US3878884A - Formation fracturing method - Google Patents

Formation fracturing method Download PDF

Info

Publication number
US3878884A
US3878884A US346862A US34686273A US3878884A US 3878884 A US3878884 A US 3878884A US 346862 A US346862 A US 346862A US 34686273 A US34686273 A US 34686273A US 3878884 A US3878884 A US 3878884A
Authority
US
United States
Prior art keywords
borehole
formation
slanted
vertical
plane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US346862A
Inventor
Cecil B Raleigh
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to US346862A priority Critical patent/US3878884A/en
Application granted granted Critical
Publication of US3878884A publication Critical patent/US3878884A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • E21B43/17Interconnecting two or more wells by fracturing or otherwise attacking the formation
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24TGEOTHERMAL COLLECTORS; GEOTHERMAL SYSTEMS
    • F24T10/00Geothermal collectors
    • F24T10/30Geothermal collectors using underground reservoirs for accumulating working fluids or intermediate fluids
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/10Geothermal energy

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Fluid Mechanics (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Physics & Mathematics (AREA)
  • Sustainable Development (AREA)
  • Sustainable Energy (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

A method for producing multiple fractures in earth formations in which the lines of least principal stress deviate substantially from vertical is described. A generally vertical borehole is drilled into the formation, the formation is hydraulically fractured from the vertical borehole, the plane in which the fracture lies is determined, a slanted borehole is drilled out from the vertical borehole in a direction such that the azimuth of slanted borehole is generally perpendicular to the plane of the fracture and then the formation adjacent the slanted borehole is hydraulically fractured at a plurality of positions along the length of the slanted borehole. When the direction of lines of least principal stress is known for the formation, the steps of hydraulically fracturing from the vertical borehole and determining the plane in which the fracture lies may be omitted and the slanted borehole is drilled in the azimuth parallel to the known lines of least principal stress.

Description

.LDO'DUUQ United States Patent 1191 Raleigh 1 Apr. 22, 1975 FORMATION FRACTURING METHOD Wilson, Drain-I-lole Fracturing in Stimulation [76] Inventor: Cecil B. Raleigh, 762 La Para. PflIO Wells world 145 and Alto, Calif. 94306 Primary E.\'aminerEmest R. Purser [22] Flled' 1973 Assistant Examiner-Jack E. Ebel [211 App]. N0.: 346,862
[57] ABSTRACT [52] [1.8. CI. 165/1; 165/45; 166/271; A method for producing multiple fractures in earth 166/308 formations in which the lines of least principal stress [51] Int. Cl. FZSd 21/00 deviate substantially f Vertical is described. A [58] Field of Search 60/26; 165/1. 45; 166/50. rally vertical borehole is drilled into the formation,
166/271, 269, 303 the formation is hydraulically fractured from the verti- I cal borehole, the plane in which the fracture lies is de- [56] References cued termined, a slanted borehole is drilled out from the UNITED STATES PATENTS vertical borehole in a direction such that the azimuth 2369.497 11/1956 Rcistle 166/308 of Slanted borehole is generally perpendicular to the 3.020954 2/1962 Graham ct al. 166/308 plane of the fracture and then the formation adjacent 3,285.335 11/1966 Rcistlc 166/308 the slanted borehole is hydraulically fractured at 21 3.31334 /196 Huitt c t a1 166/308 plurality of positions along the length of the slanted 3391-739 7/1968 vcnghmms 166/308 borehole. When the direction oflines of least principal 2 Doggcn et stress is known for the formation, the steps of hydrauf 'fii 26 lically fracturing from the vertical borehole and determining the plane in which the fracture lies may be 3,593,791 7/I97l Parker 166/308 3,679,264 7 1972 Van Huiscn 166/269 ommed and the Slanted borehole dnlled the OTHER PUBLICATIONS Clark et al., Vertical Hydraulic Fracturing," Oil And Gas Journal, Aug. 9 1954, pp. 104, 107 and 108.
muth parallel to the known lines of least principal stress.
5 Claims, 2 Drawing Figures FORMATION FRACTURING METHOD BACKGROUND OF THE INVENTION This invention relates to a method for producing a plurality of non-coplanar and approximately parallel fractures in an earth formation adjacent a borehole to facilitate the recovery of a resource contained in the formation.
Nearly forty years ago it was found that oil bearing formations could be fractured by introducing low pene tration fluids into a borehole under hydraulic pressure sufficiently high to cause propagation of a fracture from the borehole and that fracturing was generally followed by an increase in oil production from the borehole. Studies of the hydraulic fracturing process have shown that the fractures are generally planar and oriented perpendicular to the direction of least principa stress (commonly designated S in the rock.
In a great many formations or formation zones. the direction of least principal stress is approximately horizontal and the planes of hydraulically produced fractures are generally vertical and perpendicular to the direction of least principal stress in the rock. In such formations or formation zones hydraulic pressure exerted in an approximately vertical well produces just a single approximately vertical planar fracture. While hydraulically induced fractures may propagate away from boreholes distances of 100 meters or so. the benefit obtained from a single fracture is limited and it would be desirable to produce a plurality of generally parallel fractures in the formation and so obtain greatly increased benefits from the fracturing technique.
BRIEF DESCRIPTION OF THE INVENTION volves first drilling an approximately vertical boreholein the formation to a depth either penetrating, or very close to the horizon of. the resource bearing zone of the formation. A slanted borehole is then drilled into the formation from the lower part of the vertical borehole. Optimally, the azimuth (i.e., the compass direction of the horizontal line defined by the intersection of the vertical plane containing the line of the slanted hole with the surface) of the slanted borehole would be the same as the direction of lines of least principal stress in the rock. To obtain the benefits of this invention. however. a slanted borehole need not be in precisely the same direction as the direction of the lines of least principal stress in the formation but may be in a direction such that the angle between the line of the slanted borehole and the lines of least principal stress in the formation is not more than 60. After the slanted borehole has been drilled to the desired depth, the slanted hole is completed and cased. Hydraulic fractures are then propagated from the slanted borehole and the fractures may be propped with sand in conventional manner to hold them open. Thefractures are produced in conventional manner by packing off sections of the slanted borehole so that the injected fluid does not enter into existing perforations.
DETAILED DESCRIPTION OF THE INVENTION l5 ond slanted and vertical bore hole. the second slanted bore hole being drilled so that it communicates with at least the major proportion of the fractures propagated from the first slanted borehole.
Referring now to FIG. 1 of the appended drawings.
vertical borehole l is drilled into the formation so that it bottoms either in the resource containing zone of a formation or close to the horizon of the resource containing zone. Slanted borehoe 2 is then drilled into the resource containing zone C the formation from the point in the lower part of the.vertical borehole. The formations chosen for the application of the method are those in which the direction of the lines of least principal stress are generally horizontal and in which the planes of hydraulic fractures, which are known to be generally perpendicular to the lines of least principal stress. are generally vertical.
The direction of the slanted borehole is such that the angle between the line of the slanted borehole and the lines of least principal stress is not greater than preferably not more than 45 and optimally less than 30. Many formations have been drilled and studied to the point that the direction of least principal stress is already known and existing information permits the opof least principal stress is not known and must be deter- ;Qgglinined before the slanted borehole is drilled. The dife' ction of least principal stress of such formations may be determined by hydraulically fracturing the formation adjacent the lower part of the vertical borehole and then determining the plane in which the fracture lies. Methods for determining the position of the fracture plane are well-known and readily available as by the use of impression packers or by injecting radioactive tracers into the fracture and then determining the position of the plane from the pattern of the signals emitted by the radioactive material in the fracture. After the position of the fracture plane has been determined, the direction of the lines of least principal stress become known since they are perpendicular to the fracture plane.
When the position of the fracture plane is so determined. the direction of the slanted hole may be described either in terms of the angle it makes with the lines of least principal stress or in terms of the angle of incidence which the borehole makes with the fracture plane. the angle of incidence being the angle between the line of the slanted borehole and the perpendicular to the fracture plane at the point of intersection of the lines of least principal stress in less than 60 or as a direction such that the angle of incidence. i.e.. the angle between the borehole and the perpendicular to the fracture plane. is less than 60.
After slanted borehole 2 has been drilled to the desired depth. it is completed and cased. Fractures 3 and 9 inclusive are then made by perforating the casing at the shallowest practical depth. adjacent the area of fracture 3. and hydraulically fracturing the formation to maximum distance of fracture propagation consistant with economic considerations. This first fracture is propped with sand for gas and oil production and also may be propped for geo-thermal power production. if desired. At a few meters greater depth. the casing is perforated again. packed off and the fracturing operation is repeated. The fracturing here and in all successive positions down the hole will be conducted in packed off sections ofthe bore hole so that the injected fluid does not enter existing perforations.
The fracturing method above described can be used to increase the recovery of gas or oil from low permeability formations. It can also be used for in-situ. recovcry of oil from oil shale. or solution mining or extracting goo-thermal energy from subterranean formations.
There are large areas on the earth where hot. impermeable rock is accessible to drilling. Geo-thermal energy may be extracted by drilling and fracturing the hot formation as described in connection with FIG. 1 of the drawings. then pumping water down the hole into contact with the fractured surfaces. permitting the water to reside in the formation for time sufficient to heat it and then permitting the water to reissue from the same hole as steam or super-heated water.
FIG. 2 of the appended drawings illustrates a modification of the invention which is particularly well adapted to either recovery of geo-thermal energy or solution mining. Vertical well 10 is drilled to appropriate depth and if the direction of the lines of least principal stress in the formation are not known. as they probably will not be. the formation adjacent the lower part of vertical well 10 is hydraulically fractured and the plane of fracture is determined. Slant borehole 11 is then drilled in a direction such that its angle of incidence. i.e.. the angle between the borehole and the perpendicular to the plane of fracture. is less than 60. When the slant well has been drilled to appropriate depth. a plurality of non-coplanar approximately parallel fractures are produced adjacent the slanted well illustrated by fractures 12 through 18 inclusive ori the drawing. A second approximately vertical borehole 20 is then drilled and a second slanted borehole is drilled from a point near the bottom of the second vertical borehole and in a direction approximately parallel to that of the first slanted borehole. The second slanted borehole is so spaced from the first slanted borehole that it intersects most of the fractures which were produced from the first slanted borehole. It is important that the second slanted borehole intersect the major portion of the fractures extending out from the first slanted borehole. In areas where the characteristics 'of the formations are well known. it is possible to space the separate second slanted borehole apart from the first slanted borehole by a distance such that the desired fracture penetration by the second borehole will be achieved. In areas where the characteristics of the formation are not well known the second slanted borehole can be drilled to a depth where some of the fractures should have been intersected. A radioactive tracer can then be injected into the first slanted borehole and into the fractures propagated from it and the second slanted borehole can be logged for the presence of radioactive material. Alternatively. fluid can be injected into the first vertical borehole and first slanted borehole at high pressure (in excess of the parting pressure) into the fractures extending from the first slanted borehole and. if intersection of the fractures has been accomplished. a pressure increase will be produced quickly in the second slanted borehole. Failure to intersect the fractures can be corrected by then altering the inclination of the second slanted borehole or by re-drilling at a deeper level. The second slanted borehole. when completed. may be cased and perforated at the points of intersection with the fractures. After the drilling and fracturing has been completed. water is pumped down borehole 10 into slanted borehole 11 and forced into the several fractures propagated from borehole 11. The water contacts the hot subterranean rock along the fracture surfaces producing steam and the steam flows into the second slanted borehole l9 and is recovered at the surface through vertical borehole 20.
In some situations it may be desired to avoid the expense of drilling two vertical and two slanted boreholes to recover geothermal energy. In this event the pattern shown in FIG. 1 may be used. Water is injected into the formation and held under pressure for a time sufficient to produce superheated water and steam or water above its critical temperature. The pressure is then released to permit flow of superheated water and steam to the surface. Successive cycles ofinjection and recovery are then used to remove geothermal energy.
I claim:
I. A method of opening an earth formation in which the lines of least principal stress deviate substantially from the vertical to facilitate recovery of a resource held in the formation which comprises the steps of:
a. drilling an approximately vertical borehole into th formation;
b. drilling a slanted borehole extending from the vertical borehole into the formation in a direction such that the angle between the slanted borehole and the lines of least principal stress in the formation is not more than 60; and
c. hydraulically fracturing the formation adjacent the slanted borehole at a plurality of positions along the length of the slanted borehole.
2. The method of opening an earth formation in which the lines of least principal stress deviate substantially from the vertical to permit recovery of a resource held in the formation which comprises the steps of:
a. drilling an approximately vertical borehole in the earth formation;
b. hydrofracturing the formation adjacent the lower portion of the borehole;
c. determining the plane in which the fracture lies;
(1. drilling a slanted borehole extending from the vertical borehole into the formation in a direction such that the angle between the slanted borehole and the perpendicular to any plane parallel to the plane determined in step (c) which is intersected by the borehole is less than 60; and
e. hydrofracturing the formation adjacent the slanted borehole at a plurality of positions along the length of the slanted borehole.
3. The method defined in claim 2 wherein the angle between the borehole and the perpendicular to the plane is less than 4. The method defined in claim 1 characterized by a further step of drilling a second vertical borehole adjacent the first borehole and a second slanted borehole extending from the second vertical borehole into the formation generally parallel to the first slanted borehole and spaced from the first slanted borehole by a distance such that the second slanted borehole intersects at least a major proportion of the formation fractures produced in step (c) of claim 1.
5. The method of recovering heat from a subterranean geothermal zone which comprises the steps of:
a. drilling an approximately vertical borehole penetrating said geothermal zone:
b. hydrofracturing the formation adjacent the lower portion of the borehole;
c. determining the plane in which the fracture lies;
d..drilling a slanted borehole extending from the vertical borehole into the geothermal zone in a direction such that the angle between the slanted borehole and the perpendicular to any plane parallel to the plane determined in step (c) which is intersected by the borehole is less than 60;
e. h ydrofracturing the formation adjacent the slanted borehole at a plurality of positions along the length of the slanted borehole;
f. injecting water into the borehole to contact the geothermal zone under pressure.
g. holding the injected water under pressure until it is heated to elevated temperature and.
h. releasing the pressure to permit flow of heated

Claims (4)

1. A method of opening an earth formation in which the lines of least principal stress deviate substantially from the vertical to facilitate recovery of a resource held in the formation which comprises the steps of: a. drilling an approximately vertical borehole into the formation; b. drilling a slanted borehole extending from the vertical borehole into the formation in a direction such that the angle between the slanted borehole and the lines of least principal stress in the formation is not more than 60*; and c. hydraulically fracturing the formation adjacent the slanted borehole at a plurality of positions along the length of the slanted borehole.
2. The method of opening an earth formation in which the lines of least principal stress deviate substantially from the vertical to permit recovery of a resource held in the formation which comprises the steps of: a. drilling an approximately vertical borehole in the earth formation; b. hydrofracturing the formation adjacent the lower portion of the borehole; c. determining the plane in which the fracture lies; d. drilling a slanted borehole extending from the vertical borehole into the formation in a direction such that the angle between the slanted borehole and the perpendicular to any plane parallel to the plane determined in step (c) which is intersected by the borehole is less than 60*; and e. hydrofracturing the formation adjacent the slanted borehole at a plurality of positions along the length of the slanted borehole.
3. The method defined in claim 2 wherein the angle between the borehole and the perpendicular to the plane is less than 30*.
4. The method defined in claim 1 characterized by a further step of drilling a second vertical borehole adjacent the first borehole and a second slanted borehole extending from the second vertical borehole into the formation generally parallel to the first sLanted borehole and spaced from the first slanted borehole by a distance such that the second slanted borehole intersects at least a major proportion of the formation fractures produced in step (c) of claim 1.
US346862A 1973-04-02 1973-04-02 Formation fracturing method Expired - Lifetime US3878884A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US346862A US3878884A (en) 1973-04-02 1973-04-02 Formation fracturing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US346862A US3878884A (en) 1973-04-02 1973-04-02 Formation fracturing method

Publications (1)

Publication Number Publication Date
US3878884A true US3878884A (en) 1975-04-22

Family

ID=23361335

Family Applications (1)

Application Number Title Priority Date Filing Date
US346862A Expired - Lifetime US3878884A (en) 1973-04-02 1973-04-02 Formation fracturing method

Country Status (1)

Country Link
US (1) US3878884A (en)

Cited By (87)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3934649A (en) * 1974-07-25 1976-01-27 The United States Of America As Represented By The United States Energy Research And Development Administration Method for removal of methane from coalbeds
US4200152A (en) * 1979-01-12 1980-04-29 Foster John W Method for enhancing simultaneous fracturing in the creation of a geothermal reservoir
US4220205A (en) * 1978-11-28 1980-09-02 E. I. Du Pont De Nemours And Company Method of producing self-propping fluid-conductive fractures in rock
US4223729A (en) * 1979-01-12 1980-09-23 Foster John W Method for producing a geothermal reservoir in a hot dry rock formation for the recovery of geothermal energy
US4254828A (en) * 1977-12-21 1981-03-10 Messerschmitt-Bolkow-Blohm Gmbh Apparatus for producing fractures and gaps in geological formations for utilizing the heat of the earth
US4476932A (en) * 1982-10-12 1984-10-16 Atlantic Richfield Company Method of cold water fracturing in drainholes
US4479541A (en) * 1982-08-23 1984-10-30 Wang Fun Den Method and apparatus for recovery of oil, gas and mineral deposits by panel opening
US4505322A (en) * 1979-03-12 1985-03-19 Larson Sven A Method of storing heat and heat store for carrying out the method
US4529036A (en) * 1984-08-16 1985-07-16 Halliburton Co Method of determining subterranean formation fracture orientation
US4633948A (en) * 1984-10-25 1987-01-06 Shell Oil Company Steam drive from fractured horizontal wells
US4669546A (en) * 1986-01-03 1987-06-02 Mobil Oil Corporation Method to improve vertical hydraulic fracturing in inclined wellbores
US4687061A (en) * 1986-12-08 1987-08-18 Mobil Oil Corporation Stimulation of earth formations surrounding a deviated wellbore by sequential hydraulic fracturing
US4723604A (en) * 1984-01-04 1988-02-09 Atlantic Richfield Company Drainhole drilling
US4867241A (en) * 1986-11-12 1989-09-19 Mobil Oil Corporation Limited entry, multiple fracturing from deviated wellbores
US4974675A (en) * 1990-03-08 1990-12-04 Halliburton Company Method of fracturing horizontal wells
US4977961A (en) * 1989-08-16 1990-12-18 Chevron Research Company Method to create parallel vertical fractures in inclined wellbores
US5074360A (en) * 1990-07-10 1991-12-24 Guinn Jerry H Method for repoducing hydrocarbons from low-pressure reservoirs
US5085276A (en) * 1990-08-29 1992-02-04 Chevron Research And Technology Company Production of oil from low permeability formations by sequential steam fracturing
US5875843A (en) * 1995-07-14 1999-03-02 Hill; Gilman A. Method for vertically extending a well
US5964289A (en) * 1997-01-14 1999-10-12 Hill; Gilman A. Multiple zone well completion method and apparatus
US6247313B1 (en) * 1996-11-22 2001-06-19 Per H. Moe Plant for exploiting geothermal energy
US6367566B1 (en) 1998-02-20 2002-04-09 Gilman A. Hill Down hole, hydrodynamic well control, blowout prevention
WO2006059057A1 (en) * 2004-12-02 2006-06-08 Halliburton Energy Services, Inc Hydrocarbon sweep into horizontal transverse fractured wells
DE102005044352A1 (en) * 2005-09-16 2007-03-22 Diehl Stiftung & Co.Kg Method for producing an HDR heat exchanger
US20080249721A1 (en) * 2007-01-16 2008-10-09 Zoback Mark D Predicting changes in hydrofrac orientation in depleting oil and gas reservoirs
US20100307756A1 (en) * 2008-02-15 2010-12-09 Reinhard Jung Geothermal circulation system
US20110042083A1 (en) * 2009-08-20 2011-02-24 Halliburton Energy Services, Inc. Method of improving waterflood performance using barrier fractures and inflow control devices
US20110061869A1 (en) * 2009-09-14 2011-03-17 Halliburton Energy Services, Inc. Formation of Fractures Within Horizontal Well
US20110226473A1 (en) * 2010-03-18 2011-09-22 Kaminsky Robert D Deep Steam Injection Systems and Methods
US20140144623A1 (en) * 2012-11-28 2014-05-29 Nexen Energy Ulc Method for increasing product recovery in fractures proximate fracture treated wellbores
KR101419973B1 (en) * 2010-08-24 2014-07-15 이시우 System and method of creating EGS Group utilizing fault zone
WO2015132404A1 (en) * 2014-03-07 2015-09-11 Vito Geothermal plant using hot dry rock fissured zone
CN105089612A (en) * 2014-05-04 2015-11-25 中国石油化工股份有限公司 Determining method for distance of well-drain and length of pressure break of low penetration oil reservoir artificial fracture
US20150354903A1 (en) * 2012-11-01 2015-12-10 Skanska Sverige Ab Thermal energy storage comprising an expansion space
EP2659090A4 (en) * 2010-12-27 2015-12-30 Seven Generations Energy Ltd Methods for drilling and stimulating subterranean formations for recovering hydrocarbon and natural gas resources
BE1022154B1 (en) * 2014-03-07 2016-02-19 Vito GEOTHERMAL DEVICE USING A FRACTURE AREA IN A HOT DRY STONE
US9518787B2 (en) 2012-11-01 2016-12-13 Skanska Svergie Ab Thermal energy storage system comprising a combined heating and cooling machine and a method for using the thermal energy storage system
CN106415151A (en) * 2014-03-07 2017-02-15 威拓股份有限公司 Geothermal plant using hot dry rock fissured zone
US9791217B2 (en) 2012-11-01 2017-10-17 Skanska Sverige Ab Energy storage arrangement having tunnels configured as an inner helix and as an outer helix
US10030491B2 (en) 2013-11-15 2018-07-24 Nexen Energy Ulc Method for increasing gas recovery in fractures proximate fracture treated wellbores
CN108661616A (en) * 2017-03-29 2018-10-16 中国石油化工股份有限公司 A kind of separate stratum fracfturing method suitable for sandstone reservoir
US10551091B2 (en) * 2016-05-09 2020-02-04 Welltec Oilfield Solutions Ag Geothermal energy extraction subterranean system
US10738600B2 (en) * 2017-05-19 2020-08-11 Baker Hughes, A Ge Company, Llc One run reservoir evaluation and stimulation while drilling
US11009162B1 (en) 2019-12-27 2021-05-18 U.S. Well Services, LLC System and method for integrated flow supply line
US11035207B2 (en) 2018-04-16 2021-06-15 U.S. Well Services, LLC Hybrid hydraulic fracturing fleet
US11067481B2 (en) 2017-10-05 2021-07-20 U.S. Well Services, LLC Instrumented fracturing slurry flow system and method
US11066912B2 (en) 2012-11-16 2021-07-20 U.S. Well Services, LLC Torsional coupling for electric hydraulic fracturing fluid pumps
US11091992B2 (en) 2012-11-16 2021-08-17 U.S. Well Services, LLC System for centralized monitoring and control of electric powered hydraulic fracturing fleet
US11114857B2 (en) 2018-02-05 2021-09-07 U.S. Well Services, LLC Microgrid electrical load management
US11125472B2 (en) 2018-05-10 2021-09-21 Eavor Technologies Inc. Fluid for use in power production environments
US11136870B2 (en) 2012-11-16 2021-10-05 U.S. Well Services, LLC System for pumping hydraulic fracturing fluid using electric pumps
US11181107B2 (en) 2016-12-02 2021-11-23 U.S. Well Services, LLC Constant voltage power distribution system for use with an electric hydraulic fracturing system
US11181879B2 (en) 2012-11-16 2021-11-23 U.S. Well Services, LLC Monitoring and control of proppant storage from a datavan
US11193332B2 (en) 2018-09-13 2021-12-07 Schlumberger Technology Corporation Slider compensated flexible shaft drilling system
US11203901B2 (en) 2017-07-10 2021-12-21 Schlumberger Technology Corporation Radial drilling link transmission and flex shaft protective cover
US11203924B2 (en) 2017-10-13 2021-12-21 U.S. Well Services, LLC Automated fracturing system and method
US11211801B2 (en) 2018-06-15 2021-12-28 U.S. Well Services, LLC Integrated mobile power unit for hydraulic fracturing
US11208878B2 (en) 2018-10-09 2021-12-28 U.S. Well Services, LLC Modular switchgear system and power distribution for electric oilfield equipment
US11434737B2 (en) 2017-12-05 2022-09-06 U.S. Well Services, LLC High horsepower pumping configuration for an electric hydraulic fracturing system
US11449018B2 (en) 2012-11-16 2022-09-20 U.S. Well Services, LLC System and method for parallel power and blackout protection for electric powered hydraulic fracturing
US11451016B2 (en) 2012-11-16 2022-09-20 U.S. Well Services, LLC Switchgear load sharing for oil field equipment
US11454170B2 (en) 2012-11-16 2022-09-27 U.S. Well Services, LLC Turbine chilling for oil field power generation
US11454079B2 (en) 2018-09-14 2022-09-27 U.S. Well Services Llc Riser assist for wellsites
US11459863B2 (en) 2019-10-03 2022-10-04 U.S. Well Services, LLC Electric powered hydraulic fracturing pump system with single electric powered multi-plunger fracturing pump
US11466549B2 (en) 2017-01-04 2022-10-11 Schlumberger Technology Corporation Reservoir stimulation comprising hydraulic fracturing through extended tunnels
US11476781B2 (en) 2012-11-16 2022-10-18 U.S. Well Services, LLC Wireline power supply during electric powered fracturing operations
US11486214B2 (en) 2017-07-10 2022-11-01 Schlumberger Technology Corporation Controlled release of hose
US11492886B2 (en) 2019-12-31 2022-11-08 U.S. Wells Services, LLC Self-regulating FRAC pump suction stabilizer/dampener
US11506126B2 (en) 2019-06-10 2022-11-22 U.S. Well Services, LLC Integrated fuel gas heater for mobile fuel conditioning equipment
US11542786B2 (en) 2019-08-01 2023-01-03 U.S. Well Services, LLC High capacity power storage system for electric hydraulic fracturing
US11560887B2 (en) 2019-12-31 2023-01-24 U.S. Well Services, LLC Segmented fluid end plunger pump
US11578580B2 (en) 2018-10-09 2023-02-14 U.S. Well Services, LLC Electric powered hydraulic fracturing pump system with single electric powered multi-plunger pump fracturing trailers, filtration units, and slide out platform
US11578577B2 (en) 2019-03-20 2023-02-14 U.S. Well Services, LLC Oversized switchgear trailer for electric hydraulic fracturing
US11674484B2 (en) 2012-11-16 2023-06-13 U.S. Well Services, LLC System for fueling electric powered hydraulic fracturing equipment with multiple fuel sources
US11674352B2 (en) 2012-11-16 2023-06-13 U.S. Well Services, LLC Slide out pump stand for hydraulic fracturing equipment
US11713661B2 (en) * 2012-11-16 2023-08-01 U.S. Well Services, LLC Electric powered pump down
US11728709B2 (en) 2019-05-13 2023-08-15 U.S. Well Services, LLC Encoderless vector control for VFD in hydraulic fracturing applications
US11808125B2 (en) 2017-10-25 2023-11-07 U.S. Well Services, LLC Smart fracturing system and method
US11840909B2 (en) 2016-09-12 2023-12-12 Schlumberger Technology Corporation Attaining access to compromised fractured production regions at an oilfield
US11846167B2 (en) 2019-12-30 2023-12-19 U.S. Well Services, LLC Blender tub overflow catch
US11850563B2 (en) 2012-11-16 2023-12-26 U.S. Well Services, LLC Independent control of auger and hopper assembly in electric blender system
WO2023247768A1 (en) * 2022-06-24 2023-12-28 Dynasteer Drilling layout formed in a subsoil for a geothermal installation, installation and associated method
US11885206B2 (en) 2019-12-30 2024-01-30 U.S. Well Services, LLC Electric motor driven transportation mechanisms for fracturing blenders
WO2024025857A1 (en) * 2022-07-25 2024-02-01 Gti Energy Vertical and helical well designs for enhanced geothermal systems
US11959371B2 (en) 2012-11-16 2024-04-16 Us Well Services, Llc Suction and discharge lines for a dual hydraulic fracturing unit
US11959533B2 (en) 2017-12-05 2024-04-16 U.S. Well Services Holdings, Llc Multi-plunger pumps and associated drive systems
US11960305B2 (en) 2019-12-31 2024-04-16 U.S. Well Services, LLC Automated blender bucket testing and calibration

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2769497A (en) * 1955-01-06 1956-11-06 Exxon Research Engineering Co Method for treating hydrocarbon producing formations
US3020954A (en) * 1958-02-03 1962-02-13 Jersey Prod Res Co Method of fracturing in wells
US3285335A (en) * 1963-12-11 1966-11-15 Exxon Research Engineering Co In situ pyrolysis of oil shale formations
US3313348A (en) * 1963-12-27 1967-04-11 Gulf Research Development Co Process of forming vertical well bore fractures by use of circumferential notching
US3391739A (en) * 1965-06-30 1968-07-09 Dresser Ind Method and apparatus for well flow stimulation
US3402769A (en) * 1965-08-17 1968-09-24 Go Services Inc Fracture detection method for bore holes
US3427652A (en) * 1965-01-29 1969-02-11 Halliburton Co Techniques for determining characteristics of subterranean formations
US3470943A (en) * 1967-04-21 1969-10-07 Allen T Van Huisen Geothermal exchange system
US3593791A (en) * 1969-09-15 1971-07-20 Phillips Petroleum Co Horizontal fracturing techniques for bitumen recovery
US3679264A (en) * 1969-10-22 1972-07-25 Allen T Van Huisen Geothermal in situ mining and retorting system

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2769497A (en) * 1955-01-06 1956-11-06 Exxon Research Engineering Co Method for treating hydrocarbon producing formations
US3020954A (en) * 1958-02-03 1962-02-13 Jersey Prod Res Co Method of fracturing in wells
US3285335A (en) * 1963-12-11 1966-11-15 Exxon Research Engineering Co In situ pyrolysis of oil shale formations
US3313348A (en) * 1963-12-27 1967-04-11 Gulf Research Development Co Process of forming vertical well bore fractures by use of circumferential notching
US3427652A (en) * 1965-01-29 1969-02-11 Halliburton Co Techniques for determining characteristics of subterranean formations
US3391739A (en) * 1965-06-30 1968-07-09 Dresser Ind Method and apparatus for well flow stimulation
US3402769A (en) * 1965-08-17 1968-09-24 Go Services Inc Fracture detection method for bore holes
US3470943A (en) * 1967-04-21 1969-10-07 Allen T Van Huisen Geothermal exchange system
US3593791A (en) * 1969-09-15 1971-07-20 Phillips Petroleum Co Horizontal fracturing techniques for bitumen recovery
US3679264A (en) * 1969-10-22 1972-07-25 Allen T Van Huisen Geothermal in situ mining and retorting system

Cited By (100)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3934649A (en) * 1974-07-25 1976-01-27 The United States Of America As Represented By The United States Energy Research And Development Administration Method for removal of methane from coalbeds
US4254828A (en) * 1977-12-21 1981-03-10 Messerschmitt-Bolkow-Blohm Gmbh Apparatus for producing fractures and gaps in geological formations for utilizing the heat of the earth
US4220205A (en) * 1978-11-28 1980-09-02 E. I. Du Pont De Nemours And Company Method of producing self-propping fluid-conductive fractures in rock
US4200152A (en) * 1979-01-12 1980-04-29 Foster John W Method for enhancing simultaneous fracturing in the creation of a geothermal reservoir
US4223729A (en) * 1979-01-12 1980-09-23 Foster John W Method for producing a geothermal reservoir in a hot dry rock formation for the recovery of geothermal energy
US4505322A (en) * 1979-03-12 1985-03-19 Larson Sven A Method of storing heat and heat store for carrying out the method
US4479541A (en) * 1982-08-23 1984-10-30 Wang Fun Den Method and apparatus for recovery of oil, gas and mineral deposits by panel opening
US4476932A (en) * 1982-10-12 1984-10-16 Atlantic Richfield Company Method of cold water fracturing in drainholes
US4723604A (en) * 1984-01-04 1988-02-09 Atlantic Richfield Company Drainhole drilling
US4529036A (en) * 1984-08-16 1985-07-16 Halliburton Co Method of determining subterranean formation fracture orientation
US4633948A (en) * 1984-10-25 1987-01-06 Shell Oil Company Steam drive from fractured horizontal wells
US4669546A (en) * 1986-01-03 1987-06-02 Mobil Oil Corporation Method to improve vertical hydraulic fracturing in inclined wellbores
US4867241A (en) * 1986-11-12 1989-09-19 Mobil Oil Corporation Limited entry, multiple fracturing from deviated wellbores
US4687061A (en) * 1986-12-08 1987-08-18 Mobil Oil Corporation Stimulation of earth formations surrounding a deviated wellbore by sequential hydraulic fracturing
US4977961A (en) * 1989-08-16 1990-12-18 Chevron Research Company Method to create parallel vertical fractures in inclined wellbores
US4974675A (en) * 1990-03-08 1990-12-04 Halliburton Company Method of fracturing horizontal wells
US5074360A (en) * 1990-07-10 1991-12-24 Guinn Jerry H Method for repoducing hydrocarbons from low-pressure reservoirs
US5085276A (en) * 1990-08-29 1992-02-04 Chevron Research And Technology Company Production of oil from low permeability formations by sequential steam fracturing
US5875843A (en) * 1995-07-14 1999-03-02 Hill; Gilman A. Method for vertically extending a well
US6247313B1 (en) * 1996-11-22 2001-06-19 Per H. Moe Plant for exploiting geothermal energy
US5964289A (en) * 1997-01-14 1999-10-12 Hill; Gilman A. Multiple zone well completion method and apparatus
US6367566B1 (en) 1998-02-20 2002-04-09 Gilman A. Hill Down hole, hydrodynamic well control, blowout prevention
WO2006059057A1 (en) * 2004-12-02 2006-06-08 Halliburton Energy Services, Inc Hydrocarbon sweep into horizontal transverse fractured wells
US20060118305A1 (en) * 2004-12-02 2006-06-08 East Loyd E Jr Hydrocarbon sweep into horizontal transverse fractured wells
US7228908B2 (en) 2004-12-02 2007-06-12 Halliburton Energy Services, Inc. Hydrocarbon sweep into horizontal transverse fractured wells
US20090229826A1 (en) * 2004-12-02 2009-09-17 East Jr Loyd E Hydrocarbon Sweep into Horizontal Transverse Fractured Wells
DE102005044352A1 (en) * 2005-09-16 2007-03-22 Diehl Stiftung & Co.Kg Method for producing an HDR heat exchanger
DE102005044352B4 (en) * 2005-09-16 2007-10-31 Rudolf, Karl, Dipl.-Ing. Method for producing a hot dry rock (HDR) heat exchanger
US20080249721A1 (en) * 2007-01-16 2008-10-09 Zoback Mark D Predicting changes in hydrofrac orientation in depleting oil and gas reservoirs
US7848895B2 (en) * 2007-01-16 2010-12-07 The Board Of Trustees Of The Leland Stanford Junior University Predicting changes in hydrofrac orientation in depleting oil and gas reservoirs
US20100307756A1 (en) * 2008-02-15 2010-12-09 Reinhard Jung Geothermal circulation system
US8104535B2 (en) 2009-08-20 2012-01-31 Halliburton Energy Services, Inc. Method of improving waterflood performance using barrier fractures and inflow control devices
US20110042083A1 (en) * 2009-08-20 2011-02-24 Halliburton Energy Services, Inc. Method of improving waterflood performance using barrier fractures and inflow control devices
US20110061869A1 (en) * 2009-09-14 2011-03-17 Halliburton Energy Services, Inc. Formation of Fractures Within Horizontal Well
US20110226473A1 (en) * 2010-03-18 2011-09-22 Kaminsky Robert D Deep Steam Injection Systems and Methods
US8770288B2 (en) * 2010-03-18 2014-07-08 Exxonmobil Upstream Research Company Deep steam injection systems and methods
KR101419973B1 (en) * 2010-08-24 2014-07-15 이시우 System and method of creating EGS Group utilizing fault zone
EP2659090A4 (en) * 2010-12-27 2015-12-30 Seven Generations Energy Ltd Methods for drilling and stimulating subterranean formations for recovering hydrocarbon and natural gas resources
US9518787B2 (en) 2012-11-01 2016-12-13 Skanska Svergie Ab Thermal energy storage system comprising a combined heating and cooling machine and a method for using the thermal energy storage system
US9823026B2 (en) * 2012-11-01 2017-11-21 Skanska Sverige Ab Thermal energy storage with an expansion space
US9791217B2 (en) 2012-11-01 2017-10-17 Skanska Sverige Ab Energy storage arrangement having tunnels configured as an inner helix and as an outer helix
US20150354903A1 (en) * 2012-11-01 2015-12-10 Skanska Sverige Ab Thermal energy storage comprising an expansion space
US9657998B2 (en) 2012-11-01 2017-05-23 Skanska Sverige Ab Method for operating an arrangement for storing thermal energy
US11674484B2 (en) 2012-11-16 2023-06-13 U.S. Well Services, LLC System for fueling electric powered hydraulic fracturing equipment with multiple fuel sources
US11066912B2 (en) 2012-11-16 2021-07-20 U.S. Well Services, LLC Torsional coupling for electric hydraulic fracturing fluid pumps
US11181879B2 (en) 2012-11-16 2021-11-23 U.S. Well Services, LLC Monitoring and control of proppant storage from a datavan
US11451016B2 (en) 2012-11-16 2022-09-20 U.S. Well Services, LLC Switchgear load sharing for oil field equipment
US11136870B2 (en) 2012-11-16 2021-10-05 U.S. Well Services, LLC System for pumping hydraulic fracturing fluid using electric pumps
US11454170B2 (en) 2012-11-16 2022-09-27 U.S. Well Services, LLC Turbine chilling for oil field power generation
US11959371B2 (en) 2012-11-16 2024-04-16 Us Well Services, Llc Suction and discharge lines for a dual hydraulic fracturing unit
US11476781B2 (en) 2012-11-16 2022-10-18 U.S. Well Services, LLC Wireline power supply during electric powered fracturing operations
US11449018B2 (en) 2012-11-16 2022-09-20 U.S. Well Services, LLC System and method for parallel power and blackout protection for electric powered hydraulic fracturing
US11850563B2 (en) 2012-11-16 2023-12-26 U.S. Well Services, LLC Independent control of auger and hopper assembly in electric blender system
US11713661B2 (en) * 2012-11-16 2023-08-01 U.S. Well Services, LLC Electric powered pump down
US11674352B2 (en) 2012-11-16 2023-06-13 U.S. Well Services, LLC Slide out pump stand for hydraulic fracturing equipment
US11091992B2 (en) 2012-11-16 2021-08-17 U.S. Well Services, LLC System for centralized monitoring and control of electric powered hydraulic fracturing fleet
US20140144623A1 (en) * 2012-11-28 2014-05-29 Nexen Energy Ulc Method for increasing product recovery in fractures proximate fracture treated wellbores
US10030491B2 (en) 2013-11-15 2018-07-24 Nexen Energy Ulc Method for increasing gas recovery in fractures proximate fracture treated wellbores
CN106415151A (en) * 2014-03-07 2017-02-15 威拓股份有限公司 Geothermal plant using hot dry rock fissured zone
CN106415151B (en) * 2014-03-07 2019-07-26 威拓股份有限公司 Utilize the underground heat equipment in xeothermic rock crackle forming region
WO2015132404A1 (en) * 2014-03-07 2015-09-11 Vito Geothermal plant using hot dry rock fissured zone
BE1022154B1 (en) * 2014-03-07 2016-02-19 Vito GEOTHERMAL DEVICE USING A FRACTURE AREA IN A HOT DRY STONE
CN105089612A (en) * 2014-05-04 2015-11-25 中国石油化工股份有限公司 Determining method for distance of well-drain and length of pressure break of low penetration oil reservoir artificial fracture
US10551091B2 (en) * 2016-05-09 2020-02-04 Welltec Oilfield Solutions Ag Geothermal energy extraction subterranean system
US11840909B2 (en) 2016-09-12 2023-12-12 Schlumberger Technology Corporation Attaining access to compromised fractured production regions at an oilfield
US11181107B2 (en) 2016-12-02 2021-11-23 U.S. Well Services, LLC Constant voltage power distribution system for use with an electric hydraulic fracturing system
US11952996B2 (en) 2016-12-02 2024-04-09 U.S. Well Services, LLC Constant voltage power distribution system for use with an electric hydraulic fracturing system
US11466549B2 (en) 2017-01-04 2022-10-11 Schlumberger Technology Corporation Reservoir stimulation comprising hydraulic fracturing through extended tunnels
CN108661616A (en) * 2017-03-29 2018-10-16 中国石油化工股份有限公司 A kind of separate stratum fracfturing method suitable for sandstone reservoir
US10738600B2 (en) * 2017-05-19 2020-08-11 Baker Hughes, A Ge Company, Llc One run reservoir evaluation and stimulation while drilling
US11486214B2 (en) 2017-07-10 2022-11-01 Schlumberger Technology Corporation Controlled release of hose
US11203901B2 (en) 2017-07-10 2021-12-21 Schlumberger Technology Corporation Radial drilling link transmission and flex shaft protective cover
US11067481B2 (en) 2017-10-05 2021-07-20 U.S. Well Services, LLC Instrumented fracturing slurry flow system and method
US11203924B2 (en) 2017-10-13 2021-12-21 U.S. Well Services, LLC Automated fracturing system and method
US11808125B2 (en) 2017-10-25 2023-11-07 U.S. Well Services, LLC Smart fracturing system and method
US11959533B2 (en) 2017-12-05 2024-04-16 U.S. Well Services Holdings, Llc Multi-plunger pumps and associated drive systems
US11434737B2 (en) 2017-12-05 2022-09-06 U.S. Well Services, LLC High horsepower pumping configuration for an electric hydraulic fracturing system
US11114857B2 (en) 2018-02-05 2021-09-07 U.S. Well Services, LLC Microgrid electrical load management
US11035207B2 (en) 2018-04-16 2021-06-15 U.S. Well Services, LLC Hybrid hydraulic fracturing fleet
US11125472B2 (en) 2018-05-10 2021-09-21 Eavor Technologies Inc. Fluid for use in power production environments
US11211801B2 (en) 2018-06-15 2021-12-28 U.S. Well Services, LLC Integrated mobile power unit for hydraulic fracturing
US11193332B2 (en) 2018-09-13 2021-12-07 Schlumberger Technology Corporation Slider compensated flexible shaft drilling system
US11454079B2 (en) 2018-09-14 2022-09-27 U.S. Well Services Llc Riser assist for wellsites
US11208878B2 (en) 2018-10-09 2021-12-28 U.S. Well Services, LLC Modular switchgear system and power distribution for electric oilfield equipment
US11578580B2 (en) 2018-10-09 2023-02-14 U.S. Well Services, LLC Electric powered hydraulic fracturing pump system with single electric powered multi-plunger pump fracturing trailers, filtration units, and slide out platform
US11578577B2 (en) 2019-03-20 2023-02-14 U.S. Well Services, LLC Oversized switchgear trailer for electric hydraulic fracturing
US11728709B2 (en) 2019-05-13 2023-08-15 U.S. Well Services, LLC Encoderless vector control for VFD in hydraulic fracturing applications
US11506126B2 (en) 2019-06-10 2022-11-22 U.S. Well Services, LLC Integrated fuel gas heater for mobile fuel conditioning equipment
US11542786B2 (en) 2019-08-01 2023-01-03 U.S. Well Services, LLC High capacity power storage system for electric hydraulic fracturing
US11459863B2 (en) 2019-10-03 2022-10-04 U.S. Well Services, LLC Electric powered hydraulic fracturing pump system with single electric powered multi-plunger fracturing pump
US11905806B2 (en) 2019-10-03 2024-02-20 U.S. Well Services, LLC Electric powered hydraulic fracturing pump system with single electric powered multi-plunger fracturing pump
US11009162B1 (en) 2019-12-27 2021-05-18 U.S. Well Services, LLC System and method for integrated flow supply line
US11846167B2 (en) 2019-12-30 2023-12-19 U.S. Well Services, LLC Blender tub overflow catch
US11885206B2 (en) 2019-12-30 2024-01-30 U.S. Well Services, LLC Electric motor driven transportation mechanisms for fracturing blenders
US11560887B2 (en) 2019-12-31 2023-01-24 U.S. Well Services, LLC Segmented fluid end plunger pump
US11492886B2 (en) 2019-12-31 2022-11-08 U.S. Wells Services, LLC Self-regulating FRAC pump suction stabilizer/dampener
US11960305B2 (en) 2019-12-31 2024-04-16 U.S. Well Services, LLC Automated blender bucket testing and calibration
WO2023247768A1 (en) * 2022-06-24 2023-12-28 Dynasteer Drilling layout formed in a subsoil for a geothermal installation, installation and associated method
FR3137118A1 (en) * 2022-06-24 2023-12-29 Dynasteer Drilling architecture in a basement for a geothermal installation, installation and associated process
WO2024025857A1 (en) * 2022-07-25 2024-02-01 Gti Energy Vertical and helical well designs for enhanced geothermal systems

Similar Documents

Publication Publication Date Title
US3878884A (en) Formation fracturing method
US3863709A (en) Method of recovering geothermal energy
US3739851A (en) Method of producing oil from an oil shale formation
US4867241A (en) Limited entry, multiple fracturing from deviated wellbores
US3835928A (en) Method of creating a plurality of fractures from a deviated well
US4223729A (en) Method for producing a geothermal reservoir in a hot dry rock formation for the recovery of geothermal energy
US5860475A (en) Mixed well steam drive drainage process
US4633948A (en) Steam drive from fractured horizontal wells
US3513913A (en) Oil recovery from oil shales by transverse combustion
US4200152A (en) Method for enhancing simultaneous fracturing in the creation of a geothermal reservoir
US5305829A (en) Oil production from diatomite formations by fracture steamdrive
US2813583A (en) Process for recovery of petroleum from sands and shale
US3515213A (en) Shale oil recovery process using heated oil-miscible fluids
US2847202A (en) Method of mining salt using two wells connected by fluid fracturing
US4700779A (en) Parallel horizontal wells
US4163580A (en) Pressure swing recovery system for mineral deposits
US6158517A (en) Artificial aquifers in hydrologic cells for primary and enhanced oil recoveries, for exploitation of heavy oil, tar sands and gas hydrates
US4522260A (en) Method for creating a zone of increased permeability in hydrocarbon-containing subterranean formation penetrated by a plurality of wellbores
US4612989A (en) Combined replacement drive process for oil recovery
EA001243B1 (en) Method for stimulating production from lenticular natural gas formations
US3270816A (en) Method of establishing communication between wells
EP0271284A3 (en) Stimulation of earth formations surrounding a deviated wellbore by sequential hydraulic fracturing
US7493951B1 (en) Under-balanced directional drilling system
US4026359A (en) Producing shale oil by flowing hot aqueous fluid along vertically varied paths within leached oil shale
US3547198A (en) Method of forming two vertically disposed fractures from a well penetrating a subterranean earth formation