US20130043318A1 - Controllers for heat supply units - Google Patents

Controllers for heat supply units Download PDF

Info

Publication number
US20130043318A1
US20130043318A1 US13/580,575 US201113580575A US2013043318A1 US 20130043318 A1 US20130043318 A1 US 20130043318A1 US 201113580575 A US201113580575 A US 201113580575A US 2013043318 A1 US2013043318 A1 US 2013043318A1
Authority
US
United States
Prior art keywords
heat supply
period
time
supply unit
turned
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US13/580,575
Inventor
Patrick Joseph Broderick
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Contec Heat Controls Ltd
Original Assignee
Contec Heat Controls Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Contec Heat Controls Ltd filed Critical Contec Heat Controls Ltd
Priority claimed from PCT/GB2011/000251 external-priority patent/WO2011104505A2/en
Assigned to CONTEC HEAT CONTROLS LTD. reassignment CONTEC HEAT CONTROLS LTD. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: BRODERICK, PATRICK JOSEPH
Publication of US20130043318A1 publication Critical patent/US20130043318A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D19/00Details
    • F24D19/10Arrangement or mounting of control or safety devices
    • F24D19/1006Arrangement or mounting of control or safety devices for water heating systems
    • F24D19/1009Arrangement or mounting of control or safety devices for water heating systems for central heating

Definitions

  • the present invention relates to controllers for heat supply units (e.g. gas or oil-fired boilers) that form part of a heating system.
  • heat supply units e.g. gas or oil-fired boilers
  • the present invention provides a controller for a heat supply unit (e.g. a boiler) for supplying heat to a heating system, the controller including a control circuit that is adapted to provide a sequence of control signals to periodically turn the heat supply unit ON and OFF during successive operational periods of the controller, each operational period being started by an activation signal provided to the controller from an external device and being ended by a deactivation signal provided to the controller from an external device, wherein at least one period of time for which the heat supply unit is turned ON is longer than at least one other period of time for which the heat supply unit is turned ON during a particular operational period.
  • a control circuit that is adapted to provide a sequence of control signals to periodically turn the heat supply unit ON and OFF during successive operational periods of the controller, each operational period being started by an activation signal provided to the controller from an external device and being ended by a deactivation signal provided to the controller from an external device, wherein at least one period of time for which the heat supply unit is turned ON is longer than at least one other period of time for which the
  • the controller may be connected to an existing central heating (or primary) controller or integrated with the main boiler controller, for example.
  • the control circuit implements a software control program that provides savings in fuel consumption and reduces CO 2 emissions.
  • Phase 1 is when the heat supply unit (e.g. boiler) runs ‘full bore’ to heat the water in the heating system to its desired (or ‘target’) temperature.
  • Phase 2 is after the target temperature of the water has been reached, but the heat supply unit remains activated until a desired (or ‘target’) building/room temperature is reached and the heat supply unit is deactivated by a thermostat.
  • Phase 3 is after the thermostat has been engaged and periodically activates and deactivates the heat supply unit to maintain the building/room at its target temperature.
  • the control program particularly saves fuel during phase 1 and phase 2 of the heating cycle.
  • the sequence of control signals will turn the heat supply unit ON for a longer period of time at the start of each operational period. After this initial longer period of time the heat supply unit may be turned ON for shorter periods of time or turned ON for one or more longer periods of time before being turned ON for shorter periods of time.
  • the controller receives activation signals and deactivation signals from external devices, optionally from the same external device.
  • An activation signal may be provided by a conventional timer to turn the heat supply unit ON at a particular time or by a thermostat to turn the heat supply unit ON when a measured temperature (e.g. a building/room temperature) falls below a setpoint temperature.
  • the deactivation signal may be provided by a conventional timer to turn the heat supply unit OFF at a particular time or by a thermostat to turn the heat supply unit OFF when a measured temperature rises above a setpoint temperature.
  • Activation and deactivation signals may also be provided in response to unscheduled heating demands made by the user. These activation and deactivation signals would typically be used to turn the heat supply unit ON and OFF but during these cycles the activation periods are interrupted by the controller of the present invention which provides its own sequence of control signals to control the ON/OFF operation of the heat supply unit.
  • Each successive operational period of the controller will be started by an activation signal and ended by a deactivation signal.
  • the heat supply unit is preferably controlled in the same way during each operational period.
  • different control programs e.g. timings
  • different operational periods can be applied during different operational periods.
  • the heat supply unit is preferably turned ON for an initial period of time. This raises the temperature of the water in the heating system—and hence raises the temperature of the parts of the heating system that are used to actually provide space heating (e.g. radiators)—to a desired (or ‘target’) temperature.
  • the control circuit will periodically turn the heat supply unit OFF and ON until the end of the particular operational period. In other words, during each operational period there will normally be periods of time when the heat supply unit will not be supplying heat to the heating system even though heat is being demanded by the external device(s).
  • the periods of time during which the heat supply unit is turned OFF by the control circuit are not long enough for the temperature of the radiators to reduce significantly and the heating system will continue to provide space heating even when the heat supply unit is not supplying heat.
  • a small fall in the radiator temperature e.g. one or two ° C.
  • the timings are typically pre-programmed to achieve the target temperature of the heating system (i.e. the controller is temperature dependent) even though the heat supply unit is turned ON and OFF in response to control signals that are based entirely on an internal timer and are derived independently of temperature. Periodically turning the heat supply unit OFF and ON during each operational period results in energy savings without compromising heat output.
  • the heat supply unit will be turned ON for an initial period of 15 minutes to raise the temperature of the heating system to its normal operating temperature.
  • the heat supply unit will then be turned OFF for 5 minutes, ON for 10 minutes, OFF for 5 minutes, ON for 10 minutes etc. until a deactivation signal is received and the particular operational period ends.
  • the heat supply unit will be turned ON for an initial period of 15 minutes to raise the temperature of the heating system to its normal operating temperature.
  • the heat supply unit will then be turned OFF for 5 minutes, ON for a further period of 15 minutes to further raise the temperature of the heating system, OFF for 5 minutes, ON for 10 minutes, OFF for 5minutes, ON for 10 minutes etc. until a deactivation signal is received and the particular operational period ends.
  • timings will normally be pre-programmed but in some circumstances a user may be able to select from different pre-programmed options.
  • the heat supply unit is turned ON to start and raise the heating system to the desired (or ‘target’) temperature to maintain user comfort.
  • the present invention further provides a method of controlling a heat supply unit for supplying heat to a heating system during successive operational periods of a controller, each operational period being started by an activation signal provided to the controller from an external device and being ended by a deactivation signal provided to the controller from an external device, the method comprising the steps of providing a sequence of control signals to periodically turn the heat supply unit ON and OFF, wherein at least one period of time for which the heat supply unit is turned ON is longer than at least one other period of time for which the heat supply unit is turned ON during a particular operational period.
  • the present invention further provides a time-based controller that optimises the extraction of latent heat from a heating system, after a heat supply unit is turned OFF, whilst keeping the temperature of the heating system to within about 10% of a target temperature.
  • FIG. 1 is a schematic drawing showing a heating system incorporating an electronic controller according to the present invention
  • FIG. 2A shows a first example of a control program for controlling the operation of the heating system
  • FIG. 2B shows a second example of a control program for controlling the operation of the heating system.
  • a domestic heating system includes a gas boiler 2 that supplies hot water to radiators (not shown).
  • An electronic controller 4 includes a control circuit that provides ON and OFF signals to the boiler controller 6 that is integrated with the boiler 2 and controls the direct operation of the gas burners etc.
  • the electronic controller is shown as a separate or stand-alone component, in practice it can be physically integrated with the boiler controller 6 .
  • the electronic controller 4 sends an ON signal the boiler controller 6 turns to boiler ON so that it starts supplying hot water to the radiators (not shown) for space heating and when the electronic controller sends an OFF signal the boiler controller turns the boiler OFF.
  • the electronic controller 4 receives activation (ACT) signals and deactivation (DEACT) signals from one or more external devices.
  • FIG. 1 shows two typical external devices, namely a timer 8 which provides activation and deactivation signals at certain user-defined times of the day and a thermostat 10 which provides activation and deactivation signals depending on whether a measured temperature is above or below user-defined setpoint temperatures. Other external devices can be used.
  • each operational period of the electronic controller 4 is started by an activation (ACT) signal and ended by a deactivation (DEACT) signal.
  • the activation and deactivation signals can be provided by any of the external devices.
  • Each operational period essentially represents a period of time (T op ) when space heating is demanded.
  • T op a period of time
  • the electronic controller 4 operates a pre-programmed control program which sends a sequence of ON and OFF signals to the boiler controller 6 so that the boiler 2 is turned ON and OFF.
  • the electronic controller 4 is optionally provided with several pre-programmed control programs which can be selected by a user.
  • the electronic controller 4 receives an activation (ACT) signal from an external device the electronic controller sends an ON signal to the boiler controller 6 so that the boiler 2 is turned ON and starts to provide hot water to the radiators (not shown) for space heating.
  • the boiler 2 is turned ON for an initial period of time (T i ) and is then subsequently periodically turned OFF and ON by the boiler controller 6 under the control of the electronic controller 4 as shown in FIG. 2 .
  • the initial period of time (T i ) is longer than the other periods of time (T on ) when the boiler 2 is turned ON so that the radiators (not shown) are raised to the desired (or ‘target’) temperature to maintain user comfort at the start of each operational period.
  • the boiler 2 continues to be periodically turned OFF and ON by the boiler controller 6 under the control of the electronic controller 4 until the electronic controller receives a deactivation (DEACT) signal from an external device.
  • DEACT deactivation
  • the first activation (ACT) signal is received from the timer 8 at a start time (e.g. 7.00 am).
  • the first operational period will continue until the first deactivation (DEACT) signal is received from the thermostat 10 when a measured temperature rises above a setpoint temperature.
  • the second operational period will start when the second activation (ACT) signal is received from the thermostat 10 when a measured temperature falls below a setpoint temperature and continues until the second deactivation (DEACT) signal is received from the thermostat when a measured temperature rises above a setpoint temperature.
  • the third operational period will start when the third activation (ACT) signal is received from the thermostat 10 when a measured temperature falls below a setpoint temperature and continues until the third deactivation (DEACT) signal is received from the timer 8 at an end time (e.g. 9.30 am).
  • the control program timings for each operational period are the same:

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Steam Or Hot-Water Central Heating Systems (AREA)

Abstract

The present invention relates to an electronic controller for a boiler. The controller includes a control circuit that is adapted to provide a sequence of control signals to periodically turn the boiler ON and OFF during successive operational periods of the controller. Each operational period is started by an activation signal provided to the controller form an external device (e.g. a timer or thermostat and is ended by deactivation signal. At least one period of time for which the boiler is turned ON is longer than at least one other period of time for which the boiler is turned ON during a particular operational period.

Description

    TECHNICAL FIELD
  • The present invention relates to controllers for heat supply units (e.g. gas or oil-fired boilers) that form part of a heating system.
  • SUMMARY OF THE INVENTION
  • The present invention provides a controller for a heat supply unit (e.g. a boiler) for supplying heat to a heating system, the controller including a control circuit that is adapted to provide a sequence of control signals to periodically turn the heat supply unit ON and OFF during successive operational periods of the controller, each operational period being started by an activation signal provided to the controller from an external device and being ended by a deactivation signal provided to the controller from an external device, wherein at least one period of time for which the heat supply unit is turned ON is longer than at least one other period of time for which the heat supply unit is turned ON during a particular operational period.
  • The controller may be connected to an existing central heating (or primary) controller or integrated with the main boiler controller, for example. The control circuit implements a software control program that provides savings in fuel consumption and reduces CO2 emissions. There are three heating phases in a typical heating cycle. Phase 1 is when the heat supply unit (e.g. boiler) runs ‘full bore’ to heat the water in the heating system to its desired (or ‘target’) temperature. Phase 2 is after the target temperature of the water has been reached, but the heat supply unit remains activated until a desired (or ‘target’) building/room temperature is reached and the heat supply unit is deactivated by a thermostat. Phase 3 is after the thermostat has been engaged and periodically activates and deactivates the heat supply unit to maintain the building/room at its target temperature. The control program particularly saves fuel during phase 1 and phase 2 of the heating cycle.
  • In a typical arrangement the sequence of control signals will turn the heat supply unit ON for a longer period of time at the start of each operational period. After this initial longer period of time the heat supply unit may be turned ON for shorter periods of time or turned ON for one or more longer periods of time before being turned ON for shorter periods of time.
  • The controller receives activation signals and deactivation signals from external devices, optionally from the same external device. An activation signal may be provided by a conventional timer to turn the heat supply unit ON at a particular time or by a thermostat to turn the heat supply unit ON when a measured temperature (e.g. a building/room temperature) falls below a setpoint temperature. Similarly, the deactivation signal may be provided by a conventional timer to turn the heat supply unit OFF at a particular time or by a thermostat to turn the heat supply unit OFF when a measured temperature rises above a setpoint temperature. Activation and deactivation signals may also be provided in response to unscheduled heating demands made by the user. These activation and deactivation signals would typically be used to turn the heat supply unit ON and OFF but during these cycles the activation periods are interrupted by the controller of the present invention which provides its own sequence of control signals to control the ON/OFF operation of the heat supply unit.
  • Each successive operational period of the controller will be started by an activation signal and ended by a deactivation signal.
  • The heat supply unit is preferably controlled in the same way during each operational period. However, different control programs (e.g. timings) can be applied during different operational periods.
  • At the start of each operational period the heat supply unit is preferably turned ON for an initial period of time. This raises the temperature of the water in the heating system—and hence raises the temperature of the parts of the heating system that are used to actually provide space heating (e.g. radiators)—to a desired (or ‘target’) temperature. Once the initial period of time has elapsed, the control circuit will periodically turn the heat supply unit OFF and ON until the end of the particular operational period. In other words, during each operational period there will normally be periods of time when the heat supply unit will not be supplying heat to the heating system even though heat is being demanded by the external device(s).
  • The periods of time during which the heat supply unit is turned OFF by the control circuit are not long enough for the temperature of the radiators to reduce significantly and the heating system will continue to provide space heating even when the heat supply unit is not supplying heat. A small fall in the radiator temperature (e.g. one or two ° C.) is expected when the heating supply unit is turned OFF but this does not have a significant affect on the space heating. This means that the timings are typically pre-programmed to achieve the target temperature of the heating system (i.e. the controller is temperature dependent) even though the heat supply unit is turned ON and OFF in response to control signals that are based entirely on an internal timer and are derived independently of temperature. Periodically turning the heat supply unit OFF and ON during each operational period results in energy savings without compromising heat output.
  • In a typical control program, at the start of each operational period the heat supply unit will be turned ON for an initial period of 15 minutes to raise the temperature of the heating system to its normal operating temperature. The heat supply unit will then be turned OFF for 5 minutes, ON for 10 minutes, OFF for 5 minutes, ON for 10 minutes etc. until a deactivation signal is received and the particular operational period ends.
  • In another control program, at the start of each operational period the heat supply unit will be turned ON for an initial period of 15 minutes to raise the temperature of the heating system to its normal operating temperature. The heat supply unit will then be turned OFF for 5 minutes, ON for a further period of 15 minutes to further raise the temperature of the heating system, OFF for 5 minutes, ON for 10 minutes, OFF for 5minutes, ON for 10 minutes etc. until a deactivation signal is received and the particular operational period ends.
  • The various timings will normally be pre-programmed but in some circumstances a user may be able to select from different pre-programmed options.
  • As soon as a demand for heat is received by the controller (i.e. an activation signal is received) then the heat supply unit is turned ON to start and raise the heating system to the desired (or ‘target’) temperature to maintain user comfort.
  • The present invention further provides a method of controlling a heat supply unit for supplying heat to a heating system during successive operational periods of a controller, each operational period being started by an activation signal provided to the controller from an external device and being ended by a deactivation signal provided to the controller from an external device, the method comprising the steps of providing a sequence of control signals to periodically turn the heat supply unit ON and OFF, wherein at least one period of time for which the heat supply unit is turned ON is longer than at least one other period of time for which the heat supply unit is turned ON during a particular operational period.
  • The present invention further provides a time-based controller that optimises the extraction of latent heat from a heating system, after a heat supply unit is turned OFF, whilst keeping the temperature of the heating system to within about 10% of a target temperature.
  • DRAWINGS
  • FIG. 1 is a schematic drawing showing a heating system incorporating an electronic controller according to the present invention;
  • FIG. 2A shows a first example of a control program for controlling the operation of the heating system; and
  • FIG. 2B shows a second example of a control program for controlling the operation of the heating system.
  • With reference to FIG. 1, a domestic heating system includes a gas boiler 2 that supplies hot water to radiators (not shown). An electronic controller 4 includes a control circuit that provides ON and OFF signals to the boiler controller 6 that is integrated with the boiler 2 and controls the direct operation of the gas burners etc. Although in FIG. 1 the electronic controller is shown as a separate or stand-alone component, in practice it can be physically integrated with the boiler controller 6. When the electronic controller 4 sends an ON signal the boiler controller 6 turns to boiler ON so that it starts supplying hot water to the radiators (not shown) for space heating and when the electronic controller sends an OFF signal the boiler controller turns the boiler OFF.
  • The electronic controller 4 receives activation (ACT) signals and deactivation (DEACT) signals from one or more external devices. FIG. 1 shows two typical external devices, namely a timer 8 which provides activation and deactivation signals at certain user-defined times of the day and a thermostat 10 which provides activation and deactivation signals depending on whether a measured temperature is above or below user-defined setpoint temperatures. Other external devices can be used.
  • As shown in FIGS. 2A and 2B, each operational period of the electronic controller 4 is started by an activation (ACT) signal and ended by a deactivation (DEACT) signal. The activation and deactivation signals can be provided by any of the external devices. Each operational period essentially represents a period of time (Top) when space heating is demanded. Within each operational period the electronic controller 4 operates a pre-programmed control program which sends a sequence of ON and OFF signals to the boiler controller 6 so that the boiler 2 is turned ON and OFF.
  • The electronic controller 4 is optionally provided with several pre-programmed control programs which can be selected by a user.
  • As soon as the electronic controller 4 receives an activation (ACT) signal from an external device the electronic controller sends an ON signal to the boiler controller 6 so that the boiler 2 is turned ON and starts to provide hot water to the radiators (not shown) for space heating. The boiler 2 is turned ON for an initial period of time (Ti) and is then subsequently periodically turned OFF and ON by the boiler controller 6 under the control of the electronic controller 4 as shown in FIG. 2. The initial period of time (Ti) is longer than the other periods of time (Ton) when the boiler 2 is turned ON so that the radiators (not shown) are raised to the desired (or ‘target’) temperature to maintain user comfort at the start of each operational period.
  • The boiler 2 continues to be periodically turned OFF and ON by the boiler controller 6 under the control of the electronic controller 4 until the electronic controller receives a deactivation (DEACT) signal from an external device.
  • In the typical example shown in FIG. 2A the first activation (ACT) signal is received from the timer 8 at a start time (e.g. 7.00 am). The first operational period will continue until the first deactivation (DEACT) signal is received from the thermostat 10 when a measured temperature rises above a setpoint temperature. The second operational period will start when the second activation (ACT) signal is received from the thermostat 10 when a measured temperature falls below a setpoint temperature and continues until the second deactivation (DEACT) signal is received from the thermostat when a measured temperature rises above a setpoint temperature. The third operational period will start when the third activation (ACT) signal is received from the thermostat 10 when a measured temperature falls below a setpoint temperature and continues until the third deactivation (DEACT) signal is received from the timer 8 at an end time (e.g. 9.30 am). The control program timings for each operational period are the same:
      • Ti=15 minutes
      • Toff=5 minutes
      • Ton=10 minutes
  • But it will be readily appreciated that other timings may be used depending on the heating system and its operational requirements. For example, the first time the boiler 2 is turned ON again after the initial period then it may be turned on for a longer period of time (Ti) and then each subsequent time the boiler is turned ON it may be turned on for a shorter period of time (Ton). Such an alternative control program shown in FIG. 2B would provide two longer periods of time at the start of each operational period to help raise the temperature of the heating system to its target temperature.

Claims (5)

1. A time-based controller specifically adapted for a heat supply unit for supplying heat to a heating system, the heating system including a part that provides space heating, the controller including a control circuit that is adapted to provide a sequence of control signals to periodically turn the heat supply ON and OFF during successive operational periods of the controller, each successive operational period being started by an activation signal provided to the controller from any of one or more external devices and being ended by a deactivation signal provided to the controller from any of the one or more external devices, wherein during a particular one of the successive operational periods the control circuit is adapted to provide at least one period of time for which the heat supply unit is turned ON that is longer than at least one other period of time for which the heat supply unit is turned ON, and wherein the periods of time during which the heat supply unit is turned ON and OFF by the control circuit during each successive operational period are pre-programmed.
2. The time-based controller of claim 1, wherein the control circuit is adapted to provide a control signal to turn the heat supply unit ON for an initial period of time at the start of each successive operational period, the initial period of time for which the heat supply unit is turned ON being longer than at least one other period of time for which the heat supply unit is turned ON during a-the particular one of the successive operational periods.
3. (canceled)
4. (canceled)
5. The time-based controller of claim 1, wherein during each successive operational period, the control circuit is adapted to provide at least one period of time for which the heat supply unit is turned ON that is longer than at least one other period of time for which the heat supply unit is turned ON.
US13/580,575 2010-02-05 2011-02-24 Controllers for heat supply units Abandoned US20130043318A1 (en)

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
GBGB1001889.3A GB201001889D0 (en) 2010-02-05 2010-02-05 Eco system boiler controls
GB1003158.1 2010-02-25
GBGB1003158.1A GB201003158D0 (en) 2010-02-05 2010-02-25 Eco tech boiler controls
PCT/GB2011/000251 WO2011104505A2 (en) 2010-02-25 2011-02-24 Controllers for heat supply units

Publications (1)

Publication Number Publication Date
US20130043318A1 true US20130043318A1 (en) 2013-02-21

Family

ID=42082524

Family Applications (1)

Application Number Title Priority Date Filing Date
US13/580,575 Abandoned US20130043318A1 (en) 2010-02-05 2011-02-24 Controllers for heat supply units

Country Status (2)

Country Link
US (1) US20130043318A1 (en)
GB (7) GB201001889D0 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9234664B1 (en) * 2015-03-28 2016-01-12 Robert Edward Hayner Backward-compatible, programmable, and on-demand water heater and recirculation pump control unit and method of using

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4240579A (en) * 1978-10-20 1980-12-23 Post Arnold R Thermostatically controlled heating system
US4696427A (en) * 1985-03-28 1987-09-29 Electricite De France Method of transforming a pre-existing heat installation, and control device for implementing the method
US4702413A (en) * 1987-05-07 1987-10-27 Honeywell Inc. Temperature control system using a single ramp rate curve for control of a multiplant environmental unit
US5775582A (en) * 1996-09-26 1998-07-07 Hammer; Jack Method and apparatus for regulating heater cycles to improve fuel efficiency
GB2384552A (en) * 2002-01-24 2003-07-30 Roy Goodwill A hot water boiler which prevents excess heat build-up
US7240851B2 (en) * 2003-12-09 2007-07-10 Walsh Jr John Maurice Thermostat fan and boiler timer
US20090001186A1 (en) * 2007-06-28 2009-01-01 Westcast, Inc. Modulating Boiler System

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4240579A (en) * 1978-10-20 1980-12-23 Post Arnold R Thermostatically controlled heating system
US4696427A (en) * 1985-03-28 1987-09-29 Electricite De France Method of transforming a pre-existing heat installation, and control device for implementing the method
US4702413A (en) * 1987-05-07 1987-10-27 Honeywell Inc. Temperature control system using a single ramp rate curve for control of a multiplant environmental unit
US5775582A (en) * 1996-09-26 1998-07-07 Hammer; Jack Method and apparatus for regulating heater cycles to improve fuel efficiency
GB2384552A (en) * 2002-01-24 2003-07-30 Roy Goodwill A hot water boiler which prevents excess heat build-up
US7240851B2 (en) * 2003-12-09 2007-07-10 Walsh Jr John Maurice Thermostat fan and boiler timer
US20090001186A1 (en) * 2007-06-28 2009-01-01 Westcast, Inc. Modulating Boiler System

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9234664B1 (en) * 2015-03-28 2016-01-12 Robert Edward Hayner Backward-compatible, programmable, and on-demand water heater and recirculation pump control unit and method of using

Also Published As

Publication number Publication date
GB201010275D0 (en) 2010-08-04
GB201003158D0 (en) 2010-04-14
GB201003103D0 (en) 2010-04-14
GB201001989D0 (en) 2010-03-24
GB201001889D0 (en) 2010-03-24
GB201002939D0 (en) 2010-04-07
GB201002580D0 (en) 2010-03-31

Similar Documents

Publication Publication Date Title
US8204628B2 (en) Setpoint recovery with utility time of day pricing
US7500453B2 (en) Boiler control unit
WO2009072744A3 (en) Device for control room temperature of each room adapted to heating environment and its method
WO2011104505A2 (en) Controllers for heat supply units
US20130334330A1 (en) Method of controlling boiler
JP2009150609A (en) Heat pump type water heater
KR101827270B1 (en) Heating temperature control method according to the boiler room heating supply temperature control settings
GB2462183B (en) Fuel economiser
US20130043318A1 (en) Controllers for heat supply units
JP5349235B2 (en) Multi-can boiler
GB2514554A (en) Boiler control system and method
WO2008099259A3 (en) Boiler for a heating system, in particular for domestic use
JP6193740B2 (en) Hot water storage water heater
JP6513551B2 (en) Heating system
GB2520064A (en) Heating control systems
JP2007178105A (en) Water heater and its operation method
JP5151512B2 (en) Heating system
WO2016005745A1 (en) Central-heating system
JP2013155916A (en) Hot water type floor heating device
GB2534339A (en) Pre Thermostat Control
KR101469045B1 (en) A method for controlling heating by interior
RU2724474C2 (en) Improved combined boiler and associated device for increasing combined boiler efficiency
JP6375792B2 (en) Heat pump water heater
JP5272675B2 (en) Hot water storage water heater
JP2008275255A (en) Heating system and heating heat source machine

Legal Events

Date Code Title Description
AS Assignment

Owner name: CONTEC HEAT CONTROLS LTD., UNITED KINGDOM

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:BRODERICK, PATRICK JOSEPH;REEL/FRAME:029212/0473

Effective date: 20110311

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION