WO2019180426A1 - Turbogenerator method - Google Patents

Turbogenerator method Download PDF

Info

Publication number
WO2019180426A1
WO2019180426A1 PCT/GB2019/050773 GB2019050773W WO2019180426A1 WO 2019180426 A1 WO2019180426 A1 WO 2019180426A1 GB 2019050773 W GB2019050773 W GB 2019050773W WO 2019180426 A1 WO2019180426 A1 WO 2019180426A1
Authority
WO
WIPO (PCT)
Prior art keywords
grid
power
turbogenerator
turbine
electrical power
Prior art date
Application number
PCT/GB2019/050773
Other languages
French (fr)
Inventor
Michela MASCHERIN
Stuart O'Neill
Ivan CORDERO ORILLE
Shinri SZYMKO
Original Assignee
Bowman Power Group Limited
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bowman Power Group Limited filed Critical Bowman Power Group Limited
Publication of WO2019180426A1 publication Critical patent/WO2019180426A1/en

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J11/00Circuit arrangements for providing service supply to auxiliaries of stations in which electric power is generated, distributed or converted
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02PCONTROL OR REGULATION OF ELECTRIC MOTORS, ELECTRIC GENERATORS OR DYNAMO-ELECTRIC CONVERTERS; CONTROLLING TRANSFORMERS, REACTORS OR CHOKE COILS
    • H02P9/00Arrangements for controlling electric generators for the purpose of obtaining a desired output
    • H02P9/08Control of generator circuit during starting or stopping of driving means, e.g. for initiating excitation
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00002Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by monitoring
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02PCONTROL OR REGULATION OF ELECTRIC MOTORS, ELECTRIC GENERATORS OR DYNAMO-ELECTRIC CONVERTERS; CONTROLLING TRANSFORMERS, REACTORS OR CHOKE COILS
    • H02P9/00Arrangements for controlling electric generators for the purpose of obtaining a desired output
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02PCONTROL OR REGULATION OF ELECTRIC MOTORS, ELECTRIC GENERATORS OR DYNAMO-ELECTRIC CONVERTERS; CONTROLLING TRANSFORMERS, REACTORS OR CHOKE COILS
    • H02P9/00Arrangements for controlling electric generators for the purpose of obtaining a desired output
    • H02P9/006Means for protecting the generator by using control
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02PCONTROL OR REGULATION OF ELECTRIC MOTORS, ELECTRIC GENERATORS OR DYNAMO-ELECTRIC CONVERTERS; CONTROLLING TRANSFORMERS, REACTORS OR CHOKE COILS
    • H02P9/00Arrangements for controlling electric generators for the purpose of obtaining a desired output
    • H02P9/10Control effected upon generator excitation circuit to reduce harmful effects of overloads or transients, e.g. sudden application of load, sudden removal of load, sudden change of load
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F02COMBUSTION ENGINES; HOT-GAS OR COMBUSTION-PRODUCT ENGINE PLANTS
    • F02CGAS-TURBINE PLANTS; AIR INTAKES FOR JET-PROPULSION PLANTS; CONTROLLING FUEL SUPPLY IN AIR-BREATHING JET-PROPULSION PLANTS
    • F02C1/00Gas-turbine plants characterised by the use of hot gases or unheated pressurised gases, as the working fluid
    • F02C1/04Gas-turbine plants characterised by the use of hot gases or unheated pressurised gases, as the working fluid the working fluid being heated indirectly
    • F02C1/05Gas-turbine plants characterised by the use of hot gases or unheated pressurised gases, as the working fluid the working fluid being heated indirectly characterised by the type or source of heat, e.g. using nuclear or solar energy
    • F02C1/06Gas-turbine plants characterised by the use of hot gases or unheated pressurised gases, as the working fluid the working fluid being heated indirectly characterised by the type or source of heat, e.g. using nuclear or solar energy using reheated exhaust gas
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/30State monitoring, e.g. fault, temperature monitoring, insulator monitoring, corona discharge

Definitions

  • the present invention relates to a method of controlling a turbogenerator, and more particularly to a method of controlling the start a turbogenerator when an electrical grid is unavailable.
  • Turbogenerator systems are frequently used in energy recovery systems.
  • a turbine which forms part of the turbogenerator system is located within the exhaust flow of a prime mover.
  • the exhaust gases from the prime mover flow past and act upon the turbine blades of the turbine, rotating the turbine within the turbogenerator system.
  • This rotation of the turbine is then used by the turbogenerator system to generate electricity, which is exported to an electrical grid.
  • the turbogenerator may be connected to the electrical grid directly, or may be connected to the grid through power electronics.
  • Turbogenerator systems can become damaged if the turbine rotates too quickly, known as an overspeed.
  • An overspeed situation is commonly prevented with the use of an electrical load on the turbogenerator, this electrical load is frequently provided by an electrical grid.
  • Such a situation may occur when the prime mover the turbogenerator itself is connected to is providing the grid, in the case of a fault on the system or in the case of a fault on the grid.
  • the turbogenerator is connected to a grid via a power electronics system, such an overspeed situation can also damage the power electronics.
  • a high rotational speed of the turbine within the turbogenerator results in a high output voltage, this high output voltage potentially damaging the power electronics themselves.
  • an alternative method of preventing an overspeed of the turbine is required.
  • One such method is to reduce the output of the prime mover, such that the flow of exhaust gases past the turbine, and thus the speed of the turbine, is reduced.
  • the turbogenerator is usually the secondary system. Therefore, altering or ceasing the operation of the prime mover to accommodate the turbogenerator is undesirable, or even impossible.
  • An alternative option is to ensure the flow of exhaust gases does not pass the turbine of the turbogenerator during the start-up phase. This bypassing of the main exhaust system may be undertaken via the use of valves, although such systems are costly.
  • turbogenerator will also be unable to receive power from the grid.
  • the turbogenerator must commence operation and restore the grid without relying on any external power source.
  • a black start procedure is particularly problematic when considering both the issue of turbine overspeed.
  • a‘fast start’ scenario the prime mover to which any turbogenerator system connected is able to rapidly move from idle to full power operation.
  • a ‘fast start’ scenario can damage the power electronics of the turbogenerator as the turbine will rapidly achieve a high rotational speed within the generator. This high rotational speed results in a high output voltage capable of damaging the power electronics if the start-up procedure of the power electronics has not been completed.
  • the prime mover may reach maximum output level in as little as five seconds. Therefore, the power electronics must attain an operable condition in a very short amount of time, difficult especially where a fast start is combined with a black start in a‘fast black start’.
  • Embodiments of the present invention seek to address at least these problems.
  • a method of initialising a turbogenerator system for exporting electrical power to a grid comprising providing a turbogenerator system comprising a generator, a turbine configured to rotate within said generator, and power electronics, providing electrical power to the power electronics, detecting a condition of the grid or the power electronics, limiting the rotational speed of the turbine within the generator to a first predetermined setpoint speed, monitoring the condition of the grid or the power electronics, determining the grid or the powerelectonics is in a condition suitable to receive electrical power, allowing the rotational speed of the turbine within the generator to increase above the first predetermined setpoint speed to reach a second predetermined setpoint speed, using the rotation of the turbine within the generator to generate electrical power and exporting said electrical power to the grid.
  • the step of limiting the rotational speed of the turbine within the generator to a first predetermined setpoint speed encompasses the method whereby the rotational speed of the turbine is allowed to vary between the first setpoint speed and any speed below the first setpoint speed.
  • the first setpoint speed acts as a limit the rotational speed of the turbine is not allowed to exceed.
  • the rotational speed of the turbine within the generator may vary, as long as the first setpoint speed is not exceeded.
  • the step of providing power to the power electronics comprises the step of providing electrical power to the power electronics via a battery.
  • a battery external to the turbogenerator system.
  • an external battery may have a capacity higher than that of a battery within the turbogenerator system, and therefore provide a more reliable means of providing power to the power electronics in the power-up phase.
  • the step of detecting a condition of the grid comprises detecting the grid is unsuitable to receive electrical power from the turbogenerator. More preferably, the step of detecting the grid is unsuitable for power to receive electrical power from the turbogenerator comprises detecting the grid is unstable or fluctuating. Still more preferably, the step of detecting the grid is unsuitable to receive electrical power from the turbogenerator comprises detecting the grid voltage or grid frequency is unstable.
  • the step of detecting the grid is unsuitable to receive electrical power from the turbogenerator comprises detecting the grid is absent.
  • the step of limiting the turbine speed to a first predetermined setpoint speed using the power electronics comprises applying a brake to the turbine.
  • the brake comprises a physical brake.
  • the brake comprises an electrical brake.
  • the brake comprises a brake circuit.
  • the step of allowing the turbine speed to increase above the first predetermined setpoint speed to reach a second predetermined setpoint speed comprises releasing the brake.
  • the step of determining the grid is suitable to receive electrical power from the turbogenerator comprises determining or establishing the grid is present.
  • the step of determining the grid is in a condition suitable to receive electrical power from the turbogenerator comprises determining or establishing the grid is stable.
  • the step of detecting the grid is suitable to receive electrical power from the turbogenerator comprises detecting the grid voltage or grid frequency is stable compared to a predetermined threshold or tolerance.
  • the second predetermined setpoint speed is the speed at which the turbogenerator system provides an optimum output of electrical power.
  • the step of detecting a condition of the power electronics comprises determining the power electronics is in a condition unsuitable to receive power from the generator.
  • Such a feature may be advantageous as it allows the system to ensure the power electronics are in a condition suitable for the export of power to the grid before any power export commences, preventing potential damage to the power electronics.
  • the method further comprises the step of determining the rotational speed of the turbine within the generator. More, preferably, the method comprises determining the rotational speed of the turbine within the generator is above a predetermined value. Preferably, this predetermined value is l OOOrpm.
  • the step of determining the rotational speed of the turbine occurs simultaneously with the step of determining a condition of the power electronics or determining a condition of the grid.
  • the method comprises both determining a condition of the grid and determining a condition of the power electronics.
  • the method comprises both determining the grid is in a condition suitable to receive electrical power and determining the power electronics are in a condition suitable to receive electrical power.
  • the step of limiting the rotational speed of the turbine within the generator to a first predetermined setpoint speed comprises maintaining the rotational speed of the turbine at the first predetermined setpoint speed.
  • FIG. 1 is a schematic flow diagram of the outlined method.
  • the first stage of the method 101 includes the provision of a turbogenerator system including a turbine and power electronics.
  • a turbogenerator system including a turbine and power electronics.
  • Such systems are well known and are frequently attached to the exhausts or fluid outflows of prime movers to harvest energy from these fluid flows and export this energy as electrical power to a grid.
  • Such an arrangement is desirable, as the energy harvested by the turbogenerator system would otherwise be wasted. Therefore, the inclusion of a turbogenerator apparatus alongside a prime mover increases the efficiency of the system as a whole, maximising the output of electrical power for any given input of materials.
  • the described method commences with both the turbogenerator and the power electronics in an unpowered state. Such a situation may occur when both the prime mover and the turbogenerator are idle, or where the turbogenerator is not operational for any reason. In the present embodiment, the prime mover is also idle.
  • the power supply to the power electronics may be from several sources. Usually, power is supplied to the power electronics via the electrical grid. However, in the present embodiment of the invention, the prime mover has only just commenced operation and, therefore, the electrical grid is unavailable. As such, this initial supply of electrical power to the power electronics and turbogenerator system as a whole is provided by a battery located within the prime mover. This battery contains sufficient power to commence operation of the power electronics.
  • the power electronics After power is supplied to the power electronics, the power electronics continue the start-up sequence by detecting a condition of the grid.
  • the power electronics may monitor the voltage and /or frequency of the grid to determine the stability of the grid. Additionally, the detection step may involve detecting the presence of the grid. If the grid is both present and stable, then the turbogenerator may begin operation, as usual, exporting power to the grid.
  • the grid is in a condition where it is unsuitable to receive power from the turbogenerator. This unsuitability will be determined by the power electronics of the turbogenerator when detecting the condition of the grid.
  • the power electronics determine that the grid is unsuitable to receive electrical power from the turbogenerator, it is necessary to limit the speed of the turbine within the turbogenerator. If the speed of the turbogenerator is not limited, it may begin to export power to a grid that is not in a suitable state. In this case, if the turbogenerator begins to export power to a grid that is unstable or absent, there is a significant risk of an overspeed damaging both the turbine and the electrical components of the turbogenerator. The overspeed may occur as the grid is unable to provide a stable load, or any load at all, on the turbogenerator.
  • the power electronics themselves take some time to become fully operational after they receive power from the battery. Therefore, where the grid is not ready for power export, or the power electronics are not fully operational, the power electronics will detect these conditions and limit the turbine speed to a first predetermined setpoint speed 104.
  • This first predetermined setpoint speed is below the speed at which the turbogenerator begins the export of power to the grid. Therefore, limiting the turbogenerator to this first predetermined setpoint speed ensures the turbogenerator will not begin to export power, eliminating the risk of damage to the system due to an overspeed or premature power export.
  • the turbine’s speed may be limited to the first predetermined setpoint speed using a brake or brake system.
  • This brake may be in the form of a physical brake which engages with the turbine to slow its rotation.
  • the brake may be an electrical brake in the way of a brake circuit.
  • the power electronics After limiting the speed of the turbogenerator to the first predetermined setpoint speed, the power electronics will continue to monitor the condition of the grid 105.
  • This monitoring of the grid may include monitoring the voltage and frequency of the grid to determine its stability.
  • the power electronics will determine the grid is in a condition suitable to receive electrical power from the turbogenerator 106. This determination may be made when the stability of the grid voltage achieves a predetermined level set within the power electronics. Alternatively, this determination may be made when the stability of the grid frequency achieves a predetermined level set within the power electronics. Commonly, this determination will be made when the power electronics receives a‘grid healthy’ signal from an external source, such as the prime mover or an overall control circuit.
  • the power electronics will allow the turbine speed to increase above the first predetermined setpoint speed to reach a second predetermined setpoint speed 107. This increase in speed is allowed as the power electronics release the brake, allowing the turbine to accelerate.
  • the second predetermined setpoint speed may be the speed at which the turbogenerator begins to export power to the grid 108.
  • the second predetermined setpoint speed may be the speed at which the export of electrical power from the generator is optimised. As such, the turbogenerator begins to export electrical power to the grid, and the system as a whole is fully operational.

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Control Of Eletrric Generators (AREA)

Abstract

A turbogenerator method is described, the method comprising providing (101) a turbogenerator system comprising a generator, a turbine configured to rotate within said generator, and power electronics, providing (102) electrical power to the power electronics, detecting (103) a condition of the grid or the power electronics, limiting (104) the rotational speed of the turbine within the generator to a first predetermined setpoint speed, monitoring (105) the condition of the grid or the power electronics, determining (106) the grid or the powerelectonics is in a condition suitable to receive electrical power, allowing (107) the rotational speed of the turbine within the generator to increase above the first predetermined setpoint speed to reach a second predetermined setpoint speed, using the rotation of the turbine within the generator to generate electrical power and exporting (108) said electrical power to the grid.

Description

Turbogenerator Method
Field of the Invention
The present invention relates to a method of controlling a turbogenerator, and more particularly to a method of controlling the start a turbogenerator when an electrical grid is unavailable. to the Invention
Turbogenerator systems are frequently used in energy recovery systems. In one example of such an energy recovery system, a turbine which forms part of the turbogenerator system is located within the exhaust flow of a prime mover. When the prime mover is in operation, the exhaust gases from the prime mover flow past and act upon the turbine blades of the turbine, rotating the turbine within the turbogenerator system. This rotation of the turbine is then used by the turbogenerator system to generate electricity, which is exported to an electrical grid. The turbogenerator may be connected to the electrical grid directly, or may be connected to the grid through power electronics.
Turbogenerator systems can become damaged if the turbine rotates too quickly, known as an overspeed. An overspeed situation is commonly prevented with the use of an electrical load on the turbogenerator, this electrical load is frequently provided by an electrical grid. However, it is sometimes necessary for a turbogenerator to initialise or start when an electrical grid is not readily available, or when an electrical grid is not stable. Such a situation may occur when the prime mover the turbogenerator itself is connected to is providing the grid, in the case of a fault on the system or in the case of a fault on the grid. Where the turbogenerator is connected to a grid via a power electronics system, such an overspeed situation can also damage the power electronics. A high rotational speed of the turbine within the turbogenerator results in a high output voltage, this high output voltage potentially damaging the power electronics themselves.
Where an electrical grid is not available to place a load on the turbogenerator, an alternative method of preventing an overspeed of the turbine is required. One such method is to reduce the output of the prime mover, such that the flow of exhaust gases past the turbine, and thus the speed of the turbine, is reduced. However, where a turbogenerator connects to a prime mover, the turbogenerator is usually the secondary system. Therefore, altering or ceasing the operation of the prime mover to accommodate the turbogenerator is undesirable, or even impossible. An alternative option is to ensure the flow of exhaust gases does not pass the turbine of the turbogenerator during the start-up phase. This bypassing of the main exhaust system may be undertaken via the use of valves, although such systems are costly.
Additionally, where there is no grid to place a load on the turbogenerator, the turbogenerator will also be unable to receive power from the grid. Here the turbogenerator must commence operation and restore the grid without relying on any external power source. A black start procedure is particularly problematic when considering both the issue of turbine overspeed.
A turbogenerator system comprises a turbine, power electronics used to control the rotational speed of the turbine and a generator. Typically, the turbogenerator is a highspeed turbogenerator, using high-speed power electronics.
One problem associated with preventing overspeed in a black start scenario is that initially, as there is no grid, there is no power supply to the to the power electronics. As such, by the time the grid has been established, and power to the power electronics has been restored, a damaging overspeed event may already have occurred. Additionally, the grid will take time to stabilise upon start-up of the prime mover, and any power export to the grid by the turbogenerator system before the grid has stabilised again has the potential to result in a damaging overspeed.
These issues are exacerbated in a‘fast start’ scenario. In a‘fast start’ scenario, the prime mover to which any turbogenerator system connected is able to rapidly move from idle to full power operation. A ‘fast start’ scenario can damage the power electronics of the turbogenerator as the turbine will rapidly achieve a high rotational speed within the generator. This high rotational speed results in a high output voltage capable of damaging the power electronics if the start-up procedure of the power electronics has not been completed. In a fast start procedure, the prime mover may reach maximum output level in as little as five seconds. Therefore, the power electronics must attain an operable condition in a very short amount of time, difficult especially where a fast start is combined with a black start in a‘fast black start’.
Embodiments of the present invention seek to address at least these problems.
Summary of the Invention
According to the present invention, there is provided a method of initialising a turbogenerator system for exporting electrical power to a grid, the method comprising providing a turbogenerator system comprising a generator, a turbine configured to rotate within said generator, and power electronics, providing electrical power to the power electronics, detecting a condition of the grid or the power electronics, limiting the rotational speed of the turbine within the generator to a first predetermined setpoint speed, monitoring the condition of the grid or the power electronics, determining the grid or the powerelectonics is in a condition suitable to receive electrical power, allowing the rotational speed of the turbine within the generator to increase above the first predetermined setpoint speed to reach a second predetermined setpoint speed, using the rotation of the turbine within the generator to generate electrical power and exporting said electrical power to the grid.
In this way, there is provided a method which allows a turbogenerator to initialise and commence the export of power to an electrical grid with a reduced risk of damage to the turbogenerator or system as a whole. This advantage is provided as the detection of the state of the electrical grid, and the prevention of the turbine from reaching a speed higher than the first setpoint speed until the grid is suitable to receive exported power prevents any overspeed of the turbine due to the premature supply of power to the grid from the turbogenerator.
It is understood that the step of limiting the rotational speed of the turbine within the generator to a first predetermined setpoint speed encompasses the method whereby the rotational speed of the turbine is allowed to vary between the first setpoint speed and any speed below the first setpoint speed. Here, the first setpoint speed acts as a limit the rotational speed of the turbine is not allowed to exceed. The rotational speed of the turbine within the generator may vary, as long as the first setpoint speed is not exceeded.
Preferably, the step of providing power to the power electronics comprises the step of providing electrical power to the power electronics via a battery. Such a feature may be advantageous in allowing operation of the power electronics to be initiated when not connected to a grid. Preferably, the step of providing power to the power electronics comprises the step of providing electrical power to the power electronics via a battery external to the turbogenerator system. Such a feature may be preferred as an external battery may have a capacity higher than that of a battery within the turbogenerator system, and therefore provide a more reliable means of providing power to the power electronics in the power-up phase.
Preferably, the step of detecting a condition of the grid comprises detecting the grid is unsuitable to receive electrical power from the turbogenerator. More preferably, the step of detecting the grid is unsuitable for power to receive electrical power from the turbogenerator comprises detecting the grid is unstable or fluctuating. Still more preferably, the step of detecting the grid is unsuitable to receive electrical power from the turbogenerator comprises detecting the grid voltage or grid frequency is unstable.
Preferably, the step of detecting the grid is unsuitable to receive electrical power from the turbogenerator comprises detecting the grid is absent.
Preferably the step of limiting the turbine speed to a first predetermined setpoint speed using the power electronics comprises applying a brake to the turbine. More preferably, the brake comprises a physical brake. Preferably, the brake comprises an electrical brake. More preferably, the brake comprises a brake circuit.
Preferably, the step of allowing the turbine speed to increase above the first predetermined setpoint speed to reach a second predetermined setpoint speed comprises releasing the brake.
Preferably, the step of determining the grid is in a condition suitable to receive electrical power from the turbogenerator comprises receiving a signal or message from a source external to the turbogenerator. More preferably, the signal is received from the grid. More preferably, the signal is received from an external controller.
Preferably, the step of determining the grid is suitable to receive electrical power from the turbogenerator comprises determining or establishing the grid is present. Preferably, the step of determining the grid is in a condition suitable to receive electrical power from the turbogenerator comprises determining or establishing the grid is stable. Preferably, the step of detecting the grid is suitable to receive electrical power from the turbogenerator comprises detecting the grid voltage or grid frequency is stable compared to a predetermined threshold or tolerance.
Preferably, the second predetermined setpoint speed is the speed at which the turbogenerator system provides an optimum output of electrical power. Such a feature may be advantageous as it ensures the operation of the turbogenerator is optimum once the grid is in a condition where it is ready to receive power from the turbogenerator. Preferably, the step of detecting a condition of the power electronics comprises determining the power electronics is in a condition unsuitable to receive power from the generator. Such a feature may be advantageous as it allows the system to ensure the power electronics are in a condition suitable for the export of power to the grid before any power export commences, preventing potential damage to the power electronics.
Preferably, the step of detecting the power electronics is in a condition suitable to receive electrical power comprises detecting the power electronics is configured to receive electrical power from the generator.
Preferably, the method further comprises the step of determining the rotational speed of the turbine within the generator. More, preferably, the method comprises determining the rotational speed of the turbine within the generator is above a predetermined value. Preferably, this predetermined value is l OOOrpm.
Preferably, the step of determining the rotational speed of the turbine occurs simultaneously with the step of determining a condition of the power electronics or determining a condition of the grid.
Preferably, the method comprises both determining a condition of the grid and determining a condition of the power electronics.
Preferably, the method comprises both determining the grid is in a condition suitable to receive electrical power and determining the power electronics are in a condition suitable to receive electrical power.
Preferably, the step of limiting the rotational speed of the turbine within the generator to a first predetermined setpoint speed comprises maintaining the rotational speed of the turbine at the first predetermined setpoint speed.
Detailed Description
Embodiments of the present invention are now described by way of example only and with reference to the accompanying drawing, in which:
Figure 1 is a schematic flow diagram of the outlined method. Referring to Figure 1 , the first stage of the method 101 includes the provision of a turbogenerator system including a turbine and power electronics. Such systems are well known and are frequently attached to the exhausts or fluid outflows of prime movers to harvest energy from these fluid flows and export this energy as electrical power to a grid. Such an arrangement is desirable, as the energy harvested by the turbogenerator system would otherwise be wasted. Therefore, the inclusion of a turbogenerator apparatus alongside a prime mover increases the efficiency of the system as a whole, maximising the output of electrical power for any given input of materials.
In the present embodiment, the described method commences with both the turbogenerator and the power electronics in an unpowered state. Such a situation may occur when both the prime mover and the turbogenerator are idle, or where the turbogenerator is not operational for any reason. In the present embodiment, the prime mover is also idle.
Initially, electrical power is supplied to the power electronics 102, and operation of the prime mover is commenced. As power is supplied to the power electronics, this enables the power electronics to commence operation and determine both the state of the turbine and the grid itself.
The power supply to the power electronics may be from several sources. Usually, power is supplied to the power electronics via the electrical grid. However, in the present embodiment of the invention, the prime mover has only just commenced operation and, therefore, the electrical grid is unavailable. As such, this initial supply of electrical power to the power electronics and turbogenerator system as a whole is provided by a battery located within the prime mover. This battery contains sufficient power to commence operation of the power electronics.
After power is supplied to the power electronics, the power electronics continue the start-up sequence by detecting a condition of the grid. In this detection step, the power electronics may monitor the voltage and /or frequency of the grid to determine the stability of the grid. Additionally, the detection step may involve detecting the presence of the grid. If the grid is both present and stable, then the turbogenerator may begin operation, as usual, exporting power to the grid.
However, as the prime mover has commenced operation at the same time as the turbogenerator, it is likely that the grid will not yet have been established, or that the grid remains unstable. In this case, the grid is in a condition where it is unsuitable to receive power from the turbogenerator. This unsuitability will be determined by the power electronics of the turbogenerator when detecting the condition of the grid.
If the power electronics determine that the grid is unsuitable to receive electrical power from the turbogenerator, it is necessary to limit the speed of the turbine within the turbogenerator. If the speed of the turbogenerator is not limited, it may begin to export power to a grid that is not in a suitable state. In this case, if the turbogenerator begins to export power to a grid that is unstable or absent, there is a significant risk of an overspeed damaging both the turbine and the electrical components of the turbogenerator. The overspeed may occur as the grid is unable to provide a stable load, or any load at all, on the turbogenerator.
Additionally, the power electronics themselves take some time to become fully operational after they receive power from the battery. Therefore, where the grid is not ready for power export, or the power electronics are not fully operational, the power electronics will detect these conditions and limit the turbine speed to a first predetermined setpoint speed 104. This first predetermined setpoint speed is below the speed at which the turbogenerator begins the export of power to the grid. Therefore, limiting the turbogenerator to this first predetermined setpoint speed ensures the turbogenerator will not begin to export power, eliminating the risk of damage to the system due to an overspeed or premature power export.
The turbine’s speed may be limited to the first predetermined setpoint speed using a brake or brake system. This brake may be in the form of a physical brake which engages with the turbine to slow its rotation. Alternatively, the brake may be an electrical brake in the way of a brake circuit.
After limiting the speed of the turbogenerator to the first predetermined setpoint speed, the power electronics will continue to monitor the condition of the grid 105. This monitoring of the grid may include monitoring the voltage and frequency of the grid to determine its stability.
During this monitoring process, the power electronics will determine the grid is in a condition suitable to receive electrical power from the turbogenerator 106. This determination may be made when the stability of the grid voltage achieves a predetermined level set within the power electronics. Alternatively, this determination may be made when the stability of the grid frequency achieves a predetermined level set within the power electronics. Commonly, this determination will be made when the power electronics receives a‘grid healthy’ signal from an external source, such as the prime mover or an overall control circuit.
Once the grid is determined to be in a condition suitable to receive electrical power from the turbogenerator, the power electronics will allow the turbine speed to increase above the first predetermined setpoint speed to reach a second predetermined setpoint speed 107. This increase in speed is allowed as the power electronics release the brake, allowing the turbine to accelerate. The second predetermined setpoint speed may be the speed at which the turbogenerator begins to export power to the grid 108. Alternatively, the second predetermined setpoint speed may be the speed at which the export of electrical power from the generator is optimised. As such, the turbogenerator begins to export electrical power to the grid, and the system as a whole is fully operational.

Claims

1 . A method of initialising a turbogenerator system for exporting electrical power to a grid, the method comprising;
providing a turbogenerator system comprising a generator, a turbine configured to rotate within said generator, and power electronics;
providing electrical power to the power electronics;
detecting a condition of the grid or the power electronics;
limiting the rotational speed of the turbine within the generator to a first predetermined setpoint speed;
monitoring the condition of the grid or the power electronics;
determining the grid or the powerelectonics is in a condition suitable to receive electrical power;
allowing the rotational speed of the turbine within the generator to increase above the first predetermined setpoint speed to reach a second predetermined setpoint speed; using the rotation of the turbine within the generator to generate electrical power and exporting said electrical power to the grid.
2. The method of claim 1 , wherein the step of providing power to the power to the power electronics comprises the step of providing electrical power to the power electronics via a battery.
3. The method of claim 1 , wherein the step of providing power to the power electronics comprises the step of providing electrical power to the power electronics via a battery external to the turbogenerator system.
4. The method of any one preceding claim, wherein the step of detecting a condition of the grid comprises detecting the grid is unsuitable to receive electrical power from the turbogenerator.
5. The method of claim 4, wherein the step of detecting the grid is unsuitable to receive electrical power from the turbogenerator comprises detecting the grid is unstable.
6. The method of claim 4, wherein the step of detecting the grid is unsuitable to receive electrical power from the turbogenerator comprises detecting the grid is absent.
7. The method of any one preceding claim, wherein the step of limiting the turbine speed to a first predetermined setpoint speed using the power electronics comprises applying a brake to the turbine.
8. The method of claim 7, wherein the brake comprises a physical brake.
9. The method of claim 7 or claim 8, wherein the brake comprises an electrical brake.
10. The method of any one of claims 7 to 9, wherein the step of allowing the turbine speed to increase above the first predetermined setpoint speed to reach a second predetermined setpoint speed comprises releasing the brake.
1 1 . The method of any one preceding claim, wherein the step of determining the grid is in a condition suitable to receive electrical power from the turbogenerator comprises receiving a signal from a source external to the turbogenerator.
12. The method of claim 1 1 , wherein the signal is received from the grid.
13. The method of any one preceding claim, wherein the step of determining the grid is suitable to receive electrical power from the turbogenerator comprises determining the grid is present.
14. The method of any one preceding claim, wherein the step of determining the grid is in a condition suitable to receive electrical power from the turbogenerator comprises determining the grid is stable.
15. The method of any one preceding claim, wherein the second predetermined setpoint speed is the speed at which the turbogenerator system provides an optimum output of electrical power.
16. The method of any one preceding claim, wherein the step of detecting a condition of the power electronics comprises determining the power electronics is in a condition unsuitable to receive power from the generator.
17. The method of any one preceding claim, wherein the step of detecting the power electronics is in a condition suitable to receive electrical power comprises detecting the power electronics is configured to receive electrical power from the generator.
18. The method of any one preceding claim, wherein the method further comprises the step of determining the rotational speed of the turbine within the generator.
19. The method of claim 18, wherein the step of determining the rotational speed of the turbine occurs simultaneously with the step of determining a condition of the power electronics or determining a condition of the grid.
20. The method of any one preceding claim, wherein the method comprises both determining a condition of the grid and determining a condition of the power electronics.
21 . The method of any one preceding claim, wherein the method comprises both determining the grid is in a condition suitable to receive electrical power and determining the power electronics are in a condition suitable to receive electrical power.
22. The method of any one preceding claim, wherein the step of limiting the rotational speed of the turbine within the generator to a first predetermined setpoint speed comprises maintaining the rotational speed of the turbine at the first predetermined setpoint speed.
PCT/GB2019/050773 2018-03-21 2019-03-20 Turbogenerator method WO2019180426A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
GB1804488.3A GB2572171B (en) 2018-03-21 2018-03-21 Turbogenerator method
GB1804488.3 2018-03-21

Publications (1)

Publication Number Publication Date
WO2019180426A1 true WO2019180426A1 (en) 2019-09-26

Family

ID=62017834

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/GB2019/050773 WO2019180426A1 (en) 2018-03-21 2019-03-20 Turbogenerator method

Country Status (2)

Country Link
GB (1) GB2572171B (en)
WO (1) WO2019180426A1 (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1999052193A1 (en) * 1998-04-02 1999-10-14 Capstone Turbine Corporation Power controller
US6093975A (en) * 1998-10-27 2000-07-25 Capstone Turbine Corporation Turbogenerator/motor control with synchronous condenser
GB2509103A (en) * 2012-12-20 2014-06-25 Bowman Power Group Ltd Controlling a turbogenerator during a grid disturbance

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7471008B2 (en) * 2006-03-10 2008-12-30 Deere & Company Method and system for controlling a rotational speed of a rotor of a turbogenerator
DE102011111210A1 (en) * 2011-08-20 2013-02-21 Nordex Energy Gmbh A method of operating a wind turbine in the event of a mains failure with a voltage drop and such a wind turbine

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1999052193A1 (en) * 1998-04-02 1999-10-14 Capstone Turbine Corporation Power controller
US6093975A (en) * 1998-10-27 2000-07-25 Capstone Turbine Corporation Turbogenerator/motor control with synchronous condenser
GB2509103A (en) * 2012-12-20 2014-06-25 Bowman Power Group Ltd Controlling a turbogenerator during a grid disturbance

Also Published As

Publication number Publication date
GB2572171A (en) 2019-09-25
GB2572171B (en) 2022-03-23
GB201804488D0 (en) 2018-05-02

Similar Documents

Publication Publication Date Title
US6552440B2 (en) Automatic turbogenerator restarting method and system
JP6134498B2 (en) Power generation device with energy storage means and control process for this type of device
JP5108446B2 (en) Method and system for testing an overspeed protection system during a turbomachine shutdown sequence
US10704534B2 (en) Fault ride through method for load impact minimization
JP2003153595A (en) Fluid power generating unit
JP2009108860A (en) Method and system for power plant block loading
JP2010133417A (en) Device for controlling rotational speed of rotor of wind turbine for supplying electrical power to electricity network, wind turbine for electrical power generation, method for controlling rotational speed of rotor of wind turbine for supplying electrical power to electricity network, and computer program configured for controlling the method
US8109723B2 (en) Device and method for controlling wind turbine
CN111710888B (en) Start control method for vehicle-mounted fuel cell system
US20200309039A1 (en) Control of a gas turbine driving a generator of an electrical system based on faults detected in the electrical system
JP5808782B2 (en) Thermal power plant operating method and thermal power plant
KR20120018328A (en) Blade angle adjustment drive for a wind power plant
WO2019180426A1 (en) Turbogenerator method
US7119520B2 (en) Energy storage flywheel test control system
JP4138596B2 (en) Combined plant automatic stop method, automatic stop control device, and combined plant equipped with this automatic stop control device
US11035258B2 (en) Model-based monitoring of the operating state of an expansion machine
JPH11200895A (en) Revolution speed control method in gas turbine stopping process
JP3302788B2 (en) Turbine control unit and reactor isolation cooling system control system
EP3804073B1 (en) System for synchronising energy sources coupled to an aircraft
JP2006057469A (en) Wind power generation system and method for controlling the same
JP5415171B2 (en) Water wheel governor
WO2023218771A1 (en) Power generation system and control method
JPH063491A (en) Equipment for water feeding for nuclear power plant
CN116328928A (en) Control method and device of pulverizing system, storage medium and electronic equipment
KR20200049292A (en) Secondary control method for start-up equipment of gas turbine

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 19714732

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 19714732

Country of ref document: EP

Kind code of ref document: A1