US20130140021A1 - In-situ upgrading of bitumen or heavy oil - Google Patents

In-situ upgrading of bitumen or heavy oil Download PDF

Info

Publication number
US20130140021A1
US20130140021A1 US13/679,497 US201213679497A US2013140021A1 US 20130140021 A1 US20130140021 A1 US 20130140021A1 US 201213679497 A US201213679497 A US 201213679497A US 2013140021 A1 US2013140021 A1 US 2013140021A1
Authority
US
United States
Prior art keywords
bitumen
limestone
upgraded
steam
api
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US13/679,497
Inventor
Michael Helmut Kobler
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
UNDERGROUND ENERGY Inc
Original Assignee
UNDERGROUND ENERGY Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by UNDERGROUND ENERGY Inc filed Critical UNDERGROUND ENERGY Inc
Priority to US13/679,497 priority Critical patent/US20130140021A1/en
Publication of US20130140021A1 publication Critical patent/US20130140021A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • E21B43/24Enhanced recovery methods for obtaining hydrocarbons using heat, e.g. steam injection
    • E21B43/2406Steam assisted gravity drainage [SAGD]
    • E21B43/2408SAGD in combination with other methods
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10CWORKING-UP PITCH, ASPHALT, BITUMEN, TAR; PYROLIGNEOUS ACID
    • C10C3/00Working-up pitch, asphalt, bitumen
    • C10C3/02Working-up pitch, asphalt, bitumen by chemical means reaction
    • C10C3/023Working-up pitch, asphalt, bitumen by chemical means reaction with inorganic compounds
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • E21B43/24Enhanced recovery methods for obtaining hydrocarbons using heat, e.g. steam injection
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • E21B43/24Enhanced recovery methods for obtaining hydrocarbons using heat, e.g. steam injection
    • E21B43/2405Enhanced recovery methods for obtaining hydrocarbons using heat, e.g. steam injection in association with fracturing or crevice forming processes
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/24Methods of underground mining; Layouts therefor for oil-bearing deposits
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P30/00Technologies relating to oil refining and petrochemical industry
    • Y02P30/40Ethylene production

Definitions

  • the present disclosure relates to in-situ upgrading of heavy oils and bitumen in general and to upgrading by naturally occurring or injected catalysts in particular.
  • Bitumen does not flow at ambient reservoir temperatures and has an API density of typically less than ⁇ 10. Heavy crude oils also typically do not flow at ambient reservoir temperatures and have API densities in the approximate range of from ⁇ 10 to ⁇ 20 .
  • thermal methods such as for example Steam Assisted Gravity Drain (“SAGD”), solvent methods such as for example Vapor Extraction (“VAPEX”) and combinations of thermal and solvent methods such as for example Solvent Assisted Process “SAP”, Steam Alternating Solvent “SAS” and the like are used.
  • SAGD and other thermal methods are usually carried out by injecting steam into the formation at temperatures typically in the range of 150 to 400 C and pressures typically in the range of 1 to 15 MPa. These conditions may be maintained in the reservoir for days to months.
  • the reservoir matrix is formed by weakly cemented sand grains which are primarily quartz.
  • the reservoir matrix is formed by dolomites which are comprised, in part, by calcium and magnesium.
  • catalytic coal gasification In catalytic coal gasification, the use of catalytics such as calcium, magnesium, potassium, nickel and iron are used to allow coal gasification to proceed more quickly and efficiently at lower temperatures and pressures.
  • Steam gasification of methane is also known to be enhanced by catalysts such as sodium and calcium at temperatures in the range of 700 to 900 C and pressures in the range of 0.1 to 5 MPa.
  • the addition of potassium carbonate in the steam gasification of bituminous coals is known to reduce the optimum temperature and pressure from 980 to 760 C and from 6.7 MPa to 3.35 MPa.
  • Coal gasification is an upgrading process and there is conjecture that bitumen and heavy oil can be at least partially upgraded by exposure to catalysts during thermal recovery operations. If so, then these thermal recovery processes can be enhanced with little extra effort, resulting in considerable energy savings.
  • a method can include the steps:
  • the catalytic material can be one or more of oxides and/or carbonates of calcium, magnesium, potassium, nickel, and/or iron.
  • a recovered API density of upgraded bitumen can be at least about 125% of an in situ API density of bitumen.
  • a recovered API density of upgraded bitumen can be from about 2 to about 10 API degrees greater than an in situ API density of bitumen.
  • a method can include the steps of:
  • the fracturing can be performed by one or more of hydro-fracturing, explosive fracturing, and block caving.
  • the catalytic material can be an alkali and/or alkaline earth metal carbonate or bicarbonate.
  • a method can include the steps of:
  • the excavated limestone and/or dolomite can include a catalytic material having a catalytic effect on bitumen.
  • the catalytic material can be one or more of an oxide, chloride, and/or carbonate of an alkali, alkaline earth, and transition metal.
  • the underground excavation can include an underground working area and an underground chamber containing the excavated limestone and/or dolomite and injector and producer wells for injecting recovered bitumen into the underground chamber and removing upgraded bitumen from the underground chamber, respectively.
  • the excavated limestone and/or dolomite could have been used in carbon dioxide scrubbing operations to remove carbon dioxide from refinery flue gas.
  • a thermal or thermal plus solvent process can be applied to the recovered bitumen in the underground excavation.
  • the contacting step can be performed by one or more of SAGD, CSS, and steam flooding.
  • the catalytic material can be contained within the at least one of limestone and dolomite.
  • the catalytic material can be added to the at least one of limestone and dolomite.
  • a recovered API density of the upgraded bitumen can be at least about 125% of an in situ API density of the bitumen, before recovery.
  • An upgraded API density of the upgraded bitumen can be from about 2 to about 10 API degrees greater than an in situ API density of bitumen, before recovery.
  • the e upgraded API density of the upgraded bitumen can range from about 10 to about 18 API degrees.
  • the underground excavation can be heated to a temperature in the range of about 150 to about 200 degrees Celsius in the contacting step.
  • bitumen with an in-situ API of about 8 API degrees may be upgraded to a heavy oil with a recovered API density in the range of approximately about 10 API degrees to about 18 API degrees.
  • a heavy oil has a recovered API density that is typically at least about 125%, more typically at least about 135%, more typically at least about 145%, and even more typically at least about 150% of an in situ API density of a bitumen prior to upgrading.
  • steam injection for thermal recovery of bitumen in a dolomitic or limestone reservoir matrix material can be carried out at a higher temperature, a higher pressure, a longer dwell time or a combination of all three in order to allow the mobilized bitumen to remain in contact with the catalytic materials in the dolomitic or limestone reservoir matrix material for longer times at higher temperatures and pressures.
  • catalytic materials such as for example, oxides or carbonates of calcium, magnesium, potassium, nickel and/or iron can be injected into the reservoir along with steam to further enhance catalytic activity during the heating, mobilization and recovery phases of a thermal recovery operation.
  • methods such as hydro-fracturing, explosive fracturing and the like may be used to increase the permeability and surface area of the reservoir matrix material so as to enhance the contact between the catalytic elements in the dolomitic or limestone reservoir matrix material.
  • block caving methods and the like may be used to increase the permeability and surface area of the reservoir matrix material so as to enhance the contact between the catalytic elements in the dolomitic or limestone reservoir matrix material.
  • the hybrid transmission configurations all utilize a one-way clutch to prevent reverse power flow from the drive train to a free power turbine.
  • each of the expressions “at least one of A, B and C”, “at least one of A, B, or C”, “one or more of A, B, and C”, “one or more of A, B, or C” and “A, B, and/or C” means A alone, B alone, C alone, A and B together, A and C together, B and C together, or A, B and C together.
  • Acid-producing gases as used herein are gases such as carbon dioxide, sulfur dioxide, nitrogen dioxide and the like when combined with water provided by steam to form carbonic acid, sulfuric acid, nitric acid and the like.
  • a diluent as used herein is a light hydrocarbon that both dilutes and partially dissolves in heavy hydrocarbons.
  • a solvent liquid or vapor is used to reduce viscosity of the heavy oil.
  • An injected solvent vapor expands and dilutes the heavy oil by contact.
  • the diluted heavy oil is then produced via horizontal or vertical producer wells. Diluent and solvent are often used interchangeably in the production of heavy oil and bitumen.
  • a mobilized hydrocarbon is a hydrocarbon that has been made flowable by some means.
  • some heavy oils and bitumen may be mobilized by heating them or mixing them with a diluent to reduce their viscosities and allow them to flow under the prevailing drive pressure.
  • Most liquid hydrocarbons may be mobilized by increasing the drive pressure on them, for example by water or gas floods, so that they can overcome interfacial and/or surface tensions and begin to flow.
  • Primary production or recovery is the first stage of hydrocarbon production, in which natural reservoir energy, such as gasdrive, waterdrive or gravity drainage, displaces hydrocarbons from the reservoir, into the wellbore and up to surface.
  • Production using an artificial lift system, such as a rod pump, an electrical submersible pump or a gas-lift installation is considered primary recovery.
  • Secondary production or recovery methods frequently involve an artificial-lift system and/or reservoir injection for pressure maintenance.
  • the purpose of secondary recovery is to maintain reservoir pressure and to displace hydrocarbons toward the wellbore.
  • Tertiary production or recovery is the third stage of hydrocarbon production during which sophisticated techniques that alter the original properties of the oil are used.
  • Enhanced oil recovery can begin after a secondary recovery process or at any time during the productive life of an oil reservoir. Its purpose is not only to restore formation pressure, but also to improve oil displacement or fluid flow in the reservoir.
  • the three major types of enhanced oil recovery operations are chemical flooding, miscible displacement and thermal recovery.
  • a producer is a any producer of natural gas, oil, heavy oil, bitumen, peat or coal from a hydrocarbon reservoir.
  • CSS means Cyclic Steam Stimulation.
  • steam is injected into the reservoir at rates of the order of 1000 B/d for a period of weeks; the well is then allowed to flow back and is later pumped.
  • the production of oil is rapid and the process is efficient, at least in the early cycles. If the steam pressure is high enough to fracture the reservoir and thus allow injection, it can also be used to produce the very viscous oil of the oil sands at an economic rate.
  • the main drawback of the cyclic steam stimulation process is that it often allows only about 15% to 25% of the oil to be recovered before the oil-to-steam ratio becomes prohibitively low.
  • ESEIEH Solvent Extraction Incorporating Electromagnetic Heating
  • HAGD is an acronym for Heat Assisted Gravity Drain.
  • one recovery method being implemented in pilot projects involves the use of resistance heaters and heating elements to raise the temperature of the oil shales so that oil is produced. These methods are being considered for application to both oil sand and carbonate deposits in Alberta. These methods are designed to heat heavy oil and bitumen deposits to mobilize these hydrocarbons for production.
  • Heating of oil sands by electrodes often referred to as a form of HAGD.
  • Direct heating of oil sands by electrically-powered heating elements is another form of HAGD.
  • LASER Liquid Addition to Steam for Enhancing Recovery
  • LASER-CSS means Liquid Addition to Steam for Enhancing Recovery of Cyclic Steam Stimulation
  • N-Solv thermal solvent process
  • SAGD Steam Assisted Gravity Drain.
  • SAGD wells or well pairs are drilled from the earth's surface down to the bottom of the oil sand deposit and then horizontally along the bottom of the deposit and then used to inject steam and collect mobilized bitumen.
  • SA-SAGD means Solvent Assisted SAGD
  • SC-SAGD means Solvent-Cyclic SAGD
  • SAP means Solvent Assisted Process
  • SAVES means Solvent Assisted Vapour Extraction with Steam
  • SAVEX Steam and Vapour Extraction process
  • SGS Steam Gas Solvent
  • VAPEX means Vapour Extraction process and is a process which uses a diluent as the fluid injected into the hydrocarbon formation as a mobilizing fluid
  • a reference to solvent herein is intended to include diluent and a reference to diluent herein is intended to include solvent.
  • a reference to oil herein is intended to include low API hydrocarbons such as bitumen (API less than about 10 degrees) and heavy crude oils (API from about 10 degrees to about 20 degrees) as well as higher API hydrocarbons such as medium crude oils (API from about 20 degrees to about 35 degrees) and light crude oils (API higher than about 35 degrees).
  • bitumen is also taken to mean a reference to low API heavy oils.
  • FIG. 1 is a schematic of a flow process for in-situ upgrading of bitumen or heavy oil.
  • FIG. 2 is a schematic of an underground recovery operation including is-situ upgrading.
  • Known catalysts for steam gasification are oxides and chlorides of alkali and alkaline-earth metals and transition metals, separately or in combination.
  • sodium chloride and potassium chloride are known catalysts while the carbonates of sodium and potassium are known to have higher catalytic activity.
  • oxides of calcium, iron, magnesium and zinc are known to have catalytic effect on steam gasification of coal. Calcium carbonate and magnesium carbonates are known to occur naturally in dolomitic and limestone formations.
  • steam injection for thermal recovery of bitumen in a dolomitic or limestone reservoir matrix material can be carried out at a higher temperature, a higher pressure, a longer dwell time or a combination of all three in order to allow the mobilized bitumen to remain in contact with the catalytic materials in the dolomitic or limestone reservoir matrix material for longer times at higher temperatures and pressures.
  • catalytic materials such as for example, oxides or carbonates of calcium, magnesium, potassium, nickel and/or iron can be injected into the reservoir along with steam to further enhance catalytic activity during the heating, mobilization and recovery phases of a thermal recovery operation.
  • methods such as hydro-fracturing, explosive fracturing and the like may be used to increase the permeability and surface area of the reservoir matrix material so as to enhance the contact between the catalytic elements in the dolomitic or limestone reservoir matrix material.
  • block caving methods and the like may be used to increase the permeability and surface area of the reservoir matrix material so as to enhance the contact between the catalytic elements in the dolomitic or limestone reservoir matrix material.
  • Much of the Athabasca is underlain by a competent, thick limestone basement formation. These formations are well-suited to excavating tunnels or caverns by a variety of well-known methods such as for example, drill&blast, roadheaders, tunnel boring machines and the like.
  • the limestone removed from these excavations has many uses in a comprehensive thermal recovery operation in an overlying or near-by bitumen resource, especially after the bitumen has been recovered and de-watered.
  • these uses include but are not limited to: water purification, removal of sulfur dioxide and carbon dioxide from recovered gases and flue gases from on-site or near-by refineries, for aggregate in road construction etcetera and for various agricultural uses where transportation distances are not to great.
  • bitumen In well-known thermal recovery operations of bitumen, a hot, dirty bitumen/water mixture is recovered. It is possible to effect a partial upgrade of this by storing it in a catalytic matrix. Such a matrix can be provided by the dirty limestone that has been returned to the underground excavations previously formed in the limestone formation.
  • injector and producer wells will be far less expensive than installation by surface-based horizontal drilling since they need not be drilled from the surface or even a near-by tunnel or shaft but can be installed directly in an open tunnel or cavern.
  • the cost of recovering the bitumen a second time can be more than offset by the upgrading action of the bitumen being heated while in contact with the catalytic limestone backfill. This second recovery operation is expected to be very efficient because the injector and producer wells can be installed accurately with optimal separation.
  • heating elements or electrodes can be installed to assist or replace heating by steam.
  • FIG. 1 is a schematic of a flow process for in-situ upgrading of bitumen or heavy oil.
  • a thermal or thermal plus solvent process 102 is applied to a bitumen or heavy oil reservoir 101 .
  • a catalyst 103 may also be injected to enhance the catalytic reactions occurring during the in-situ thermal or thermal plus solvent operations to produce an upgraded bitumen 111 which is recovered. This upgraded bitumen may then be combined with excavated and crushed limestone or dolomite in a cavern 104 excavated in the basement limestone or dolomite rock.
  • a second thermal or thermal plus solvent process 105 is applied to the bitumen or heavy oil in cavern 104 .
  • a catalyst 106 may also be injected to enhance the catalytic reactions occurring during the thermal or thermal plus solvent operation in the cavern to produce a further upgraded bitumen 112 which is then recovered and prepared for on-site refining or for transport to market.
  • FIG. 2 is a schematic of a possible underground recovery operation including is-situ upgrading.
  • a bitumen or heavy oil reservoir formation 201 is shown over basement rock 202 and overlain by an overburden layer 203 .
  • An underground working area 203 has been excavated in the basement rock 202 .
  • a number of horizontal well pairs 205 have been installed from the underground work space 203 into reservoir 201 with wellheads 206 installed for operating well pairs 205 .
  • steam or steam plus solvent and catalysts can be injected at the well head through the injector well of well pair 205 .
  • Mobilized bitumen or heavy oil is recovered through the producer well of well pair 205 .
  • AOSTRA Alberta Oil Sands Technology and Research Authority
  • AOSTRA constructed the Underground Test Facility (UTF)) in the Athabasca Oil Sands, in the 1980's to specifically test the SAGD hypothesis.
  • UTF Underground Test Facility
  • another underground chamber 204 is also excavated and serves as an upgrading chamber.
  • the chamber is filled with bitumen or heavy oil recovered from reservoir 201 and mixed with catalytic material such as limestone and/or dolomite rubble which may or may not be recovered from the material excavated to form either the work space 203 or the upgrading chamber 204 .
  • catalytic material such as limestone and/or dolomite rubble which may or may not be recovered from the material excavated to form either the work space 203 or the upgrading chamber 204 .
  • Upgrading chamber 204 is separated from working space 203 and connected by one or more passage ways 207 .
  • Passage ways 207 can be blocked of by gates or barriers.
  • bitumen or heavy oil recovered and catalytic material can then be steamed and heated up to temperatures in the range of about 150 C to about 200 C for additional upgrading. It is also possible to incorporate mechanical mixing apparatuses in the upgrading chamber to increase the catalytic action.
  • the same slow fill system can be applied to filling any vehicle powered by gaseous fuels such as CNG, propane, hydrogen etcetera.
  • CNG gaseous fuel
  • propane propane
  • hydrogen etcetera gaseous fuels
  • These slow fill systems could be located, for example, at malls, parking garages, factory outlets and the like.
  • a similar strategy, which is known, is charging electric cars overnight.
  • the present disclosure differs in that a slow fill CNG location is based on a central storage and metering facility serving a number of fueling posts.
  • the present disclosure includes components, methods, processes, systems and/or apparatus substantially as depicted and described herein, including various embodiments, sub-combinations, and subsets thereof. Those of skill in the art will understand how to make and use the present disclosure after understanding the present disclosure.
  • the present disclosure includes providing devices and processes in the absence of items not depicted and/or described herein or in various embodiments hereof, including in the absence of such items as may have been used in previous devices or processes, for example for improving performance, achieving ease and ⁇ or reducing cost of implementation.

Abstract

A method is disclosed for in-situ upgrading bitumen or heavy oils during thermal recovery operations. In one embodiment, steam injection for thermal recovery of bitumen in a dolomitic or limestone reservoir matrix material can be carried out at a higher temperature, a higher pressure, a longer dwell time or a combination of all three to allow the mobilized bitumen to remain in contact with the catalytic materials in the dolomitic or limestone reservoir matrix material for longer times at higher temperatures and pressures. In another embodiment, catalytic materials such as for example, oxides or carbonates of calcium, magnesium, potassium, nickel and/or iron can be injected into the reservoir along with steam to further enhance catalytic activity during the heating, mobilization and recovery phases of a thermal recovery operation.

Description

    CROSS REFERENCE TO RELATED APPLICATION
  • The present application claims the benefits, under 35 U.S.C. §119(e), of U.S. Provisional Application Ser. No. 61/560,618 entitled “In-Situ Upgrading of Bitumen or Heavy Oil” filed Nov. 16, 2011, which is incorporated herein by reference.
  • FIELD
  • The present disclosure relates to in-situ upgrading of heavy oils and bitumen in general and to upgrading by naturally occurring or injected catalysts in particular.
  • BACKGROUND
  • There are an estimated 300 million barrels of recoverable bitumen from Alberta's Athabasca oil sands. There is an approximately equal amount of potentially recoverable bitumen from the carbonates in the Grosmont Carbonates, also in Alberta.
  • Bitumen does not flow at ambient reservoir temperatures and has an API density of typically less than ˜10. Heavy crude oils also typically do not flow at ambient reservoir temperatures and have API densities in the approximate range of from ˜10 to ˜20. In order to mobilize these hydrocarbons so that they can be recovered when they are too deep to mine, thermal methods such as for example Steam Assisted Gravity Drain (“SAGD”), solvent methods such as for example Vapor Extraction (“VAPEX”) and combinations of thermal and solvent methods such as for example Solvent Assisted Process “SAP”, Steam Alternating Solvent “SAS” and the like are used.
  • SAGD and other thermal methods are usually carried out by injecting steam into the formation at temperatures typically in the range of 150 to 400 C and pressures typically in the range of 1 to 15 MPa. These conditions may be maintained in the reservoir for days to months.
  • In the oil sands such as the Athabasca, the reservoir matrix is formed by weakly cemented sand grains which are primarily quartz. In the carbonates, the reservoir matrix is formed by dolomites which are comprised, in part, by calcium and magnesium.
  • In catalytic coal gasification, the use of catalytics such as calcium, magnesium, potassium, nickel and iron are used to allow coal gasification to proceed more quickly and efficiently at lower temperatures and pressures. Steam gasification of methane is also known to be enhanced by catalysts such as sodium and calcium at temperatures in the range of 700 to 900 C and pressures in the range of 0.1 to 5 MPa. The addition of potassium carbonate in the steam gasification of bituminous coals is known to reduce the optimum temperature and pressure from 980 to 760 C and from 6.7 MPa to 3.35 MPa.
  • Coal gasification is an upgrading process and there is conjecture that bitumen and heavy oil can be at least partially upgraded by exposure to catalysts during thermal recovery operations. If so, then these thermal recovery processes can be enhanced with little extra effort, resulting in considerable energy savings.
  • There is an economic benefit to achieving a partial upgrade of bitumen and heavy oil during thermal recovery operations since, once recovered, these hydrocarbons must be upgraded either for transportation to a refinery and/or for upgrading into marketable products at a refinery.
  • SUMMARY
  • These and other needs are addressed by the various embodiments and configurations of the present disclosure which are directed generally to means of upgrading bitumen or heavy oils during thermal recovery operations by the use of appropriate catalysts and control of thermal recovery conditions.
  • A method can include the steps:
  • (a) injecting a catalytic material and steam into a bitumen-containing dolomitic or limestone reservoir matrix material to form upgraded bitumen, wherein the catalytic material is an oxide, carbonate, and/or chloride of an alkali and alkaline earth metal; and
  • (b) recovering the upgraded bitumen.
  • The catalytic material can be one or more of oxides and/or carbonates of calcium, magnesium, potassium, nickel, and/or iron.
  • A recovered API density of upgraded bitumen can be at least about 125% of an in situ API density of bitumen.
  • A recovered API density of upgraded bitumen can be from about 2 to about 10 API degrees greater than an in situ API density of bitumen.
  • A method can include the steps of:
  • (a) fracturing a bitumen-containing dolomotic or limestone reservoir matrix material to increase a permeability and exposed surface area of the matrix material; and injecting steam into the fractured matrix material to form an upgraded bitumen, wherein the matrix material comprises a catalytic material having a catalytic effect on bitumen; and
  • (b) injecting steam into the fractured reservoir matrix material to form an upgraded bitumen.
  • The fracturing can be performed by one or more of hydro-fracturing, explosive fracturing, and block caving.
  • The catalytic material can be an alkali and/or alkaline earth metal carbonate or bicarbonate.
  • A method can include the steps of:
  • (a) recovering, by steam injection, bitumen from a bitumen-containing material;
  • (b) in an underground excavation, contacting the recovered bitumen with excavated limestone and/or dolomite to upgrade the bitumen; and
  • (c) recovering the upgraded bitumen.
  • The excavated limestone and/or dolomite can include a catalytic material having a catalytic effect on bitumen.
  • The catalytic material can be one or more of an oxide, chloride, and/or carbonate of an alkali, alkaline earth, and transition metal.
  • The underground excavation can include an underground working area and an underground chamber containing the excavated limestone and/or dolomite and injector and producer wells for injecting recovered bitumen into the underground chamber and removing upgraded bitumen from the underground chamber, respectively.
  • The excavated limestone and/or dolomite could have been used in carbon dioxide scrubbing operations to remove carbon dioxide from refinery flue gas.
  • A thermal or thermal plus solvent process can be applied to the recovered bitumen in the underground excavation.
  • The contacting step can be performed by one or more of SAGD, CSS, and steam flooding.
  • The catalytic material can be contained within the at least one of limestone and dolomite.
  • The catalytic material can be added to the at least one of limestone and dolomite.
  • A recovered API density of the upgraded bitumen can be at least about 125% of an in situ API density of the bitumen, before recovery.
  • An upgraded API density of the upgraded bitumen can be from about 2 to about 10 API degrees greater than an in situ API density of bitumen, before recovery.
  • The e upgraded API density of the upgraded bitumen can range from about 10 to about 18 API degrees.
  • The underground excavation can be heated to a temperature in the range of about 150 to about 200 degrees Celsius in the contacting step.
  • The various methods disclosed herein can increase the API density of bitumen typically by about 1 to about 20 API degrees, more typically by about 2 to about 15 degrees, and more typically by about 2 API degrees to about 10 API degrees. For example, a bitumen with an in-situ API of about 8 API degrees may be upgraded to a heavy oil with a recovered API density in the range of approximately about 10 API degrees to about 18 API degrees. In another example, a heavy oil has a recovered API density that is typically at least about 125%, more typically at least about 135%, more typically at least about 145%, and even more typically at least about 150% of an in situ API density of a bitumen prior to upgrading.
  • In one embodiment, steam injection for thermal recovery of bitumen in a dolomitic or limestone reservoir matrix material can be carried out at a higher temperature, a higher pressure, a longer dwell time or a combination of all three in order to allow the mobilized bitumen to remain in contact with the catalytic materials in the dolomitic or limestone reservoir matrix material for longer times at higher temperatures and pressures.
  • In another embodiment, catalytic materials such as for example, oxides or carbonates of calcium, magnesium, potassium, nickel and/or iron can be injected into the reservoir along with steam to further enhance catalytic activity during the heating, mobilization and recovery phases of a thermal recovery operation.
  • In another embodiment, methods such as hydro-fracturing, explosive fracturing and the like may be used to increase the permeability and surface area of the reservoir matrix material so as to enhance the contact between the catalytic elements in the dolomitic or limestone reservoir matrix material.
  • In another embodiment applicable to recovery operations conducted from a tunnel or a shaft in or below the hydrocarbon reservoir, block caving methods and the like may be used to increase the permeability and surface area of the reservoir matrix material so as to enhance the contact between the catalytic elements in the dolomitic or limestone reservoir matrix material.
  • The above-described embodiments and configurations are neither complete nor exhaustive. As will be appreciated, other embodiments of the disclosure are possible utilizing, alone or in combination, one or more of the features set forth above or described in detail below.
  • As noted above, the hybrid transmission configurations all utilize a one-way clutch to prevent reverse power flow from the drive train to a free power turbine.
  • These and other advantages will be apparent from the disclosures contained herein.
  • The phrases at least one, one or more, and/or are open-ended expressions that are both conjunctive and disjunctive in operation. For example, each of the expressions “at least one of A, B and C”, “at least one of A, B, or C”, “one or more of A, B, and C”, “one or more of A, B, or C” and “A, B, and/or C” means A alone, B alone, C alone, A and B together, A and C together, B and C together, or A, B and C together.
  • The following definitions are used herein:
  • Acid-producing gases as used herein are gases such as carbon dioxide, sulfur dioxide, nitrogen dioxide and the like when combined with water provided by steam to form carbonic acid, sulfuric acid, nitric acid and the like.
  • A diluent as used herein is a light hydrocarbon that both dilutes and partially dissolves in heavy hydrocarbons. In a thermal or non-thermal heavy oil or bitumen production method, a solvent liquid or vapor is used to reduce viscosity of the heavy oil. An injected solvent vapor expands and dilutes the heavy oil by contact. The diluted heavy oil is then produced via horizontal or vertical producer wells. Diluent and solvent are often used interchangeably in the production of heavy oil and bitumen.
  • A mobilized hydrocarbon is a hydrocarbon that has been made flowable by some means. For example, some heavy oils and bitumen may be mobilized by heating them or mixing them with a diluent to reduce their viscosities and allow them to flow under the prevailing drive pressure. Most liquid hydrocarbons may be mobilized by increasing the drive pressure on them, for example by water or gas floods, so that they can overcome interfacial and/or surface tensions and begin to flow.
  • Primary production or recovery is the first stage of hydrocarbon production, in which natural reservoir energy, such as gasdrive, waterdrive or gravity drainage, displaces hydrocarbons from the reservoir, into the wellbore and up to surface. Production using an artificial lift system, such as a rod pump, an electrical submersible pump or a gas-lift installation is considered primary recovery. Secondary production or recovery methods frequently involve an artificial-lift system and/or reservoir injection for pressure maintenance. The purpose of secondary recovery is to maintain reservoir pressure and to displace hydrocarbons toward the wellbore. Tertiary production or recovery is the third stage of hydrocarbon production during which sophisticated techniques that alter the original properties of the oil are used. Enhanced oil recovery can begin after a secondary recovery process or at any time during the productive life of an oil reservoir. Its purpose is not only to restore formation pressure, but also to improve oil displacement or fluid flow in the reservoir. The three major types of enhanced oil recovery operations are chemical flooding, miscible displacement and thermal recovery.
  • A producer is a any producer of natural gas, oil, heavy oil, bitumen, peat or coal from a hydrocarbon reservoir.
  • The following in-situ process acronyms are used herein:
  • CSS means Cyclic Steam Stimulation. In the CSS process, steam is injected into the reservoir at rates of the order of 1000 B/d for a period of weeks; the well is then allowed to flow back and is later pumped. In suitable applications, the production of oil is rapid and the process is efficient, at least in the early cycles. If the steam pressure is high enough to fracture the reservoir and thus allow injection, it can also be used to produce the very viscous oil of the oil sands at an economic rate. The main drawback of the cyclic steam stimulation process is that it often allows only about 15% to 25% of the oil to be recovered before the oil-to-steam ratio becomes prohibitively low.
  • ESEIEH means Solvent Extraction Incorporating Electromagnetic Heating
  • HAGD is an acronym for Heat Assisted Gravity Drain. In the US oil shales, one recovery method being implemented in pilot projects involves the use of resistance heaters and heating elements to raise the temperature of the oil shales so that oil is produced. These methods are being considered for application to both oil sand and carbonate deposits in Alberta. These methods are designed to heat heavy oil and bitumen deposits to mobilize these hydrocarbons for production. Heating of oil sands by electrodes, often referred to as a form of HAGD. Direct heating of oil sands by electrically-powered heating elements is another form of HAGD.
  • LASER means Liquid Addition to Steam for Enhancing Recovery
  • LASER-CSS means Liquid Addition to Steam for Enhancing Recovery of Cyclic Steam Stimulation
  • N-Solv means thermal solvent process
  • PHARM means Passive Heat Assisted Recovery Methods
  • SAGD means Steam Assisted Gravity Drain. Typically, SAGD wells or well pairs are drilled from the earth's surface down to the bottom of the oil sand deposit and then horizontally along the bottom of the deposit and then used to inject steam and collect mobilized bitumen.
  • SAGP means Steam Gas Push.
  • SA-SAGD means Solvent Assisted SAGD
  • SC-SAGD means Solvent-Cyclic SAGD
  • ES-SAGD means Expanding Solvent-SAGD
  • SAP means Solvent Assisted Process
  • SAS means Steam Alternating Solvent
  • SAVES means Solvent Assisted Vapour Extraction with Steam
  • SAVEX means Steam and Vapour Extraction process
  • SGS means Steam Gas Solvent.
  • In a steamflooding process, steam is forced continuously into specific injection wells and oil is driven to separate production wells. The zones around the injection wells become heated to the saturation temperature of the steam, and these zones expand toward the production wells. Oil and water from the condensation of steam are removed from the producers. With viscous oil there is a considerable tendency for the steam to override the reservoir, and this tends to limit the downward penetration of the heat and hence the recovery. Steamflooding can allow higher steam injection rates than steam stimulation; this advantage often offsets the rather lower thermal efficiency.
  • VAPEX means Vapour Extraction process and is a process which uses a diluent as the fluid injected into the hydrocarbon formation as a mobilizing fluid
  • It is to be understood that a reference to solvent herein is intended to include diluent and a reference to diluent herein is intended to include solvent.
  • It is to be understood that a reference to oil herein is intended to include low API hydrocarbons such as bitumen (API less than about 10 degrees) and heavy crude oils (API from about 10 degrees to about 20 degrees) as well as higher API hydrocarbons such as medium crude oils (API from about 20 degrees to about 35 degrees) and light crude oils (API higher than about 35 degrees). A reference to bitumen is also taken to mean a reference to low API heavy oils.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • The present disclosure may take form in various components and arrangements of components, and in various steps and arrangements of steps. The drawings are only for purposes of illustrating the preferred embodiments and are not to be construed as limiting the disclosure. In the drawings, like reference numerals refer to like or analogous components throughout the several views.
  • FIG. 1 is a schematic of a flow process for in-situ upgrading of bitumen or heavy oil.
  • FIG. 2 is a schematic of an underground recovery operation including is-situ upgrading.
  • DETAILED DESCRIPTION In-Situ Upgrading
  • Known catalysts for steam gasification are oxides and chlorides of alkali and alkaline-earth metals and transition metals, separately or in combination. For example, sodium chloride and potassium chloride are known catalysts while the carbonates of sodium and potassium are known to have higher catalytic activity. Also, oxides of calcium, iron, magnesium and zinc are known to have catalytic effect on steam gasification of coal. Calcium carbonate and magnesium carbonates are known to occur naturally in dolomitic and limestone formations.
  • In one embodiment, steam injection for thermal recovery of bitumen in a dolomitic or limestone reservoir matrix material can be carried out at a higher temperature, a higher pressure, a longer dwell time or a combination of all three in order to allow the mobilized bitumen to remain in contact with the catalytic materials in the dolomitic or limestone reservoir matrix material for longer times at higher temperatures and pressures.
  • In another embodiment, catalytic materials such as for example, oxides or carbonates of calcium, magnesium, potassium, nickel and/or iron can be injected into the reservoir along with steam to further enhance catalytic activity during the heating, mobilization and recovery phases of a thermal recovery operation.
  • In another embodiment, methods such as hydro-fracturing, explosive fracturing and the like may be used to increase the permeability and surface area of the reservoir matrix material so as to enhance the contact between the catalytic elements in the dolomitic or limestone reservoir matrix material.
  • In another embodiment applicable to recovery operations conducted from a tunnel or a shaft in or below the hydrocarbon reservoir, block caving methods and the like may be used to increase the permeability and surface area of the reservoir matrix material so as to enhance the contact between the catalytic elements in the dolomitic or limestone reservoir matrix material.
  • Formation of an Upgrading Chamber
  • Much of the Athabasca is underlain by a competent, thick limestone basement formation. These formations are well-suited to excavating tunnels or caverns by a variety of well-known methods such as for example, drill&blast, roadheaders, tunnel boring machines and the like.
  • The limestone removed from these excavations has many uses in a comprehensive thermal recovery operation in an overlying or near-by bitumen resource, especially after the bitumen has been recovered and de-watered. In the upgrading and refining processes, these uses include but are not limited to: water purification, removal of sulfur dioxide and carbon dioxide from recovered gases and flue gases from on-site or near-by refineries, for aggregate in road construction etcetera and for various agricultural uses where transportation distances are not to great.
  • One of the principal uses for this limestone is to form calcium oxide (quick lime) which can be hydrated to form slaked lime and used to remove carbon dioxide from flue gases. In the production of quick lime, carbon dioxide is generated. This carbon dioxide is “clean” (uncontaminated by sulfur dioxide and NOXs for example) and can be readily captured for various uses or it can be sold.
  • When used to remove carbon dioxide from flue gases, a “dirty” limestone sludge is formed (contaminated by sulfur dioxide and NOXs for example). One option is to take this dirty limestone and return it to the underground excavations previously formed in the aforementioned limestone formation. In effect, clean carbon dioxide (produced by turning limestone into calcium oxide) which has been captured and has some value, is exchanged for dirty limestone which can be sequestered in the underground excavations previously formed in the limestone formation.
  • In well-known thermal recovery operations of bitumen, a hot, dirty bitumen/water mixture is recovered. It is possible to effect a partial upgrade of this by storing it in a catalytic matrix. Such a matrix can be provided by the dirty limestone that has been returned to the underground excavations previously formed in the limestone formation.
  • If this is anticipated, then the following method can be envisioned:
    • 1. Form an excavation in a competent limestone or dolomite formation under or near a natural bitumen deposit.
    • 2. Utilize the excavated limestone or dolomite for a variety of purposes including usage as gravel and removal of carbon dioxide from refinery flue gases to provide a source of clean carbon dioxide.
    • 3. In the excavation in the competent limestone or dolomite formation, install injector and producer wells suitable for a thermal stimulation operation such as SAGD, CSS or steam flooding.
    • 4. Backfill the excavation in the limestone or dolomite formation with dirty limestone or dolomite sludge from carbon dioxide scrubbing operations.
    • 5. Inject the hot, dirty bitumen/water mixture from a conventional thermal recovery operation into the excavation that now contains injector and producer wells and is backfilled with dirty limestone or dolomite sludge.
    • 6. Steam the “man-made” reservoir and recover partially upgraded bitumen.
  • In effect, a new thermal recovery operation can be applied to the bitumen now in a limestone or dolomite matrix or reservoir. It is expected that there will be some upgrading of the bitumen as the bitumen is further heated and recovered for a second time.
  • It is noted that the installation of injector and producer wells will be far less expensive than installation by surface-based horizontal drilling since they need not be drilled from the surface or even a near-by tunnel or shaft but can be installed directly in an open tunnel or cavern. The cost of recovering the bitumen a second time can be more than offset by the upgrading action of the bitumen being heated while in contact with the catalytic limestone backfill. This second recovery operation is expected to be very efficient because the injector and producer wells can be installed accurately with optimal separation. Alternately, heating elements or electrodes can be installed to assist or replace heating by steam.
  • FIG. 1 is a schematic of a flow process for in-situ upgrading of bitumen or heavy oil. A thermal or thermal plus solvent process 102 is applied to a bitumen or heavy oil reservoir 101. A catalyst 103 may also be injected to enhance the catalytic reactions occurring during the in-situ thermal or thermal plus solvent operations to produce an upgraded bitumen 111 which is recovered. This upgraded bitumen may then be combined with excavated and crushed limestone or dolomite in a cavern 104 excavated in the basement limestone or dolomite rock. A second thermal or thermal plus solvent process 105 is applied to the bitumen or heavy oil in cavern 104. A catalyst 106 may also be injected to enhance the catalytic reactions occurring during the thermal or thermal plus solvent operation in the cavern to produce a further upgraded bitumen 112 which is then recovered and prepared for on-site refining or for transport to market.
  • FIG. 2 is a schematic of a possible underground recovery operation including is-situ upgrading. A bitumen or heavy oil reservoir formation 201 is shown over basement rock 202 and overlain by an overburden layer 203. An underground working area 203 has been excavated in the basement rock 202. A number of horizontal well pairs 205 have been installed from the underground work space 203 into reservoir 201 with wellheads 206 installed for operating well pairs 205. As described above, steam or steam plus solvent and catalysts can be injected at the well head through the injector well of well pair 205. Mobilized bitumen or heavy oil is recovered through the producer well of well pair 205.
  • Bitumen recovery operations have been demonstrated in this manner by the Underground Test Facility (“UTF”). The Alberta Oil Sands Technology and Research Authority (“AOSTRA”), a government organization responsible for funding research in oil sands, was the key link in the transformation from concept to implementation. AOSTRA constructed the Underground Test Facility (UTF)) in the Athabasca Oil Sands, in the 1980's to specifically test the SAGD hypothesis. Using directional drilling techniques, the original SAGD wells were drilled upwards and then horizontally from a tunnel in the limestone basement rock such as shown in FIG. 2.
  • As also shown in FIG. 2, another underground chamber 204 is also excavated and serves as an upgrading chamber. The chamber is filled with bitumen or heavy oil recovered from reservoir 201 and mixed with catalytic material such as limestone and/or dolomite rubble which may or may not be recovered from the material excavated to form either the work space 203 or the upgrading chamber 204. As shown in FIG. 2,
  • Upgrading chamber 204 is separated from working space 203 and connected by one or more passage ways 207. Passage ways 207 can be blocked of by gates or barriers.
  • The bitumen or heavy oil recovered and catalytic material can then be steamed and heated up to temperatures in the range of about 150 C to about 200 C for additional upgrading. It is also possible to incorporate mechanical mixing apparatuses in the upgrading chamber to increase the catalytic action.
  • The disclosure has been described with reference to the preferred embodiments. Modifications and alterations will occur to others upon a reading and understanding of the preceding detailed description. It is intended that the disclosure be construed as including all such modifications and alterations insofar as they come within the scope of the appended claims or the equivalents thereof.
  • A number of variations and modifications of the disclosures can be used. As will be appreciated, it would be possible to provide for some features of the disclosures without providing others. For example, the same slow fill system can be applied to filling any vehicle powered by gaseous fuels such as CNG, propane, hydrogen etcetera. These slow fill systems could be located, for example, at malls, parking garages, factory outlets and the like. A similar strategy, which is known, is charging electric cars overnight. The present disclosure differs in that a slow fill CNG location is based on a central storage and metering facility serving a number of fueling posts.
  • The present disclosure, in various embodiments, includes components, methods, processes, systems and/or apparatus substantially as depicted and described herein, including various embodiments, sub-combinations, and subsets thereof. Those of skill in the art will understand how to make and use the present disclosure after understanding the present disclosure. The present disclosure, in various embodiments, includes providing devices and processes in the absence of items not depicted and/or described herein or in various embodiments hereof, including in the absence of such items as may have been used in previous devices or processes, for example for improving performance, achieving ease and\or reducing cost of implementation.
  • The foregoing discussion of the disclosure has been presented for purposes of illustration and description. The foregoing is not intended to limit the disclosure to the form or forms disclosed herein. In the foregoing Detailed Description for example, various features of the disclosure are grouped together in one or more embodiments for the purpose of streamlining the disclosure. This method of disclosure is not to be interpreted as reflecting an intention that the claimed disclosure requires more features than are expressly recited in each claim. Rather, as the following claims reflect, inventive aspects lie in less than all features of a single foregoing disclosed embodiment. Thus, the following claims are hereby incorporated into this Detailed Description, with each claim standing on its own as a separate preferred embodiment of the disclosure.
  • Moreover though the description of the disclosure has included description of one or more embodiments and certain variations and modifications, other variations and modifications are within the scope of the disclosure, e.g., as may be within the skill and knowledge of those in the art, after understanding the present disclosure. It is intended to obtain rights which include alternative embodiments to the extent permitted, including alternate, interchangeable and/or equivalent structures, functions, ranges or steps to those claimed, whether or not such alternate, interchangeable and/or equivalent structures, functions, ranges or steps are disclosed herein, and without intending to publicly dedicate any patentable subject matter.

Claims (20)

What is claimed is:
1. A method, comprising:
injecting a catalytic material and steam into a bitumen-containing dolomitic or limestone reservoir matrix material to form upgraded bitumen, wherein the catalytic material is an oxide, carbonate, and/or chloride of an alkali and alkaline earth metal; and
recovering the upgraded bitumen.
2. The method of claim 1, wherein the catalytic material is one or more of oxides and/or carbonates of calcium, magnesium, potassium, nickel, and/or iron.
3. The method of claim 1, wherein a recovered API density of upgraded bitumen is at least about 125% of an in situ API density of bitumen.
4. The method of claim 1, wherein a recovered API density of upgraded bitumen is from about 2 to about 10 API degrees greater than an in situ API density of bitumen.
5. A method, comprising:
fracturing a bitumen-containing dolomotic or limestone reservoir matrix material to increase a permeability and exposed surface area of the matrix material; and
injecting steam into the fractured matrix material to form an upgraded bitumen, wherein the matrix material comprises a catalytic material having a catalytic effect on bitumen; and
injecting steam into the fractured reservoir matrix material to form an upgraded bitumen.
6. The method of claim 5, wherein the fracturing is performed by one or more of hydro-fracturing, explosive fracturing, and block caving.
7. The method of claim 5, wherein the catalytic material is an alkali and/or alkaline earth metal carbonate or bicarbonate.
8. A method, comprising:
recovering, by steam injection, bitumen from a bitumen-containing material;
in an underground excavation, contacting the recovered bitumen with at least one of excavated limestone and dolomite to upgrade the bitumen; and
recovering the upgraded bitumen.
9. The method of claim 8, wherein the at least one of excavated limestone and dolomite comprises a catalytic material having a catalytic effect on bitumen.
10. The method of claim 9, wherein the catalytic material is one or more of an oxide, chloride, and/or carbonate of an alkali, alkaline earth, and transition metal.
11. The method of claim 8, wherein the underground excavation comprises an underground working area and an underground chamber containing the at least one of excavated limestone and dolomite and injector and producer wells for injecting recovered bitumen into the underground chamber and removing upgraded bitumen from the underground chamber, respectively.
12. The method of claim 8, wherein the at least one of excavated limestone and dolomite has been used in carbon dioxide scrubbing operations to remove carbon dioxide from refinery flue gas.
13. The method of claim 8, wherein a thermal or thermal plus solvent process is applied to the recovered bitumen in the underground excavation.
14. The method of claim 8, wherein the contacting step is performed by one or more of SAGD, CSS, and steam flooding.
15. The method of claim 8, wherein the catalytic material is contained within the at least one of limestone and dolomite.
16. The method of claim 8, wherein the catalytic material is added to the at least one of limestone and dolomite.
17. The method of claim 8, wherein a recovered API density of the upgraded bitumen is at least about 125% of an in situ API density of the bitumen, before recovery.
18. The method of claim 8, wherein a upgraded API density of the upgraded bitumen is from about 2 to about 10 API degrees greater than an in situ API density of bitumen, before recovery.
19. The method of claim 8, wherein the upgraded API density of the upgraded bitumen ranges from about 10 to about 18 API degrees.
20. The method of claim 8, wherein the underground excavation is heated to a temperature in the range of about 150 to about 200 degrees Celsius in the contacting step.
US13/679,497 2011-11-16 2012-11-16 In-situ upgrading of bitumen or heavy oil Abandoned US20130140021A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US13/679,497 US20130140021A1 (en) 2011-11-16 2012-11-16 In-situ upgrading of bitumen or heavy oil

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US201161560618P 2011-11-16 2011-11-16
US13/679,497 US20130140021A1 (en) 2011-11-16 2012-11-16 In-situ upgrading of bitumen or heavy oil

Publications (1)

Publication Number Publication Date
US20130140021A1 true US20130140021A1 (en) 2013-06-06

Family

ID=48430215

Family Applications (1)

Application Number Title Priority Date Filing Date
US13/679,497 Abandoned US20130140021A1 (en) 2011-11-16 2012-11-16 In-situ upgrading of bitumen or heavy oil

Country Status (2)

Country Link
US (1) US20130140021A1 (en)
WO (1) WO2013075010A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104910888A (en) * 2014-03-12 2015-09-16 西安石油大学 Preparation method and application method of clean thick oil degradation catalyzing system
US10214683B2 (en) 2015-01-13 2019-02-26 Bp Corporation North America Inc Systems and methods for producing hydrocarbons from hydrocarbon bearing rock via combined treatment of the rock and subsequent waterflooding

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7980312B1 (en) * 2005-06-20 2011-07-19 Hill Gilman A Integrated in situ retorting and refining of oil shale
US7712528B2 (en) * 2006-10-09 2010-05-11 World Energy Systems, Inc. Process for dispersing nanocatalysts into petroleum-bearing formations
CA2684485C (en) * 2007-04-20 2016-06-14 Shell Internationale Research Maatschappij B.V. Electrically isolating insulated conductor heater
CA2713536C (en) * 2008-02-06 2013-06-25 Osum Oil Sands Corp. Method of controlling a recovery and upgrading operation in a reservoir

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Greg H. Rau, Kevin G. Knauss, William H. Langer, Ken Caldeira, "Reducing energy-related CO2 emissions using accelerated weathering of limestone", August 2007, Energy, Volume 32, Issue 8, Pages 1471-1477, ISSN 0360-5442, http://dx.doi.org/10.1016/j.energy.2006.10.011. *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104910888A (en) * 2014-03-12 2015-09-16 西安石油大学 Preparation method and application method of clean thick oil degradation catalyzing system
US10214683B2 (en) 2015-01-13 2019-02-26 Bp Corporation North America Inc Systems and methods for producing hydrocarbons from hydrocarbon bearing rock via combined treatment of the rock and subsequent waterflooding

Also Published As

Publication number Publication date
WO2013075010A1 (en) 2013-05-23

Similar Documents

Publication Publication Date Title
US10927655B2 (en) Pressure assisted oil recovery
CN107387052B (en) A kind of oil shale in-situ recovery method
US8176982B2 (en) Method of controlling a recovery and upgrading operation in a reservoir
US8235110B2 (en) Preconditioning an oilfield reservoir
US6918444B2 (en) Method for production of hydrocarbons from organic-rich rock
US4065183A (en) Recovery system for oil shale deposits
US7500517B2 (en) Kerogen extraction from subterranean oil shale resources
US20080257552A1 (en) Apparatus, system, and method for in-situ extraction of hydrocarbons
US20060042794A1 (en) Method for high temperature steam
WO2016127108A1 (en) Stimulation of light tight shale oil formations
AU2001250938A1 (en) Method for production of hydrocarbons from organic-rich rock
US9534482B2 (en) Thermal mobilization of heavy hydrocarbon deposits
US20150192002A1 (en) Method of recovering hydrocarbons from carbonate and shale formations
Turta In situ combustion
Veil et al. Water issues associated with heavy oil production.
WO2019136533A1 (en) Method and system for recovery of hydrocarbons from a subterranean formation
US20130140021A1 (en) In-situ upgrading of bitumen or heavy oil
CN102926723A (en) Remaining oil cave extracting method of exhausted oil field
Burger In-situ recovery of oil from oil sands
VAJPAYEE et al. A COMPARATIVE STUDY OF THERMAL ENHANCED OIL RECOVERY METHOD.
Asghari Review of field implementations of in-situ combustion and air injection projects
Fang et al. Recycling CO 2 in heavy oil or bitumen production
Turta Enhanced oil recovery field case studies: Chapter 18. In situ combustion
Looney et al. Kerogen extraction from subterranean oil shale resources
CA2813001A1 (en) Method of controlling a recovery and upgrading operation in a reservoir

Legal Events

Date Code Title Description
STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION