US20100230104A1 - Method for completing a borehole - Google Patents

Method for completing a borehole Download PDF

Info

Publication number
US20100230104A1
US20100230104A1 US12/602,173 US60217308A US2010230104A1 US 20100230104 A1 US20100230104 A1 US 20100230104A1 US 60217308 A US60217308 A US 60217308A US 2010230104 A1 US2010230104 A1 US 2010230104A1
Authority
US
United States
Prior art keywords
tube
module
borehole
terminals
conveying tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US12/602,173
Inventor
Rolf-Dieter Nölke
Roland Peeters
Liam Mcnelis
Malte Veehmayer
Frank Preiss
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
DynaEnergetics GmbH and Co KG
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Publication of US20100230104A1 publication Critical patent/US20100230104A1/en
Assigned to DYNAENERGETICS GMBH & CO. KG reassignment DYNAENERGETICS GMBH & CO. KG ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: NOLKE, ROLF-DIETER, PEETERS, ROLAND, MCNELIS, LIAM, VEEHMAYER, MALTE, PREISS, FRANK
Abandoned legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/02Subsoil filtering
    • E21B43/10Setting of casings, screens, liners or the like in wells
    • E21B43/103Setting of casings, screens, liners or the like in wells of expandable casings, screens, liners, or the like
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/13Methods or devices for cementing, for plugging holes, crevices or the like
    • E21B33/14Methods or devices for cementing, for plugging holes, crevices or the like for cementing casings into boreholes
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/11Perforators; Permeators
    • E21B43/116Gun or shaped-charge perforators

Definitions

  • the invention relates to a method for completing a borehole before the start of production, wherein after the introduction of the borehole the borehole wall is anchored sealingly by means of a conveying tube and/or casing tube, and the borehole wall is perforated at desired locations by means of perforation units.
  • the object on which the invention is based is to provide a method for completing a borehole prior to the start of production (through tubing rotary drill bores), without the use of cemented conveying tubes and/or casing tubes.
  • the method should fulfill the following conditions:
  • the aim is to have a simultaneous installation of the conveying tube and/or casing tube and of the perforation unit.
  • the system or method must allow the sealing off of various zones and the selective activation of each zone at any desired position and at any desired time point.
  • conveying tube and/or casing tube are/is provided on their/its outer face with a swellable sealing jacket, the sealing jacket after activation swelling and anchoring the annular gap sealingly between the conveying tube and/or casing tube and the borehole wall and at the same time centering the conveying tube and/or casing tube in the borehole.
  • the activation and swelling of the sealing jacket are carried out after perforation.
  • the conveying tube and/or the casing tube are/is anchored sealingly and at the same time centered in the borehole.
  • the perforation pressure and/or the borehole temperature and/or the liquid which is generated in the production zone are/is used for activating the sealing jacket for swelling purposes. These are characteristic variables which change during and/or after perforation.
  • the material used for the sealing jacket is a viscous material and/or a rubber or thermoplastic.
  • the sealing jacket is designed to be deactivatable and, after deactivation, is permeable to liquids or gases. As a result of deactivation, previously sealed-off regions can be opened again.
  • chemical and/or thermal activation stimulators are used for deactivation.
  • the chemical activation stimulators used are aggressive media, for example acids, which dissolve the sealing jacket or parts of the sealing jacket.
  • the activation stimulator used is a heating module which, for activation, is brought to the desired location in the conveying tube and/or casing tube.
  • different sealing jackets are used for different horizons, so that, if different activation stimulators are used, a selective opening of the sealing jackets is achieved, and these orifices can be connected to the conveying tube for production.
  • At least one perforation unit is inserted inside the conveying tube and/or casing tube.
  • the conveying tube and/or casing tube are/is designed in a module-like manner together with the perforation unit, each module consisting of a section of the conveying tube and/or casing tube and of a perforation unit.
  • These modules can be connected to one another, for example via a screw connection, outside the borehole.
  • all the necessary components such as charges, ignition cable sections and wire pieces, are preinstalled in the module, the terminals for electrical and ballistic contact being installed fixedly at one end of each module, and, at the other end, the terminals being prestressed by means of a spring, so that, after the connection of two modules, reliable electrical and ballistic contact between the individual modules is ensured.
  • the terminals of the first module which are to be coupled are coupled to the terminals of the contiguous second module so that the terminals lie opposite one another in their axial direction and thus, during use, transfer electrical and ballistic contact, the terminals of at least one module being acted upon with force in the direction of the terminals of the contiguous other module, so that the end faces of the adjacent terminals always touch one another during use.
  • a gas-pressure-activated ignition mechanism is used, which is installed at the lower end of the perforation system.
  • the gas-pressure-activated ignition mechanism activates an impact fuse.
  • a separate electrical detonator is used for each perforation zone.
  • the detonators are connected via wires, the ignition mechanism containing an induction appliance, which is operated by the gas pressure, and the induced current then igniting the detonators.
  • the ignition mechanism used is a wire-operated firing head (wireline firing head) which is installed on the top side of the conveying tubing before installation takes place in the lower region of the borehole.
  • wire-operated firing head wireline firing head
  • a module on the cable is moved into the borehole, latches on the ignition mechanism on top and, by the electrical connection of the borehole head to the perforation unit, locks on the electrical signals which are required for igniting the detonators.
  • the ignition mechanism is separated from the conveying tubing and is moved out of the borehole with the aid of the cable.
  • the elements of the perforation unit dissolve automatically after detonation. As a result, production is not impeded by residues of the perforation unit.
  • reactive materials such as zinc, aluminum or magnesium, are used for the charge housings of the hollow charges.
  • Non-reactive sleeve materials of the charges which generate a fine sand-like dust, such as glass or porcelain, may also be used for the charge housings.
  • a conveying tube and/or casing tube according to the invention for carrying out the method is characterized in that the conveying tube and/or casing tube has on its outer face a swellable sealing jacket.
  • the material of the sealing jacket is a viscous material and/or a rubber or thermoplastic.
  • the sealing jacket is deactivatable and, after deactivation, is permeable to liquids.
  • the conveying tube and/or casing tube is designed in a module-like manner, and at least one perforation unit is inserted in each module.
  • the terminals for electrical and ballistic contact are installed fixedly at one end of each module and, at the other end, the contacts are prestressed by means of a spring, so that, after the connection of two modules, reliable electric and ballistic contact between the individual modules is ensured.
  • the terminals of the first module which are to be coupled are coupled to the terminals of the contiguous second module so that the terminals lie opposite one another in their axial direction and thus, during use, transfer electrical and ballistic contact, the terminals of at least one module being acted upon with force in the direction of the terminals of the contiguous other module, so that the end faces of the adjacent terminals always touch one another during use.
  • the perforation units contain charge housings of the hollow charges which dissolve automatically after detonation.
  • the charge housings of the hollow charges consist of reactive materials, such as zinc, aluminum or magnesium, or consist of non-reactive materials which, after the detonation of the hollow charges, generate a fine sand-like dust, such as glass or porcelain.
  • a simultaneous perforation of all the production horizons can easily be achieved if conventional perforation systems are used together with the conveying tube technique.
  • a sealing-off device on the outside of the conveying tube is proposed.
  • the sealing-off device used may be a slide.
  • a sealing jacket is employed which is installed on the conductor tube on the outside and which is activated under specific conditions.
  • the sealing material of the sealing jacket preferably extends over the entire length of the sidetrack completion, that is to say of a side train. It is possible that the perforation horizons which are intended for immediate production are not equipped with the sealing material, if this is required by the geology or production conditions.
  • the perforation pressure, the borehole temperature or the liquid which is generated by the conveying zone may be used for activating the sealing jacket, with the result that the material of the sealing jacket swells and closes the annular gap between the conductor tube and the open hole.
  • the sealing jacket may be manufactured from a viscous material, for example from a type of rubber or thermoplastic, which is exposed immediately after perforation. The activation and swelling of the sealing jacket must take place after perforation.
  • the various zones are isolated, and all the desired perforation ducts in the reservoir are closed and therefore separated from the conveying tube.
  • the ducts are tied up directly to the conveying tube at the location where no sealing jacket has been applied and are therefore ready for production. As soon as the sealing material of the sealing jacket has been swollen, it not only closes the annular gap, but also centers the conveying tube in the open borehole.
  • various types of deactivation of the sealing material may be employed.
  • chemical and thermal activation stimulators may be used.
  • aggressive media for example acids
  • part of the sealing material can be dissolved.
  • different sealing materials must be employed, that is to say, if different acids are used, a selective opening of the perforation ducts can be achieved.
  • a heating module may be employed which, using a wireline tractor, is brought to the corresponding location. Depending on the position of the heating module, horizons can be selectively opened and connected to the conveying tube for production.
  • the conveying tube also functions as a transport mechanism for the perforation system.
  • a conveying tube made from steel with a sealing jacket made from sealing material transports the perforation unit downward in the borehole and serves for completing the side track, that is to say the side train.
  • a self-dissolving perforation unit is employed inside the conveying tube.
  • One possibility for achieving this aim is to use reactive materials for the charge housings for the purpose of generating a self-destructing charge (for example zinc or magnesium).
  • the charges are attached to locations which are provided for production in the conveying tube. In each individual horizon, the charges are connected via detonating cords.
  • a booster-booster ballistic transfer is used for ballistic and electrical connection between various sections of the conveying tube.
  • Various perforation zones are connected via wires. Each perforation zone has its own detonator for igniting the detonation.
  • the conveying tube has flat threaded connections (for example, extreme line joints) at the ends.
  • the wire and booster connectors are fastened centrally inside the conveying tube.
  • One side of the terminal is always fixedly installed, while the other side is prestressed by means of a spring. Reliable electrical and ballistic contact between the individual tube pieces is thereby ensured.
  • a gas-pressure-activated ignition mechanism is proposed which can be installed at the lower end of the perforation unit. This ignition mechanism may activate an impact fuse for single-horizon completions or for several horizons in which the individual perforation regions are connected via a detonating cord. In this application, only a single detonator is employed.
  • a gas-initiated inductive-electrical ignition mechanism may be used.
  • Such an appliance would, as a result of the movement of a piston, induce in a coil an electrical current which is used in order to initiate the various electrical detonators inside the conveying tube.
  • a further possibility for ignition would be to use a wireline firing head at the upper end of the installation, this wireline firing head being connected to all the detonators.
  • a cable has to be laid downwardly in the borehole and connected to the ignition mechanism. The explosive impulse is then sent downward in the borehole via the cable.
  • Such an ignition device would make it possible to use electrical and electronic detonators or EFI/EBW which have the additional advantage that they are HF-safe. As a result, a reliable operation of the system can be achieved. Even radio traffic does not have to be interrupted during use. The latched cable is used in order to move out the explosive head after the explosion. As a result, as already mentioned, a free flow path and direct access for later maintenance work are made possible.
  • a standard hollow charge has to be modified so that it self-destructs. It is proposed to use reactive materials for the charge housings.
  • the reactive materials used could be, on the one hand, metals, such as zinc, aluminum or magnesium.
  • problems with specific borehole scavengings may arise. An exact analysis of the borehole conditions is therefore necessary before this material can be employed.
  • the advantage of zinc is its easy solubility in acid, with the result that the residues of the charges can easily be dissolved.
  • the residues of the zinc charges normally take the form of fine dust which has a very large surface, thus further promoting a dissolution of the residues.
  • Aluminum and magnesium are highly reactive materials which react even during the operation of detonating the hollow charges. Moreover, magnesium reacts with water, this, in turn, having an effect conducive to the dissolution of the residues.
  • An alternative to solving the problem of a self-destructing hollow charge would be to use reactive materials, such as propellants or explosives, in combination with reactive binders, in order to produce the housing of the hollow charge.
  • reactive materials such as propellants or explosives
  • reactive binders reactive binders
  • a further solution would be to use non-reactive sleeve materials which generate a fine sand-like dust.
  • Glass or porcelain are materials which may be used for hollow charge housings and which leave behind only fine particles. These could then be washed out of the borehole together with the first quantities produced and be separated from the hydrocarbons in a sand separator. As a result, as already mentioned, a free flow path and direct access for subsequent maintenance are made possible.
  • a standard conveying tube with flat threaded connections (for example, extreme line joints) at the ends is employed.
  • the conveying tubes can be screwed together without sockets, with the result that a flat surface is obtained after the tube is finished.
  • Standard materials and sizes of conveying tubes are employed.
  • the desired diameter range amounts to 27 ⁇ 8′′, 33 ⁇ 8′′, 4′′, 41 ⁇ 2′′, 5′′ with a standard length of 3-9 m. However, smaller and larger diameters may also be used (min. 1 9/16′′/max. 7′′).
  • a gas-activated ignition mechanism is employed which is installed at the end of the perforation system. Installation in one operation with remote-controlled ignition of the perforation units is thereby possible.
  • this gas-activated ignition mechanism activates an impact fuse (mechanical gas-activated ignition mechanism).
  • a separate electrical detonator is proposed for each perforation zone.
  • the detonators are connected via wires.
  • the ignition mechanism contains an induction appliance which is operated by the gas pressure. The induced current then ignites the electrical detonators (electrical inductive gas-activated ignition mechanism).
  • the third initiation possibility is to use a wireline firing head.
  • This firing head is installed on the top side of the conveying tubing before installation in the lower region of the borehole takes place.
  • a snap mechanism is located on the top side.
  • a module is moved into the borehole on the cable and latches on the ignition mechanism on top.
  • the borehole head being connected electrically to the perforation unit, the electrical signals required for igniting the detonators can be locked on.
  • the ignition mechanism is separated from the conveying tubing and moved out of the borehole with the aid of the cable.
  • Each conveying tube is equipped with the charges, the ignition cable, the detonators, wires and ballistic and electrical transfer devices before transport to the borehole location takes place.
  • a connector unit such as is described in EP 1 828 709 A1, is installed at the end of each conveying tube. One side is fastened and the other tensioned by a spring. This ensures a reliable transfer of the detonation and/or of the electrical signals between the various sections.
  • the threaded parts of the conveying tube sections are screwed together. In this case, there is no fear of any damage to the electrical and ballistic terminals. This method allows a simple, safe, reliable and rapid assembly of the conveying tube sections.
  • the sealing jacket is a central integral part of the system.
  • a material may be used which expands either in conjunction with specific liquids when the perforation pressure prevails or when there is the action of heat.
  • the sealing jacket is installed on the outside of the conveying tube made from steel. The application of the material to the outer face of the steel tube may take place by adhesive bonding, vulcanization, thermal shrinkage, extrusion or other robust fastening methods. The coefficient of expansion must be carefully selected as a function of the minimum and maximum diameter of the open hole.
  • the sealing material could be melted away by the action of heat.
  • a heating module may be employed which is moved into the borehole on a cable.
  • a borehole tractor for horizontal boreholes may be used. By means of this module, the required heat energy for dissolving the sealing jacket is generated.
  • Another possibility for the selective opening of the sealing jacket is to use aggressive chemicals, for example acids, which dissolve the sealing jacket.
  • aggressive chemicals for example acids
  • a heating module must be used so that it is possible to generate in the borehole sufficient heat with the aid of which the sealed-off ducts can be opened again.
  • This device is required only when a chemical method for opening the regions is not employed.
  • shut-off devices such as plugs or packers
  • shut-off devices may be installed on the surface during the installation of the conveying tube. In this type of use, it is necessary to ensure that the shut-off devices are capable of withstanding the detonation pressure arising during perforation. Furthermore, access to the lower-lying sections of the installation is restricted inside the conductor tube on account of shut-off devices.
  • the solution affords a reliable robust method for connecting the production horizons to the borehole, using standard perforation systems which are well known in the industry.
  • a gas-activated ignition mechanism functioning mechanically or inductive-electrically, remote activation of the perforation system is possible. Since the perforation system is installed inside the conductor tube and standard threads are used which are screwed together at the borehole location, without in this case the fear of damage to the electrical or ballistic contacts, the assembly time required can be minimized, and the borehole can be finished and put into operation in the shortest possible time.
  • the system can be installed in the borehole in one operation.
  • the perforation system is installed inside the conveying tubing with which the borehole is completed.
  • a self-destructing perforation system being used, a free flow path and easy access for the maintenance of the borehole are achieved.
  • the diameter of the system is designed so that the system can be introduced via a side aperture in the casing tube. In this case, the stipulated minimum dimensions for opening regions are adhered to.
  • an opening device By the use of an opening device, a selective opening of the perforation ducts in the case of multiple-horizon completions, with selective production in different horizons, is possible.
  • the corresponding intervals are limited only by the standard conveying tube technique.
  • the system may be used in oil and gas boreholes under wet or dry conditions.
  • the conductor tube is compatible with underground-installed safety valves [subsurface safety valves (SCSSV)] or with other sensitive borehole equipment located in the set-up.
  • SCSSV subsurface safety valves
  • FIG. 1 shows a borehole 1 as a main borehole and a branching-off secondary track as borehole 2 .
  • a completion of the borehole 2 prior to the start of production is described.
  • the borehole 2 is subdivided into various zones 13 a , 13 b , 13 c , and each zone requires a different completion or completion at a different time point.
  • FIG. 2 shows a finished completion for the zones 13 a and 13 b which consist of modules 11 a , 11 b and 11 c connected to one another.
  • Each of the said modules 11 a , 11 b and 11 c consists of a conveying tube 4 a , 4 b , 4 c which is provided on its outside in each case with a sealing jacket 6 .
  • the conveying tubes 4 a , 4 c with their sealing jackets 6 are perforated, so that production can take place via the perforation ducts 14 .
  • FIG. 3 shows a conveying tube 4 which is provided on its outer face with a sealing jacket 6 .
  • various methods may be adopted.
  • a heating module 7 may be employed which, using a well tractor with a wireline unit, is brought to the corresponding location. The heating module 7 heats the sealing jacket 6 at the desired locations, with the result that the material of the sealing jacket melts at these locations and thereby provides opening ducts. Perforation ducts 14 are thereby connected for production purposes.
  • FIG. 4 shows a conveying tube 4 which is provided on its outer face with a sealing jacket 6 .
  • chemical activation stimulators are employed here.
  • these are aggressive acids 17 which dissolve parts of the sealing jacket 6 .
  • FIG. 5 shows a module 11 a consisting inter alia of a conveying tube 4 with a sealing jacket 6 which is activated, that is to say closed, and acts as a seal.
  • the perforation ducts 14 are therefore partitioned off from production.
  • the hollow charges have dissolved after detonation, and no residues are present.
  • FIG. 6 shows two modules 11 a , 11 b connected to one another via a screw connection 18 and in each case having a perforation unit 5 .
  • Each perforation unit 5 consists of a tubular housing into which hollow charges 10 are inserted. These hollow charges 10 consist in each case of a charge housing 9 with an inserted charge.
  • each perforation unit 5 has an ignition cord for initiating the hollow charges 10 and an electrically conductive wire 19 . For coupling between these, these terminals 12 are connected to one another between the modules 11 a , 11 b.
  • Each module 11 a , 11 b contains all the necessary components, such as charges, ignition cable sections and wires 19 , which are preinstalled in the module 11 , the terminals 12 a for electric and ballistic contacts being installed fixedly at one end of each module 11 , and, at the other end, the terminals 12 b being prestressed by means of a spring 8 , so that, after the connection of two modules 11 , reliable electrical and ballistic contact between the individual modules 11 is ensured.
  • the terminals of the first module 11 which are to be coupled are coupled to the terminals of the contiguous second module so that the terminals 12 a , 12 b lie opposite one another in their axial direction and thus, during use, transfer electrical and ballistic contact, the terminals 12 b of at least one module being acted upon with force in the direction of the terminals of the contiguous other module, so that the end faces of the adjacent terminals 12 a , 12 b always touch one another during use.
  • FIG. 7 shows an extract from the completion of a borehole.
  • the individual modules 11 a , 11 b can be seen in the two zones 13 b and 13 a .
  • Each module consists of a conveying tube 4 with a sealing jacket 6 (see the previous figures).
  • a gas-pressure-activated ignition head 15 Arranged at the lower end is a gas-pressure-activated ignition head 15 which initiates the ignition of the hollow charges 10 .
  • the ignition signal is conducted to the individual perforation units in the modules and ignites the hollow charges there.
  • Reference symbol 16 denotes a detonator for initiating the contiguous ignition cord in the zone 13 b , which, in turn, initiates, that is to say explodes, the hollow charges in the perforation units of the modules in this zone.
  • the zones in which production is to be started by the provision of the perforation ducts can therefore be controlled, as desired.

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Pipe Accessories (AREA)
  • Earth Drilling (AREA)

Abstract

The invention relates to a method for completing a borehole (1, 2) prior to the start of production, wherein after making the borehole (1, 2) the borehole wall (3) is anchored in a sealed manner with a conveying tube (4) and/or casing tube, and the borehole wall (3) is perforated with perforation units (5) at desired points. To complete a borehole without the use of cemented conveying tubes and/or casing tubes, it is proposed that the conveying tube (3) and/or casing tube be provided on its outer surface with a swellable sealing jacket (6), wherein the sealing jacket (6) swells after activation and anchors the annular gap between the conveying tube (4) and/or casing tube and the borehole wall (3) in a sealed manner and simultaneously centres the conveying tube (4) and/or casing tube in the borehole (1, 2).

Description

  • The invention relates to a method for completing a borehole before the start of production, wherein after the introduction of the borehole the borehole wall is anchored sealingly by means of a conveying tube and/or casing tube, and the borehole wall is perforated at desired locations by means of perforation units.
  • The object on which the invention is based is to provide a method for completing a borehole prior to the start of production (through tubing rotary drill bores), without the use of cemented conveying tubes and/or casing tubes.
  • The method should fulfill the following conditions:
      • reliable/robust connection of the formation to the borehole
      • remote control for activating the perforation guns
      • the boreholes must be finished and ready for production in the shortest possible time
      • preferably, only one descent into the bore
      • the system must be capable of being used above the conductor tubing by means of which the bore is completed
      • after installation, the possibility of access to the borehole so that maintenance work can be carried out
      • it must be possible to use the system via a side orifice in the casing tube
      • allows the completion of several horizons
      • allows the selective production of different horizons
      • capable of being used for short and long sections up to a few hundred meters
      • use must be possible in petroleum and natural gas bores (under dry and wet conditions)
      • guarantee of compatibility with surface controlled subsurface safety valves or other sensitive borehole equipment
  • The aim is to have a simultaneous installation of the conveying tube and/or casing tube and of the perforation unit. The system or method must allow the sealing off of various zones and the selective activation of each zone at any desired position and at any desired time point.
  • On account of the temperature restrictions in explosive perforation systems, long underground times are not possible before the explosion. The flow channels in the reservoir therefore have to be set up immediately after the installation of the system, even when multiple-horizon completions with different production times are required.
  • This object is achieved, according to the invention, in that the conveying tube and/or casing tube are/is provided on their/its outer face with a swellable sealing jacket, the sealing jacket after activation swelling and anchoring the annular gap sealingly between the conveying tube and/or casing tube and the borehole wall and at the same time centering the conveying tube and/or casing tube in the borehole. This affords a method for completing a borehole before the start of production, without cemented conveying tubes and/or casing tubes having to be used.
  • In a development, the activation and swelling of the sealing jacket are carried out after perforation. As a result, the conveying tube and/or the casing tube are/is anchored sealingly and at the same time centered in the borehole.
  • In an inventive refinement, the perforation pressure and/or the borehole temperature and/or the liquid which is generated in the production zone are/is used for activating the sealing jacket for swelling purposes. These are characteristic variables which change during and/or after perforation.
  • In one embodiment, the material used for the sealing jacket is a viscous material and/or a rubber or thermoplastic.
  • In a development of the invention, the sealing jacket is designed to be deactivatable and, after deactivation, is permeable to liquids or gases. As a result of deactivation, previously sealed-off regions can be opened again.
  • Preferably, chemical and/or thermal activation stimulators are used for deactivation.
  • In one embodiment, the chemical activation stimulators used are aggressive media, for example acids, which dissolve the sealing jacket or parts of the sealing jacket.
  • In an inventive refinement, for thermal deactivation, the activation stimulator used is a heating module which, for activation, is brought to the desired location in the conveying tube and/or casing tube.
  • In one refinement, different sealing jackets are used for different horizons, so that, if different activation stimulators are used, a selective opening of the sealing jackets is achieved, and these orifices can be connected to the conveying tube for production.
  • In a preferred refinement, at least one perforation unit is inserted inside the conveying tube and/or casing tube.
  • In a preferred refinement, the conveying tube and/or casing tube are/is designed in a module-like manner together with the perforation unit, each module consisting of a section of the conveying tube and/or casing tube and of a perforation unit. These modules can be connected to one another, for example via a screw connection, outside the borehole.
  • Preferably, all the necessary components, such as charges, ignition cable sections and wire pieces, are preinstalled in the module, the terminals for electrical and ballistic contact being installed fixedly at one end of each module, and, at the other end, the terminals being prestressed by means of a spring, so that, after the connection of two modules, reliable electrical and ballistic contact between the individual modules is ensured.
  • In an inventive development, the terminals of the first module which are to be coupled are coupled to the terminals of the contiguous second module so that the terminals lie opposite one another in their axial direction and thus, during use, transfer electrical and ballistic contact, the terminals of at least one module being acted upon with force in the direction of the terminals of the contiguous other module, so that the end faces of the adjacent terminals always touch one another during use.
  • In one embodiment, to trigger the perforation unit or perforation units, a gas-pressure-activated ignition mechanism is used, which is installed at the lower end of the perforation system.
  • In one design variant, preferably in single-horizon completions, the gas-pressure-activated ignition mechanism activates an impact fuse.
  • In another embodiment, particularly in multiple-horizon completions, a separate electrical detonator is used for each perforation zone.
  • In this case, in a development of the invention, the detonators are connected via wires, the ignition mechanism containing an induction appliance, which is operated by the gas pressure, and the induced current then igniting the detonators.
  • In another embodiment, the ignition mechanism used is a wire-operated firing head (wireline firing head) which is installed on the top side of the conveying tubing before installation takes place in the lower region of the borehole. For ignition, a module on the cable is moved into the borehole, latches on the ignition mechanism on top and, by the electrical connection of the borehole head to the perforation unit, locks on the electrical signals which are required for igniting the detonators. After detonation, the ignition mechanism is separated from the conveying tubing and is moved out of the borehole with the aid of the cable.
  • In one embodiment, the elements of the perforation unit dissolve automatically after detonation. As a result, production is not impeded by residues of the perforation unit.
  • Since the elements of the perforation unit can be dissolved automatically after detonation, preferably reactive materials, such as zinc, aluminum or magnesium, are used for the charge housings of the hollow charges.
  • Non-reactive sleeve materials of the charges, which generate a fine sand-like dust, such as glass or porcelain, may also be used for the charge housings.
  • A conveying tube and/or casing tube according to the invention for carrying out the method is characterized in that the conveying tube and/or casing tube has on its outer face a swellable sealing jacket.
  • In one embodiment, the material of the sealing jacket is a viscous material and/or a rubber or thermoplastic.
  • Preferably, the sealing jacket is deactivatable and, after deactivation, is permeable to liquids.
  • In one embodiment, the conveying tube and/or casing tube is designed in a module-like manner, and at least one perforation unit is inserted in each module.
  • In one refinement, the terminals for electrical and ballistic contact are installed fixedly at one end of each module and, at the other end, the contacts are prestressed by means of a spring, so that, after the connection of two modules, reliable electric and ballistic contact between the individual modules is ensured.
  • In a preferred development, the terminals of the first module which are to be coupled are coupled to the terminals of the contiguous second module so that the terminals lie opposite one another in their axial direction and thus, during use, transfer electrical and ballistic contact, the terminals of at least one module being acted upon with force in the direction of the terminals of the contiguous other module, so that the end faces of the adjacent terminals always touch one another during use.
  • In an inventive refinement, the perforation units contain charge housings of the hollow charges which dissolve automatically after detonation.
  • Preferably, the charge housings of the hollow charges consist of reactive materials, such as zinc, aluminum or magnesium, or consist of non-reactive materials which, after the detonation of the hollow charges, generate a fine sand-like dust, such as glass or porcelain.
  • The invention is described in detail below.
  • A simultaneous perforation of all the production horizons can easily be achieved if conventional perforation systems are used together with the conveying tube technique. In order to separate different horizons from one another and seal off individual perforation ducts, a sealing-off device on the outside of the conveying tube is proposed. The sealing-off device used may be a slide. Preferably, according to the invention, a sealing jacket is employed which is installed on the conductor tube on the outside and which is activated under specific conditions. The sealing material of the sealing jacket preferably extends over the entire length of the sidetrack completion, that is to say of a side train. It is possible that the perforation horizons which are intended for immediate production are not equipped with the sealing material, if this is required by the geology or production conditions.
  • The perforation pressure, the borehole temperature or the liquid which is generated by the conveying zone may be used for activating the sealing jacket, with the result that the material of the sealing jacket swells and closes the annular gap between the conductor tube and the open hole. The sealing jacket may be manufactured from a viscous material, for example from a type of rubber or thermoplastic, which is exposed immediately after perforation. The activation and swelling of the sealing jacket must take place after perforation.
  • After the activation of the sealing jacket, the various zones are isolated, and all the desired perforation ducts in the reservoir are closed and therefore separated from the conveying tube. The ducts are tied up directly to the conveying tube at the location where no sealing jacket has been applied and are therefore ready for production. As soon as the sealing material of the sealing jacket has been swollen, it not only closes the annular gap, but also centers the conveying tube in the open borehole.
  • In order to connect specific desired horizons, various types of deactivation of the sealing material may be employed. In particular, chemical and thermal activation stimulators may be used. By using aggressive media, for example acids, part of the sealing material can be dissolved. For different horizons, different sealing materials must be employed, that is to say, if different acids are used, a selective opening of the perforation ducts can be achieved. To dissolve the sealing material by the supply of heat, a heating module may be employed which, using a wireline tractor, is brought to the corresponding location. Depending on the position of the heating module, horizons can be selectively opened and connected to the conveying tube for production.
  • Hydrocarbon production itself takes place directly via the conveying tube. The conveying tube also functions as a transport mechanism for the perforation system. A conveying tube made from steel with a sealing jacket made from sealing material transports the perforation unit downward in the borehole and serves for completing the side track, that is to say the side train. In order to obtain a free flow path and allow access to the borehole for the purpose of maintenance work, a self-dissolving perforation unit is employed inside the conveying tube.
  • One possibility for achieving this aim is to use reactive materials for the charge housings for the purpose of generating a self-destructing charge (for example zinc or magnesium). The charges are attached to locations which are provided for production in the conveying tube. In each individual horizon, the charges are connected via detonating cords. A booster-booster ballistic transfer is used for ballistic and electrical connection between various sections of the conveying tube. Various perforation zones are connected via wires. Each perforation zone has its own detonator for igniting the detonation.
  • In order to ensure a rapid assembly of this installation at the borehole location, all the charges, ignition cable sections and wire pieces are preinstalled in the conveying tube before they are transported to the borehole location. The conveying tube has flat threaded connections (for example, extreme line joints) at the ends. The wire and booster connectors are fastened centrally inside the conveying tube. One side of the terminal is always fixedly installed, while the other side is prestressed by means of a spring. Reliable electrical and ballistic contact between the individual tube pieces is thereby ensured.
  • For triggering the perforation unit, various devices may be employed. For use in the case of once-only descent, a gas-pressure-activated ignition mechanism is proposed which can be installed at the lower end of the perforation unit. This ignition mechanism may activate an impact fuse for single-horizon completions or for several horizons in which the individual perforation regions are connected via a detonating cord. In this application, only a single detonator is employed.
  • Alternatively, a gas-initiated inductive-electrical ignition mechanism may be used. Such an appliance would, as a result of the movement of a piston, induce in a coil an electrical current which is used in order to initiate the various electrical detonators inside the conveying tube. A further possibility for ignition would be to use a wireline firing head at the upper end of the installation, this wireline firing head being connected to all the detonators. In this case, a cable has to be laid downwardly in the borehole and connected to the ignition mechanism. The explosive impulse is then sent downward in the borehole via the cable.
  • Such an ignition device would make it possible to use electrical and electronic detonators or EFI/EBW which have the additional advantage that they are HF-safe. As a result, a reliable operation of the system can be achieved. Even radio traffic does not have to be interrupted during use. The latched cable is used in order to move out the explosive head after the explosion. As a result, as already mentioned, a free flow path and direct access for later maintenance work are made possible.
  • The system contains in detail the following components:
  • Hollow Charges
  • For the method or system according to the invention, a standard hollow charge has to be modified so that it self-destructs. It is proposed to use reactive materials for the charge housings. The reactive materials used could be, on the one hand, metals, such as zinc, aluminum or magnesium. In the case of zinc charges, problems with specific borehole scavengings may arise. An exact analysis of the borehole conditions is therefore necessary before this material can be employed. The advantage of zinc is its easy solubility in acid, with the result that the residues of the charges can easily be dissolved. Furthermore, the residues of the zinc charges normally take the form of fine dust which has a very large surface, thus further promoting a dissolution of the residues.
  • Aluminum and magnesium are highly reactive materials which react even during the operation of detonating the hollow charges. Moreover, magnesium reacts with water, this, in turn, having an effect conducive to the dissolution of the residues.
  • An alternative to solving the problem of a self-destructing hollow charge would be to use reactive materials, such as propellants or explosives, in combination with reactive binders, in order to produce the housing of the hollow charge. A similar solution is known from military applications with regard to caseless ammunition.
  • A further solution would be to use non-reactive sleeve materials which generate a fine sand-like dust. Glass or porcelain are materials which may be used for hollow charge housings and which leave behind only fine particles. These could then be washed out of the borehole together with the first quantities produced and be separated from the hydrocarbons in a sand separator. As a result, as already mentioned, a free flow path and direct access for subsequent maintenance are made possible.
  • Conveying Tube and Connectors
  • A standard conveying tube with flat threaded connections (for example, extreme line joints) at the ends is employed. As a result, the conveying tubes can be screwed together without sockets, with the result that a flat surface is obtained after the tube is finished. Standard materials and sizes of conveying tubes are employed. The desired diameter range amounts to 2⅞″, 3⅜″, 4″, 4½″, 5″ with a standard length of 3-9 m. However, smaller and larger diameters may also be used (min. 1 9/16″/max. 7″).
  • Initiating Device, Ballistic Transfer and Electrical Contact
  • Various initiating devices may be used for the system. Three different systems are proposed.
  • Preferably, a gas-activated ignition mechanism is employed which is installed at the end of the perforation system. Installation in one operation with remote-controlled ignition of the perforation units is thereby possible.
  • In the case of single-horizon completions, this gas-activated ignition mechanism activates an impact fuse (mechanical gas-activated ignition mechanism).
  • In the case of multiple-horizon completions, a separate electrical detonator is proposed for each perforation zone. The detonators are connected via wires. The ignition mechanism contains an induction appliance which is operated by the gas pressure. The induced current then ignites the electrical detonators (electrical inductive gas-activated ignition mechanism).
  • The third initiation possibility is to use a wireline firing head. This firing head is installed on the top side of the conveying tubing before installation in the lower region of the borehole takes place. A snap mechanism is located on the top side. For ignition, a module is moved into the borehole on the cable and latches on the ignition mechanism on top. By the borehole head being connected electrically to the perforation unit, the electrical signals required for igniting the detonators can be locked on. After detonation, the ignition mechanism is separated from the conveying tubing and moved out of the borehole with the aid of the cable.
  • The disadvantage of this solution is that an additional descent into the borehole is required. On the other hand, one advantage is that it is possible to use electronic detonators or EBW/EFI initiators. These detonators are HF-safe, and there is therefore no need to suspend radio traffic during use. The system therefore acquires additional safety, in particular under offshore conditions.
  • Each conveying tube is equipped with the charges, the ignition cable, the detonators, wires and ballistic and electrical transfer devices before transport to the borehole location takes place. A connector unit, such as is described in EP 1 828 709 A1, is installed at the end of each conveying tube. One side is fastened and the other tensioned by a spring. This ensures a reliable transfer of the detonation and/or of the electrical signals between the various sections. During the installation of the system on site in a borehole, the threaded parts of the conveying tube sections are screwed together. In this case, there is no fear of any damage to the electrical and ballistic terminals. This method allows a simple, safe, reliable and rapid assembly of the conveying tube sections.
  • Sealing Jacket
  • The sealing jacket is a central integral part of the system. In this case, a material may be used which expands either in conjunction with specific liquids when the perforation pressure prevails or when there is the action of heat. The sealing jacket is installed on the outside of the conveying tube made from steel. The application of the material to the outer face of the steel tube may take place by adhesive bonding, vulcanization, thermal shrinkage, extrusion or other robust fastening methods. The coefficient of expansion must be carefully selected as a function of the minimum and maximum diameter of the open hole.
  • In order to allow a selective opening of the perforation ducts for production, it must be possible to deactivate and open the sealing material at specific locations and specific time points by means of special methods.
  • The sealing material could be melted away by the action of heat. For this purpose, a heating module may be employed which is moved into the borehole on a cable. In this case, a borehole tractor for horizontal boreholes may be used. By means of this module, the required heat energy for dissolving the sealing jacket is generated.
  • Another possibility for the selective opening of the sealing jacket is to use aggressive chemicals, for example acids, which dissolve the sealing jacket. To remove specific regions by etching, either the use of different types of sealing materials which react only with specific chemicals is required or it is necessary to separate the individual regions by means of packers.
  • Opening Module
  • Depending on the type of sealing material, a heating module must be used so that it is possible to generate in the borehole sufficient heat with the aid of which the sealed-off ducts can be opened again. This device is required only when a chemical method for opening the regions is not employed.
  • Shut-Off of Various Horizons within the Conveying Tube
  • Standard shut-off devices, such as plugs or packers, can be installed in the conveying tubing by means of standard methods, for example by means of cables, in combination with a tractor for horizontal boreholes. In addition, shut-off devices may be installed on the surface during the installation of the conveying tube. In this type of use, it is necessary to ensure that the shut-off devices are capable of withstanding the detonation pressure arising during perforation. Furthermore, access to the lower-lying sections of the installation is restricted inside the conductor tube on account of shut-off devices.
  • The proposed solution for the problem of the completion of the through tubing rotary drill bores for boreholes, without the use of cemented conductor tubes, constitutes a completion which is exceedingly variable and modern.
  • In particular, the solution affords a reliable robust method for connecting the production horizons to the borehole, using standard perforation systems which are well known in the industry. By the use of a gas-activated ignition mechanism functioning mechanically or inductive-electrically, remote activation of the perforation system is possible. Since the perforation system is installed inside the conductor tube and standard threads are used which are screwed together at the borehole location, without in this case the fear of damage to the electrical or ballistic contacts, the assembly time required can be minimized, and the borehole can be finished and put into operation in the shortest possible time.
  • The system can be installed in the borehole in one operation. The perforation system is installed inside the conveying tubing with which the borehole is completed. By a self-destructing perforation system being used, a free flow path and easy access for the maintenance of the borehole are achieved. The diameter of the system is designed so that the system can be introduced via a side aperture in the casing tube. In this case, the stipulated minimum dimensions for opening regions are adhered to.
  • By the use of an opening device, a selective opening of the perforation ducts in the case of multiple-horizon completions, with selective production in different horizons, is possible. The corresponding intervals are limited only by the standard conveying tube technique. The system may be used in oil and gas boreholes under wet or dry conditions.
  • On account of the super-flat outer face of the completion section, which is coated with a sealing jacket, the conductor tube is compatible with underground-installed safety valves [subsurface safety valves (SCSSV)] or with other sensitive borehole equipment located in the set-up.
  • The invention is further explained below with reference to figures.
  • FIG. 1 shows a borehole 1 as a main borehole and a branching-off secondary track as borehole 2. In the following figures, a completion of the borehole 2 prior to the start of production is described. The borehole 2 is subdivided into various zones 13 a, 13 b, 13 c, and each zone requires a different completion or completion at a different time point.
  • FIG. 2 shows a finished completion for the zones 13 a and 13 b which consist of modules 11 a, 11 b and 11 c connected to one another. Each of the said modules 11 a, 11 b and 11 c consists of a conveying tube 4 a, 4 b, 4 c which is provided on its outside in each case with a sealing jacket 6. The conveying tubes 4 a, 4 c with their sealing jackets 6 are perforated, so that production can take place via the perforation ducts 14.
  • FIG. 3 shows a conveying tube 4 which is provided on its outer face with a sealing jacket 6. To deactivate the sealing jacket 6, that is to say to dissolve the sealing jacket 6 at specific locations, various methods may be adopted. To dissolve the sealing jacket 6 by the supply of heat, a heating module 7 may be employed which, using a well tractor with a wireline unit, is brought to the corresponding location. The heating module 7 heats the sealing jacket 6 at the desired locations, with the result that the material of the sealing jacket melts at these locations and thereby provides opening ducts. Perforation ducts 14 are thereby connected for production purposes.
  • FIG. 4 shows a conveying tube 4 which is provided on its outer face with a sealing jacket 6. To deactivate the sealing jacket 6, that is to say to dissolve the sealing jacket 6 at specific locations, chemical activation stimulators are employed here. Here, these are aggressive acids 17 which dissolve parts of the sealing jacket 6.
  • FIG. 5 shows a module 11 a consisting inter alia of a conveying tube 4 with a sealing jacket 6 which is activated, that is to say closed, and acts as a seal. The perforation ducts 14 are therefore partitioned off from production. The hollow charges have dissolved after detonation, and no residues are present.
  • FIG. 6 shows two modules 11 a, 11 b connected to one another via a screw connection 18 and in each case having a perforation unit 5. Each perforation unit 5 consists of a tubular housing into which hollow charges 10 are inserted. These hollow charges 10 consist in each case of a charge housing 9 with an inserted charge. Moreover, each perforation unit 5 has an ignition cord for initiating the hollow charges 10 and an electrically conductive wire 19. For coupling between these, these terminals 12 are connected to one another between the modules 11 a, 11 b.
  • Each module 11 a, 11 b contains all the necessary components, such as charges, ignition cable sections and wires 19, which are preinstalled in the module 11, the terminals 12 a for electric and ballistic contacts being installed fixedly at one end of each module 11, and, at the other end, the terminals 12 b being prestressed by means of a spring 8, so that, after the connection of two modules 11, reliable electrical and ballistic contact between the individual modules 11 is ensured.
  • The terminals of the first module 11 which are to be coupled are coupled to the terminals of the contiguous second module so that the terminals 12 a, 12 b lie opposite one another in their axial direction and thus, during use, transfer electrical and ballistic contact, the terminals 12 b of at least one module being acted upon with force in the direction of the terminals of the contiguous other module, so that the end faces of the adjacent terminals 12 a, 12 b always touch one another during use.
  • FIG. 7 shows an extract from the completion of a borehole. The individual modules 11 a, 11 b can be seen in the two zones 13 b and 13 a. Each module consists of a conveying tube 4 with a sealing jacket 6 (see the previous figures). Arranged at the lower end is a gas-pressure-activated ignition head 15 which initiates the ignition of the hollow charges 10. The ignition signal is conducted to the individual perforation units in the modules and ignites the hollow charges there. Reference symbol 16 denotes a detonator for initiating the contiguous ignition cord in the zone 13 b, which, in turn, initiates, that is to say explodes, the hollow charges in the perforation units of the modules in this zone. The zones in which production is to be started by the provision of the perforation ducts can therefore be controlled, as desired.

Claims (29)

1. A method for completing a borehole before the start of production, wherein after the introduction of the borehole the borehole wall is anchored sealingly by means of a conveying tube and/or casing tube, and the borehole wall is perforated at desired locations by means of perforation units, characterized in that the conveying tube and/or casing tube are/is provided on their/its outer face with a swellable sealing jacket, wherein after activation the sealing jacket swells and anchors the annular gap sealingly between the conveying tube and/or casing tube and the borehole wall and at the same time centers the conveying tube and/or casing tube in the borehole.
2. A method as claimed in claim 1, characterized in that the activation and swelling of the sealing jacket are carried out after perforation.
3. A method as claimed in claim 1, characterized in that the perforation pressure and/or the borehole temperature and/or the liquid which is generated in the production zone are/is used for activating the sealing jacket for swelling purposes.
4. A method as claimed in claim 1, characterized in that the material used for the sealing jacket is a viscous material and/or a rubber or thermoplastic.
5. A method as claimed in claim 1, characterized in that the sealing jacket is designed to be deactivatable and, after deactivation, is permeable to liquids or gases.
6. A method as claimed in claim 5, characterized in that chemical and/or thermal activation stimulators are used for deactivation.
7. A method as claimed in claim 6, characterized in that the chemical activation stimulators used are aggressive media, for example acids, which dissolve the sealing jacket or parts of the sealing jacket.
8. A method as claimed in claim 6, characterized in that, for thermal deactivation, the activation stimulator used is a heating module which, for activation, is brought to the desired location in the conveying tube and/or casing tube.
9. A method as claimed in claim 1, characterized in that different sealing jackets are used for different horizons, so that, if different activation stimulators are used, a selective opening of the sealing jackets is achieved, and these orifices can be connected to the conveying tube for production.
10. A method as claimed in claim 1, characterized in that at least one perforation unit is inserted inside the conveying tube and/or casing tube.
11. A method as claimed in claim 10, characterized in that the conveying tube and/or casing tube are/is designed in a module-like manner together with the perforation unit, each module consisting of a section of the conveying tube and/or casing tube and of a perforation unit.
12. A method as claimed in claim 11, characterized in that all the necessary components, such as charges, ignition cable sections and wire pieces, are preinstalled in the module, the terminals for electrical and ballistic contact being installed fixedly at one end of each module, and, at the other end, the terminals being prestressed by means of a spring, so that, after the connection of two modules, reliable electrical and ballistic contact between the individual modules is ensured.
13. A method as claimed in claim 12, characterized in that the terminals of the first module which are to be coupled are coupled to the terminals of the contiguous second module so that the terminals lie opposite one another in their axial direction and thus, during use, transfer electrical and ballistic contact, the terminals of at least one module being acted upon with force in the direction of the terminals of the contiguous other module, so that the end faces of the adjacent terminals always touch one another during use.
14. A method as claimed in claim 1, characterized in that, to trigger the perforation unit or perforation units, a gas-pressure-activated ignition mechanism is used which is installed at the lower end of the perforation unit.
15. A method as claimed in claim 14, characterized in that preferably, in single-horizon completions, the gas-pressure-activated ignition mechanism activates an impact fuse.
16. A method as claimed in claim 1, characterized in that, particularly in multiple-horizon completions, a separate electrical detonator is used for each perforation zone.
17. A method as claimed in claim 16, characterized in that the detonators are connected via wires, the ignition mechanism containing an induction appliance, which is operated by the gas pressure, and the induced current then igniting the detonators.
18. A method as claimed in claim 1, characterized in that the ignition mechanism used is a wire-operated firing head which is installed on the top side of the conveying tubing before installation takes place in the lower region of the borehole, and, for ignition, a module on the cable is moved into the borehole and latches on the ignition mechanism on top, and, by electrical connection of the borehole head to the perforation unit, the electrical signals required for igniting the detonators are locked on, and, after detonation, the ignition mechanism is separated from the conveying tubing and is moved out of the borehole with the aid of the cable.
19. A method as claimed in claim 1, characterized in that the elements of the perforation unit dissolve automatically after detonation.
20. A method as claimed in claim 19, characterized in that reactive materials, such as zinc, aluminum or magnesium, are used for the charge housings of the hollow charges.
21. A method as claimed in claim 20, characterized in that non-reactive sleeve materials which generate a fine sand-like dust, such as glass or porcelain, are used for the charge housings.
22. A conveying tube and/or casing tube for carrying out the method as claimed in claim 1, characterized in that the conveying tube and/or casing tube has on its outer face a swellable sealing jacket.
23. A conveying tube and/or casing tube as claimed in claim 22, characterized in that the material of the sealing jacket is a viscous material and/or a rubber or thermoplastic.
24. A conveying tube and/or casing tube as claimed in claim 22, characterized in that the sealing jacket is deactivatable and, after deactivation, is permeable to liquids.
25. A conveying tube and/or casing tube as claimed in claim 22, characterized in that the conveying tube and/or casing tube is designed in a module-like manner, and at least one perforation unit is inserted in each module.
26. A conveying tube and/or casing tube as claimed in claim 25, characterized in that the terminals for electrical and ballistic contact are installed fixedly at one end of each module and, at the other end, the terminals are prestressed by means of a spring, so that, after the connection of two modules, reliable electrical and ballistic contact between the individual modules is ensured.
27. A conveying tube and/or casing tube as claimed in claim 26, characterized in that the terminals of the first module which are to be coupled are coupled to the terminals of the contiguous second module so that the terminals lie opposite one another in their axial direction and thus, during use, transfer electrical and ballistic contact, the terminals of at least one module being acted upon with force in the direction of the terminals of the contiguous other module, so that the end faces of the adjacent terminals always touch one another during use.
28. A conveying tube and/or casing tube as claimed in claim 22, characterized in that the perforation units contain charge housings of the hollow charges which dissolve automatically after detonation.
29. A conveying tube and/or casing tube as claimed in claim 28, characterized in that the charge housings of the hollow charges consist of reactive materials, such as zinc, aluminum or magnesium, or consist of non-reactive materials which, after the detonation of the hollow charges, generate a fine sand-like dust, such as glass or porcelain.
US12/602,173 2007-05-31 2008-05-30 Method for completing a borehole Abandoned US20100230104A1 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
DE102007025568 2007-05-31
DE102007025568.5 2007-05-31
PCT/EP2008/056684 WO2008145726A1 (en) 2007-05-31 2008-05-30 Method for completing a borehole

Publications (1)

Publication Number Publication Date
US20100230104A1 true US20100230104A1 (en) 2010-09-16

Family

ID=39731424

Family Applications (1)

Application Number Title Priority Date Filing Date
US12/602,173 Abandoned US20100230104A1 (en) 2007-05-31 2008-05-30 Method for completing a borehole

Country Status (7)

Country Link
US (1) US20100230104A1 (en)
EP (1) EP2156013A1 (en)
BR (1) BRPI0812294A2 (en)
CA (1) CA2689315A1 (en)
DE (1) DE102008026079A1 (en)
MX (1) MX2009012853A (en)
WO (1) WO2008145726A1 (en)

Cited By (45)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090078420A1 (en) * 2007-09-25 2009-03-26 Schlumberger Technology Corporation Perforator charge with a case containing a reactive material
US20110000669A1 (en) * 2009-07-01 2011-01-06 Halliburton Energy Services, Inc. Perforating Gun Assembly and Method for Controlling Wellbore Pressure Regimes During Perforating
US20110209871A1 (en) * 2009-07-01 2011-09-01 Halliburton Energy Services, Inc. Perforating Gun Assembly and Method for Controlling Wellbore Pressure Regimes During Perforating
US20110219978A1 (en) * 2010-03-09 2011-09-15 Halliburton Energy Services, Inc. Shaped Charge Liner Comprised of Reactive Materials
US8449798B2 (en) 2010-06-17 2013-05-28 Halliburton Energy Services, Inc. High density powdered material liner
US8734960B1 (en) 2010-06-17 2014-05-27 Halliburton Energy Services, Inc. High density powdered material liner
WO2015028204A3 (en) * 2013-08-26 2015-06-18 Dynaenergetics Gmbh & Co. Kg Perforating gun and detonator assembly
WO2015148660A1 (en) * 2014-03-26 2015-10-01 Superior Energy Services, Llc Location and stimulation methods and apparatuses utilizing downhole tools
US9862027B1 (en) 2017-01-12 2018-01-09 Dynaenergetics Gmbh & Co. Kg Shaped charge liner, method of making same, and shaped charge incorporating same
US9896920B2 (en) * 2014-03-26 2018-02-20 Superior Energy Services, Llc Stimulation methods and apparatuses utilizing downhole tools
US10188990B2 (en) 2014-03-07 2019-01-29 Dynaenergetics Gmbh & Co. Kg Device and method for positioning a detonator within a perforating gun assembly
US10273788B2 (en) 2014-05-23 2019-04-30 Hunting Titan, Inc. Box by pin perforating gun system and methods
US10316629B2 (en) * 2014-06-18 2019-06-11 Halliburton Energy Services, Inc. Pressure-restrictor plate for a partially loaded perforating gun
US10435986B2 (en) 2014-11-06 2019-10-08 Superior Energy Services, Llc Method and apparatus for secondary recovery operations in hydrocarbon formations
US10472938B2 (en) 2013-07-18 2019-11-12 Dynaenergetics Gmbh & Co. Kg Perforation gun components and system
US10739115B2 (en) 2017-06-23 2020-08-11 DynaEnergetics Europe GmbH Shaped charge liner, method of making same, and shaped charge incorporating same
US10845177B2 (en) 2018-06-11 2020-11-24 DynaEnergetics Europe GmbH Conductive detonating cord for perforating gun
US10844696B2 (en) 2018-07-17 2020-11-24 DynaEnergetics Europe GmbH Positioning device for shaped charges in a perforating gun module
USD904475S1 (en) 2020-04-29 2020-12-08 DynaEnergetics Europe GmbH Tandem sub
USD908754S1 (en) 2020-04-30 2021-01-26 DynaEnergetics Europe GmbH Tandem sub
US10900333B2 (en) 2015-11-12 2021-01-26 Hunting Titan, Inc. Contact plunger cartridge assembly
US10927627B2 (en) 2019-05-14 2021-02-23 DynaEnergetics Europe GmbH Single use setting tool for actuating a tool in a wellbore
US10982941B2 (en) 2015-03-18 2021-04-20 DynaEnergetics Europe GmbH Pivotable bulkhead assembly for crimp resistance
CN113588914A (en) * 2021-06-22 2021-11-02 清华大学 Tunnel cave wall rock body testing device and rock body disturbance state testing method
US11225848B2 (en) 2020-03-20 2022-01-18 DynaEnergetics Europe GmbH Tandem seal adapter, adapter assembly with tandem seal adapter, and wellbore tool string with adapter assembly
US11255147B2 (en) 2019-05-14 2022-02-22 DynaEnergetics Europe GmbH Single use setting tool for actuating a tool in a wellbore
US11299967B2 (en) 2014-05-23 2022-04-12 Hunting Titan, Inc. Box by pin perforating gun system and methods
US11339614B2 (en) 2020-03-31 2022-05-24 DynaEnergetics Europe GmbH Alignment sub and orienting sub adapter
US11408279B2 (en) 2018-08-21 2022-08-09 DynaEnergetics Europe GmbH System and method for navigating a wellbore and determining location in a wellbore
US11480038B2 (en) 2019-12-17 2022-10-25 DynaEnergetics Europe GmbH Modular perforating gun system
US11578549B2 (en) 2019-05-14 2023-02-14 DynaEnergetics Europe GmbH Single use setting tool for actuating a tool in a wellbore
US11591885B2 (en) 2018-05-31 2023-02-28 DynaEnergetics Europe GmbH Selective untethered drone string for downhole oil and gas wellbore operations
USD981345S1 (en) 2020-11-12 2023-03-21 DynaEnergetics Europe GmbH Shaped charge casing
US11713625B2 (en) 2021-03-03 2023-08-01 DynaEnergetics Europe GmbH Bulkhead
US11732556B2 (en) 2021-03-03 2023-08-22 DynaEnergetics Europe GmbH Orienting perforation gun assembly
US11753889B1 (en) 2022-07-13 2023-09-12 DynaEnergetics Europe GmbH Gas driven wireline release tool
US11808098B2 (en) 2018-08-20 2023-11-07 DynaEnergetics Europe GmbH System and method to deploy and control autonomous devices
US11808093B2 (en) 2018-07-17 2023-11-07 DynaEnergetics Europe GmbH Oriented perforating system
USD1010758S1 (en) 2019-02-11 2024-01-09 DynaEnergetics Europe GmbH Gun body
US11905823B2 (en) 2018-05-31 2024-02-20 DynaEnergetics Europe GmbH Systems and methods for marker inclusion in a wellbore
USD1019709S1 (en) 2019-02-11 2024-03-26 DynaEnergetics Europe GmbH Charge holder
US11946728B2 (en) 2019-12-10 2024-04-02 DynaEnergetics Europe GmbH Initiator head with circuit board
US11952872B2 (en) 2013-07-18 2024-04-09 DynaEnergetics Europe GmbH Detonator positioning device
US11988049B2 (en) 2020-03-31 2024-05-21 DynaEnergetics Europe GmbH Alignment sub and perforating gun assembly with alignment sub
USD1028181S1 (en) 2019-04-01 2024-05-21 DynaEnergetics Europe GmbH Perforating gun assembly

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011149597A1 (en) * 2010-05-26 2011-12-01 Exxonmobil Upstream Research Company Assembly and method for multi-zone fracture stimulation of a reservoir using autonomous tubular units
DE102013217146A1 (en) * 2013-08-28 2015-03-05 Carl Zeiss Smt Gmbh Optical component

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4509604A (en) * 1982-04-16 1985-04-09 Schlumberger Technology Corporation Pressure responsive perforating and testing system
US4744424A (en) * 1986-08-21 1988-05-17 Schlumberger Well Services Shaped charge perforating apparatus
US5509356A (en) * 1995-01-27 1996-04-23 The Ensign-Bickford Company Liner and improved shaped charge especially for use in a well pipe perforating gun
US20050194181A1 (en) * 2004-03-04 2005-09-08 Barker James M. Perforating gun assembly and method for enhancing perforation depth
WO2006063713A1 (en) * 2004-12-13 2006-06-22 Dynaenergetics Gmbh & Co. Kg Reliable propagation of ignition in perforation systems
US20060175065A1 (en) * 2004-12-21 2006-08-10 Schlumberger Technology Corporation Water shut off method and apparatus

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU2002225233B2 (en) * 2001-01-26 2007-08-02 E2 Tech Limited Device and method to seal boreholes
MY135121A (en) * 2001-07-18 2008-02-29 Shell Int Research Wellbore system with annular seal member
GB2428263B (en) * 2004-03-12 2008-07-30 Schlumberger Holdings Sealing system and method for use in a well
MY143661A (en) * 2004-11-18 2011-06-30 Shell Int Research Method of sealing an annular space in a wellbore

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4509604A (en) * 1982-04-16 1985-04-09 Schlumberger Technology Corporation Pressure responsive perforating and testing system
US4744424A (en) * 1986-08-21 1988-05-17 Schlumberger Well Services Shaped charge perforating apparatus
US5509356A (en) * 1995-01-27 1996-04-23 The Ensign-Bickford Company Liner and improved shaped charge especially for use in a well pipe perforating gun
US20050194181A1 (en) * 2004-03-04 2005-09-08 Barker James M. Perforating gun assembly and method for enhancing perforation depth
WO2006063713A1 (en) * 2004-12-13 2006-06-22 Dynaenergetics Gmbh & Co. Kg Reliable propagation of ignition in perforation systems
US20060175065A1 (en) * 2004-12-21 2006-08-10 Schlumberger Technology Corporation Water shut off method and apparatus

Cited By (80)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090078420A1 (en) * 2007-09-25 2009-03-26 Schlumberger Technology Corporation Perforator charge with a case containing a reactive material
US20110000669A1 (en) * 2009-07-01 2011-01-06 Halliburton Energy Services, Inc. Perforating Gun Assembly and Method for Controlling Wellbore Pressure Regimes During Perforating
US20110209871A1 (en) * 2009-07-01 2011-09-01 Halliburton Energy Services, Inc. Perforating Gun Assembly and Method for Controlling Wellbore Pressure Regimes During Perforating
US8336437B2 (en) * 2009-07-01 2012-12-25 Halliburton Energy Services, Inc. Perforating gun assembly and method for controlling wellbore pressure regimes during perforating
US8555764B2 (en) 2009-07-01 2013-10-15 Halliburton Energy Services, Inc. Perforating gun assembly and method for controlling wellbore pressure regimes during perforating
US8739673B2 (en) 2009-07-01 2014-06-03 Halliburton Energy Services, Inc. Perforating gun assembly and method for controlling wellbore pressure regimes during perforating
US8807003B2 (en) 2009-07-01 2014-08-19 Halliburton Energy Services, Inc. Perforating gun assembly and method for controlling wellbore pressure regimes during perforating
US8794153B2 (en) 2010-03-09 2014-08-05 Halliburton Energy Services, Inc. Shaped charge liner comprised of reactive materials
US20110219978A1 (en) * 2010-03-09 2011-09-15 Halliburton Energy Services, Inc. Shaped Charge Liner Comprised of Reactive Materials
US8381652B2 (en) 2010-03-09 2013-02-26 Halliburton Energy Services, Inc. Shaped charge liner comprised of reactive materials
US9617194B2 (en) 2010-03-09 2017-04-11 Halliburton Energy Services, Inc. Shaped charge liner comprised of reactive materials
US8741191B2 (en) 2010-06-17 2014-06-03 Halliburton Energy Services, Inc. High density powdered material liner
US8734960B1 (en) 2010-06-17 2014-05-27 Halliburton Energy Services, Inc. High density powdered material liner
US8449798B2 (en) 2010-06-17 2013-05-28 Halliburton Energy Services, Inc. High density powdered material liner
US10472938B2 (en) 2013-07-18 2019-11-12 Dynaenergetics Gmbh & Co. Kg Perforation gun components and system
US11542792B2 (en) 2013-07-18 2023-01-03 DynaEnergetics Europe GmbH Tandem seal adapter for use with a wellbore tool, and wellbore tool string including a tandem seal adapter
US11125056B2 (en) 2013-07-18 2021-09-21 DynaEnergetics Europe GmbH Perforation gun components and system
US11608720B2 (en) 2013-07-18 2023-03-21 DynaEnergetics Europe GmbH Perforating gun system with electrical connection assemblies
US11648513B2 (en) 2013-07-18 2023-05-16 DynaEnergetics Europe GmbH Detonator positioning device
US11661823B2 (en) 2013-07-18 2023-05-30 DynaEnergetics Europe GmbH Perforating gun assembly and wellbore tool string with tandem seal adapter
US11788389B2 (en) 2013-07-18 2023-10-17 DynaEnergetics Europe GmbH Perforating gun assembly having seal element of tandem seal adapter and coupling of housing intersecting with a common plane perpendicular to longitudinal axis
US10844697B2 (en) 2013-07-18 2020-11-24 DynaEnergetics Europe GmbH Perforation gun components and system
US11952872B2 (en) 2013-07-18 2024-04-09 DynaEnergetics Europe GmbH Detonator positioning device
RU2662840C2 (en) * 2013-08-26 2018-07-31 Динаэнергетикс Гмбх Унд Ко. Кг Perforating gun and detonator assembly
CN109372475A (en) * 2013-08-26 2019-02-22 德国德力能有限公司 Perforating gun and detonator assembly
US9581422B2 (en) 2013-08-26 2017-02-28 Dynaenergetics Gmbh & Co. Kg Perforating gun and detonator assembly
US9605937B2 (en) 2013-08-26 2017-03-28 Dynaenergetics Gmbh & Co. Kg Perforating gun and detonator assembly
CN105492721A (en) * 2013-08-26 2016-04-13 德国德力能有限公司 Perforating gun and detonator assembly
CZ307065B6 (en) * 2013-08-26 2017-12-27 Dynaenergetics Gmbh & Co. Kg A perforator assembly of boreholes and detonators
WO2015028204A3 (en) * 2013-08-26 2015-06-18 Dynaenergetics Gmbh & Co. Kg Perforating gun and detonator assembly
US10507433B2 (en) 2014-03-07 2019-12-17 Dynaenergetics Gmbh & Co. Kg Device and method for positioning a detonator within a perforating gun assembly
US10188990B2 (en) 2014-03-07 2019-01-29 Dynaenergetics Gmbh & Co. Kg Device and method for positioning a detonator within a perforating gun assembly
US20150275643A1 (en) * 2014-03-26 2015-10-01 Superior Energy Services, Llc Location and Stimulation Methods and Apparatuses Utilizing Downhole Tools
US9896920B2 (en) * 2014-03-26 2018-02-20 Superior Energy Services, Llc Stimulation methods and apparatuses utilizing downhole tools
WO2015148660A1 (en) * 2014-03-26 2015-10-01 Superior Energy Services, Llc Location and stimulation methods and apparatuses utilizing downhole tools
US9689247B2 (en) * 2014-03-26 2017-06-27 Superior Energy Services, Llc Location and stimulation methods and apparatuses utilizing downhole tools
US11299967B2 (en) 2014-05-23 2022-04-12 Hunting Titan, Inc. Box by pin perforating gun system and methods
US11428081B2 (en) 2014-05-23 2022-08-30 Hunting Titan, Inc. Box by pin perforating gun system and methods
US10975671B2 (en) 2014-05-23 2021-04-13 Hunting Titan, Inc. Box by pin perforating gun system and methods
US10273788B2 (en) 2014-05-23 2019-04-30 Hunting Titan, Inc. Box by pin perforating gun system and methods
US10316629B2 (en) * 2014-06-18 2019-06-11 Halliburton Energy Services, Inc. Pressure-restrictor plate for a partially loaded perforating gun
US10435986B2 (en) 2014-11-06 2019-10-08 Superior Energy Services, Llc Method and apparatus for secondary recovery operations in hydrocarbon formations
US10982941B2 (en) 2015-03-18 2021-04-20 DynaEnergetics Europe GmbH Pivotable bulkhead assembly for crimp resistance
US10900333B2 (en) 2015-11-12 2021-01-26 Hunting Titan, Inc. Contact plunger cartridge assembly
US11929570B2 (en) 2015-11-12 2024-03-12 Hunting Titan, Inc. Contact plunger cartridge assembly
US11283207B2 (en) 2015-11-12 2022-03-22 Hunting Titan, Inc. Contact plunger cartridge assembly
US9862027B1 (en) 2017-01-12 2018-01-09 Dynaenergetics Gmbh & Co. Kg Shaped charge liner, method of making same, and shaped charge incorporating same
US10376955B2 (en) 2017-01-12 2019-08-13 Dynaenergetics Gmbh & Co. Kg Shaped charge liner and shaped charge incorporating same
US10739115B2 (en) 2017-06-23 2020-08-11 DynaEnergetics Europe GmbH Shaped charge liner, method of making same, and shaped charge incorporating same
US11591885B2 (en) 2018-05-31 2023-02-28 DynaEnergetics Europe GmbH Selective untethered drone string for downhole oil and gas wellbore operations
US11905823B2 (en) 2018-05-31 2024-02-20 DynaEnergetics Europe GmbH Systems and methods for marker inclusion in a wellbore
US10845177B2 (en) 2018-06-11 2020-11-24 DynaEnergetics Europe GmbH Conductive detonating cord for perforating gun
US11385036B2 (en) 2018-06-11 2022-07-12 DynaEnergetics Europe GmbH Conductive detonating cord for perforating gun
US11339632B2 (en) 2018-07-17 2022-05-24 DynaEnergetics Europe GmbH Unibody gun housing, tool string incorporating same, and method of assembly
US11808093B2 (en) 2018-07-17 2023-11-07 DynaEnergetics Europe GmbH Oriented perforating system
US11525344B2 (en) 2018-07-17 2022-12-13 DynaEnergetics Europe GmbH Perforating gun module with monolithic shaped charge positioning device
US11773698B2 (en) 2018-07-17 2023-10-03 DynaEnergetics Europe GmbH Shaped charge holder and perforating gun
US10920543B2 (en) 2018-07-17 2021-02-16 DynaEnergetics Europe GmbH Single charge perforating gun
US10844696B2 (en) 2018-07-17 2020-11-24 DynaEnergetics Europe GmbH Positioning device for shaped charges in a perforating gun module
US11808098B2 (en) 2018-08-20 2023-11-07 DynaEnergetics Europe GmbH System and method to deploy and control autonomous devices
US11408279B2 (en) 2018-08-21 2022-08-09 DynaEnergetics Europe GmbH System and method for navigating a wellbore and determining location in a wellbore
USD1019709S1 (en) 2019-02-11 2024-03-26 DynaEnergetics Europe GmbH Charge holder
USD1010758S1 (en) 2019-02-11 2024-01-09 DynaEnergetics Europe GmbH Gun body
USD1028181S1 (en) 2019-04-01 2024-05-21 DynaEnergetics Europe GmbH Perforating gun assembly
US11255147B2 (en) 2019-05-14 2022-02-22 DynaEnergetics Europe GmbH Single use setting tool for actuating a tool in a wellbore
US10927627B2 (en) 2019-05-14 2021-02-23 DynaEnergetics Europe GmbH Single use setting tool for actuating a tool in a wellbore
US11578549B2 (en) 2019-05-14 2023-02-14 DynaEnergetics Europe GmbH Single use setting tool for actuating a tool in a wellbore
US11946728B2 (en) 2019-12-10 2024-04-02 DynaEnergetics Europe GmbH Initiator head with circuit board
US11480038B2 (en) 2019-12-17 2022-10-25 DynaEnergetics Europe GmbH Modular perforating gun system
US11814915B2 (en) 2020-03-20 2023-11-14 DynaEnergetics Europe GmbH Adapter assembly for use with a wellbore tool string
US11225848B2 (en) 2020-03-20 2022-01-18 DynaEnergetics Europe GmbH Tandem seal adapter, adapter assembly with tandem seal adapter, and wellbore tool string with adapter assembly
US11988049B2 (en) 2020-03-31 2024-05-21 DynaEnergetics Europe GmbH Alignment sub and perforating gun assembly with alignment sub
US11339614B2 (en) 2020-03-31 2022-05-24 DynaEnergetics Europe GmbH Alignment sub and orienting sub adapter
USD904475S1 (en) 2020-04-29 2020-12-08 DynaEnergetics Europe GmbH Tandem sub
USD908754S1 (en) 2020-04-30 2021-01-26 DynaEnergetics Europe GmbH Tandem sub
USD981345S1 (en) 2020-11-12 2023-03-21 DynaEnergetics Europe GmbH Shaped charge casing
US11732556B2 (en) 2021-03-03 2023-08-22 DynaEnergetics Europe GmbH Orienting perforation gun assembly
US11713625B2 (en) 2021-03-03 2023-08-01 DynaEnergetics Europe GmbH Bulkhead
CN113588914A (en) * 2021-06-22 2021-11-02 清华大学 Tunnel cave wall rock body testing device and rock body disturbance state testing method
US11753889B1 (en) 2022-07-13 2023-09-12 DynaEnergetics Europe GmbH Gas driven wireline release tool

Also Published As

Publication number Publication date
DE102008026079A1 (en) 2008-12-04
BRPI0812294A2 (en) 2014-11-25
CA2689315A1 (en) 2008-12-04
MX2009012853A (en) 2010-02-03
WO2008145726A1 (en) 2008-12-04
EP2156013A1 (en) 2010-02-24

Similar Documents

Publication Publication Date Title
US20100230104A1 (en) Method for completing a borehole
EP3452684B1 (en) Pressure activated selective perforating switch support
US11732554B2 (en) Universal plug and play perforating gun tandem
AU2010217840B2 (en) Novel device and methods for firing perforating guns
CN101389826B (en) Apparatus and method for selective actuation of downhole tools
US11859471B2 (en) Modular initiator
US11391126B2 (en) Modular gun system
US20220282600A1 (en) Modular Gun System
US11965393B2 (en) Downhole setting assembly with switch module
CN116710631A (en) Direction detection switch and perforating gun
CA3151264A1 (en) Detonation system having sealed explosive initiation assembly
CA3221719A1 (en) Top connection for electrically ignited power charge

Legal Events

Date Code Title Description
AS Assignment

Owner name: DYNAENERGETICS GMBH & CO. KG, GERMANY

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:NOLKE, ROLF-DIETER;PEETERS, ROLAND;MCNELIS, LIAM;AND OTHERS;SIGNING DATES FROM 20100527 TO 20100609;REEL/FRAME:025231/0951

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION