WO2012116205A3 - Queuing access to a shared power supply - Google Patents
Queuing access to a shared power supply Download PDFInfo
- Publication number
- WO2012116205A3 WO2012116205A3 PCT/US2012/026355 US2012026355W WO2012116205A3 WO 2012116205 A3 WO2012116205 A3 WO 2012116205A3 US 2012026355 W US2012026355 W US 2012026355W WO 2012116205 A3 WO2012116205 A3 WO 2012116205A3
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- access
- access points
- power supply
- queued
- duration curve
- Prior art date
Links
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05F—SYSTEMS FOR REGULATING ELECTRIC OR MAGNETIC VARIABLES
- G05F1/00—Automatic systems in which deviations of an electric quantity from one or more predetermined values are detected at the output of the system and fed back to a device within the system to restore the detected quantity to its predetermined value or values, i.e. retroactive systems
- G05F1/10—Regulating voltage or current
- G05F1/46—Regulating voltage or current wherein the variable actually regulated by the final control device is dc
- G05F1/56—Regulating voltage or current wherein the variable actually regulated by the final control device is dc using semiconductor devices in series with the load as final control devices
- G05F1/565—Regulating voltage or current wherein the variable actually regulated by the final control device is dc using semiconductor devices in series with the load as final control devices sensing a condition of the system or its load in addition to means responsive to deviations in the output of the system, e.g. current, voltage, power factor
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/12—Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
- H02J3/14—Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B15/00—Systems controlled by a computer
- G05B15/02—Systems controlled by a computer electric
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05F—SYSTEMS FOR REGULATING ELECTRIC OR MAGNETIC VARIABLES
- G05F1/00—Automatic systems in which deviations of an electric quantity from one or more predetermined values are detected at the output of the system and fed back to a device within the system to restore the detected quantity to its predetermined value or values, i.e. retroactive systems
- G05F1/66—Regulating electric power
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06N—COMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
- G06N7/00—Computing arrangements based on specific mathematical models
- G06N7/01—Probabilistic graphical models, e.g. probabilistic networks
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2310/00—The network for supplying or distributing electric power characterised by its spatial reach or by the load
- H02J2310/10—The network having a local or delimited stationary reach
- H02J2310/12—The local stationary network supplying a household or a building
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B70/00—Technologies for an efficient end-user side electric power management and consumption
- Y02B70/30—Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
- Y02B70/3225—Demand response systems, e.g. load shedding, peak shaving
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B90/00—Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
- Y02B90/20—Smart grids as enabling technology in buildings sector
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S20/00—Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S20/00—Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
- Y04S20/20—End-user application control systems
- Y04S20/222—Demand response systems, e.g. load shedding, peak shaving
Abstract
Priority Applications (9)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020137025252A KR20140024291A (en) | 2011-02-25 | 2012-02-23 | Queuing access to a shared power supply |
CA2828221A CA2828221C (en) | 2011-02-25 | 2012-02-23 | Queuing access to a shared power supply |
RU2013142696/08A RU2013142696A (en) | 2011-02-25 | 2012-02-23 | ACCESS TO POWER SUPPLY |
CN201280019721.6A CN103534661B (en) | 2011-02-25 | 2012-02-23 | Power supply is shared in access of queuing up |
JP2013555566A JP5957014B2 (en) | 2011-02-25 | 2012-02-23 | Queue access to shared power supply |
EP12750287.0A EP2678750B1 (en) | 2011-02-25 | 2012-02-23 | Queuing access to a shared power supply |
MX2013009839A MX2013009839A (en) | 2011-02-25 | 2012-02-23 | Queuing access to a shared power supply. |
IL228115A IL228115A (en) | 2011-02-25 | 2013-08-25 | Apparatus and power demand management system for queuing access to a shared power supply |
ZA2013/07183A ZA201307183B (en) | 2011-02-25 | 2013-09-25 | Queuing access to a shared power supply |
Applications Claiming Priority (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US201161463946P | 2011-02-25 | 2011-02-25 | |
US61/463,946 | 2011-02-25 | ||
US13/402,283 | 2012-02-22 | ||
US13/402,283 US8219258B1 (en) | 2011-02-25 | 2012-02-22 | Queuing access to a shared power supply |
Publications (2)
Publication Number | Publication Date |
---|---|
WO2012116205A2 WO2012116205A2 (en) | 2012-08-30 |
WO2012116205A3 true WO2012116205A3 (en) | 2012-12-27 |
Family
ID=46395988
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/US2012/026355 WO2012116205A2 (en) | 2011-02-25 | 2012-02-23 | Queuing access to a shared power supply |
Country Status (11)
Country | Link |
---|---|
US (4) | US8219258B1 (en) |
EP (1) | EP2678750B1 (en) |
JP (1) | JP5957014B2 (en) |
KR (1) | KR20140024291A (en) |
CN (1) | CN103534661B (en) |
CA (1) | CA2828221C (en) |
IL (1) | IL228115A (en) |
MX (1) | MX2013009839A (en) |
RU (1) | RU2013142696A (en) |
WO (1) | WO2012116205A2 (en) |
ZA (1) | ZA201307183B (en) |
Families Citing this family (29)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7181317B2 (en) | 2003-12-02 | 2007-02-20 | Honeywell International Inc. | Controller interface with interview programming |
US20110046805A1 (en) | 2009-08-18 | 2011-02-24 | Honeywell International Inc. | Context-aware smart home energy manager |
US8626348B2 (en) * | 2010-11-18 | 2014-01-07 | Sears Brands, L.L.C. | Methods and systems for community energy management |
US8219258B1 (en) * | 2011-02-25 | 2012-07-10 | eCurv, Inc. | Queuing access to a shared power supply |
US20120330473A1 (en) * | 2011-06-24 | 2012-12-27 | Bobbie Jo Meredith | System and method for managing loads |
US9157764B2 (en) | 2011-07-27 | 2015-10-13 | Honeywell International Inc. | Devices, methods, and systems for occupancy detection |
US9115908B2 (en) | 2011-07-27 | 2015-08-25 | Honeywell International Inc. | Systems and methods for managing a programmable thermostat |
US9082141B2 (en) | 2011-10-27 | 2015-07-14 | General Electric Company | Systems and methods to implement demand response events |
US8972071B2 (en) | 2011-10-27 | 2015-03-03 | General Electric Company | Systems and methods to predict a reduction of energy consumption |
US9125010B2 (en) * | 2011-10-27 | 2015-09-01 | General Electric Company | Systems and methods to implement demand response events |
US20140324227A1 (en) | 2013-04-30 | 2014-10-30 | Honeywell International Inc. | Hvac controller having a fixed segment display with an interactive message center |
US9530169B2 (en) * | 2013-07-18 | 2016-12-27 | Honeywell International Inc. | Demand response automated load characterization systems and methods |
US10563876B2 (en) | 2013-11-22 | 2020-02-18 | Ademco Inc. | Setup routine to facilitate user setup of an HVAC controller |
US20150159904A1 (en) | 2013-12-11 | 2015-06-11 | Honeywell International Inc. | Rotary dial mechanism for a building automation controller |
CN105088170B (en) * | 2014-04-29 | 2018-03-09 | 北京北方华创微电子装备有限公司 | Processing chamber shares power source method and equipment |
US9685788B2 (en) * | 2014-05-21 | 2017-06-20 | Panasonic Intellectual Property Management Co., Ltd. | Electric power control method and electric power control device |
CN105762831B (en) * | 2014-12-18 | 2019-07-19 | 神华集团有限责任公司 | Energy network system |
US10619888B2 (en) * | 2016-03-02 | 2020-04-14 | Watlow Electric Manufacturing Company | Heater bundle for adaptive control and method of reducing current leakage |
US10247445B2 (en) * | 2016-03-02 | 2019-04-02 | Watlow Electric Manufacturing Company | Heater bundle for adaptive control |
US10302322B2 (en) | 2016-07-22 | 2019-05-28 | Ademco Inc. | Triage of initial schedule setup for an HVAC controller |
CN106712111B (en) * | 2017-01-23 | 2018-07-13 | 南京邮电大学 | The multiple-energy-source economic load dispatching method of multi-target fuzzy optimal under active power distribution network environment |
US11050377B2 (en) | 2017-10-30 | 2021-06-29 | Schlumberger Technology Corporation | Systems and methods for managing drive parameters after maintenance |
US10920562B2 (en) | 2017-11-01 | 2021-02-16 | Schlumberger Technology Corporation | Remote control and monitoring of engine control system |
CN108110829B (en) * | 2017-12-22 | 2021-07-27 | 南京邮电大学 | Charging management method, device and system |
US11264801B2 (en) | 2018-02-23 | 2022-03-01 | Schlumberger Technology Corporation | Load management algorithm for optimizing engine efficiency |
CN108964027B (en) * | 2018-07-02 | 2020-09-11 | 清华大学 | Power routing method and device based on electric energy router networking |
US11038351B2 (en) * | 2019-08-05 | 2021-06-15 | Haier Us Appliance Solutions, Inc. | System and method for power sharing between a plurality of electrical appliances on an alternating current circuit |
CN111049359B (en) * | 2019-12-27 | 2020-11-03 | 深圳市越疆科技有限公司 | Power control method and system |
US11803164B2 (en) | 2020-12-01 | 2023-10-31 | DemandQ, Inc. | Controlling power distribution serving an aggregate of electrical loads behind a meter |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4456788A (en) * | 1982-12-01 | 1984-06-26 | Gte Business Communication Systems Inc. | Telecommunication trunk circuit reporter and advisor |
US20050049758A1 (en) * | 1999-01-12 | 2005-03-03 | Amir Lehr | Method and apparatus for power management in a local area network |
US20100125376A1 (en) * | 2007-03-01 | 2010-05-20 | Daniel Flohr | Methods, systems, circuits, and computer program products for reducing peak electrical demand by shifting activation of electrical appliances |
US20110035073A1 (en) * | 2009-01-14 | 2011-02-10 | Integral Analytics, Inc. | Optimization of microgrid energy use and distribution |
Family Cites Families (46)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4023043A (en) * | 1974-08-16 | 1977-05-10 | Megatherm Corporation | Computerized peak-shaving system for alleviating electric utility peak loads |
US4090062A (en) | 1976-07-12 | 1978-05-16 | Phillips Control Corp. | Energy demand controller and method therefor |
US4136393A (en) | 1977-07-18 | 1979-01-23 | Westinghouse Electric Corp. | Method of power demand control with time dependent target |
US4208593A (en) | 1978-02-13 | 1980-06-17 | U.S. Energy Conservation Systems, Inc. | Method and system of selective disconnection of loads from a power source |
US4211933A (en) | 1978-05-26 | 1980-07-08 | Cyborex Laboratories, Inc. | Electrical load restoration method |
US4421992A (en) | 1981-12-04 | 1983-12-20 | Nuclear Systems, Inc. | Smart switch |
US5687139A (en) * | 1987-03-23 | 1997-11-11 | Budney; Stanley M. | Electrical load optimization device |
US4998024A (en) | 1988-04-01 | 1991-03-05 | Vaughn Manufacturing Corporation | Energy controlling system for time shifting electric power use |
US5414640A (en) | 1991-07-05 | 1995-05-09 | Johnson Service Company | Method and apparatus for adaptive demand limiting electric consumption through load shedding |
US5905616A (en) | 1998-06-01 | 1999-05-18 | Square D Company | Load selectivity system for use with electronic trip circuit breakers |
CN1364332A (en) | 1999-04-16 | 2002-08-14 | 曼宁超尼克斯有限公司 | Electrical peak load distributor |
US6119469A (en) | 1999-06-14 | 2000-09-19 | Spx Corporation | Programmable electronic start-up delay for refrigeration units |
US7142523B1 (en) * | 2000-07-31 | 2006-11-28 | Lucent Technologies Inc. | Methods and apparatus for design, adjustment or operation of wireless networks using pre-frequency-assignment optimization |
US6925066B1 (en) * | 2000-07-31 | 2005-08-02 | Lucent Technologies Inc. | Methods and apparatus for design, adjustment or operation of wireless networks using multi-stage optimization |
US7324876B2 (en) * | 2001-07-10 | 2008-01-29 | Yingco Electronic Inc. | System for remotely controlling energy distribution at local sites |
JP2003087969A (en) * | 2001-09-17 | 2003-03-20 | Mitsubishi Electric Corp | Power demand adjusting system |
US20030171851A1 (en) | 2002-03-08 | 2003-09-11 | Peter J. Brickfield | Automatic energy management and energy consumption reduction, especially in commercial and multi-building systems |
US7110832B2 (en) | 2002-03-22 | 2006-09-19 | Whirlpool Corporation | Energy management system for an appliance |
AU2003220520A1 (en) * | 2002-04-01 | 2003-10-20 | Battelle Memorial Institute | Energy management system |
US7454012B2 (en) * | 2002-04-29 | 2008-11-18 | Adc Dsl Systems, Inc. | Managing power in a line powered network element |
US20040075343A1 (en) | 2002-09-05 | 2004-04-22 | Paul Wareham | System and method for power load management |
US7860702B1 (en) * | 2002-09-18 | 2010-12-28 | Peter B. Evans | Assessing distributed energy resources for the energynet |
US6940272B2 (en) | 2002-10-10 | 2005-09-06 | Green Socket Ltd. | Electric socket control device |
US7870241B2 (en) * | 2002-11-27 | 2011-01-11 | International Business Machines Corporation | Automated power control policies based on application-specific redundancy characteristics |
ES2538484T3 (en) | 2003-01-21 | 2015-06-22 | Whirlpool Corporation | A process to manage and reduce the power demand of household appliances and their components, and the system that uses said process |
US7546475B2 (en) * | 2003-05-13 | 2009-06-09 | Hewlett-Packard Development Company, L.P. | Power-aware adaptation in a data center |
US7702424B2 (en) * | 2003-08-20 | 2010-04-20 | Cannon Technologies, Inc. | Utility load control management communications protocol |
GB2407440B (en) * | 2003-09-23 | 2006-02-22 | Responsiveload Ltd | Grid stabilising system |
US7644148B2 (en) * | 2005-05-16 | 2010-01-05 | Hewlett-Packard Development Company, L.P. | Historical data based workload allocation |
US7580775B2 (en) * | 2006-07-11 | 2009-08-25 | Regen Energy Inc. | Method and apparatus for implementing enablement state decision for energy consuming load based on demand and duty cycle of load |
JP2008146105A (en) * | 2006-12-05 | 2008-06-26 | Toshiba Corp | System, method and program for evaluating power transaction |
US20080170497A1 (en) * | 2007-01-11 | 2008-07-17 | Moo Ryong Jeong | Proactive Per-Class Load Management |
US7827813B2 (en) * | 2007-01-30 | 2010-11-09 | Johnson Controls Technology Company | Adaptive real-time optimization control |
JP2008295134A (en) * | 2007-05-22 | 2008-12-04 | Canon Inc | Electrical equipment, and power consumption control system, method, and program |
DE102007030451B4 (en) * | 2007-06-29 | 2013-07-18 | Diehl Ako Stiftung & Co. Kg | Power supply apparatus |
US8671294B2 (en) * | 2008-03-07 | 2014-03-11 | Raritan Americas, Inc. | Environmentally cognizant power management |
US8138627B2 (en) | 2008-06-27 | 2012-03-20 | Sharp Laboratories Of America, Inc. | Power management of network-connected devices in peak power periods |
AU2009308467A1 (en) * | 2008-10-21 | 2010-04-29 | Raritan Americas, Inc. | Methods of achieving cognizant power management |
JP5394085B2 (en) * | 2009-01-29 | 2014-01-22 | 株式会社インティ | Energy saving support system and energy saving support program |
JP2010213367A (en) * | 2009-03-06 | 2010-09-24 | Univ Of Tsukuba | Energy saving system using ubiquitous sensor and intelligent table tap |
US8159084B2 (en) | 2009-05-13 | 2012-04-17 | Briggs & Stratton Corporation | Power distribution device |
CN101610005A (en) * | 2009-07-08 | 2009-12-23 | 浙江中控电子技术有限公司 | A kind of electrical control method and system |
US8397088B1 (en) * | 2009-07-21 | 2013-03-12 | The Research Foundation Of State University Of New York | Apparatus and method for efficient estimation of the energy dissipation of processor based systems |
US8219258B1 (en) * | 2011-02-25 | 2012-07-10 | eCurv, Inc. | Queuing access to a shared power supply |
JP6193393B2 (en) * | 2012-12-28 | 2017-09-06 | インテル コーポレイション | Power optimization for distributed computing systems |
WO2015066048A1 (en) * | 2013-10-28 | 2015-05-07 | Virtual Power Systems, Inc. | Energy control via power requirement analysis and power source enablement |
-
2012
- 2012-02-22 US US13/402,283 patent/US8219258B1/en active Active
- 2012-02-23 RU RU2013142696/08A patent/RU2013142696A/en not_active Application Discontinuation
- 2012-02-23 WO PCT/US2012/026355 patent/WO2012116205A2/en active Application Filing
- 2012-02-23 CA CA2828221A patent/CA2828221C/en active Active
- 2012-02-23 KR KR1020137025252A patent/KR20140024291A/en active IP Right Grant
- 2012-02-23 CN CN201280019721.6A patent/CN103534661B/en not_active Expired - Fee Related
- 2012-02-23 JP JP2013555566A patent/JP5957014B2/en active Active
- 2012-02-23 EP EP12750287.0A patent/EP2678750B1/en active Active
- 2012-02-23 MX MX2013009839A patent/MX2013009839A/en active IP Right Grant
- 2012-07-09 US US13/543,942 patent/US8798802B2/en active Active
-
2013
- 2013-08-25 IL IL228115A patent/IL228115A/en active IP Right Grant
- 2013-09-25 ZA ZA2013/07183A patent/ZA201307183B/en unknown
-
2014
- 2014-08-04 US US14/450,598 patent/US9594363B2/en active Active
-
2017
- 2017-03-13 US US15/457,327 patent/US10474114B2/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4456788A (en) * | 1982-12-01 | 1984-06-26 | Gte Business Communication Systems Inc. | Telecommunication trunk circuit reporter and advisor |
US20050049758A1 (en) * | 1999-01-12 | 2005-03-03 | Amir Lehr | Method and apparatus for power management in a local area network |
US20100125376A1 (en) * | 2007-03-01 | 2010-05-20 | Daniel Flohr | Methods, systems, circuits, and computer program products for reducing peak electrical demand by shifting activation of electrical appliances |
US20110035073A1 (en) * | 2009-01-14 | 2011-02-10 | Integral Analytics, Inc. | Optimization of microgrid energy use and distribution |
Also Published As
Publication number | Publication date |
---|---|
MX2013009839A (en) | 2014-04-14 |
CA2828221C (en) | 2020-09-15 |
ZA201307183B (en) | 2015-07-29 |
IL228115A (en) | 2016-10-31 |
CA2828221A1 (en) | 2012-08-30 |
US9594363B2 (en) | 2017-03-14 |
EP2678750B1 (en) | 2018-05-02 |
US20140350744A1 (en) | 2014-11-27 |
CN103534661A (en) | 2014-01-22 |
US10474114B2 (en) | 2019-11-12 |
US8798802B2 (en) | 2014-08-05 |
EP2678750A4 (en) | 2017-03-29 |
US8219258B1 (en) | 2012-07-10 |
CN103534661B (en) | 2015-11-25 |
WO2012116205A2 (en) | 2012-08-30 |
KR20140024291A (en) | 2014-02-28 |
EP2678750A2 (en) | 2014-01-01 |
US20120277925A1 (en) | 2012-11-01 |
US20170277145A1 (en) | 2017-09-28 |
RU2013142696A (en) | 2015-03-27 |
JP2014514896A (en) | 2014-06-19 |
IL228115A0 (en) | 2013-09-30 |
JP5957014B2 (en) | 2016-07-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2012116205A3 (en) | Queuing access to a shared power supply | |
PH12017500553A1 (en) | Unified frame structure | |
WO2012097168A3 (en) | Unified access and management of events across multiple applications and associated contacts thereof | |
WO2013049326A3 (en) | Priority based application event control (paec) to reduce power consumption | |
WO2015057498A3 (en) | Managing conversations | |
ES2722408T3 (en) | A wind power plant, and a method to increase the reactive power capacity of a wind power plant | |
WO2012174391A3 (en) | Security measures for the smart grid | |
WO2013003159A3 (en) | Increasing power efficiency of turbo mode operation in a processor | |
WO2012135210A3 (en) | Location-based conversational understanding | |
WO2012054899A3 (en) | Secure content distribution | |
WO2011115984A3 (en) | Pluggable token provider model to implement authentication across multiple web services | |
WO2012161435A3 (en) | Social information management method and system adapted thereto | |
WO2012162060A3 (en) | Eye gaze to alter device behavior | |
WO2012025825A3 (en) | Method for feature activation of machine type communication and mtc device thereof | |
WO2012024165A3 (en) | Proactive arc management of a plasma load | |
WO2012024156A3 (en) | Dynamic place visibility in geo-social networking system | |
WO2014164839A3 (en) | Systems and methods of flexibility activating temporary attended delivery/pickup locations | |
MY167085A (en) | Providing adaptive demand response based on distributed load control | |
WO2012033839A3 (en) | Oxygen concentrator heat management system and method | |
WO2013106590A3 (en) | Cloud-based distributed data system | |
WO2014133522A3 (en) | Local message queue processing for co-located workers | |
GB2508542A (en) | Application switching in graphical operating system | |
WO2012087655A3 (en) | Computing platform with adaptive cache flush | |
WO2012012144A3 (en) | Systems and methods for implementing reduced power states | |
EP2590106A3 (en) | Security and safety manager implementation in a multi-core processor |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 12750287 Country of ref document: EP Kind code of ref document: A2 |
|
ENP | Entry into the national phase |
Ref document number: 2828221 Country of ref document: CA |
|
ENP | Entry into the national phase |
Ref document number: 2013555566 Country of ref document: JP Kind code of ref document: A |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
WWE | Wipo information: entry into national phase |
Ref document number: MX/A/2013/009839 Country of ref document: MX |
|
ENP | Entry into the national phase |
Ref document number: 2013142696 Country of ref document: RU Kind code of ref document: A Ref document number: 20137025252 Country of ref document: KR Kind code of ref document: A |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2012750287 Country of ref document: EP |
|
REG | Reference to national code |
Ref country code: BR Ref legal event code: B01A Ref document number: 112013027251 Country of ref document: BR |
|
ENP | Entry into the national phase |
Ref document number: 112013027251 Country of ref document: BR Kind code of ref document: A2 Effective date: 20130826 |