US20200011157A1 - Drilling productive wells - Google Patents
Drilling productive wells Download PDFInfo
- Publication number
- US20200011157A1 US20200011157A1 US16/460,835 US201916460835A US2020011157A1 US 20200011157 A1 US20200011157 A1 US 20200011157A1 US 201916460835 A US201916460835 A US 201916460835A US 2020011157 A1 US2020011157 A1 US 2020011157A1
- Authority
- US
- United States
- Prior art keywords
- well
- trajectory
- segment
- determining
- potential
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000005553 drilling Methods 0.000 title claims description 18
- 238000000034 method Methods 0.000 claims abstract description 33
- 238000004519 manufacturing process Methods 0.000 claims abstract description 23
- 230000006870 function Effects 0.000 claims description 38
- 230000035699 permeability Effects 0.000 claims description 19
- 229930195733 hydrocarbon Natural products 0.000 claims description 8
- 150000002430 hydrocarbons Chemical class 0.000 claims description 8
- 238000004590 computer program Methods 0.000 claims description 7
- 239000011435 rock Substances 0.000 claims description 7
- 239000004215 Carbon black (E152) Substances 0.000 claims description 6
- 239000004927 clay Substances 0.000 claims description 6
- 239000011148 porous material Substances 0.000 claims description 6
- 239000000463 material Substances 0.000 claims description 4
- 230000008569 process Effects 0.000 description 12
- 238000005295 random walk Methods 0.000 description 12
- 238000013459 approach Methods 0.000 description 11
- 238000012800 visualization Methods 0.000 description 9
- 238000010586 diagram Methods 0.000 description 6
- 238000013461 design Methods 0.000 description 4
- 230000008901 benefit Effects 0.000 description 3
- 230000015572 biosynthetic process Effects 0.000 description 3
- 230000001186 cumulative effect Effects 0.000 description 3
- 239000012530 fluid Substances 0.000 description 3
- 238000005755 formation reaction Methods 0.000 description 3
- 238000002347 injection Methods 0.000 description 3
- 239000007924 injection Substances 0.000 description 3
- 230000003287 optical effect Effects 0.000 description 3
- 238000005457 optimization Methods 0.000 description 3
- 208000035126 Facies Diseases 0.000 description 2
- 238000007792 addition Methods 0.000 description 2
- 238000004458 analytical method Methods 0.000 description 2
- 238000007598 dipping method Methods 0.000 description 2
- 230000003993 interaction Effects 0.000 description 2
- VNWKTOKETHGBQD-UHFFFAOYSA-N methane Chemical compound C VNWKTOKETHGBQD-UHFFFAOYSA-N 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 239000003129 oil well Substances 0.000 description 2
- 238000012545 processing Methods 0.000 description 2
- 239000000243 solution Substances 0.000 description 2
- 238000003860 storage Methods 0.000 description 2
- 230000001052 transient effect Effects 0.000 description 2
- XQCFHQBGMWUEMY-ZPUQHVIOSA-N Nitrovin Chemical compound C=1C=C([N+]([O-])=O)OC=1\C=C\C(=NNC(=N)N)\C=C\C1=CC=C([N+]([O-])=O)O1 XQCFHQBGMWUEMY-ZPUQHVIOSA-N 0.000 description 1
- 238000003491 array Methods 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000012512 characterization method Methods 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 238000013016 damping Methods 0.000 description 1
- 238000011156 evaluation Methods 0.000 description 1
- 238000000605 extraction Methods 0.000 description 1
- 238000001914 filtration Methods 0.000 description 1
- 239000007789 gas Substances 0.000 description 1
- 239000003673 groundwater Substances 0.000 description 1
- 239000004973 liquid crystal related substance Substances 0.000 description 1
- 238000013507 mapping Methods 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 239000003345 natural gas Substances 0.000 description 1
- 239000003921 oil Substances 0.000 description 1
- 230000010355 oscillation Effects 0.000 description 1
- 239000003208 petroleum Substances 0.000 description 1
- 238000013138 pruning Methods 0.000 description 1
- 238000005070 sampling Methods 0.000 description 1
- 230000001953 sensory effect Effects 0.000 description 1
- 238000012144 step-by-step procedure Methods 0.000 description 1
- 230000008685 targeting Effects 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
- 238000000844 transformation Methods 0.000 description 1
- 230000001131 transforming effect Effects 0.000 description 1
- 238000013519 translation Methods 0.000 description 1
- 230000014616 translation Effects 0.000 description 1
- 230000000007 visual effect Effects 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B41/00—Equipment or details not covered by groups E21B15/00 - E21B40/00
- E21B41/0092—Methods relating to program engineering, design or optimisation
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B44/00—Automatic control systems specially adapted for drilling operations, i.e. self-operating systems which function to carry out or modify a drilling operation without intervention of a human operator, e.g. computer-controlled drilling systems; Systems specially adapted for monitoring a plurality of drilling variables or conditions
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/02—Determining slope or direction
- E21B47/022—Determining slope or direction of the borehole, e.g. using geomagnetism
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/04—Directional drilling
Definitions
- Well drilling can include drilling a hole in the ground, for example, for extraction of a natural resource such as ground water, natural gas, oil, petroleum, and/or hydrocarbons, for the injection of a fluid from the surface to a subsurface reservoir, or for subsurface formations evaluation or monitoring.
- a natural resource such as ground water, natural gas, oil, petroleum, and/or hydrocarbons
- a geologic target can be identified to meet the objectives of the well. For instance, for a production well, the target can be selected based on estimated production from the well and/or to manage reservoir drainage. For an exploration or appraisal well, the target can be chosen to confirm the existence of a viable hydrocarbon reservoir or to ascertain its extent. For an injection well, the target can be selected to locate the point of injection in a permeable zone, which may support disposing of water or gas and/or pushing hydrocarbons into nearby production wells.
- the target e.g., the end point of the well
- a surface location e.g., the starting point of the well
- a team of geoscientists or engineers can develop a set of presumed properties of the subsurface that will be drilled through to reach the target. These properties can include, for example, pore pressure, fracture gradient, stresses, Young's modulus, Poisson's ratio, porosity, permeability, lithology, faults, and clay content.
- the subsurface data can be used by a well engineering team to perform the casing design and completion design for the well. Thereafter, detailed planning for executing the well in a safe and cost-efficient manner can occur, where, for example, the drill bits are selected, a bottom hole assembly (BHA) is designed, drilling fluid are selected, and step-by-step procedures are written to provide instruction for executing the well.
- BHA bottom hole assembly
- reservoir properties can be received.
- a plurality of potential well trajectories can be determined. Each trajectory can characterize an extension of the well from a well origin position. Each trajectory can include a plurality of well segments. Production contribution of each potential well trajectory can be evaluated using the reservoir properties. A final well trajectory can be provided based on the evaluated production contribution of the potential well trajectories.
- the well can be drilled using well drilling machinery and according to the final well trajectory.
- the reservoir properties can include density, pore pressure, fracture gradient, stresses, saturations, Youngs modulus, Poisson's ratio, brittleness index, wellbore stability, porosity, permeability, hydrocarbon content, lithology, faults, and/or clay content.
- Determining the plurality of potential well trajectories can include, for each trajectory, determining the plurality of well segments, each well segment characterizing an extension of the well from a segment start position in a random, pseudorandom, or a direction determined based on a computed gradient.
- the random or pseudorandom direction can be determined subject to well constraints.
- the well constraints can include stress state, wellbore orientation and inclination, minimum mud weight, maximum mud weight, material properties, proximity to another well, proximity to a natural object, proximity to a man-made object, and/or pipe deviation limitations. Constraints can be characterized by one or more interval ranges to account for uncertainty in the reservoir parameters.
- Determining the plurality of potential well trajectories can include, for each trajectory, determining the plurality of well segments, each well segment characterizing an extension of the well from a segment start position, the extension in a direction based on an objective function evaluated for a respective position of the segment and using the reservoir properties.
- the production contributions of each potential well trajectory can be characterized by: porosity value; permeability value; total organic content value; saturation value; a product of permeability value and total organic content; a product of permeability and saturation of mobile total organic content; a fracability index derived from rock mechanical properties and stresses; a brittleness index; well stability; and/or a mathematical combination of such values.
- the providing can include transmitting, storing, and/or displaying.
- the providing of the final well trajectory can include transmitting the final well trajectory, storing (e.g., in memory) the final well trajectory, displaying the final well trajectory, and/or further processing of the final well trajectory.
- At least one of the receiving, the determining, the evaluating and the providing can be performed by at least one data processor forming part of at least one computing system.
- Non-transitory computer program products i.e., physically embodied computer program products
- store instructions which when executed by one or more data processors of one or more computing systems, causes at least one data processor to perform operations herein.
- computer systems are also described that may include one or more data processors and memory coupled to the one or more data processors. The memory may temporarily or permanently store instructions that cause at least one processor to perform one or more of the operations described herein.
- methods can be implemented by one or more data processors either within a single computing system or distributed among two or more computing systems.
- Such computing systems can be connected and can exchange data and/or commands or other instructions or the like via one or more connections, including a connection over a network (e.g. the Internet, a wireless wide area network, a local area network, a wide area network, a wired network, or the like), via a direct connection between one or more of the multiple computing systems, etc.
- a network e.g. the Internet, a wireless wide area network, a local area network,
- FIG. 1 is a process flow diagram illustrating an example process of some implementations of the current subject matter that can provide for improved well planning, which can increase well productivity;
- FIG. 2 is a process flow diagram illustrating another example method according to some implementations that can provide for improved well planning, which can increase well productivity;
- FIG. 3 is a diagram illustrating an example of a well trajectory
- FIG. 4 includes a surface map illustrating an example of an objective function (e.g., in this case based on porosity) distributed in the reservoir volume and multiple wells traversing the volume and (right) the objective function evaluated as cumulative productivity along the well bore length;
- an objective function e.g., in this case based on porosity
- FIG. 5 is a surface plot illustrating an example of an objective function (porosity in this case) distributed in the reservoir volume and randomly created wells (e.g., Sobol sampled) traversing the volume;
- FIG. 6 is a three-dimensional visualization of well paths through a faulted reservoir
- FIG. 7 is a three-dimensional visualization of multiple wells in a three-dimensional grid.
- FIG. 8 is a three-dimensional visualization of multiple wells in a dipping formation.
- oil well planning can include identifying a starting point of the well and a trajectory (e.g., path) to an end point or reservoir boundary.
- the oil well plan can be designed to achieve high production from the well.
- some approaches to well planning can be sub-optimal because they require input by a subject matter expert and may require iteration between a well planning team and a well drilling team.
- Sub-optimal plans can result in reduced production such that oil and other resources are left in the ground (e.g., not extracted), the well plan may not be feasible (e.g., it may not be possible to drill the well), and drilling the sub-optimal well plan may result in ground collapse, which can be dangerous and costly. Accordingly, some implementations of the current subject matter provide for improved well planning, which can increase well productivity.
- FIG. 1 is a process flow diagram illustrating an example process 100 of some implementations of the current subject matter that can provide for improved well planning, which can increase well productivity.
- reservoir properties can be received.
- the reservoir properties can include rock facies, pore pressure, fracture gradient, stresses, Young's modulus, Poisson's ratio, porosity, permeability, hydrocarbon content, saturations, lithology, faults, and/or clay content.
- the reservoir properties can be generated as a result of characterizing (e.g., mapping) the reservoir; and identifying rock properties and potential high productivity spots based on raw logging data, resistivity data, seismic data, core data, drill cuttings, outcrop data, and the like.
- Each trajectory can characterize an extension of the well from a well origin position (e.g., a well start position, such as a pad position).
- Each trajectory can include a plurality of well segments.
- each well segment can be characterized as a line segment between two points (e.g., a segment start position and a segment end position), a segment start position and an angle (e.g., azimuth, inclination), and the like. Points can be expressed as subsurface location coordinates.
- determining the plurality of potential well trajectories can include, for each trajectory, determining the plurality of well segments that comprise the well trajectory. Determining a well segment can include determining and/or selecting a direction to extend the well trajectory.
- the direction to extend the well can be chosen according to a randomization scheme such that the direction can be random. For example, this can be considered as a random walk scheme in which, the origin (e.g., well start position) of the wellbore is advanced successively in small increments in random directions.
- the direction may be considered a pseudorandom direction.
- each well segment can characterize an extension of the well from a segment start position in a random or pseudorandom direction.
- the direction and/or length of the wellbore extension can specified by a vector in three-dimensional (3D) space.
- the direction of the wellbore extension can be specified by a new location in 3D space, which in combination with the previous location in 3D space can define the orientation and length of the next wellbore segment.
- the direction of the wellbore extension can be specified by two angles and a length metric, such as azimuth (e.g., measuring orientation in a North-East plane), inclination (e.g., measuring departure from the vertical direction), and measured depth (e.g., a distance quantity).
- the depth and/or inclination of the next wellbore segment can be specified to follow a pre-defined depth-distance relation, which can be established by a formula, by a planar or non-planar surface in 3D space, and/or the like.
- a pre-defined depth-distance relation can be established by a formula, by a planar or non-planar surface in 3D space, and/or the like.
- the surface can, for example, be established as the mid-plane between top and bottom horizon of the reservoir.
- Another method to maintain a non-horizontal well trajectory in a reservoir can include first moving the reservoir properties into a two-dimensional (2D) plane, then execute the disclosed method to identify the optimum well-path in 2D, and then compute the appropriate depth of each wellbore segment.
- the user prescribes an initial well path as a starting point, which can then be perturbed.
- Perturbations can be made on a segment scale (e.g., by adjusting one or more well bore segments or survey points or inclination and/or azimuth angles, or on a wellbore scale by transforming parts or the entire well in 3D space; transformations can include translations in space, rotations, scaling of coordinates).
- the direction to extend a potential well trajectory can be subject to constraints. For example, there may be a limited amount a well can bend during the drilling process (e.g., radius of curvature). For example, if a well drilling machine can provide, at most, for 3 degrees of directional change per 100 feet at any location along the wellbore, the build rate may be determined as being randomly selected from the range ⁇ 3/100 to 3/100 degree/foot.
- constraints can include stress state, wellbore orientation, inclination, material properties, mud weight (e.g., wellbore stability), proximity to existing or planned wells in the reservoir (collision avoidance), and pipe deviation limitations (e.g., build rate).
- the direction to extend a potential well segment can be chosen in a direction based on an objective function evaluated for the respective position of the segment and using the reservoir properties. For example, a gradient descent (or conjugate gradient descent) can be used to compute the direction of the next wellbore segment (e.g., walk uphill or downhill in a non-random direction, or sideways, or both, and according to an objective function).
- a gradient descent or conjugate gradient descent
- the direction of the next wellbore segment e.g., walk uphill or downhill in a non-random direction, or sideways, or both, and according to an objective function.
- different approaches can be utilized to identify which well path or well trajectory maximizes an objective function. These approaches can include random walk, random walk with random adjustment, random walk with non-random adjustment, gradient descent, random walk with tree search, maximized objective function gradient, and inversion.
- a random walk approach can include, from the origin, advancing the wellbore successively in small increments in random directions and selecting the best well from the ensemble.
- a random walk with random adjustment in which a random walk scheme is performed, but followed by adjusting one or more wellbore trajectory segments in a random direction.
- a random walk with non-random adjustment approach can include a random walk, but adjustments can be non-random.
- well bore segments can be adjusted so that one segment can move towards a higher value of the objective function.
- Other segments can be adjusted so that drillability constraints can be matched.
- Gradient descent or conjugate gradient descent
- Random walk using a tree search can include a random walk whereby each segment branches off with more than one segment. Each full wellbore lineage can be treated as a separate wellbore. Heuristic pruning can be utilized.
- the maximized objective function gradient approach can include choosing a direction that can be in the direction of maximum objective function gradient. Inversion can include formulating a mathematical characterization of a well path where the azimuth and inclination of each segment are free parameters, application of well constraints, and mathematically solving for drill trajectory parameters that maximize the objective function.
- damping can be utilized to avoid numerical oscillations.
- the objective function can be smoothed in 3 Dimensional space, which can aid in avoiding issues from small-scale scatter.
- multiple object functions can be combined by using weights.
- multiple constraints can be satisfied simultaneously.
- an objective function can be maximized while satisfying one or more constraints.
- production contribution of each potential well trajectory can be evaluated using the reservoir properties. How production contribution can be evaluated can vary and can be characterized by an objective function.
- the production contributions of each potential well trajectory can be characterized by: porosity value; permeability value; total organic content; a combination of several values such as a product of permeability value and total organic content; a product of permeability and saturation of mobile total organic content; a fracability index derived from rock mechanical properties and stresses; a brittleness index; and/or well stability.
- evaluating production contribution can include evaluating the objective function, which can be evaluated along the entire well, or along well segment(s) inside the reservoir, and/or at one or more specific locations (such as perforation clusters or stages), and/or a combination thereof.
- the objective function can be maximized, can be summed or integrated over those values; can be taken as the maximum, or another statistical metric such as the average, the p 90 , and the like.
- a final well trajectory can be provided.
- the final well trajectory can include the potential trajectory that is evaluated as including the greatest production contribution.
- additional well planning steps can be performed, such as performing casing design and completion design for the well, including detailed planning such as selecting the drill bits, designing a bottom hole assembly (BHA), selecting drilling fluid and the like.
- BHA bottom hole assembly
- a well can be drilled using well drilling machinery and according to the final well trajectory.
- the providing of the final well trajectory can include transmitting the final well trajectory, storing (e.g., in memory) the final well trajectory, displaying the final well trajectory, and/or further processing of the final well trajectory.
- determining potential well trajectories can result in getting stuck in a local maximum (or minimum). This can occur when the objective function has multiple scattered local extrema. In such a case, depending on the approach utilized to determine the potential well trajectories, the search radius can be increased to find an appropriate direction. In some implementation, different well path starting points can be considered. In some implementation, the objective function can be smoothed so that fewer local extrema exist. In some implementations, directions can be selected based on the reservoir center such that successive extensions follow in roughly the same direction, towards reservoir center, or towards a direction to create the longest well in lease boundaries or in reservoir volume.
- interval analysis may be employed to obtain a range of acceptable lower bounds and upper bounds on the mud weight needed for stability considerations for each wellbore segment when filtering out un-drillable wells using user specified mud weight limits.
- interval analysis may be applied to any input parameter that has uncertainty associated with it allowing the algorithm to compute a number of acceptable well paths based on the amount of uncertainty in the inputs.
- FIG. 2 is a process flow diagram illustrating another example method 200 according to some implementations that can provide for improved well planning, which can increase well productivity.
- reservoir properties can be obtained.
- the reservoir properties can include pore pressure, fracture gradient, stresses, Young's modulus, Poisson's ratio, rock facies, porosity, hydrocarbon content, permeability, saturations, lithology, faults, wellbore stability and/or clay content.
- a well origin can be identified.
- the well origin can include the well head and/or an initial landing point. In some implementations, the well origin can include a point on a predetermined well segment.
- the trajectory can be extended by a segment subject to drill-ability and wellbore stability constraints.
- the extension can be from the well origin.
- the contribution from well extension to well productivity can be computed.
- it can be determined whether the potential well trajectory is extendable. This determination can include determining whether a well extension is feasible (e.g., satisfies all constraints).
- the process 200 can return to step 230 and extend the potential well trajectory starting from the end of the prior well segment and subject to the constraints.
- the process can repeat steps 230 , 240 and 250 until extension of the well is no longer feasible (e.g., no additional segment can be determined that satisfies all constraints), until a predetermined number of segments have been determined, or the well has reached the reservoir boundary.
- the potential well segment can be evaluated by at least computing the cumulative productivity according to the objective function.
- the potential well segment can be added as one realization to the set of potential well segments and it can be determined whether N realizations of potential well trajectories have been computed. If N realization have not been computed, the process can return to step 230 to determine a new realization of a potential well segment. In this case, a segment for extending the well can be determined but starting again from the well origin. In some implementations, steps 230 , 240 , 250 , and 260 are computed. If N realization segments have been computed, then at 270 , the potential well trajectory having the maximum (e.g., greatest) productivity in the ensemble can be selected as the final well trajectory.
- FIG. 3 is a diagram illustrating an example of a well trajectory.
- a trajectory extend is defined by well segments, with each segment having a respective length (dx), and deviation angle between segments (a).
- a constraint e.g., deviation constraint, wellbore stability constraint, collision avoidance constraint
- Adjusting a well bore segment can be useful when, for instance, a well bore segment does not satisfy a constraint (e.g., deviation constraint, wellbore stability constraint, collision avoidance constraint), and can include several of the following steps: the well bore segment that does not satisfy a constraint can be reoriented so that is does satisfy the constraint; in succession, the next adjacent segment or segments can be adjusted so it also satisfies a constraint, until the path defined by the adjusted segments reconnects to a previous segment.
- a constraint e.g., deviation constraint, wellbore stability constraint, collision avoidance constraint
- FIG. 4 includes a surface map 405 illustrating an example of an objective function (e.g., in this case based on porosity) distributed in the reservoir volume (shown as a horizontal slice, with subsurface coordinates shown along the x and y axis) and multiple wells traversing the volume and (right) the objective function evaluated as cumulative productivity along the well bore length.
- the well 415 curving towards the center of the surface plot has a higher productivity, which can be attributed to its traversal of the elevated permeability region.
- FIG. 5 is a surface plot illustrating an example of an objective function (porosity in this case) distributed in the reservoir volume and 300 randomly created wells (e.g., Sobol sampled) traversing the volume and all starting at the same landing point (e.g., well origin point).
- the worst and best wells are shown as thicker lines 505 and 510 , respectively.
- FIG. 6 is a three-dimensional visualization 600 illustrating optimum stable and unstable well paths through a faulted reservoir.
- the stability of these wells can be determined by wellbore stability considerations including, for example, stress state, mud weight window, and the direction of a wellbore segment of each wellbore path.
- visualization 600 can include wellbore wellpath_best_as 610 .
- Wellbore 610 can include an optimum stable well path 620 and an optimum unstable well path 630 .
- FIG. 7 is a three-dimensional visualization 700 illustrating multiple wells in a three-dimensional (3D) grid.
- the 3D grid can be visualized by means of several two-dimensional slices that can offer the viewer perspective and can inform on the level of heterogeneity of relevant subsurface properties.
- a plurality of well paths can be displayed and can inform the viewer of the covered subsurface space.
- the plurality of wells can be trimmed by eliminating wells that do not satisfy all of the constraints, and the optimum well path (e.g. the path for which the objective function is maximized) can be selected.
- FIG. 8 is a three-dimensional visualization 800 illustrating multiple wells in a dipping formation. For example, visualization 800 can illustrate an optimal well 810 .
- FIGS. 6, 7 and 8 can used to visualize grid properties and well trajectories and can be generated with software that allows visualization of objects in 3D space, such as BHGE's JewelSuiteTM Software.
- the objective function can be expressed in terms of a financial metric, cost of well can be incorporated into objective function.
- aspects of the current subject matter can be applied to optimize multiple wells on the pad.
- An objective function can be utilized that includes productivity from all wells.
- maximum deviation and central path (go straight) for each new wellbore segment can be utilized to cover the maximum range of possible well paths. Sampling within the range can be performed, and the optimum can be found by either brute force/Monte Carlo or gradient descent-type methods.
- constraint optimization can be used to identify the optimum with either hard or soft limits.
- Constrained optimization in some contexts called constraint optimization
- the objective function can include a cost function or energy function, which is to be minimized, or a reward function or utility function, which is to be maximized.
- Constraints can be either hard constraints, which set conditions for the variables that are required to be satisfied, or soft constraints, which have some variable values that are penalized in the objective function if, and based on the extent that, the conditions on the variables are not satisfied.
- multiple objective functions can be combined and/or multiple constraints are combined.
- the subject matter described herein can provide a number of technical advantages. For example, some implementations of the current subject matter can improve upon well trajectories that are planned by manual considerations, whereby the truly optimal well is likely not identified because not all possible wells can be evaluated by a human. Well planning can be accelerated compared to some existing processes and an objective criteria can be evaluated for determining the best well path.
- the subject matter improves system execution time.
- Some current systems require weeks, or even months, when planning a well trajectory because it can involve numerous iterations between a geoscientist, who can be focused on the targeting the pay zone, and a drilling engineer, who can be focused on the drilling constraints such as surface location, dog leg severity factor, geomechanical constraints, and can make sure the new well path is not close to any existing wells in the reservoir. Further iterations can involve the asset manager, who can be trying to capitalize on the existing infrastructure in the form of surface facilities.
- each wellbore path is independent from any other can be advantageous because this approach can be computationally parallelized and it can be possible in some implementations to obtain ideal linear speed-up.
- the described random well bore extension approach may not depend on numerical or mathematical techniques that are known to, at times, have convergence or inversion issues. Given enough trials, some aspects of the current subject matter can reliably identify a drillable well bore path if there is a possible one, even when other approaches cannot. In addition, this method can require lower memory (e.g., RAM) usage as compared to some other approaches. Furthermore, in some implementations, a modest number of trials can produce what might be an acceptable well path, even if a larger number will determine a better path.
- One or more aspects or features of the subject matter described herein can be realized in digital electronic circuitry, integrated circuitry, specially designed application specific integrated circuits (ASICs), field programmable gate arrays (FPGAs) computer hardware, firmware, software, and/or combinations thereof.
- ASICs application specific integrated circuits
- FPGAs field programmable gate arrays
- These various aspects or features can include implementation in one or more computer programs that are executable and/or interpretable on a programmable system including at least one programmable processor, which can be special or general purpose, coupled to receive data and instructions from, and to transmit data and instructions to, a storage system, at least one input device, and at least one output device.
- the programmable system or computing system may include clients and servers.
- a client and server are generally remote from each other and typically interact through a communication network. The relationship of client and server arises by virtue of computer programs running on the respective computers and having a client-server relationship to each other.
- machine-readable signal refers to any signal used to provide machine instructions and/or data to a programmable processor.
- the machine-readable medium can store such machine instructions non-transitorily, such as for example as would a non-transient solid-state memory or a magnetic hard drive or any equivalent storage medium.
- the machine-readable medium can alternatively or additionally store such machine instructions in a transient manner, such as for example as would a processor cache or other random access memory associated with one or more physical processor cores.
- one or more aspects or features of the subject matter described herein can be implemented on a computer having a display device, such as for example a cathode ray tube (CRT) or a liquid crystal display (LCD) or a light emitting diode (LED) monitor for displaying information to the user and a keyboard and a pointing device, such as for example a mouse or a trackball, by which the user may provide input to the computer.
- a display device such as for example a cathode ray tube (CRT) or a liquid crystal display (LCD) or a light emitting diode (LED) monitor for displaying information to the user and a keyboard and a pointing device, such as for example a mouse or a trackball, by which the user may provide input to the computer.
- CTR cathode ray tube
- LCD liquid crystal display
- LED light emitting diode
- keyboard and a pointing device such as for example a mouse or a trackball
- Other kinds of devices can be used to provide
- phrases such as “at least one of” or “one or more of” may occur followed by a conjunctive list of elements or features.
- the term “and/or” may also occur in a list of two or more elements or features. Unless otherwise implicitly or explicitly contradicted by the context in which it is used, such a phrase is intended to mean any of the listed elements or features individually or any of the recited elements or features in combination with any of the other recited elements or features.
- the phrases “at least one of A and B;” “one or more of A and B;” and “A and/or B” are each intended to mean “A alone, B alone, or A and B together.”
- a similar interpretation is also intended for lists including three or more items.
- the phrases “at least one of A, B, and C;” “one or more of A, B, and C;” and “A, B, and/or C” are each intended to mean “A alone, B alone, C alone, A and B together, A and C together, B and C together, or A and B and C together.”
- use of the term “based on,” above and in the claims is intended to mean, “based at least in part on,” such that an unrecited feature or element is also permissible.
Abstract
Description
- This application claims the benefit of U.S. Provisional Application No. 62/693,569, filed on Jul. 3, 2018 and entitled “Drilling Productive Wells,” the entirety of which is hereby incorporated by reference.
- Well drilling can include drilling a hole in the ground, for example, for extraction of a natural resource such as ground water, natural gas, oil, petroleum, and/or hydrocarbons, for the injection of a fluid from the surface to a subsurface reservoir, or for subsurface formations evaluation or monitoring.
- In some instances, before a well is drilled, a geologic target can be identified to meet the objectives of the well. For instance, for a production well, the target can be selected based on estimated production from the well and/or to manage reservoir drainage. For an exploration or appraisal well, the target can be chosen to confirm the existence of a viable hydrocarbon reservoir or to ascertain its extent. For an injection well, the target can be selected to locate the point of injection in a permeable zone, which may support disposing of water or gas and/or pushing hydrocarbons into nearby production wells.
- The target (e.g., the end point of the well) can be matched with a surface location (e.g., the starting point of the well), and a trajectory between the two can be designed.
- When the well path is identified, a team of geoscientists or engineers, for example, can develop a set of presumed properties of the subsurface that will be drilled through to reach the target. These properties can include, for example, pore pressure, fracture gradient, stresses, Young's modulus, Poisson's ratio, porosity, permeability, lithology, faults, and clay content. In an example, the subsurface data can be used by a well engineering team to perform the casing design and completion design for the well. Thereafter, detailed planning for executing the well in a safe and cost-efficient manner can occur, where, for example, the drill bits are selected, a bottom hole assembly (BHA) is designed, drilling fluid are selected, and step-by-step procedures are written to provide instruction for executing the well.
- In an aspect, reservoir properties can be received. A plurality of potential well trajectories can be determined. Each trajectory can characterize an extension of the well from a well origin position. Each trajectory can include a plurality of well segments. Production contribution of each potential well trajectory can be evaluated using the reservoir properties. A final well trajectory can be provided based on the evaluated production contribution of the potential well trajectories.
- One or more of the following features can be included in any feasible combination. For example, the well can be drilled using well drilling machinery and according to the final well trajectory. The reservoir properties can include density, pore pressure, fracture gradient, stresses, saturations, Youngs modulus, Poisson's ratio, brittleness index, wellbore stability, porosity, permeability, hydrocarbon content, lithology, faults, and/or clay content. Determining the plurality of potential well trajectories can include, for each trajectory, determining the plurality of well segments, each well segment characterizing an extension of the well from a segment start position in a random, pseudorandom, or a direction determined based on a computed gradient. The random or pseudorandom direction can be determined subject to well constraints. The well constraints can include stress state, wellbore orientation and inclination, minimum mud weight, maximum mud weight, material properties, proximity to another well, proximity to a natural object, proximity to a man-made object, and/or pipe deviation limitations. Constraints can be characterized by one or more interval ranges to account for uncertainty in the reservoir parameters.
- Determining the plurality of potential well trajectories can include, for each trajectory, determining the plurality of well segments, each well segment characterizing an extension of the well from a segment start position, the extension in a direction based on an objective function evaluated for a respective position of the segment and using the reservoir properties. The production contributions of each potential well trajectory can be characterized by: porosity value; permeability value; total organic content value; saturation value; a product of permeability value and total organic content; a product of permeability and saturation of mobile total organic content; a fracability index derived from rock mechanical properties and stresses; a brittleness index; well stability; and/or a mathematical combination of such values.
- The providing can include transmitting, storing, and/or displaying. In some implementations, the providing of the final well trajectory can include transmitting the final well trajectory, storing (e.g., in memory) the final well trajectory, displaying the final well trajectory, and/or further processing of the final well trajectory. At least one of the receiving, the determining, the evaluating and the providing can be performed by at least one data processor forming part of at least one computing system.
- Non-transitory computer program products (i.e., physically embodied computer program products) are also described that store instructions, which when executed by one or more data processors of one or more computing systems, causes at least one data processor to perform operations herein. Similarly, computer systems are also described that may include one or more data processors and memory coupled to the one or more data processors. The memory may temporarily or permanently store instructions that cause at least one processor to perform one or more of the operations described herein. In addition, methods can be implemented by one or more data processors either within a single computing system or distributed among two or more computing systems. Such computing systems can be connected and can exchange data and/or commands or other instructions or the like via one or more connections, including a connection over a network (e.g. the Internet, a wireless wide area network, a local area network, a wide area network, a wired network, or the like), via a direct connection between one or more of the multiple computing systems, etc.
- The details of one or more variations of the subject matter described herein are set forth in the accompanying drawings and the description below. Other features and advantages of the subject matter described herein will be apparent from the description and drawings, and from the claims.
-
FIG. 1 is a process flow diagram illustrating an example process of some implementations of the current subject matter that can provide for improved well planning, which can increase well productivity; -
FIG. 2 is a process flow diagram illustrating another example method according to some implementations that can provide for improved well planning, which can increase well productivity; -
FIG. 3 is a diagram illustrating an example of a well trajectory; -
FIG. 4 includes a surface map illustrating an example of an objective function (e.g., in this case based on porosity) distributed in the reservoir volume and multiple wells traversing the volume and (right) the objective function evaluated as cumulative productivity along the well bore length; -
FIG. 5 is a surface plot illustrating an example of an objective function (porosity in this case) distributed in the reservoir volume and randomly created wells (e.g., Sobol sampled) traversing the volume; -
FIG. 6 is a three-dimensional visualization of well paths through a faulted reservoir; -
FIG. 7 is a three-dimensional visualization of multiple wells in a three-dimensional grid; and -
FIG. 8 is a three-dimensional visualization of multiple wells in a dipping formation. - Like reference symbols in the various drawings indicate like elements.
- As noted above, oil well planning can include identifying a starting point of the well and a trajectory (e.g., path) to an end point or reservoir boundary. The oil well plan can be designed to achieve high production from the well. But some approaches to well planning can be sub-optimal because they require input by a subject matter expert and may require iteration between a well planning team and a well drilling team. Sub-optimal plans can result in reduced production such that oil and other resources are left in the ground (e.g., not extracted), the well plan may not be feasible (e.g., it may not be possible to drill the well), and drilling the sub-optimal well plan may result in ground collapse, which can be dangerous and costly. Accordingly, some implementations of the current subject matter provide for improved well planning, which can increase well productivity.
-
FIG. 1 is a process flow diagram illustrating anexample process 100 of some implementations of the current subject matter that can provide for improved well planning, which can increase well productivity. - At 110, reservoir properties can be received. The reservoir properties can include rock facies, pore pressure, fracture gradient, stresses, Young's modulus, Poisson's ratio, porosity, permeability, hydrocarbon content, saturations, lithology, faults, and/or clay content. The reservoir properties can be generated as a result of characterizing (e.g., mapping) the reservoir; and identifying rock properties and potential high productivity spots based on raw logging data, resistivity data, seismic data, core data, drill cuttings, outcrop data, and the like.
- At 120, a plurality of potential well trajectories can be determined. Each trajectory can characterize an extension of the well from a well origin position (e.g., a well start position, such as a pad position). Each trajectory can include a plurality of well segments. For example, each well segment can be characterized as a line segment between two points (e.g., a segment start position and a segment end position), a segment start position and an angle (e.g., azimuth, inclination), and the like. Points can be expressed as subsurface location coordinates.
- In some implementations, determining the plurality of potential well trajectories can include, for each trajectory, determining the plurality of well segments that comprise the well trajectory. Determining a well segment can include determining and/or selecting a direction to extend the well trajectory. In some implementation, the direction to extend the well can be chosen according to a randomization scheme such that the direction can be random. For example, this can be considered as a random walk scheme in which, the origin (e.g., well start position) of the wellbore is advanced successively in small increments in random directions. In some implementations, because true randomness may not be achievable in a computing system, the direction may be considered a pseudorandom direction. In some implementations, each well segment can characterize an extension of the well from a segment start position in a random or pseudorandom direction.
- In some implementation, the direction and/or length of the wellbore extension can specified by a vector in three-dimensional (3D) space. In some implementation, the direction of the wellbore extension can be specified by a new location in 3D space, which in combination with the previous location in 3D space can define the orientation and length of the next wellbore segment. In some implementation, the direction of the wellbore extension can be specified by two angles and a length metric, such as azimuth (e.g., measuring orientation in a North-East plane), inclination (e.g., measuring departure from the vertical direction), and measured depth (e.g., a distance quantity). In some implementation, the depth and/or inclination of the next wellbore segment can be specified to follow a pre-defined depth-distance relation, which can be established by a formula, by a planar or non-planar surface in 3D space, and/or the like. The latter case can be interesting when a reservoir varies in depth and the wellbore can be desired to remain in the reservoir. The surface can, for example, be established as the mid-plane between top and bottom horizon of the reservoir. Another method to maintain a non-horizontal well trajectory in a reservoir can include first moving the reservoir properties into a two-dimensional (2D) plane, then execute the disclosed method to identify the optimum well-path in 2D, and then compute the appropriate depth of each wellbore segment.
- In some implementation, the user prescribes an initial well path as a starting point, which can then be perturbed. Perturbations can be made on a segment scale (e.g., by adjusting one or more well bore segments or survey points or inclination and/or azimuth angles, or on a wellbore scale by transforming parts or the entire well in 3D space; transformations can include translations in space, rotations, scaling of coordinates).
- In some implementations, the direction to extend a potential well trajectory can be subject to constraints. For example, there may be a limited amount a well can bend during the drilling process (e.g., radius of curvature). For example, if a well drilling machine can provide, at most, for 3 degrees of directional change per 100 feet at any location along the wellbore, the build rate may be determined as being randomly selected from the range −3/100 to 3/100 degree/foot. Other constraints can include stress state, wellbore orientation, inclination, material properties, mud weight (e.g., wellbore stability), proximity to existing or planned wells in the reservoir (collision avoidance), and pipe deviation limitations (e.g., build rate).
- In some implementations, the direction to extend a potential well segment can be chosen in a direction based on an objective function evaluated for the respective position of the segment and using the reservoir properties. For example, a gradient descent (or conjugate gradient descent) can be used to compute the direction of the next wellbore segment (e.g., walk uphill or downhill in a non-random direction, or sideways, or both, and according to an objective function).
- In some implementations, different approaches can be utilized to identify which well path or well trajectory maximizes an objective function. These approaches can include random walk, random walk with random adjustment, random walk with non-random adjustment, gradient descent, random walk with tree search, maximized objective function gradient, and inversion.
- A random walk approach can include, from the origin, advancing the wellbore successively in small increments in random directions and selecting the best well from the ensemble. A random walk with random adjustment in which a random walk scheme is performed, but followed by adjusting one or more wellbore trajectory segments in a random direction. A random walk with non-random adjustment approach can include a random walk, but adjustments can be non-random. Instead, well bore segments can be adjusted so that one segment can move towards a higher value of the objective function. Other segments can be adjusted so that drillability constraints can be matched. Gradient descent (or conjugate gradient descent) can be used to compute the direction of the next wellbore segment (e.g., walk uphill or downhill in a non-random direction, or sideways or both). Random walk using a tree search can include a random walk whereby each segment branches off with more than one segment. Each full wellbore lineage can be treated as a separate wellbore. Heuristic pruning can be utilized. The maximized objective function gradient approach can include choosing a direction that can be in the direction of maximum objective function gradient. Inversion can include formulating a mathematical characterization of a well path where the azimuth and inclination of each segment are free parameters, application of well constraints, and mathematically solving for drill trajectory parameters that maximize the objective function.
- In some implementations, damping can be utilized to avoid numerical oscillations. In some implementations, the objective function can be smoothed in 3 Dimensional space, which can aid in avoiding issues from small-scale scatter.
- In some implementations, multiple object functions can be combined by using weights. In some implementations, multiple constraints can be satisfied simultaneously. In some implementations, an objective function can be maximized while satisfying one or more constraints.
- At 130, production contribution of each potential well trajectory can be evaluated using the reservoir properties. How production contribution can be evaluated can vary and can be characterized by an objective function. For example, the production contributions of each potential well trajectory can be characterized by: porosity value; permeability value; total organic content; a combination of several values such as a product of permeability value and total organic content; a product of permeability and saturation of mobile total organic content; a fracability index derived from rock mechanical properties and stresses; a brittleness index; and/or well stability.
- In some implementations, evaluating production contribution can include evaluating the objective function, which can be evaluated along the entire well, or along well segment(s) inside the reservoir, and/or at one or more specific locations (such as perforation clusters or stages), and/or a combination thereof. In some implementations, the objective function can be maximized, can be summed or integrated over those values; can be taken as the maximum, or another statistical metric such as the average, the p90, and the like.
- At 140, a final well trajectory can be provided. The final well trajectory can include the potential trajectory that is evaluated as including the greatest production contribution. In some implementations, additional well planning steps can be performed, such as performing casing design and completion design for the well, including detailed planning such as selecting the drill bits, designing a bottom hole assembly (BHA), selecting drilling fluid and the like. In some implementations, a well can be drilled using well drilling machinery and according to the final well trajectory.
- In some implementations, the providing of the final well trajectory can include transmitting the final well trajectory, storing (e.g., in memory) the final well trajectory, displaying the final well trajectory, and/or further processing of the final well trajectory.
- In some implementations, determining potential well trajectories can result in getting stuck in a local maximum (or minimum). This can occur when the objective function has multiple scattered local extrema. In such a case, depending on the approach utilized to determine the potential well trajectories, the search radius can be increased to find an appropriate direction. In some implementation, different well path starting points can be considered. In some implementation, the objective function can be smoothed so that fewer local extrema exist. In some implementations, directions can be selected based on the reservoir center such that successive extensions follow in roughly the same direction, towards reservoir center, or towards a direction to create the longest well in lease boundaries or in reservoir volume.
- In some implementations, sub-surface uncertainty may be present. In some implementations, interval analysis may be employed to obtain a range of acceptable lower bounds and upper bounds on the mud weight needed for stability considerations for each wellbore segment when filtering out un-drillable wells using user specified mud weight limits. In some implementations, interval analysis may be applied to any input parameter that has uncertainty associated with it allowing the algorithm to compute a number of acceptable well paths based on the amount of uncertainty in the inputs.
-
FIG. 2 is a process flow diagram illustrating anotherexample method 200 according to some implementations that can provide for improved well planning, which can increase well productivity. - At 210, reservoir properties can be obtained. The reservoir properties can include pore pressure, fracture gradient, stresses, Young's modulus, Poisson's ratio, rock facies, porosity, hydrocarbon content, permeability, saturations, lithology, faults, wellbore stability and/or clay content. At 220, a well origin can be identified. The well origin can include the well head and/or an initial landing point. In some implementations, the well origin can include a point on a predetermined well segment.
- At 230, for a given potential well trajectory, the trajectory can be extended by a segment subject to drill-ability and wellbore stability constraints. The extension can be from the well origin. At 240, the contribution from well extension to well productivity can be computed. At 250, it can be determined whether the potential well trajectory is extendable. This determination can include determining whether a well extension is feasible (e.g., satisfies all constraints).
- If the well is extendable, the
process 200 can return to step 230 and extend the potential well trajectory starting from the end of the prior well segment and subject to the constraints. In some implementations, the process can repeatsteps - If the well is not extendable, the potential well segment can be evaluated by at least computing the cumulative productivity according to the objective function. The potential well segment can be added as one realization to the set of potential well segments and it can be determined whether N realizations of potential well trajectories have been computed. If N realization have not been computed, the process can return to step 230 to determine a new realization of a potential well segment. In this case, a segment for extending the well can be determined but starting again from the well origin. In some implementations, steps 230, 240, 250, and 260 are computed. If N realization segments have been computed, then at 270, the potential well trajectory having the maximum (e.g., greatest) productivity in the ensemble can be selected as the final well trajectory.
-
FIG. 3 is a diagram illustrating an example of a well trajectory. At 3A, a trajectory extend is defined by well segments, with each segment having a respective length (dx), and deviation angle between segments (a). At 3B is an example of adjusting well bore segments. Adjusting a well bore segment can be useful when, for instance, a well bore segment does not satisfy a constraint (e.g., deviation constraint, wellbore stability constraint, collision avoidance constraint), and can include several of the following steps: the well bore segment that does not satisfy a constraint can be reoriented so that is does satisfy the constraint; in succession, the next adjacent segment or segments can be adjusted so it also satisfies a constraint, until the path defined by the adjusted segments reconnects to a previous segment. -
FIG. 4 includes asurface map 405 illustrating an example of an objective function (e.g., in this case based on porosity) distributed in the reservoir volume (shown as a horizontal slice, with subsurface coordinates shown along the x and y axis) and multiple wells traversing the volume and (right) the objective function evaluated as cumulative productivity along the well bore length. The well 415 curving towards the center of the surface plot has a higher productivity, which can be attributed to its traversal of the elevated permeability region. -
FIG. 5 is a surface plot illustrating an example of an objective function (porosity in this case) distributed in the reservoir volume and 300 randomly created wells (e.g., Sobol sampled) traversing the volume and all starting at the same landing point (e.g., well origin point). The worst and best wells are shown asthicker lines -
FIG. 6 is a three-dimensional visualization 600 illustrating optimum stable and unstable well paths through a faulted reservoir. The stability of these wells can be determined by wellbore stability considerations including, for example, stress state, mud weight window, and the direction of a wellbore segment of each wellbore path. For example,visualization 600 can includewellbore wellpath_best_as 610.Wellbore 610 can include an optimumstable well path 620 and an optimumunstable well path 630. -
FIG. 7 is a three-dimensional visualization 700 illustrating multiple wells in a three-dimensional (3D) grid. The 3D grid can be visualized by means of several two-dimensional slices that can offer the viewer perspective and can inform on the level of heterogeneity of relevant subsurface properties. A plurality of well paths can be displayed and can inform the viewer of the covered subsurface space. The plurality of wells can be trimmed by eliminating wells that do not satisfy all of the constraints, and the optimum well path (e.g. the path for which the objective function is maximized) can be selected.FIG. 8 is a three-dimensional visualization 800 illustrating multiple wells in a dipping formation. For example,visualization 800 can illustrate anoptimal well 810.FIGS. 6, 7 and 8 can used to visualize grid properties and well trajectories and can be generated with software that allows visualization of objects in 3D space, such as BHGE's JewelSuite™ Software. - Although a few variations have been described in detail above, other modifications or additions are possible. For example, in some implementations, the objective function can be expressed in terms of a financial metric, cost of well can be incorporated into objective function. In some implementations, aspects of the current subject matter can be applied to optimize multiple wells on the pad. An objective function can be utilized that includes productivity from all wells.
- In some implementations, maximum deviation and central path (go straight) for each new wellbore segment can be utilized to cover the maximum range of possible well paths. Sampling within the range can be performed, and the optimum can be found by either brute force/Monte Carlo or gradient descent-type methods.
- In some implementations, constraint optimization can be used to identify the optimum with either hard or soft limits. Constrained optimization (in some contexts called constraint optimization) can include the process of optimizing an objective function with respect to some variables in the presence of constraints on those variables. The objective function can include a cost function or energy function, which is to be minimized, or a reward function or utility function, which is to be maximized. Constraints can be either hard constraints, which set conditions for the variables that are required to be satisfied, or soft constraints, which have some variable values that are penalized in the objective function if, and based on the extent that, the conditions on the variables are not satisfied. In some implementations, multiple objective functions can be combined and/or multiple constraints are combined.
- The subject matter described herein can provide a number of technical advantages. For example, some implementations of the current subject matter can improve upon well trajectories that are planned by manual considerations, whereby the truly optimal well is likely not identified because not all possible wells can be evaluated by a human. Well planning can be accelerated compared to some existing processes and an objective criteria can be evaluated for determining the best well path.
- In some implementations, the subject matter improves system execution time. Some current systems require weeks, or even months, when planning a well trajectory because it can involve numerous iterations between a geoscientist, who can be focused on the targeting the pay zone, and a drilling engineer, who can be focused on the drilling constraints such as surface location, dog leg severity factor, geomechanical constraints, and can make sure the new well path is not close to any existing wells in the reservoir. Further iterations can involve the asset manager, who can be trying to capitalize on the existing infrastructure in the form of surface facilities.
- In some implementations, which involve searching through wellbore path solution space and taking the best of all possible solutions, each wellbore path is independent from any other can be advantageous because this approach can be computationally parallelized and it can be possible in some implementations to obtain ideal linear speed-up.
- In some implementations, the described random well bore extension approach may not depend on numerical or mathematical techniques that are known to, at times, have convergence or inversion issues. Given enough trials, some aspects of the current subject matter can reliably identify a drillable well bore path if there is a possible one, even when other approaches cannot. In addition, this method can require lower memory (e.g., RAM) usage as compared to some other approaches. Furthermore, in some implementations, a modest number of trials can produce what might be an acceptable well path, even if a larger number will determine a better path.
- One or more aspects or features of the subject matter described herein can be realized in digital electronic circuitry, integrated circuitry, specially designed application specific integrated circuits (ASICs), field programmable gate arrays (FPGAs) computer hardware, firmware, software, and/or combinations thereof. These various aspects or features can include implementation in one or more computer programs that are executable and/or interpretable on a programmable system including at least one programmable processor, which can be special or general purpose, coupled to receive data and instructions from, and to transmit data and instructions to, a storage system, at least one input device, and at least one output device. The programmable system or computing system may include clients and servers. A client and server are generally remote from each other and typically interact through a communication network. The relationship of client and server arises by virtue of computer programs running on the respective computers and having a client-server relationship to each other.
- These computer programs, which can also be referred to as programs, software, software applications, applications, components, or code, include machine instructions for a programmable processor, and can be implemented in a high-level procedural language, an object-oriented programming language, a functional programming language, a logical programming language, and/or in assembly/machine language. As used herein, the term “machine-readable medium” refers to any computer program product, apparatus and/or device, such as for example magnetic discs, optical disks, memory, and Programmable Logic Devices (PLDs), used to provide machine instructions and/or data to a programmable processor, including a machine-readable medium that receives machine instructions as a machine-readable signal. The term “machine-readable signal” refers to any signal used to provide machine instructions and/or data to a programmable processor. The machine-readable medium can store such machine instructions non-transitorily, such as for example as would a non-transient solid-state memory or a magnetic hard drive or any equivalent storage medium. The machine-readable medium can alternatively or additionally store such machine instructions in a transient manner, such as for example as would a processor cache or other random access memory associated with one or more physical processor cores.
- To provide for interaction with a user, one or more aspects or features of the subject matter described herein can be implemented on a computer having a display device, such as for example a cathode ray tube (CRT) or a liquid crystal display (LCD) or a light emitting diode (LED) monitor for displaying information to the user and a keyboard and a pointing device, such as for example a mouse or a trackball, by which the user may provide input to the computer. Other kinds of devices can be used to provide for interaction with a user as well. For example, feedback provided to the user can be any form of sensory feedback, such as for example visual feedback, auditory feedback, or tactile feedback; and input from the user may be received in any form, including acoustic, speech, or tactile input. Other possible input devices include touch screens or other touch-sensitive devices such as single or multi-point resistive or capacitive trackpads, voice recognition hardware and software, optical scanners, optical pointers, digital image capture devices and associated interpretation software, and the like.
- In the descriptions above and in the claims, phrases such as “at least one of” or “one or more of” may occur followed by a conjunctive list of elements or features. The term “and/or” may also occur in a list of two or more elements or features. Unless otherwise implicitly or explicitly contradicted by the context in which it is used, such a phrase is intended to mean any of the listed elements or features individually or any of the recited elements or features in combination with any of the other recited elements or features. For example, the phrases “at least one of A and B;” “one or more of A and B;” and “A and/or B” are each intended to mean “A alone, B alone, or A and B together.” A similar interpretation is also intended for lists including three or more items. For example, the phrases “at least one of A, B, and C;” “one or more of A, B, and C;” and “A, B, and/or C” are each intended to mean “A alone, B alone, C alone, A and B together, A and C together, B and C together, or A and B and C together.” In addition, use of the term “based on,” above and in the claims is intended to mean, “based at least in part on,” such that an unrecited feature or element is also permissible.
- The subject matter described herein can be embodied in systems, apparatus, methods, and/or articles depending on the desired configuration. The implementations set forth in the foregoing description do not represent all implementations consistent with the subject matter described herein. Instead, they are merely some examples consistent with aspects related to the described subject matter. Although a few variations have been described in detail above, other modifications or additions are possible. In particular, further features and/or variations can be provided in addition to those set forth herein. For example, the implementations described above can be directed to various combinations and subcombinations of the disclosed features and/or combinations and subcombinations of several further features disclosed above. In addition, the logic flows depicted in the accompanying figures and/or described herein do not necessarily require the particular order shown, or sequential order, to achieve desirable results. Other implementations may be within the scope of the following claims.
Claims (20)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US16/460,835 US11299964B2 (en) | 2018-07-03 | 2019-07-02 | Drilling productive wells |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US201862693569P | 2018-07-03 | 2018-07-03 | |
US16/460,835 US11299964B2 (en) | 2018-07-03 | 2019-07-02 | Drilling productive wells |
Publications (2)
Publication Number | Publication Date |
---|---|
US20200011157A1 true US20200011157A1 (en) | 2020-01-09 |
US11299964B2 US11299964B2 (en) | 2022-04-12 |
Family
ID=69059882
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US16/460,835 Active 2040-01-23 US11299964B2 (en) | 2018-07-03 | 2019-07-02 | Drilling productive wells |
Country Status (2)
Country | Link |
---|---|
US (1) | US11299964B2 (en) |
WO (1) | WO2020010122A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US11560785B2 (en) * | 2020-01-28 | 2023-01-24 | Enverus, Inc. | Determining spacing between wellbores |
Family Cites Families (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6549879B1 (en) * | 1999-09-21 | 2003-04-15 | Mobil Oil Corporation | Determining optimal well locations from a 3D reservoir model |
US8812334B2 (en) * | 2006-02-27 | 2014-08-19 | Schlumberger Technology Corporation | Well planning system and method |
US8527248B2 (en) * | 2008-04-18 | 2013-09-03 | Westerngeco L.L.C. | System and method for performing an adaptive drilling operation |
US8061444B2 (en) * | 2008-05-22 | 2011-11-22 | Schlumberger Technology Corporation | Methods and apparatus to form a well |
AU2009311619B2 (en) * | 2008-11-06 | 2015-10-01 | Exxonmobil Upstream Research Company | System and method for planning a drilling operation |
US8301382B2 (en) * | 2009-03-27 | 2012-10-30 | Schlumberger Technology Corporation | Continuous geomechanically stable wellbore trajectories |
US8768671B2 (en) * | 2010-04-26 | 2014-07-01 | Schlumberger Technology Corporation | System for optimizing a drilling operation and method for using same |
US9388682B2 (en) * | 2013-01-25 | 2016-07-12 | Schlumberger Technology Corporation | Hazard avoidance analysis |
US20170051598A1 (en) * | 2015-08-20 | 2017-02-23 | FracGeo, LLC | System For Hydraulic Fracturing Design And Optimization In Naturally Fractured Reservoirs |
WO2017116436A1 (en) * | 2015-12-30 | 2017-07-06 | Landmark Graphics Corporation | Geosteering based on automated well performance prediction |
WO2018118020A1 (en) * | 2016-12-20 | 2018-06-28 | Landmark Graphics Corporation | Real-time trajectory control during drilling operations |
-
2019
- 2019-07-02 WO PCT/US2019/040365 patent/WO2020010122A1/en active Application Filing
- 2019-07-02 US US16/460,835 patent/US11299964B2/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US11560785B2 (en) * | 2020-01-28 | 2023-01-24 | Enverus, Inc. | Determining spacing between wellbores |
Also Published As
Publication number | Publication date |
---|---|
US11299964B2 (en) | 2022-04-12 |
WO2020010122A1 (en) | 2020-01-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10767448B2 (en) | Multistage oilfield design optimization under uncertainty | |
US9086503B2 (en) | Propagating fracture plane updates | |
US20200040719A1 (en) | Machine-Learning Based Drilling Models for A New Well | |
US20160090822A1 (en) | Collision detection method | |
US10408957B2 (en) | Analysis of microseismic supported stimulated reservoir volumes | |
US11512573B2 (en) | Stimulation using fiber-derived information and fracturing modeling | |
US10598817B2 (en) | Local layer geometry engine with work zone generated from buffer defined relative to a wellbore trajectory | |
US11299964B2 (en) | Drilling productive wells | |
NO20190360A1 (en) | Avoiding geological formation boundaries during drilling operations | |
CA2905228C (en) | Systems and methods for adjusting existing well plans | |
CA2933853C (en) | Determining appraisal locations in a reservoir system | |
US20220235654A1 (en) | Drilling uncertainty real time updates for accurate well placement | |
AU2013387684B2 (en) | Systems and methods for adjusting existing well plans |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
FEPP | Fee payment procedure |
Free format text: ENTITY STATUS SET TO UNDISCOUNTED (ORIGINAL EVENT CODE: BIG.); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY |
|
AS | Assignment |
Owner name: BAKER HUGHES, A GE COMPANY, LLC, TEXAS Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:HOEINK, TOBIAS;COTRELL, DAVID L.;GHORPADE, SACHIN;SIGNING DATES FROM 20190710 TO 20190711;REEL/FRAME:049732/0298 |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: DOCKETED NEW CASE - READY FOR EXAMINATION |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: NON FINAL ACTION MAILED |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: RESPONSE TO NON-FINAL OFFICE ACTION ENTERED AND FORWARDED TO EXAMINER |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: NOTICE OF ALLOWANCE MAILED -- APPLICATION RECEIVED IN OFFICE OF PUBLICATIONS |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: PUBLICATIONS -- ISSUE FEE PAYMENT VERIFIED |
|
STCF | Information on status: patent grant |
Free format text: PATENTED CASE |