WO2004027203A2 PCT/US2003/029775 US0329775W WO2004027203A2 WO 2004027203 A2 WO2004027203 A2 WO 2004027203A2 US 0329775 W US0329775 W US 0329775W WO 2004027203 A2 WO2004027203 A2 WO 2004027203A2
Authority
WO
WIPO (PCT)
Prior art keywords
platform
temporary buoyancy
installation
floating platform
buoyancy means
Prior art date
Application number
PCT/US2003/029775
Other languages
French (fr)
Other versions
WO2004027203A3 (en
Inventor
Steven J. Leverette
Kent B. Davies
Stephen E. Kibbee
Original Assignee
Seahorse Equipment Corporation
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Seahorse Equipment Corporation filed Critical Seahorse Equipment Corporation
Priority to US10/528,494 priority Critical patent/US20060039758A1/en
Priority to AU2003272625A priority patent/AU2003272625A1/en
Publication of WO2004027203A2 publication Critical patent/WO2004027203A2/en
Publication of WO2004027203A3 publication Critical patent/WO2004027203A3/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • B63B35/44Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
    • B63B35/4413Floating drilling platforms, e.g. carrying water-oil separating devices
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B21/00Tying-up; Shifting, towing, or pushing equipment; Anchoring
    • B63B21/50Anchoring arrangements or methods for special vessels, e.g. for floating drilling platforms or dredgers
    • B63B21/502Anchoring arrangements or methods for special vessels, e.g. for floating drilling platforms or dredgers by means of tension legs
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B43/00Improving safety of vessels, e.g. damage control, not otherwise provided for
    • B63B43/02Improving safety of vessels, e.g. damage control, not otherwise provided for reducing risk of capsizing or sinking
    • B63B43/04Improving safety of vessels, e.g. damage control, not otherwise provided for reducing risk of capsizing or sinking by improving stability
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B43/00Improving safety of vessels, e.g. damage control, not otherwise provided for
    • B63B43/02Improving safety of vessels, e.g. damage control, not otherwise provided for reducing risk of capsizing or sinking
    • B63B43/10Improving safety of vessels, e.g. damage control, not otherwise provided for reducing risk of capsizing or sinking by improving buoyancy
    • B63B43/14Improving safety of vessels, e.g. damage control, not otherwise provided for reducing risk of capsizing or sinking by improving buoyancy using outboard floating members
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B21/00Tying-up; Shifting, towing, or pushing equipment; Anchoring
    • B63B21/50Anchoring arrangements or methods for special vessels, e.g. for floating drilling platforms or dredgers
    • B63B2021/505Methods for installation or mooring of floating offshore platforms on site

Definitions

  • Fig. 5 illustrates a floating platform of the invention being positioned for connection to pre-installed tendons for anchoring the floating platform to the seabed;
  • the tendons 20 are locked in the tendon porches 50 located on the pontoons
  • the tank 68 is provided with the necessary

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)
  • Movable Scaffolding (AREA)

Abstract

In a floating platform, temporary buoyancy modules (30) detachably mounted on the hull (12) of the floating platform (10) are provided. Each temporary buoyancy module (30) is provided with removable winches (42) for developing initial pre-tension of pre-installed tendons (20) for anchoring the platform (10) at the installation site.

Description

APPARATUS AND METHOD OF INSTALLATION OF A MONO-COLUMN FLOATING PLATFORM
BACKGROUND OF THE DISCLOSURE
The present invention relates to a method for the installation of a floating platform, and
more particularly, to a method for the installation of a mono-column TLP (tension leg platform)
in deepwater which is not dependent on deepwater heavy lift vessels.
The usual method of installing a mono-column TLP includes (1) installing anchor piles in the seabed, (2) connecting tendons to the anchor piles, (3) installing the platform hull and connecting it to the tendons, (4) lifting and setting the deck on the hull, and (5) completing hook¬
up of interfaces. This installation method works well in areas such as the Gulf of Mexico, where deepwater heavy lift crane vessels are routinely available and the installation site is not subject to long-period ocean swells.
In some areas of the world, however, deepwater heavy lift vessels are only occasionally present. But when available, in areas such as West Africa, they are not easily utilized because persistent long-period ocean swells cause substantial relative motion between the platform hull being installed and the deepwater heavy lift crane vessel. In such an installation, the crane
vessel's hook provides the mono-column hull with a stabilizing upward force as the mono-
column hull is lowered into the water through its brief condition of hydrostatic instability after
pontoon submergence. The relative motion between these two different vessels, i.e.,between the
hull and the deepwater heavy lift vessel, under the action of long period ocean swells, causes unacceptably large variations in hook load.
It is therefore an object of the present invention to provide apparatus and a method for
installing a floating platform in areas where deepwater heavy lift vessels are not routinely available. It is another object of the present invention to provide apparatus and a method for
installing a floating platform in areas prone to long-period ocean swells.
SUMMARY OF THE INVENTION
In accordance with the present invention, a mono-column floating platform is provided with temporary buoyancy modules detachably mounted on the hull of the floating platform. Each
temporary buoyancy module is provided with removable winches for developing initial pre¬
tension of the tendons.
BRIEF DESCRIPTION OF THE DRAWINGS
So that the manner in which the above recited features, advantages and objects of the present invention are attained can be understood in detail, a more particular description of the invention briefly summarized above, may be had by reference to the embodiments thereof which
are illustrated in the appended drawings.
It is noted, however, that the appended drawings illustrate only typical embodiments of this invention and are therefore not to be considered limiting of its scope, for the invention may admit to other equally effective embodiments.
Fig. 1 illustrates a floating platform of the invention being dry-towed to an offshore
assembly area;
Fig. 1 A is an enlarged partial perspective view depicting temporary buoyancy module and
winch arrangement of the invention;
Fig. 2 illustrates a floating platform of the invention being off-loaded at an offshore assembly area;
Fig. 3 illustrates a floating platform of the invention ballasted down to installation draft; Fig. 4 illustrates a floating platform of the invention being towed to an installation site;
Fig. 5 illustrates a floating platform of the invention being positioned for connection to pre-installed tendons for anchoring the floating platform to the seabed;
Fig. 6 illustrates a floating platform of the invention being ballasted down and winches
connected to the tendons for developing initial pretension of the tendons;
Fig. 7 illustrates a floating platform of the invention with the tendons locked and the hull
of the floating platform deballasted;
Fig. 8 illustrates a floating platform of the invention depicting the winch decks removed
from the temporary buoyancy modules; Fig. 9 illustrates a floating platform of the invention depicting the temporary buoyancy modules removed and complete installation of the floating platform; and
Figs. 10 - 14 illustrate an alternate installation sequence in accordance with the present
invention wherein the temporary buoyancy modules of the invention are hingedly secured to a
floating platform.
DETAILED DESCRIPTION OF A PREFERRED EMBODIMENT
Referring first to Fig. 1 , a floating platform of the present invention is generally identified
by the reference numeral 10. The platform 10 includes a hull 12 which provides positive
buoyancy and vertical support for the platform 10. The hull 12 comprises a central column 13
and pontoons 18 extending radially outwardly from the lower end of the central column 13. One
or more decks 14 are supported on the central column 13 above the water surface 16. Drilling and/or production equipment necessary for the recovery and processing of oil, gas and water recovered from the oil and gas field are secured on the deck 14. The lower portion of the central column 13 forms the base of the platform 10. The base
of the platform 10 is at the intersection of the central column 13 and the pontoons 18 extending
radially outwardly therefrom. The platform 10 is anchored to the seabed by tendons 20 secured
at one end thereof to the pontoons 18, as shown in Fig. 5, and at the opposite ends thereof to foundation piles (not shown in the drawings) embedded in the seabed. The hull 12 provides sufficient buoyancy to support the payload of the platform 10; which payload includes the deck 14, drilling and/or completion equipment, production facilities, production and drilling risers;
and sufficient excess buoyancy to develop the tendon pre-tension required by the platform 10. In a typical installation of a mono-column floating platform , the hull 12 is towed to the
installation site and maneuvered over tendons 20 which have been pre-installed and connected at the lower ends thereof to foundation piles embedded in the seabed. The hull 12 is stable
floating on the pontoons 18 because of the large water plane area provided by the pontoons 18. The hull 12, however, becomes hydrostatically unstable when the pontoons 18 are fully submerged below the water line 16. For such an installation, a heavy lift vessel is typically utilized to provide the hull 12 with a stabilizing upward force as the hull 12 is lowered into the
water for connection to the tendons 20. The deck 14 is then lifted by the heavy lift vessel and set
on the hull 12. However, in some areas of the world, heavy lift vessels are not readily available. Heavy lift vessels are also not particularly suitable for use at installation sites subject to long-
period ocean swells. Referring again to Fig. 1, it will be observed that the platform 10 of the invention is
substantially assembled, including the deck 14 mounted on the central column 13 , and dry-towed
to an offshore site where the water depth is sufficient to lower the platform 10 in the water to an
installation draft. Temporary buoyancy modules 30 are mounted on the pontoons 18 at the distal
ends thereof. Referring now to Fig. 1A, a temporary buoyancy module of the invention generally identified by the reference numeral 30 is shown in greater detail. The buoyancy module 30
includes a floodable tank 32 secured on top of the pontoons 18. The tank 32 is provided with the
necessary plumbing, including a fill port and vent, for connection with a ballast system used
during installation. In a preferred embodiment shown in Fig. 1 A, brackets 34 provided on the
pontoons 18 are adapted for mating engagement with padeyes 36 provided on the tank 32. A connector pin 38 inserted through the aligned brackets 34 and padeyes 36 fixedly secures the temporary buoyancy module 30 on top of the pontoons 18 at the distal ends thereof.
A removable temporary winch deck 40 is mounted on top of the tank 32 of the temporary
buoyancy modules 30. The winch deck 40 provides a dry deck area to support one or more
winches 42. The winches 42 are powered by hydraulic power units 44 or the like mounted on the
winch deck 40. The winches 42 are supported on the temporary buoyancy modules 30 directly
above the pre-installed tendons 20. Winch lines 46 connect the winches 42 to the tendons 20 for developing initial pre-tension in the tendons 20.
Referring now to Figs. 1-9 collectively, the installation sequence for the platform 10 of the invention 10 is shown. One benefit of the present invention is that the platform 10 may be substantially assembled on shore. The assembled platform 10 is dry-towed to an offshore site
where the water depth is sufficient for off loading the platform 10 and ballasting down to
installation draft as shown in Fig. 3. The temporary buoyancy modules 30 maintain the stability of the platform 10 as it is lowered into the water by providing water plane areas at a relatively
large distance from the axial center of the platform 10 for efficiently developing a righting
moment as the platform 10 is lowered from its stable position floating on the pontoons 18 to an otherwise unstable position immediately after the pontoons 18 submerge below the water surface
16. The upper ends of the temporary buoyancy modules 30 extend above the water surface 16
providing a dry deck area for the winches 42. Thereafter the platform 10 is towed to the installation site and positioned above the pre- installed tendons 20. The winch lines 46 are connected to the tendons 20 for holding the platform
10 in position above the tendons 20 and then the winches 42 are activated. The hull 12 is lowered
toward the tendons 20 by ballasting and then the hull 12 is pulled down by the winches 42 to gain
initial pretension. The tendons 20 are locked in the tendon porches 50 located on the pontoons
18 and the hull 12 is deballasted to develop the tendon pre-tension required to provide stability to the platform 10. The winch decks 40 and temporary buoyancy modules 30 are removed and installation of the platform 10 is completed. The temporary buoyancy modules 30 and winch
deck 40 and winches 42 may be shipped and re-used in installations at other locations. Referring now to Figs. 10 - 14, an alternate installation sequence is depicted. In some
offshore environments it may be desirable to transport the floating platform 10 to the installation site with the temporary buoyancy modules laying down on top of the pontoons 18. For such environments, an alternate embodiment of the temporary buoyancy modules generally identified by the reference numeral 60 is provided. The temporary buoyancy modules 60 include a lower
angular transition portion 62 terminating at a lower edge 66. The temporaty buoyancy modules
60 are releasably connected to the distal ends of the pontoons 18. Any number of releasable
connection means may be utilized to securely mount the buoyancy modules 60 to the pontoons
18. In a preferred embodiment shown in Figs. 10 - 14, hinge brackets 64 pivotally secure the
buoyancy modules 60 to the distal ends of the pontoons 18. The temporary buoyancy modules 60 further include a floodable tank 68 (substantially identical to the tank 32 previously described herein) welded, integrally formed therewith or
otherwise mounted on top of the transition portion 62. The tank 68 is provided with the necessary
plumbing, including a fill port and vent, for connection with a ballast system used during
installation. Referring still to Figs. 10 - 14 and in accordance with the alternate installation sequence, the assembled platforai 10 is dry-towed to the installation site. For transport to the installation site, the temporary buoyancy modules 60 are rotated to a horizontal position and lay down on top of the pontoons 18 as shown in Fig. 10. At the installation site, the platform 10 is offloaded and the temporary buoyancy modules 60 are rotated about the hinge brackets 64 to an upright position
shown in Fig. 12. After rotation, a connector pin 70 is inserted through aligned padeyes 72 and
74 on the modules 60 and the pontoons 18, respectively, to secure the temporary buoyancy modules 60 in the upright position shown in Fig. 12. The winch and deck assemblies are thereafter mounted on top of the temporary buoyancy modules 60 and the platform 10 is lowered
in the water and connected to the tendons 20 and the buoyancy modules 60 are removed similarly
to the manner previously described herein.
While a preferred embodiment of the invention has been shown and described, other and
further embodiments of the invention may be devised without departing from the basic scope thereof, and the scope thereof is determined by the claims which follow.

Claims

CLAIMS:
1. A floating platform comprising a hull having a deck mounted on the upper end thereof
extending above the water line and pontoons extending radially outwardly from the base
of the hull, the improvement comprising temporary buoyancy means mounted on said pontoons at the distal ends thereof for maintaining the hydrostatic stability of said platform during installation.
2. The floating platform of claim 1 wherein said temporary buoyancy means comprises a
removable ballast tank secured on said pontoons at the distal ends thereof.
3. The floating platform of claim 2 including a dry deck on said ballast tank supporting at
least one winch thereon for connection with pre-installed tendons for developing initial pre-tension of said tendons.
4. The floating platform of claim 1 wherein said temporary buoyancy means is hingedly secured to said pontoons.
5. A method of installing a floating platform, comprising the steps of:
a) providing said platform with removable temporary buoyancy means for maintaining
hydrostatic stability of said platform while ballasting down to the installation draft of said platform;
b) towing said platform to an installation site; c) ballasting down said platform to an installation draft;
d) connecting said platform to the pre-installed tendons;
e) removing said temporary buoyancy means; and
f) deballasting said platform to develop the tendon pre-tension required to provide stability to said platform.
6. The method of claim 5 including the step of providing winch means on said temporary buoyancy means for developing initial pre-tension in pre-installed tendons for anchoring
said platform at the installation site.
7. The method of claim 5 including the step of rotating said temporary buoyancy means to
a horizontal position prior to towing said platform to the installation site.
8. The method of claim 7 including the step of rotating said temporary buoyancy means to an upright position prior to ballasting down to the installation draft of said platform.
9. The method of claim 8 including the step of providing winch means on said temporary buoyancy means for developing initial pre-tension in pre-installed tendons for anchoring said platform at the installation site.
10. The method of claim 5 including the step of ballasting down said platform without using a heavy lift crane vessel to maintain the hydrostatic stability of said floating platform.
PCT/US2003/029775 2002-09-19 2003-09-19 Mono-column floating platform and method of installing same WO2004027203A2 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
US10/528,494 US20060039758A1 (en) 2002-09-19 2003-09-19 Apparatus and method of installation of a mono-column floating platform
AU2003272625A AU2003272625A1 (en) 2002-09-19 2003-09-19 Mono-column floating platform and method of installing same

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US41206902P 2002-09-19 2002-09-19
US60/412,069 2002-09-19

Publications (2)

Publication Number Publication Date
WO2004027203A2 true WO2004027203A2 (en) 2004-04-01
WO2004027203A3 WO2004027203A3 (en) 2004-07-01

Family

ID=32030796

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/US2003/029775 WO2004027203A2 (en) 2002-09-19 2003-09-19 Mono-column floating platform and method of installing same

Country Status (3)

Country Link
US (1) US20060039758A1 (en)
AU (1) AU2003272625A1 (en)
WO (1) WO2004027203A2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2461713A (en) * 2008-07-09 2010-01-13 Pelamis Wave Power Ltd Marine connection system and method using a floatable winch
WO2010029766A1 (en) * 2008-09-11 2010-03-18 三井造船株式会社 Tension-moored floating body and method for towing and installing tension-moored floating body
ES2453765A1 (en) * 2012-10-08 2014-04-08 Iberdrola Ingeniería Y Construcción, S.A.U. Method for installing a floating platform

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100387783C (en) * 2003-02-28 2008-05-14 默代克国际有限公司 Method of installation of a tension leg platform
US20080017093A1 (en) * 2005-03-28 2008-01-24 Seahorse Equipment Corporation Drawdown apparatus and installation method for a floating platform
EP2036815B1 (en) * 2007-09-12 2013-05-01 WeserWind GmbH Method for installing and de-installing a foundation structure, foundation structure and lifting body
EP2529054B1 (en) 2010-01-26 2021-10-06 Husqvarna AB A laying machine for a flexible elongate member
GB2538275B (en) 2015-05-13 2018-01-31 Crondall Energy Consultants Ltd Floating production unit and method of installing a floating production unit
CN114455017A (en) * 2022-03-10 2022-05-10 中国电建集团华东勘测设计研究院有限公司 Floating body, floating type offshore transformer substation and installation method thereof

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4452166A (en) * 1981-11-20 1984-06-05 Daniel Nathan I Foil stabilized monohull vessel
US4457248A (en) * 1980-06-25 1984-07-03 Thurston John W Multihull vessels
US4829924A (en) * 1986-07-21 1989-05-16 Dynovation Design And Engineering Inc. Semi submersible device and method to set and salvage marine superstructures

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3837309A (en) * 1971-06-17 1974-09-24 Offshore Technology Corp Stably buoyed floating offshore device
US4557248A (en) * 1985-01-07 1985-12-10 Richards James A Wood and gas fired furnace
NO309233B1 (en) * 1995-06-07 2001-01-02 Aker Eng As Procedure for installation of tensioning platform
DE60138541D1 (en) * 2000-05-12 2009-06-10 Deepwater Marine Technology Llc TEMPORARY DRIVE AND STABILIZATION DEVICE AND METHOD

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4457248A (en) * 1980-06-25 1984-07-03 Thurston John W Multihull vessels
US4452166A (en) * 1981-11-20 1984-06-05 Daniel Nathan I Foil stabilized monohull vessel
US4829924A (en) * 1986-07-21 1989-05-16 Dynovation Design And Engineering Inc. Semi submersible device and method to set and salvage marine superstructures

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2461713A (en) * 2008-07-09 2010-01-13 Pelamis Wave Power Ltd Marine connection system and method using a floatable winch
GB2461713B (en) * 2008-07-09 2010-09-08 Pelamis Wave Power Ltd Marine connection system and method
WO2010004314A3 (en) * 2008-07-09 2010-12-29 Pelamis Wave Power Limited Marine connection system and method
JP2011527261A (en) * 2008-07-09 2011-10-27 ペラミス ウェーブ パワー リミテッド Marine connection system and method
US8991325B2 (en) 2008-07-09 2015-03-31 Pelamis Wave Power Limited Marine connection system and method
WO2010029766A1 (en) * 2008-09-11 2010-03-18 三井造船株式会社 Tension-moored floating body and method for towing and installing tension-moored floating body
JP2010064649A (en) * 2008-09-11 2010-03-25 Mitsui Eng & Shipbuild Co Ltd Taut mooring float and method for towing and installing taut mooring float
ES2453765A1 (en) * 2012-10-08 2014-04-08 Iberdrola Ingeniería Y Construcción, S.A.U. Method for installing a floating platform

Also Published As

Publication number Publication date
AU2003272625A8 (en) 2004-04-08
US20060039758A1 (en) 2006-02-23
AU2003272625A1 (en) 2004-04-08
WO2004027203A3 (en) 2004-07-01

Similar Documents

Publication Publication Date Title
US5421676A (en) Tension leg platform and method of instalation therefor
EP1766143B1 (en) Ballasting offshore platform with buoy assistance
CN103917439B (en) There is the offshore platforms of external post
KR20050109518A (en) Method of installation of a tension leg platform
EP0741822A1 (en) Tension leg platform and method of installation therefor
GB2344843A (en) Gravity securing system for offshore generating equipment
US20080017093A1 (en) Drawdown apparatus and installation method for a floating platform
US4417831A (en) Mooring and supporting apparatus and methods for a guyed marine structure
US20020154954A1 (en) Floating stability device for offshore platform
US6688250B2 (en) Method and apparatus for reducing tension variations in mono-column TLP systems
US7278801B2 (en) Method for deploying floating platform
US20060039758A1 (en) Apparatus and method of installation of a mono-column floating platform
NO315111B1 (en) Löftefartöy for positioning, lifting and handling of a marine structure
JPH10511753A (en) Offshore platform with floating rig supplemental support
USRE32119E (en) Mooring and supporting apparatus and methods for a guyed marine structure
EP0908382A2 (en) Methods of assembling floating offshore structures
AU2011101650A4 (en) Self installing tension leg platform and subsea storage tank
AU2002335802B2 (en) Achieving hydrostatic stability of a floating structure
US7104730B2 (en) Achieving hydrostatic stability of a floating structure
AU2002335802A1 (en) Achieving hydrostatic stability of a floating structure
US20020067958A1 (en) Methods of installing offshore platforms
US11739732B2 (en) Off-shore wind turbine system and method of installation
WO2023015254A1 (en) Installation system and method for an offshore wind turbine
DK178712B1 (en) Arctic Drilling Process
DK201700747A1 (en) Arctic Drilling Process

Legal Events

Date Code Title Description
AK Designated states

Kind code of ref document: A2

Designated state(s): AE AG AL AM AT AU AZ BA BB BG BR BY BZ CA CH CN CO CR CU CZ DE DK DM DZ EC EE ES FI GB GD GE GH GM HR HU ID IL IN IS JP KE KG KP KR KZ LC LK LR LS LT LU LV MA MD MG MK MN MW MX MZ NI NO NZ OM PG PH PL PT RO RU SC SD SE SG SK SL SY TJ TM TN TR TT TZ UA UG US UZ VC VN YU ZA ZM ZW

AL Designated countries for regional patents

Kind code of ref document: A2

Designated state(s): GH GM KE LS MW MZ SD SL SZ TZ UG ZM ZW AM AZ BY KG KZ MD RU TJ TM AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LU MC NL PT RO SE SI SK TR BF BJ CF CG CI CM GA GN GQ GW ML MR NE SN TD TG

121 Ep: the epo has been informed by wipo that ep was designated in this application
DFPE Request for preliminary examination filed prior to expiration of 19th month from priority date (pct application filed before 20040101)
ENP Entry into the national phase

Ref document number: 2006039758

Country of ref document: US

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 10528494

Country of ref document: US

122 Ep: pct application non-entry in european phase
WWP Wipo information: published in national office

Ref document number: 10528494

Country of ref document: US

NENP Non-entry into the national phase

Ref country code: JP

WWW Wipo information: withdrawn in national office

Country of ref document: JP