US3766732A - Steam reheater control for turbine power plant - Google Patents

Steam reheater control for turbine power plant Download PDF

Info

Publication number
US3766732A
US3766732A US00185268A US3766732DA US3766732A US 3766732 A US3766732 A US 3766732A US 00185268 A US00185268 A US 00185268A US 3766732D A US3766732D A US 3766732DA US 3766732 A US3766732 A US 3766732A
Authority
US
United States
Prior art keywords
steam
pressure
reheater
turbine
control valve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US00185268A
Inventor
S Woodcock
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
General Electric Co
Original Assignee
General Electric Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by General Electric Co filed Critical General Electric Co
Application granted granted Critical
Publication of US3766732A publication Critical patent/US3766732A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01KSTEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
    • F01K3/00Plants characterised by the use of steam or heat accumulators, or intermediate steam heaters, therein
    • F01K3/18Plants characterised by the use of steam or heat accumulators, or intermediate steam heaters, therein having heaters
    • F01K3/26Plants characterised by the use of steam or heat accumulators, or intermediate steam heaters, therein having heaters with heating by steam
    • F01K3/262Plants characterised by the use of steam or heat accumulators, or intermediate steam heaters, therein having heaters with heating by steam by means of heat exchangers
    • F01K3/265Plants characterised by the use of steam or heat accumulators, or intermediate steam heaters, therein having heaters with heating by steam by means of heat exchangers using live steam for superheating or reheating
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F22STEAM GENERATION
    • F22GSUPERHEATING OF STEAM
    • F22G1/00Steam superheating characterised by heating method
    • F22G1/005Steam superheating characterised by heating method the heat being supplied by steam

Definitions

  • Steam turbine power plants operating from an essentially saturated steam supply commonly employ moisture separating and reheating devices to remove moisture from the steam and to reheat it between a high-pressure turbine section and a lower pressure turbine section.
  • the reheaters which may either be combined with moisture separating elements in a single pressure vessel, or disposed in a separate pressure vessel, commonly withdraw a portion of the inlet steam supply to the steam turbine to serve as heating fluid for the cycle steam which is at a lower pressure and temperature. More than one stage of reheating may be employed.
  • the highest temperature stage uses inlet steam as the heating fluid and the temperature on the tube-side of the reheater tube bundles does not change greatly with load.
  • the shellside temperatureof the cycle steam being reheated varies over a wide range during load as does .the pres- 1 sure of the steam.-At partial loads, significanttempera- SUMMARY OF THE INVENTION Briefly stated, the invention is practiced 'by providing a controller which varies the pressure of the inlet steam supplied to the reheater as a function of the pressure of the reheated cyelesteam over selected load ranges according to the mode of operation of the reheater.
  • FIG. 1 is a simplified schematic diagram of a steam turbine power plant with reheater, illustrating the preferred controller of the invention in block diagram form, and v FIGS. 2 and 3 are steam temperature and pressure versus steam flow diagrams under two different modes of reheater operation.
  • a steam turbine power plant includes a high-pressure steam turbine section 1 and low-pressure turbine sections 2, with O a combined moisture separator and reheater vessel-3,
  • the interior of the moisture separator and reheater 3 contains moisture separating elements (not shown) for removing moisture from the cycle steam which is drained off through pipes 8.
  • Cycle steam is then guided via internal baffles (not shown) over a first stage 9 of reheater tubes (shown schematically) and a second stage 10 of similar tubes.
  • the tube bundlesof stages 9, 10 are supplied from internal headers 11 12, respectively, which connect to the tube bundles via tube sheets.
  • Supply and drain pipes for the headers pass through the pressure vessel wall and comprise a first stage reheater inlet 13, a first stage condensate drain 14, a second stage inlet 15 and a second stage drain 16.
  • the first stage inlet 13 is supplied by an extraction line 17 from high-pressure turbine l.
  • the pressure of this extraction steam varies proportionately with turbine load as does the cycle steam discharged through line 5 from the high-pressure turbine.
  • the second stage reheater inlet 15 is supplied by a branch line 18 connected to the main steam supply line 4.
  • the steam pressure and temperature in this line is substantially constant over the load range.
  • I system shown generally at 20', is provided to control the pressure of the steam flowing to thesecond stage reheaterinlet 15 so that it is a linear function (proportional to) the cycle steam pressure in line 19 (.or line 5).
  • Control of the pressure in the preferred embodiment is effected by means of a pneumatically operated steam valve 21 connected in parallel with a motor-operated check valve 22.
  • the control system 20 includes a pressure transducer 23 connected to sense steam pressure'in line 19 (or, alternatively, line 5 ahead of the reheater) and to convert it to a controlling variable.
  • a multiplying relay.24 serves to multiply the signal from transducer 23 by a selected factor K.
  • Abypass 25 is connected to shunt relay 24 under selected modes of operation.
  • the parallel-connected check valve 22 is operated to assume either open or closed condition by a signal in line 29.
  • the connections are such that the check valve 22 opens when the pressure drop across control valve 21 is less than about 50 psi, so that the valve 21 controls over only a portion of the turbine load range.
  • control valve 21 it may be desirable to allow control valve 21 to control the inlet pressure to a pair of moisture separators and reheaters, and in this case there may be a check valve 22 for each of the reheaters connected in parallel with a single control valve such as 21.
  • transducer 23 may be a Fisher Type 4157 pressure transmitter ranged 6-30 psig (air) output for -175 psig (steam) input.
  • Transducer 26 may be a Fisher Type 4157 pressure transmitter ranged 6-30 psig (air) output for 0-885 psig (steam) input.
  • Multiplier 24 may be a Moore Type 68-2 2/1 multiplying relay which provides a pneumatic output pressure which is twice the input pressure.
  • Comparator 27 may conveniently be a Fisher Type 4l64 differential pressure controller with proportional plug reset response.
  • the moisture separator and reheater 3 shown in FIG. 1 is arranged by means of appropriate valving, such as valve 30, so that it can be used either with or without the first stage of reheating.
  • valve 30 With both the first stage 9 and the second stage 10 of reheating in service. valve 30 is open. This is the normal mode of operation and in this case, bypass 25 in the control system 20 is positioned as shown so that multiplying relay 24 is active. In the other mode of reheater operation, valve 30 is closed and only the second stage reheater 10 is then supplied with steam. In this mode, bypass 25 is positioned sov as to shunt multiplier 24.
  • FIG. 2 illustrates pressure and temperature conditions obtained during normal two stage operation of the reheater over the load range of the turbine.
  • FIG. 3 ha similar graph but with only the second stage reheater in operation.
  • the abscissa of both graphs is scaled to show the percent of steam flow to high-pressure turbine 1 (which is proportional to load on the turbine). Identical reference numerals are used on both graphs for purposes of comparison.
  • Variation of the controlling steam pressure in steam line 19 measured by transducer 23 is indicated by curve 30, while the controlled steam pressue in steam line 18a measured by transducer 26 is shown by curves 31, 31a.
  • Curve 31 on FIG. 2 is at twice the slope of curve 31 on FIG. 3, because the multiplying relay 24 is in operation.
  • the controlled steam pressure cannot exceed that in steam supply line 4 which is indicated by the flat portion of curve 31a in the FIG. 2 mode.
  • Variation of temperature of the cycle steam on the shell-side at the inlet to the second stage reheater is indicated by curve 32.
  • curve 32 In the FIG. 3 mode (since the first stage reheater is not in service) curve 32 is simply the saturation temperature corresponding to the steam pressure shown in line 30.
  • curve 32 is the shell-side outlet temperature from the first stage reheater.
  • the temperature of the heating steam inside the tubes of the second stage reheater is indicated by curves 33, 33a. These correspond to saturation temperatures at the steam pressures of curves 31, 31a.
  • the maximum temperature difference between the second stage reheater shell-side and tube-side are shown as T. This temperature difference is a contributing factor to reheater thermal stress and is held at a minimum value by the present invention.
  • the pressures and corresponding temperatures which would be supplied to the reheater without the control system of the present invention are shown by the dashed line portions 34, 35, respectively.
  • the maximum tube-side versus shell-side temperature differential would be represented by a temperature difference T'.
  • the operation of the invention in normal (or two stage) operation is as follows. From no-load up to approximately one-half load, the steam control valve 21 is controlled to cause the steam pressure entering the second stage reheater from line 18a through inlet 15 to vary in proportion to the reheater cycle steam pressure. With multiplier 24 in operation, valve 21 is fully open at approximately one-half load. From approximately one-half load to full load, the temperature differential is limited by the system characteristics, because the reheater shell-side inlet temperature continues to increase, while the tube-side temperature is limited to turbine inlet temperature. Thus, the control system only operates from no load to one-half load.
  • valve 21 serves to control the inlet pressure in line 18a to the second stage reheater inlet over the full load range in proportion to the reheat cycle steam pressure. Because of the similar characteristics of the steam temperaturewith respect to pressure in various parts of the reheater, controlling the second stage reheater steam inlet pressure linearly with reheater cycle steam pressure causes the temperature curves to generally follow one another. This limits the maximum temperature differential T between tubeside and shell-side in the reheater.
  • the invention offers a very simple means of controlling steam serving as the heat:
  • the invention makes use of the fact that the characteristic temperature curves of heating and heated fluids are caused to be similar. This serves to reduce temperature differentials within and around the reheater tube bundle thereby holding thermal stresses to a minimum.
  • the invention also offers a very simple means of controlling the heating steam to the reheater as load is built up on the turbine.
  • the automatic control ensures that as the turbine is loaded, so the second stage reheater heating steam pressure is gradually built up in accordance with the turbine loading routine, thus minimizing I rates of temperature change in the second stage reheater, so improving reliability.
  • Such control could only be effected manually with the most careful and time-consuming operational procedures.
  • reheater means with tube bundles adapted to reheat cycle steam from the high-pressure turbine using a portion of said source steam in said tube bundles as the reheating fluid, the improvement comprising:
  • control means arranged to vary the pressure of said reheating fluid as a function of the pressure of said cycle steam from said high-pressure turbine.
  • control means comprises a control valve interposed between said steam source and said reheater means and further including comparator means controlling said control valve in response to a difference between a first signal representing steam pressure at said control valve outlet and a second signal representing a selected multiple of cycle steam pressure.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Control Of Turbines (AREA)
  • Engine Equipment That Uses Special Cycles (AREA)

Abstract

A moisture separator and reheater for a steam turbine power plant which uses a portion of the inlet steam in tube bundles to reheat lower pressure power plant cycle steam has a valve which controls the pressure of the reheating steam in the bundles as a proportional function of the lower pressure cycle steam.

Description

United States Patent 1191' Woodcock Oct. 23, 1973 STEAM REHEATER CONTROL FOR 2,579,027 12/1951 Walter et al. 60/73 TURBINE POWER PLANT 2,586,510 2/1952 Bryant 60/73 3,451,220 6/1969 Buscemi... 60/105 Inventor: d y J- Woodcock, Schenectady, 3,488,961 1/1970 Gerber 60/105 N.Y. [73] Assignee: General Electric Company, Primary ExaminerMartin P. Schwadron Schenectady, N.Y. Assistant ExaminerH. Burks, Sr. [22] Filed p 30 1971 Attorney-William Cv Crutcher et a1.
21 A 1. N0.: 185 268 1 pp 57 ABSTRACT 52 US. Cl. 60/64 60/105 A misture SeParmor and heater for a Steam mine [51] Int L F01, 31/16, Folk 19/10 6 3/04 power plant which uses a portion of the inlet steam in [58] Field of Search 60/105 64 73 70 tube bundles reheat Pressure POWer Plant cycle steam has a valve which controls the pressure of [56] Reerences Cited the reheating steam in the bundles as a proportional UNITED STATES PATENTS function of the lower pressure cycle steam. 2,540,691 2 1951 Reese et a1. 60/73 4 claims, 3 Drawing Figures 1 STEAM REHEATER CONTROL FOR TURBINE POWER PLANT BACKGROUND OF THE INVENTION the supply of heating steam to the reheater to reduce 1 stresses due to temperature differences and rapid temperature changes.
Steam turbine power plants operating from an essentially saturated steam supply, as in the case of plants supplied by boiling water or pressurized water nuclear reactors, commonly employ moisture separating and reheating devices to remove moisture from the steam and to reheat it between a high-pressure turbine section and a lower pressure turbine section. The reheaters, which may either be combined with moisture separating elements in a single pressure vessel, or disposed in a separate pressure vessel, commonly withdraw a portion of the inlet steam supply to the steam turbine to serve as heating fluid for the cycle steam which is at a lower pressure and temperature. More than one stage of reheating may be employed.
1 In the reheater, the highest temperature stage uses inlet steam as the heating fluid and the temperature on the tube-side of the reheater tube bundles does not change greatly with load. On the other hand, the shellside temperatureof the cycle steam being reheated varies over a wide range during load as does .the pres- 1 sure of the steam.-At partial loads, significanttempera- SUMMARY OF THE INVENTION Briefly stated, the invention is practiced 'by providing a controller which varies the pressure of the inlet steam supplied to the reheater as a function of the pressure of the reheated cyelesteam over selected load ranges according to the mode of operation of the reheater.
DRAWING The subject matter which is regarded as the invention is particularly pointed out and distinctly claimed in the concluding portion of this specification. The invention, however, both as to organization and. method of practice, together with further objects andadvantages thereof, may best be understood by" reference to the following description taken in connection with the accompanying drawing in which:'
FIG. 1 is a simplified schematic diagram of a steam turbine power plant with reheater, illustrating the preferred controller of the invention in block diagram form, and v FIGS. 2 and 3 are steam temperature and pressure versus steam flow diagrams under two different modes of reheater operation.
DESCRIPTION OF THE PREFERRED EMBODIMENT Referring now to FIG. 1 of the drawing, a steam turbine power plant includes a high-pressure steam turbine section 1 and low-pressure turbine sections 2, with O a combined moisture separator and reheater vessel-3,
only one of several such units being shown for purposes of clarity. Steam entering the supply line 4 expands through the high-pressure turbine l to a wet condition,
' leaving via line 5. The cycle steam then enters moisture separator and reheater 3 at a number of inlets 6 on the bottom of the pressure shell and leaves by way of outlets 7 at the top of the pressure shell. From there itv flows through line 19 to the low-pressure turbine and then to condensers (not shown).
The interior of the moisture separator and reheater 3 contains moisture separating elements (not shown) for removing moisture from the cycle steam which is drained off through pipes 8. Cycle steam is then guided via internal baffles (not shown) over a first stage 9 of reheater tubes (shown schematically) and a second stage 10 of similar tubes. The tube bundlesof stages 9, 10 are supplied from internal headers 11 12, respectively, which connect to the tube bundles via tube sheets. Supply and drain pipes for the headers pass through the pressure vessel wall and comprise a first stage reheater inlet 13, a first stage condensate drain 14, a second stage inlet 15 and a second stage drain 16. The first stage inlet 13 is supplied by an extraction line 17 from high-pressure turbine l. The pressure of this extraction steam varies proportionately with turbine load as does the cycle steam discharged through line 5 from the high-pressure turbine. Y
The second stage reheater inlet 15 is supplied by a branch line 18 connected to the main steam supply line 4. The steam pressure and temperature in this lineis substantially constant over the load range.
I system, shown generally at 20', is provided to control the pressure of the steam flowing to thesecond stage reheaterinlet 15 so that it is a linear function (proportional to) the cycle steam pressure in line 19 (.or line 5). Control of the pressure in the preferred embodiment is effected by means of a pneumatically operated steam valve 21 connected in parallel with a motor-operated check valve 22.
The control system 20 includes a pressure transducer 23 connected to sense steam pressure'in line 19 (or, alternatively, line 5 ahead of the reheater) and to convert it to a controlling variable. A multiplying relay.24 serves to multiply the signal from transducer 23 by a selected factor K. Abypass 25 is connected to shunt relay 24 under selected modes of operation.
Reheater steam'inlet pressure downstreamof valves parator 27 with proportional plus reset characteristics, the signal in the output 28 being used to adjust the opening of control valve 21 so as to reduce the error to zero.
In order to reduce the flow requirements and size of the control valve 21, the parallel-connected check valve 22 is operated to assume either open or closed condition by a signal in line 29. The connections are such that the check valve 22 opens when the pressure drop across control valve 21 is less than about 50 psi, so that the valve 21 controls over only a portion of the turbine load range.
In some installations, it may be desirable to allow control valve 21 to control the inlet pressure to a pair of moisture separators and reheaters, and in this case there may be a check valve 22 for each of the reheaters connected in parallel with a single control valve such as 21.
The components and operating medium for the control system '20 may take many different forms, such as electronic, fluidic, hydraulic, etc. The elements shown in the, figure are conventional pneumatic and hence are only shown in block diagram form. By way of example, and not limitation, transducer 23 may be a Fisher Type 4157 pressure transmitter ranged 6-30 psig (air) output for -175 psig (steam) input. Transducer 26 may be a Fisher Type 4157 pressure transmitter ranged 6-30 psig (air) output for 0-885 psig (steam) input. Multiplier 24 may be a Moore Type 68-2 2/1 multiplying relay which provides a pneumatic output pressure which is twice the input pressure. Comparator 27 may conveniently be a Fisher Type 4l64 differential pressure controller with proportional plug reset response.
The moisture separator and reheater 3 shown in FIG. 1 is arranged by means of appropriate valving, such as valve 30, so that it can be used either with or without the first stage of reheating. With both the first stage 9 and the second stage 10 of reheating in service. valve 30 is open. This is the normal mode of operation and in this case, bypass 25 in the control system 20 is positioned as shown so that multiplying relay 24 is active. In the other mode of reheater operation, valve 30 is closed and only the second stage reheater 10 is then supplied with steam. In this mode, bypass 25 is positioned sov as to shunt multiplier 24.
Referring now toFIGS. 2 and 3 of the drawing, FIG. 2 illustrates pressure and temperature conditions obtained during normal two stage operation of the reheater over the load range of the turbine. FIG. 3 ha similar graph but with only the second stage reheater in operation. The abscissa of both graphs is scaled to show the percent of steam flow to high-pressure turbine 1 (which is proportional to load on the turbine). Identical reference numerals are used on both graphs for purposes of comparison.
Variation of the controlling steam pressure in steam line 19 measured by transducer 23 is indicated by curve 30, while the controlled steam pressue in steam line 18a measured by transducer 26 is shown by curves 31, 31a. Curve 31 on FIG. 2 is at twice the slope of curve 31 on FIG. 3, because the multiplying relay 24 is in operation. The controlled steam pressure cannot exceed that in steam supply line 4 which is indicated by the flat portion of curve 31a in the FIG. 2 mode. Variation of temperature of the cycle steam on the shell-side at the inlet to the second stage reheater is indicated by curve 32. In the FIG. 3 mode (since the first stage reheater is not in service) curve 32 is simply the saturation temperature corresponding to the steam pressure shown in line 30. In the FIG. 2 mode (since some first stage reheating takes place), curve 32 is the shell-side outlet temperature from the first stage reheater.
Similarly, the temperature of the heating steam inside the tubes of the second stage reheater is indicated by curves 33, 33a. These correspond to saturation temperatures at the steam pressures of curves 31, 31a. The maximum temperature difference between the second stage reheater shell-side and tube-side are shown as T. This temperature difference is a contributing factor to reheater thermal stress and is held at a minimum value by the present invention.
For purposes of comparison, the pressures and corresponding temperatures which would be supplied to the reheater without the control system of the present invention are shown by the dashed line portions 34, 35, respectively. Without the present invention, the maximum tube-side versus shell-side temperature differential would be represented by a temperature difference T'.
OPERATION The operation of the invention in normal (or two stage) operation is as follows. From no-load up to approximately one-half load, the steam control valve 21 is controlled to cause the steam pressure entering the second stage reheater from line 18a through inlet 15 to vary in proportion to the reheater cycle steam pressure. With multiplier 24 in operation, valve 21 is fully open at approximately one-half load. From approximately one-half load to full load, the temperature differential is limited by the system characteristics, because the reheater shell-side inlet temperature continues to increase, while the tube-side temperature is limited to turbine inlet temperature. Thus, the control system only operates from no load to one-half load.
Single stage operation takes place when the first stage reheater tubes 9 are shut off using valve 30 and the bypass 25 is repositioned to shunt multiplier 24. In this case, as, seen on FIG. 3, valve 21 serves to control the inlet pressure in line 18a to the second stage reheater inlet over the full load range in proportion to the reheat cycle steam pressure. Because of the similar characteristics of the steam temperaturewith respect to pressure in various parts of the reheater, controlling the second stage reheater steam inlet pressure linearly with reheater cycle steam pressure causes the temperature curves to generally follow one another. This limits the maximum temperature differential T between tubeside and shell-side in the reheater.
Thus, it can be seen that the invention offers a very simple means of controlling steam serving as the heat:
ing fluid in the reheater in a manner which limits its temperature over certain load ranges in certain modes of operation. The invention makes use of the fact that the characteristic temperature curves of heating and heated fluids are caused to be similar. This serves to reduce temperature differentials within and around the reheater tube bundle thereby holding thermal stresses to a minimum.
The invention also offers a very simple means of controlling the heating steam to the reheater as load is built up on the turbine. The automatic control ensures that as the turbine is loaded, so the second stage reheater heating steam pressure is gradually built up in accordance with the turbine loading routine, thus minimizing I rates of temperature change in the second stage reheater, so improving reliability. Such control could only be effected manually with the most careful and time-consuming operational procedures.
Although the invention has been shown in its preferred and simplest form as using reheat cycle steam as the controlling variable to control the pressure of the reheater supply steam, other methods of obtaining the same linearly increasing pressure characteristic with respect to load will beapparent to those skilled in the art. It is desired to cover in the appended claims all such modifications as fall within the true spirit and scope of the invention.
What is claimed:
1. In a steam turbine power plant of the type having a high-pressure turbine supplied from a steam source, reheater means with tube bundles adapted to reheat cycle steam from the high-pressure turbine using a portion of said source steam in said tube bundles as the reheating fluid, the improvement comprising:
control means arranged to vary the pressure of said reheating fluid as a function of the pressure of said cycle steam from said high-pressure turbine.
2. The combination according to claim 1, wherein said control means comprises a control valve interposed between said steam source and said reheater means and further including comparator means controlling said control valve in response to a difference between a first signal representing steam pressure at said control valve outlet and a second signal representing a selected multiple of cycle steam pressure.
3. The combination according to claim 2 and further including check valve means connected in parallel with said control valve means and arranged to open at a third signal representing a selected pressure of cycle steam from the high-pressure turbine, whereby said control valve means controls over only a portion of the turbine load range.
4. The combination according to claim 2, further including selectable signal bypass means to change the multiple of said controlling cycle steam pressure second signal supplied to said comparaton'

Claims (4)

1. In a steam turbine power plant of the type having a highpressure turbine supplied from a steam source, reheater means with tube bundles adapted to reheat cycle steam from the highpressure turbine using a portion of said source steam in said tube bundles as the reheating fluid, the improvement comprising: control means arranged to vary the pressure of said reheating fluid as a function of the pressure of said cycle steam from said high-pressure turbine.
2. The combination according to claim 1, wherein said control means comprises a control valve interposed between said steam source and said reheater means and further including comparator means controlling said control valve in response to a difference between a first signal representing steam pressure at said control valve outlet and a second signal representing a selected multiple of cycle steam pressure.
3. The combination accordinG to claim 2 and further including check valve means connected in parallel with said control valve means and arranged to open at a third signal representing a selected pressure of cycle steam from the high-pressure turbine, whereby said control valve means controls over only a portion of the turbine load range.
4. The combination according to claim 2, further including selectable signal bypass means to change the multiple of said controlling cycle steam pressure second signal supplied to said comparator.
US00185268A 1971-09-30 1971-09-30 Steam reheater control for turbine power plant Expired - Lifetime US3766732A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US18526871A 1971-09-30 1971-09-30

Publications (1)

Publication Number Publication Date
US3766732A true US3766732A (en) 1973-10-23

Family

ID=22680298

Family Applications (1)

Application Number Title Priority Date Filing Date
US00185268A Expired - Lifetime US3766732A (en) 1971-09-30 1971-09-30 Steam reheater control for turbine power plant

Country Status (5)

Country Link
US (1) US3766732A (en)
JP (1) JPS5538563B2 (en)
CH (1) CH558469A (en)
DE (1) DE2246556C3 (en)
FR (1) FR2155410A5 (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040182082A1 (en) * 2002-12-26 2004-09-23 Saranchuk Theodore Charles Low temperature heat engine
US20110056201A1 (en) * 2009-09-08 2011-03-10 General Electric Company Method and apparatus for controlling moisture separator reheaters
CN102121910A (en) * 2010-12-20 2011-07-13 北京化工大学 Performance test device for micro heat exchanger
US8499874B2 (en) 2009-05-12 2013-08-06 Icr Turbine Engine Corporation Gas turbine energy storage and conversion system
US8669670B2 (en) 2010-09-03 2014-03-11 Icr Turbine Engine Corporation Gas turbine engine configurations
US8866334B2 (en) 2010-03-02 2014-10-21 Icr Turbine Engine Corporation Dispatchable power from a renewable energy facility
US8984895B2 (en) 2010-07-09 2015-03-24 Icr Turbine Engine Corporation Metallic ceramic spool for a gas turbine engine
US9051873B2 (en) 2011-05-20 2015-06-09 Icr Turbine Engine Corporation Ceramic-to-metal turbine shaft attachment
US20150218970A1 (en) * 2014-01-09 2015-08-06 Doosan Heavy Industries & Construction Co., Ltd. Apparatus and method for reactor power control of steam turbine power generation system
US9328633B2 (en) 2012-06-04 2016-05-03 General Electric Company Control of steam temperature in combined cycle power plant
US10094288B2 (en) 2012-07-24 2018-10-09 Icr Turbine Engine Corporation Ceramic-to-metal turbine volute attachment for a gas turbine engine

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS515332A (en) * 1974-07-03 1976-01-17 Sakurai Kenzai Sangyo Kk Konkuriitono hyomenshorihoho
JPS54126218A (en) * 1978-02-15 1979-10-01 Kazuo Takatsu Production of inorganic plate
JPS54119519A (en) * 1978-03-10 1979-09-17 Yoshiyuki Hiroura Production of multiileveled patterned cement stone plate
JPS5644615A (en) * 1979-09-18 1981-04-23 Kajima Corp Method of separating solid from cement group hardened substance
JPS6122904A (en) * 1985-06-24 1986-01-31 千代田技研工業株式会社 Manufacture of roughened-surface concrete product
JP3638307B2 (en) * 1994-06-08 2005-04-13 株式会社東芝 Reheat steam pipe device for nuclear power plant

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2540691A (en) * 1948-08-19 1951-02-06 Westinghouse Electric Corp Valve control of reheat turbine installation
US2579027A (en) * 1949-04-14 1951-12-18 Comb Eng Superheater Inc Overheat protection for steam reheaters
US2586510A (en) * 1948-10-05 1952-02-19 Westinghouse Electric Corp Reheater control for turbine apparatus
US3451220A (en) * 1966-06-28 1969-06-24 Westinghouse Electric Corp Closed-cycle turbine power plant and distillation plant
US3488961A (en) * 1967-02-06 1970-01-13 Sulzer Ag Method and apparatus for regulating a steam heating-power plant

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT118122B (en) * 1928-05-02 1930-06-25 Siemens Ag Multi-stage steam power plant with multi-stage reheating.

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2540691A (en) * 1948-08-19 1951-02-06 Westinghouse Electric Corp Valve control of reheat turbine installation
US2586510A (en) * 1948-10-05 1952-02-19 Westinghouse Electric Corp Reheater control for turbine apparatus
US2579027A (en) * 1949-04-14 1951-12-18 Comb Eng Superheater Inc Overheat protection for steam reheaters
US3451220A (en) * 1966-06-28 1969-06-24 Westinghouse Electric Corp Closed-cycle turbine power plant and distillation plant
US3488961A (en) * 1967-02-06 1970-01-13 Sulzer Ag Method and apparatus for regulating a steam heating-power plant

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7010920B2 (en) * 2002-12-26 2006-03-14 Terran Technologies, Inc. Low temperature heat engine
US20040182082A1 (en) * 2002-12-26 2004-09-23 Saranchuk Theodore Charles Low temperature heat engine
US8499874B2 (en) 2009-05-12 2013-08-06 Icr Turbine Engine Corporation Gas turbine energy storage and conversion system
US8708083B2 (en) 2009-05-12 2014-04-29 Icr Turbine Engine Corporation Gas turbine energy storage and conversion system
US20110056201A1 (en) * 2009-09-08 2011-03-10 General Electric Company Method and apparatus for controlling moisture separator reheaters
US9719378B2 (en) 2009-09-08 2017-08-01 General Electric Company Method and apparatus for controlling moisture separator reheater
US8499561B2 (en) * 2009-09-08 2013-08-06 General Electric Company Method and apparatus for controlling moisture separator reheaters
US8866334B2 (en) 2010-03-02 2014-10-21 Icr Turbine Engine Corporation Dispatchable power from a renewable energy facility
US8984895B2 (en) 2010-07-09 2015-03-24 Icr Turbine Engine Corporation Metallic ceramic spool for a gas turbine engine
US8669670B2 (en) 2010-09-03 2014-03-11 Icr Turbine Engine Corporation Gas turbine engine configurations
CN102121910B (en) * 2010-12-20 2013-01-02 北京化工大学 Performance test device for micro heat exchanger
CN102121910A (en) * 2010-12-20 2011-07-13 北京化工大学 Performance test device for micro heat exchanger
US9051873B2 (en) 2011-05-20 2015-06-09 Icr Turbine Engine Corporation Ceramic-to-metal turbine shaft attachment
US9328633B2 (en) 2012-06-04 2016-05-03 General Electric Company Control of steam temperature in combined cycle power plant
US10094288B2 (en) 2012-07-24 2018-10-09 Icr Turbine Engine Corporation Ceramic-to-metal turbine volute attachment for a gas turbine engine
US20150218970A1 (en) * 2014-01-09 2015-08-06 Doosan Heavy Industries & Construction Co., Ltd. Apparatus and method for reactor power control of steam turbine power generation system
US10060297B2 (en) * 2014-01-09 2018-08-28 Doosan Heavy Industries & Construction Co., Ltd. Apparatus and method for reactor power control of steam turbine power generation system

Also Published As

Publication number Publication date
FR2155410A5 (en) 1973-05-18
DE2246556B2 (en) 1980-06-26
DE2246556C3 (en) 1981-04-16
JPS4842201A (en) 1973-06-20
DE2246556A1 (en) 1973-04-05
CH558469A (en) 1975-01-31
JPS5538563B2 (en) 1980-10-04

Similar Documents

Publication Publication Date Title
US3766732A (en) Steam reheater control for turbine power plant
CA1156718A (en) Coordinated control system for an electric power plant
US3529580A (en) Start-up system
EP0079598B1 (en) Steam turbine bypass system
US3162179A (en) Fluid circulation system for a oncethrough type steam generator
GB2036374A (en) Electronic drain system
US3338053A (en) Once-through vapor generator start-up system
US3882680A (en) By-pass system
US3021824A (en) Forced flow steam generating plant
US4414858A (en) Steam turbine fluid sampling apparatus
US2921441A (en) Feed water preheating system for steam power plants
US3212477A (en) Forced flow steam generator and method of starting same
US4088182A (en) Temperature control system for a J-module heat exchanger
US3411300A (en) Method and apparatus for sliding pressure operation of a vapor generator at subcritical and supercritical pressure
US4487166A (en) Start-up system for once-through boilers
KR900018499A (en) Improved reheater piping and condensate cooler system
US4274259A (en) Superheated steam power plant with steam to steam reheater
US4665706A (en) Control system for variable pressure once-through boilers
US4007596A (en) Dual turbine power plant and method of operating such plant, especially one having an HTGR steam supply
US4241585A (en) Method of operating a vapor generating system having integral separators and a constant pressure furnace circuitry
US3362164A (en) Start-up system for forced flow vapor generator
US4277944A (en) Method and apparatus for regeneratively superheating auxiliary steam
US4301650A (en) Pressure regulating apparatus for a closed water circuit
GB1053515A (en)
US3411299A (en) Peak load operation in steam power plants