US20090044482A1 - Wind turbine installation comprising an apparatus for protection of anchor bolts and method of installation - Google Patents

Wind turbine installation comprising an apparatus for protection of anchor bolts and method of installation Download PDF

Info

Publication number
US20090044482A1
US20090044482A1 US12/287,917 US28791708A US2009044482A1 US 20090044482 A1 US20090044482 A1 US 20090044482A1 US 28791708 A US28791708 A US 28791708A US 2009044482 A1 US2009044482 A1 US 2009044482A1
Authority
US
United States
Prior art keywords
grout
template member
template
sleeve
anchor bolts
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US12/287,917
Inventor
Norman L. Tooman
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from US12/012,137 external-priority patent/US7975519B1/en
Application filed by Individual filed Critical Individual
Priority to US12/287,917 priority Critical patent/US20090044482A1/en
Publication of US20090044482A1 publication Critical patent/US20090044482A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/02Structures made of specified materials
    • E04H12/08Structures made of specified materials of metal
    • E04H12/085Details of flanges for tubular masts
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03DWIND MOTORS
    • F03D13/00Assembly, mounting or commissioning of wind motors; Arrangements specially adapted for transporting wind motor components
    • F03D13/20Arrangements for mounting or supporting wind motors; Masts or towers for wind motors
    • F03D13/22Foundations specially adapted for wind motors
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/728Onshore wind turbines

Definitions

  • This invention generally relates to wind turbines, and anchoring devices, such as bolts, which are used in the foundations of wind turbines because of the high overturning moments to which wind turbines are subjected.
  • the invention more specifically relates to a plastic bolt sleeve used in combination with a threaded anchor, where the plastic sleeve is plastically deformed or “crimped” onto a portion of the threads of the bolt.
  • the invention further discloses methods and devices for crimping the sleeve onto a portion of the bolt threads.
  • the crimped bolt sleeve protects the anchor bolts from moisture and resulting corrosive attack and, when utilized with the disclosed template member, allows for the use of high compressive strength, low viscosity grouts, such as epoxy grout, to be used in the construction of the wind turbine foundation.
  • the use of the template member obviates the need for a crane to place and level the foundation flange prior to the grout setting and before the grout has cured and reached its full strength. This results in less time spent rigging the crane as the foundation flange may be set and the turbine tower placed in a single crane deployment.
  • the bolts used for anchoring wind turbines may either be set in concrete or drilled into the rock.
  • the integrity of the foundation of a wind turbine is subject to failure if the anchor bolts are not adequately protected.
  • anchors are subject to corrosive attack caused by the accumulation of water or other electrolytes in the anchoring hole which results in the creation of a corrosion cell.
  • the practices employed in preparing the foundation for a wind turbine often create an environment in which the anchor bolt is exposed to water or other liquid.
  • elongated high strength steel bolts In the fabrication of foundations for wind turbines, elongated high strength steel bolts, generally fashioned from 11 ⁇ 4′′ (#10) rebar material or 13 ⁇ 8′′ (#11) rebar material are set within the foundation excavation and concrete is poured into the excavation such that the bolts extend vertically up through the concrete from a peripheral anchor plate or ring near the bottom of the cylinder to a peripheral connecting plate or flange at the base of the wind turbine tower.
  • the bolts are typically threaded at the top and bottom ends for a length of approximately 24 inches.
  • the bolts are largely contained within hollow sleeves made of PVC which prevent adhesion of the concrete to the bolts.
  • the sleeves are typically installed prior to delivery of the bolts to the job site, and nuts must be placed on each end of the anchor bolt to retain the PVC sleeve on the anchor bolt material.
  • Henderson further discloses the post-stressing of the concrete in great compression by tightening the high strength bolts to provide heavy tension from the heavy top flange (i.e, the flange at the base of the wind turbine) through which the bolts pass to the anchor plate or ring at the bottom of the foundation, thereby placing the entire foundation from the heavy top plate or flange to the lower anchor plate or ring under high unit compression loading.
  • the nuts on the bolts are tightened so as to apply tension to the bolts exceeding the maximum expected overturning force of the wind turbine tower structure on the foundation. Therefore, the entire foundation withstands various loads with the concrete always in compression and the bolts always in static tension.
  • each bolt is free to move within its sleeve as the bolts are tensioned by tightening the nuts abutting the top flange. Steps are typically taken before the concrete is poured to seal the tops of the PVC sleeves to prevent the flow of concrete into the sleeves, such as wrapping duct tape around the tops of the sleeves. This can be a time-consuming process.
  • the sleeve typically terminates at approximately the top of the concrete foundation, with the bare metal of the anchor bolt extending above the sleeve, where the bolts extend through the flange and have a nut and bolt cap installed on the top side of the flange.
  • the tower flange is usually set on a grout base which overlies the concrete foundation.
  • the grout base is placed within a circular “grout trough” which is formed by the pouring of the concrete foundation around a circular template.
  • This circular template is utilized to collectively lift and place the anchor bolt assembly within the excavation prepared for the foundation.
  • the bolt holes in the circular template are sized to accommodate the bolt diameter, but not the diameter of the PVC sleeve, so the tops of the bolt sleeves will generally be flush with the bottom of the grout trough formed by the circular template.
  • the tower flange is set on the grout before the grout sets so that the tower base may be leveled. It is hoped that the foam sleeve will prevent grout from adhering to the body of the bolt, such that when the grout fully cures the bolt may be tensioned and slide through the foam sleeve without damage to the grout. However, in reality the foam sleeve is likely so deformed by the flange of the tower base that the bolts will not slide freely through the sleeves once the grout cures.
  • the use of the template member would eliminate the need for leveling shims and allow the grout to be poured and adequately cure before setting the flange onto the grout, as opposed to the current practice of setting and leveling the tower flange before the grout cures.
  • the current practice requires the service of a high capacity crane for the initial setting of the tower flange and subsequently for the assembly of the complete turbine.
  • the tower flange can be placed at the same time as the other turbine tower components, only a single use of the crane is required, resulting in less rigging up and rigging down time at each turbine tower installation.
  • the annulus between the bolt and PVC is sealed.
  • the annulus between the bolt and the PVC sleeve is open thereby providing a pathway for water and other fluids to enter the annulus and be trapped between the PVC sleeve and the metallic bolt, forming a corrosion cell. Because of this opening, steps are usually taken to protect the bolt from corrosive attack and/or to seal the sleeve-bolt annulus during installation.
  • the currently practiced installation procedure aggravates the situation, because, as described above, the procedure typically includes pouring water in the grout trough to allow the grout to cure. This practice allows water to accumulate at the top of the PVC sleeve, and potentially migrate into the sleeve-bolt annulus.
  • the initial attempt at solving the anchor bolt corrosion problem was to paint the anchor bolts along the entire length.
  • this solution is labor intensive and does not prevent liquid accumulation around the anchors.
  • this protection method requires that the anchors be repainted periodically, as well as after re-tensioning the anchor if required in the particular application.
  • the currently practiced method of protecting the anchor bolts is to seal the annulus between the top of the PVC sleeve and the bolt with a sealant, such as a silicon gel.
  • the current practice also includes placing foam or other material around the portion of the bolt extending above the PVC sleeve, so as to prevent adhesion of the grout to the bolt and to block the migration of water into the sleeve-bolt annulus.
  • foam cylinders with longitudinal slits are placed around the bolts, with duct tape wrapped around each cylinder, and the cylinder pushed downwardly into contact with the top of the PVC sleeve.
  • foam cylinders with longitudinal slits are placed around the bolts, with duct tape wrapped around each cylinder, and the cylinder pushed downwardly into contact with the top of the PVC sleeve.
  • the annulus may not be adequately sealed to prevent the intrusion of water into the PVC-bolt annulus.
  • the cylinders are greatly deformed. It is not unlikely that when the anchor bolts are tensioned, the bolt does not slide through the foam cylinder, but that the deformed foam cylinder moves within the grout, potentially damaging the integrity of the grout.
  • the PVC sleeves because of the outside diameter, displace, in totality, a significant volume of concrete in the foundation, thereby reducing the overall compressive strength of the foundation.
  • the use of the foam cylinders around the anchor bolts in the grout trough displaces a significant volume of grout, and thereby reduces the compressive strength of the flange foundation.
  • the present application is directed toward a method and apparatus which addresses the problems identified above.
  • the present invention comprises anchor bolts comprising a sheath or sleeve which extends above the grout trough and, if desired, may partially extend inside the base flange of the wind turbine base.
  • the sleeve may be manufactured from polypropylene, polyethylene or other materials having satisfactory mechanical properties, primarily that the material be capable of withstanding sufficient plastic deformation to cause the material to conform to the shape of the threads of the anchor bolts without failing.
  • each anchor bolt comprises a polypropylene sleeve in which a portion of the sleeve is “swaged” onto a portion of the threads of the bolt thereby creating a mechanical seal between the interior of the sleeve and the threads of the bolt.
  • the presently disclosed sleeve is hereinafter referred to as the “crimped sleeve”, although it is to be appreciated that only a portion of the sleeve actually comprises crimping or swaging.
  • the bolt package i.e. a bolt/sleeve combination
  • the bolt package has an overall diameter less than the overall diameter of the currently utilized bolt-PVC sleeve combination. This reduced diameter allows the bolt and crimped sleeve to extend through the bolt holes of the circular template, and into the bolt holes of the tower flange, which under the known apparatus and method, only a sleeveless bolt would extend. Because the crimped sleeve extends above the top of the grout trough, the encased bolts will not be exposed to water placed within the grout trough.
  • the top of the crimped sleeve extends above the level of the grout, the crimped sleeve prevents adhesion of the grout to the bolt, thereby allowing the bolt to move relative to the grout.
  • the disclosed apparatus provides a template member that comprises a surface to which grout will not adhere.
  • the template member is suspended by the anchor bolts, and is leveled across the grout trough.
  • grout is added to the space defined by the template member and the grout trough.
  • the grout may be introducing into the trough through fill holes that extend through the template member.
  • the grout is placed into the grout trough until the grout reaches the surface of the lower layer of the template member across the entirety of the grout trough.
  • the template may then be removed and the grout allowed to cure, or the template may be left in place atop the grout until the grout has cured, depending upon the environmental conditions present at the time.
  • the template member may comprise an upper layer and a lower layer, and the lower layer comprises a surface to which grout will not adhere.
  • the layers can be bonded together, and the bonding means can be thermal, chemical or mechanical bonding.
  • the upper layer may comprise a metallic layer.
  • the lower layer may comprise a plastic layer, and the plastic layer may comprise polyethylene.
  • the template member utilized in one embodiment of the disclosed device may be sectional, and can be placed sequentially around the grout trough and leveled. By placing the template member over the anchor bolts and then leveling the template member, the top surface of the grout placed into the area defined by the grout trough and the template member is thereby leveled. When the grout cures, the tower flange is installed on a level surface. No shims or blocks are required using this method to obtain a level foundation for the tower flange, as required in the known method.
  • FIG. 1 shows the base of a wind turbine which might utilize embodiments of the disclosed apparatus and method.
  • FIG. 2 shows a bolt assembly utilized for the foundation of a wind turbine being lowered into an excavation for the foundation.
  • FIG. 3 shows a detailed view of a portion of the grout trough prior to the placement of the tower base flange, showing the use of foam sleeves for preventing adhesion of grout onto each bolt body, and the use of a spacer block for leveling the tower base.
  • FIG. 4 shows a front view of a portion of a tower foundation, with the tower base flange beginning to be lowered onto the anchor bolts.
  • FIG. 5 shows a cross section of a portion of the base flange, grout, and PVC sleeve of a prior art anchor bolt installation.
  • FIG. 6 shows a cross section of a portion of the base flange, grout, and sleeve of an embodiment of the present invention.
  • FIG. 7 shows a portion of an embodiment of the disclosed crimped sleeve, showing how the sleeve is swaged around some of the threads of the anchor bolt.
  • FIG. 8 shows an embodiment of a device which may be utilized for swaging the sleeve around the threads of the anchor bolt.
  • FIG. 9 shows the device of FIG. 8 , showing how it is placed around an anchor bolt.
  • FIG. 10 shows a perspective side view of an embodiment of another swaging device which may utilized for swaging the sleeve around the threads of the anchor bolt.
  • FIG. 11 shows a perspective front view of the swaging device of FIG. 10 .
  • FIG. 12 shows a front view of the swaging device of FIG. 10 .
  • FIG. 13 shows a side vide of the swaging device of FIG. 10 .
  • FIG. 14 shows a cross section of a portion of the foundation, grout trough, template member and template member suspension means, prior to placement of the grout.
  • FIG. 15 shows a cross section of a portion of the foundation, grout trough, grout, template member and template member suspension means, following the placement of the grout.
  • FIG. 16 shows a cross section of a portion of the foundation, grout trough, grout, template member and template member suspension means, following the placement of the grout.
  • FIG. 17 shows a cross sectional view of an anchor bolt, a crimped sleeve, a suspension means and a portion of the template member.
  • FIG. 1 generally depicts the base 10 of a wind turbine set upon a foundation 12 .
  • Base 10 comprises a flange 14 , by which the base is attached to foundation 12 with anchor bolts 16 .
  • the anchor bolts 16 may be placed in side-by-side pairs, the pairs extending radially from the center of the foundation 12 forming an inner ring of bolts and an outer ring of bolts.
  • the bolt pattern is, of course, determined by the bolt pattern on the mounting flange 14 .
  • Each anchor bolt 16 has a corresponding nut 18 which is used to secure the base 10 , and to apply tension to the bolt.
  • the exposed portion of each bolt 16 is usually protected with a bolt cap 19 .
  • a large number of anchor bolts 16 is typically used for this type of foundation.
  • Henderson discloses an embodiment having forty-eight tensioning bolts in the inner ring and forty-eight tensioning bolts in the outer ring for a total of ninety-six.
  • the lower ends of the bolts are anchored at the bottom of the foundation to a lower anchor ring which may be constructed of several circumferentially butted and joined sections.
  • a lower anchor ring which may be constructed of several circumferentially butted and joined sections.
  • FIG. 2 depicts a bolt assembly 20 comprising a plurality of anchor bolts 16 being lifted in preparation for being placed within a relatively deep excavation prepared for construction of the foundation 12 .
  • the anchor bolts 16 typically used for wind turbines are approximately thirty feet in length, and usually have outside diameters of 11 ⁇ 4 inch or 13 ⁇ 8 inch.
  • Each anchor bolt 16 is partially enclosed within a “hollow tube” or sleeve 22 .
  • the sleeve is typically an elongated plastic tube fabricated from polyvinyl chloride (“PVC”) which encases the bolt 16 substantially through the entire vertical extent of the concrete and allows the bolt to be tensioned after the concrete has hardened and cured, thereby post-tensioning the entire concrete foundation.
  • PVC polyvinyl chloride
  • the anchor bolts 16 comprising bolt assembly 20 are secured at the end by circular template 23 , which is attached to a lifting assembly 24 and lifted by crane 26 .
  • FIG. 3 shows a close view of a portion of the grout trough 28 before grout has been poured or base flange 14 has been placed.
  • Grout trough 28 is formed as follows: when the concrete is poured, circular template 23 , which remains attached to lifting assembly 24 and held in place by crane 26 , holds the bolt assembly 20 in place. Concrete is poured up around circular template 23 , thereby forming an inner ring groove in the top of the foundation 12 known as the grout trough 28 . Before grout 30 is placed in grout trough 28 , a sealing member 32 comprising foam, plastic or other material, is placed around each bolt 16 .
  • Sealing member 32 is typically cylindrical in shape, having a circular opening and longitudinal slit cut through from the outside edge to the circular opening so the sealing member may be placed around each bolt 16 .
  • the sealing member 32 often has duct tape wrapped around it to secure it to the bolt 16 .
  • a leveling block 5 which is used, in combination with a number of other leveling blocks contained within the grout trough, to properly level the base flange 14 . It is to be appreciated that the placement of leveling block 5 immediately adjacent to sealing members 32 , which is not an uncommon occurrence in the prior art installations, inhibits the uniform deformation of the sealing members as the base flange 14 is lowered into the grout trough 28 , resulting in the non-uniform deformation discussed below.
  • FIG. 4 depicts a portion of a prior art foundation 12 after the grout has been poured and cured, but before flange 14 has been set upon the foundation 12 and nuts 18 made up onto bolts 16 . As shown in FIG. 5 , flange 14 will be set on top of the grout 30 contained within grout trough 28 .
  • FIG. 5 shows a cross section of a portion of the base flange 14 , grout layer 30 , and sleeve 22 of a prior art anchor bolt installation for a wind turbine, where sleeve 22 contains bolt 16 .
  • the top of sleeve 22 is generally flush with the bottom 34 of grout trough 28 . It is to be appreciated that before grout 30 is placed within grout trough 28 , the top of sleeve 22 is exposed to whatever liquids may enter the grout trough, such as water which may be placed in the grout trough to provide for hydration of the grout.
  • An annulus 36 is formed between bolt 16 and sleeve 22 , which provides a potential path for water or other liquids, such as low viscosity grout, to travel along the length of bolt 16 .
  • sealing member 32 is substantially deformed once engaged by base flange 14 .
  • FIG. 4 shows an idealized view of the deformed sealing member 32 , in which the deformation has been uniform. In actuality, it is expected that the deformation will not be uniform because of, for example, obstructions which may inhibit uniform deformation such as the leveling block 5 shown in FIG. 3 . It is also to be appreciated that the deformed sealing member 32 displaces more volume than the non-deformed sealing member.
  • each bolt requires the sealing member, a typical installation may have ninety-six of the deformed sealing members 32 in the grout trough 28 , thereby reducing the overall volume of grout which may be placed, resulting in a final grout pack with less strength than one having less grout displacement. It is also to be appreciated that once the grout 30 sufficiently cures, tension will be applied to each anchor bolt 16 by the tightening of a nut at the top of base flange 14 , causing the bolt to move relative to the grout. Ideally sealing member 32 would remain stationary, allowing bolt 16 to slide through the sealing member 32 . However, deformation of sealing member 32 reduces the ease with which anchor bolt 16 will slide through the sealing member 32 , potentially causing sealing member 32 to also move, potentially damaging the surrounding grout 30 .
  • FIG. 6 shows a cross section of a portion of the base flange 14 , grout 30 ′, and sleeve 38 of an embodiment of the present invention.
  • the crimped sleeve 38 does not terminate at the bottom 34 of the grout trough 28 , but rather extends upwardly through the space in which grout 30 ′ will be placed and partially penetrates the bolt hole 13 of base flange 14 . This feature prevents the top of crimped sleeve 38 from being exposed to the liquids which may be placed within grout trough 28 .
  • the use of crimped sleeve 38 as the protective sleeve for bolt 16 ′ is a substantial departure from the present use of PVC sleeve 22 .
  • the critical distinction between the presently disclosed crimped sleeves from the prior art sleeves 22 is that the wall thickness of the crimped sleeve 38 is substantially reduced, and the tolerance between the internal diameter of the crimped sleeve 38 and the outer diameter of the bolt threads is substantially reduced, resulting in an external diameter of the crimped sleeve which is smaller than possible with the thicker-walled PVC sleeves, allowing the crimped sleeves to extend into the bolt holes 13 of the base flange 14 .
  • a crimped sleeve 38 comprising polypropylene sleeves has a closer tolerance than the available PVC, such that the crimped sleeves 38 may have a clearance of 20 thousands of an inch between the internal diameter of the crimped sleeve 38 and the outer diameter of the anchor bolt threads. As shown in FIG. 6 , this smaller outside diameter of the crimped sleeve 38 allows a portion of the sleeve to be disposed within the holes 13 in the base flange 14 rather than terminating at the bottom 34 of the grout trough 28 as shown in FIG. 5 for the prior art sleeves.
  • the PVC tubes presently in use as sleeves do not extend into the base flange 14 of the wind turbine.
  • the diameters of bolt holes 13 for the base flanges 14 for wind turbines are approximately 11 ⁇ 2 inch, and the external diameters of commonly available PVC tubes which may be utilized as hollow tubes for 11 ⁇ 4 inch to 13 ⁇ 8 inch bolts are too large to be inserted within the holes of the flange.
  • the top of the crimped sleeve 38 is “swaged” such that a portion of the sleeve conforms to the threads of the anchor bolt 16 ′.
  • the swaging serves several purposes. First, the swaging retains the crimped sleeve 38 on the anchor bolt 16 ′ such that nuts are not required to retain the sleeve on the anchor bolt during transportation. This characteristic allows the anchor bolts 16 ′ to be shipped without nuts, which reduces manpower required for placing the nuts on the bolts for transportation and removing of the nuts from the bolts upon arrival.
  • the swaging further inhibits the flow of liquids into the annulus between the crimped sleeve 38 and the anchor bolt 16 ′, although it is to be appreciated that the exposure of the sleeve end to liquid is reduced or eliminated, because of the capability of placing the top of the crimped sleeve 38 within the base flange 14 rather than disposed at the bottom 34 of the grout trough 28 .
  • crimped sleeves 38 comprising polypropylene, or similar materials, have the desired mechanical properties for swaging the sleeve material such that it conforms to the shape of the threads.
  • the mechanical properties of the polypropylene are such that the material has a “memory” and retains the crimps 17 once the swaging operation has been completed.
  • the mechanical properties of the sleeve material are such that upon tensioning of the anchor bolt 16 ′, the material will plastically deform and the crimps 17 will relax and allow relative movement of the anchor bolt with little resistance.
  • FIGS. 8 and 9 show a die assembly 40 which may be utilized either with bolts 48 or with a hydraulic press to create the crimping of the crimped sleeve 38 .
  • Die assembly 40 comprises two sides, wherein each side comprises a thread profile 46 which matches the thread profile of the anchor bolt 16 ′. Compressing each side of the die assembly against a sleeve encased anchor bolt causes the crimped sleeve 38 to conform to the thread profile of the anchor bolt 16 ′.
  • FIGS. 10 through 13 show another embodiment of a swaging tool 50 .
  • This tool 50 comprises a swaging end 56 and a threaded end 54 , which define a longitudinal axis L, wherein the longitudinal axis is at the center of the tool.
  • the swaging tool 50 comprises an opening coinciding with the longitudinal axis L, and the threaded end comprises internal threads 52 which match the threads of the anchor bolt 16 ′.
  • the swaging end 56 comprises a plurality of rollers 58 a , 58 b , 58 c , 58 d , 58 e and 58 f , each roller having the same diameter.
  • Rollers 58 a , 58 b , 58 c , 58 d , 58 e and 58 f are arranged at different points along the length of the longitudinal axis L and have different radial distances from the longitudinal axis. Rollers 58 a through 58 f are attached to the swaging end with fasteners 60 , such as bolts or screws.
  • the rollers 58 a through 58 f are disposed within the tool 50 to follow the threads 21 of an anchor bolt 16 ′, compressing the sleeve into the threads to create the crimps 17 .
  • the rollers are disposed such that the center of each roller is a different radial distance from the longitudinal axis L. It is to be appreciated that a different swaging tool 50 may be fashioned for each bolt diameter and thread type, including right-handed and left-handed threads.
  • the centers of the rollers may have the following radial distances from the longitudinal axis L:
  • roller 58 a 1.391 inches
  • roller 58 b 1.415 inches
  • roller 58 c 1.295 inches
  • roller 58 d 1.319 inches
  • roller 58 e 1.343 inches
  • roller 58 f 1.367 inches
  • Swaging tool 50 which may comprise suitable material such as 1080 steel, is made up on at the end of a sleeve-encased anchor bolt, with the swaging end 56 made up first. As swaging tool 50 is screwed onto the threads, the bolt will ultimately engage internal threads 52 , which assist in guiding the tool. Once the swaging tool reaches the polypropylene sleeve, roller 58 f will be the first roller to engage the sleeve, followed by 58 e , etc., the rollers compressing the sleeve into the threads 21 .
  • the swaging tool 50 may be attached to both power tools and hand tools.
  • FIGS. 14 through 16 show the use of the template member 62 .
  • the template member 62 is leveled above the grout trough 28 , prior to the placement of the grout 30 ′.
  • the grout 30 ′ will be added to the space defined by the template member 62 and the grout trough 28 through fill holes 70 .
  • the template member 62 comprises a surface which the grout 30 ′ will contact but to which the grout 30 ′ will not adhere.
  • the template member 62 may be comprised of an upper metallic layer 64 and a lower layer 66 , wherein the lower layer 66 comprises a surface to which grout will not adhere. The lower layer 66 contacts the grout 30 ′.
  • the non-grout adhering properties of the template member ensure that the grout will not stick to the template and cause a rough grout surface. Additionally, the propensity for the grout to “flash” or cure unevenly may be reduced.
  • the upper metallic layer 64 and lower layer 66 may be bonded together through thermal, mechanical or chemical bonding.
  • the grout is added to the grout trough 28 through fill holes 70 in the template member 62 .
  • the template member 62 is held above the grout trough 28 through the use of suspension means 68 .
  • the suspension means 68 are used to retain the placement of the template member 62 once the template member 62 has been leveled.
  • the suspension means 68 may be nuts that are made up onto the anchor bolts 16 ′ and are magnetically attached to the upper metallic layer 64 of the template member 62 .
  • the grout 30 ′ has been placed into the grout trough 28 of the foundation 12 through a fill hole 70 that transverses the template member 62 .
  • FIG. 17 shows a cross sectional view of a portion of the template member 62 , an anchor bolt 16 ′ and a rotating sleeve 72 as the suspension means.
  • the rotating sleeve 72 is made up onto the anchor bolt 16 ′ and suspends and supports the template member 62 .
  • the upper layer 64 and the lower layer 66 are also shown.
  • the anchor bolt 16 ′ extends downward through the foundation and upwards through the template member 62 , and will be used to retain and support the wind turbine tower flange.
  • the crimped sleeve protects the anchor bolt 16 ′ from corrosion caused by contact with water or other electrolytes.

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Chemical & Material Sciences (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Paleontology (AREA)
  • Mining & Mineral Resources (AREA)
  • Materials Engineering (AREA)
  • Wood Science & Technology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Sustainable Development (AREA)
  • Sustainable Energy (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Foundations (AREA)

Abstract

An apparatus for use in providing a level grout surface for placement of a wind turbine tower flange, the apparatus comprising a template member levelly suspended on the anchor bolts above the grout trough, wherein the template member comprises a surface to which grout will not adhere. The template member can comprise an upper layer and a lower grout engagement layer, wherein the grout engagement layer comprises a surface to which grout will not adhere. The upper layer can comprise a metallic layer, and the lower layer can comprise a plastic layer, wherein the upper layer and the lower layer are bonded together. The lower layer can comprise polypropylene. The means of bonding are selected from the group consisting of mechanical bonding, thermal bonding and chemical bonding. The grout can comprise an epoxy grout. The template member can be suspended through the use of magnetic nuts or the use of a rotating sleeve. The template member can comprise a plurality of sections, and can comprise a circular form.

Description

    CROSS-REFERENCE TO RELATED APPLICATIONS
  • This is a continuation-in-part of U.S. application Ser. No. 12/012,137 filed on Jan. 30, 2008, which application claimed priority to U.S. Provision Application 60/898,452 filed on Jan. 30, 2007 and U.S. Provisional Application No. 60/905,399 filed on Mar. 5, 2007, for which applications this inventor claims domestic priority.
  • BACKGROUND OF THE INVENTION
  • This invention generally relates to wind turbines, and anchoring devices, such as bolts, which are used in the foundations of wind turbines because of the high overturning moments to which wind turbines are subjected. The invention more specifically relates to a plastic bolt sleeve used in combination with a threaded anchor, where the plastic sleeve is plastically deformed or “crimped” onto a portion of the threads of the bolt. The invention further discloses methods and devices for crimping the sleeve onto a portion of the bolt threads. Among other benefits, the crimped bolt sleeve protects the anchor bolts from moisture and resulting corrosive attack and, when utilized with the disclosed template member, allows for the use of high compressive strength, low viscosity grouts, such as epoxy grout, to be used in the construction of the wind turbine foundation. The use of the template member obviates the need for a crane to place and level the foundation flange prior to the grout setting and before the grout has cured and reached its full strength. This results in less time spent rigging the crane as the foundation flange may be set and the turbine tower placed in a single crane deployment.
  • The bolts used for anchoring wind turbines may either be set in concrete or drilled into the rock. The integrity of the foundation of a wind turbine is subject to failure if the anchor bolts are not adequately protected. In particular, anchors are subject to corrosive attack caused by the accumulation of water or other electrolytes in the anchoring hole which results in the creation of a corrosion cell. As described below, the practices employed in preparing the foundation for a wind turbine often create an environment in which the anchor bolt is exposed to water or other liquid.
  • By way of background for wind turbine foundations, U.S. Pat. Nos. 5,586,417 and 5,826,387, both by Henderson, disclose a pier foundation “which can be poured-on-site monolithically and is of cylindrical construction with many post-tensioned anchor bolts which maintain the poured portion of the foundation under heavy compression, even during periods when the foundation may be subject to high overturning moment.” Henderson's foundation is preferably in the shape of a cylinder, having an outer boundary shell and an inner boundary shell each formed of corrugated metal pipe which are set within an excavation.
  • In the fabrication of foundations for wind turbines, elongated high strength steel bolts, generally fashioned from 1¼″ (#10) rebar material or 1⅜″ (#11) rebar material are set within the foundation excavation and concrete is poured into the excavation such that the bolts extend vertically up through the concrete from a peripheral anchor plate or ring near the bottom of the cylinder to a peripheral connecting plate or flange at the base of the wind turbine tower. The bolts are typically threaded at the top and bottom ends for a length of approximately 24 inches. The bolts are largely contained within hollow sleeves made of PVC which prevent adhesion of the concrete to the bolts. The sleeves are typically installed prior to delivery of the bolts to the job site, and nuts must be placed on each end of the anchor bolt to retain the PVC sleeve on the anchor bolt material.
  • Henderson further discloses the post-stressing of the concrete in great compression by tightening the high strength bolts to provide heavy tension from the heavy top flange (i.e, the flange at the base of the wind turbine) through which the bolts pass to the anchor plate or ring at the bottom of the foundation, thereby placing the entire foundation from the heavy top plate or flange to the lower anchor plate or ring under high unit compression loading. The nuts on the bolts are tightened so as to apply tension to the bolts exceeding the maximum expected overturning force of the wind turbine tower structure on the foundation. Therefore, the entire foundation withstands various loads with the concrete always in compression and the bolts always in static tension. Because the bolts are each largely contained within a PVC sleeve, each bolt is free to move within its sleeve as the bolts are tensioned by tightening the nuts abutting the top flange. Steps are typically taken before the concrete is poured to seal the tops of the PVC sleeves to prevent the flow of concrete into the sleeves, such as wrapping duct tape around the tops of the sleeves. This can be a time-consuming process.
  • Based upon the discussion above, it is clear that the integrity of this type of foundation is dependent upon the integrity of the anchor bolts—the failure of a bolt creates a stress riser on the remaining bolts, leading to the potential failure of the entire foundation. The integrity of the steel anchor bolts can be compromised by corrosive attack. As described above, according to the current practice each anchor bolt is enclosed for most of its length within a PVC sleeve. However, because the outside diameter of the PVC sleeve is too large for the sleeve to enter the bolt hole of the flange of the tower structure, the sleeve typically terminates at approximately the top of the concrete foundation, with the bare metal of the anchor bolt extending above the sleeve, where the bolts extend through the flange and have a nut and bolt cap installed on the top side of the flange.
  • The tower flange is usually set on a grout base which overlies the concrete foundation. The grout base is placed within a circular “grout trough” which is formed by the pouring of the concrete foundation around a circular template. This circular template is utilized to collectively lift and place the anchor bolt assembly within the excavation prepared for the foundation. As with the holes of the flange of the tower base, the bolt holes in the circular template are sized to accommodate the bolt diameter, but not the diameter of the PVC sleeve, so the tops of the bolt sleeves will generally be flush with the bottom of the grout trough formed by the circular template.
  • In order to prevent dehydration of the grout—thus adversely impacting the grout strength—it is a common practice to place water within the grout trough prior to the pouring of the grout to keep the grout properly hydrated during the curing process. However, water placed in the trough will gravitate into the ends of the PVC sleeves which are flush with the bottom of the grout trough. In the current installation practice, a foam sleeve is typically placed around a portion of each bare bolt extending above the bottom of the grout trough, with each foam sleeve held in place with duct tape. The length (or height) of the foam sleeve is sized to extend above the anticipated thickness of the grout layer within the grout trough. In the known practice, the tower flange is set on the grout before the grout sets so that the tower base may be leveled. It is hoped that the foam sleeve will prevent grout from adhering to the body of the bolt, such that when the grout fully cures the bolt may be tensioned and slide through the foam sleeve without damage to the grout. However, in reality the foam sleeve is likely so deformed by the flange of the tower base that the bolts will not slide freely through the sleeves once the grout cures.
  • In particular, the use of the template member would eliminate the need for leveling shims and allow the grout to be poured and adequately cure before setting the flange onto the grout, as opposed to the current practice of setting and leveling the tower flange before the grout cures. The current practice requires the service of a high capacity crane for the initial setting of the tower flange and subsequently for the assembly of the complete turbine. However, if the tower flange can be placed at the same time as the other turbine tower components, only a single use of the crane is required, resulting in less rigging up and rigging down time at each turbine tower installation.
  • Once the tower has been installed and a nut and bolt cap installed on the bolt ends extending above the tower flange, the annulus between the bolt and PVC is sealed. However, during the known installation method, the annulus between the bolt and the PVC sleeve is open thereby providing a pathway for water and other fluids to enter the annulus and be trapped between the PVC sleeve and the metallic bolt, forming a corrosion cell. Because of this opening, steps are usually taken to protect the bolt from corrosive attack and/or to seal the sleeve-bolt annulus during installation. Unfortunately, the currently practiced installation procedure aggravates the situation, because, as described above, the procedure typically includes pouring water in the grout trough to allow the grout to cure. This practice allows water to accumulate at the top of the PVC sleeve, and potentially migrate into the sleeve-bolt annulus.
  • The initial attempt at solving the anchor bolt corrosion problem was to paint the anchor bolts along the entire length. However, this solution is labor intensive and does not prevent liquid accumulation around the anchors. In addition, this protection method requires that the anchors be repainted periodically, as well as after re-tensioning the anchor if required in the particular application. The currently practiced method of protecting the anchor bolts is to seal the annulus between the top of the PVC sleeve and the bolt with a sealant, such as a silicon gel.
  • As discussed above, the current practice also includes placing foam or other material around the portion of the bolt extending above the PVC sleeve, so as to prevent adhesion of the grout to the bolt and to block the migration of water into the sleeve-bolt annulus. Typically, foam cylinders with longitudinal slits are placed around the bolts, with duct tape wrapped around each cylinder, and the cylinder pushed downwardly into contact with the top of the PVC sleeve. However, with the large number of bolts utilized in these types of foundations, it is time consuming and difficult to seal the top of each PVC sleeve with sealant and to install the foam cylinders or similar devices. If hurried, the annulus may not be adequately sealed to prevent the intrusion of water into the PVC-bolt annulus. Moreover, once the tower base flange is set upon the foam cylinders, the cylinders are greatly deformed. It is not unlikely that when the anchor bolts are tensioned, the bolt does not slide through the foam cylinder, but that the deformed foam cylinder moves within the grout, potentially damaging the integrity of the grout. The PVC sleeves, because of the outside diameter, displace, in totality, a significant volume of concrete in the foundation, thereby reducing the overall compressive strength of the foundation. Likewise, the use of the foam cylinders around the anchor bolts in the grout trough displaces a significant volume of grout, and thereby reduces the compressive strength of the flange foundation.
  • SUMMARY OF THE INVENTION
  • The present application is directed toward a method and apparatus which addresses the problems identified above. In embodiments of the disclosed invention, rather than utilizing PVC sleeves which terminate at the bottom of the grout trough, the present invention comprises anchor bolts comprising a sheath or sleeve which extends above the grout trough and, if desired, may partially extend inside the base flange of the wind turbine base. The sleeve may be manufactured from polypropylene, polyethylene or other materials having satisfactory mechanical properties, primarily that the material be capable of withstanding sufficient plastic deformation to cause the material to conform to the shape of the threads of the anchor bolts without failing. The term “polypropylene” when used below, not only includes polypropylene materials, but other plastic materials having mechanical properties which allow those materials to be substituted for polypropylene. In the present application, each anchor bolt comprises a polypropylene sleeve in which a portion of the sleeve is “swaged” onto a portion of the threads of the bolt thereby creating a mechanical seal between the interior of the sleeve and the threads of the bolt. For purposes of distinguishing the presently disclosed sleeve from the prior art sleeves, the presently disclosed sleeve is hereinafter referred to as the “crimped sleeve”, although it is to be appreciated that only a portion of the sleeve actually comprises crimping or swaging.
  • The use of the polypropylene sleeve and the swaging of the sleeve onto a portion of the bolt threads accomplishes several improvements over the known apparatus and methods. The bolt package (i.e. a bolt/sleeve combination) has an overall diameter less than the overall diameter of the currently utilized bolt-PVC sleeve combination. This reduced diameter allows the bolt and crimped sleeve to extend through the bolt holes of the circular template, and into the bolt holes of the tower flange, which under the known apparatus and method, only a sleeveless bolt would extend. Because the crimped sleeve extends above the top of the grout trough, the encased bolts will not be exposed to water placed within the grout trough. Moreover, because a seal is formed between the top of the crimped sleeve and a portion of the threads of the bolt, access to the annulus between the bolt and the crimped sleeve is either eliminated or substantially reduced, thereby preventing or greatly limiting the axial migration of water or other electrolytes along the length of the bolt. In addition, because the top of the crimped sleeve extends above the level of the grout, the crimped sleeve prevents adhesion of the grout to the bolt, thereby allowing the bolt to move relative to the grout.
  • The disclosed apparatus provides a template member that comprises a surface to which grout will not adhere. The template member is suspended by the anchor bolts, and is leveled across the grout trough. Once the template member is leveled, either by the use of a laser level or a conventionally leveling means, grout is added to the space defined by the template member and the grout trough. The grout may be introducing into the trough through fill holes that extend through the template member. The grout is placed into the grout trough until the grout reaches the surface of the lower layer of the template member across the entirety of the grout trough. The template may then be removed and the grout allowed to cure, or the template may be left in place atop the grout until the grout has cured, depending upon the environmental conditions present at the time.
  • The template member may comprise an upper layer and a lower layer, and the lower layer comprises a surface to which grout will not adhere. The layers can be bonded together, and the bonding means can be thermal, chemical or mechanical bonding. The upper layer may comprise a metallic layer. The lower layer may comprise a plastic layer, and the plastic layer may comprise polyethylene.
  • The template member utilized in one embodiment of the disclosed device may be sectional, and can be placed sequentially around the grout trough and leveled. By placing the template member over the anchor bolts and then leveling the template member, the top surface of the grout placed into the area defined by the grout trough and the template member is thereby leveled. When the grout cures, the tower flange is installed on a level surface. No shims or blocks are required using this method to obtain a level foundation for the tower flange, as required in the known method.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • FIG. 1 shows the base of a wind turbine which might utilize embodiments of the disclosed apparatus and method.
  • FIG. 2 shows a bolt assembly utilized for the foundation of a wind turbine being lowered into an excavation for the foundation.
  • FIG. 3 shows a detailed view of a portion of the grout trough prior to the placement of the tower base flange, showing the use of foam sleeves for preventing adhesion of grout onto each bolt body, and the use of a spacer block for leveling the tower base.
  • FIG. 4 shows a front view of a portion of a tower foundation, with the tower base flange beginning to be lowered onto the anchor bolts.
  • FIG. 5 shows a cross section of a portion of the base flange, grout, and PVC sleeve of a prior art anchor bolt installation.
  • FIG. 6 shows a cross section of a portion of the base flange, grout, and sleeve of an embodiment of the present invention.
  • FIG. 7 shows a portion of an embodiment of the disclosed crimped sleeve, showing how the sleeve is swaged around some of the threads of the anchor bolt.
  • FIG. 8 shows an embodiment of a device which may be utilized for swaging the sleeve around the threads of the anchor bolt.
  • FIG. 9 shows the device of FIG. 8, showing how it is placed around an anchor bolt.
  • FIG. 10 shows a perspective side view of an embodiment of another swaging device which may utilized for swaging the sleeve around the threads of the anchor bolt.
  • FIG. 11 shows a perspective front view of the swaging device of FIG. 10.
  • FIG. 12 shows a front view of the swaging device of FIG. 10.
  • FIG. 13 shows a side vide of the swaging device of FIG. 10.
  • FIG. 14 shows a cross section of a portion of the foundation, grout trough, template member and template member suspension means, prior to placement of the grout.
  • FIG. 15 shows a cross section of a portion of the foundation, grout trough, grout, template member and template member suspension means, following the placement of the grout.
  • FIG. 16 shows a cross section of a portion of the foundation, grout trough, grout, template member and template member suspension means, following the placement of the grout.
  • FIG. 17 shows a cross sectional view of an anchor bolt, a crimped sleeve, a suspension means and a portion of the template member.
  • DETAILED DESCRIPTION OF THE EMBODIMENTS Prior Art Bolt Protection Devices
  • FIG. 1 generally depicts the base 10 of a wind turbine set upon a foundation 12. Base 10 comprises a flange 14, by which the base is attached to foundation 12 with anchor bolts 16. As shown in FIG. 1, the anchor bolts 16 may be placed in side-by-side pairs, the pairs extending radially from the center of the foundation 12 forming an inner ring of bolts and an outer ring of bolts. The bolt pattern is, of course, determined by the bolt pattern on the mounting flange 14. Each anchor bolt 16 has a corresponding nut 18 which is used to secure the base 10, and to apply tension to the bolt. The exposed portion of each bolt 16 is usually protected with a bolt cap 19.
  • A large number of anchor bolts 16 is typically used for this type of foundation. For example, Henderson discloses an embodiment having forty-eight tensioning bolts in the inner ring and forty-eight tensioning bolts in the outer ring for a total of ninety-six. In Henderson's foundation, the lower ends of the bolts are anchored at the bottom of the foundation to a lower anchor ring which may be constructed of several circumferentially butted and joined sections. Although it is to be appreciated that other means may be employed for anchoring the bolts, including drilling a portion of the anchor bolt into the ground.
  • FIG. 2 depicts a bolt assembly 20 comprising a plurality of anchor bolts 16 being lifted in preparation for being placed within a relatively deep excavation prepared for construction of the foundation 12. The anchor bolts 16 typically used for wind turbines are approximately thirty feet in length, and usually have outside diameters of 1¼ inch or 1⅜ inch. Each anchor bolt 16 is partially enclosed within a “hollow tube” or sleeve 22. The sleeve is typically an elongated plastic tube fabricated from polyvinyl chloride (“PVC”) which encases the bolt 16 substantially through the entire vertical extent of the concrete and allows the bolt to be tensioned after the concrete has hardened and cured, thereby post-tensioning the entire concrete foundation. The anchor bolts 16 comprising bolt assembly 20 are secured at the end by circular template 23, which is attached to a lifting assembly 24 and lifted by crane 26.
  • FIG. 3 shows a close view of a portion of the grout trough 28 before grout has been poured or base flange 14 has been placed. Grout trough 28 is formed as follows: when the concrete is poured, circular template 23, which remains attached to lifting assembly 24 and held in place by crane 26, holds the bolt assembly 20 in place. Concrete is poured up around circular template 23, thereby forming an inner ring groove in the top of the foundation 12 known as the grout trough 28. Before grout 30 is placed in grout trough 28, a sealing member 32 comprising foam, plastic or other material, is placed around each bolt 16. Sealing member 32 is typically cylindrical in shape, having a circular opening and longitudinal slit cut through from the outside edge to the circular opening so the sealing member may be placed around each bolt 16. The sealing member 32 often has duct tape wrapped around it to secure it to the bolt 16. Also shown in FIG. 3 is a leveling block 5 which is used, in combination with a number of other leveling blocks contained within the grout trough, to properly level the base flange 14. It is to be appreciated that the placement of leveling block 5 immediately adjacent to sealing members 32, which is not an uncommon occurrence in the prior art installations, inhibits the uniform deformation of the sealing members as the base flange 14 is lowered into the grout trough 28, resulting in the non-uniform deformation discussed below.
  • FIG. 4 depicts a portion of a prior art foundation 12 after the grout has been poured and cured, but before flange 14 has been set upon the foundation 12 and nuts 18 made up onto bolts 16. As shown in FIG. 5, flange 14 will be set on top of the grout 30 contained within grout trough 28.
  • FIG. 5 shows a cross section of a portion of the base flange 14, grout layer 30, and sleeve 22 of a prior art anchor bolt installation for a wind turbine, where sleeve 22 contains bolt 16. As shown in FIG. 5, the top of sleeve 22 is generally flush with the bottom 34 of grout trough 28. It is to be appreciated that before grout 30 is placed within grout trough 28, the top of sleeve 22 is exposed to whatever liquids may enter the grout trough, such as water which may be placed in the grout trough to provide for hydration of the grout. An annulus 36 is formed between bolt 16 and sleeve 22, which provides a potential path for water or other liquids, such as low viscosity grout, to travel along the length of bolt 16.
  • As can be seen in FIG. 5, sealing member 32 is substantially deformed once engaged by base flange 14. It is to be appreciated that FIG. 4 shows an idealized view of the deformed sealing member 32, in which the deformation has been uniform. In actuality, it is expected that the deformation will not be uniform because of, for example, obstructions which may inhibit uniform deformation such as the leveling block 5 shown in FIG. 3. It is also to be appreciated that the deformed sealing member 32 displaces more volume than the non-deformed sealing member. Because each bolt requires the sealing member, a typical installation may have ninety-six of the deformed sealing members 32 in the grout trough 28, thereby reducing the overall volume of grout which may be placed, resulting in a final grout pack with less strength than one having less grout displacement. It is also to be appreciated that once the grout 30 sufficiently cures, tension will be applied to each anchor bolt 16 by the tightening of a nut at the top of base flange 14, causing the bolt to move relative to the grout. Ideally sealing member 32 would remain stationary, allowing bolt 16 to slide through the sealing member 32. However, deformation of sealing member 32 reduces the ease with which anchor bolt 16 will slide through the sealing member 32, potentially causing sealing member 32 to also move, potentially damaging the surrounding grout 30.
  • Embodiments of the Present Invention
  • FIG. 6 shows a cross section of a portion of the base flange 14, grout 30′, and sleeve 38 of an embodiment of the present invention. In contrast to the prior art shown in FIG. 4, it can be seen in FIG. 5 that the crimped sleeve 38 does not terminate at the bottom 34 of the grout trough 28, but rather extends upwardly through the space in which grout 30′ will be placed and partially penetrates the bolt hole 13 of base flange 14. This feature prevents the top of crimped sleeve 38 from being exposed to the liquids which may be placed within grout trough 28. The use of crimped sleeve 38 as the protective sleeve for bolt 16′ is a substantial departure from the present use of PVC sleeve 22.
  • The critical distinction between the presently disclosed crimped sleeves from the prior art sleeves 22 is that the wall thickness of the crimped sleeve 38 is substantially reduced, and the tolerance between the internal diameter of the crimped sleeve 38 and the outer diameter of the bolt threads is substantially reduced, resulting in an external diameter of the crimped sleeve which is smaller than possible with the thicker-walled PVC sleeves, allowing the crimped sleeves to extend into the bolt holes 13 of the base flange 14. For example, a crimped sleeve 38 comprising polypropylene sleeves has a closer tolerance than the available PVC, such that the crimped sleeves 38 may have a clearance of 20 thousands of an inch between the internal diameter of the crimped sleeve 38 and the outer diameter of the anchor bolt threads. As shown in FIG. 6, this smaller outside diameter of the crimped sleeve 38 allows a portion of the sleeve to be disposed within the holes 13 in the base flange 14 rather than terminating at the bottom 34 of the grout trough 28 as shown in FIG. 5 for the prior art sleeves. The PVC tubes presently in use as sleeves do not extend into the base flange 14 of the wind turbine. The diameters of bolt holes 13 for the base flanges 14 for wind turbines are approximately 1½ inch, and the external diameters of commonly available PVC tubes which may be utilized as hollow tubes for 1¼ inch to 1⅜ inch bolts are too large to be inserted within the holes of the flange.
  • As shown in FIG. 6, and in greater detail in FIG. 7, the top of the crimped sleeve 38 is “swaged” such that a portion of the sleeve conforms to the threads of the anchor bolt 16′. The swaging serves several purposes. First, the swaging retains the crimped sleeve 38 on the anchor bolt 16′ such that nuts are not required to retain the sleeve on the anchor bolt during transportation. This characteristic allows the anchor bolts 16′ to be shipped without nuts, which reduces manpower required for placing the nuts on the bolts for transportation and removing of the nuts from the bolts upon arrival.
  • The swaging further inhibits the flow of liquids into the annulus between the crimped sleeve 38 and the anchor bolt 16′, although it is to be appreciated that the exposure of the sleeve end to liquid is reduced or eliminated, because of the capability of placing the top of the crimped sleeve 38 within the base flange 14 rather than disposed at the bottom 34 of the grout trough 28. It has been found that swaging approximately two inches of the top of the crimped sleeve 38 forms a sufficient length of “crimps” 17 (i.e., portions of the crimped sleeve 38 which conform to the shape of individual threads 21) to form an interference fit which adequately inhibits liquid penetration into the sleeve-bolt annulus. It has been found that crimped sleeves 38 comprising polypropylene, or similar materials, have the desired mechanical properties for swaging the sleeve material such that it conforms to the shape of the threads. The mechanical properties of the polypropylene are such that the material has a “memory” and retains the crimps 17 once the swaging operation has been completed. It is also to be appreciated that when the anchor bolts 16′ are tensioned by the tightening of the nuts 18, the mechanical properties of the sleeve material are such that upon tensioning of the anchor bolt 16′, the material will plastically deform and the crimps 17 will relax and allow relative movement of the anchor bolt with little resistance.
  • Also disclosed are swaging devices utilized in forming the crimped sleeves 38. FIGS. 8 and 9 show a die assembly 40 which may be utilized either with bolts 48 or with a hydraulic press to create the crimping of the crimped sleeve 38. Die assembly 40 comprises two sides, wherein each side comprises a thread profile 46 which matches the thread profile of the anchor bolt 16′. Compressing each side of the die assembly against a sleeve encased anchor bolt causes the crimped sleeve 38 to conform to the thread profile of the anchor bolt 16′.
  • FIGS. 10 through 13 show another embodiment of a swaging tool 50. This tool 50 comprises a swaging end 56 and a threaded end 54, which define a longitudinal axis L, wherein the longitudinal axis is at the center of the tool. The swaging tool 50 comprises an opening coinciding with the longitudinal axis L, and the threaded end comprises internal threads 52 which match the threads of the anchor bolt 16′. The swaging end 56 comprises a plurality of rollers 58 a, 58 b, 58 c, 58 d, 58 e and 58 f, each roller having the same diameter. Rollers 58 a, 58 b, 58 c, 58 d, 58 e and 58 f are arranged at different points along the length of the longitudinal axis L and have different radial distances from the longitudinal axis. Rollers 58 a through 58 f are attached to the swaging end with fasteners 60, such as bolts or screws.
  • The rollers 58 a through 58 f are disposed within the tool 50 to follow the threads 21 of an anchor bolt 16′, compressing the sleeve into the threads to create the crimps 17. The rollers are disposed such that the center of each roller is a different radial distance from the longitudinal axis L. It is to be appreciated that a different swaging tool 50 may be fashioned for each bolt diameter and thread type, including right-handed and left-handed threads.
  • By way of example only, for a tool having an overall radius of 2.0 inches, an inside diameter of 0.680 inches, and individual roller diameters of 1.250 inches, the centers of the rollers may have the following radial distances from the longitudinal axis L:
  • roller 58 a: 1.391 inches
  • roller 58 b: 1.415 inches
  • roller 58 c: 1.295 inches
  • roller 58 d: 1.319 inches
  • roller 58 e: 1.343 inches
  • roller 58 f: 1.367 inches
  • Swaging tool 50, which may comprise suitable material such as 1080 steel, is made up on at the end of a sleeve-encased anchor bolt, with the swaging end 56 made up first. As swaging tool 50 is screwed onto the threads, the bolt will ultimately engage internal threads 52, which assist in guiding the tool. Once the swaging tool reaches the polypropylene sleeve, roller 58 f will be the first roller to engage the sleeve, followed by 58 e, etc., the rollers compressing the sleeve into the threads 21. The swaging tool 50 may be attached to both power tools and hand tools.
  • FIGS. 14 through 16 show the use of the template member 62. In FIG. 14 the template member 62 is leveled above the grout trough 28, prior to the placement of the grout 30′. The grout 30′ will be added to the space defined by the template member 62 and the grout trough 28 through fill holes 70. The template member 62 comprises a surface which the grout 30′ will contact but to which the grout 30′ will not adhere. The template member 62 may be comprised of an upper metallic layer 64 and a lower layer 66, wherein the lower layer 66 comprises a surface to which grout will not adhere. The lower layer 66 contacts the grout 30′. The non-grout adhering properties of the template member ensure that the grout will not stick to the template and cause a rough grout surface. Additionally, the propensity for the grout to “flash” or cure unevenly may be reduced. The upper metallic layer 64 and lower layer 66 may be bonded together through thermal, mechanical or chemical bonding. The grout is added to the grout trough 28 through fill holes 70 in the template member 62. The template member 62 is held above the grout trough 28 through the use of suspension means 68. The suspension means 68 are used to retain the placement of the template member 62 once the template member 62 has been leveled. The suspension means 68 may be nuts that are made up onto the anchor bolts 16′ and are magnetically attached to the upper metallic layer 64 of the template member 62. In FIGS. 15 and 16 the grout 30′ has been placed into the grout trough 28 of the foundation 12 through a fill hole 70 that transverses the template member 62.
  • FIG. 17 shows a cross sectional view of a portion of the template member 62, an anchor bolt 16′ and a rotating sleeve 72 as the suspension means. The rotating sleeve 72 is made up onto the anchor bolt 16′ and suspends and supports the template member 62. The upper layer 64 and the lower layer 66 are also shown. The anchor bolt 16′ extends downward through the foundation and upwards through the template member 62, and will be used to retain and support the wind turbine tower flange. The crimped sleeve protects the anchor bolt 16′ from corrosion caused by contact with water or other electrolytes.
  • While the above is a description of various embodiments of the present invention, further modifications may be employed without departing from the spirit and scope of the present invention. For example, the size, shape, and/or material of the various components may be changed as desired. Thus the scope of the invention should not be limited by the specific structures disclosed.

Claims (19)

1. An apparatus for use in providing a level grout surface for placement of a wind turbine tower flange wherein the wind tower flange supports and stabilizes a wind turbine tower, the wind turbine tower flange installed on a foundation comprising a concrete base, a grout trough formed in the cement base for the placement of a grout used to support the wind turbine flange, and a plurality of upwardly disposed anchor bolts extending through the grout, wherein the anchor bolts retain and support the wind turbine flange, the apparatus comprising:
a template member levelly suspended on the anchor bolts above the grout trough, wherein said template member comprises a surface to which grout will not adhere.
2. The apparatus of claim 1 wherein said template member comprises an upper layer and a lower grout engagement layer, wherein said grout engagement layer comprises said surface to which grout will not adhere.
3. The apparatus of claim 2 wherein said upper layer comprises a metallic layer, and said lower layer comprises a plastic layer, wherein the upper layer and the lower layer are bonded together by a bonding means.
4. The apparatus of claim 3 wherein the lower layer is polypropylene.
5. The apparatus of claim 3 wherein the bonding means are selected from the group consisting of mechanical bonding, thermal bonding and chemical bonding.
6. The apparatus of claim 1 wherein the grout is an epoxy grout.
7. The apparatus of claim 3 wherein the template member is suspended by one or more nuts made up on respective anchor bolts, the bottom of each nut comprising a magnetic substance which adheres to the metallic surface.
8. The apparatus of claim 1 wherein the template member is suspended through the use of one or more rotating sleeves made up on the respective anchor bolts, wherein said sleeve extends through said template member, said sleeve further comprising a support member, said support member in rotatable engagement with said template member.
9. The apparatus of claim 1 wherein the template member comprises a plurality of sections.
10. The apparatus of claim 1 wherein the template member comprises a circular form.
11. An apparatus for use in leveling a wind turbine tower flange installed on a foundation comprising a plurality of upwardly disposed anchor bolts, the apparatus comprising:
a template member and a plurality of anchor bolt engagement means, the anchor bolt engagement means comprising a means for leveling said template member relative to the anchor bolts.
12. The apparatus of claim 11 wherein the anchor bolt engagement means are one or more nuts made up on respective anchor bolts, the bottom of each nut comprising a magnetic substance which adheres to the metallic surface.
13. The apparatus of claim 11 wherein the anchor bolt engagement means are one or more rotating sleeves made up on the respective anchor bolts, wherein said sleeve extends through said template member, said sleeve further comprising a support member, said support member in rotatable engagement with said template member.
14. The apparatus of claim 11 wherein the template member comprises a plurality of sections.
15. A method for levelly installing a wind turbine tower onto a wind turbine foundation, the method comprising the steps of:
installing an anchor bolt assembly using a circular template to lift said anchor bolt assembly and place said anchor bolt assembly into an excavation and pouring concrete to form a foundation;
removing said circular template from the foundation thereby creating a grout trough;
suspending a template member above said grout trough using suspension means attached to said anchor bolts;
leveling said template member;
introducing a grout into the space defined by said template member and said grout trough and allowing said grout to cure;
removing said template member; and installing the wind turbine flange.
16. The method of claim 15 wherein said template member comprises an upper metallic layer and a lower layer to which grout will not adhere.
17. The method of claim 15 wherein said grout comprises an epoxy grout.
18. The method of claim 16 wherein said suspension means are one or more nuts made up on respective anchor bolts, the bottom of each nut comprising a magnetic substance which adheres to the metallic surface.
19. The method of claim 15 wherein said suspension means are one or more rotating sleeves made up on the respective anchor bolts, wherein said sleeve extends through said template member, said sleeve further comprising a support member, said support member in rotatable engagement with said template member.
US12/287,917 2007-01-30 2008-10-14 Wind turbine installation comprising an apparatus for protection of anchor bolts and method of installation Abandoned US20090044482A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US12/287,917 US20090044482A1 (en) 2007-01-30 2008-10-14 Wind turbine installation comprising an apparatus for protection of anchor bolts and method of installation

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
US89845207P 2007-01-30 2007-01-30
US90539907P 2007-03-05 2007-03-05
US12/012,137 US7975519B1 (en) 2007-01-30 2008-01-30 Wind turbine installation comprising an apparatus for protection of anchor bolts and method
US12/287,917 US20090044482A1 (en) 2007-01-30 2008-10-14 Wind turbine installation comprising an apparatus for protection of anchor bolts and method of installation

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
US12/012,137 Continuation-In-Part US7975519B1 (en) 2007-01-30 2008-01-30 Wind turbine installation comprising an apparatus for protection of anchor bolts and method

Publications (1)

Publication Number Publication Date
US20090044482A1 true US20090044482A1 (en) 2009-02-19

Family

ID=40361868

Family Applications (1)

Application Number Title Priority Date Filing Date
US12/287,917 Abandoned US20090044482A1 (en) 2007-01-30 2008-10-14 Wind turbine installation comprising an apparatus for protection of anchor bolts and method of installation

Country Status (1)

Country Link
US (1) US20090044482A1 (en)

Cited By (39)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20100074760A1 (en) * 2008-09-24 2010-03-25 Yury Sherman Supporting system for suspended wind turbines
US20100307097A1 (en) * 2009-06-09 2010-12-09 Word Iii Thomas Nott Structural flange connection system and method
WO2011047723A1 (en) * 2009-10-22 2011-04-28 Amsc Windtec Gmbh Foundation fixing unit, wind energy converter, and method for fixing a tower of a wind energy converter onto a foundation
US20110138720A1 (en) * 2009-03-03 2011-06-16 Tooman Norman L Grout Sleeve for Foundation Anchor Bolts and Method for Protection of Anchor Bolts for a Vertical Structure, Including Wind Turbines
WO2011107589A1 (en) * 2010-03-05 2011-09-09 Suzlon Energy Gmbh Tower for a wind turbine
WO2011116817A1 (en) * 2010-03-24 2011-09-29 Vestas Wind Systems A/S A method of laying a foundation
EP2402278A1 (en) * 2010-06-29 2012-01-04 Siemens Aktiengesellschaft Arrangement for lifting a tower wall portion of a wind turbine and method for lifting a tower wall portion of a wind turbine
WO2012007000A1 (en) * 2010-07-13 2012-01-19 Tom Andresen Method of assembling a tubular building structure by using screw sockets
US8146323B1 (en) 2010-05-10 2012-04-03 Tooman Norman L Apparatus and method for installing anchor bolts in a cylindrical pier foundation
US20120124924A1 (en) * 2007-01-30 2012-05-24 Tooman Norman L Wind Turbine Installation Comprising an Apparatus for Protection of Anchor Bolts and Method of Installation.
US20120124919A1 (en) * 2009-05-05 2012-05-24 Aloys Wobben Method for erecting a tower, and tower
US8220214B1 (en) 2009-05-02 2012-07-17 Purdy Charles L Prefabricated weight distribution element
WO2012159061A1 (en) * 2011-05-18 2012-11-22 Toorman Norman L Foundation for a wind turbine utilizing a slurry of low viscosity grout
WO2012159086A1 (en) * 2011-05-18 2012-11-22 Tooman Norman L Grout template and method of use for wind turbine foundations
ES2405034R1 (en) * 2011-11-17 2013-06-17 Acciona Windpower Sa PROCEDURE AND UNIT FOR THE SETTING OF A TOWER FROM AN AIRCRAFT TO A FOUNDATION AND AEROGENERATOR THAT INCLUDES SUCH UNIT
CN103352475A (en) * 2013-07-08 2013-10-16 中铁二十一局集团电务电化工程有限公司 Electrified railway strong wind area contact net steel pipe support foundation bolt positioning mold
EP2224062A3 (en) * 2009-02-26 2013-11-06 Vestas Wind Systems A/S A foundation for a wind turbine and a method of making a foundation for a wind turbine
US8753040B2 (en) * 2012-11-14 2014-06-17 Ship And Ocean Industries R&D Center Offshore installation method of a wind power generator and its fabrication segments
EP2824057A1 (en) * 2013-07-11 2015-01-14 Siemens Aktiengesellschaft Raising a tower segment
CN104674837A (en) * 2015-02-26 2015-06-03 石健 Connection structure and connection method of draught fan foundation and draught fan tower barrel
US20150252581A1 (en) * 2012-10-01 2015-09-10 Valmont Industries, Inc. Base angle attachment assemblies
EP2616594A4 (en) * 2010-09-16 2016-05-11 Peikko Group Oy Method and arrangement for attaching a tower-like structure to a foundation
US20170067256A1 (en) * 2014-03-07 2017-03-09 Esteyco S.A.P. Cable anchoring means for a horizontal joint and cable anchoring procedure for a horizontal joint
CN106760890A (en) * 2017-02-28 2017-05-31 德阳市恒达灯具制造有限公司 Pedestal and the integrated anti-theft base station using the pedestal
WO2017108043A1 (en) * 2015-12-21 2017-06-29 Vestas Wind Systems A/S Method for forming a wind turbine foundation and related system for forming such a foundation
US9834727B2 (en) 2010-04-23 2017-12-05 Organic Fuel Technology A/S Process for the production of biofuel
CN107664100A (en) * 2016-07-27 2018-02-06 西门子公司 Bolt connecting device for the pylon of wind turbine
US9937643B2 (en) 2011-09-16 2018-04-10 Goss Construction, Inc. Concrete forming systems and methods
US10116846B2 (en) 2013-09-03 2018-10-30 Tobii Ab Gaze based directional microphone
US10214872B2 (en) 2014-04-16 2019-02-26 Vestas Wind Systems A/S Foundation for a wind turbine
US10310597B2 (en) 2013-09-03 2019-06-04 Tobii Ab Portable eye tracking device
US10370844B2 (en) * 2015-06-03 2019-08-06 Onguard Group Limited Securing assembly
EP3533998A1 (en) * 2018-03-01 2019-09-04 Siemens Gamesa Renewable Energy A/S Method for corrosion protection in a wind turbine and wind turbine
CN110387900A (en) * 2019-08-16 2019-10-29 中国水利水电第四工程局有限公司 Portable grouting slot structure in a kind of back-grouting of blower anchor bolt basis
US20200087945A1 (en) * 2018-09-13 2020-03-19 DEME Offshore Holding N.V. Auxiliary Device and Method for Realizing a Bolt Connection Between Connecting Flanges of a First and a Second Structure
US10686972B2 (en) 2013-09-03 2020-06-16 Tobii Ab Gaze assisted field of view control
CN111946556A (en) * 2020-07-29 2020-11-17 上海市机电设计研究院有限公司 Construction positioning method for precast concrete shell ring
US20220213704A1 (en) * 2021-01-06 2022-07-07 China Eleventh Chemical Construction Co., Ltd. Foundation bolt pre-embedding positioning mold and method for mounting foundation bolt
EP4047203A1 (en) * 2021-02-19 2022-08-24 Siemens Gamesa Renewable Energy A/S Plug for flange holes

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5586417A (en) * 1994-11-23 1996-12-24 Henderson; Allan P. Tensionless pier foundation
US6672023B2 (en) * 2000-09-27 2004-01-06 Allan P. Henderson Perimeter weighted foundation for wind turbines and the like
US6782667B2 (en) * 2000-12-05 2004-08-31 Z-Tek, Llc Tilt-up and telescopic support tower for large structures
US6808350B1 (en) * 2003-01-27 2004-10-26 Norman L. Tooman Anchor bolt cap and method of use

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5586417A (en) * 1994-11-23 1996-12-24 Henderson; Allan P. Tensionless pier foundation
US5826387A (en) * 1994-11-23 1998-10-27 Henderson; Allan P. Pier foundation under high unit compression
US6672023B2 (en) * 2000-09-27 2004-01-06 Allan P. Henderson Perimeter weighted foundation for wind turbines and the like
US7155875B2 (en) * 2000-09-27 2007-01-02 Henderson Allan P Method of forming a perimeter weighted foundation for wind turbines and the like
US6782667B2 (en) * 2000-12-05 2004-08-31 Z-Tek, Llc Tilt-up and telescopic support tower for large structures
US6808350B1 (en) * 2003-01-27 2004-10-26 Norman L. Tooman Anchor bolt cap and method of use

Cited By (68)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120124924A1 (en) * 2007-01-30 2012-05-24 Tooman Norman L Wind Turbine Installation Comprising an Apparatus for Protection of Anchor Bolts and Method of Installation.
US8726589B2 (en) * 2007-01-30 2014-05-20 Norman L. Tooman Wind turbine installation comprising an apparatus for protection of anchor bolts and method of installation
US8007236B2 (en) * 2008-09-24 2011-08-30 Yury Sherman Supporting system for suspended wind turbines
US20100074760A1 (en) * 2008-09-24 2010-03-25 Yury Sherman Supporting system for suspended wind turbines
EP2224062A3 (en) * 2009-02-26 2013-11-06 Vestas Wind Systems A/S A foundation for a wind turbine and a method of making a foundation for a wind turbine
US8272181B2 (en) * 2009-03-03 2012-09-25 Tooman Norman L Grout sleeve for foundation anchor bolts and method for protection of anchor bolts for a vertical structure, including wind turbines
US20110138720A1 (en) * 2009-03-03 2011-06-16 Tooman Norman L Grout Sleeve for Foundation Anchor Bolts and Method for Protection of Anchor Bolts for a Vertical Structure, Including Wind Turbines
US8220214B1 (en) 2009-05-02 2012-07-17 Purdy Charles L Prefabricated weight distribution element
US8857131B2 (en) * 2009-05-05 2014-10-14 Aloys Wobben Method for erecting a tower, and tower
US20120124919A1 (en) * 2009-05-05 2012-05-24 Aloys Wobben Method for erecting a tower, and tower
US8490337B2 (en) 2009-06-09 2013-07-23 Thomas Nott Word, III Structural flange connection system and method
US20100307097A1 (en) * 2009-06-09 2010-12-09 Word Iii Thomas Nott Structural flange connection system and method
WO2011047723A1 (en) * 2009-10-22 2011-04-28 Amsc Windtec Gmbh Foundation fixing unit, wind energy converter, and method for fixing a tower of a wind energy converter onto a foundation
WO2011107589A1 (en) * 2010-03-05 2011-09-09 Suzlon Energy Gmbh Tower for a wind turbine
WO2011116817A1 (en) * 2010-03-24 2011-09-29 Vestas Wind Systems A/S A method of laying a foundation
CN102859076A (en) * 2010-03-24 2013-01-02 维斯塔斯风力系统集团公司 A method of laying a foundation
US9080306B2 (en) 2010-03-24 2015-07-14 Vestas Wind Systems A/S Method of laying a foundation of a tower construction
US9834727B2 (en) 2010-04-23 2017-12-05 Organic Fuel Technology A/S Process for the production of biofuel
US8146323B1 (en) 2010-05-10 2012-04-03 Tooman Norman L Apparatus and method for installing anchor bolts in a cylindrical pier foundation
EP2402278A1 (en) * 2010-06-29 2012-01-04 Siemens Aktiengesellschaft Arrangement for lifting a tower wall portion of a wind turbine and method for lifting a tower wall portion of a wind turbine
US8764082B2 (en) 2010-06-29 2014-07-01 Siemens Aktiengesellschaft Arrangement for lifting a tower wall portion of a wind turbine and method for lifting a tower wall portion of a wind turbine
CN103124823A (en) * 2010-07-13 2013-05-29 安德森塔沃森有限公司 Method of assembling a tubular building structure by using screw sockets
US9175494B2 (en) 2010-07-13 2015-11-03 Andresen Towers A/S Method of assembling a tubular building structure by using screw sockets
US9091098B2 (en) * 2010-07-13 2015-07-28 Andresen Towers A/S Method of assembling a tubular building structure by using screw sockets
WO2012007000A1 (en) * 2010-07-13 2012-01-19 Tom Andresen Method of assembling a tubular building structure by using screw sockets
EP2616594A4 (en) * 2010-09-16 2016-05-11 Peikko Group Oy Method and arrangement for attaching a tower-like structure to a foundation
WO2012159061A1 (en) * 2011-05-18 2012-11-22 Toorman Norman L Foundation for a wind turbine utilizing a slurry of low viscosity grout
US8555518B2 (en) 2011-05-18 2013-10-15 Norman Tooman Grout template for wind turbine foundations
WO2012159086A1 (en) * 2011-05-18 2012-11-22 Tooman Norman L Grout template and method of use for wind turbine foundations
US10836080B2 (en) 2011-09-16 2020-11-17 Goss Construction, Inc. Concrete forming systems and methods
US10449699B2 (en) 2011-09-16 2019-10-22 Goss Construction, Inc. Concrete forming systems and methods
US11559924B2 (en) 2011-09-16 2023-01-24 Goss Construction, Inc. Concrete forming systems and methods
US10112325B2 (en) 2011-09-16 2018-10-30 Goss Construction, Inc. Concrete forming systems and methods
US9937643B2 (en) 2011-09-16 2018-04-10 Goss Construction, Inc. Concrete forming systems and methods
US9016005B2 (en) 2011-11-17 2015-04-28 Acciona Windpower, S.A. Process and unit for the attachment of a wind turbine's tower to a foundation and wind turbine incorporating said unit
ES2405034R1 (en) * 2011-11-17 2013-06-17 Acciona Windpower Sa PROCEDURE AND UNIT FOR THE SETTING OF A TOWER FROM AN AIRCRAFT TO A FOUNDATION AND AEROGENERATOR THAT INCLUDES SUCH UNIT
US10100548B2 (en) * 2012-10-01 2018-10-16 Valmont Industries, Inc. Base angle attachment assemblies
US20150252581A1 (en) * 2012-10-01 2015-09-10 Valmont Industries, Inc. Base angle attachment assemblies
US8753040B2 (en) * 2012-11-14 2014-06-17 Ship And Ocean Industries R&D Center Offshore installation method of a wind power generator and its fabrication segments
CN103352475A (en) * 2013-07-08 2013-10-16 中铁二十一局集团电务电化工程有限公司 Electrified railway strong wind area contact net steel pipe support foundation bolt positioning mold
EP2824057A1 (en) * 2013-07-11 2015-01-14 Siemens Aktiengesellschaft Raising a tower segment
US10277787B2 (en) 2013-09-03 2019-04-30 Tobii Ab Portable eye tracking device
US10389924B2 (en) 2013-09-03 2019-08-20 Tobii Ab Portable eye tracking device
US10116846B2 (en) 2013-09-03 2018-10-30 Tobii Ab Gaze based directional microphone
US10708477B2 (en) 2013-09-03 2020-07-07 Tobii Ab Gaze based directional microphone
US10310597B2 (en) 2013-09-03 2019-06-04 Tobii Ab Portable eye tracking device
US10375283B2 (en) 2013-09-03 2019-08-06 Tobii Ab Portable eye tracking device
US10686972B2 (en) 2013-09-03 2020-06-16 Tobii Ab Gaze assisted field of view control
US10633862B2 (en) * 2014-03-07 2020-04-28 Esteyco S.A.P. Cable anchoring means for a horizontal joint and cable anchoring procedure for a horizontal joint
US20170067256A1 (en) * 2014-03-07 2017-03-09 Esteyco S.A.P. Cable anchoring means for a horizontal joint and cable anchoring procedure for a horizontal joint
US10214872B2 (en) 2014-04-16 2019-02-26 Vestas Wind Systems A/S Foundation for a wind turbine
CN104674837A (en) * 2015-02-26 2015-06-03 石健 Connection structure and connection method of draught fan foundation and draught fan tower barrel
US10370844B2 (en) * 2015-06-03 2019-08-06 Onguard Group Limited Securing assembly
US11236727B2 (en) 2015-12-21 2022-02-01 Vestas Wind Systems A/S Method for forming a wind turbine foundation and related system for forming such a foundation
WO2017108043A1 (en) * 2015-12-21 2017-06-29 Vestas Wind Systems A/S Method for forming a wind turbine foundation and related system for forming such a foundation
US20180355851A1 (en) * 2015-12-21 2018-12-13 Vestas Wind Systems A/S Method for forming a wind turbine foundation and related system for forming such a foundation
CN108474193A (en) * 2015-12-21 2018-08-31 维斯塔斯风力系统有限公司 It is used to form the method for turbine foundation and is used to form the related system of this pedestal
US10378516B2 (en) 2016-07-27 2019-08-13 Siemens Gamesa Renewable Energy A/S Bolt connection for a tower of a wind turbine
CN107664100A (en) * 2016-07-27 2018-02-06 西门子公司 Bolt connecting device for the pylon of wind turbine
CN106760890A (en) * 2017-02-28 2017-05-31 德阳市恒达灯具制造有限公司 Pedestal and the integrated anti-theft base station using the pedestal
CN110219777A (en) * 2018-03-01 2019-09-10 西门子歌美飒可再生能源公司 Method for corrosion protection in a wind turbine and wind turbine
EP3533998A1 (en) * 2018-03-01 2019-09-04 Siemens Gamesa Renewable Energy A/S Method for corrosion protection in a wind turbine and wind turbine
US20200087945A1 (en) * 2018-09-13 2020-03-19 DEME Offshore Holding N.V. Auxiliary Device and Method for Realizing a Bolt Connection Between Connecting Flanges of a First and a Second Structure
US10920443B2 (en) * 2018-09-13 2021-02-16 Deme Offshore Be Nv Auxiliary device and method for realizing a bolt connection between connecting flanges of a first and a second structure
CN110387900A (en) * 2019-08-16 2019-10-29 中国水利水电第四工程局有限公司 Portable grouting slot structure in a kind of back-grouting of blower anchor bolt basis
CN111946556A (en) * 2020-07-29 2020-11-17 上海市机电设计研究院有限公司 Construction positioning method for precast concrete shell ring
US20220213704A1 (en) * 2021-01-06 2022-07-07 China Eleventh Chemical Construction Co., Ltd. Foundation bolt pre-embedding positioning mold and method for mounting foundation bolt
EP4047203A1 (en) * 2021-02-19 2022-08-24 Siemens Gamesa Renewable Energy A/S Plug for flange holes

Similar Documents

Publication Publication Date Title
US20090044482A1 (en) Wind turbine installation comprising an apparatus for protection of anchor bolts and method of installation
US8726589B2 (en) Wind turbine installation comprising an apparatus for protection of anchor bolts and method of installation
US20120291380A1 (en) Foundation for a Wind Turbine Utilizing a Slurry of Low Viscosity Grout
US8272181B2 (en) Grout sleeve for foundation anchor bolts and method for protection of anchor bolts for a vertical structure, including wind turbines
EP2041371B1 (en) A tower construction
CA2809429C (en) System for anchoring a load
EP0793754B1 (en) Tensionless pier foundation
US9481973B2 (en) Continuous strand hoop reinforcement for concrete foundations
US4702057A (en) Repairing utility poles
US5175973A (en) Compression repair method and apparatus
CN111764379A (en) Construction method and structure applied to reverse construction steel pipe pile
CA2942790C (en) Pile foundations for supporting power transmission towers
US20160340858A1 (en) Method for installing overhead transmission line supports on permafrost soils
KR102019693B1 (en) Intake tower earthquake proofing and reinforcing method using cable
US10704252B2 (en) Method for lifting and supporting a new slab foundation with hydraulic jacks
Tabatabai et al. Implications of test results from full-scale fatigue tests of stay cables composed of seven-wire prestressing strands
EP3128095B1 (en) Post tensioned tendon and method of coupling
CN112393031B (en) Pipeline maintenance method
CN216339716U (en) Anti-floating anchor rod structure
GB2109437A (en) A structural member having a stressing element and a reinforcing element
CN114000547A (en) Anti-floating anchor rod structure and construction method thereof
CN114411799A (en) Prestressed anchor bolt and mounting method thereof
CN117888531A (en) Pulling-pressing combined slow-bonding post Zhang Kang pile pulling and construction process thereof
JPS63289117A (en) Construction and structure of anchor
AU2476101A (en) Method of restoring termite or rot damaged timber

Legal Events

Date Code Title Description
STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION