WO2009024096A1 - Resource management apparatus, method and system - Google Patents

Resource management apparatus, method and system Download PDF

Info

Publication number
WO2009024096A1
WO2009024096A1 PCT/CN2008/072096 CN2008072096W WO2009024096A1 WO 2009024096 A1 WO2009024096 A1 WO 2009024096A1 CN 2008072096 W CN2008072096 W CN 2008072096W WO 2009024096 A1 WO2009024096 A1 WO 2009024096A1
Authority
WO
WIPO (PCT)
Prior art keywords
resource
transmission
admission control
request
transmission resource
Prior art date
Application number
PCT/CN2008/072096
Other languages
French (fr)
Chinese (zh)
Inventor
Min Zha
Yong Huang
Original Assignee
Huawei Technologies Co., Ltd.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huawei Technologies Co., Ltd. filed Critical Huawei Technologies Co., Ltd.
Publication of WO2009024096A1 publication Critical patent/WO2009024096A1/en

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L47/00Traffic control in data switching networks
    • H04L47/70Admission control; Resource allocation
    • H04L47/82Miscellaneous aspects
    • H04L47/822Collecting or measuring resource availability data
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L47/00Traffic control in data switching networks
    • H04L47/70Admission control; Resource allocation
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L47/00Traffic control in data switching networks
    • H04L47/70Admission control; Resource allocation
    • H04L47/78Architectures of resource allocation
    • H04L47/781Centralised allocation of resources

Definitions

  • the present invention relates to the field of communication technologies, and in particular, to a resource management apparatus, a resource management method, and a system. Background technique
  • IPTV Internet Protocol TV
  • on-demand mode has the characteristics of real-time interaction, which can provide users with more personalized choices; the broadcast mode can provide various contents for the user to select, and the specific performance is that the user selects different channels and can receive different program contents.
  • the implementation of the on-demand mode uses unicast technology, and correspondingly, the unicast service can be carried out by on-demand.
  • the main practice of the unicast service is that the user equipment requests the unicast service from the network side, and the network side returns the corresponding data packet to the user equipment.
  • the broadcast mode is implemented by using the multicast technology, and correspondingly, the group can be developed through the broadcast. Broadcast business.
  • the so-called multicast requires the user equipment to join a multicast group. After the multicast source sends the data packet to the multicast group, the multicast group transmits the data packet to all user equipments in the multicast group.
  • the development of multicast technology has effectively improved the efficiency of data transmission and effectively reduced network congestion.
  • a converged network that combines unicast and multicast technologies, such as a triple play network, which can carry high-speed Internet access (HIS, High Speed). Internet), Voice over IP (VoIP, Voice over IP) and broadcast television (BTV, Broadcast Television) and other services.
  • VoIP Voice over IP
  • BTV Broadcast Television
  • RM Resource Manager
  • Management can include operations such as resource admission and resource reservation.
  • the RM responsible for resource management of unicast services is the Central Resource Manager (C-RM, Central RM).
  • C-RM Central Resource Manager
  • the transmission resource size report to be occupied by the unicast service will be carried out by the network side, such as a video on demand server (VOD Server, Video on Demand Server) or an IP Multimedia Subsystem (IMS).
  • VOD Server Video on Demand Server
  • IMS IP Multimedia Subsystem
  • the C-RM may perform resource admission control according to the current usage status of the transmission resource, that is, whether the current available transmission resource is sufficient, and if yes, accept the request.
  • the resource reservation processing is continued, and a corresponding size transmission resource is reserved for the unicast service; otherwise, the request may be rejected.
  • the triggering request for the reserved resource is initiated by the user-side terminal device, such as a set-top box, because of the channel switching operation of the user. Therefore, in order to achieve a fast switching effect between channels, a certain user experience is guaranteed.
  • the RM that manages the transmission resource of the multicast service cannot be too far away from the terminal device. Otherwise, there are too many intermediate devices between the terminal device and the RM, so that the signaling sent by the terminal device reaches the RM after a long time. Therefore, the user cannot receive the relevant program in time after switching the channel. Therefore, the transmission resources used to carry out the multicast service are usually managed by a distributed resource manager (D-RM, Distributed RM) that is closer to the terminal device.
  • D-RM distributed resource manager
  • FIG. 1 is a schematic structural diagram of a single multicast resource management system of an existing access network.
  • the network provider divides the user transmission resources in the access line proportionally, and manages some of the transmission resources by the D-RM, which is managed by the C-RM. Another part of the transmission resource.
  • the network side application function entity AF
  • the user equipment When the multicast service is carried out, the user equipment itself requests the D-RM for the transmission resource required for the multicast service, and after the D-RM accepts the request, reserves the requested transmission resource for the multicast service. .
  • the prior art solution can prevent the resources managed by the D-RM and the C-RM from being shared with each other, thereby avoiding resource conflicts.
  • the solution has the following disadvantages: The transmission resources available for the unicast service and the transmission resources available for the multicast service are separately managed, which is not conducive to making full use of the limited transmission resources.
  • FIG. 2 is a schematic structural diagram of another single multicast resource management system of an existing access network.
  • the prior art 2 shown in FIG. 2 is based on the same network architecture as the above-mentioned prior art, and the prior art 2 is directed to the resource conflict problem, and the solution is: unified management access by the access node (AN, Access Node)
  • the user in the line transmits resources.
  • the AN is the device used by the network to access the subscriber line.
  • DSLAM digital subscriber ring access device
  • the D-RM is set on the AN and is still responsible for managing the transmission resources of the multicast service.
  • the AF of the network side is required to request the C-RM, and then the C-RM requests the transmission resource from the AN.
  • the AN combines the current unicast service with the transmission resource, performs resource admission control on the C-RM request, and decides whether to accept the C-RM request.
  • the solution can uniformly utilize the AN to manage transmission resources, and can fully utilize Limited transmission resources.
  • the problem with this solution is that when the unicast service is launched, the required transmission resources need to be requested by the C-RM to the AN.
  • the performance requirements of the AN are high, and on the one hand, the AN and the C-RM resources are required.
  • the execution interface and the signaling interaction with the C-RM are complex. Summary of the invention
  • the embodiments of the present invention provide a resource management apparatus, a resource management method, and a system, which are used to solve the problem of transmission resource conflicts that may occur when a single multicast service is performed.
  • a resource management method including:
  • An embodiment of the present invention provides a resource management apparatus, including: a processing unit and a reporting unit;
  • a processing unit configured to perform resource admission control on the received resource request requesting the transmission resource, and obtain the usage status of the transmission resource after the resource admission control;
  • the reporting unit is configured to report the usage status of the resource admission control resource obtained by the obtaining unit to the central resource manager according to the preset reporting policy.
  • Embodiments of the present invention provide a resource management method, which manages transmission resources and solves resource conflicts.
  • a resource management method including:
  • the resource request for allocating the transmission resource to the received request is subjected to resource admission control.
  • the embodiment of the invention further provides a resource manager, including: an advertisement receiving unit, a second resource management unit; wherein
  • the notification receiving unit is configured to receive the usage status of the transmission resource after the resource admission control reported by the resource management device;
  • the second resource management unit performs resource admission control on the received resource request for allocating the transmission resource according to the usage status received by the notification receiving unit.
  • the embodiment of the present invention further provides a resource management system, including: a resource management device and a resource manager;
  • a resource management device including: a processing unit and a reporting unit; wherein,
  • a processing unit configured to perform resource admission control on a resource request that the received user equipment requires to occupy the transmission resource, and obtain a usage status of the transmission resource after the resource admission control;
  • the reporting unit is configured to report, to the central resource manager, the usage status of the resource admission control resource obtained by the obtaining unit according to the preset reporting policy;
  • the resource manager includes: an announcement receiving unit and a second resource management unit; wherein
  • the notification receiving unit is configured to receive the usage status of the transmission resource after the resource admission control reported by the resource management device;
  • the second resource management unit performs resource access control on the resource request for the allocated application function entity to allocate the transmission resource according to the usage status received by the notification receiving unit.
  • the first resource manager (such as D) may be used by the two resource managers.
  • - RM knowing the usage status of the transmission resource locally, and reporting the usage status of the transmission resource to the second resource manager (such as C-RM) in the two resource managers, and the second resource manager according to the received report
  • the usage status of the current transmission resource can be known, and when the resource request of the unicast service is subsequently processed, the resource admission control of the transmission resource requested by the unicast service can be performed according to the current usage status of the transmission resource.
  • the solution can solve the problem of transmission resource conflicts that may occur when a single multicast service is carried out, and the information exchange between the two resource managers only needs to increase the usage status of the transmission resources, and the implementation is simple.
  • FIG. 1 is a schematic structural diagram of a single multicast resource management system of an existing access network
  • FIG. 2 is a schematic structural diagram of another single multicast resource management system of an existing access network
  • FIG. 3 is a resource in an embodiment of the present invention
  • FIG. 4 is a schematic flowchart of a resource management method in an embodiment of the present invention
  • FIG. 5 is a flowchart of another resource management method in an embodiment of the present invention.
  • FIG. 6 is a flowchart of management of transmission resources by an AN in the first embodiment of the present invention
  • FIG. 7 is a flowchart of C-RM management transmission resources in Embodiment 2 of the present invention
  • FIG. 8 is a structure of a resource management apparatus according to an embodiment of the present invention
  • FIG. 9 is a schematic structural diagram of a resource manager in an embodiment of the present invention.
  • FIG. 10 is a schematic structural diagram of a resource management system according to an embodiment of the present invention. detailed description
  • the AN has the function of managing the transmission resource by the D-RM
  • the AN including the D-RM is used as a resource management device, referred to as a resource management device.
  • the C-RM is still used to manage the transmission resources required by the unicast service, and the C-RM reports the transmission resources required by the C-RM to the AN. Size; Use AN to manage the transmission resources required for multicast services.
  • the resource may be subjected to resource admission control by the AN for requesting to occupy the transmission resource, and then reported to the C-RM according to the preset reporting policy.
  • the resource accepts the usage status of the transmission resource after control, and thus, for the D-RM that manages the multicast service, it can be locally After the resource acceptance control is obtained, the usage status of the transmission resource is obtained.
  • the usage of the transmission resource can be known in time through the reporting of the AN, and then the C-RM can be based on the learned user.
  • the usage status of the transmission resource is used for resource admission control of the unicast service requested by the network side application function entity.
  • the transmission resource may be a user transmission resource in the access line, or may be a transmission resource that can be managed by the C-RM or the D-RM.
  • FIG. 3 is a schematic structural diagram of a resource management system according to an embodiment of the present invention.
  • the system may include: a UE, a D-RM, an AN, a C-RM, and an AF disposed on the AN.
  • FIG. 4 is a flowchart of a resource management method according to an embodiment of the present invention, where the process may include the following steps:
  • Step s401 The AN performs resource admission control on the received resource request requesting the transmission resource, and obtains the usage status of the transmission resource after the resource admission control.
  • Step s402 The AN reports the usage status of the resource admission control resource to the C-RM according to the preset reporting policy, so that after the C-RM learns the usage status, the transmission is allocated to the received request according to the usage status. Resource requests for resources are used for resource admission control.
  • the C-RM and the AN jointly manage the transmission resource, after the AN receives the request sent by the UE to carry out the multicast service and needs to occupy the transmission resource, the C-RM can learn the current transmission resource. The usage status of the transmission resource can be reported to the C-RM by the AN.
  • the reporting policy may be set in advance, for example, according to the control result of the resource admission control by the AN, after the resource request is accepted or rejected, the usage status of the resource after the resource admission control is reported to the C-RM; or After the resource request is accepted, the usage status of the transmission resource after the resource admission control is reported to the C-RM; the report may be periodically reported.
  • the reporting policy can also be set according to actual conditions.
  • the usage status of the transmission resource after the resource admission control may include: a size change condition of the idle transmission resource or the occupied transmission resource after the resource admission control, or a size of the idle transmission resource after the resource admission control, or a transmission occupied after the resource admission control The size of the resource.
  • the use of the transmission resource after the resource admission control is obtained The method may be: calculating the amount of change of the idle transmission resource or the occupied transmission resource after the resource admission control, or calculating the size of the idle transmission resource after the resource admission control, or calculating the size of the transmission resource occupied after the resource admission control; Record the usage status of the transmission resource locally.
  • FIG. 5 is a flowchart of another resource management method in an embodiment of the present invention, where the process may include the following steps:
  • Step s501 The C-RM receives the usage status of the transmission resource after the resource admission control reported by the AN.
  • Step s502 The C-RM performs resource admission control on the received resource request for allocating the transmission resource according to the usage status.
  • the C-RM can receive the usage status of the transmission resource reported by the AN, and further, the C-RM can perform admission control on the transmission resource that may be occupied by the unicast service based on the usage status, if the unicast If the transmission resource requested by the service is larger than the size of the idle resource in the current transmission resource, the request may be rejected, and conversely, the request may be accepted.
  • the usage status of the transmission resource may be: the size of the idle transmission resource or the occupied transmission resource, or the size of the idle transmission resource, or the size of the occupied transmission resource.
  • the transmission resource that can be managed by the AN or the C-RM by default is the entire transmission resource. After the user side first requests the transmission resource, and the AN accepts the resource request of the user side, the transmission resource that can be managed by the D-RM and the C-RM is deducted from the transmission resource occupied by the user side for performing the multicast service. The remaining free resources.
  • the AN can record the usage of each transmission locally, so that D-RM or C-RM can accurately and timely know the usage status of the current transmission resources.
  • Embodiment 1 is a diagrammatic representation of Embodiment 1:
  • FIG. 6 is a management flow of an AN to a transmission resource according to Embodiment 1 of the present invention. Cheng Tu.
  • the process can include the following steps:
  • Step s601 The UE initiates a request to the AN to join the multicast group in the AN, and requests to occupy the transmission resource.
  • the request may be an IGMP protocol, and the AN obtains a required transmission resource corresponding to the multicast group by using a pre-configuration.
  • the request may also be a high-level signaling, such as a session initiation protocol (SIP, Session Initiation Protocol).
  • SIP session initiation protocol
  • Session Initiation Protocol Session Initiation Protocol
  • the information of the transmission resource required by the multicast service can be carried in the session description protocol (SDP) of the SIP bearer.
  • SDP session description protocol
  • Step s602 After receiving the resource request for the transmission resource, the D-RM in the AN obtains the current usage status of the transmission resource, and performs resource admission control on the transmission resource required for the UE to perform the multicast service.
  • the D-RM may obtain, according to the usage status of the transmission resource in the current access line, how many idle transmission resources are available in the transmission resource; compare the size of the idle transmission resource with the transmission resource requested by the UE. If the former is greater than or equal to the latter, it is determined that the resource request can be accepted, and the transmission resource occupied by the UE is deducted from the current idle resource; otherwise, the resource request may be rejected, in which case the current idle transmission may not be changed. The size of the resource.
  • the AN can obtain the usage status of the transmission resource after the resource admission control is obtained locally. In the first embodiment, it is assumed that the available transmission resources are sufficient, and the AN accepts the resource request.
  • the usage status can be known from the local D-RM through the internal interface between the AN and the D-RM.
  • Step s603 The D-RM reserves the requested transmission resource for the multicast service, and then the AN performs a multicast replication operation, that is, uses the transmission resource to transmit the media stream to the UE.
  • Step s604 The D-RM calculates the size of the idle transmission resource in the transmission resource after the resource admission control, and reports the usage status of the transmission resource after the current resource admission control to the C-RM, and the process may end.
  • the size of the resource or may be the size of the transmission resource that has been occupied, or may be the amount of change of the idle transmission resource compared to the previous resource admission control, etc. Wait.
  • step s603 the execution order between step s603 and step s604 is adjustable.
  • Embodiment 2 the execution order between step s603 and step s604 is adjustable.
  • FIG. 7 is a flow chart of C-RM management transmission resources in Embodiment 2 of the present invention.
  • the process can include the following steps:
  • Step s701 The AF sends a resource request to the C-RM to allocate a transmission resource for the unicast service.
  • Step s702 The C-RM performs resource admission control on the request of the AF according to the learned usage status of the current transmission resource.
  • C-RM can be learned in the following two ways:
  • the C-RM can learn the size of the idle resources in the current transmission resource according to the reporting.
  • the other may be that the C-RM can be known according to the usage status of the locally recorded transmission resources, and the processing can be similar to the existing related processing, and will not be described again.
  • the C-RM calculates the size of the current idle transmission resource according to the usage status of the transmission resource reported by the AN, that is, the transmission resource that can be managed by the C-RM is not the entire transmission resource, but deducts the transmission resource occupied by the multicast service. , the remaining idle transmission resources.
  • the C-RM may obtain the size of the transmission resource requested by the AF according to the unicast service related information carried in the request of the AF, and compare the idle transmission resource with the size of the transmission resource requested by the AF, if the former is greater than or equal to The latter accepts the resource request sent by the AF; otherwise, it rejects the resource request sent by the AF.
  • the resource request sent by the AF is accepted.
  • Step s703 After receiving the resource request, the C-RM sends an installation command to the AN requesting the AN to install the accepted transmission resource on the AN.
  • Step s704 After receiving the installation command of the C-RM, the AN requests the installed transmission resource according to the current usage status of the current transmission resource recorded by the AN. The source performs resource conflict detection. If the check passes, the transmission resource is installed; otherwise, the installation command is rejected.
  • the AN can calculate the size of the current idle transmission resource according to the current usage status of the transmission resource, and then compare the size of the current idle transmission resource with the size of the transmission resource required to be installed by the C-RM, if the former is greater than or If the latter is equal to the latter, the C-RM installation command is accepted, and the transmission resource accepted by the C-RM is installed on the AN, that is, the installation is successful, and the transmission resource to be installed is deducted from the idle resources existing before the installation is performed; otherwise , rejects the C-RM installation command, and thus does not change the size of the idle transmission resources that exist when the installation is refused.
  • the AN can know the usage status of the transmission resource at this time according to the control result, and the local D-RM can learn the usage status through the internal interface.
  • the AN receives the installation command of the C-RM before the step s602, and if the AN accepts the installation command, in step s602, when the D-RM performs the resource admission control, the obtained In the usage status of the transmission resource, the transmission resource available for D-RM management is an idle resource after deducting the transmission resource accepted by the C-RM.
  • Step s705 The AN sends the result of the installation to the C-RM through a response message corresponding to the installation command.
  • the result of the installation can be a successful installation or an installation failure. If the installation fails, it indicates that the transmission resource requested by the AF for performing the unicast service conflicts with the transmission resource of the user requesting the UE to perform the multicast service.
  • Step s706 After receiving the response message sent by the AN, the C-RM reserves the requested transmission resource for the unicast service if the installation is successful; otherwise, the resource request sent by the AF is further rejected, that is, the unicast service is not unicast. The transmission resource requested by the reservation is reserved. The unicast service fails to be deployed, and the C-RM sends a response message to the AF.
  • the C-RM can learn the usage status of the transmission resource by using the foregoing response message; if the installation is successful, the AN does not need to actively report the usage status of the transmission resource, and the C-RM receives the response message of the installation success. After being unicast The transmission resource occupied by the service is deducted from the idle resource in the locally recorded transmission resource, thereby enabling the C-RM to locally obtain the usage status of the transmission resource in the access line.
  • the C-RM will perform resource admission control according to the usage status of the transmission resource that is known at the time, and if the idle transmission resource is sufficient at the time, the C-RM accepts the resource request; If the usage status of the actual transmission resource changes, the AN returns the installation failure response to the C-RM.
  • the C-RM can know that the usage status of the current transmission resource may have changed, and the change may have the D-RM receiving user side.
  • the resource request is caused by the D-RM, and the D-RM will report the usage status of the changed transmission resource.
  • the C-RM will update the local record according to the usage status of the received transmission resource, and the subsequent record can be performed according to the updated record. Resource admission control.
  • the D-RM can also report the current transmission resource usage status to the C-RM.
  • the embodiment of the present invention further provides a resource management apparatus, which is used to manage transmission resources required for performing a multicast service, and may be an AN including a D-RM.
  • a resource management apparatus which is used to manage transmission resources required for performing a multicast service, and may be an AN including a D-RM.
  • FIG. 8 is a schematic structural diagram of the resource management apparatus, where the resource management apparatus may include: a processing unit 810 and an upper unit 820;
  • the processing unit 810 is configured to perform resource admission control on the received resource request requesting the transmission resource, and obtain the usage status of the transmission resource after the resource admission control;
  • the reporting unit 820 is configured to report the usage status of the transmission resource after the resource admission control obtained by the obtaining unit to the central resource manager according to the preset reporting policy.
  • the processing unit 810 may include: a first resource management unit 811, an obtaining unit 812;
  • the first resource management unit 811 is configured to perform resource admission control on the received resource request for occupying the transmission resource
  • the obtaining unit 812 is configured to obtain, after the first resource management unit 811 performs resource admission control, the usage status of the transmission resource after the resource admission control.
  • the obtaining unit 812 may include: a calculating unit 8121 and a recording unit 8122; wherein The calculating unit 8121 is configured to calculate a size change of the idle transmission resource or the occupied transmission resource after the resource admission control, or calculate a size of the idle transmission resource after the resource admission control, or calculate a size of the transmission resource that is occupied after the resource admission control;
  • the recording unit 8122 is configured to locally record the calculation result of the computing unit.
  • the first resource management unit may include: a first calculating unit 8111, a first receiving unit 8112;
  • the first calculating unit 8111 is configured to calculate a size of the current idle transmission resource.
  • the first receiving unit 8112 is configured to compare the size of the transmission resource occupied by the request with the size of the idle resource. If the former is less than or equal to the latter, the resource request is accepted. ; Otherwise, the resource request is denied.
  • the above processing unit 810 and upper unit 820 may be disposed on the D-RM.
  • the resource management device may further include:
  • the resource processing unit 830 is configured to: according to the admission result of the first resource management unit 811, that is, if the admission result of the first resource management unit 811 is an admission resource request, the resource processing unit 830 deducts the occupied transmission resource from the current idle resource. Or, if the first resource management unit 811 accepts the result as rejecting the resource request, the resource processing unit 830 does not change the size of the current idle transmission resource.
  • the resource management device may further include:
  • the installation processing unit 840 is configured to receive an installation command sent by the C-RM to request the installation of the transmission resource accepted by the C-RM; perform resource conflict detection on the transmission resource required to be installed in the installation command, and if the check passes, install The transmission resource; otherwise, returning a response to the C-RM rejecting the installation command;
  • the resource processing unit 830 is further operable to, according to the installation result of the installation processing unit 840, that is, if the installation result of the installation processing unit 840 is to install the transmission resource, the resource processing unit 830 will install the transmission resource from the idle resource existing before the installation is performed. Or deducted; or, if the installation result of the installation processing unit 840 is a rejection of the installation command, the installation processing unit 840 does not change the size of the idle transmission resource that exists when the installation is refused.
  • the resource processing unit 830 and the installation processing unit 840 described above may be disposed on the AN.
  • the embodiment of the present invention further provides a resource manager, which may be a C-RM in the foregoing embodiment of the present invention, for managing a transmission resource required for performing a unicast service.
  • a resource manager which may be a C-RM in the foregoing embodiment of the present invention, for managing a transmission resource required for performing a unicast service.
  • FIG. 9 is a schematic structural diagram of the resource manager, where the resource manager may include: an advertisement receiving unit 910, a second resource management unit 920, where the advertisement receiving unit 910 is configured to receive resources reported by the resource management apparatus. Acceptance of the use of transmission resources after control;
  • the second resource management unit 920 performs resource admission control on the received resource request for allocating transmission resources according to the usage status received by the advertisement receiving unit 910.
  • the second resource management unit 920 may include: a second calculating unit 921 and a second receiving unit 922;
  • the second calculating unit 921 is configured to calculate a size of the current idle resource according to the usage status received by the notification receiving unit 910;
  • the second receiving unit 922 is configured to compare the transmission resource required to be allocated with the size of the idle resource calculated by the computing unit, and if the former is less than or equal to the latter, accept the resource request; otherwise, reject the resource request.
  • the resource manager may further include: a control unit 930, a response processing unit 940; wherein
  • the control unit 930 is configured to: after the second receiving unit 922 receives the resource request, send an installation command for installing the accepted transmission resource to the resource management device; and the response processing unit 940 is configured to receive the corresponding response sent by the resource management device. Responding to the installation command, if the response is successful, reserving the installed transmission resource, such as recording the installed transmission resource as used; otherwise, requesting the sender of the resource, such as AF, returning the rejection The response to the resource request.
  • the embodiment of the present invention further provides a resource management system.
  • the structure of the system can be seen in FIG. 10 , and the implementation diagram of the system can participate in FIG. 3 .
  • the system may include the resource management device 1001 shown in FIG. 8 above and the resource manager 1002 shown in FIG. 9, and a UE 1003 for transmitting a resource request requesting to occupy a transmission resource, and a resource request for transmitting a request to allocate a transmission resource.
  • AF1004 the D-RM can obtain the usage status of the transmission resource locally, and The usage status of the transmission resource is reported to the C-RM.
  • the C-RM can know the usage status of the current transmission resource, and then, according to the resource usage request of the current transmission resource, when the resource request of the unicast service is subsequently processed. Resource admission control for the transmission resources requested by the unicast service. Moreover, in the case of not dividing the user's transmission resources, the unicast service and the multicast service share the transmission resources of the user, the C-RM is still used to manage the transmission resources required for the unicast service, and the D-RM is used to manage the multicast service. The required transmission resources, correspondingly reduce the performance requirements for the AN containing D-RM.
  • the technical solution of the embodiment of the present invention can solve the problem of transmission resource conflict that may occur when a single multicast service is performed.
  • the C-RM management process for the transmission resources required for the unicast service can be implemented based on the existing unicast resource admission process, and thus the implementation is simple.
  • the transmission resources required for the multicast service are still managed by the D-RM set on the AN, so that the channel can be quickly switched.
  • no additional requirements are imposed on the AN, and therefore, the implementation of the AN is simple.
  • the resource request for occupying the transmission resource is a resource request received on the D-RM
  • the resource request for allocating the transmission resource is a resource request received on the C-RM.
  • a resource request may be any one of a resource request of a multicast service and a resource request of a unicast service.
  • the present invention can be implemented by means of software plus a necessary general hardware platform, and of course, can also be through hardware, but in many cases, the former is a better implementation. the way.
  • the technical solution of the present invention which is essential or contributes to the prior art, may be embodied in the form of a software product stored in a storage medium, including a plurality of instructions for making a
  • a computer device which may be a personal computer, server, or network device, etc.
  • the above is only the process and method embodiments of the embodiments of the present invention, and is not intended to limit the embodiments of the present invention. Any modifications, equivalents, improvements, etc., which are made within the spirit and principles of the embodiments of the present invention, are It should be included in the scope of protection of the embodiments of the present invention.

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Data Exchanges In Wide-Area Networks (AREA)
  • Telephonic Communication Services (AREA)

Abstract

A resource management method, includes: implementing resource admission control over the received request for occupying the transmission resources, and acquiring the transmission resource use condition after resource admission control; according to the pre-set report strategy, reporting the use condition to the center resource manager, which implements resource admission control over the received request for distributing the transmission resource according to the use condition.

Description

资源管理装置、 资源管理方法及系统 本申请要求于 2007年 8月 22日提交中国专利局、 申请号为 200710145111.1、发明名称为 "资源管理装置、 资源管理方法及系统" 的中国专利申请的优先权, 其全部内容通过引用结合在本申请中。 技术领域  Resource management device, resource management method and system The present application claims priority to a Chinese patent application filed on August 22, 2007 by the Chinese Patent Office, application number 200710145111.1, and the invention titled "resource management device, resource management method and system" The entire contents of which are incorporated herein by reference. Technical field
本发明涉及通信技术领域, 尤其涉及资源管理装置、 资源管理方 法及系统。 背景技术  The present invention relates to the field of communication technologies, and in particular, to a resource management apparatus, a resource management method, and a system. Background technique
宽带用户对多媒体相关需求的提升以及网络通信技术的不断 发展, 推动了因特网协议电视(IPTV, Internet Protocol TV ) 的产 生与发展。 IPTV技术中, IPTV媒体流的传输方式主要有两种, 分 别是点播和广播。 其中点播方式具有实时交互的特点, 可为用户 提供更具个性化的选择; 广播方式可提供多样的内容供用户选择, 其具体表现为用户选择不同的频道, 可接收到不同的节目内容。  The increasing demand for multimedia related to broadband users and the continuous development of network communication technologies have promoted the development and development of Internet Protocol TV (IPTV). In the IPTV technology, there are mainly two ways to transmit IPTV media streams, which are on-demand and broadcast. The on-demand mode has the characteristics of real-time interaction, which can provide users with more personalized choices; the broadcast mode can provide various contents for the user to select, and the specific performance is that the user selects different channels and can receive different program contents.
点播方式的实现釆用单播技术, 相应地, 通过点播可开展单 播业务。 开展单播业务的主要做法是, 用户设备向网络侧请求开 展单播业务, 由网络侧向用户设备返回相应的数据包; 广播方式 的实现釆用组播技术, 相应地, 通过广播可开展组播业务。 所谓 组播即要求用户设备先加入一个组播组, 在组播源将数据包发送 到组播组后, 通过该组播组将数据包传输给组播组内的所有用户 设备。 组播技术的发展有效提高了数据的传输效率, 且有效地减 少网络拥塞。  The implementation of the on-demand mode uses unicast technology, and correspondingly, the unicast service can be carried out by on-demand. The main practice of the unicast service is that the user equipment requests the unicast service from the network side, and the network side returns the corresponding data packet to the user equipment. The broadcast mode is implemented by using the multicast technology, and correspondingly, the group can be developed through the broadcast. Broadcast business. The so-called multicast requires the user equipment to join a multicast group. After the multicast source sends the data packet to the multicast group, the multicast group transmits the data packet to all user equipments in the multicast group. The development of multicast technology has effectively improved the efficiency of data transmission and effectively reduced network congestion.
基于单播与组播各自的优点, 运营商通常釆用融合单播与组 播技术的融合网络, 如三网合一 (Triple play ) 网络, 该类融合网 络能够承载高速上网 ( HIS , High Speed Internet ) 、 IP语音 ( VoIP, Voice over IP ) 与广播电视 ( BTV, Broadcast Television )等业务。 上述单组播共享接入线路中的传输资源的融合网络中, 在实现 IPTV时, 通常釆用资源管理器 (RM, Resource Manager ) 来管理 开展单播或组播业务所需的传输资源, 具体的管理可包括资源接 纳与资源预留等操作。 Based on the advantages of unicast and multicast, operators usually use a converged network that combines unicast and multicast technologies, such as a triple play network, which can carry high-speed Internet access (HIS, High Speed). Internet), Voice over IP (VoIP, Voice over IP) and broadcast television (BTV, Broadcast Television) and other services. In the converged network of the transmission resources in the single multicast shared access line, when the IPTV is implemented, the resource manager (RM, Resource Manager) is usually used to manage the transmission resources required for the unicast or multicast service. Management can include operations such as resource admission and resource reservation.
如负责单播业务的资源管理的 RM是中心资源管理器( C -RM , Central RM ) 。 在开展单播业务时, 由网络侧, 如视频点播服务器 ( VOD Server, Video on Demand Server ) 或 IP 多媒体子系统 ( IMS , IP Multimedia Subsystem ) 等将开展该单播业务所要占用 的传输资源大小报告给 C-RM, 向 C-RM请求该传输资源; C-RM 收到请求后, 可根据当前传输资源的使用状况, 进行资源接纳控 制, 即算出当前可用传输资源是否足够, 若足够则接受请求, 继 续进行资源预留处理, 为该单播业务预留相应大小的传输资源; 否则, 可拒绝该请求。  For example, the RM responsible for resource management of unicast services is the Central Resource Manager (C-RM, Central RM). When the unicast service is started, the transmission resource size report to be occupied by the unicast service will be carried out by the network side, such as a video on demand server (VOD Server, Video on Demand Server) or an IP Multimedia Subsystem (IMS). To the C-RM, requesting the transmission resource from the C-RM; after receiving the request, the C-RM may perform resource admission control according to the current usage status of the transmission resource, that is, whether the current available transmission resource is sufficient, and if yes, accept the request. The resource reservation processing is continued, and a corresponding size transmission resource is reserved for the unicast service; otherwise, the request may be rejected.
对于组播业务的实现, 由于其涉及用户的频道切换操作, 预 留资源的触发请求由用户侧的终端设备, 如机顶盒发起, 因此, 为达到频道间快速切换的效果, 以保证一定的用户体验, 要求管 理组播业务的传输资源的 RM 不能够离该终端设备太远, 否则会 因终端设备与 RM 间存在过多的中间设备, 使得终端设备发送的 信令很长一段时间之后才到达 RM, 而导致用户在切换频道后, 不 能及时收看到相关节目。 因此, 用于开展组播业务的传输资源通 常由离终端设备较近的分布式资源管理器( D-RM , Distributed RM ) 来管理。  For the implementation of the multicast service, the triggering request for the reserved resource is initiated by the user-side terminal device, such as a set-top box, because of the channel switching operation of the user. Therefore, in order to achieve a fast switching effect between channels, a certain user experience is guaranteed. The RM that manages the transmission resource of the multicast service cannot be too far away from the terminal device. Otherwise, there are too many intermediate devices between the terminal device and the RM, so that the signaling sent by the terminal device reaches the RM after a long time. Therefore, the user cannot receive the relevant program in time after switching the channel. Therefore, the transmission resources used to carry out the multicast service are usually managed by a distributed resource manager (D-RM, Distributed RM) that is closer to the terminal device.
在单播业务与组播业务共享传输资源的融合网络中, 由于存 在 D-RM与 C-RM两个资源管理器, 而网络侧提供给一个用户的 传输资源有限, 即每一个用户通过一根用户接入线路连接至网络, 该接入线路中的传输资源需要同时承载单播与组播业务, 并需要 充分共享以最大限度利用传输资源。 在使用 D-RM与 C-RM共同 管理传输资源时, 在开展单播与组播业务时, 可能出现因其中一 项业务占用传输资源过多, 而另一方因未知用户传输资源的使用 状况, 仍然要求对应的资源管理器预留资源, 从而导致资源预留 失败的情况发生, 即 D-RM与 C-RM在分别预留两种业务共享的 资源时, 可能会发生资源预留的冲突问题, 可简称该问题为资源 冲突问题。 In a converged network where unicast services and multicast services share transmission resources, there are two resource managers of D-RM and C-RM, and the transmission resources provided to one user by the network side are limited, that is, each user passes one The user access line is connected to the network, and the transmission resources in the access line need to carry both unicast and multicast services, and need to be fully shared to maximize the use of transmission resources. When using D-RM and C-RM to jointly manage transmission resources, one of them may occur when performing unicast and multicast services. The item service occupies too many transmission resources, and the other party still requires the corresponding resource manager to reserve resources due to the usage status of the unknown user transmission resource, which causes the resource reservation to fail, that is, D-RM and C-RM are in the situation. When the resources shared by the two services are reserved separately, the resource reservation conflict may occur. The problem may be referred to as a resource conflict.
参见图 1 , 图 1是现有接入网的一种单组播资源管理系统结构 示意图。 为解决上述资源冲突问题, 现有技术一给出的解决方案 是: 网络提供商将接入线路中的用户传输资源按比例划分开, 由 D-RM管理其中一部分传输资源, 由 C-RM管理另一部分传输资 源。 在开展单播业务时, 由网络侧应用功能实体 (AF ) 向 C-RM 请求开展单播业务所需的传输资源, 在 C-RM接纳该请求后, 为 该单播业务预留所请求的传输资源; 在开展组播业务时, 由用户 设备自身向 D-RM请求开展组播业务所需的传输资源, 在 D-RM 接纳该请求后, 为该组播业务预留所请求的传输资源。 现有技术 一的解决方案可使 D-RM与 C-RM各自管理的资源互不共享, 也 因此可避免出现资源冲突问题。 但该解决方案存在的不足之处在 于: 单播业务可用的传输资源与组播业务可用的传输资源被单独 管理, 不利于充分利用有限的传输资源。  Referring to FIG. 1, FIG. 1 is a schematic structural diagram of a single multicast resource management system of an existing access network. In order to solve the above resource conflict problem, the solution proposed in the prior art is: the network provider divides the user transmission resources in the access line proportionally, and manages some of the transmission resources by the D-RM, which is managed by the C-RM. Another part of the transmission resource. When the unicast service is carried out, the network side application function entity (AF) requests the C-RM to transmit the transmission resource required for the unicast service, and after the C-RM accepts the request, reserves the requested request for the unicast service. When the multicast service is carried out, the user equipment itself requests the D-RM for the transmission resource required for the multicast service, and after the D-RM accepts the request, reserves the requested transmission resource for the multicast service. . The prior art solution can prevent the resources managed by the D-RM and the C-RM from being shared with each other, thereby avoiding resource conflicts. However, the solution has the following disadvantages: The transmission resources available for the unicast service and the transmission resources available for the multicast service are separately managed, which is not conducive to making full use of the limited transmission resources.
参见图 2 , 图 2是现有接入网的另一种单组播资源管理系统结 构示意图。 图 2 所示现有技术二与上述现有技术一基于相同的网 络架构, 现有技术二针对资源冲突问题, 给出的解决方案是: 由 接入节点 (AN, Access Node )统一管理接入线路中的用户传输资 源,该 AN是网络用于接入用户线路的设备,对于固定接入网来说, 即指数字用户环线接入设备, 简称 DSLAM。 其中, D-RM设置于 AN上, 仍负责管理组播业务的传输资源, 对于单播业务的传输资 源, 需要网络侧的 AF向 C-RM请求 , 然后由 C-RM向 AN请求传 输资源; AN结合当前单播业务使用传输资源的情况, 对 C-RM的 请求进行资源接纳控制, 判决是否接纳 C-RM 的请求。 该解决方 案相比于现有技术一,通过 AN统一管理传输资源, 可充分利用有 限的传输资源。 但该解决方案存在的问题是开展单播业务时, 其 所需传输资源需要通过 C-RM向 AN请求,一方面对 AN的性能要 求较高, 一方面由于 AN还要与 C-RM的资源执行接口, 与 C-RM 间的信令交互复杂。 发明内容 Referring to FIG. 2, FIG. 2 is a schematic structural diagram of another single multicast resource management system of an existing access network. The prior art 2 shown in FIG. 2 is based on the same network architecture as the above-mentioned prior art, and the prior art 2 is directed to the resource conflict problem, and the solution is: unified management access by the access node (AN, Access Node) The user in the line transmits resources. The AN is the device used by the network to access the subscriber line. For the fixed access network, it refers to the digital subscriber ring access device, referred to as DSLAM. The D-RM is set on the AN and is still responsible for managing the transmission resources of the multicast service. For the transmission resource of the unicast service, the AF of the network side is required to request the C-RM, and then the C-RM requests the transmission resource from the AN. The AN combines the current unicast service with the transmission resource, performs resource admission control on the C-RM request, and decides whether to accept the C-RM request. Compared with the prior art, the solution can uniformly utilize the AN to manage transmission resources, and can fully utilize Limited transmission resources. However, the problem with this solution is that when the unicast service is launched, the required transmission resources need to be requested by the C-RM to the AN. On the one hand, the performance requirements of the AN are high, and on the one hand, the AN and the C-RM resources are required. The execution interface and the signaling interaction with the C-RM are complex. Summary of the invention
本发明实施例提供一种资源管理装置、 资源管理方法及系统, 用于解决开展单组播业务时可能发生的传输资源冲突问题。  The embodiments of the present invention provide a resource management apparatus, a resource management method, and a system, which are used to solve the problem of transmission resource conflicts that may occur when a single multicast service is performed.
一种资源管理方法, 包括:  A resource management method, including:
对接收到的要求占用传输资源的资源请求做资源接纳控制, 获取资源接纳控制后传输资源的使用状况;  Performing resource admission control on the received resource request requesting the transmission resource, and obtaining the usage status of the transmission resource after the resource admission control;
根据预先设置的上报策略, 将所述使用状况上报给中心资源 管理器, 使得所述中心资源管理器获知该使用状况后, 根据所述 使用状况, 对接收到的要求分配传输资源的资源请求做资源接纳 控制。  And reporting the usage status to the central resource manager according to the preset reporting policy, so that after the central resource manager knows the usage status, according to the usage status, the resource request for allocating the transmission resource to the received request is performed. Resource admission control.
本发明实施例提供一种资源管理装置, 包括: 处理单元和上 报单元; 其中,  An embodiment of the present invention provides a resource management apparatus, including: a processing unit and a reporting unit;
处理单元, 用于对接收到的要求占用传输资源的资源请求做 资源接纳控制, 获取资源接纳控制后传输资源的使用状况;  a processing unit, configured to perform resource admission control on the received resource request requesting the transmission resource, and obtain the usage status of the transmission resource after the resource admission control;
上报单元, 用于根据预先设置的上报策略, 将获取单元获取 到的资源接纳控制后传输资源的使用状况上报给中心资源管理 器。  The reporting unit is configured to report the usage status of the resource admission control resource obtained by the obtaining unit to the central resource manager according to the preset reporting policy.
本发明实施例提供一种资源管理方法, 管理传输资源, 解决 资源冲突问题。  Embodiments of the present invention provide a resource management method, which manages transmission resources and solves resource conflicts.
一种资源管理方法, 包括:  A resource management method, including:
接收资源管理装置上报的传输资源的使用状况;  Receiving a usage status of the transmission resource reported by the resource management device;
根据所述使用状况, 对接收到的要求分配传输资源的资源请 求做资源接纳控制。  According to the usage status, the resource request for allocating the transmission resource to the received request is subjected to resource admission control.
本发明实施例还提供一种资源管理器, 包括: 通告接收单元、 第二资源管理单元; 其中, The embodiment of the invention further provides a resource manager, including: an advertisement receiving unit, a second resource management unit; wherein
通告接收单元, 用于接收资源管理装置上报的资源接纳控制 后传输资源的使用状况;  The notification receiving unit is configured to receive the usage status of the transmission resource after the resource admission control reported by the resource management device;
第二资源管理单元, 根据通告接收单元收到的所述使用状况, 对接收到的要求分配传输资源的资源请求做资源接纳控制。  The second resource management unit performs resource admission control on the received resource request for allocating the transmission resource according to the usage status received by the notification receiving unit.
本发明实施例还提供一种资源管理系统, 包括, 资源管理装 置和资源管理器; 其中,  The embodiment of the present invention further provides a resource management system, including: a resource management device and a resource manager;
资源管理装置, 包括: 处理单元和上报单元; 其中,  a resource management device, including: a processing unit and a reporting unit; wherein,
处理单元, 用于对接收到的用户设备要求占用传输资源的资 源请求做资源接纳控制, 获取资源接纳控制后传输资源的使用状 况;  a processing unit, configured to perform resource admission control on a resource request that the received user equipment requires to occupy the transmission resource, and obtain a usage status of the transmission resource after the resource admission control;
上报单元, 用于根据预先设置的上报策略, 将获取单元获取 到的资源接纳控制后传输资源的使用状况上报给中心资源管理 器;  The reporting unit is configured to report, to the central resource manager, the usage status of the resource admission control resource obtained by the obtaining unit according to the preset reporting policy;
资源管理器, 包括: 通告接收单元、 第二资源管理单元; 其 中,  The resource manager includes: an announcement receiving unit and a second resource management unit; wherein
通告接收单元, 用于接收资源管理装置上报的资源接纳控制 后传输资源的使用状况;  The notification receiving unit is configured to receive the usage status of the transmission resource after the resource admission control reported by the resource management device;
第二资源管理单元, 根据通告接收单元收到的所述使用状况, 对接收到的应用功能实体要求分配传输资源的资源请求做资源接 纳控制。  The second resource management unit performs resource access control on the resource request for the allocated application function entity to allocate the transmission resource according to the usage status received by the notification receiving unit.
综上所述, 本发明实施例提供的上述技术方案中, 为使两个 资源管理器各自管理的传输资源不发生资源冲突问题, 可由两个 资源管理器中的第一资源管理器(如 D-RM )在本地获知传输资源 的使用状况, 且将传输资源的使用状况上报给两个资源管理器中 的第二资源管理器(如 C-RM ) , 第二资源管理器根据接收到的上 报, 可获知当前传输资源的使用状况, 进而在后续处理单播业务 的资源请求时, 可根据当前传输资源的使用状况, 对单播业务所 请求的传输资源作资源接纳控制。 因此, 本发明实施例的技术方 案可解决开展单组播业务时可能发生的传输资源冲突问题, 且两 个资源管理器之间的只需增加传输资源的使用状况的信息交互, 实现简便。 附图说明 In summary, in the foregoing technical solution provided by the embodiment of the present invention, in order for the transmission resources managed by the two resource managers to not have a resource conflict problem, the first resource manager (such as D) may be used by the two resource managers. - RM) knowing the usage status of the transmission resource locally, and reporting the usage status of the transmission resource to the second resource manager (such as C-RM) in the two resource managers, and the second resource manager according to the received report The usage status of the current transmission resource can be known, and when the resource request of the unicast service is subsequently processed, the resource admission control of the transmission resource requested by the unicast service can be performed according to the current usage status of the transmission resource. Therefore, the technical side of the embodiment of the present invention The solution can solve the problem of transmission resource conflicts that may occur when a single multicast service is carried out, and the information exchange between the two resource managers only needs to increase the usage status of the transmission resources, and the implementation is simple. DRAWINGS
图 1是现有接入网的一种单组播资源管理系统结构示意图; 图 2是现有接入网的另一种单组播资源管理系统结构示意图; 图 3是本发明实施例中资源管理系统的一个结构示意图; 图 4是本发明实施例中资源管理方法流程图;  1 is a schematic structural diagram of a single multicast resource management system of an existing access network; FIG. 2 is a schematic structural diagram of another single multicast resource management system of an existing access network; FIG. 3 is a resource in an embodiment of the present invention; FIG. 4 is a schematic flowchart of a resource management method in an embodiment of the present invention; FIG.
图 5是本发明实施例中另一个资源管理方法流程图;  FIG. 5 is a flowchart of another resource management method in an embodiment of the present invention; FIG.
图 6是本发明实施例一中 AN对传输资源的管理流程图; 图 7是本发明实施例二中 C-RM管理传输资源的流程图; 图 8是本发明实施例中资源管理装置的结构示意图;  6 is a flowchart of management of transmission resources by an AN in the first embodiment of the present invention; FIG. 7 is a flowchart of C-RM management transmission resources in Embodiment 2 of the present invention; FIG. 8 is a structure of a resource management apparatus according to an embodiment of the present invention; Schematic diagram
图 9是本发明实施例中资源管理器的结构示意图;  9 is a schematic structural diagram of a resource manager in an embodiment of the present invention;
图 10是本发明实施例中资源管理系统的结构示意图。 具体实施方式  FIG. 10 is a schematic structural diagram of a resource management system according to an embodiment of the present invention. detailed description
下面将结合附图对本发明实施例提供的技术方案作进一步详 细描述。  The technical solutions provided by the embodiments of the present invention will be further described in detail below with reference to the accompanying drawings.
本发明实施例中,设仍可将 D-RM设置于 AN中, 即 AN兼具 D-RM管理传输资源的功能, 且为方便起见, 将包含 D-RM的 AN 作为一个资源管理装置, 简称为 AN。 在不划分传输资源, 单播业 务与组播业务共享用户传输资源的情况下, 仍釆用 C-RM 管理单 播业务所需传输资源,并且 C-RM会向 AN报告其要求占用的传输 资源大小; 釆用 AN管理组播业务所需传输资源。 进一步, 为使两 种资源管理器各自管理的传输资源不发生资源冲突问题, 则可由 AN在对要求占用传输资源的请求作资源接纳控制, 之后, 可根据 预先设置的上报策略向 C-RM上报资源接纳控制后传输资源的使 用状况, 因而, 对于管理组播业务的 D-RM来讲, 其在本地就能 够获知资源接纳控制后, 传输资源的使用状况; 而对于管理单播 业务的 C-RM来讲,也能够通过 AN的上报,及时获知传输资源的 使用状况, 进而 C-RM可根据获知的用户传输资源的使用状况, 对网络侧应用功能实体所请求的单播业务做资源接纳控制。 还需 要说明的是, 本发明实施例中, 传输资源可以是接入线路中用户 传输资源, 也可以是 C-RM或 D-RM能够管理的传输资源。 In the embodiment of the present invention, it is still possible to set the D-RM in the AN, that is, the AN has the function of managing the transmission resource by the D-RM, and for convenience, the AN including the D-RM is used as a resource management device, referred to as a resource management device. For AN. In the case of not dividing the transmission resources, the unicast service and the multicast service share the user transmission resources, the C-RM is still used to manage the transmission resources required by the unicast service, and the C-RM reports the transmission resources required by the C-RM to the AN. Size; Use AN to manage the transmission resources required for multicast services. Further, in order to prevent the resource resource from being separately managed by the two resource managers, the resource may be subjected to resource admission control by the AN for requesting to occupy the transmission resource, and then reported to the C-RM according to the preset reporting policy. The resource accepts the usage status of the transmission resource after control, and thus, for the D-RM that manages the multicast service, it can be locally After the resource acceptance control is obtained, the usage status of the transmission resource is obtained. For the C-RM that manages the unicast service, the usage of the transmission resource can be known in time through the reporting of the AN, and then the C-RM can be based on the learned user. The usage status of the transmission resource is used for resource admission control of the unicast service requested by the network side application function entity. It should be noted that, in the embodiment of the present invention, the transmission resource may be a user transmission resource in the access line, or may be a transmission resource that can be managed by the C-RM or the D-RM.
参见图 3 , 图 3是本发明实施例中资源管理系统的一个结构示 意图, 该系统可包括: UE、 设置于 AN上的 D-RM、 AN、 C-RM 和 AF。 参见图 4 , 图 4是本发明实施例中资源管理方法流程图, 该流程可包括以下步骤:  Referring to FIG. 3, FIG. 3 is a schematic structural diagram of a resource management system according to an embodiment of the present invention. The system may include: a UE, a D-RM, an AN, a C-RM, and an AF disposed on the AN. Referring to FIG. 4, FIG. 4 is a flowchart of a resource management method according to an embodiment of the present invention, where the process may include the following steps:
步骤 s401、 AN对接收到的要求占用传输资源的资源请求做资 源接纳控制, 获取资源接纳控制后传输资源的使用状况。  Step s401: The AN performs resource admission control on the received resource request requesting the transmission resource, and obtains the usage status of the transmission resource after the resource admission control.
步骤 s402、 AN根据预先设置的上报策略, 将资源接纳控制后 传输资源的使用状况上报给 C-RM,使得 C-RM获知该使用状况后 , 根据所述使用状况, 对接收到的要求分配传输资源的资源请求做 资源接纳控制。  Step s402: The AN reports the usage status of the resource admission control resource to the C-RM according to the preset reporting policy, so that after the C-RM learns the usage status, the transmission is allocated to the received request according to the usage status. Resource requests for resources are used for resource admission control.
本发明实施例中,由于 C-RM与 AN共同管理传输资源,因此, 在 AN接收 UE发来的为开展组播业务而要占用传输资源的请求 后, 为使 C-RM能够获知当前传输资源的使用状况,可由 AN将该 传输资源的使用状况上报给 C-RM。  In the embodiment of the present invention, since the C-RM and the AN jointly manage the transmission resource, after the AN receives the request sent by the UE to carry out the multicast service and needs to occupy the transmission resource, the C-RM can learn the current transmission resource. The usage status of the transmission resource can be reported to the C-RM by the AN.
本发明实施例中, 可预先设置上报策略,如可根据 AN做资源 接纳控制的控制结果, 在接纳或拒绝资源请求后, 将资源接纳控 制后传输资源的使用状况上报给 C-RM; 或, 接纳资源请求后, 将 资源接纳控制后传输资源的使用状况上报给 C-RM;上报可以是定 期上报等。 实际应用中, 该上报策略也可根据实际情况来设置。  In the embodiment of the present invention, the reporting policy may be set in advance, for example, according to the control result of the resource admission control by the AN, after the resource request is accepted or rejected, the usage status of the resource after the resource admission control is reported to the C-RM; or After the resource request is accepted, the usage status of the transmission resource after the resource admission control is reported to the C-RM; the report may be periodically reported. In actual applications, the reporting policy can also be set according to actual conditions.
上述资源接纳控制后传输资源的使用状况可包括: 资源接纳 控制后空闲传输资源或被占用传输资源的大小变化状况, 或资源 接纳控制后空闲传输资源的大小, 或资源接纳控制后被占用的传 输资源的大小。 相应地, 获取资源接纳控制后传输资源的使用状 况的做法可以是: 算出资源接纳控制后空闲传输资源或被占用传 输资源的大小变化量, 或算出资源接纳控制后空闲传输资源的大 小, 或算出资源接纳控制后被占用的传输资源的大小; 在本地记 录传输资源的使用状况。 The usage status of the transmission resource after the resource admission control may include: a size change condition of the idle transmission resource or the occupied transmission resource after the resource admission control, or a size of the idle transmission resource after the resource admission control, or a transmission occupied after the resource admission control The size of the resource. Correspondingly, the use of the transmission resource after the resource admission control is obtained The method may be: calculating the amount of change of the idle transmission resource or the occupied transmission resource after the resource admission control, or calculating the size of the idle transmission resource after the resource admission control, or calculating the size of the transmission resource occupied after the resource admission control; Record the usage status of the transmission resource locally.
参见图 5 ,图 5是本发明实施例中另一个资源管理方法流程图, 该流程可包括以下步骤:  Referring to FIG. 5, FIG. 5 is a flowchart of another resource management method in an embodiment of the present invention, where the process may include the following steps:
步骤 s501、 C-RM接收 AN上报的资源接纳控制后传输资源的 使用状况。  Step s501: The C-RM receives the usage status of the transmission resource after the resource admission control reported by the AN.
步骤 s502、 C-RM根据该使用状况,对接收到的要求分配传输 资源的资源请求做资源接纳控制。  Step s502: The C-RM performs resource admission control on the received resource request for allocating the transmission resource according to the usage status.
本发明实施例中, C-RM可接收到 AN上报的传输资源的使用 状况, 进而, C-RM可基于该使用状况, 来对开展单播业务可能占 用的传输资源进行接纳控制, 如果单播业务所请求的传输资源大 于当前传输资源中空闲资源的大小, 则可拒绝该请求, 反之, 可 接受请求。  In the embodiment of the present invention, the C-RM can receive the usage status of the transmission resource reported by the AN, and further, the C-RM can perform admission control on the transmission resource that may be occupied by the unicast service based on the usage status, if the unicast If the transmission resource requested by the service is larger than the size of the idle resource in the current transmission resource, the request may be rejected, and conversely, the request may be accepted.
传输资源的使用状况可以是: 空闲传输资源或被占用传输资 源的大小变化状况, 或空闲传输资源的大小, 或被占用的传输资 源的大小。 本发明实施例中,在初始状态下,可默认可供 AN或 C-RM管 理的传输资源为整个的传输资源。 之后, 若用户侧先请求传输资 源, 且 AN接纳用户侧的资源请求后, 则可供 D-RM与 C-RM管 理的传输资源为扣除了用户侧开展组播业务所占用的传输资源 后, 剩余下的空闲资源。  The usage status of the transmission resource may be: the size of the idle transmission resource or the occupied transmission resource, or the size of the idle transmission resource, or the size of the occupied transmission resource. In the embodiment of the present invention, in the initial state, the transmission resource that can be managed by the AN or the C-RM by default is the entire transmission resource. After the user side first requests the transmission resource, and the AN accepts the resource request of the user side, the transmission resource that can be managed by the D-RM and the C-RM is deducted from the transmission resource occupied by the user side for performing the multicast service. The remaining free resources.
对于传输资源的使用状况, AN 可在本地记录每次的使用情 况, 使 D-RM或 C-RM能够准确及时地获知当前传输资源的使用 状况。  For the use of transmission resources, the AN can record the usage of each transmission locally, so that D-RM or C-RM can accurately and timely know the usage status of the current transmission resources.
实施例一:  Embodiment 1:
参见图 6 , 图 6是本发明实施例一中 AN对传输资源的管理流 程图。 该流程可包括以下步骤: Referring to FIG. 6, FIG. 6 is a management flow of an AN to a transmission resource according to Embodiment 1 of the present invention. Cheng Tu. The process can include the following steps:
步骤 s601、 UE向 AN发起要求加入 AN中的组播组的请求, 要求占用传输资源。  Step s601: The UE initiates a request to the AN to join the multicast group in the AN, and requests to occupy the transmission resource.
该步骤 s601 中, 上述请求可以是 IGMP协议 ^艮文, AN通过 预先配置获得对应于组播组的所需传输资源; 上述请求也可以是 高层信令, 例如会话发起协议 ( SIP, Session Initiation Protocol ) 消息,组播业务所需要的传输资源的信息可通过 SIP承载的会话描 述协议 ( SDP, Session Description Protocol ) 中携带过来。  In the step s601, the request may be an IGMP protocol, and the AN obtains a required transmission resource corresponding to the multicast group by using a pre-configuration. The request may also be a high-level signaling, such as a session initiation protocol (SIP, Session Initiation Protocol). The information of the transmission resource required by the multicast service can be carried in the session description protocol (SDP) of the SIP bearer.
步骤 s602、AN中的 D-RM收到该要求占用传输资源的资源请 求后, 可获得当前传输资源的使用状况, 对 UE开展组播业务所需 传输资源进行资源接纳控制。  Step s602: After receiving the resource request for the transmission resource, the D-RM in the AN obtains the current usage status of the transmission resource, and performs resource admission control on the transmission resource required for the UE to perform the multicast service.
本实施例中, D-RM可根据当前接入线路中传输资源的使用状 况, 得到传输资源中还有多少可供使用的空闲传输资源; 比较该 空闲传输资源与 UE所请求的传输资源的大小,若前者大于或等于 后者, 则确定可接纳该资源请求, 且将被 UE占用的传输资源从当 时空闲资源中扣除; 否则, 可拒绝该资源请求, 在这种情况下可 不更改当前空闲传输资源的大小。 资源接纳控制后, AN可在本地 得到资源接纳控制后传输资源的使用状况。 本实施例一中, 设可 用传输资源足够多, AN接纳资源请求。  In this embodiment, the D-RM may obtain, according to the usage status of the transmission resource in the current access line, how many idle transmission resources are available in the transmission resource; compare the size of the idle transmission resource with the transmission resource requested by the UE. If the former is greater than or equal to the latter, it is determined that the resource request can be accepted, and the transmission resource occupied by the UE is deducted from the current idle resource; otherwise, the resource request may be rejected, in which case the current idle transmission may not be changed. The size of the resource. After the resource admission control, the AN can obtain the usage status of the transmission resource after the resource admission control is obtained locally. In the first embodiment, it is assumed that the available transmission resources are sufficient, and the AN accepts the resource request.
本实施例一中, 可通过 AN与 D-RM之间的内部接口, 由本 地的 D-RM获知该使用状况。  In the first embodiment, the usage status can be known from the local D-RM through the internal interface between the AN and the D-RM.
步骤 s603、 D-RM 为本次组播业务预留请求到的传输资源, 然后, AN进行组播复制操作, 即利用传输资源向 UE传输媒体流。  Step s603: The D-RM reserves the requested transmission resource for the multicast service, and then the AN performs a multicast replication operation, that is, uses the transmission resource to transmit the media stream to the UE.
步骤 s604、 D-RM 算出资源接纳控制后传输资源中空闲传输 资源的大小, 且将本次资源接纳控制后传输资源的使用状况上报 给 C-RM, 该流程可结束。 资源的大小, 或者可以是已被占用的传输资源的大小, 或者可以 是空闲传输资源相比较本次资源接纳控制之前的变化了多少, 等 等。 Step s604: The D-RM calculates the size of the idle transmission resource in the transmission resource after the resource admission control, and reports the usage status of the transmission resource after the current resource admission control to the C-RM, and the process may end. The size of the resource, or may be the size of the transmission resource that has been occupied, or may be the amount of change of the idle transmission resource compared to the previous resource admission control, etc. Wait.
本实施例一中,步骤 s603与步骤 s604之间的执行次序可调换。 实施例二:  In the first embodiment, the execution order between step s603 and step s604 is adjustable. Embodiment 2:
参见图 7 , 图 7是本发明实施例二中 C-RM管理传输资源的流 程图。 该流程可包括以下步骤:  Referring to FIG. 7, FIG. 7 is a flow chart of C-RM management transmission resources in Embodiment 2 of the present invention. The process can include the following steps:
步骤 s701、 AF向 C-RM发送要求为单播业务分配传输资源的 资源请求。  Step s701: The AF sends a resource request to the C-RM to allocate a transmission resource for the unicast service.
步骤 s702、 C-RM根据所获知的当前传输资源的使用状况,对 AF的请求做资源接纳控制。  Step s702: The C-RM performs resource admission control on the request of the AF according to the learned usage status of the current transmission resource.
实际应用中, 对于当前传输资源的使用状况, C-RM可通过如 下两种方式获知:  In practical applications, for the current usage of transmission resources, C-RM can be learned in the following two ways:
一种可以是本发明实施例给出的由 AN向 C-RM上报传输资源 的使用状况。 C-RM可根据该上报, 获知当前传输资源中空闲资源 的大小;  One may be the use status of the transmission resource reported by the AN to the C-RM according to the embodiment of the present invention. The C-RM can learn the size of the idle resources in the current transmission resource according to the reporting.
另一种可以是 C-RM可根据本地记录的传输资源的使用状况 来获知, 该处理可与现有相关处理类似, 不作赘述。  The other may be that the C-RM can be known according to the usage status of the locally recorded transmission resources, and the processing can be similar to the existing related processing, and will not be described again.
设 C-RM根据 AN上报的传输资源的使用状况,算出当前空闲 传输资源的大小, 即可供 C-RM 管理的传输资源不是整个的传输 资源, 而是扣除了组播业务占用的传输资源之后, 剩余的空闲传 输资源。  The C-RM calculates the size of the current idle transmission resource according to the usage status of the transmission resource reported by the AN, that is, the transmission resource that can be managed by the C-RM is not the entire transmission resource, but deducts the transmission resource occupied by the multicast service. , the remaining idle transmission resources.
C-RM 可根据 AF 的请求中携带的单播业务相关信息, 得出 AF所请求的传输资源的大小, 且将空闲传输资源与 AF所请求的 传输资源的大小作比较, 若前者大于或等于后者, 则接纳 AF发来 的资源请求; 否则, 拒绝 AF发来的资源请求。  The C-RM may obtain the size of the transmission resource requested by the AF according to the unicast service related information carried in the request of the AF, and compare the idle transmission resource with the size of the transmission resource requested by the AF, if the former is greater than or equal to The latter accepts the resource request sent by the AF; otherwise, it rejects the resource request sent by the AF.
本实施例二中, 设接纳 AF发来的资源请求。  In the second embodiment, the resource request sent by the AF is accepted.
步骤 s703、 C-RM在接纳资源请求后, 向 AN发送要求 AN在 AN上安装所接纳的传输资源的安装命令。  Step s703: After receiving the resource request, the C-RM sends an installation command to the AN requesting the AN to install the accepted transmission resource on the AN.
步骤 s704、 AN在收到 C-RM的安装命令后, 根据 AN本地记 载的当前传输资源的使用状况, 对安装命令中要求安装的传输资 源进行资源冲突检测, 若检查通过, 则安装该传输资源; 否则, 拒绝安装命令。 Step s704: After receiving the installation command of the C-RM, the AN requests the installed transmission resource according to the current usage status of the current transmission resource recorded by the AN. The source performs resource conflict detection. If the check passes, the transmission resource is installed; otherwise, the installation command is rejected.
本实施例二中, AN可根据当前传输资源的使用状况, 算出当 前空闲传输资源的大小,然后将当时空闲传输资源的大小与 C-RM 要求安装的传输资源的大小作比较, 若前者大于或等于后者, 则 接受 C-RM的安装命令, 在 AN上安装 C-RM所接纳的传输资源, 即安装成功, 且从执行安装之前所存在的空闲资源中将被安装的 传输资源扣除; 否则, 拒绝 C-RM 的安装命令, 进而可不更改拒 绝安装时所存在的空闲传输资源的大小。  In the second embodiment, the AN can calculate the size of the current idle transmission resource according to the current usage status of the transmission resource, and then compare the size of the current idle transmission resource with the size of the transmission resource required to be installed by the C-RM, if the former is greater than or If the latter is equal to the latter, the C-RM installation command is accepted, and the transmission resource accepted by the C-RM is installed on the AN, that is, the installation is successful, and the transmission resource to be installed is deducted from the idle resources existing before the installation is performed; otherwise , rejects the C-RM installation command, and thus does not change the size of the idle transmission resources that exist when the installation is refused.
本实施例二, AN可根据控制结果, 及时获知此时传输资源的 使用状况, 进而可通过内部接口, 由本地的 D-RM获知该使用状 况。 相应地, 本发明实施例一中, 若步骤 s602之前, AN收到过 C-RM的安装命令,且若 AN接受安装命令,则步骤 s602中, D-RM 做资源接纳控制时, 所获得的传输资源的使用状况中, 可供 D-RM 管理的传输资源是扣除了 C-RM所接纳的传输资源后的空闲资源。  In the second embodiment, the AN can know the usage status of the transmission resource at this time according to the control result, and the local D-RM can learn the usage status through the internal interface. Correspondingly, in the first embodiment of the present invention, if the AN receives the installation command of the C-RM before the step s602, and if the AN accepts the installation command, in step s602, when the D-RM performs the resource admission control, the obtained In the usage status of the transmission resource, the transmission resource available for D-RM management is an idle resource after deducting the transmission resource accepted by the C-RM.
上述安装命令的发送以及 AN 如何本地安装传输资源的操作 可与现有相关技术类似, 不作赘述。  The operation of the above-mentioned installation command and the operation of the AN to locally transmit the transmission resources may be similar to the related related art, and will not be described again.
步骤 s705、 AN将安装结果, 通过与安装命令相对应的响应消 息传送给 C-RM。  Step s705: The AN sends the result of the installation to the C-RM through a response message corresponding to the installation command.
安装结果可以是安装成功, 或安装失败。 若安装失败, 则说 明 AF所请求的用于开展单播业务的传输资源与 UE所请求的用户 开展组播业务的传输资源发生冲突。  The result of the installation can be a successful installation or an installation failure. If the installation fails, it indicates that the transmission resource requested by the AF for performing the unicast service conflicts with the transmission resource of the user requesting the UE to perform the multicast service.
步骤 s706、 C-RM收到 AN发来的响应消息后, 若安装成功, 则为单播业务预留请求到的传输资源; 否则, 进一步拒绝 AF发来 的资源请求, 即不为单播业务预留请求到的传输资源, 本次单播 业务未能开展, 且 C-RM将响应消息发送给 AF。  Step s706: After receiving the response message sent by the AN, the C-RM reserves the requested transmission resource for the unicast service if the installation is successful; otherwise, the resource request sent by the AF is further rejected, that is, the unicast service is not unicast. The transmission resource requested by the reservation is reserved. The unicast service fails to be deployed, and the C-RM sends a response message to the AF.
本实施例二中, C - RM可通过上述响应消息获知传输资源的使 用状况; 若对于安装成功的情况,可不需要 AN主动上报传输资源 的使用状况, C-RM在收到安装成功的响应消息后, 可将被单播业 务占用的传输资源从本地记录的传输资源中空闲资源中扣除, 进 而可使 C-RM 能够在本地获得接入线路中传输资源的使用状况。 对于安装失败的情况, 则如步骤 s702给出的, C-RM会根据其当 时获知的传输资源的使用状况, 来做资源接纳控制, 若当时空闲 传输资源足够, C-RM接纳资源请求; 可能实际传输资源的使用状 况发生了变化, 则通过 AN向 C-RM返回安装失败的响应, C-RM 可获知当前传输资源的使用状况可能发生了变化, 而该变化可能 有 D-RM接纳用户侧的资源请求引起的, 且 D-RM会上报变化后 的传输资源的使用状况; 之后, C-RM会根据接收到的传输资源的 使用状况, 更新本地的记录, 后续可根据该更新的记录进行资源 接纳控制。 In the second embodiment, the C-RM can learn the usage status of the transmission resource by using the foregoing response message; if the installation is successful, the AN does not need to actively report the usage status of the transmission resource, and the C-RM receives the response message of the installation success. After being unicast The transmission resource occupied by the service is deducted from the idle resource in the locally recorded transmission resource, thereby enabling the C-RM to locally obtain the usage status of the transmission resource in the access line. For the case of installation failure, as shown in step s702, the C-RM will perform resource admission control according to the usage status of the transmission resource that is known at the time, and if the idle transmission resource is sufficient at the time, the C-RM accepts the resource request; If the usage status of the actual transmission resource changes, the AN returns the installation failure response to the C-RM. The C-RM can know that the usage status of the current transmission resource may have changed, and the change may have the D-RM receiving user side. The resource request is caused by the D-RM, and the D-RM will report the usage status of the changed transmission resource. After that, the C-RM will update the local record according to the usage status of the received transmission resource, and the subsequent record can be performed according to the updated record. Resource admission control.
另外, 若原先被占用的传输资源被释放, 则 D-RM也可将当 时的传输资源使用状况上报给 C-RM。  In addition, if the previously occupied transmission resource is released, the D-RM can also report the current transmission resource usage status to the C-RM.
基于以上技术方案, 本发明实施例还提供一种资源管理装置, 用于管理开展组播业务所需的传输资源,可以是包含 D-RM的 AN。 参见图 8 , 图 8是该资源管理装置的结构示意图, 该资源管理装置 可包括: 处理单元 810和上 ^艮单元 820; 其中,  Based on the foregoing technical solution, the embodiment of the present invention further provides a resource management apparatus, which is used to manage transmission resources required for performing a multicast service, and may be an AN including a D-RM. Referring to FIG. 8, FIG. 8 is a schematic structural diagram of the resource management apparatus, where the resource management apparatus may include: a processing unit 810 and an upper unit 820;
处理单元 810,用于对接收到的要求占用传输资源的资源请求 做资源接纳控制, 获取资源接纳控制后传输资源的使用状况;  The processing unit 810 is configured to perform resource admission control on the received resource request requesting the transmission resource, and obtain the usage status of the transmission resource after the resource admission control;
上报单元 820 , 用于根据预先设置的上报策略, 将获取单元获 取到的资源接纳控制后传输资源的使用状况上报给中心资源管理 器。  The reporting unit 820 is configured to report the usage status of the transmission resource after the resource admission control obtained by the obtaining unit to the central resource manager according to the preset reporting policy.
处理单元 810可包括: 第一资源管理单元 811、获取单元 812; 其中,  The processing unit 810 may include: a first resource management unit 811, an obtaining unit 812;
第一资源管理单元 811 ,用于对接收到的要求占用传输资源的 资源请求做资源接纳控制;  The first resource management unit 811 is configured to perform resource admission control on the received resource request for occupying the transmission resource;
获取单元 812,用于在第一资源管理单元 811做资源接纳控制 后, 获取资源接纳控制后传输资源的使用状况。  The obtaining unit 812 is configured to obtain, after the first resource management unit 811 performs resource admission control, the usage status of the transmission resource after the resource admission control.
获取单元 812可包括:计算单元 8121和记录单元 8122;其中, 计算单元 8121 , 用于计算资源接纳控制后空闲传输资源或被 占用传输资源的大小变化量, 或计算资源接纳控制后空闲传输资 源的大小, 或计算资源接纳控制后被占用的传输资源的大小; The obtaining unit 812 may include: a calculating unit 8121 and a recording unit 8122; wherein The calculating unit 8121 is configured to calculate a size change of the idle transmission resource or the occupied transmission resource after the resource admission control, or calculate a size of the idle transmission resource after the resource admission control, or calculate a size of the transmission resource that is occupied after the resource admission control;
记录单元 8122 , 用于在本地记录该计算单元的计算结果。 第一资源管理单元可包括: 第一计算单元 8111、 第一接纳单 元 8112; 其中,  The recording unit 8122 is configured to locally record the calculation result of the computing unit. The first resource management unit may include: a first calculating unit 8111, a first receiving unit 8112;
第一计算单元 8111 , 用于算出当前空闲传输资源的大小; 第一接纳单元 8112 , 用于比较请求占用的传输资源与所述空 闲资源的大小, 若前者小于或等于后者, 则接纳资源请求; 否则, 拒绝资源请求。  The first calculating unit 8111 is configured to calculate a size of the current idle transmission resource. The first receiving unit 8112 is configured to compare the size of the transmission resource occupied by the request with the size of the idle resource. If the former is less than or equal to the latter, the resource request is accepted. ; Otherwise, the resource request is denied.
上述处理单元 810和上 单元 820可设置在 D-RM上。  The above processing unit 810 and upper unit 820 may be disposed on the D-RM.
资源管理装置进一步可包括:  The resource management device may further include:
资源处理单元 830 ,用于根据第一资源管理单元 811的接纳结 果, 即如果第一资源管理单元 811 的接纳结果为接纳资源请求, 资源处理单元 830 将被占用的传输资源从当前空闲资源中扣除; 或, 如果第一资源管理单元 811 接纳结果为拒绝资源请求, 资源 处理单元 830不更改当前空闲传输资源的大小。  The resource processing unit 830 is configured to: according to the admission result of the first resource management unit 811, that is, if the admission result of the first resource management unit 811 is an admission resource request, the resource processing unit 830 deducts the occupied transmission resource from the current idle resource. Or, if the first resource management unit 811 accepts the result as rejecting the resource request, the resource processing unit 830 does not change the size of the current idle transmission resource.
资源管理装置进一步可包括:  The resource management device may further include:
安装处理单元 840 ,用于接收 C-RM发来的要求安装 C-RM已 接纳的传输资源的安装命令; 对所述安装命令中要求安装的传输 资源进行资源冲突检测, 若检查通过, 则安装该传输资源; 否则, 向 C-RM返回拒绝安装命令的响应;  The installation processing unit 840 is configured to receive an installation command sent by the C-RM to request the installation of the transmission resource accepted by the C-RM; perform resource conflict detection on the transmission resource required to be installed in the installation command, and if the check passes, install The transmission resource; otherwise, returning a response to the C-RM rejecting the installation command;
资源处理单元 830进一步可用于, 根据安装处理单元 840的 安装结果, 即如果安装处理单元 840的安装结果为安装传输资源, 资源处理单元 830 将被安装的传输资源从执行安装之前所存在的 空闲资源中扣除; 或, 如果安装处理单元 840 的安装结果为拒绝 安装命令, 安装处理单元 840 不更改拒绝安装时所存在的空闲传 输资源的大小。  The resource processing unit 830 is further operable to, according to the installation result of the installation processing unit 840, that is, if the installation result of the installation processing unit 840 is to install the transmission resource, the resource processing unit 830 will install the transmission resource from the idle resource existing before the installation is performed. Or deducted; or, if the installation result of the installation processing unit 840 is a rejection of the installation command, the installation processing unit 840 does not change the size of the idle transmission resource that exists when the installation is refused.
上述资源处理单元 830和安装处理单元 840可设置在 AN上。 本发明实施例还提供一种资源管理器, 该资源管理器可以是 上述本发明实施例中的 C-RM,用于管理开展单播业务所需的传输 资源。 参见图 9 , 图 9是该资源管理器的结构示意图, 该资源管理 器可包括: 通告接收单元 910、 第二资源管理单元 920; 其中, 通告接收单元 910 ,用于接收资源管理装置上报的资源接纳控 制后传输资源的使用状况; The resource processing unit 830 and the installation processing unit 840 described above may be disposed on the AN. The embodiment of the present invention further provides a resource manager, which may be a C-RM in the foregoing embodiment of the present invention, for managing a transmission resource required for performing a unicast service. Referring to FIG. 9, FIG. 9 is a schematic structural diagram of the resource manager, where the resource manager may include: an advertisement receiving unit 910, a second resource management unit 920, where the advertisement receiving unit 910 is configured to receive resources reported by the resource management apparatus. Acceptance of the use of transmission resources after control;
第二资源管理单元 920 ,根据通告接收单元 910收到的所述使 用状况, 对接收到的要求分配传输资源的资源请求做资源接纳控 制。  The second resource management unit 920 performs resource admission control on the received resource request for allocating transmission resources according to the usage status received by the advertisement receiving unit 910.
第二资源管理单元 920可包括: 第二计算单元 921 和第二接 纳单元 922; 其中,  The second resource management unit 920 may include: a second calculating unit 921 and a second receiving unit 922;
第二计算单元 921 ,用于根据通告接收单元 910收到的所述使 用状况, 算出当前空闲资源的大小;  The second calculating unit 921 is configured to calculate a size of the current idle resource according to the usage status received by the notification receiving unit 910;
第二接纳单元 922 ,用于比较要求分配的传输资源与计算单元 算出的所述空闲资源的大小, 若前者小于或等于后者, 则接纳资 源请求; 否则, 拒绝资源请求。  The second receiving unit 922 is configured to compare the transmission resource required to be allocated with the size of the idle resource calculated by the computing unit, and if the former is less than or equal to the latter, accept the resource request; otherwise, reject the resource request.
资源管理器进一步可包括:控制单元 930 ,响应处理单元 940; 其中,  The resource manager may further include: a control unit 930, a response processing unit 940; wherein
控制单元 930 , 用于在第二接纳单元 922接纳资源请求后, 将 要求安装所接纳的传输资源的安装命令, 发送给资源管理装置; 响应处理单元 940 ,用于接收资源管理装置发来的对应于所述 安装命令的响应, 若所述响应为安装成功, 则预留被安装的传输 资源, 如将被安装的传输资源记录为已使用; 否则, 向资源请求 发送者, 如 AF , 返回拒绝该资源请求的回应。  The control unit 930 is configured to: after the second receiving unit 922 receives the resource request, send an installation command for installing the accepted transmission resource to the resource management device; and the response processing unit 940 is configured to receive the corresponding response sent by the resource management device. Responding to the installation command, if the response is successful, reserving the installed transmission resource, such as recording the installed transmission resource as used; otherwise, requesting the sender of the resource, such as AF, returning the rejection The response to the resource request.
本发明实施例还提供一种资源管理系统, 该系统的结构示意 图可参见图 10 , 该系统的实施图可参加上述图 3。 该系统可包括 上述图 8所示的资源管理装置 1001与图 9所示的资源管理器 1002 , 以及用于发送要求占用传输资源的资源请求的 UE1003 , 和用于发 送要求分配传输资源的资源请求的 AF1004。 综上所述, 本发明实施例提供的上述技术方案中, 为使两个 资源管理器各自管理的传输资源不发生资源冲突问题, 可 D-RM 在本地可获知传输资源的使用状况, 且将传输资源的使用状况上 报给 C-RM, C-RM根据接收到的上报, 可获知当前传输资源的使 用状况, 进而在后续处理单播业务的资源请求时, 可根据当前传 输资源的使用状况, 对单播业务所请求的传输资源作资源接纳控 制。 并且, 在不划分用户的传输资源, 单播业务与组播业务共享 用户的传输资源的情况下, 仍釆用 C-RM 管理单播业务所需传输 资源, 釆用 D-RM管理组播业务所需传输资源, 相应地减少对包 含 D-RM的 AN的性能要求。 利用本发明实施例的资源管理方案, 还可以在 AN 判断资源冲突并通过返回安装失败避免线路资源过 量预留。 因此, 本发明实施例的技术方案可解决开展单组播业务 时可能发生的传输资源冲突问题。 The embodiment of the present invention further provides a resource management system. The structure of the system can be seen in FIG. 10 , and the implementation diagram of the system can participate in FIG. 3 . The system may include the resource management device 1001 shown in FIG. 8 above and the resource manager 1002 shown in FIG. 9, and a UE 1003 for transmitting a resource request requesting to occupy a transmission resource, and a resource request for transmitting a request to allocate a transmission resource. AF1004. In summary, in the above technical solution provided by the embodiment of the present invention, in order to prevent the resource resource conflicts of the transmission resources managed by the two resource managers, the D-RM can obtain the usage status of the transmission resource locally, and The usage status of the transmission resource is reported to the C-RM. According to the received report, the C-RM can know the usage status of the current transmission resource, and then, according to the resource usage request of the current transmission resource, when the resource request of the unicast service is subsequently processed. Resource admission control for the transmission resources requested by the unicast service. Moreover, in the case of not dividing the user's transmission resources, the unicast service and the multicast service share the transmission resources of the user, the C-RM is still used to manage the transmission resources required for the unicast service, and the D-RM is used to manage the multicast service. The required transmission resources, correspondingly reduce the performance requirements for the AN containing D-RM. With the resource management scheme of the embodiment of the present invention, it is also possible to determine a resource conflict in the AN and avoid excessive line resource reservation by returning the installation failure. Therefore, the technical solution of the embodiment of the present invention can solve the problem of transmission resource conflict that may occur when a single multicast service is performed.
另外, 本发明实施例中, C-RM对开展单播业务所需传输资源 的管理流程可基于现有的单播资源接纳流程实现, 因此实现简便。 本发明实施例中, 组播业务所需传输资源仍然由设置于 AN 上的 D-RM管理, 因此, 可实现频道快速切换。 并且, 本发明实施例中, 没有对 AN提出额外的要求, 因此, AN的实现简单。  In addition, in the embodiment of the present invention, the C-RM management process for the transmission resources required for the unicast service can be implemented based on the existing unicast resource admission process, and thus the implementation is simple. In the embodiment of the present invention, the transmission resources required for the multicast service are still managed by the D-RM set on the AN, so that the channel can be quickly switched. Moreover, in the embodiment of the present invention, no additional requirements are imposed on the AN, and therefore, the implementation of the AN is simple.
另外, 在本发明各个实施例中, 要求占用传输资源的资源请 求是表示 D-RM上接收到的资源请求, 要求分配传输资源的资源 请求是表示 C-RM上接收到的资源请求, 上述任一种资源请求可 以是组播业务的资源请求和单播业务的资源请求中的任何一种。  In addition, in various embodiments of the present invention, the resource request for occupying the transmission resource is a resource request received on the D-RM, and the resource request for allocating the transmission resource is a resource request received on the C-RM. A resource request may be any one of a resource request of a multicast service and a resource request of a unicast service.
通过以上的实施方式的描述,本领域的技术人员可以清楚地了解 到本发明可借助软件加必需的通用硬件平台的方式来实现, 当然也可 以通过硬件,但很多情况下前者是更佳的实施方式。基于这样的理解, 本发明的技术方案本质上或者说对现有技术做出贡献的部分可以以 软件产品的形式体现出来, 该计算机软件产品存储在一个存储介质 中, 包括若干指令用以使得一台计算机设备(可以是个人计算机, 服 务器, 或者网络设备等)执行本发明各个实施例所述的方法。 以上所述仅为本发明实施例的过程及方法实施例,并不用以限制 本发明实施例, 凡在本发明实施例的精神和原则之内所做的任何修 改、 等同替换、 改进等, 均应包含在本发明实施例的保护范围之内。 Through the description of the above embodiments, those skilled in the art can clearly understand that the present invention can be implemented by means of software plus a necessary general hardware platform, and of course, can also be through hardware, but in many cases, the former is a better implementation. the way. Based on such understanding, the technical solution of the present invention, which is essential or contributes to the prior art, may be embodied in the form of a software product stored in a storage medium, including a plurality of instructions for making a A computer device (which may be a personal computer, server, or network device, etc.) performs the methods described in various embodiments of the present invention. The above is only the process and method embodiments of the embodiments of the present invention, and is not intended to limit the embodiments of the present invention. Any modifications, equivalents, improvements, etc., which are made within the spirit and principles of the embodiments of the present invention, are It should be included in the scope of protection of the embodiments of the present invention.

Claims

权利要求 Rights request
1、 一种资源管理方法, 其特征在于, 包括: A resource management method, characterized in that it comprises:
对接收到的要求占用传输资源的资源请求做资源接纳控制, 获取资源接纳控制后传输资源的使用状况;  Performing resource admission control on the received resource request requesting the transmission resource, and obtaining the usage status of the transmission resource after the resource admission control;
根据预先设置的上报策略, 将所述使用状况上报给中心资源 管理器, 使得所述中心资源管理器获知该使用状况后, 根据所述 使用状况, 对接收到的要求分配传输资源的资源请求做资源接纳 控制。  And reporting the usage status to the central resource manager according to the preset reporting policy, so that after the central resource manager knows the usage status, according to the usage status, the resource request for allocating the transmission resource to the received request is performed. Resource admission control.
2、 根据权利要求 1所述的方法, 其特征在于, 所述资源接纳 控制后传输资源的使用状况包括:  2. The method according to claim 1, wherein the usage status of the transmission resource after the resource admission control comprises:
资源接纳控制后空闲传输资源或被占用传输资源的大小变化 状况, 或资源接纳控制后空闲传输资源的大小, 或资源接纳控制 后被占用的传输资源的大小;  The size of the idle transmission resource or the occupied transmission resource after the resource admission control, or the size of the idle transmission resource after the resource admission control, or the size of the transmission resource occupied after the resource admission control;
获取所述传输资源的使用状况的步骤包括:  The steps of obtaining the usage status of the transmission resource include:
算出资源接纳控制后空闲传输资源或被占用传输资源的大小 变化量, 或算出资源接纳控制后空闲传输资源的大小, 或算出资 源接纳控制后被占用的传输资源的大小。  The amount of change of the idle transmission resource or the occupied transmission resource after the resource admission control is calculated, or the size of the idle transmission resource after the resource admission control is calculated, or the size of the transmission resource occupied after the resource admission control is calculated.
3、 根据权利要求 2所述的方法, 其特征在于, 该方法进一步 包括:  3. The method according to claim 2, wherein the method further comprises:
接收中心资源管理器发来的要求安装中心资源管理器已接纳 的传输资源的安装命令;  The installation command sent by the receiving center resource manager to request the transmission resource accepted by the installation center resource manager;
对所述安装命令中要求安装的传输资源进行资源冲突检测, 若检查通过, 则安装该传输资源, 从执行安装之前所存在的空闲 资源中将被安装的传输资源扣除; 否则, 拒绝安装命令, 不更改 拒绝安装时所存在的空闲传输资源的大小。  Performing resource conflict detection on the transmission resource required to be installed in the installation command. If the check is passed, the transmission resource is installed, and the transmission resource to be installed is deducted from the idle resource existing before the installation is performed; otherwise, the installation command is rejected. The size of the idle transport resources that existed when the installation was refused is not changed.
4、 根据权利要求 1至 3中任一项所述的方法, 其特征在于, 所述上报策略包括:  The method according to any one of claims 1 to 3, wherein the reporting policy comprises:
接纳或拒绝资源请求后, 将资源接纳控制后传输资源的使用 状况上报给中心资源管理器; 或, After accepting or rejecting a resource request, the resource is admitted to control the use of the transmitted resource. The status is reported to the central resource manager; or,
接纳资源请求后, 将资源接纳控制后传输资源的使用状况上 报给中心资源管理器; 或,  After the resource request is accepted, the usage status of the transmission resource after the resource admission control is reported to the central resource manager; or
定期上报资源接纳控制后传输资源的使用状况。  Regularly report the usage status of the transmission resources after the resource admission control.
5、 根据权利要求 1至 3中任一项所述的方法, 其特征在于, 所述占用传输资源的资源请求, 是组播业务的资源请求, 则 对接收到的要求占用传输资源的资源请求做资源接纳控制的步骤 是: 对接收到的组播业务的资源请求做资源接纳控制;  The method according to any one of claims 1 to 3, wherein the resource request for occupying a transmission resource is a resource request of a multicast service, and the received resource request for occupying the transmission resource is requested. The steps of performing resource admission control are: performing resource admission control on resource requests of the received multicast service;
所述要求分配传输资源的资源请求, 是单播业务的资源请求, 则对接收到的要求分配传输资源的资源请求做资源接纳控制的步 骤是: 对接收到的单播业务的资源请求做资源接纳控制。  The resource request for allocating the transmission resource is a resource request of the unicast service, and the step of performing resource admission control on the received resource request for allocating the transmission resource is: performing resource for the resource request of the received unicast service Admission control.
6、 一种资源管理装置, 其特征在于, 包括: 处理单元和上报 单元; 其中,  A resource management device, comprising: a processing unit and a reporting unit; wherein
处理单元, 用于对接收到的要求占用传输资源的资源请求做 资源接纳控制, 获取资源接纳控制后传输资源的使用状况;  a processing unit, configured to perform resource admission control on the received resource request requesting the transmission resource, and obtain the usage status of the transmission resource after the resource admission control;
上报单元, 用于根据预先设置的上报策略, 将获取单元获取 到的资源接纳控制后传输资源的使用状况上报给中心资源管理 器。  The reporting unit is configured to report the usage status of the resource admission control resource obtained by the obtaining unit to the central resource manager according to the preset reporting policy.
7、 根据权利要求 6所述的资源管理装置, 其特征在于, 所述 处理单元包括: 第一资源管理单元、 获取单元; 其中,  The resource management device according to claim 6, wherein the processing unit comprises: a first resource management unit, an obtaining unit;
第一资源管理单元, 用于对接收到的要求占用传输资源的资 源请求做资源接纳控制;  a first resource management unit, configured to perform resource admission control on the received resource request for occupying the transmission resource;
获取单元, 用于在第一资源管理单元做资源接纳控制后, 获 取资源接纳控制后传输资源的使用状况。  And an obtaining unit, configured to obtain, after the resource admission control by the first resource management unit, the usage status of the transmission resource after the resource admission control.
8、 根据权利要求 7所述的资源管理装置, 其特征在于, 所述 获取单元包括: 计算单元和记录单元; 其中,  The resource management device according to claim 7, wherein the obtaining unit comprises: a calculating unit and a recording unit;
计算单元, 用于计算资源接纳控制后空闲传输资源或被占用 传输资源的大小变化量, 或计算资源接纳控制后空闲传输资源的 大小, 或计算资源接纳控制后被占用的传输资源的大小; 记录单元, 用于在本地记录该计算单元的计算结果。 a calculation unit, configured to calculate a size change of the idle transmission resource or the occupied transmission resource after the resource admission control, or calculate a size of the idle transmission resource after the resource admission control, or calculate a size of the transmission resource that is occupied after the resource admission control; a recording unit, configured to locally record the calculation result of the computing unit.
9、 根据权利要求 6所述的资源管理装置, 其特征在于, 所述 资源管理装置进一步包括: 资源处理单元, 其中,  The resource management device according to claim 6, wherein the resource management device further comprises: a resource processing unit, wherein
如果第一资源管理单元的接纳结果为接纳资源请求, 资源处 理单元将被占用的传输资源从当前空闲资源中扣除;  If the admission result of the first resource management unit is an admission resource request, the resource processing unit deducts the occupied transmission resource from the current idle resource;
如果第一资源管理单元的接纳结果为拒绝资源请求, 资源处 理单元不更改当前空闲传输资源的大小。  If the admission result of the first resource management unit is a denial of resource request, the resource processing unit does not change the size of the current idle transmission resource.
10、 根据权利要求 9 所述的资源管理装置, 其特征在于, 所 述资源管理装置进一步包括: 安装处理单元, 其中,  The resource management device according to claim 9, wherein the resource management device further comprises: an installation processing unit, wherein
所述安装处理单元, 用于接收中心资源管理器发来的要求安 装中心资源管理器已接纳的传输资源的安装命令; 对所述安装命 令中要求安装的传输资源进行资源冲突检测, 若检查通过, 则安 装该传输资源; 否则, 向中心资源管理器返回拒绝安装命令的响 应;  The installation processing unit is configured to receive an installation command sent by the central resource manager and require the installation resource manager to receive the transmission resource; perform resource conflict detection on the transmission resource required to be installed in the installation command, if the check is passed , then install the transport resource; otherwise, return a response to the central resource manager rejecting the install command;
所述资源处理单元进一步用于, 如果所述安装处理单元安装传输 资源, 所述资源处理单元将被安装的传输资源从执行安装之前所 存在的空闲资源中扣除; 或, 如果所述安装处理单元拒绝安装命 令, 所述资源处理单元不更改拒绝安装时所存在的空闲传输资源 的大小。 The resource processing unit is further configured to: if the installation processing unit installs a transmission resource, the resource processing unit deducts the installed transmission resource from an idle resource existing before performing the installation; or, if the installation processing unit The installation command is rejected, and the resource processing unit does not change the size of the idle transmission resource that exists when the installation is refused.
11、 一种资源管理方法, 其特征在于, 包括:  11. A resource management method, characterized in that:
接收资源管理装置上报的资源接纳控制后传输资源的使用状 况;  Receiving the use status of the transmission resource after the resource admission control reported by the resource management device;
根据所述使用状况, 对接收到的要求分配传输资源的资源请 求做资源接纳控制。  According to the usage status, the resource request for allocating the transmission resource to the received request is subjected to resource admission control.
12、 根据权利要求 11所述的方法, 其特征在于, 所述资源接 纳控制后传输资源的使用状况为组播接纳控制后传输资源的使用 状况; 所述要求分配传输资源的资源请求为单播业务的资源请求; 其中,  The method according to claim 11, wherein the usage status of the transmission resource after the resource admission control is a usage status of the transmission resource after the multicast admission control; and the resource request for allocating the transmission resource is a unicast Resource request for the business;
对接收到的要求分配传输资源的资源请求做资源接纳控制的 步骤包括: 对接收到的单播业务的资源请求做资源接纳控制。 Resource admission control for receiving resource requests for allocating transmission resources The steps include: performing resource admission control on the resource request of the received unicast service.
13、 根据权利要求 12所述的方法, 其特征在于, 根据所述使 用状况, 对接收到的要求分配传输资源的资源请求做资源接纳控 制的步骤包括:  The method according to claim 12, wherein the step of performing resource admission control on the received resource request for allocating transmission resources according to the usage status comprises:
根据所述使用状况, 算出当前空闲资源的大小;  Calculating the size of the current idle resource according to the usage status;
比较要求分配的传输资源与所述空闲资源的大小, 若前者小 于或等于后者, 则接纳资源请求; 否则, 拒绝资源请求。  Comparing the required transmission resource with the size of the idle resource, if the former is less than or equal to the latter, the resource request is accepted; otherwise, the resource request is rejected.
14、 根据权利要求 11 至 13 中任一项所述的方法, 其特征在 于, 所述传输资源的使用状况包括:  The method according to any one of claims 11 to 13, wherein the usage status of the transmission resource comprises:
空闲传输资源或被占用传输资源的大小变化状况, 或空闲传 输资源的大小, 或被占用的传输资源的大小。  The size of the idle transmission resource or the occupied transmission resource, or the size of the idle transmission resource, or the size of the occupied transmission resource.
15、 一种资源管理器, 其特征在于, 包括: 通告接收单元、 第二资源管理单元; 其中,  A resource manager, comprising: an advertisement receiving unit and a second resource management unit; wherein
通告接收单元, 用于接收资源管理装置上报的传输资源的使 用状况;  An advertisement receiving unit, configured to receive a usage status of the transmission resource reported by the resource management device;
第二资源管理单元, 根据通告接收单元收到的所述使用状况, 对接收到的要求分配传输资源的资源请求做资源接纳控制。  The second resource management unit performs resource admission control on the received resource request for allocating the transmission resource according to the usage status received by the notification receiving unit.
16、 根据权利要求 15所述的资源管理器, 其特征在于, 所述 第二资源管理单元包括: 第二计算单元和第二接纳单元; 其中, 第二计算单元, 用于根据通告接收单元收到的所述使用状况, 算出当前空闲资源的大小;  The resource manager according to claim 15, wherein the second resource management unit comprises: a second calculating unit and a second receiving unit, wherein the second calculating unit is configured to receive according to the notification receiving unit Calculating the current idle resource size according to the usage status;
第二接纳单元, 用于比较要求分配的传输资源与计算单元算 出的所述空闲资源的大小, 若前者小于或等于后者, 则接纳资源 请求; 否则, 拒绝资源请求。  And a second receiving unit, configured to compare the transmission resource required to be allocated with the size of the idle resource calculated by the computing unit, and if the former is less than or equal to the latter, accept the resource request; otherwise, reject the resource request.
17、 根据权利要求 16所述的资源管理器, 其特征在于, 所述 资源管理器进一步包括: 控制单元, 响应处理单元; 其中,  The resource manager according to claim 16, wherein the resource manager further comprises: a control unit, a response processing unit;
控制单元, 用于在接纳单元接纳资源请求后, 将要求安装所 接纳的传输资源的安装命令, 发送给资源管理装置;  a control unit, configured to send, after the receiving unit receives the resource request, an installation command that requests the installation of the received transmission resource to the resource management device;
响应处理单元, 用于接收资源管理装置发来的对应于所述安 装命令的响应, 若所述响应为安装成功, 则预留被安装的传输资 源; 否则, 向资源请求发送者返回拒绝该资源请求的回应。 a response processing unit, configured to receive, by the resource management device, corresponding to the security The response of the loaded command, if the response is successful, reserves the installed transmission resource; otherwise, returns a response to the resource request sender rejecting the resource request.
18、 一种资源管理系统, 其特征在于, 包括: 资源管理装置 和资源管理器; 其中,  18. A resource management system, comprising: a resource management device and a resource manager; wherein
资源管理装置, 包括: 处理单元和上报单元; 其中,  a resource management device, including: a processing unit and a reporting unit; wherein,
处理单元, 用于对接收到的用户设备要求占用传输资源的资 源请求做资源接纳控制, 获取资源接纳控制后传输资源的使用状 况;  a processing unit, configured to perform resource admission control on a resource request that the received user equipment requires to occupy the transmission resource, and obtain a usage status of the transmission resource after the resource admission control;
上报单元, 用于根据预先设置的上报策略, 将获取单元获取 'J的资源接纳控制后传输资源的使用状况上报给资源管理器;  The reporting unit is configured to report, to the resource manager, the usage status of the transmission resource after the resource acquisition control of the acquisition unit is obtained according to the preset reporting policy;
资源管理器, 包括: 通告接收单元、 第二资源管理单元; 其 中,  The resource manager includes: an announcement receiving unit and a second resource management unit; wherein
通告接收单元, 用于接收资源管理装置上报的资源接纳控制 后传输资源的使用状况;  The notification receiving unit is configured to receive the usage status of the transmission resource after the resource admission control reported by the resource management device;
第二资源管理单元, 根据通告接收单元收到的所述使用状况, 对接收到的应用功能实体要求分配传输资源的资源请求做资源接 纳控制。  The second resource management unit performs resource access control on the resource request for the allocated application function entity to allocate the transmission resource according to the usage status received by the notification receiving unit.
PCT/CN2008/072096 2007-08-22 2008-08-21 Resource management apparatus, method and system WO2009024096A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN200710145111.1 2007-08-22
CN2007101451111A CN101374103B (en) 2007-08-22 2007-08-22 Resource management apparatus, resource management method and system

Publications (1)

Publication Number Publication Date
WO2009024096A1 true WO2009024096A1 (en) 2009-02-26

Family

ID=40377877

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2008/072096 WO2009024096A1 (en) 2007-08-22 2008-08-21 Resource management apparatus, method and system

Country Status (2)

Country Link
CN (1) CN101374103B (en)
WO (1) WO2009024096A1 (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101494607B (en) 2009-03-05 2011-12-21 华为技术有限公司 Acceptance control method, system and equipment
CN102474445A (en) * 2009-07-10 2012-05-23 瑞典爱立信有限公司 A method, a terminal, an access node and a media server for providing resource admission control of digital media streams
CN104284369B (en) * 2013-07-04 2019-04-16 上海无线通信研究中心 A kind of semi Joint admission control method and system
CN105208530B (en) * 2015-09-02 2018-12-04 哈尔滨海能达科技有限公司 A kind of group call operation processing method, terminal and core network element
CN106921506B (en) * 2015-12-25 2020-11-03 北京京东尚科信息技术有限公司 Data acquisition reporting method and system for mobile equipment

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2655568Y (en) * 2002-04-05 2004-11-10 交互数字技术公司 Device for regulating radio network controller and node B resource management device for high-speed down link packet data service
CN1798357A (en) * 2004-12-30 2006-07-05 大唐移动通信设备有限公司 Implement method for pre-managing wireless resources in mobile communication system

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100414924C (en) * 2003-11-20 2008-08-27 华为技术有限公司 Method of distributing ABIS interface band width resource
CN100433682C (en) * 2006-01-20 2008-11-12 华为技术有限公司 Resource managing device, cut-in system and method for securing multiple service quality

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2655568Y (en) * 2002-04-05 2004-11-10 交互数字技术公司 Device for regulating radio network controller and node B resource management device for high-speed down link packet data service
CN1798357A (en) * 2004-12-30 2006-07-05 大唐移动通信设备有限公司 Implement method for pre-managing wireless resources in mobile communication system

Also Published As

Publication number Publication date
CN101374103B (en) 2011-08-03
CN101374103A (en) 2009-02-25

Similar Documents

Publication Publication Date Title
US8111695B2 (en) Resource admission control for customer triggered and network triggered reservation requests
WO2010115331A1 (en) Content location method and content delivery network node
US9226002B2 (en) Method, device and system for realizing broadcast TV
US7885286B2 (en) Method and arrangements in an IP network
CN101662376B (en) Method, device and system for pushing information based on internet protocol television
US20120185906A1 (en) Scalable Video Controls Bandwidth Allocation to Data Services
JP2010534011A (en) Method, system, and network apparatus for resource management
WO2009071012A1 (en) Method, system and device for processing media flow request in sip network
WO2008131651A1 (en) Method, system and device of multicast resource control
WO2009026844A1 (en) Method, system and apparatus for admission control of multicast or unicast
WO2009106011A1 (en) Method, system and device of resource admission control
US7944826B2 (en) Method and system for service application and service application control agent
WO2009024096A1 (en) Resource management apparatus, method and system
WO2011015015A1 (en) Content upload method and content delivery function entity
EP2351300B1 (en) Method and system for establishing digital media streams
WO2009155770A1 (en) Interactive iptv system and content pushing method thereof
WO2008151528A1 (en) Method, apparatus and system for controlling multicast bearing resource
WO2008046336A1 (en) A system and method for realizing distributed access control in multicast service
WO2008089702A1 (en) System and method for implementing stream-media service, and stream-media service control function entity
US20120124182A1 (en) Method, a terminal, an access node and a media server for providing resource admission control of digital media streams
WO2009100625A1 (en) Selecting method of policy decision functional entity in resource and admission control system
CN101667877B (en) Method and system used for next generation network for implementing user live broadcast
WO2008025267A1 (en) Method, system, resource and admission control unit for realizing the multicast service
CN101662377A (en) Method, device and system for information push based on internet protocol television
WO2009076887A1 (en) Method, system and device of achieving user information for resource and admission control subsystem

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 08784087

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 08784087

Country of ref document: EP

Kind code of ref document: A1