US20130132055A1 - Method for optimizing the development of an underground medium by means of a reservoir study comprising optimized upscaling - Google Patents

Method for optimizing the development of an underground medium by means of a reservoir study comprising optimized upscaling Download PDF

Info

Publication number
US20130132055A1
US20130132055A1 US13/667,137 US201213667137A US2013132055A1 US 20130132055 A1 US20130132055 A1 US 20130132055A1 US 201213667137 A US201213667137 A US 201213667137A US 2013132055 A1 US2013132055 A1 US 2013132055A1
Authority
US
United States
Prior art keywords
reservoir
model
grid
cells
development
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
US13/667,137
Other versions
US9187985B2 (en
Inventor
Christophe PREUX
Mickaele Le Ravalec
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
IFP Energies Nouvelles IFPEN
Original Assignee
IFP Energies Nouvelles IFPEN
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by IFP Energies Nouvelles IFPEN filed Critical IFP Energies Nouvelles IFPEN
Assigned to IFP Energies Nouvelles reassignment IFP Energies Nouvelles ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: LE RAVALEC, MICKAELE, PREUX, CHRISTOPHE
Publication of US20130132055A1 publication Critical patent/US20130132055A1/en
Application granted granted Critical
Publication of US9187985B2 publication Critical patent/US9187985B2/en
Expired - Fee Related legal-status Critical Current
Adjusted expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01VGEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
    • G01V11/00Prospecting or detecting by methods combining techniques covered by two or more of main groups G01V1/00 - G01V9/00
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01VGEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
    • G01V20/00Geomodelling in general
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01VGEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
    • G01V2210/00Details of seismic processing or analysis
    • G01V2210/60Analysis
    • G01V2210/66Subsurface modeling
    • G01V2210/665Subsurface modeling using geostatistical modeling

Definitions

  • the present invention relates to the development of underground reservoirs, such as hydrocarbon reservoirs, or acid gas storage sites.
  • the invention relates to a method for development optimization according to a production scheme for an underground medium containing fluids.
  • Exploration and development of reservoirs requires knowledge of the underground geology as precise as possible to efficiently provide reserve evaluation, production modelling or development management. Indeed, determining the location of a production well or of an injection well, the drilling mud composition, the completion characteristics, selecting a hydrocarbon recovery method (such as waterflooding for example) and the parameters required to implement this method (such as injection pressure, production flow rate, etc.) requires good knowledge of the reservoir. Knowledge of the reservoir notably requires knowing the petrophysical properties of the subsoil at any point in space and being able to predict the flows likely to occur therein.
  • Petroleum reservoir modelling thus is a technical stage that is essential for any reservoir exploration or development procedure.
  • the goal of such modelling is to provide a description of the reservoir.
  • a geological model is constructed.
  • This model is a three-dimensional computer-implemented numerical model representative of the spatial distribution of the petrophysical properties (porosity, permeability, initial oil saturation for example) in the geological formation of interest.
  • Geostatistical techniques are often applied to generate the petrophysical properties in the geological model.
  • this model comprises a number of cells that is much too large to allow direct simulation of the fluid flows. The required computation times are difficult to handle in practice.
  • the second stage which is upscaling defines a second model, referred to as reservoir model, from the geological model.
  • the reservoir model is constructed on a coarser grid than the geological model and comprises a more limited number of cells.
  • the goal of the upscaling process is to transfer the petrophysical properties of the geological model to the reservoir model. It determines equivalent properties to be assigned to the coarse cells of the reservoir model from knowledge of the petrophysical properties of the fine cells of the geological model.
  • the third stage solves the flow equations for the reservoir model created with a computer-implemented flow simulator (software). It is thus possible to estimate how the fluids flow according to the petrophysical properties.
  • Each stage of the reservoir study requires many repetitions of the simulation chain. Indeed, this sequence of simulation modules is repeated several times, either within the context of a sensitivity analysis or of history matching for optimizing the development of a field. In these various cases, the same sequence is repeated with different parameters occurring in the various simulation modules (geostatistics, upscaling, flow simulation). The sequence is repeated entirely from the time when one parameter at least is modified. If a parameter varies at the level of the geological model construction, all the components of the sequence are relaunched.
  • the invention relates to a method for optimizing the development of a reservoir, wherein a reservoir study is carried out by accelerating the stages of the reservoir study. This is achieved by limiting the computation cost (computer time) required by the upscaling stage by storing the geometrical links that exist between the geological model and the reservoir model.
  • the invention is a method for optimizing the development, according to a development scheme, of an underground medium containing a fluid, wherein petrophysical measurements relative to the medium and/or to the fluid are acquired and wherein the following steps are carried out:
  • a geological model including a first grid with a set of cells discretizing the medium with a value of at least one petrophysical property being assigned to each cell by a geostatistical simulation and of the measurements; b. constructing a reservoir model having a second grid including a set of cells discretizing the medium with each cell of the second grid containing a set of cells of the first grid by upscaling the geological model, characterized wherein: c. links are determined between the cells of the first grid and a cell of the second grid in which they are contained and the links are stored; d. flow simulations are carried out using a reservoir simulator, the reservoir model and the links; e.
  • steps a, b and d are repeated without repeating c, by modifying parameters of at least: a production scheme, the geostatistical simulation, the upscaling, the flow simulations, to optimize the development scheme; and f. the underground medium is developed according to the optimized development scheme.
  • FIG. 1 illustrates the stages of the method according to the invention
  • FIG. 2 shows an example of a geological model
  • FIG. 3 is an example of a coarse grid of a reservoir model, corresponding to the fine grid of the geological model of FIG. 2 ;
  • FIG. 4 illustrates the notion of geometrical links between the cells of the two models.
  • FIG. 1 illustrates the stages of the method according to the invention for optimizing the development, according to a production scheme, of an underground medium containing fluids.
  • a production scheme comprises the technical development parameters of the reservoir such as the following parameters: location of a production well or of an injection well, drilling mud composition, completion characteristics, selection of a hydrocarbon recovery method (such as waterflooding for example), and parameters required to implement this method (such as injection pressure, production flow rate, etc.).
  • the following static parameters are measured directly, for example by logs (measurements obtained after drilling, within the well) or of cores providing porosity, permeability, lithology and fracturation information, etc.
  • Seismic campaigns are also used to perform indirect measurements of the reservoir, by providing an image of the subsoil. These data are static or dynamic when they are repeated over time.
  • Dynamic parameters such as the pressure in the reservoir can also be measured directly.
  • a mesh (grid) discretizing the reservoir into a set of cells is defined in order to construct a geological model.
  • This mesh is referred to as “fine” because the cells are of small dimensions, and therefore numerous, so as to best represent the heterogeneities of the reservoir.
  • a value of at least one petrophysical property is then associated with each cell of this first mesh. This property can be the porosity, the permeability, the lithology, etc.
  • Geostatistics modeling spatial uncertainty, Jean-Paul Chilès, Pierre Delfiner, John Wiley & Sons, Inc., 1999.
  • FIG. 2 shows an example of a geological model.
  • a mesh (grid) discretizing the reservoir into a set of cells is defined in order to construct a reservoir model.
  • This mesh is referred to as “coarse” because the cells are of larger dimensions, and therefore less numerous, than the cells of the fine mesh.
  • This second grid the coarse grid (GG) thus forms a set of cells discretizing the reservoir.
  • Each cell of this second grid contains a set of cells of the first grid, as illustrated in FIG. 4 . It represents the grid of the reservoir model (MR).
  • FIG. 3 is an example of a coarse grid of the reservoir model corresponding to the fine grid of the geological model of FIG. 2 .
  • the geometrical links between the cells of the fine grid of the geological model and the cells of the coarse grid of the reservoir model are determined.
  • a geometrical link defines, for each cell of the grid of the geological model, the cell of the grid of the reservoir model with which it is associated in the reservoir model.
  • FIG. 4 illustrates the geometrical links between the cells of the two models.
  • the thick line represents a cell of the reservoir model and the thin lines represent the cells of the geological model. All the cells of the geological model contained in the cell represented with a thick line have a geometrical link with this cell of the reservoir model.
  • Determination of the belonging of a cell of the fine grid to a cell of the coarse grid is achieved from the coordinates of each cell. For example, it can be decided that a cell of the fine grid belongs to the cell of the coarse grid that contains the center of this cell of the fine grid.
  • these geometrical links are then saved the first time the simulation sequence is carried out, by storing them in a memory, such as a computer memory, in a database or in a file.
  • a memory such as a computer memory
  • these computations are no longer necessary, which generates substantial savings in computation time.
  • a value of a petrophysical value (porosity, permeability, lithology, etc.) is associated with each cell of the second grid (coarse grid). This assignment is achieved through upscaling. For each cell of the coarse grid, an average of the petrophysical properties of the cells of the fine grid associated therewith is calculated.
  • Flow simulations allowing simulation of production parameters according to the production scheme which is selected are performed from the reservoir model being software referred to as a “flow simulator”.
  • the production expected over the coming years can be determined for example.
  • the flow simulator marked as PumaFlow® (IFP Energys Hospital, France) can, for example, be used.
  • stage 1 The sequence of four stages 2, 3, 5 and 6 (and optionally stage 1) is repeated many times to test different values of one or more parameters.
  • the geostatistical simulation parameters such as correlation lengths in a kriging technique, to obtain a geological model that best represents the heterogeneities of the reservoir from the measurements acquired in stage 1,
  • the upscaling parameters such as the parameters are used in the averaging formula (exponent for the power law) or the thresholds (cut-off), to obtain a more accurate reservoir model,
  • the flow simulator parameters such as the relative permeability curves, the capillary pressure curves, the contacts (water/oil, gas/oil), the well productivity indices, so as to better simulate the flows and to obtain predictions are used that are closer to actual measured parameters.
  • stage 1 It is also possible to repeat the sequence of the four stages 2, 3, 5 and 6 (and optionally stage 1) in order to optimize the reservoir development and production scheme, by carrying out at least one of the following operations: sensitivity analysis and history matching.
  • History matching modifies the parameters of the reservoir model, such as permeabilities, porosities or well skins (representing near-well damages), fault connections, etc., in order to minimize the differences between the simulated and measured historical data.
  • the parameters can be linked with geographic regions, such as permeabilities or porosities around one or more wells.
  • the difference between real data and simulated data forms a functional referred to as objective function.
  • the history matching problem is solved by minimizing this functional.
  • the objective function is usually computed as the sum of squared errors between simulated data and measured data.
  • the geological model and the reservoir model are coherent with the static data (porosity, permeability, 3S seismic, etc.) and the dynamic data (pressure, 4D seismic, etc.).
  • the flow simulator is calibrated and the development parameters having an influence on the production are identified by the sensitivity analysis.
  • the reservoir is developed by specialists according to this scenario allowing reservoir production to be optimized.
  • the method according to the invention is applied to a simplified oil field case.
  • a sequence of simulation modules that is going to be repeated several times within the context of history matching is created. At each iteration, an attempt is made to improve the calibration by adjusting parameters of the geological model. The computation times required for the upscaling stage at the first iteration and at the next iterations are compared to quantify the gain in terms of computation time.
  • Such a time gain has the effect of enabling processing large volumes of data (several million cells) that are encountered for large-size reservoirs or very heterogeneous reservoirs where discretization has to be fine, and which cannot be processed under operational conditions with prior methods. This time gain also allows testing more parameters and therefore improving the production scheme and thus production itself.

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Geophysics And Detection Of Objects (AREA)
  • Road Paving Structures (AREA)

Abstract

A method for optimizing the development of a fluid reservoir by means of an accelerated reservoir study. A geological model is constructed. A reservoir model is then constructed by upscaling the geological model. The links between cells of the geological model and a cell of the reservoir model where they are contained are determined and stored. Flow simulations are carried out by computer-implemented reservoir simulator, the reservoir model and the links. The above stages are then repeated without repeating the link determination, by modifying parameters of the reservoir study to optimize the development scheme. Finally, the reservoir is developed according to this optimized development scheme.

Description

    CROSS-REFERENCE TO RELATED APPLICATION
  • Reference is made to French patent application Ser. No. 11/03.498, filed on Nov. 17, 2011, which application is incorporated herein by reference in its entirety.
  • BACKGROUND OF THE INVENTION
  • 1. Field of the Invention
  • The present invention relates to the development of underground reservoirs, such as hydrocarbon reservoirs, or acid gas storage sites. In particular, the invention relates to a method for development optimization according to a production scheme for an underground medium containing fluids.
  • Description of the Prior Art
  • Exploration and development of reservoirs, notably petroleum reservoirs, requires knowledge of the underground geology as precise as possible to efficiently provide reserve evaluation, production modelling or development management. Indeed, determining the location of a production well or of an injection well, the drilling mud composition, the completion characteristics, selecting a hydrocarbon recovery method (such as waterflooding for example) and the parameters required to implement this method (such as injection pressure, production flow rate, etc.) requires good knowledge of the reservoir. Knowledge of the reservoir notably requires knowing the petrophysical properties of the subsoil at any point in space and being able to predict the flows likely to occur therein.
  • The petroleum industry has therefore combined for a long time field (in-situ) measurements with experimental modelling (performed in the laboratory) and/or numerical modelling (using softwares). Petroleum reservoir modelling thus is a technical stage that is essential for any reservoir exploration or development procedure. The goal of such modelling is to provide a description of the reservoir.
  • In order to best develop underground media, the petroleum industries define models allowing better control of development oil fields. The precision of the flow simulations is extremely important since the results of the simulations helps make technical and economic decisions relative to the field development. The models used are generally uncertain due to the lack of data which results in many iterative techniques being used to quantify these uncertainties and/or to calibrate the simulation results relative to the well history. The models derived therefrom are then more reliable and they can be used to predict the future production of the field.
  • The simulation chain conventionally used in a reservoir study involves the elements presented hereafter.
  • In a first stage, a geological model is constructed. This model is a three-dimensional computer-implemented numerical model representative of the spatial distribution of the petrophysical properties (porosity, permeability, initial oil saturation for example) in the geological formation of interest. Geostatistical techniques are often applied to generate the petrophysical properties in the geological model. In general, this model comprises a number of cells that is much too large to allow direct simulation of the fluid flows. The required computation times are difficult to handle in practice.
  • The second stage which is upscaling defines a second model, referred to as reservoir model, from the geological model. The reservoir model is constructed on a coarser grid than the geological model and comprises a more limited number of cells. The goal of the upscaling process is to transfer the petrophysical properties of the geological model to the reservoir model. It determines equivalent properties to be assigned to the coarse cells of the reservoir model from knowledge of the petrophysical properties of the fine cells of the geological model.
  • The third stage solves the flow equations for the reservoir model created with a computer-implemented flow simulator (software). It is thus possible to estimate how the fluids flow according to the petrophysical properties.
  • Each stage of the reservoir study requires many repetitions of the simulation chain. Indeed, this sequence of simulation modules is repeated several times, either within the context of a sensitivity analysis or of history matching for optimizing the development of a field. In these various cases, the same sequence is repeated with different parameters occurring in the various simulation modules (geostatistics, upscaling, flow simulation). The sequence is repeated entirely from the time when one parameter at least is modified. If a parameter varies at the level of the geological model construction, all the components of the sequence are relaunched.
  • SUMMARY OF THE INVENTION
  • The invention relates to a method for optimizing the development of a reservoir, wherein a reservoir study is carried out by accelerating the stages of the reservoir study. This is achieved by limiting the computation cost (computer time) required by the upscaling stage by storing the geometrical links that exist between the geological model and the reservoir model.
  • In general terms, the invention is a method for optimizing the development, according to a development scheme, of an underground medium containing a fluid, wherein petrophysical measurements relative to the medium and/or to the fluid are acquired and wherein the following steps are carried out:
  • a. constructing a geological model including a first grid with a set of cells discretizing the medium with a value of at least one petrophysical property being assigned to each cell by a geostatistical simulation and of the measurements;
    b. constructing a reservoir model having a second grid including a set of cells discretizing the medium with each cell of the second grid containing a set of cells of the first grid by upscaling the geological model, characterized wherein:
    c. links are determined between the cells of the first grid and a cell of the second grid in which they are contained and the links are stored;
    d. flow simulations are carried out using a reservoir simulator, the reservoir model and the links;
    e. steps a, b and d are repeated without repeating c, by modifying parameters of at least: a production scheme, the geostatistical simulation, the upscaling, the flow simulations, to optimize the development scheme; and
    f. the underground medium is developed according to the optimized development scheme.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • Other features and advantages of the method according to the invention will be clear from reading the description hereafter of non-limitative embodiment examples, with reference to the accompanying figures wherein:
  • FIG. 1 illustrates the stages of the method according to the invention;
  • FIG. 2 shows an example of a geological model;
  • FIG. 3 is an example of a coarse grid of a reservoir model, corresponding to the fine grid of the geological model of FIG. 2; and
  • FIG. 4 illustrates the notion of geometrical links between the cells of the two models.
  • DETAILED DESCRIPTION OF THE INVENTION
  • FIG. 1 illustrates the stages of the method according to the invention for optimizing the development, according to a production scheme, of an underground medium containing fluids.
  • 1. Acquisition of petrophysical measurements relative to the medium and/or to the fluid (ACQ)
    2. Construction of a geological model (MG)
    3. Construction of a coarse grid (GG)
    4. Determination and storage of links between the cells of the two grids (MEM)
    5. Construction of a reservoir model (MR)
    6. Flow simulations (SIM)
    7. Optimization of the production scheme through iteration of stages 2, 3 and 5 (OPT)
    8. Development of the underground medium according to the optimized development scheme (EXP).
  • A production scheme comprises the technical development parameters of the reservoir such as the following parameters: location of a production well or of an injection well, drilling mud composition, completion characteristics, selection of a hydrocarbon recovery method (such as waterflooding for example), and parameters required to implement this method (such as injection pressure, production flow rate, etc.).
  • 1. Acquisition of Petrophysical Measurements Relative to the Medium and/or to the Fluid (ACQ)
  • In order to explore, evaluate, develop an underground reservoir, specialists perform direct or indirect, static or dynamic measurements of this medium.
  • The following static parameters are measured directly, for example by logs (measurements obtained after drilling, within the well) or of cores providing porosity, permeability, lithology and fracturation information, etc.
  • Seismic campaigns are also used to perform indirect measurements of the reservoir, by providing an image of the subsoil. These data are static or dynamic when they are repeated over time.
  • Dynamic parameters such as the pressure in the reservoir can also be measured directly.
  • 2. Construction of a Geological Model (MG)
  • A mesh (grid) discretizing the reservoir into a set of cells is defined in order to construct a geological model. This mesh is referred to as “fine” because the cells are of small dimensions, and therefore numerous, so as to best represent the heterogeneities of the reservoir. A value of at least one petrophysical property is then associated with each cell of this first mesh. This property can be the porosity, the permeability, the lithology, etc.
  • This assignment is achieved by a geostatistical simulation. An example of a technique that can be used to carry out this stage is described in the following document:
  • Geostatistics: modeling spatial uncertainty, Jean-Paul Chilès, Pierre Delfiner, John Wiley & Sons, Inc., 1999.
  • FIG. 2 shows an example of a geological model.
  • 3. Construction of a Coarse Grid (GG)
  • A mesh (grid) discretizing the reservoir into a set of cells is defined in order to construct a reservoir model. This mesh is referred to as “coarse” because the cells are of larger dimensions, and therefore less numerous, than the cells of the fine mesh.
  • This second grid, the coarse grid (GG), thus forms a set of cells discretizing the reservoir. Each cell of this second grid contains a set of cells of the first grid, as illustrated in FIG. 4. It represents the grid of the reservoir model (MR).
  • FIG. 3 is an example of a coarse grid of the reservoir model corresponding to the fine grid of the geological model of FIG. 2.
  • 4. Determination and Storage of Links Between the Cells of the Two Grids (MEM)
  • According to the invention, the geometrical links between the cells of the fine grid of the geological model and the cells of the coarse grid of the reservoir model are determined.
  • A geometrical link defines, for each cell of the grid of the geological model, the cell of the grid of the reservoir model with which it is associated in the reservoir model. FIG. 4 illustrates the geometrical links between the cells of the two models. The thick line represents a cell of the reservoir model and the thin lines represent the cells of the geological model. All the cells of the geological model contained in the cell represented with a thick line have a geometrical link with this cell of the reservoir model.
  • Determination of the belonging of a cell of the fine grid to a cell of the coarse grid is achieved from the coordinates of each cell. For example, it can be decided that a cell of the fine grid belongs to the cell of the coarse grid that contains the center of this cell of the fine grid.
  • When the simulation sequence is repeated, the geometry of the models remains unchanged. The geometrical links are thus always identical at each iteration. The stage of computing these geometrical links is potentially costly in computation time (even costlier than the properties upscaling computations). Storage of them is suggested.
  • Thus, according to the invention, these geometrical links are then saved the first time the simulation sequence is carried out, by storing them in a memory, such as a computer memory, in a database or in a file. Thus, when the process is repeated, these computations are no longer necessary, which generates substantial savings in computation time.
  • 5. Construction of a Reservoir Model (MR)
  • To construct the reservoir model, a value of a petrophysical value (porosity, permeability, lithology, etc.) is associated with each cell of the second grid (coarse grid). This assignment is achieved through upscaling. For each cell of the coarse grid, an average of the petrophysical properties of the cells of the fine grid associated therewith is calculated.
  • An example of a technique that can be used to carry out this stage is described in the following document:
  • Calculating Equivalent Permeability: A Review, P. Renard and G. de Marsily, Advances in Water Resources 20(5-6), 253-278, 1997.
  • 6. Flow Simulations (SIM)
  • Flow simulations allowing simulation of production parameters according to the production scheme which is selected are performed from the reservoir model being software referred to as a “flow simulator”. The production expected over the coming years can be determined for example.
  • The flow simulator marked as PumaFlow® (IFP Energies nouvelles, France) can, for example, be used.
  • An example of a technique that can be used to carry out this stage is described in the following document:
  • Petroleum Reservoir Simulation, K. Aziz and A. Settari, Applied Science Publishers, p. 476, 1979.
  • 7. Optimization of the Production Scheme Through Iteration of Stages 2, 3 and 5 (OPT)
  • The sequence of four stages 2, 3, 5 and 6 (and optionally stage 1) is repeated many times to test different values of one or more parameters.
  • It is thus possible to modify:
  • the geostatistical simulation parameters, such as correlation lengths in a kriging technique, to obtain a geological model that best represents the heterogeneities of the reservoir from the measurements acquired in stage 1,
  • the upscaling parameters, such as the parameters are used in the averaging formula (exponent for the power law) or the thresholds (cut-off), to obtain a more accurate reservoir model,
  • the flow simulator parameters, such as the relative permeability curves, the capillary pressure curves, the contacts (water/oil, gas/oil), the well productivity indices, so as to better simulate the flows and to obtain predictions are used that are closer to actual measured parameters.
  • It is also possible to repeat the sequence of the four stages 2, 3, 5 and 6 (and optionally stage 1) in order to optimize the reservoir development and production scheme, by carrying out at least one of the following operations: sensitivity analysis and history matching.
  • History matching modifies the parameters of the reservoir model, such as permeabilities, porosities or well skins (representing near-well damages), fault connections, etc., in order to minimize the differences between the simulated and measured historical data. The parameters can be linked with geographic regions, such as permeabilities or porosities around one or more wells. The difference between real data and simulated data forms a functional referred to as objective function. The history matching problem is solved by minimizing this functional. The objective function is usually computed as the sum of squared errors between simulated data and measured data.
  • The advantage of not recalculating the geometrical links during these iterations is to accelerate the iterative processes (sensitivity study, calibration, model and flow simulation optimization) used in the petroleum industry.
  • At the end of these stages, the geological model and the reservoir model are coherent with the static data (porosity, permeability, 3S seismic, etc.) and the dynamic data (pressure, 4D seismic, etc.). The flow simulator is calibrated and the development parameters having an influence on the production are identified by the sensitivity analysis.
  • By selecting various scenarios, characterized for example by various respective injector and producer well sites, and by simulating the hydrocarbon production for each one according to stage 6, the scenario allowing optimizing the production of the fractured reservoir considered according to the technical and economic criteria chosen can be selected.
  • 8. Development of the Underground Medium According to the Optimized Development Scheme (EXP)
  • The reservoir is developed by specialists according to this scenario allowing reservoir production to be optimized.
  • Application Example
  • The method according to the invention is applied to a simplified oil field case.
  • A geological model comprising 1390*480*45=30,024,000 fine cells is considered. This model is populated with petrophysical properties from geostatistical simulation tools. Furthermore, there are two reservoir models:
  • Model 1 consists of 139*48*9=60,048 cells,
  • Model 2 consists of 417*144*27=1,631,296 cells.
  • A sequence of simulation modules that is going to be repeated several times within the context of history matching is created. At each iteration, an attempt is made to improve the calibration by adjusting parameters of the geological model. The computation times required for the upscaling stage at the first iteration and at the next iterations are compared to quantify the gain in terms of computation time.
  • Computation
    Computation time time Gain
    Iteration 1 Next iterations (iteration 1/next iterations)
    Model 1  8 minutes 1 minute 800%
    Model 2 45 minutes 6 minutes 750%
  • A very definite acceleration of the simulation is thus observed after the first iteration: storing the geometrical links between the models allows reduction of the computation times by 700 to 800%.
  • Such a time gain has the effect of enabling processing large volumes of data (several million cells) that are encountered for large-size reservoirs or very heterogeneous reservoirs where discretization has to be fine, and which cannot be processed under operational conditions with prior methods. This time gain also allows testing more parameters and therefore improving the production scheme and thus production itself.

Claims (2)

1. (canceled)
2. A method for optimizing developments of an underground medium containing a fluid according to a development scheme utilizing petrophysical measurements acquired relative to the medium and/or the fluid comprising the steps:
a) constructing a geological model having a first grid having a set of cells discretizing the medium with a value of at least one petrophysical property being assigned to each cell from a geostatistical simulation and from the measurements;
b) constructing by upscaling the geological model a reservoir model having a second grid including a set of cells discretizing the medium with each cell of the second grid containing a set of cells of the first grid;
c) determining links between the cells of the first grid and the cell of the second grid in which the cells of the first grid are contained and storing the links;
d) performing flow simulations using a reservoir simulator, the reservoir model, and the links;
e) repeating steps a), b) and d) without repeating c), by modifying parameters of at least the development scheme, the geostatistical simulation, the upscaling, and the flow simulation, to optimize the development scheme; and
f) developing the underground medium according to the optimized development scheme.
US13/667,137 2011-11-17 2012-11-02 Method for optimizing the development of an underground medium by means of a reservoir study comprising optimized upscaling Expired - Fee Related US9187985B2 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
FR1103498 2011-11-17
FR11/03498 2011-11-17
FR1103498A FR2982902B1 (en) 2011-11-17 2011-11-17 METHOD FOR OPTIMIZING THE OPERATION OF A SUBTERRANEAN MEDIUM USING A RESERVOIR STUDY COMPRISING OPTIMIZED SCALING

Publications (2)

Publication Number Publication Date
US20130132055A1 true US20130132055A1 (en) 2013-05-23
US9187985B2 US9187985B2 (en) 2015-11-17

Family

ID=47010435

Family Applications (1)

Application Number Title Priority Date Filing Date
US13/667,137 Expired - Fee Related US9187985B2 (en) 2011-11-17 2012-11-02 Method for optimizing the development of an underground medium by means of a reservoir study comprising optimized upscaling

Country Status (4)

Country Link
US (1) US9187985B2 (en)
EP (1) EP2594733A1 (en)
CA (1) CA2796697A1 (en)
FR (1) FR2982902B1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20140246194A1 (en) * 2013-03-01 2014-09-04 Vincent Artus Control fracturing in unconventional reservoirs
WO2015023265A1 (en) * 2013-08-13 2015-02-19 Landmark Graphics Corporation A simulation-to-seismic workflow construed from core based rock typing and enhanced by rock replacement modeling
WO2015038163A1 (en) * 2013-09-16 2015-03-19 Landmark Graphics Corporation Pseudo-phase production simulation: a signal processing approach to assess quasi-multiphase flow production via successive analogous step-function relative permeability controlled models in reservoir flow simulation
CN113777668A (en) * 2020-06-10 2021-12-10 中国石油化工股份有限公司 Geostress calculation method and device for tight gas reservoir of sand-shale interbed

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116609836B (en) * 2023-07-19 2023-09-19 北京建工环境修复股份有限公司 Geophysical simulation testing device and method for groundwater pollution

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BRPI0714028A2 (en) * 2006-07-07 2012-12-18 Exxonmobil Upstream Res Co methods for refining a physical property and producing hydrocarbons from an underground region
FR2920816B1 (en) 2007-09-06 2010-02-26 Inst Francais Du Petrole METHOD FOR UPDATING A GEOLOGICAL MODEL USING DYNAMIC DATA AND WELL TESTS
US8350851B2 (en) * 2009-03-05 2013-01-08 Schlumberger Technology Corporation Right sizing reservoir models

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
EP search report with 3 "X" reference citations; 2012; one page *

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20140246194A1 (en) * 2013-03-01 2014-09-04 Vincent Artus Control fracturing in unconventional reservoirs
US9494025B2 (en) * 2013-03-01 2016-11-15 Vincent Artus Control fracturing in unconventional reservoirs
WO2015023265A1 (en) * 2013-08-13 2015-02-19 Landmark Graphics Corporation A simulation-to-seismic workflow construed from core based rock typing and enhanced by rock replacement modeling
GB2534990A (en) * 2013-08-13 2016-08-10 Landmark Graphics Corp A simulation-to-seismic workflow construed from core based rock typing and enhanced by rock replacement modeling
GB2534990B (en) * 2013-08-13 2020-03-25 Landmark Graphics Corp A simulation-to-seismic workflow construed from core based rock typing and enhanced by rock replacement modeling
WO2015038163A1 (en) * 2013-09-16 2015-03-19 Landmark Graphics Corporation Pseudo-phase production simulation: a signal processing approach to assess quasi-multiphase flow production via successive analogous step-function relative permeability controlled models in reservoir flow simulation
GB2535648A (en) * 2013-09-16 2016-08-24 Landmark Graphics Corp Pseudo-phase production simulation: a signal processing approach to assess quasi-multiphase flow production via successive analogous step-function
AU2013400129B2 (en) * 2013-09-16 2017-10-05 Landmark Graphics Corporation Pseudo-phase production simulation: a signal processing approach to assess quasi-multiphase flow production via successive analogous step-function relative permeability controlled models in reservoir flow simulation
US10235478B2 (en) 2013-09-16 2019-03-19 Landmark Graphics Corporation Pseudo-phase production simulation: a signal processing approach to assess quasi-multiphase flow production via successive analogous step-function relative permeability controlled models in reservoir flow simulation
GB2535648B (en) * 2013-09-16 2020-02-19 Landmark Graphics Corp Pseudo-phase production simulation: a signal processing approach to assess quasi-multiphase flow production
CN113777668A (en) * 2020-06-10 2021-12-10 中国石油化工股份有限公司 Geostress calculation method and device for tight gas reservoir of sand-shale interbed

Also Published As

Publication number Publication date
US9187985B2 (en) 2015-11-17
FR2982902A1 (en) 2013-05-24
CA2796697A1 (en) 2013-05-17
EP2594733A1 (en) 2013-05-22
FR2982902B1 (en) 2013-11-08

Similar Documents

Publication Publication Date Title
US10288544B2 (en) Method for characterizing the fracture network of a fractured reservoir and method for exploiting it
US9135378B2 (en) Method of developing a reservoir from a technique of selecting the positions of wells to be drilled
US9805144B2 (en) Method for exploiting a geological reservoir on the basis of a reservoir model matched by means of multiple-scale parameterization
EP2629123B1 (en) Simulation model optimization
US8676557B2 (en) Method of developing a petroleum reservoir from optimized history matching
US8868390B2 (en) Method of developing a petroleum reservoir from a flow model calibrated through pressure and saturation map scaling
EP3563030A1 (en) Method and system for regression and classification in subsurface models to support decision making for hydrocarbon operations
US20130046524A1 (en) Method for modeling a reservoir basin
US20030028325A1 (en) Method of constraining by dynamic production data a fine model representative of the distribution in the reservoir of a physical quantity characteristic of the subsoil structure
US20070055447A1 (en) Method for updating a geological reservoir model by means of dynamic data
US11269113B2 (en) Modeling of oil and gas fields for appraisal and early development
US9187985B2 (en) Method for optimizing the development of an underground medium by means of a reservoir study comprising optimized upscaling
US20140019108A1 (en) Method for exploiting a geological reservoir from a reservoir model matched by the computation of an analytical law of conditional distribution of uncertain parameters of the model
Chen et al. Eur assessment of unconventional assets using parallelized history matching workflow together with rml method
US8942967B2 (en) Method for real-time reservoir model updating from dynamic data while keeping the coherence thereof with static observations
US11434759B2 (en) Optimization of discrete fracture network (DFN) using streamlines and machine learning
Price et al. Dynamic calibration of the Shaikan Jurassic full-field fractured reservoir model through single-well DST and multi-well interference discrete fracture network simulation
Boing et al. Impact assessment and input parameters selection for stratigraphic forward modelling (SFM)
WO2020047451A1 (en) Digitial multi-phase flow analysis system for assisting enhanced oil recovery
Tømmerås et al. Prewell and postwell predictions of oil and gas columns using an iterative Monte Carlo technique with three-dimensional petroleum systems modeling
US20230385476A1 (en) Automated live properties component update in reservoir simulation model
Jo et al. Sensitivity analysis of geological rule-based subsurface model parameters on fluid flow
Cunha Integrating static and dynamic data for oil and gas reservoir modelling
Baxter et al. Exploring conditioned simulations of discrete fracture networks in support of hydraulic acceptance of deposition holes
Disiyona Uncertainty Analysis Workflow to Estimate Oil and Gas Reserves as A Guideline for Field

Legal Events

Date Code Title Description
AS Assignment

Owner name: IFP ENERGIES NOUVELLES, FRANCE

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:PREUX, CHRISTOPHE;LE RAVALEC, MICKAELE;REEL/FRAME:029576/0913

Effective date: 20121210

STCF Information on status: patent grant

Free format text: PATENTED CASE

FEPP Fee payment procedure

Free format text: MAINTENANCE FEE REMINDER MAILED (ORIGINAL EVENT CODE: REM.); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY

LAPS Lapse for failure to pay maintenance fees

Free format text: PATENT EXPIRED FOR FAILURE TO PAY MAINTENANCE FEES (ORIGINAL EVENT CODE: EXP.); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY

STCH Information on status: patent discontinuation

Free format text: PATENT EXPIRED DUE TO NONPAYMENT OF MAINTENANCE FEES UNDER 37 CFR 1.362

FP Lapsed due to failure to pay maintenance fee

Effective date: 20191117