WO2007110005A1 - Method for planning a technical installation taking account of topology and visualization presets - Google Patents

Method for planning a technical installation taking account of topology and visualization presets Download PDF

Info

Publication number
WO2007110005A1
WO2007110005A1 PCT/DE2006/000566 DE2006000566W WO2007110005A1 WO 2007110005 A1 WO2007110005 A1 WO 2007110005A1 DE 2006000566 W DE2006000566 W DE 2006000566W WO 2007110005 A1 WO2007110005 A1 WO 2007110005A1
Authority
WO
WIPO (PCT)
Prior art keywords
file
visualization
components
topology
automation
Prior art date
Application number
PCT/DE2006/000566
Other languages
German (de)
French (fr)
Inventor
Jürgen Binder
Original Assignee
Siemens Aktiengesellschaft
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Siemens Aktiengesellschaft filed Critical Siemens Aktiengesellschaft
Priority to EP06722718A priority Critical patent/EP1999661A1/en
Priority to PCT/DE2006/000566 priority patent/WO2007110005A1/en
Priority to CN2006800540658A priority patent/CN101416189B/en
Publication of WO2007110005A1 publication Critical patent/WO2007110005A1/en

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]

Abstract

The invention relates to a computer-aided method for planning a technical installation (110), particularly electrical switchgear, in which a topology file (50) describing the topology of the technical installation is read from a memory (30) and is processed using a data processing installation (10), and the processing result produced is an installation data record (A) describing the planned installation. The invention provides for a visualization file (60) to be read from a memory (30), said visualization file containing a visualization data record which defines the installation data to be visualized for a user of the installation during the later operation of the technical installation, for the topology file (50) and the visualization file (60) to be processed simultaneously by virtue of both the presets defined by the topology file (50) and the presets defined by the visualization file (60) being taken into account for the planning of the installation when selecting automation components (130) and when selecting visualization components (120) for the technical installation (110), and for the installation data record (A) produced to be a data record which denotes both the automation components (130) to be used and the visualization components (120) to be used.

Description

Beschreibung description
VERFAHREN ZUM PROJEKTIEREN EINER TECHNISCHEN ANLAGE XBTTER BERÜCKSICHTIGUNG VON TOPOLOGIE UND VISUALISIERUNGSVORGABENPROCESS FOR DESIGNING A TECHNICAL PLANT XBTTER CONSIDERATION OF TOPOLOGY AND VISUALIZATION PROVISIONS
Die Erfindung bezieht sich auf ein rechnergestütztes Verfahren zum Projektieren einer technischen Anlage mit den Merkmalen gemäß dem Oberbegriff des Anspruchs 1.The invention relates to a computer-aided method for designing a technical system with the features according to the preamble of claim 1.
Ein derartigem Verfahren ist aus der deutschen Patentschrift DE 101 13 565 Cl bekannt. Bei diesem vorbekannten rechnergestützten Verfahren wird eine die Topologie einer gewünschten technischen Anlage beschreibende Topologiedatei mit einer Datenverarbeitungsanlage verarbeitet. Als Verarbeitungsergebnis . wird ein Anlagendatensatz erzeugt, der angibt, an welcherSuch a method is known from the German patent DE 101 13 565 Cl. In this previously known computer-aided method, a topology file describing the topology of a desired technical system is processed with a data processing system. As a processing result. a system record is generated which indicates to which
Einspeisestelle eines Leitungssystems der technischen Anlage ein Speisebaustein besonders günstig angeschlossen werden kann.Infeed point of a pipe system of the technical system a power supply module can be connected particularly favorable.
Der Erfindung liegt die Aufgabe zugrunde, ein Verfahren zum Projektieren einer technischen Anlage anzugeben, bei dem bereits bei der Projektierung der Anlage auf zukünftige Bedürfnisse eines Benutzers der Anlage Rücksicht genommen wird.The invention has for its object to provide a method for projecting a technical system, in which consideration is already given to the future needs of a user of the system when designing the system.
Diese Aufgabe wird erfindungsgemäß dadurch gelöst, dass aus einem Speicher eine Topologiedatei und eine Visualisierungsdatei ausgelesen werden, wobei die Visualisierungsdatei einen Visualisierungsdatensatz enthält, der die einem Benutzer während des späteren Betriebs der technischen Anlage zu visuali- sierenden Anlagendaten definiert. Die Topologiedatei und die Visualisierungsdatei werden gleichzeitig verarbeitet, indem im Rahmen des Projektierens der Anlage bei einer Auswahl von Automatisierungskomponenten und bei einer Auswahl von Visualisierungskomponenten für die technische Anlage sowohl die durch die Topologiedatei als auch die durch die Visualisierungsdatei definierten Vorgaben berücksichtigt werden. Als Anlagendatensatz wird ein Datensatz erzeugt, der sowohl die zu verwendenden Automatisierungskomponenten als auch die zu verwendenden Visualisierungskomponenten bezeichnet.This object is achieved in that a topology file and a visualization file are read from a memory, wherein the visualization file contains a visualization data set that defines the system data to be visualized during a later operation of the technical installation. The topology file and the visualization file are simultaneously processed by using the system as part of the configuration of the plant with a selection of automation components and with a selection of visualization components for the technical installation be taken into account by the topology file as well as the defaults defined by the visualization file. An asset record is created as a record that identifies both the automation components to be used and the visualization components to be used.
Ein wesentlicher Vorteil des erfindungsgemäßen Verfahrens ist darin zu sehen, dass bei der Auswahl von Automat!sierungskom- ponenten für die technische Anlage nicht nur die zu erfüllen- den Automatisierungsaufgaben, sondern darüber hinaus auch die zu erfüllenden Visualisierungsaufgaben berücksichtigt werden. Um dies zu erreichen, ist erfindungsgemäß zusätzlich die Visualisierungsdatei vorgesehen, in der Visualisierungsanforderungen definiert sind, die im späteren Betrieb der Anlage er- füllt werden sollen. Das erfindungsgemäße Verfahren unterscheidet sich damit grundlegend von vorbekannten rechnergestützten Verfahren, bei denen nach Erfassen der Topologie der herzustellenden Anlage die Automatisierungskomponenten ausschließlich auf die zu erfüllenden Automatisierungsaufgaben hin ausgewählt werden und bei denen folglicherweise Visualisierungsaufgaben unberücksichtigt bleiben, was nachfolgend zu einem erheblichen zeitlichen Aufwand führt, wenn die kunden- seitig bzw. benutzerseitig definierten Visualisierungswünsche mit der projektierten technischen Anlage in Einklang gebracht werden müssen. Der Begriff „Visualisierung" ist in diesem Zusammenhang sehr breit zu verstehen; er umfasst alle Arten der Ausgabe von Signalen, Messergebnissen, Auswertergebnissen etc., sei es auf graphische oder sonstige optische Weise, a- kustisch oder mechanisch (z. B. haptisch) .A significant advantage of the method according to the invention is that in the selection of automation components for the technical system, not only the automation tasks to be performed but also the visualization tasks to be performed are taken into account. In order to achieve this, the visualization file is additionally provided according to the invention, in which visualization requirements are defined which are to be fulfilled in the subsequent operation of the system. The inventive method thus differs fundamentally from previously known computer-aided method, in which after detecting the topology of the system to be manufactured, the automation components are selected exclusively on the automation tasks to be performed and where consequently visualization tasks remain unconsidered, which subsequently leads to a considerable amount of time, if the customer-side or user-defined visualization requirements must be reconciled with the configured technical system. The term "visualization" is to be understood in this context very broadly, it includes all types of output of signals, measurement results, evaluation results, etc., whether in graphic or other optical manner, acoustically or mechanically (eg haptic) ,
Gemäß einer vorteilhaften Weiterbildung des rechnergestützten Verfahrens ist vorgesehen, dass zusätzlich zu dem Anlagendatensatz auch ein Parametrierungsdatensatz erzeugt wird, mit dem sich Parametrierungssignale zum Parametrieren der im An- lagendatensatz aufgeführten Automatisierungs- und Visualisierungskomponenten automatisch erzeugen lassen. Diese vorteil¬ hafte Ausgestaltung des Verfahrens erschöpft sich somit nicht in der Ausgabe eines Projektierungsergebnisses in Form eines Anlagendatensatzes, sondern geht darüber hinaus, indem zusätzlich auch die zum späteren Betrieb der Automatisierungsund Visualisierungskomponenten erforderlichen Parametrie- rungsinformationen (Geräteeinstellungen) bereits miterzeugt werden und in Form eines Parametrierungsdatensatzes hinter- legt werden. Ein solcher Parametrierungsdatensatz ermöglicht es, nach der hardwaremäßigen Herstellung der technischen Anlage unmittelbar eine Parametrierung sowohl der Automatisierungskomponenten als auch der Visualisierungskomponenten vorzunehmen, indem unter Berücksichtigung des Parametrierungsda- tensatzes die erforderlichen Parametrierungssignale unmittelbar automatisch erzeugt werden.According to an advantageous embodiment of the computer-aided method, it is provided that in addition to the system data record, a parameterization data record is generated with which parameterization signals for parameterizing the data automatically generate the set of automation data and visualization components listed. These beneficial ¬ development of the method thus does not end with the delivery of a project results in the form of a complex data set, but goes further by additionally required for subsequent operation of the automation and visualization components parameterization insurance information (device settings) are already co-produced and as a Parameterization data set are stored. Such a parameterization data record makes it possible to carry out a parameterization of both the automation components and the visualization components directly after the hardware-related production of the technical system by directly generating the required parameterization signals taking into account the parameterization data set.
Die beschriebene Parametrierung der Automatisierungs- und Visualisierungskomponenten lässt sich besonders einfach und da- mit vorteilhaft mit einem Parametriergerät durchführen, das unter Verwendung des bereits erwähnten Parametrierungsdatensatzes die Parametrierungssignale erzeugt und diese zur Parametrierung in die Automatisierungs- und Visualisierungskomponenten der projektierten und demgemäß hergestellten Anlage einspeist.The described parameterization of the automation and visualization components can be carried out in a particularly simple manner and advantageously with a parameterizing device which generates the parameterization signals using the parameterization data record already mentioned and feeds these for parameterization into the automation and visualization components of the configured and accordingly produced system.
Im Hinblick darauf, dass sowohl die Automatisierungskomponenten als auch die Visualisierungskomponenten während des späteren Betriebs der Anlage korrekt arbeiten, wird es als vor- teilhaft angesehen, wenn bereits während der Projektierung der Anlage aus einem Speicher eine Verriegelungsdatei geladen wird, die einen Verriegelungsdatensatz enthält, der die während des späteren Betriebs der technischen Anlage einzuhaltenden Verriegelungsbedingungen definiert. Während des Pro- jektierens der Anlage werden in diesem Fall die Verriegelungsdatei, die Automatisierungsdatei und die Visualisierungsdatei gleichzeitig verarbeitet, indem bei der Auswahl der Automatisierungs- und Visualisierungskomponenten sowie ggf. bei deren Parametrierung die in den genannten Dateien definierten Vorgaben berücksichtigt werden.In view of the fact that both the automation components and the visualization components work correctly during the later operation of the installation, it is considered advantageous if a lock file containing a lock record which already contains a lock file during configuration of the installation from a memory is loaded defines the locking conditions to be met during the later operation of the technical installation. During the pro- In this case, the locking file, the automation file and the visualization file are processed simultaneously by taking into account the specifications defined in the files mentioned when selecting the automation and visualization components and, if applicable, during their parameterization.
Vorzugsweise werden in der Verriegelungsdatei Verriegelungsbedingungen definiert, die ein Regelwerk für den späteren Be- trieb der projektierten Anlage festlegen. Beispielsweise können in der Verriegelungsdatei Regeln enthalten sein, die vorgegebene Reaktionen der Automatisierungs- bzw. Visualisierungskomponenten auf Bedienhandlungen eines Benutzers hin festlegen. Zum Beispiel können Verriegelungsbedingungen Rand- bedingungen definieren, die automatisch überprüft werden, wenn Bedienhandlungen des Benutzers vorgenommen werden, bevor es zu einer Ausgabe von Befehlssignalen an eine der Automatisierungs- bzw. Visualisierungskomponenten der Anlage kommt.Preferably, interlocking conditions are defined in the interlock file, which define a set of rules for the subsequent operation of the configured system. For example, rules may be contained in the interlock file that specify predetermined responses of the automation or visualization components to operator actions of a user. For example, interlock conditions may define constraints that are automatically checked when operator actions are taken by the user before outputting command signals to any of the plant's automation and visualization components.
Mit Blick auf eine optimale Ausgestaltung der technischen Anlage wird es als vorteilhaft angesehen, wenn im Rahmen der Verarbeitung der Visualisierungsdatei und der Topologiedatei auf eine Datenbank zurückgegriffen wird, in der eine Vielzahl an Automatisierungs- und Visualisierungskomponenten beschrie- ben ist. Aus dieser Vielzahl an Komponenten werden während des rechnergestützten Verfahrens diejenigen ausgewählt, mit denen sich die in der Visualisierungs- und der Topologiedatei sowie ggf. der Verriegelungsdatei beschriebenen Anforderungen optimal erfüllen lassen.With a view to optimum design of the technical system, it is considered advantageous if, during the processing of the visualization file and the topology file, a database is used in which a multiplicity of automation and visualization components are described. From this multitude of components, those are selected during the computer-aided method, with which the requirements described in the visualization and the topology file as well as possibly the lock file can optimally be met.
Falls im Rahmen des Verfahrens festgestellt wird, dass zwei oder mehr verschiedene Einzelkomponenten geeignet wären, als Automatisierungskomponenten oder Visualisierungskomponenten verwendet zu werden, wird bevorzugt gemäß einer vorgegebenen Priorisierungsvorgabe bestimmt, welche der Einzelkomponenten konkret für den Anlagendatensatz herangezogen werden sollen. Eine solche Priorisierungsvorgabe kann beispielsweise folgen¬ de Kriterien berücksichtigen: Kosten der jeweiligen Einzel- komponente, Funktionsumfang der jeweiligen Einzelkomponente, nachträgliche Erweiterbarkeit der jeweiligen Einzelkomponente.If it is determined in the process that two or more different individual components would be suitable to be used as automation components or visualization components, it is preferred according to a predetermined Prioritization specification determines which of the individual components should specifically be used for the asset record. Such prioritization default can for example follow consider ¬ de criteria: cost of each individual component functions of each individual component, future extensibility of each individual component.
Im Übrigen wird es als vorteilhaft angesehen, wenn mit dem nach dem beschriebenen Verfahren erzeugten Anlagendatensatz automatisch weitere Datensätze erzeugt werden: Beispielsweise kann mit dem Anlagendatensatz ein elektrischer Verdrahtungsplan erzeugt und in einer Verdrahtungsdatei abgelegt werden. In entsprechender Weise können Stücklistendateien, Kostenvor- anschlagsdateien und Arbeitsplandateien erzeugt werden, die Stücklisten, Kostenvoranschläge bzw. Arbeitspläne beschreiben.Incidentally, it is considered advantageous if further data sets are generated automatically using the plant data record generated by the method described. For example, an electrical wiring diagram can be generated with the plant data record and stored in a wiring file. Similarly, BOM files, cost estimate files, and workplan files describing BOMs, quotes, and routings can be created.
Die Erfindung bezieht sich darüber hinaus auf ein Computer- programmprodukt, das geeignet ist, nach Installation auf einer Datenverarbeitungsanlage das beschriebene rechnergestützte Verfahren durchzuführen.The invention also relates to a computer program product which is suitable for performing the described computer-aided method after installation on a data processing system.
Die Erfindung wird nachfolgend anhand von Ausführungsbeispie- len näher erläutert; dabei zeigen beispielhaftThe invention will be explained in more detail with reference to exemplary embodiments; thereby show by way of example
Figur 1 ein Ausführungsbeispiel für eine Anordnung, anhand derer das erfindungsgemäße Verfahren beispielhaft erläutert wird, undFigure 1 shows an embodiment of an arrangement, by means of which the inventive method is exemplified, and
Figur 2 eine Anordnung mit einem Parametriergerät, mit dem unter Verwendung eines mit der Anordnung gemäß Figur 1 erzeugten Parametrierungsdatensatzes die Au- tomatisierungs- und Visualisierungskomponenten einer technischen Anlage parametriert werden.FIG. 2 shows an arrangement with a parameterizing device, with which the parameterization data record generated using the arrangement according to FIG. automation and visualization components of a technical system are parameterized.
In der Figur 1 ist eine DV-Anlage (Datenverarbeitungsanlage) 10 dargestellt, die mit einer Mikroprozessoreinheit 20 sowie einem daran angeschlossenen Speicher 30 ausgestattet ist. In dem Speicher 30 ist ein Computerprogramm bzw. Computerprogrammprodukt 40 installiert, das nach einer Inbetriebnahme in der Mikroprozessoreinheit 20 ein Verfahren zum Projektieren einer technischen Anlage ausführt.1 shows a computer system (data processing system) 10 is shown, which is equipped with a microprocessor unit 20 and a memory 30 connected thereto. In the memory 30, a computer program or computer program product 40 is installed, which executes a method for designing a technical system after a startup in the microprocessor unit 20.
In dem Speicher 30 sind darüber hinaus eine Topologiedatei 50, eine Visualisierungsdatei 60 sowie eine Verriegelungsdatei 70 abgespeichert, die bei der Projektierung der techni- sehen Anlage herangezogen werden sollen. Die Topologie-, die Verriegelungs- und die Visualisierungsdatei werden benutzer- seitig erzeugt und im Speicher 30 abgelegt, damit diese Dateien von dem Computerprogramm 40 beim Projektieren der technischen Anlage berücksichtigt werden können. In der Topolo- giedatei 50 sind in einer maschinenlesbaren Datenstruktur To- pologiedaten abgespeichert, die die anlagenseitige Topologie der zu projektierenden technischen Anlage definieren. In der Visualisierungsdatei 60 sind in einer maschinenlesbaren Datenstruktur alle diejenigen Daten abgespeichert, die sich mit der Visualisierung der in der technischen Anlage zukünftig auftretenden Zuständen bzw. Messwerte beschäftigen. Die Verriegelungsdatei 70 enthält alle Randbedingungen, die beim späteren Betrieb der technischen Anlage zu berücksichtigen sind: Beispielsweise ist in der Verriegelungsdatei festge- legt, wie die Automatisierungs- bzw. Visualisierungskomponenten arbeiten sollen, wenn es zu benutzerseitigen Eingaben in die fertig gestellte technische Anlage kommt. In dem Speicher 30 ist darüber hinaus eine Gerätedatenbank 80 abgespeichert, in der eine Vielzahl an Automatisierungs- und Visualisierungskomponenten mit deren jeweiligen Eigenschaften beschrieben ist. Die Gerätedatenbank 80 dient dazu, für das Computerprogramm 40 eine Geräteauswahl zur Verfügung zu stellen, die das Programm beim Projektieren der technischen Anlage verwenden kann. Die Gerätedatenbank 80 kann in einer maschinenlesbaren Datenstruktur beispielsweise Schutz- oder Leittechnikgeräte, Datenbussysteme, elektrische oder optische Leitungen, Messgeräte, Strom- und Spannungswandler, Leitsta- tionsgeräte, Steuerrechner usw. enthalten.In addition, a topology file 50, a visualization file 60 as well as a lock file 70 are stored in the memory 30, which are to be used in the configuration of the technical system. The topology, the locking and the visualization file are generated by the user and stored in the memory 30 so that these files can be taken into account by the computer program 40 when configuring the technical system. Topology file 50 stores toplication data in a machine-readable data structure which define the plant-side topology of the technical installation to be configured. In the visualization file 60, in a machine-readable data structure, all those data are stored which deal with the visualization of the states or measured values which will occur in the future in the technical installation. The interlocking file 70 contains all the boundary conditions that are to be taken into account in the subsequent operation of the technical installation. For example, in the interlocking file it is determined how the automation or visualization components should work when user-supplied entries are made in the completed technical installation. In the memory 30, a device database 80 is also stored, in which a plurality of automation and visualization components is described with their respective properties. The device database 80 serves to provide the computer program 40 with a device selection which the program can use when configuring the technical system. The device database 80 may include, for example, protection or control technology devices, data bus systems, electrical or optical lines, measuring devices, current and voltage transformers, control stations, control computers, etc. in a machine-readable data structure.
Das Computerprogramm 40 ist derart ausgestaltet, dass es nach einer Inbetriebnahme die Daten der Topologiedatei 50, der Vi- sualisierungsdatei 60 sowie der Verriegelungsdatei 70 ausliest. Anschließend überprüft das Computerprogramm 40 die in der Gerätedatenbank 80 abgespeicherten bzw. verfügbaren Automatisierungs- und Visualisierungskomponenten auf ihre Eignung, für eine Anlage herangezogen zu werden, die den Anfor- derungen der Topologiedatei, der Verriegelungsdatei sowie der Visualisierungsdatei entspricht.The computer program 40 is configured such that it reads out the data of the topology file 50, the visualization file 60 and the lock file 70 after a startup. The computer program 40 then checks the automation and visualization components stored or available in the device database 80 for their suitability for being used for a system that meets the requirements of the topology file, the lock file and the visualization file.
Nachfolgend erzeugt die Mikroprozessoreinheit 20 unter Heranziehung der Daten der Topologiedatei 50, der Visualisierungs- datei 60 und der Verriegelungsdatei 70 ausgangsseitig einen Anlagendatensatz A, der die zur Realisierung der technischen Anlagen geeigneten Automatisierungs- sowie Visualisierungskomponenten beschreibt. Außerdem erzeugt die Mikroprozessoreinheit 20 einen Parametrierungsdatensatz P, der zur Paramet- rierung der im Anlagendatensatz A enthaltenen Automatisierungs- und Visualisierungskomponenten geeignet ist.Subsequently, the microprocessor unit 20, using the data of the topology file 50, the visualization file 60 and the interlocking file 70, generates on the output side a system data record A which describes the automation and visualization components suitable for the realization of the technical systems. In addition, the microprocessor unit 20 generates a parameterization data record P which is suitable for the parameterization of the automation and visualization components contained in the system data record A.
Der Anlagendatensatz A sowie der Parametrierungsdatensatz P werden von der Mikroprozessoreinheit 20 entweder ausgangssei- tig abgegeben oder in dem Speicher 30 zur weiteren Verwendung abgespeichert.The system data set A and the parameterization data record P are output by the microprocessor unit 20, either on the output side. or stored in the memory 30 for further use.
Falls die DV-Anlage 10 nicht nur zum Projektieren der techni- sehen Anlage herangezogen wird, sondern auch zum Parametrie- ren der im Anlagendatensatz A definierten Automatisierungsund Visualisierungskomponenten, so können mit dem Parametrie- rungsdatensatz P außerdem unmittelbar Parametrierungssignale S erzeugt werden, die in die Komponenten der technischen An- läge zu deren Parametrierung eingespeist werden. In diesem Falle arbeitet die DV-Anlage auch als Parametriergerät .If the computer system 10 is used not only for configuring the technical system, but also for parameterizing the automation and visualization components defined in the system data set A, the parameterization data record P can also be used to directly generate parameterization signals S that are stored in the Components of the technical systems are fed into their parameterization. In this case, the computer system also works as a parameterization device.
In der Figur 2 ist eine Anordnung bestehend aus einem Parametriergerät 100 sowie der gemäß dem Anlagendatensatz A gemäß Figur 1 hergestellten technischen Anlage 110 dargestellt. Die in der Anlage 110 enthaltenen Visualisierungskomponenten 120 sowie die Automatisierungskomponenten 130 sind der Übersichtlichkeit halber nur schematisch dargestellt.FIG. 2 shows an arrangement consisting of a parameterizing device 100 and the technical system 110 produced according to the system data set A according to FIG. The visualization components 120 contained in the system 110 and the automation components 130 are shown only schematically for the sake of clarity.
Mit dem Parametriergerät 100 lassen sich die Komponenten 120 bzw. 130 der technischen Anlage 110 parametrieren, indem der mit der DV-Anlage 10 gemäß Figur 1 erzeugte Parametrierungs- datensatz P in das Parametriergerät 100 eingespeist wird. Das Parametriergerät 100 erzeugt unter Verwendung des eingegebe- nen Parametrierungsdatensatzes P ausgangsseitig die Parametrierungssignale S, die in die zu parametrierenden Komponenten 120 bzw. 130 eingespeist werden, so dass es zu einer Parametrierung dieser Komponenten kommt. Im Rahmen der Parametrierung können beispielsweise Gerätegrundeinstellungen wie die elektrische Nennfrequenz oder die Nennspannung der elektrischen Anlage, Schutzeinstellungen, Datenprotokoll-Standards usw. eingestellt werden. Mit der DV-Anlage 10 gemäß Figur 1 lassen sich im Übrigen nicht nur der Anlagendatensatz A sowie der Parametrierungsda- tensatz P erzeugen, sondern darüber hinaus noch weitere Datensätze, die sich auf weitere Aspekte der technischen Anlage 110 gemäß Figur 2 beziehen. Beispielsweise kann mit der Mikroprozessoreinheit 20 ein elektrischer Verdrahtungsplan V erzeugt werden, der die Verdrahtung der Komponenten 120 und 130 gemäß Figur 2 definiert. Der entsprechende Verdrahtungsplan kann beispielsweise als Verdrahtungsdatei in dem Speicher 30 der DV-Anlage 10 abgespeichert oder ausgegeben werden. In entsprechender Weise lässt sich mit der Mikropro.zessoreinheit 20 ein Kostenvoranschlag erzeugen, der in einer Kostenvoranschlagsdatei beispielsweise in dem Speicher 30 der DV-Anlage 10 abgespeichert wird. Ein solcher Kostenvoranschlag würde die zu erwartenden Kosten der technischen Anlage 110 gemäß Figur 2 angeben.The parameterizing device 100 can be used to parameterize the components 120 or 130 of the technical system 110 by feeding the parameterization data set P generated by the computer system 10 according to FIG. 1 into the parameterizing device 100. The parameterizing device 100 generates the parameterization signals S on the output side using the parameterization data set P that are input to the components 120 or 130 to be parameterized so that these components are parameterized. As part of the parameterization, basic device settings such as the rated electrical frequency or rated voltage of the electrical system, protection settings, data protocol standards, etc. can be set, for example. Incidentally, not only the system data set A and the parameterization data set P can be generated with the computer system 10 according to FIG. 1, but also further data sets relating to further aspects of the technical system 110 according to FIG. For example, an electrical wiring diagram V defining the wiring of components 120 and 130 of FIG. 2 may be generated with the microprocessor unit 20. The corresponding wiring plan can be stored or output, for example, as a wiring file in the memory 30 of the computer system 10. In a similar way can be with the micropro . Zessoreinheit 20 generate a cost estimate, which is stored in a cost estimate file, for example, in the memory 30 of the computer system 10. Such a cost estimate would indicate the expected costs of the technical system 110 according to FIG.
Auch ist es möglich, mit der Mikroprozessoreinheit 20 gemäß Figur 1 einen Arbeitsplan zu erzeugen, der die zur Herstel- lung der technischen Anlage 110 gemäß Figur 2 erforderlichen Arbeitsschritte kennzeichnet. Der entsprechende Arbeitsplan kann ebenfalls in dem Speicher 30 als Arbeitsplandatei abgelegt werden. It is also possible with the microprocessor unit 20 according to FIG. 1 to generate a work plan which identifies the work steps required for the production of the technical system 110 according to FIG. The corresponding work plan can likewise be stored in the memory 30 as a work plan file.
BezugszeichenlisteLIST OF REFERENCE NUMBERS
10 DV-Anlage10 DV system
20 Mikroprozessoreinheit20 microprocessor unit
30 Speicher 40 Computerprogramm30 memory 40 computer program
50 • Topologiedatei50 • Topology file
60 Visualisierungsdatei60 visualization file
70 Verriegelungsdatei70 lock file
80 Gerätedatenbank: 100 Parametriergerät80 Device Database: 100 Parameterization Device
110 technische Anlage110 technical plant
120 Visualisierungskomponenten120 visualization components
130 Automatisierungskomponenten130 automation components
A Anlagendatensatz P ParametrierungsdatensatzA Plant data record P Parameterization data record
S ParametrierungssignaleS parameterization signals
V elektrischer Verdrahtungsplan V electrical wiring diagram

Claims

Patentansprüche claims
1. Rechnergestütztes Verfahren zum Projektieren einer technischen Anlage (110), insbesondere einer elektrischen Schaltan- läge, bei dem eine die Topologie der technischen Anlage beschreibende Topologiedatei (50) aus einem Speicher (30) ausgelesen und mit einer Datenverarbeitungsanlage (10) verarbeitet wird und als Verarbeitungsergebnis eine die projektierte Anlage beschreibender Anlagendatensatz (A) erzeugt wird, d a d u r c h g e k e n n z e i c h n e t , dass1. Computer-assisted method for projecting a technical system (110), in particular an electrical Schaltan, in which a topology of the technical plant descriptive topology file (50) is read from a memory (30) and processed with a data processing system (10) and is generated as a result of processing a projected plant descriptive plant record (A), characterized in that
- aus einem Speicher (30) eine Visualisierungsdatei (60) ausgelesen wird, die einen Visualisierungsdatensatz enthält, der die während des späteren Betriebs der technischen Anlage einem Benutzer der Anlage zu visualisierenden Anlagenda- ten definiert,a visualization file (60) is read from a memory (30) which contains a visualization data record which defines the system data to be visualized during a later operation of the technical system to a user of the system,
-die Topologiedatei (50) und die Visualisierungsdatei (60) gleichzeitig verarbeitet werden, indem im Rahmen des Pro- jektierens der Anlage bei einer Auswahl von Automatisierungskomponenten (130) und bei einer Auswahl von Visuali- sierungskomponenten (120) für die technische Anlage (110) sowohl die durch die Topologiedatei (50) als auch die durch die Visualisierungsdatei (60) definierten Vorgaben berücksichtigt werden, undthe topology file (50) and the visualization file (60) are processed simultaneously by using the system for a selection of automation components (130) and a selection of visualization components (120) for the technical system (110 ) Both the topology file (50) and the defaults defined by the visualization file (60) are taken into account, and
— als Anlagendatensatz (A) ein Datensatz erzeugt wird, der sowohl die zu verwendenden Automatisierungskomponenten- As a plant record (A) a record is generated, which includes both the automation components to be used
(130) als auch die zu verwendenden Visualisierungskomponenten (120) bezeichnet.(130) as well as the visualization components (120) to be used.
2. Verfahren nach Anspruch 1, d a d u r c h g e k e n n z e i c h n e t , dass zusätzlich zu dem Anlagendatensatz (A) ein Parametrierungsda- tensatz (P) erzeugt wird, mit dem sich Parametrierungssignale (S) zum Parametrieren der im Anlagendatensatz (A) aufgeführ- ten Automatisierungs- und Visualisierungskomponenten (120, 130) automatisch erzeugen lassen.2. The method according to claim 1, characterized in that in addition to the plant data record (A) a Parameterisierungsda- tensatz (P) is generated, with the parameterization signals (S) for parameterizing the in the plant record (A) listed- automation and visualization components (120, 130).
3. Verfahren nach Anspruch 2, d a d u r c h g e k e n n z e i c h n e t , dass die projektierte Anlage (110) parametriert wird, indem mit einem Parametriergerät (100) unter Heranziehung des gemäß Anspruch 2 gebildeten Parametrierungsdatensatzes (A) die Para- metrierungssignale (S) erzeugt werden und diese in die Auto- matisierungs- und Visualisierungskomponenten (120, 130) der projektierten Anlage (110) zu deren Parametrierung eingespeist werden.3. The method according to claim 2, characterized in that the configured system (110) is parameterized by using a parameterizing device (100) using the parameterization data record (A) formed according to claim 2, the parameterization signals (S) are generated and these in the Automation and visualization components (120, 130) of the configured system (110) are fed to their parameterization.
4. Verfahren nach einem der vorangehenden Ansprüche, d a d u r c h g e k e n n z e i c h n e t , dass4. Method according to one of the preceding claims, characterized in that
- aus einem Speicher (30) eine Verriegelungsdatei geladen wird, die einen Verriegelungsdatensatz (70) enthält, der die während des späteren Betriebs der technischen Anlage einzuhaltenden Verriegelungsbedingungen definiert, - die Verriegelungsdatei (70) , die Topologiedatei (50) und die Visualisierungsdatei (60) gleichzeitig verarbeitet werden, indem bei der Auswahl von Automatisierungs- und Visualisierungskomponenten (120, 130) die durch die Topologiedatei, die Verriegelungsdatei und die Visualisierungsdatei definierten Vorgaben berücksichtigt werden.from a memory (30) a lock file is loaded containing a lock record (70) defining the lock conditions to be met during the later operation of the technical equipment, the lock file (70), the topology file (50) and the visualization file (60 ) are processed simultaneously by taking into account the specifications defined by the topology file, the lock file and the visualization file when selecting automation and visualization components (120, 130).
5. Verfahren nach einem der voranstehenden Ansprüche, d a d u r c h g e k e n n z e i c h n e t , dass5. Method according to one of the preceding claims, characterized in that
- im Rahmen der Verarbeitung der Visualisierungsdatei und der Topologiedatei auf eine Datenbank (80) zurückgegriffen wird, in der eine Vielzahl an Automatisierungs- und Visualisierungskomponenten beschrieben ist, und - aus der Vielzahl an Komponenten diejenigen ausgewählt werden, mit denen sich die in der Visualisierungs- und der To- pologiedatei beschriebenen Anforderungen erfüllen lassen.- As part of the processing of the visualization file and the topology file on a database (80) is used, in which a variety of automation and visualization components is described, and - from the multitude of components, those can be selected which fulfill the requirements described in the visualization and to- pology file.
6. Verfahren nach Anspruch 5, d a d u r c h g e k e n n z e i c h n e t , dass im Falle, dass zwei oder mehr verschiedene Einzelkomponenten geeignet sind, als Automatisierungskomponente oder Visualisierungskomponente verwendet zu werden, gemäß einer Priori- sierungsvorgabe bestimmt wird, welche der Einzelkomponenten für den Anlagendatensatz herangezogen werden.6. The method according to claim 5, wherein, if two or more different individual components are suitable for being used as an automation component or visualization component, it is determined according to a prioritization specification which of the individual components are used for the system data record.
7. Verfahren nach Anspruch 6, d a d u r c h g e k e n n z e i c h n e t , dass die Priorisierungsvorgabe zumindest eine der folgenden Kriterien enthält: Kosten der jeweiligen Einzelkomponente, Funktionsumfang der jeweiligen Einzelkomponente, nachträgliche Er- weiterbarkeit der jeweiligen Einzelkomponente.7. The method according to claim 6, wherein a prioritization specification includes at least one of the following criteria: cost of the respective individual component, functional scope of the respective individual component, subsequent expandability of the respective individual component.
8. Verfahren nach einem der voranstehenden Ansprüche, d a d u r c h g e k e n n z e i c h n e t , dass mit dem Anlagendatensatz ein elektrischer Verdrahtungsplan erzeugt und in einer Verdrahtungsdatei (V) abgelegt wird.8. The method according to claim 1, wherein an electrical wiring diagram is generated with the system data record and stored in a wiring file (V).
9. Verfahren nach einem der voranstehenden Ansprüche, d a d u r c h g e k e n n z e i c h n e t , dass mit dem Anlagendatensatz eine Stückliste erzeugt und in einer Stücklistendatei abgelegt wird.9. Method according to one of the preceding claims, wherein a piece list is generated with the plant data record and stored in a piece list file.
10. Verfahren nach einem der voranstehenden Ansprüche, d a d u r c h g e k e n n z e i c h n e t , dass mit dem Anlagendatensatz ein Kostenvoranschlag erzeugt und in einer Kostenvoranschlagsdatei abgelegt wird. 10. The method according to any one of the preceding claims, characterized in that generated with the asset record a cost estimate and stored in a cost estimate file.
11. Verfahren nach einem der voranstehenden Ansprüche, d a d u r c h g e k e n n z e i c h n e t , dass mit dem Anlagendatensatz ein Arbeitsplan erzeugt und in einer Arbeitsplandatei abgelegt wird.11. Method according to one of the preceding claims, characterized in that a work plan is generated with the system data record and stored in a work plan file.
12. Computerprogrammprodukt (40) zur Installation auf einer Datenverarbeitungsanlage (10), wobei das Computerprogrammprodukt derart ausgestaltet ist, dass es nach der Installation auf der Datenverarbeitungsanlage geeignet ist, ein Verfahren nach einem der voranstehenden Ansprüche 1 bis 11 auszuführen. 12. computer program product (40) for installation on a data processing system (10), wherein the computer program product is designed such that it is suitable after installation on the data processing system to carry out a method according to any one of the preceding claims 1 to 11.
PCT/DE2006/000566 2006-03-28 2006-03-28 Method for planning a technical installation taking account of topology and visualization presets WO2007110005A1 (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
EP06722718A EP1999661A1 (en) 2006-03-28 2006-03-28 Method for planning a technical installation taking account of topology and visualization presets
PCT/DE2006/000566 WO2007110005A1 (en) 2006-03-28 2006-03-28 Method for planning a technical installation taking account of topology and visualization presets
CN2006800540658A CN101416189B (en) 2006-03-28 2006-03-28 Method for taking regard of topological structure and visual predetermined value planning technology apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/DE2006/000566 WO2007110005A1 (en) 2006-03-28 2006-03-28 Method for planning a technical installation taking account of topology and visualization presets

Publications (1)

Publication Number Publication Date
WO2007110005A1 true WO2007110005A1 (en) 2007-10-04

Family

ID=36646092

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/DE2006/000566 WO2007110005A1 (en) 2006-03-28 2006-03-28 Method for planning a technical installation taking account of topology and visualization presets

Country Status (3)

Country Link
EP (1) EP1999661A1 (en)
CN (1) CN101416189B (en)
WO (1) WO2007110005A1 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3086428B1 (en) * 2015-04-23 2020-02-26 Siemens Aktiengesellschaft Method and assembly for parameterizing field control devices and/or protection devices of a circuit assembly
EP3764311A1 (en) * 2019-07-08 2021-01-13 Siemens Aktiengesellschaft Method for planning an electrical power transmission network, planning system and computer program product

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1233317A2 (en) 2001-02-16 2002-08-21 Siemens Aktiengesellschaft Apparatus and method for the creation of user components
DE10113565C1 (en) 2001-03-20 2002-10-10 Siemens Ag Computer-aided method for configuring a piping system
DE10343963A1 (en) 2003-09-19 2005-04-14 Siemens Ag Provision of diagnostic information

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1069518B1 (en) * 1999-07-16 2003-01-15 ABB Schweiz AG Calculation and visual representation of voltage states in an electrical switching graph
US7225115B2 (en) * 2001-10-04 2007-05-29 Novint Technologies, Inc. Coordinating haptics with visual images in a human-computer interface
CN1521829A (en) * 2003-01-29 2004-08-18 上海芯华微电子有限公司 Topology verification method for integrated circuit

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1233317A2 (en) 2001-02-16 2002-08-21 Siemens Aktiengesellschaft Apparatus and method for the creation of user components
DE10113565C1 (en) 2001-03-20 2002-10-10 Siemens Ag Computer-aided method for configuring a piping system
DE10343963A1 (en) 2003-09-19 2005-04-14 Siemens Ag Provision of diagnostic information

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
MERGET O: "Prozessvisualisierung mit neuen Perspektiven", SPS-MAGAZIN HMIS 2002, 2002, pages 53 - 55, XP002390320 *

Also Published As

Publication number Publication date
CN101416189A (en) 2009-04-22
EP1999661A1 (en) 2008-12-10
CN101416189B (en) 2011-11-16

Similar Documents

Publication Publication Date Title
DE19929821A1 (en) A processor-based process control system for controlling industrial process machines e.g. plastics injection molding machine has computer with I/O bus controller directly connected to I/O bus network
DE102008060005A1 (en) A safety controller and method for controlling an automated plant having a plurality of plant hardware components
DE102016013496A1 (en) NUMERICAL CONTROL SYSTEM FOR COORDINATION WITH A TOOL CATALOG DATABASE
EP2574997B1 (en) Method for adjusting an operating status
EP2795414B1 (en) Automated project design of a control technology for a technical system
EP1886198B1 (en) Parameterization device and method for parameterizing electrical devices
EP1513036A2 (en) Device for regulating and/or controlling drives in machine tools or production machines
EP0801340B1 (en) Method and device for controlling a machine tool, in particular an electro-erosion machine
EP1463981A2 (en) Method for maintaining a production installation
WO2007110005A1 (en) Method for planning a technical installation taking account of topology and visualization presets
EP3732608B1 (en) Method for the computer-aided parameterisation of a technical system
EP1450279A2 (en) Method for configuring an electrical system
EP1402326B1 (en) Method and device for commissioning manufacturing execution systems (mes) components
EP1929382B1 (en) Parameterisation device and method or parameterising electrical devices
DE102004045196A1 (en) Method for adapting parameters of a control or regulating device
DE102019004944A1 (en) CONTROL SYSTEM OF AN INDUSTRIAL MACHINE
EP1383061A2 (en) Procedure and configurator for the construction of a plant concept from a number of plant components
DE102014016819A1 (en) Method and device for managing and configuring field devices of an automation system
DE102013212181A1 (en) Welding system and method for exchanging process data of a welding system
WO2013037987A1 (en) Identification of reusable mechatronic components in factory automation
DE10360529A1 (en) System for generating a control program
EP2360576B1 (en) Method and device for projecting an industrial automation assembly
EP1179428B1 (en) Method and device for working through process steps
EP1183577A1 (en) Method for the production of an open-loop control block and said control block
EP0770946A1 (en) Method for the automated optimal redundant interpretation of measurements of bus-systems in power stations

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 06722718

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 2006722718

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: 3719/KOLNP/2008

Country of ref document: IN

WWE Wipo information: entry into national phase

Ref document number: 200680054065.8

Country of ref document: CN