影起始时间。此类规则可以尽可能将空余时间整合,有利于用户更加合理的利用时间。当然,在另一个例子中,预设规则也可以是选择时间间隔最长的空余时间段并将该空余时间段的起始时间作为观影起始时间。当然,还可以按照一定概率进行随机选择,或者分别给不同的空余时间段一定的权重,并按照一定的方式计算以确定最终的观影起始时间,本申请在此不作限定。In yet another example, if the video APP has obtained the permission to read the information of the schedule management APP, the video APP can also read other schedule tasks in the schedule management APP, that is, execute S1305. Afterwards, the video APP removes the execution time corresponding to all other scheduled tasks in the best viewing time period. That is to say, it is necessary to ensure that the viewing time of the newly added video needs to avoid all other schedule tasks. Of course, it should be understood that only execution times corresponding to other scheduled tasks on the same day as the best movie viewing time period may be considered. Assuming that the best viewing time is 13:00-17:00, and the playing time of the video is 50 minutes, and other schedule tasks such as the F schedule task are 14:00-16:30, the best viewing time can be determined The free time slots in the segment are 13:00-14:00 and 16:30-17:00. At this time, considering that the playing time of the video is 50 minutes, it can be determined that 13:00-14:00 is the most suitable free time period, so it can be determined that the viewing start time is 13:00, and the viewing end time is 13:50. In another case, still taking the best movie viewing time period as 13:00-17:00, and the video playing time as 50 minutes as an example, if other schedule tasks such as G schedule tasks are 14:00-15: 30. At this point, it can be determined that the free time periods in the best movie viewing time period are 13:00-14:00 and 15:30-17:00, obviously, the two free time periods all satisfy that the playing time of the video is 50 minutes. You can choose the appropriate viewing start time according to the preset rules. The preset rule may be, for example, to select the free time period with the shortest time interval, and use the start time of the free time period as the movie viewing start time. Such rules can integrate spare time as much as possible, which is beneficial for users to use time more reasonably. Of course, in another example, the preset rule may also be to select the free time period with the longest time interval and use the start time of the free time period as the movie viewing start time. Of course, it is also possible to randomly select according to a certain probability, or give certain weights to different free time periods, and calculate according to a certain method to determine the final movie viewing start time, which is not limited in this application.
在另有一种情况下,假设仍以最佳观影时间段为13:00~17:00,该视频的播放时长为50分钟为例,若其它日程任务如H日程任务为13:30~16:50,显然,空余时间段为13:00~13:30以及16:50~17:00,均不满足视频的播放时长要求。此时可以从其它观影时间段进行选择,例如选择其它观影时间段中空余时间段最长的,并将该空余时间段作为观影起始时间。In another case, assuming that the best viewing time is still 13:00-17:00, and the playing time of the video is 50 minutes as an example, if other schedule tasks such as the H schedule task are 13:30-16 :50, obviously, the free time periods are 13:00-13:30 and 16:50-17:00, which do not meet the playback duration requirements of the video. At this time, you can choose from other movie viewing time periods, for example, select the longest free time period among other movie watching time periods, and use this free time period as the movie viewing start time.
在一个例子中,视频类APP服务端可以在确定出用户最佳观影时间后直接执行S1307,也可以将确定的最佳观影时间进行显示,以便用户确认是否满足自身需求。即执行S1306。In one example, the video APP server may directly execute S1307 after determining the user's best movie viewing time, or may display the determined best movie watching time so that the user can confirm whether the user's needs are met. That is, execute S1306.
在一个例子中,视频类APP服务端在确定出最佳观影时间后,还可以结合日程任务的标题、日程提醒方式等信息确定出最终的新增日程任务。显然,新增日程任务中包含有观影起始时间、观影结束时间、日程任务的标题、提醒方式等信息。In one example, after the video APP server determines the best movie viewing time, it can also combine information such as the title of the schedule task and the schedule reminder method to determine the final new schedule task. Obviously, the newly added schedule task includes information such as the start time of movie viewing, the end time of movie viewing, the title of the schedule task, and the reminder method.
S1305,获取用户的日程任务。S1305. Obtain the user's schedule task.
若视频类APP获得了读取日程管理APP信息的权限,终端设备的视频类APP可以获取日程管理APP中存储的用户的日程任务,即上述图8至图12中提到的其它日程任务,以便用于预测新增日程任务的日程计划起始时间,即观影起始时间。If the video APP has obtained the permission to read the information of the schedule management APP, the video APP of the terminal device can obtain the user's schedule tasks stored in the schedule management APP, that is, other schedule tasks mentioned in Figure 8 to Figure 12 above, so that It is used to predict the schedule start time of the newly added schedule task, that is, the movie viewing start time.
S1306,用户修改并确定最佳观影时间。S1306, the user modifies and determines the best viewing time.
视频类APP服务端可以将最佳观影时间进行显示,以便用户确认是否满足自身需求。当然,在一些例子中,还可以同时将新增日程任务中的日程任务的标题、日程提醒方式等信息一并进行显示。The video APP server can display the best viewing time, so that users can confirm whether their needs are met. Of course, in some examples, information such as the title of the new scheduled task and the way of reminding the schedule can also be displayed together.
在一个例子中,例如若用户允许,则可以点击“确认”、“是”等功能类似的按钮,以执行后续步骤。又或者若用户对该时段不满意,则可以点击“取消”、“否”、“删除”等功能类似的按钮,以取消新增该日程任务,并结束流程。In an example, for example, if the user permits, a button with a similar function such as "confirm" and "yes" may be clicked to perform subsequent steps. Or if the user is dissatisfied with the time period, he can click buttons with similar functions such as "cancel", "no" and "delete" to cancel adding the schedule task and end the process.
当然,在另一个例子中,用户还可以点击最佳观影时间,以修改该最佳观影时间。当用户修改完毕后,可以点击页面的其它位置,或者点击“确认”等功能类似的按钮,从而完成对最佳观影时间的修改。Of course, in another example, the user can also click on the best viewing time to modify the best viewing time. After the modification is completed, the user can click other positions on the page, or click a button with a similar function such as "Confirm" to complete the modification of the best viewing time.
可以理解的是,若将新增日程任务中的日程任务的标题、日程提醒方式等信息一并进行显示,则还可以允许用户对显示的上述信息进行修改与确认,其实现过程与修改、确认最佳观影时间的方式相类似,在此不再赘述。It can be understood that if the title of the new schedule task and the schedule reminder method are displayed together, the user can also be allowed to modify and confirm the above information displayed, and the implementation process is related to modification and confirmation The method of the best viewing time is similar and will not be repeated here.
在一个例子中,例如图15所示出的一种可能的用户修改确认新增日程任务界面。在该界面中包括视频标题、视频子标题1501、观影起始时间、观影结束时间、提醒方式和同步日程按钮1502。其中,提醒方式可以包括闹钟提醒或者推送(push)提醒等,若选择闹钟提醒,则可以进一步包括提醒时间和提醒铃声等。在一些例子中,提醒方式的具体设定可以是默认设定,也可以是最近一次用户修改后的设定。在一些例子中,还可以包括提醒是否重复等。In an example, for example, a possible user modification interface shown in FIG. 15 for confirming the addition of a scheduled task. The interface includes a video title, a video subtitle 1501 , a viewing start time, a viewing end time, a reminder mode and a synchronization schedule button 1502 . Wherein, the reminder method may include an alarm clock reminder or a push (push) reminder, and the like, and if an alarm clock reminder is selected, it may further include a reminder time and a reminder ringtone. In some examples, the specific setting of the reminder method may be a default setting, or a setting modified by the user last time. In some examples, it may also include whether the reminder is repeated or not.
如图15中所显示的所有信息均可以根据用户的实际情况进行修改。对于视频子标题1501,可以理解的是,若某类视频具有多个分集,如电视机、动漫、综艺等。则可以包括视频子标题1501。而对于如电影、短视频等较为独立的视频,则可以不包含视频子标题1501,例如不显示视频子标题1501或者将视频子标题1501置灰(即无法编辑或操作状态)。All the information shown in Figure 15 can be modified according to the actual situation of the user. Regarding the video subtitle 1501, it can be understood that if a certain type of video has multiple episodes, such as TV, animation, and variety shows. A video subtitle 1501 may then be included. For relatively independent videos such as movies and short videos, the video subtitle 1501 may not be included, for example, the video subtitle 1501 is not displayed or the video subtitle 1501 is grayed out (that is, cannot be edited or operated).
同时对于同步日程按钮1502,若视频类APP获得了读取日程管理APP信息的权限,则用户可以通过点击该按钮将同步功能开启,以便将新增日程任务保存至日程管理APP,即执行S1308。若视频类APP没有获得读取日程管理APP信息的权限,则同步日程按钮1502可以永久处于关闭状态,例如置灰(即无法编辑或操作状态)。At the same time, for the sync schedule button 1502, if the video APP has obtained the permission to read the schedule management APP information, the user can click this button to enable the synchronization function, so as to save the newly added schedule tasks to the schedule management APP, that is, execute S1308. If the video APP does not have the permission to read the information of the schedule management APP, the sync schedule button 1502 can be permanently off, for example grayed out (that is, cannot be edited or operated).
S1307,添加至个人视频日程中。S1307, add to personal video schedule.
视频类APP服务端可以将确定完的新增日程任务添加至个人视频日程中。例如可以点击图15右上角的“√”或者功能类似的按钮,如“确认”、“是”等。The video APP server can add the confirmed new schedule tasks to the personal video schedule. For example, you can click "√" in the upper right corner of Figure 15 or buttons with similar functions, such as "confirm" and "yes".
可以理解的是,S1307主要用于将新增日程任务保存至视频类APP中,例如保存至视频类APP的后台数据库中。It can be understood that S1307 is mainly used for saving the newly added schedule task in the video APP, for example, in the background database of the video APP.
S1308,添加至个人日程。S1308, adding to personal schedule.
若视频类APP获得了读取日程管理APP信息的权限,则视频类APP服务端还可以将新增日程任务保存至日程管理APP中的数据库中,例如日程管理APP中的数据库可以成为“个人日程”。If the video APP has obtained the permission to read the information of the schedule management APP, the video APP server can also save the newly added schedule tasks to the database in the schedule management APP. For example, the database in the schedule management APP can become a "personal schedule ".
S1309,观影是否存在冲突。S1309, whether there is a conflict in viewing the movie.
视频类APP的服务端确定新增日程任务与其它日程任务是否存在冲突。The server side of the video APP determines whether there is a conflict between the newly added schedule task and other schedule tasks.
在一个例子中,可以确定新增日程任务的最佳观影时间与其它日程任务的执行时间是否存在交集。若新增日程任务的最佳观影时间与其它日程任务的执行时间不存在交集,则执行S1310。若与新增日程任务的最佳观影时间存在交集的其它日程任务数量大于0,则表示存在与新增日程任务冲突的其它日程任务,则可以执行S1311。In an example, it may be determined whether there is an intersection between the optimal movie viewing time of the newly added scheduled task and the execution time of other scheduled tasks. If there is no intersection between the optimal viewing time of the newly added scheduled task and the execution time of other scheduled tasks, S1310 is executed. If the number of other scheduled tasks intersecting with the optimal viewing time of the newly added scheduled task is greater than 0, it means that there are other scheduled tasks that conflict with the newly added scheduled task, and S1311 may be executed.
S1310,通知用户视频日程添加成功。S1310. Notify the user that the video schedule is added successfully.
当S1309中确定新增日程任务的最佳观影时间与其它日程任务的执行时间不存在交集,则视频类APP的客户端可以通知用户视频日程添加成功,即新增日程任务添加成功。例如可以显示用于表示添加成功的提示信息。如图16所示出的,可以看到1601即表示添加成功的提示信息。When it is determined in S1309 that the optimal movie viewing time of the newly added schedule task does not overlap with the execution time of other schedule tasks, the client side of the video APP may notify the user that the video schedule is added successfully, that is, the newly added schedule task is added successfully. For example, a prompt message indicating that the addition is successful may be displayed. As shown in FIG. 16 , it can be seen that 1601 is a prompt message indicating that the addition is successful.
在一些例子中,视频类APP还可以将所有的日程任务进行显示,例如图16中的1602。该区域显示了用户添加的所有观看视频的日程任务。可以理解的是,当新增日程任务添加 成功后,也将在此部分进行显示。1602中可以显示即将观看的视频,以及观影起始时间等信息。便于用户进行查看和管理。在一些例子中用户,可以通过某种预设的手势操作,直接在1602中删除或者修改已经添加过的日程任务。其中,所有的观看视频的日程任务可以按照时间线进行展示。In some examples, the video APP can also display all the scheduled tasks, such as 1602 in FIG. 16 . This area displays all schedule tasks added by users to watch videos. It can be understood that when the new schedule task is successfully added, it will also be displayed in this part. In step 1602, information such as the video to be watched and the start time of viewing can be displayed. It is convenient for users to view and manage. In some examples, the user can directly delete or modify the added schedule task in 1602 through some preset gesture operation. Wherein, all scheduled tasks for watching videos can be displayed according to the timeline.
当然在另一些例子中,用户添加的所有观看视频的日程任务也可以通过列表的形式展现。当然,用户也可以在此列表中对已经添加过的日程任务进行删除或者修改,本申请在此不作限定。Of course, in some other examples, all scheduled tasks for watching videos added by the user may also be displayed in the form of a list. Of course, the user can also delete or modify the added schedule tasks in this list, which is not limited in this application.
S1311,按照用户的观影类型偏好对日程中的视频列表进行排序。S1311. Sort the video list in the schedule according to the user's viewing type preference.
当S1309中确定新增日程任务的最佳观影时间与其它日程任务的执行时间存在交集,则视频类APP的客户端可以查询用户的观影偏好。观影偏好可以是视频的类型或标签,以及对应的分数或占比。其中,分数或占比用于表示用户对该类型或标签的喜好程度,分数或占比越高,表示用户对该类型或标签越感兴趣。When it is determined in S1309 that the optimal viewing time of the newly added scheduled task overlaps with the execution time of other scheduled tasks, the client side of the video APP can query the user's viewing preference. The viewing preference can be the type or tag of the video, and the corresponding score or proportion. Among them, the score or proportion is used to indicate the user's preference for the type or label, and the higher the score or proportion, the more interested the user is in the type or label.
在一个例子中,查询用户的观影偏好的过程可以是将用户信息输入至执行偏好预测模型中进行预测,其输出结果为该用户信息对应用户的日程任务执行偏好,如包括各个类型或标签所对应的分数或占比。之后,可以按照得到的分数或占比,由高到低依次排序,从而确定用户出用户对那些类型或标签更感兴趣。之后,可以对新增日程任务和至少一个其它日程任务按照类型或标签的排序情况进行排序,以便用户按照该顺序依次执行日程任务。In one example, the process of querying the user's movie viewing preference may be to input the user information into the execution preference prediction model for prediction, and the output result is that the user information corresponds to the user's schedule task execution preference, as indicated by various types or tags. Corresponding scores or proportions. After that, it can be sorted from high to low according to the obtained scores or proportions, so as to determine which types or tags the user is more interested in. Afterwards, the newly added scheduled task and at least one other scheduled task may be sorted according to the type or label, so that the user executes the scheduled task sequentially according to this order.
在按照用户的观影类型偏好对日程中的视频列表进行排序之后,可以执行S1310,以通知用户视频日程添加成功。After the video list in the schedule is sorted according to the user's viewing type preference, S1310 may be executed to notify the user that the video schedule is added successfully.
可以理解的是,视频类APP还可以随时记录用户的播放记录,以便对上述S1303提到的日程时间预测模型和上述S1311提到的执行偏好预测模型进行更新。因此,该方法还可以包括以下步骤:It can be understood that the video APP can also record the user's playback records at any time, so as to update the schedule time prediction model mentioned in the above S1303 and the execution preference prediction model mentioned in the above S1311. Therefore, the method can also include the following steps:
S1312,记录用户的播放记录。S1312. Record the playback record of the user.
视频类APP可以不断记录用户的播放记录。Video apps can continuously record the user's playback records.
在一些例子中,用户可以选择是否开启对模型更新的功能,当接收到用户发出的授权指令后,记录用户的播放记录。In some examples, the user can choose whether to enable the function of updating the model, and record the user's playback record after receiving an authorization instruction from the user.
在一些例子中,记录用户的播放记录这一行为也可以称为对用户的播放记录进行打点。打点可以理解为记录某一次的播放记录,如可以包括观影起始时间、观影结束时间、视频标识(identification,ID)、播放时长、播放进度、视频标题、视频类别或标签、演员信息等等。当然,播放记录中还可以包括用户信息,例如用户的账号、性别、年龄、地域、终端设备的型号等。用户的上述播放记录可以保存至视频类APP的后台数据库中。在一个例子中,后台数据库可以位于终端设备上,也可以是位于云端服务器。In some examples, the act of recording the user's play records may also be referred to as marking the user's play records. Dot can be understood as recording a certain playback record, for example, it can include viewing start time, viewing end time, video identification (identification, ID), playback duration, playback progress, video title, video category or label, actor information, etc. wait. Of course, the play record may also include user information, such as the user's account, gender, age, region, model of the terminal device, and the like. The above playback records of the user can be saved in the background database of the video APP. In one example, the background database can be located on the terminal device, or on a cloud server.
在一个例子中,后台数据库中存储的用户的播放记录可以按天进行分类。In one example, the user's playback records stored in the background database can be classified by day.
S1313,更新用户的日程时间预测模型。S1313, updating the user's schedule time prediction model.
视频类APP可以根据S1312中记录的用户的播放记录对用户的日程时间预测模型进行更新。在一些例子中,可以将用户的播放记录中的用户信息、视频ID、播放时长、视频标题、视频类别或标签、演员信息、观影起始时间和观影结束时间等。其中,可以将观影起始时间和观影结束时间所处的时间段作为标签,对日程时间预测模型进行有监督学习, 并更新日程时间预测模型中相应的参数,从而实现对日程时间预测模型的更新。The video APP can update the user's schedule time prediction model according to the user's playback records recorded in S1312. In some examples, the user information, video ID, playback duration, video title, video category or tag, actor information, movie viewing start time and movie viewing end time, etc. in the user's playback records can be stored. Among them, the time period between the movie viewing start time and the movie viewing end time can be used as a label to carry out supervised learning on the schedule time prediction model, and update the corresponding parameters in the schedule time prediction model, so as to realize the schedule time prediction model update.
在一些例子中,可以仅选择前一天的用户的播放记录对用户的日程时间预测模型进行更新。当然在另一些例子中,可以选择某一时间段内的用户的播放记录对用户的日程时间预测模型进行更新。当然在一些例子中,还可以对不同时期的用户的播放记录分配相应的权重,例如以“天”为单位对不同日期的用户的播放记录分配不同权重,如越靠近当前日期的播放记录权重越高。之后,采用具有相应权重的用户的播放记录对用户的日程时间预测模型进行更新。In some examples, only the user's play records of the previous day may be selected to update the user's schedule time prediction model. Of course, in some other examples, the user's play record within a certain period of time may be selected to update the user's schedule prediction model. Of course, in some examples, it is also possible to assign corresponding weights to the playback records of users in different periods. high. Afterwards, the user's schedule time prediction model is updated by using the user's play records with corresponding weights.
显然,对于更新后的日程时间预测模型,将用户信息和部分视频信息输入至该日程时间预测模型后,可以预测出最佳观影时间段,即预测日程时间段。Obviously, for the updated schedule time prediction model, after inputting the user information and some video information into the schedule time prediction model, the best viewing time period can be predicted, that is, the predicted schedule time period.
S1314,更新用户的执行偏好预测模型。S1314, updating the user's execution preference prediction model.
视频类APP还可以根据S1312中记录的用户的播放记录对用户的执行偏好预测模型进行更新。在一些例子中,可以采用用户的播放记录中的用户信息、视频类别或标签、演员信息等信息对执行偏好预测模型进行有监督学习,其中,可以将视频类别或标签作为训练时的数据标签,或者将演员信息作为标签,从而在有监督学习中更新执行偏好预测模型中相应的参数,实现对执行偏好预测模型的更新。The video APP may also update the user's execution preference prediction model according to the user's playback records recorded in S1312. In some examples, user information, video category or label, actor information and other information in the user's playback record can be used to perform supervised learning on the execution preference prediction model, wherein the video category or label can be used as the data label during training, Or use the actor information as a label to update the corresponding parameters in the execution preference prediction model in supervised learning, so as to realize the update of the execution preference prediction model.
在一些例子中,可以仅选择前一天的用户的播放记录对用户的执行偏好预测模型进行更新。当然在另一些例子中,可以选择某一时间段内的用户的播放记录对用户的执行偏好预测模型进行更新。当然在一些例子中,还可以对不同时期的用户的播放记录分配相应的权重,例如以“天”为单位对不同日期的用户的播放记录分配不同权重,如越靠近当前日期的播放记录权重越高。之后,采用具有相应权重的用户的播放记录对用户的执行偏好预测模型进行更新。In some examples, only the user's playback records of the previous day may be selected to update the user's execution preference prediction model. Of course, in some other examples, the user's playback records within a certain period of time may be selected to update the user's execution preference prediction model. Of course, in some examples, it is also possible to assign corresponding weights to the playback records of users in different periods. high. Afterwards, the user's execution preference prediction model is updated by using the user's playing records with corresponding weights.
对于更新后的执行偏好预测模型,将用户信息输入至该执行偏好预测模型后,可以预测出用户信息所对应用户的观影类型偏好。For the updated execution preference prediction model, after user information is input into the execution preference prediction model, the movie viewing type preference of the user corresponding to the user information can be predicted.
S1315,用户的观影类型偏好。S1315, the user's viewing type preference.
视频类APP可以根据更新后的执行偏好预测模型,通过输入用户信息以得到用户的观影类型偏好。The video APP can obtain the user's viewing type preference by inputting user information according to the updated execution preference prediction model.
可以理解的是,对于S1313中的日程时间预测模型的输出可以作为下一次S1303的输入,即更新后的日程时间预测模型可以用于后续S1303中预测最佳观影时间段。同时,对于S1314中的执行偏好预测模型的输出可以作为下一次S1311的输入,即更新后的执行偏好预测模型可以用于后续S1311中预测用户的观影类型偏好。It can be understood that the output of the schedule time prediction model in S1313 can be used as the input of the next S1303, that is, the updated schedule time prediction model can be used in subsequent S1303 to predict the best viewing time period. At the same time, the output of the execution preference prediction model in S1314 can be used as the input of the next S1311, that is, the updated execution preference prediction model can be used to predict the user's viewing type preference in the subsequent S1311.
显然图13所涉及以信息流APP为视频类APP为例的情况下,可以有效的针对多种使用场景。其中,Apparently, in the case where the information flow APP involved in FIG. 13 is a video APP as an example, it can effectively target various usage scenarios. in,
场景一,可以是用户追剧“上瘾”以及无限制刷短视频、小视频等,导致规划好的计划安排被搁置。Scenario 1, it can be that the user is "addicted" to watching dramas and unlimited viewing of short videos, small videos, etc., causing the planned plan to be put on hold.
在该场景下,视频类APP可以对已经上线或者正在更新的视频新增“添加至个人的视频日程管理”的入口,即上述提到的日程管理按钮。当用户点击该日程管理按钮之后,可以跳转或者弹出日程展示界面,以确定新增日程任务,可以如图15所示出的。通过设置相应的参数,如观看时间、提醒方式等,并将该新增日程任务进行保存。以便在临近该日程任务执行时,可以通过闹钟或推送等提醒方式提醒用户进行观看。在该场景下,用户 通过规划不同视频的观看日程,可以提升对时间的利用效率,并增强用户的自律性。In this scenario, the video app can add an entry for "add to personal video schedule management" for videos that are already online or are being updated, that is, the aforementioned schedule management button. After the user clicks the schedule management button, a schedule display interface may be jumped or popped up to determine the new schedule task, as shown in FIG. 15 . By setting corresponding parameters, such as viewing time, reminder method, etc., and saving the newly added schedule task. So that when the scheduled task is about to be executed, the user can be reminded to watch it through reminders such as an alarm clock or push. In this scenario, users can improve the efficiency of time utilization and enhance user self-discipline by planning viewing schedules for different videos.
场景二,用户关注的视频UP主太多且不同UP主更新时间较为分散,以及针对一个UP主其更新时间也较为零散,当用户看到某UP主更新的推送通知后,可能忍不住打开短视频、小视频等进行观看,从而出现类似场景一的情况。Scenario 2: There are too many video UP masters that the user cares about and the update time of different UP masters is relatively scattered, and the update time for one UP master is also relatively scattered. When the user sees the push notification of a certain UP master update, he may not be able to resist opening Watch short videos, small videos, etc., and a situation similar to scene 1 will appear.
在该场景下,可以在UP主的页面,或者在显示UP主的位置相应新增“关注并添加至视频日程管理”的入口,即上述提到的日程管理按钮。当用户点击该日程管理按钮之后,可以关注UP主,并且跳转或者弹出日程展示界面,以确定新增日程任务,可以如图15所示出的。通过设置相应的参数,如观看时间、提醒方式等,并将该新增日程任务进行保存。以便在临近该日程任务执行时,可以通过闹钟或推送等提醒方式提醒用户进行观看。在该场景下,用户通过规划不同视频的观看日程,可以提升对时间的利用效率,并增强用户的自律性。In this scenario, you can add an entry for "follow and add to video schedule management" on the page of the UP master, or at the position where the UP master is displayed, that is, the aforementioned schedule management button. After the user clicks the schedule management button, he can follow the UP master, and jump or pop up the schedule display interface to confirm the new schedule task, as shown in Figure 15. By setting corresponding parameters, such as viewing time, reminder method, etc., and saving the newly added schedule task. So that when the scheduled task is about to be executed, the user can be reminded to watch it through reminders such as an alarm clock or push. In this scenario, the user can improve the efficiency of time utilization and enhance the user's self-discipline by planning the viewing schedule of different videos.
当然,在一些例子中,可以针对每个UP主设置一个未观看视频合集,里面存储该UP主未观看的视频,同时设置的观看时间可以是观看时间段,例如上述提到的预测日程时间段或称最佳观影时间段。之后,当关注的UP主更新了视频后,系统并不会第一时间进行通知,而是将该视频添加至对应UP主的未观看视频合集中,然后将以未观看视频合集确定对应的新增日程任务,以便在临近该日程任务执行时,可以通过闹钟或推送等提醒方式提醒用户进行观看该UP主的未观看视频合集。Of course, in some examples, an unwatched video collection can be set for each UP master, which stores the unwatched videos of the UP master, and the viewing time set can be the viewing time period, such as the above-mentioned predicted schedule time period Or the best viewing time period. Afterwards, when the following UP master updates the video, the system will not notify the first time, but add the video to the unwatched video collection of the corresponding UP master, and then use the unwatched video collection to determine the corresponding new Add a schedule task, so that when the schedule task is about to be executed, the user can be reminded to watch the unwatched video collection of the UP master through reminders such as alarm clock or push.
场景三,用户观看视频中途退出观看视频。Scenario 3: The user exits the video while watching the video.
在该场景下,用户可能会在观看视频的中途退出观看,此时视频类APP可以弹出窗口,以通知用户是否将未观看玩的是屁你添加至日程管理中,也就是是否新增日程任务。如果用户选择“同意”、“是”、“可以”等类似的选项后,此时该视频类APP可以生成新增日程任务。其中,视频类APP可以确定视频中未观看时间,并且确定出该新增日程任务的日程计划执行时间。In this scenario, the user may quit watching the video in the middle. At this time, the video app can pop up a window to notify the user whether to add the unwatched game to the schedule management, that is, whether to add a new schedule task. . If the user selects "Agree", "Yes", "Yes" and other similar options, the video APP can generate a new schedule task at this time. Among them, the video APP can determine the unwatched time in the video, and determine the schedule execution time of the newly added schedule task.
场景四,用户正在追剧或者预约观看视频。Scenario 4, the user is watching a drama or making an appointment to watch a video.
在该场景下,如果用户正在追剧,视频类APP可以获取该剧的追剧日历。之后,通过日程时间预测模型可以确定出每次剧集更新后的最佳观影时间。当然在一些例子中,还可以根据用户自定义设置的每个日程的日程计划起始时间,确定出对应的日程计划结束时间。然后将生成的一个或多个新增日程任务进行保存。In this scenario, if the user is watching a drama, the video APP can obtain the drama calendar of the drama. Afterwards, the best viewing time after each episode update can be determined through the schedule time prediction model. Of course, in some examples, the corresponding schedule end time can also be determined according to the schedule start time of each schedule customized by the user. Then save the generated one or more new schedule tasks.
若用户进行了某个视频的预约,则视频类APP可以获取该视频的上线时间。然后通过日程时间预测模型可以确定出该视频上线之后的最佳观影时间。当然在一些例子中,还可以根据用户自定义设置的日程计划起始时间,确定出对应的日程计划结束时间。然后将生成的新增日程任务进行保存。If the user makes a reservation for a video, the video APP can obtain the online time of the video. Then the best viewing time after the video goes online can be determined through the schedule time prediction model. Of course, in some examples, the corresponding schedule end time can also be determined according to the schedule start time customized by the user. Then save the generated new schedule task.
场景五,用户最近一段时间未观看视频。Scenario 5, the user has not watched the video for a while.
在该场景下,视频类APP可以具有“视频日程中添加个性化推荐”的开关,用户通过选择开启或关闭以实现对用户个性化推荐视频的功能。例如当用选择开启该功能,则视频类APP会识别用户是否在一定时间段内未观看视频,当用户在一段时间内未观看视频,且视频类APP中也没有当天的日程任务,则可以根据用户的观影偏好,推荐适合的视频作为新增日程任务进行保存。其中,用户的观影偏好可以通过执行偏好预测模型确定。In this scenario, the video APP can have the switch of "add personalized recommendation to the video schedule", and the user can realize the function of personalized video recommendation for the user by selecting whether to enable or disable it. For example, when the user chooses to enable this function, the video APP will identify whether the user has not watched the video within a certain period of time. According to the user's viewing preferences, suitable videos are recommended and saved as new schedule tasks. Wherein, the user's viewing preference can be determined by executing a preference prediction model.
可以理解的是,上述五种场景中对于如何添加新增日程任务,以及添加新增日程任 务的过程可以参考图8至图13中相应的描述,本申请在此不再赘述。同时,图13以及上述五种场景仅仅是以信息流APP为视频类APP为例进行描述,当然还可以替换为其它信息流APP,例如资讯类APP、音乐播放类APP、读书类APP等。相应的,添加的新增日程任务也可以相应替换为合适的日程任务,例如添加某个文章、添加某个音乐等,本申请在此不作限定。It can be understood that, how to add a new schedule task and the process of adding a new schedule task in the above five scenarios can refer to the corresponding descriptions in Figure 8 to Figure 13, and the present application will not repeat them here. At the same time, Figure 13 and the above five scenarios are only described by taking the information streaming APP as a video APP as an example. Of course, it can also be replaced by other information streaming APPs, such as information APPs, music playing APPs, and reading APPs. Correspondingly, the added new schedule task can also be replaced with a suitable schedule task, such as adding a certain article, adding a certain music, etc., which is not limited in this application.
图17为本申请实施例提供的一种日程管理装置示意图。FIG. 17 is a schematic diagram of a schedule management device provided by an embodiment of the present application.
如图17所示出的,本申请还提供了一种日程管理装置1700。该装置1700可以是终端设备,其中,该装置1700可以包括信息流APP和日程管理APP。其中,信息流APP可以包括信息流APP前端和信息流APP后端。可以理解的是,信息流APP前端即图13所描述的视频类APP客户端,信息流APP后端即图13所描述的视频类APP服务端。As shown in FIG. 17 , the present application also provides a schedule management device 1700 . The apparatus 1700 may be a terminal device, where the apparatus 1700 may include an information flow APP and a schedule management APP. Wherein, the information flow APP may include an information flow APP front end and an information flow APP back end. It can be understood that the front end of the information flow APP is the video APP client described in FIG. 13 , and the back end of the information flow APP is the video APP server described in FIG. 13 .
信息流APP前端可以包括用户配置模块1701和页面展示模块1702。可以理解的是,信息流APP前端主要用于实现与用户进行交互的部分功能。例如用户配置模块1701用于获取用户输入的信息,比如对新增日程管理的各个参数进行设置、调整。页面展示模块1702用于将特定的信息进行显示,例如显示新增日常管理页面,显示提示信息等。信息流APP后端可以包括内容管理模块1703、存储模块1704和日程管理模块1705。其中,内容管理模块1703可以负责日程任务的上传、编解码、用户个性化数据处理、日程任务推荐等功能。存储模块1704用于存储新增日程任务,以及其它可能的日程任务。日程管理模块1705可以用于展示用户所有的日程任务、日程管理按钮、日程的编辑页面等。日程管理模块1705还可以用于日程任务编辑,包括标题、日程计划执行时间等,以及用于用户日程任务的保存、其它日程管理APP中其它日程任务的读取、将新增日程任务保存至日程管理APP中等。The front end of the information flow APP may include a user configuration module 1701 and a page display module 1702 . It can be understood that the information flow APP front-end is mainly used to realize some functions of interacting with users. For example, the user configuration module 1701 is used to obtain information input by the user, such as setting and adjusting various parameters of the newly added schedule management. The page display module 1702 is used to display specific information, such as displaying new daily management pages, displaying prompt information, and so on. The information flow APP backend may include a content management module 1703 , a storage module 1704 and a schedule management module 1705 . Among them, the content management module 1703 may be responsible for functions such as uploading of schedule tasks, codec, user personalized data processing, and schedule task recommendation. The storage module 1704 is used for storing new scheduled tasks and other possible scheduled tasks. The schedule management module 1705 can be used to display all the schedule tasks of the user, schedule management buttons, schedule edit pages, and the like. The schedule management module 1705 can also be used for editing schedule tasks, including title, schedule execution time, etc., as well as for saving user schedule tasks, reading other schedule tasks in other schedule management APPs, and saving new schedule tasks to the schedule The management APP is medium.
日程管理APP中可以包括其它日程管理模块1706。可以理解的是,其它日程管理模块1706用于存储日程管理APP中的一个或多个其它日程任务。日程管理APP可以是系统默认的日程管理APP、终端设备上安装的第三方日程管理APP等,可以服务于信息流APP中的日程管理模块。The schedule management APP may include other schedule management modules 1706 . It can be understood that the other schedule management module 1706 is used to store one or more other schedule tasks in the schedule management APP. The schedule management APP can be the default schedule management APP of the system, a third-party schedule management APP installed on the terminal device, etc., and can serve the schedule management module in the information flow APP.
本申请主要将日程管理模块添加到信息流APP中。通过对信息流APP中的所有项(包括已上线、未上线的长视频和短小视频、up主、各类文章、各类音频等)添加日程管理按钮。当用户点击日程管理按钮后确定新增日程任务,同时确定出西政日程任务的标题、日程计划执行时间、优先级排序等。之后将新增日程任务进行保存,和/或同步至日程管理APP中。提升了用户对时间的利用效率,并增强用户的自律性。This application mainly adds the schedule management module to the information flow APP. By adding schedule management buttons to all items in the information flow APP (including online and offline long videos and short videos, up hosts, various articles, various audios, etc.). When the user clicks the schedule management button to confirm the new schedule task, and at the same time determine the title of the schedule task, schedule execution time, priority ranking, etc. Afterwards, the newly added schedule tasks will be saved and/or synchronized to the schedule management APP. It improves the user's time utilization efficiency and enhances the user's self-discipline.
本申请在信息流APP中为已经上线的长视频、短小视频、各类文章、各类音频等集成日程管理模块。同时丰富了用户的使用场景,提升了用户体验,以信息流APP为视频类APP为例,新增了以下场景:This application is an integrated schedule management module for long videos, short videos, various articles, and various audios that have already been launched in the information flow APP. At the same time, it enriches the user's use scenarios and improves the user experience. Taking the information flow APP as a video APP as an example, the following new scenarios are added:
a)用户追剧“上瘾”或无限刷短小视频,导致规划好的安排泡汤;a) Users are "addicted" to watching dramas or watching short videos infinitely, which leads to the failure of planned arrangements;
b)用户关注的视频up主太多且up主更新时间较为零散,当用户看到up主更新的推送通知后,忍不住要打开刷短小视频,从而可能出现场景a)的情况;b) There are too many video up masters that the user cares about and the update time of the up masters is relatively scattered. When the user sees the push notification of the up master update, he can't help but open and scan short videos, which may lead to scenario a);
c)用户中途退出观看视频;c) The user quits watching the video halfway;
d)用户正在追剧或预约视频;d) The user is watching dramas or booking videos;
e)用户最近没有看视频。e) The user has not watched the video recently.
显然,本申请中的信息流APP支持完整的个人日程管理。同时,用户可以将已上线 的视频和up主添加到日程管理中,并可以设置时间进行观看。这会使用户能够有效地利用时间,提高了用户的自律性。并且丰富了追剧和预约视频功能,使其可以通过日程管理自行设置时间进行观看。进一步地,在用户最近没有看视频和用户中途退出观看视频等场景中,提升了用户的观影体验。Obviously, the information flow APP in this application supports complete personal schedule management. At the same time, users can add online videos and up masters to the schedule management, and can set the time to watch them. This enables the user to use time efficiently and improves the user's self-discipline. It also enriches the functions of chasing dramas and booking videos, so that it can set the time to watch by itself through schedule management. Furthermore, in scenarios where the user has not watched the video recently and the user quits watching the video midway, the user's viewing experience is improved.
可以理解的是,本申请还可以延伸至PC端的信息流应用以及智能电视的视频应用中。It can be understood that the present application can also be extended to the information flow application on the PC side and the video application on the smart TV.
同时,本申请还提供了一种侵权认证方法,针对信息流APP中若存在上述涉及到的五种场景中添加新增日程任务,则可认定侵权。其中,信息流APP包括但不限于手机、PC、PAD、智能电视等终端设备上的信息流APP。At the same time, this application also provides an infringement certification method. If there are new schedule tasks added to the above-mentioned five scenarios in the information flow APP, the infringement can be determined. Wherein, the information flow APP includes but is not limited to the information flow APP on terminal devices such as mobile phones, PCs, PADs, and smart TVs.
在一个例子中,本申请上述图8至图17的日程管理方法具体可以是集成在任意一款信息流APP中的软件开发工具包(software development kit,SDK)。例如当某款信息流APP中新增了用于日程管理的SDK之后,可以通过发布新的版本以更新终端设备上原有的信息流APP,从而使得更新后的信息流APP可以实现上述图8至图17中的任意一种方法。In an example, the above-mentioned schedule management method in FIG. 8 to FIG. 17 of the present application may specifically be a software development kit (software development kit, SDK) integrated in any information flow APP. For example, when an SDK for schedule management is added to a certain information flow APP, the original information flow APP on the terminal device can be updated by releasing a new version, so that the updated information flow APP can realize the above-mentioned Figure 8 to Either of the methods in Figure 17.
图18为本申请实施例提供的一种终端设备示意图。FIG. 18 is a schematic diagram of a terminal device provided by an embodiment of the present application.
如图18所示,本申请还提供了一种终端设备1800。该装置终端设备1800可以是上述图1至图17中所描述的终端设备。该终端设备1800可以包括:处理器1810、外部存储器接口1820、内部存储器1821、通用串行总线(universal serial bus,USB)接口1830、充电管理模块1840、电源管理模块1841、电池1842、天线1、天线2、移动通信模块1850、无线通信模块1860和显示屏1870等。As shown in FIG. 18 , the present application also provides a terminal device 1800 . The device terminal device 1800 may be the terminal device described above in FIG. 1 to FIG. 17 . The terminal device 1800 may include: a processor 1810, an external memory interface 1820, an internal memory 1821, a universal serial bus (universal serial bus, USB) interface 1830, a charging management module 1840, a power management module 1841, a battery 1842, an antenna 1, Antenna 2, mobile communication module 1850, wireless communication module 1860, display screen 1870, etc.
可以理解的是,本申请实施例示意的结构并不构成对终端设备1800的具体限定。终端设备1800可以包括比图示更多或更少的部件,或者组合某些部件,或者拆分某些部件,或者不同的部件布置。图示的部件可以以硬件,软件或软件和硬件的组合实现。It can be understood that, the structure illustrated in the embodiment of the present application does not constitute a specific limitation on the terminal device 1800 . The terminal device 1800 may include more or fewer components than shown, or combine some components, or separate some components, or arrange different components. The illustrated components can be realized in hardware, software or a combination of software and hardware.
处理器1810可以是高级精简指令集处理器(advanced reduced instruction set computing machines,ARM)、X86、无内部互锁流水级的微处理器(microprocessor without interlocked piped stages,MIPS)等架构的处理器。处理器1810可以包括一个或多个处理单元,例如:应用处理器(application processor,AP),调制解调处理器,GPU,图像信号处理器(image signal processor,ISP),控制器,视频编解码器,数字信号处理器(digital signal processor,DSP),基带处理器和/或神经网络处理器(neural-network processing unit,NPU)等。其中,不同的处理单元可以是独立的器件,也可以集成在一个或多个处理器中。The processor 1810 may be a processor with architectures such as advanced reduced instruction set computing machines (ARM), X86, and microprocessor without interlocked piped stages (MIPS). Processor 1810 may include one or more processing units, for example: application processor (application processor, AP), modem processor, GPU, image signal processor (image signal processor, ISP), controller, video codec device, digital signal processor (digital signal processor, DSP), baseband processor and/or neural network processor (neural-network processing unit, NPU), etc. Wherein, different processing units may be independent devices, or may be integrated in one or more processors.
控制器可以根据指令操作码和时序信号,产生操作控制信号,完成取指令和执行指令的控制。The controller can generate an operation control signal according to the instruction opcode and timing signal, and complete the control of fetching and executing the instruction.
处理器1810中还可以设置存储器,用于存储指令和数据。在一些实施例中,处理器1810中的存储器为高速缓冲存储器。该存储器可以保存处理器1810刚用过或循环使用的指令或数据。如果处理器1810需要再次使用该指令或数据,可从存储器中直接调用。避免了重复存取,减少了处理器1810的等待时间,因而提高了系统的效率。A memory may also be provided in the processor 1810 for storing instructions and data. In some embodiments, the memory in processor 1810 is a cache memory. The memory may hold instructions or data that the processor 1810 has just used or recycled. If the processor 1810 needs to use the instruction or data again, it can be directly recalled from the memory. Repeated access is avoided, and the waiting time of the processor 1810 is reduced, thus improving the efficiency of the system.
在一些实施例中,处理器1810可以包括一个或多个接口。接口可以包括集成电路(inter-integrated circuit,I2C)接口、集成电路内置音频(inter-integrated circuit sound,I2S)接口、脉冲编码调制(pulse code modulation,PCM)接口、通用异步收发传输器(universal asynchronous receiver/transmitter,UART)接口、移动产业处理 器接口(mobile industry processor interface,MIPI),通用输入输出(general-purpose input/output,GPIO)接口、用户标识模块(subscriber identity module,SIM)接口和/或通用串行总线(universal serial bus,USB)接口等。In some embodiments, processor 1810 may include one or more interfaces. The interface may include an integrated circuit (inter-integrated circuit, I2C) interface, an integrated circuit built-in audio (inter-integrated circuit sound, I2S) interface, a pulse code modulation (pulse code modulation, PCM) interface, a universal asynchronous transmitter (universal asynchronous receiver/transmitter, UART) interface, mobile industry processor interface (mobile industry processor interface, MIPI), general-purpose input and output (general-purpose input/output, GPIO) interface, subscriber identity module (subscriber identity module, SIM) interface and / Or a universal serial bus (universal serial bus, USB) interface, etc.
可以理解的是,本申请终端设备的操作系统存储在存储器中,处理器1810通过调用存储在存储器中的操作系统以实现上述图8至图17所描述的方法。It can be understood that the operating system of the terminal device of the present application is stored in the memory, and the processor 1810 implements the methods described above in FIG. 8 to FIG. 17 by calling the operating system stored in the memory.
充电管理模块1840用于从充电器接收充电输入。其中,充电器可以是无线充电器,也可以是有线充电器。The charging management module 1840 is used for receiving charging input from the charger. Wherein, the charger may be a wireless charger or a wired charger.
在一些有线充电的实施例中,充电管理模块1840可以通过USB接口1830接收有线充电器的充电输入。在一些无线充电的实施例中,充电管理模块1840可以通过终端设备1800的无线充电线圈接收无线充电输入。充电管理模块1840为电池1842充电的同时,还可以通过电源管理模块1841为终端设备1800供电。In some wired charging embodiments, the charging management module 1840 can receive charging input from a wired charger through the USB interface 1830 . In some wireless charging embodiments, the charging management module 1840 may receive wireless charging input through the wireless charging coil of the terminal device 1800 . While the charging management module 1840 is charging the battery 1842 , it can also supply power to the terminal device 1800 through the power management module 1841 .
终端设备1800的无线通信功能可以通过天线1,天线2,移动通信模块1850,无线通信模块1860,调制解调处理器以及基带处理器等实现。The wireless communication function of the terminal device 1800 may be implemented by the antenna 1, the antenna 2, the mobile communication module 1850, the wireless communication module 1860, a modem processor, a baseband processor, and the like.
移动通信模块1850可以提供应用在终端设备1800上的包括2G/3G/4G/5G/6G等无线通信的解决方案。无线通信模块1860可以提供应用在终端设备1800上的包括无线局域网(wireless local area networks,WLAN)、蓝牙(bluetooth,BT)、全球导航卫星系统(global navigation satellite system,GNSS)、调频(frequency modulation,FM)、近距离无线通信技术(near field communication,NFC)、紫蜂(zigbee)和红外技术(infrared,IR)等无线通信的解决方案。其中,WLAN例如可以是无线保真(wireless fidelity,Wi-Fi)网络。The mobile communication module 1850 can provide wireless communication solutions including 2G/3G/4G/5G/6G applied on the terminal device 1800 . The wireless communication module 1860 can provide wireless local area networks (wireless local area networks, WLAN), bluetooth (bluetooth, BT), global navigation satellite system (global navigation satellite system, GNSS), frequency modulation (frequency modulation, FM), near field communication (near field communication, NFC), Zigbee (zigbee) and infrared technology (infrared, IR) and other wireless communication solutions. Wherein, the WLAN may be, for example, a wireless fidelity (wireless fidelity, Wi-Fi) network.
外部存储器接口1820可以用于连接外部存储卡,例如Micro SD卡,实现扩展终端设备1800的存储能力。外部存储卡通过外部存储器接口1820与处理器1810通信,实现数据存储功能。The external memory interface 1820 may be used to connect an external memory card, such as a Micro SD card, to expand the storage capacity of the terminal device 1800. The external memory card communicates with the processor 1810 through the external memory interface 1820 to realize data storage function.
内部存储器1821可以用于存储计算机可执行程序代码,可执行程序代码包括指令。内部存储器1821可以包括存储程序区和存储数据区。其中,存储程序区可存储操作系统,至少一个功能所需的应用程序等。存储数据区可存储终端设备1800使用过程中所创建的数据等。此外,内部存储器1821可以包括高速随机存取存储器,还可以包括非易失性存储器,例如至少一个磁盘存储器件,闪存器件,通用闪存存储器(universal flash storage,UFS)等。处理器1810通过运行存储在内部存储器1821的指令,和/或存储在设置于处理器中的存储器的指令,执行终端设备1800的各种功能应用以及数据处理。The internal memory 1821 may be used to store computer-executable program codes including instructions. The internal memory 1821 may include an area for storing programs and an area for storing data. Wherein, the stored program area can store an operating system, an application program required by at least one function, and the like. The storage data area can store data created during the use of the terminal device 1800 and the like. In addition, the internal memory 1821 may include a high-speed random access memory, and may also include a non-volatile memory, such as at least one magnetic disk storage device, flash memory device, universal flash storage (universal flash storage, UFS) and the like. The processor 1810 executes various functional applications and data processing of the terminal device 1800 by executing instructions stored in the internal memory 1821 and/or instructions stored in a memory provided in the processor.
本申请所提供的终端设备1800可以实现上述图8至图17中描述的任意一种方法,具体实现方式可以参考述图8至图17的相应描述,在此不再赘述。The terminal device 1800 provided in this application can implement any one of the methods described in FIG. 8 to FIG. 17 , and the specific implementation manner can refer to the corresponding descriptions in FIG. 8 to FIG. 17 , which will not be repeated here.
本领域普通技术人员应该还可以进一步意识到,结合本文中所公开的实施例描述的各示例的单元及算法步骤,能够以电子硬件、计算机软件或者二者的结合来实现,为了清楚地说明硬件和软件的可互换性,在上述说明中已经按照功能一般性地描述了各示例的组成及步骤。这些功能究竟以硬件还是软件方式来执行,取决于技术方案的特定应用和设计约束条件。专业技术人员可以对每个特定的应用来使用不同方法来实现所描述的功能,但是这种实现不应认为超出本申请的范围。Those of ordinary skill in the art should further realize that the units and algorithm steps of the examples described in conjunction with the embodiments disclosed herein can be implemented by electronic hardware, computer software, or a combination of the two. In order to clearly illustrate the hardware and software interchangeability, the composition and steps of each example have been generally described in terms of functions in the above description. Whether these functions are executed by hardware or software depends on the specific application and design constraints of the technical solution. Those skilled in the art may use different methods to implement the described functions for each specific application, but such implementation should not be regarded as exceeding the scope of the present application.
本领域普通技术人员可以理解实现上述实施例方法中的全部或部分步骤是可以通过 程序来指令处理器完成,所述的程序可以存储于计算机可读存储介质中,所述存储介质是非短暂性(英文:non-transitory)介质,例如随机存取存储器,只读存储器,快闪存储器,硬盘,固态硬盘,磁带(英文:magnetic tape),软盘(英文:floppy disk),光盘(英文:optical disc)及其任意组合。Those of ordinary skill in the art can understand that all or part of the steps in the methods of the above embodiments can be implemented through a program to instruct the processor to complete, and the program can be stored in a computer-readable storage medium, and the storage medium is non-transitory ( English: non-transitory) media, such as random access memory, read-only memory, flash memory, hard disk, solid-state drive, magnetic tape (English: magnetic tape), floppy disk (English: floppy disk), optical disc (English: optical disc) and any combination thereof.
以上所述,仅为本申请较佳的具体实施方式,但本申请的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本申请揭露的技术范围内,可轻易想到的变化或替换,都应涵盖在本申请的保护范围之内。因此,本申请的保护范围应该以权利要求的保护范围为准。The above is only a preferred embodiment of the present application, but the scope of protection of the present application is not limited thereto. Any person familiar with the technical field can easily conceive of changes or changes within the technical scope disclosed in this application Replacement should be covered within the protection scope of this application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.

Claims (20)

  1. 一种日程管理方法,其特征在于,所述方法应用于终端设备中的信息流应用,所述信息流应用具有日程管理按钮,所述信息流应用包括购物应用、视频应用、音乐播放应用、资讯类应用和读书类应用,所述方法包括:A schedule management method, characterized in that the method is applied to an information flow application in a terminal device, the information flow application has a schedule management button, and the information flow application includes a shopping application, a video application, a music playing application, an information class application and reading class application, the method includes:
    获取新增日程任务指令,所述新增日程任务指令为用户通过所述信息流应用中的所述日程管理按钮触发生成的;Obtaining a new schedule task instruction, the new schedule task instruction is triggered and generated by the user through the schedule management button in the information flow application;
    根据所述新增日程任务指令,确定新增任务信息;According to the new schedule task instruction, determine the new task information;
    将所述新增任务信息输入至日程任务时间预测模型,确定预测日程时间段;Inputting the newly added task information into the schedule task time prediction model to determine the forecast schedule time period;
    根据所述预测日程时间段确定日程计划执行时间;determining the schedule execution time according to the predicted schedule time period;
    确定新增日程任务,其中,所述新增日程任务包括所述新增任务信息和所述日程计划执行时间。A newly added schedule task is determined, wherein the newly added schedule task includes the information of the newly added task and the scheduled execution time of the schedule.
  2. 如权利要求1所述的方法,其特征在于,所述终端设备中还包括日程管理应用;The method according to claim 1, wherein the terminal device further includes a schedule management application;
    所述根据所述预测日程时间段确定日程计划执行时间,包括:The determining the schedule execution time according to the predicted schedule time period includes:
    获取所述日程管理应用中至少一个其它日程任务的执行时间;Obtain the execution time of at least one other schedule task in the schedule management application;
    根据所述预测日程时间段与所述至少一个其它日程任务的执行时间,确定所述日程计划执行时间。The schedule execution time is determined according to the predicted schedule time period and the execution time of the at least one other schedule task.
  3. 如权利要求1或2所述的方法,其特征在于,在所述根据所述预测日程时间段确定日程计划执行时间之后,所述方法还包括:The method according to claim 1 or 2, wherein, after determining the schedule execution time according to the forecasted schedule time period, the method further comprises:
    将所述日程计划执行时间进行显示;displaying the execution time of the schedule;
    接收用户发出的修改指令;Receive modification instructions issued by users;
    根据所述修改指令对所述日程计划执行时间进行调整。The execution time of the schedule plan is adjusted according to the modification instruction.
  4. 如权利要求1-3任意一项所述的方法,其特征在于,所述新增任务信息包括用户信息;The method according to any one of claims 1-3, wherein the newly added task information includes user information;
    在所述确定新增日程任务之后,所述方法还包括:After the determination of the newly added schedule task, the method also includes:
    若其它日程任务的执行时间与所述日程计划执行时间存在交集,将所述用户信息输入至执行偏好预测模型以确定用户的日程任务执行偏好;If there is an intersection between the execution time of other scheduled tasks and the execution time of the schedule plan, input the user information into the execution preference prediction model to determine the user's schedule task execution preference;
    根据所述日程任务执行偏好确定所述其它日程任务与所述新增日程任务的执行顺序。The execution order of the other scheduled tasks and the newly added scheduled task is determined according to the scheduled task execution preference.
  5. 如权利要求1-4任意一项所述的方法,其特征在于,所述方法还包括:The method according to any one of claims 1-4, wherein the method further comprises:
    当日程任务执行完毕后,记录所述日程任务的行为信息,所述日程任务的行为信息包括所述日程任务的真实执行时间和所述日程任务的任务信息,其中,所述日程任务包括其它日程任务和/或所述新增日程任务;After the scheduled task is executed, record the behavior information of the scheduled task, the behavior information of the scheduled task includes the actual execution time of the scheduled task and the task information of the scheduled task, wherein the scheduled task includes other schedules tasks and/or said new schedule tasks;
    根据所述日程任务的行为信息对所述日程时间预测模型进行更新。The schedule time prediction model is updated according to the behavior information of the schedule task.
  6. 如权利要求4所述的方法,其特征在于,所述方法还包括:The method of claim 4, further comprising:
    当日程任务执行完毕后,记录所述日程任务的行为信息,所述日程任务的行为信息包括所述日程任务对应的用户信息和所述日程任务的类别信息,其中,所述日程任务包括所述其它日程任务和/或所述新增日程任务;After the scheduled task is executed, record the behavior information of the scheduled task, the behavior information of the scheduled task includes the user information corresponding to the scheduled task and the category information of the scheduled task, wherein the scheduled task includes the other scheduled tasks and/or the added scheduled tasks;
    根据所述日程任务的行为信息对所述执行偏好预测模型进行更新。The execution preference prediction model is updated according to the behavior information of the scheduled tasks.
  7. 如权利要求1-6任意一项所述的方法,其特征在于,所述方法还包括:The method according to any one of claims 1-6, further comprising:
    若上一次执行日程任务的时间与当前时刻之间的时间差大于或等于预设时间阈值,获取用户信息,其中,所述日程任务包括其它日程任务和/或所述新增日程任务;If the time difference between the time when the last scheduled task was executed and the current moment is greater than or equal to a preset time threshold, user information is obtained, wherein the scheduled task includes other scheduled tasks and/or the newly added scheduled task;
    将所述用户信息输入执行偏好预测模型,以确定用户的日程任务执行偏好;Inputting the user information into the execution preference prediction model to determine the user's schedule task execution preference;
    根据所述用户的日程任务执行偏好确定推荐日程任务,并将所述推荐日程任务作为所述新增日程任务。A recommended schedule task is determined according to the schedule task execution preference of the user, and the recommended schedule task is used as the newly added schedule task.
  8. 如权利要求7所述的方法,其特征在于,所述将所述推荐日程任务作为所述新增日程任务包括:The method according to claim 7, wherein said using the recommended schedule task as the newly added schedule task comprises:
    将所述推荐日程任务进行显示;displaying the recommended schedule tasks;
    接收用户的确认指令;Receive confirmation instructions from users;
    根据所述确认指令将所述推荐日程任务作为所述新增日程任务。The recommended schedule task is used as the new schedule task according to the confirming instruction.
  9. 如权利要求1-8任意一项所述的方法,其特征在于,所述方法还包括:将所述新增日程任务添加至所述终端设备中的日程管理应用中。The method according to any one of claims 1-8, further comprising: adding the newly added schedule task to a schedule management application in the terminal device.
  10. 一种日程管理终端设备,其特征在于,所述终端设备包括信息流应用,所述信息流应用具有日程管理按钮,所述信息流应用包括购物应用、视频应用、音乐播放应用、资讯类应用和读书类应用,所述终端设备包括:A schedule management terminal device, characterized in that the terminal device includes an information flow application, the information flow application has a schedule management button, and the information flow application includes a shopping application, a video application, a music player application, an information application and For reading applications, the terminal devices include:
    处理器用于与存储器耦合,以及读取并执行存储在所述存储器中的指令;a processor is configured to be coupled to a memory, and to read and execute instructions stored in said memory;
    当所述处理器运行时执行所述指令,使得所述处理器用于获取新增日程任务指令,所述新增日程任务指令为用户通过所述信息流应用中的所述日程管理按钮触发生成的;根据所述新增日程任务指令,确定新增任务信息;将所述新增任务信息输入至日程任务时间预测模型,确定预测日程时间段;根据所述预测日程时间段确定日程计划执行时间;确定新增日程任务,其中,所述新增日程任务包括所述新增任务信息和所述日程计划执行时间。Executing the instruction when the processor is running, so that the processor is used to acquire a new schedule task instruction, and the new schedule task instruction is triggered and generated by the user through the schedule management button in the information flow application ; According to the newly added schedule task instruction, determine the newly added task information; input the newly added task information into the schedule task time prediction model to determine the predicted schedule time period; determine the schedule plan execution time according to the predicted schedule time period; A newly added schedule task is determined, wherein the newly added schedule task includes the information of the newly added task and the scheduled execution time of the schedule.
  11. 如权利要求10所述的终端设备,其特征在于,所述终端设备还包括日程管理应用;The terminal device according to claim 10, further comprising a schedule management application;
    所述处理器还用于:The processor is also used to:
    获取所述日程管理应用中至少一个其它日程任务的执行时间;Obtain the execution time of at least one other schedule task in the schedule management application;
    根据所述预测日程时间段与所述至少一个其它日程任务的执行时间,确定所述日程计划执行时间。The schedule execution time is determined according to the predicted schedule time period and the execution time of the at least one other schedule task.
  12. 如权利要求10或11所述的终端设备,其特征在于,所述处理器还用于:The terminal device according to claim 10 or 11, wherein the processor is further configured to:
    控制显示器将所述日程计划执行时间进行显示;Controlling the display to display the execution time of the schedule;
    接收用户发出的修改指令;Receive modification instructions issued by users;
    根据所述修改指令对所述日程计划执行时间进行调整。The execution time of the schedule plan is adjusted according to the modification instruction.
  13. 如权利要求10-12任意一项所述的终端设备,其特征在于,所述新增任务信息包括用户信息;The terminal device according to any one of claims 10-12, wherein the newly added task information includes user information;
    所述处理器还用于:The processor is also used to:
    若其它日程任务的执行时间与所述日程计划执行时间存在交集,将所述用户信息输入至执行偏好预测模型以确定用户的日程任务执行偏好;If there is an intersection between the execution time of other scheduled tasks and the execution time of the schedule plan, input the user information into the execution preference prediction model to determine the user's schedule task execution preference;
    根据所述日程任务执行偏好确定所述其它日程任务与所述新增日程任务的执行顺 序。Determine the execution order of the other scheduled tasks and the newly added scheduled task according to the scheduled task execution preference.
  14. 如权利要求10-13任意一项所述的终端设备,其特征在于,所述处理器还用于:The terminal device according to any one of claims 10-13, wherein the processor is further configured to:
    当日程任务执行完毕后,记录所述日程任务的行为信息,所述日程任务的行为信息包括所述日程任务的真实执行时间和所述日程任务的任务信息,其中,所述日程任务包括其它日程任务和/或所述新增日程任务;After the scheduled task is executed, record the behavior information of the scheduled task, the behavior information of the scheduled task includes the actual execution time of the scheduled task and the task information of the scheduled task, wherein the scheduled task includes other schedules tasks and/or said new schedule tasks;
    根据所述日程任务的行为信息对所述日程时间预测模型进行更新。The schedule time prediction model is updated according to the behavior information of the schedule task.
  15. 如权利要求13所述的终端设备,其特征在于,所述处理器还用于:The terminal device according to claim 13, wherein the processor is further configured to:
    当日程任务执行完毕后,记录所述日程任务的行为信息,所述日程任务的行为信息包括所述日程任务对应的用户信息和所述日程任务的类别信息,其中,所述日程任务包括所述其它日程任务和/或所述新增日程任务;After the scheduled task is executed, record the behavior information of the scheduled task, the behavior information of the scheduled task includes the user information corresponding to the scheduled task and the category information of the scheduled task, wherein the scheduled task includes the other scheduled tasks and/or the added scheduled tasks;
    根据所述日程任务的行为信息对所述执行偏好预测模型进行更新。The execution preference prediction model is updated according to the behavior information of the scheduled tasks.
  16. 如权利要求10-15任意一项所述的终端设备,其特征在于,所述处理器还用于:The terminal device according to any one of claims 10-15, wherein the processor is further configured to:
    若上一次执行日程任务的时间与当前时刻之间的时间差大于或等于预设时间阈值,获取用户信息,其中,所述日程任务包括其它日程任务和/或所述新增日程任务;If the time difference between the time when the last scheduled task was executed and the current moment is greater than or equal to a preset time threshold, user information is obtained, wherein the scheduled task includes other scheduled tasks and/or the newly added scheduled task;
    将所述用户信息输入执行偏好预测模型,以确定用户的日程任务执行偏好;Inputting the user information into the execution preference prediction model to determine the user's schedule task execution preference;
    根据所述用户的日程任务执行偏好确定推荐日程任务,并将所述推荐日程任务作为所述新增日程任务。A recommended schedule task is determined according to the schedule task execution preference of the user, and the recommended schedule task is used as the newly added schedule task.
  17. 如权利要求16所述的终端设备,其特征在于,所述处理器还用于:The terminal device according to claim 16, wherein the processor is further configured to:
    控制显示器将所述推荐日程任务进行显示;controlling the display to display the recommended schedule tasks;
    接收用户的确认指令;Receive confirmation instructions from users;
    根据所述确认指令将所述推荐日程任务作为所述新增日程任务。The recommended schedule task is used as the new schedule task according to the confirming instruction.
  18. 如权利要求10-17任意一项所述的终端设备,其特征在于,所述处理器还用于:将所述新增日程任务添加至所述终端设备中的日程管理应用中。The terminal device according to any one of claims 10-17, wherein the processor is further configured to: add the newly added schedule task to a schedule management application in the terminal device.
  19. 一种计算机可读存储介质,所述计算机可读存储介质中存储有指令,其特征在于,当所述指令在终端上运行时,使得所述终端执行如权利要求1-9任意一项所述的方法。A computer-readable storage medium, wherein instructions are stored in the computer-readable storage medium, wherein, when the instructions are run on a terminal, the terminal is made to perform the operation described in any one of claims 1-9. Methods.
  20. 一种包含指令的计算机设备,当其在终端上运行时,使得所述终端执行如权利要求1-9中的任意一项所述的方法。A computer device containing instructions which, when run on a terminal, cause the terminal to perform the method according to any one of claims 1-9.
PCT/CN2022/106487 2021-07-30 2022-07-19 Schedule management method and terminal device WO2023005737A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN202110874437.8A CN115686698A (en) 2021-07-30 2021-07-30 Schedule management method and terminal equipment
CN202110874437.8 2021-07-30

Publications (1)

Publication Number Publication Date
WO2023005737A1 true WO2023005737A1 (en) 2023-02-02

Family

ID=85057904

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2022/106487 WO2023005737A1 (en) 2021-07-30 2022-07-19 Schedule management method and terminal device

Country Status (2)

Country Link
CN (1) CN115686698A (en)
WO (1) WO2023005737A1 (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130104170A1 (en) * 2011-10-21 2013-04-25 Avermedia Technologies, Inc. Method for Processing Electronic Television Program
CN104836724A (en) * 2015-03-31 2015-08-12 北京奇艺世纪科技有限公司 Content updating prompting method and device
CN105208409A (en) * 2015-08-28 2015-12-30 北京奇艺世纪科技有限公司 Information recommendation method and device
CN107122959A (en) * 2017-04-28 2017-09-01 努比亚技术有限公司 A kind of office management method, computer equipment and storage medium
CN109978491A (en) * 2019-02-12 2019-07-05 平安科技(深圳)有限公司 Remind prediction technique, device, computer equipment and storage medium
CN113099304A (en) * 2021-03-17 2021-07-09 北京达佳互联信息技术有限公司 Video processing method and device, server and computer readable storage medium

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130104170A1 (en) * 2011-10-21 2013-04-25 Avermedia Technologies, Inc. Method for Processing Electronic Television Program
CN104836724A (en) * 2015-03-31 2015-08-12 北京奇艺世纪科技有限公司 Content updating prompting method and device
CN105208409A (en) * 2015-08-28 2015-12-30 北京奇艺世纪科技有限公司 Information recommendation method and device
CN107122959A (en) * 2017-04-28 2017-09-01 努比亚技术有限公司 A kind of office management method, computer equipment and storage medium
CN109978491A (en) * 2019-02-12 2019-07-05 平安科技(深圳)有限公司 Remind prediction technique, device, computer equipment and storage medium
CN113099304A (en) * 2021-03-17 2021-07-09 北京达佳互联信息技术有限公司 Video processing method and device, server and computer readable storage medium

Also Published As

Publication number Publication date
CN115686698A (en) 2023-02-03

Similar Documents

Publication Publication Date Title
AU2022275490B2 (en) User interfaces for browsing content from multiple content applications on an electronic device
AU2019100566A4 (en) User interfaces for browsing content from multiple content applications on an electronic device
US20200304863A1 (en) User interfaces for a media browsing application
US10206004B2 (en) Systems and methods of providing a media-on-demand-based programming channel
US20200201596A1 (en) Method and system for playback of audio content using wireless mobile device
US20140289196A1 (en) Prioritizing synchronization of audio files to an in-vehicle computing device
US10063928B2 (en) Methods, systems, and media for controlling a presentation of media content
US20150160853A1 (en) Video transition method and video transition system
US20140075316A1 (en) Method and apparatus for creating a customizable media program queue
US10069888B1 (en) Playing of media content among multiple devices using a temporal progress
US9537913B2 (en) Method and system for delivery of audio content for use on wireless mobile device
CN109597900A (en) The management of local and remote media item
CN111417009B (en) Predictive media routing
US20220198403A1 (en) Method and device for interacting meeting minute, apparatus and medium
US20160285937A1 (en) Playback of streamed media content
WO2022134689A1 (en) Multimedia resource display method and device
WO2023061358A1 (en) Cache method and apparatus, and electronic device
US20170064405A1 (en) System and method for personalizing and recommending content
WO2023005737A1 (en) Schedule management method and terminal device
JP6991146B2 (en) Modifying upcoming content based on profile and elapsed time
WO2023216941A1 (en) Video recording display method and apparatus, and electronic device, medium and program product
US20240121485A1 (en) Method, apparatus, device, medium and program product for obtaining text material
WO2023020517A1 (en) Method and apparatus for multimedia resource editing scene, and device and storage medium
KR20230032687A (en) Method for providing music sharing sns

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 22848342

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE