Prior art keywords
module
combination unit
unit according
nitrogen
well servicing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US11/796,168
Inventor
James D. Crawford
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WS (BLOCKER) Inc
Original Assignee
WS (BLOCKER) Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WS (BLOCKER) Inc filed Critical WS (BLOCKER) Inc
Priority to US11/796,168 priority Critical patent/US20080264649A1/en
Publication of US20080264649A1 publication Critical patent/US20080264649A1/en
Assigned to WS (BLOCKER), INC. reassignment WS (BLOCKER), INC. BILL OF SALE/ASSIGNMENT Assignors: WISE WELL INTERVENTION SERVICES, INC.
Abandoned legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B19/00Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
    • E21B19/22Handling reeled pipe or rod units, e.g. flexible drilling pipes
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • E21B43/166Injecting a gaseous medium; Injecting a gaseous medium and a liquid medium
    • E21B43/168Injecting a gaseous medium

Definitions

  • This invention relates, generally, to the treatment of oil and gas wells using fluids to increase the production capability of the wells, and more specifically, to providing for treatment of oil and gas wells with a means and apparatus that combines multiple modules—which may include: coiled tubing, nitrogen generation, fluid pumping, blending tanks, wireline inspection, and other modules—into a single unit.
  • the prior art equivalent typically brings as many as five transportation units (tractor-trailers, barges, or boats) to the well to be treated, one having a coil tubing unit; one having either a liquid nitrogen tank or a large footprint nitrogen generation unit; one having the nitrogen pumping unit; one high pressure pumping unit for acids and other chemicals; and a separate wireline unit.
  • the prior art may have a very large boat or barge with multiple units, each with its own power source. Separate, dedicated power sources for each unit drastically increases the mass and volume that must be transported.
  • Current power packs are horsepower limited, which limits the equipment that each can drive.
  • each of the five units above has its own engine. Even with a hydraulic power manifold to drive multiple units from a single engine, the horsepower limits how many can be integrated. The requirement for multiple (or much larger) transportation units increases the transportation costs, time, and personnel required to bring the units to the well and run these services.
  • U.S. Provisional Patent application 60/699,759 teaches a single, relatively small, self-powered unit with all of the equipment and accessories for running a nitrogen generation system and pressure pumping chemicals to treat wells.
  • U.S. Pat. No. 6,230,805 (Vercaemer) teaches a method of hydraulic fracturing in which at least two separate fracturing fluid components are pumped downhole—one of said components being pumped downhole within coiled tubing—but does not teach how to accomplish this with a single compact unit in which all equipment is powered by an onsite engine and that also provides for the coil tubing operation and wireline inspection.
  • U.S. Pat. No. 6,702,011 also by the present inventors, teaches a combined nitrogen treatment system and coiled tubing system in one tractor/trailer apparatus.
  • a single tractor-trailer unit is provided, in which the tractor itself drives a plurality of hydraulic motors that control the pumps and motors associated with a nitrogen system that is used for injecting nitrogen into a well.
  • a crane unit and a coiled tubing injection unit are also provided.
  • no disclosure is made for the provision of wireline inspection, well servicing fluid tanks, mixers, and pumps.
  • the preferred type of nitrogen system is tanks of liquid nitrogen, although an alternative mode is disclosed in which the liquid nitrogen system is replaced with one or more nitrogen generators that gather nitrogen from the earth's atmosphere.
  • the nitrogen could be mixed with well servicing fluids provided by the same unit.
  • PCT Application US2004/034521 teaches a three in-one nitrogen treatment system, fluid system, and coiled tubing system in one unit.
  • a single tractor-trailer or marine unit is provided, but unlike the engineless present invention, an onboard engine drives a plurality of hydraulic motors that control the pumps and motors associated with a nitrogen system and a fluid system that is used for injecting nitrogen and fluid into a well.
  • a coil tubing system is also provided. The only means disclosed for pumping fluid to the well is through the coil tubing system and no disclosure is made for the injection of well servicing fluids directly into the well, and no fluid blending tank is disclosed. Also, no means for wireline inspection is provided.
  • the off-shore prior art that has the same functionality as the present invention is larger, more expensive, and requires either multiple barges or ships—necessitating additional time and expense for set up and take down of ship to ship plumbing- or a larger, more expensive barge or ship that has a deeper draft and can therefore depart from and reach fewer locations.
  • the primary object of this present invention is to provide a small engineless unit that can be placed on a single small barge or ship or a single tractor-trailer or marsh buggy and use an onsite power supply to provide wireline inspection, coil tubing operations, and nitrogen generation and pump a combination of high pressure nitrogen and acids or other chemicals into wells.
  • the configuration of the present invention on a marsh buggy could be nearly identical to the configuration on a boat or barge.
  • Combination of multiple units such as a wireline, coil tubing unit, nitrogen generator with fluid pumping and mixing on a single transportation unit and all powered by an external power source through a single onboard custom hydraulic manifold is not known in the prior art to the best of the inventor's knowledge.
  • the primary object of the present invention is to provide a modular well servicing unit that can be placed on a single tractor-trailer, amphibious vehicle, or a small barge or ship.
  • a single well servicing combination unit comprising: a hydraulic manifold removably connectable to the power-take-off of a power source to drive a plurality of hydraulic pumps and motors that control a plurality of well servicing modules that are removably mounted on said combination unit, said well servicing modules being interconnectable by plumbing.
  • FIG. 1 is a top view diagram of the lay out of a 105 class jack-up boat with a custom hydraulic manifold, wireline inspection module, coil tubing module, crane, mixing tank module, storage tank module, fluid pump with power pack, operator console module, and nitrogen generation module, in accordance with an embodiment of the present invention.
  • FIG. 2 is an elevated, block diagram side view of the deck of the boat from FIG. 1 , that shows a nitrogen generation module that is connected to the discharge line at a tee, and storage, mixing, and pumping modules for well servicing fluid connected to said discharge line at said tee, in accordance with an embodiment of the present invention.
  • FIG. 3 illustrates, in block diagram, the various systems that are used in accordance with the present invention to treat a well with nitrogen and well servicing fluid, in accordance with an embodiment of the present invention.
  • FIG. 4 is a pictorial view of three nitrogen generator modules, in accordance with an embodiment of the present invention.
  • FIG. 5 is a pictorial view of a module using membrane technology to pull gaseous nitrogen out of the atmosphere, in accordance with an embodiment of the present invention.
  • FIG. 6 shows the external interfaces of the entire WISETM unit including customer-furnished modules, in accordance with an embodiment of the present invention.
  • FIG. 7 shows the external interfaces of a subset of the entire WISETM unit, in accordance with an embodiment of the present invention.
  • FIG. 8 shows injector head performance, in accordance with an embodiment of the present invention.
  • FIG. 9 shows injector head performance, in accordance with an embodiment of the present invention.
  • FIG. 10 is a block diagram of a WISETM Unit including a coil tubing deployment module, injector head module, and well control stack module, in accordance with an embodiment of the present invention.
  • FIG. 11 is a block diagram of a WISETM CTN2 Unit including a coil tubing deployment module, injector head module, and well control stack BOP Module, in accordance with an embodiment of the present invention.
  • the preferred embodiment of the present invention is the “WISETM Unit”, comprising a plurality of modules and components.
  • the “WISETM Unit” is the entire package of equipment delivered.
  • a “Module” can be any of the removably connectable major parts of the “WISETM Unit.” Examples:
  • a Component is a sub part of a Module. This specification defines components only to the extent necessary for manufacturing or operational flexibility.
  • the WISETM CT SGN2 unit's architecture (also called the “WISETM Architecture”) allows the insertion of different servicing modules (i.e., coiled tubing, self-generating nitrogen, and servicing fluid pumps) when ordering future WISETM Units without redesign of other Modules (i.e., operator control module, transportation modules, and power packs).
  • servicing modules i.e., coiled tubing, self-generating nitrogen, and servicing fluid pumps
  • the WISETM Unit's architecture and design documentation allow substitution of major Modules and Components supplied by one manufacturer with Modules and Components meeting the same specifications supplied by another manufacturer to take advantage of shorter lead times.
  • a system integrator approach is enabled by completely modularity. Every piece of well intervention equipment becomes a Module to be “integrated” into a working unit. This gives WISE flexibility of design without sacrificing producibility of design (manufacturability—standards) and has direct impact on depot maintenance program and reduces the number of different spare parts in inventory (Standardization).
  • FIG. 1 a top view of jack-up boat 10 having either a gasoline engine or a diesel engine is illustrated.
  • nitrogen generator module 31 also shown in FIG. 4
  • boat deck 30 Mounted on the boat deck 30 are nitrogen generator module 31 (also shown in FIG. 4 ) that extracts nitrogen from the atmosphere to eliminate the need for (and the associated cost of) transporting and filling nitrogen tanks.
  • Mounted to boat deck 30 are chemical storage tank modules 42 that supply chemicals to blending tank modules 50 where the chemicals are mixed.
  • the mixed chemicals flow to the well servicing fluid pump module 48 .
  • the mixed chemicals may flow through the coil tubing 82 , 50 to the well head.
  • Wireline inspection module 52 is mounted to deck 30 .
  • control cabin module 34 Also mounted on the deck 30 is control cabin module 34 in which the electrical and hydraulic modules 36 are controlled by a human operator. Components are described in greater detail in the description of FIG. 2 below.
  • FIG. 2 a diagram of a jack-up boat 10 is illustrated.
  • a custom hydraulic manifold 70 that distributes power from an external power source 200 to all engineless modules on deck 30 —nitrogen air feed module 32 , injector module 44 , crane module 46 , well servicing pump module 48 , blending tank module 50 , and Wireline module 52 .
  • Mounted on deck 30 is a feed air system 32 that is connected to nitrogen membranes 33 . Together, the feed air system 32 and nitrogen membranes 33 function as a nitrogen generator module 31 (also shown in FIG. 4 ) that extracts nitrogen from the atmosphere to eliminate the need for (and the associated cost of) transporting and filling nitrogen tanks.
  • nitrogen generator module 31 utilizes a membrane 33 (also shown in detail in FIG. 5 ) that allows nitrogen-rich air from the earth's atmosphere to be continuously fed into the bundle housing.
  • the air reaches the center of the bundle of membrane fibers which, at that point, consists mostly of gaseous nitrogen.
  • the nitrogen collects in the mandrel at the center of the bundle.
  • the oxygen and other fast gases pass through the wall of the membrane fibers as the fast gases go through to be collected at the end. Oxygen, water vapor, and the other fast gases are continuously collected and are moved from the bundle, thus leaving the nitrogen available to be used for injection into the well being treated. This occurs at near ambient pressure and temperature.
  • the nitrogen generator modules 31 of the preferred embodiment accomplish this nitrogen generation with a smaller footprint than any prior art the inventor knows.
  • the nitrogen then flows to the nitrogen booster compressor 38 that then compresses the dry nitrogen to the desired pressure.
  • the nitrogen will then be pumped to the tee 39 where it mixes with a fluid or a fluid mix, such as an acid, and then the resulting mixture enters the discharge line 41 .
  • the nitrogen in the discharge line may be either liquid or gas.
  • Mounted to boat deck 30 are chemical storage tank modules 42 that supply chemicals to blending tanks 50 where the chemicals are mixed.
  • the mixed chemicals flow first to the centrifugal pump 47 and then to the well servicing fluid pump module 48 .
  • the mixed chemicals flow to the tee 39 where the mixed chemicals mix with nitrogen and the resulting mixture flows into the discharge line 41 . From the discharge line 41 the resulting mixture can flow directly to the well head or through the coil tubing 55 to the well head.
  • An injector module 44 also described in more detail hereinafter, is situated on the boat deck.
  • a hydraulically driven crane module 46 is also situated on the boat deck for situating the coiled tubing injector module 44 immediately above the well being treated.
  • a hose reel module 45 and a coiled tubing reel module 55 are situated on the deck 30 .
  • a goose neck module 53 is also situated on the deck 30 adjacent the coiled tubing injector module 44 for feeding the coiled tubing from the reel into the injector.
  • a stripper 54 is located on the lower end of the coiled tubing injector system 44 for enabling the coiled tubing 55 to be placed into the well being treated.
  • a blow out preventer module 56 is also located on the boat deck to be used in shutting in the well to be treated, if needed.
  • Wireline inspection module 52 is mounted to deck 30 . Also mounted on the deck 30 is a control cabin 34 in which the electrical 36 (not shown) and hydraulic modules 70 are controlled by a human operator. Referring now to FIG. 3 , there is illustrated in block diagram some of the components that are illustrated in FIGS. 1 and 2 .
  • the nitrogen air feed module 32 has its output connected into the input of a hydraulic pump 90 .
  • the custom hydraulic manifold 70 which may be connected to either a gasoline powered or diesel powered external power source or marine mobile power pack 200 , has a return line 74 .
  • a hydraulic pump 90 is connected into a hydraulic motor 92 that is used to drive the return line 74 .
  • a hydraulic pump 96 is connected into a hydraulic motor 98 that is used to drive the chains of the injector module 44 that can either move the coiled tubing into the well being treated or pull the coiled tubing out of the well being treated, as desired, depending on the direction of the chain rotation.
  • Another hydraulic pump 100 drives a motor 102 to drive the crane 46 illustrated in FIG. 2 .
  • Another hydraulic pump 110 drives a motor 112 to power the well servicing pump 48 , which is illustrated in FIG. 2 .
  • Another hydraulic pump 116 drives a motor 118 to power the blending tank modules 50 , which are illustrated in FIG. 2 .
  • Another hydraulic pump 122 drives a motor 124 to power the wireline inspection module 52 , which is illustrated in FIG. 2 .
  • a custom hydraulic manifold distributes power to each of the five modules.
  • Said power source with a power-take-off 200 routed through custom hydraulic manifold 70 drives each of the hydraulic pumps 90 , 96 , 100 , 116 and 122 as shown by the line 106 .
  • the hydraulic pumps 90 , 96 , 100 , 116 and 122 are preferably driven by one or more belts that can be used with clutch pulleys as desired.
  • the compressor module 108 is also driven by the custom hydraulic manifold 70 via the drive line 106 to bring the nitrogen down to its desired temperature.
  • the preferred embodiment of the present invention can operate with a separate land or marine external power source. As long as the preferred embodiment of the present invention can avail itself of an adequate power source it can do all of the following well servicing, including but not limited to:
  • One advantage of the present invention is that it makes it possible to do with one unit and an single power source what previously required five separate powered units—a wireline inspection unit, a coiled tubing unit, a liquid nitrogen tank transport means, a powered unit with a high pressure pumping system for other chemicals and acids, and a unit with a nitrogen pumping means. Because this embodiment allows one unit to do what once required several powered units connected together with the requisite hoses and plumbing, the time and expense of plumbing rig-up is avoided. Disconnecting and stowing all of the plumbing after completion is also avoided, saving additional time and labor.
  • the preferred embodiment of the present invention can do the same job with one unit in one day.
  • the present invention saves the trouble and expense of transporting five separate power sources to the site, each of which takes up over sixty square feet of deck space, allowing this combined unit to be smaller and cheaper than any prior art equivalent.
  • the smallest existing vessel with a coil tubing unit is a 175 class boat, yet an embodiment of the present invention with an integrated coil tubing module along with four other integrated modules can be placed on a single 105 class boat.
  • the deck load of the prior art equivalent would be about 150,000 pounds, yet an embodiment of the present invention has a deck load of only about 50,000 pounds, allowing operations in shallower water.
  • the danger of transporting liquid nitrogen, which is an explosion hazard, is also avoided. Hazards associated with running plumbing and hoses from boat to boat are also avoided, and fewer personnel are required.
  • the preferred embodiment of the present invention has a smaller footprint and lighter weight than any functional equivalent.
  • the preferred embodiment of the present invention is even more advantageous in remote locations where liquid nitrogen is rare and expensive, or extremely difficult to transport to the well head.
  • the invention is well suited for off shore use. Because of its small footprint, this invention allows replacement of large, expensive vessels with much smaller and cheaper barges or ships that have shallower drafts.
  • the invention can also be mounted on and use the engine of a truck power pack and is equally suited for on shore use.
  • An embodiment of the present invention may be trailered on land, to replace as many as five separate units and realize similar time and cost savings.
  • CT SGN2 Onshore-offshore convertible WISETM Combination Coiled Tubing (CT) and Nitrogen (N2) Unit with a Self-Generating Nitrogen (SGN2) Module.
  • This WISETM Unit is called the “WISETM CT SGN2 ONSHORE-OFFSHORE CONVERTIBLE UNIT” abbreviated as “CT SGN2”.
  • a Truck Power Pack will tow a crane trailer module loaded with modules such as: an Operator Control Module, Coiled Tubing Deployment Module, Injector Head Module, Well Control Stack BOP Module, and SGN2 Nitrogen Module to and from well servicing sites. At well servicing sites, the Truck Power Pack will power the servicing equipment.
  • modules such as: an Operator Control Module, Coiled Tubing Deployment Module, Injector Head Module, Well Control Stack BOP Module, and SGN2 Nitrogen Module to and from well servicing sites.
  • the Truck Power Pack will power the servicing equipment.
  • An advantage of the present invention is that customer-furnished equipment (CFE) can be provided to be integrated into the WISETM Unit, allowing a high degree of customization and cost savings. Changes to the unit configuration can be made much later in the manufacturing/assembly process, or even after the unit is in use in the field.
  • CFE customer-furnished equipment
  • This WISETM Unit can be deployed for both on-shore and off-shore jobs:
  • the WISETM CTN2 Unit can be augmented by an independently-powered fluid pump (customer-furnished) to deliver servicing fluid or nitrified servicing fluid into the well.
  • the WISETM CTN2 Unit provides fluid pumping from its Marine Mobile Power Pack to deliver servicing fluid or nitrified servicing fluid into the well.
  • the WISETM Unit can be reconfigured for different well-servicing functions at the maintenance depot level.
  • the cryogenic liquid nitrogen module can be replaced by or augmented by a fluid servicing pump without modifying the operator control module.
  • the following interface standards are universal throughout all of the WISETM units. These standards govern connections between the Operator Control Module and other modules within the WISETM Unit.
  • the WISETM Unit will preferably provide nitrogen at a discharge pressure ranging from 0-7500 psig and at an operator-controllable flow rate ranging from 0-850 scfm, while maintaining the discharge temperature at 10° F. above ambient.
  • the WISETM Unit will preferably transfer servicing fluid from an independently-powered, customer-furnished source to the well via 2-inch pipe with 1502 Hammer unions compatible with well-servicing fluids.
  • the WISETM Unit will preferably pressurize and transfer servicing fluid from a customer-furnished source to the well via the CT at an operator-controllable flow rate ranging from 0-50 gpm and a pressure ranging from 0-5000 psig.
  • the Truck Power Pack will tow the WISETM Unit trailer (comprising for example: a crane trailer loaded with an Operator Control Module, Coiled Tubing Deployment Module, and Nitrogen Module) to and from well servicing sites.
  • WISETM Unit trailer comprising for example: a crane trailer loaded with an Operator Control Module, Coiled Tubing Deployment Module, and Nitrogen Module
  • the Unit travels over a wide range of roads, paved and unpaved, between well-servicing jobs.
  • the Unit should configure for transportation to minimize need for special permits in onshore and offshore configurations.
  • the Unit can operate beyond its transportation envelope with an operator-extended crane and other extensions such as coolers or open ventilation doors.
  • the Unit may be Shipped Overseas.
  • Well servicing modules can be installed onto the Onshore Transport Trailer Module with cranes or forklifts.
  • the WISETM Unit can provide self-contained onshore transportation for the onshore configuration.
  • An embodiment of the onshore configuration comprises all modules except the offshore marine mobile power pack, transportation skid kit, and hose basket with offshore hose bundle.
  • the WISETM Unit should preferably have a total height less than 13 feet, 6 inches.
  • the WISETM Unit should preferably have a total width of less than 8 feet, 6 inches.
  • the WISETM Unit should preferably have a total length of less than 64 feet.
  • the preferred embodiment of a marine mobile power pack should preferably be transportable onshore on trucks.
  • no single skid in the offshore transportation configuration weigh more than 18,500 pounds, except for the coil tubing drum loaded with coil tubing in its transportation skid.
  • the WISETM Unit should preferably weigh less than 85,000 pounds including one full cryogenic nitrogen storage vessel and 10,000 feet of 11 ⁇ 4′′ coil tubing.
  • the WISETM Unit should preferably be designed so that the following modules and components can be removed from its onshore transportation trailer for separate transport to an offshore site:
  • Availability is defined as the WISETM Unit being ready for transit between well-servicing sites and for performing well-servicing activities. Increasing availability of units minimizes maintenance down time and increases utilization rate. By keeping modules at the depot in inventory, a “broken” module is simply replaced by a certified working. This keeps a unit in service more days per month but with no additional fixed costs (such as crew, etc.). Taking this maintenance approach improves unit availability (utilization).
  • the WISETM Unit should preferably provide well services for 12 hours without refueling.
  • the WISETM Unit should preferably require no preventive maintenance beyond that described in Appendix C, Customer Maintenance Program.
  • the WISETM Unit should preferably incorporate the following provisions (hardware “scars”) for the post-deployment addition of a well servicing fluid pump integrated into the onshore configuration:
  • the complete WISETM Unit has the following modules integrated:
  • Interface P-1 and P-2 should preferably be identical for hydraulics and electrical.
  • Interface P-2 should preferably be identical to the interface between the WISETM III power pack and the remainder of the WISETM III Unit.
  • the Operator Control Module represents the core of the WISETM technology principal of central control and operation of multiple well-serving functions from a single power source and control point. Mated with the appropriate power sources and ancillary equipment packages, this module monitors and controls: Coiled Tubing Deployment, Cryogenic Nitrogen, and Fluid Pumping Operations (if installed).
  • the Operator Control Module should preferably provide:
  • the Operator Control Module should preferably be a skid-mounted module with a crash frame; forklift guide tubes and a four point sling lift attachment points. Lifting slings are CFE.
  • the Operator Control Module should preferably e 96′′ long ⁇ 96′′ wide with height to allow 13′6′′ height clearance when loaded on a 48′′ tall truck trailer.
  • the Operator Control Module should preferably weigh 15,500 lbs or less.
  • the Operator Control Module should preferably operate in the offshore well servicing environment.
  • the Operator Control Module should preferably operate in the onshore well servicing environment.
  • the control cabin shall:
  • BOP control valves should preferably be labeled from left to right “Blinds”, “Cutters”, “Slips”, “Pipe”, “Aux Pipe” and “Blind Shears”. BOP's to have an emergency back-up circuit from an air or hand operated in cabin pump.
  • N2 Boost Pump LN2 discharge pressure gauge (150 psi) with debooster or remote sender to protect operators from cryogenic N2 exposure in case of gauge or gauge plumbing failure.
  • N2 tank discharge (vaporizer inlet) pressure gauge (10,000 psi) with debooster or remote sender to protect operators from cryogenic N2 exposure in case of gauge or gauge plumbing failure.
  • Cryogenic Nitrogen Triplex Injection Pump Speed control valve (warm end).
  • N2 Triplex pump hydraulic pressure gauge 27
  • the hydraulic controls should preferably be rated for operation at 3000 psi working pressure.
  • the hydraulic distribution component of the operator control module should preferably include:
  • the hoses should preferably be labeled at each end with bands imprinted with customer-specified text and by numbered stainless steel washers.
  • the electrical distribution component of the operator control module should preferably distribute 120 VAC from the electric generator to the listed components at no more than listed current:
  • the electrical distribution component of the operator control module should preferably distribute 120 VAC from an offshore platform supply to the listed components at no more than listed current:
  • the electrical distribution component should preferably transform 120 VAC to 12 VDC and distribute 12 VDC to:
  • the Water-Glycol Distribution component should preferably distribute a water and glycol mix from the power pack to the cryogenic liquid nitrogen modules via the hydraulics heat exchanger.
  • the operator control module shall:
  • An over-the-road truck tractor provides onshore transportation and onshore power to the hydraulic systems for all Coiled Tubing and Nitrogen Modules.
  • the truck power pack should preferably tow the trailer containing the crane and well-servicing modules to onshore well servicing sites and maintenance locations.
  • the truck power pack should preferably provide hydraulic power to concurrently operate the coil tubing and nitrogen modules at their maximum capabilities described in section 2.2 (functional and performance requirements).
  • the truck power pack should preferably operate in the onshore well servicing environment.
  • the truck power pack consists of a Freightliner 515-hp Detroit Diesel series 60, 14.0 L tractor with 10-speed transmission plus “wet kit” consisting of: an auxiliary transmission, a pair of PTO's, a hydraulic reservoir, a glycol reservoir, fluid coolers, hydraulic pumps, and various hoses, fittings, and control valves. Its features include:
  • the OnShore Transport Trailer with Crane should preferably operate in the onshore well servicing environment.
  • a 48 ft long single drop-deck triple-axle trailer provides the transportation and work platform for all the well servicing equipment and a hydraulic pedestal crane.
  • Injector head and well control stack equipment mount should preferably be within the crane's operating envelope. As shown in FIGS. 8 and 9 , the injector may be operated continuously at the intersection of any speed and pull combination as long as the intersection remains on or to the left and below of the 100 hp continuous output curve.
  • Injector head mount should preferably position the HydraRig 635 injector head so that the COIL TUBING can remain stabbed during transport between well servicing sites.
  • Mounting brackets and setups should preferably secure one 1800-gallon cryogenic liquid nitrogen tank (tank itself is described in nitrogen module specification).
  • a hydraulically-operated pedestal crane (such as: National Crane Model 638, 18 ton Pedestal Crane) should preferably be installed on the crane trailer.
  • Crane capacities may vary with boom length and attachments.
  • Explosion-proof system that helps prevent cable damage by sensing position of winch cable and attachments with respect to sheave case.
  • the crane must fold up and fit in the space provided on the crane trailer during transport.
  • a reel pivot cylinder that will pivot to either side of the unit will be installed on the unit.
  • the WISETM Unit should preferably deploy coiled tubing using the following combinations of coil tubing deployment modules and injector heads:
  • the WISETM Unit can:
  • the WISETM Unit can:
  • This embodiment of the WISETM Unit supplies hydraulic fluid to an injector at an operator-controllable rate ranging from 0-85 gpm (inclusive) and at an operator-controllable pressure ranging from 0-3000 psig (inclusive).
  • the Cryogenic Liquid Nitrogen Module should preferably output up to 1,500 scfm gaseous nitrogen at 10,000 psig. However, note that overall integrated unit nitrogen capacities are below this peak due to horsepower limitations.
  • the Cryogenic Liquid Nitrogen Module should preferably meet these output requirements in the onshore well servicing environment.
  • the cryogenic liquid nitrogen module has two major components:
  • the Cryogenic Liquid Nitrogen Storage Vessel module should preferably comprise a double layer vacuum insulated pressure vessel.
  • This tank should preferably be provided with fill, suction vent, and pressure building manifolds and valves.
  • the vessel capacity should preferably be approximately 1800 liquid gallons. This vessel will be removably attached to the upper deck on the land transport trailer:
  • the Cryogenic Liquid Nitrogen Pump and Vaporization Component should preferably draw cryogenic liquid nitrogen from the Cryogenic Liquid Nitrogen Storage vessel and force it through the vaporizer to produce gaseous nitrogen.
  • the Cryogenic Liquid Nitrogen Pump and Vaporization Component should preferably meet its output requirements in the offshore well servicing environment.
  • This component should preferably be packaged separate from other systems and the cryogenic liquid nitrogen storage vessel.
  • the Cryogenic Liquid Nitrogen Pump and Vaporization Component should interface with customer-furnished offshore cryogenic liquid nitrogen storage vessels without modification.
  • the Marine Mobile Power Pack provides hydraulic power to concurrently operate the coil tubing and nitrogen modules at their maximum capabilities.
  • the Marine Mobile Power Pack should meet its power output requirement in the offshore well servicing environment.
  • the preferred embodiment of the Marine Mobile Power Pack should preferably be skid-mounted and comprise a crash frame, forklift guide tubes and a 4-point lift attachment for lifting slings, and one fall protection harness tie off point incorporated into its crash frame.
  • the Marine Mobile Power Pack should preferably be no larger than 126′′long ⁇ 96′′ wide ⁇ 102′′ high including the structural skid to allow 13′6′′ height clearance when loaded on a 48′′ tall truck trailer.
  • the Marine Mobile Power Pack should preferably weigh no more than 18,500 lbs maximum wet.
  • An Electric Generator provides electric power for distribution by the operator control module in onshore applications.
  • the Electric Generator should preferably meet these requirements in the onshore well servicing environment.
  • a Coil Tubing Reel Carry Skid is used for transport of a Coil Tubing Reel Drum when the drum is removed from unit.
  • the Coil Tubing Reel Carry Skid should preferably hold the Coil Tubing Reel Drum in axle-horizontal position during:
  • Coil Tubing Reel Carry Skid should comprise forklift and crane sling provisions for moving between ground, truck, and boat in loaded and unloaded configurations, and one fall protection harness tie off point incorporated into its crash frame.
  • a Coil Tubing Component Carry Skid is used for transport of injector head, well control stack, and CT-specific tools when removed from a WISETM Unit onshore transportation trailer.
  • the Coil Tubing Component Carry Skid should preferably hold the injector head, well control stack, and CT-specific tools during:
  • the Coil Tubing Component Carry Skid should preferably have provisions for moving between ground, truck, and boat in loaded and unloaded configurations.
  • a hose reel skid when the WISETM Unit is converted to offshore use, a hose reel skid will provide the hydraulic fluid distribution between the modules.
  • the onshore hydraulic fluid distribution will remain on the crane trailer.
  • the Hose Reel Skid should preferably carry all the WISETM Unit's interconnecting hoses needed for offshore use.
  • the Hose Reel Skid should preferably protect the WISETM Unit's interconnecting hoses from damage during transport from onshore to offshore.
  • the Hose Reel Skid should preferably have provisions for moving between ground, truck, and boat in loaded and unloaded configurations.
  • the Hose Reel Skid should preferably comprise:
  • the hoses should preferably be labeled at each end with bands imprinted with text and by numbered stainless steel washers.
  • the Hose Reel Skid should preferably include 3 hose reels:
  • the Hose Reel Skid should preferably include a hose rack for the marine mobile power pack-to-operator control module hoses.
  • Availability The days on which the WISETM Unit is ready for transit between well-servicing sites and for well-servicing activities Scar—A hardware provision for a module or component coming later: must be consistent with the interface requirement Hook—A software provision for programming coming later, such as the ability to expand functionality etc.
  • Depot Maintenance maintenance done at a shop Field Maintenance—maintenance done at a job site (other than inside the shop)

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Mechanical Engineering (AREA)
  • Earth Drilling (AREA)

Abstract

A single well servicing combination unit comprising: a hydraulic manifold removably connectable to the power-take-off of a power source to drive a plurality of hydraulic pumps and motors that control a plurality of well servicing modules that are removably mounted on said combination unit, said well servicing modules being interconnectable by plumbing.

Description

    CROSS REFERENCE TO RELATED APPLICATIONS
  • This application is a CONTINUATION IN PART of PCT Patent Application PCT/U.S.07/06891 entitled “WELL SERVICING COMBINATION UNIT”, filed 20 Mar. 2007 at the USPTO, which is herein incorporated by reference. This application claims the benefit of US Provisional Patent Application entitled “WELL SERVICING MODULAR COMBINATION UNIT”, filed 19 Apr. 2007 at the USPTO, which is herein incorporated by reference.
  • FIELD
  • This invention relates, generally, to the treatment of oil and gas wells using fluids to increase the production capability of the wells, and more specifically, to providing for treatment of oil and gas wells with a means and apparatus that combines multiple modules—which may include: coiled tubing, nitrogen generation, fluid pumping, blending tanks, wireline inspection, and other modules—into a single unit.
  • BACKGROUND
  • It is known in the art to use self-powered units to provide wireline inspection and workover operations using gaseous nitrogen to remove sand and/or water or other impediments to production of oil and gas wells. The prior art has not recognized that a single, relatively small, engineless unit requiring minimal set-up/take-down time can be provided with all of the equipment and accessories for tapping into an onsite power source to run a combined and integrated system that may include one or more of the following: coiled tubing unit, nitrogen generator, fluid pumps, blending tanks, and wireline inspection unit, or other units.
  • The prior art equivalent typically brings as many as five transportation units (tractor-trailers, barges, or boats) to the well to be treated, one having a coil tubing unit; one having either a liquid nitrogen tank or a large footprint nitrogen generation unit; one having the nitrogen pumping unit; one high pressure pumping unit for acids and other chemicals; and a separate wireline unit. Alternatively, the prior art may have a very large boat or barge with multiple units, each with its own power source. Separate, dedicated power sources for each unit drastically increases the mass and volume that must be transported. Current power packs are horsepower limited, which limits the equipment that each can drive. Conventionally, each of the five units above has its own engine. Even with a hydraulic power manifold to drive multiple units from a single engine, the horsepower limits how many can be integrated. The requirement for multiple (or much larger) transportation units increases the transportation costs, time, and personnel required to bring the units to the well and run these services.
  • U.S. Provisional Patent application 60/699,759 teaches a single, relatively small, self-powered unit with all of the equipment and accessories for running a nitrogen generation system and pressure pumping chemicals to treat wells.
  • U.S. Pat. No. 6,230,805 (Vercaemer) teaches a method of hydraulic fracturing in which at least two separate fracturing fluid components are pumped downhole—one of said components being pumped downhole within coiled tubing—but does not teach how to accomplish this with a single compact unit in which all equipment is powered by an onsite engine and that also provides for the coil tubing operation and wireline inspection.
  • U.S. Pat. No. 6,273,188 (McCafferty) teaches a trailer mounted coiled tubing rig.
  • U.S. Pat. No. 6,702,011, also by the present inventors, teaches a combined nitrogen treatment system and coiled tubing system in one tractor/trailer apparatus. A single tractor-trailer unit is provided, in which the tractor itself drives a plurality of hydraulic motors that control the pumps and motors associated with a nitrogen system that is used for injecting nitrogen into a well. A crane unit and a coiled tubing injection unit are also provided. Unlike the present invention, no disclosure is made for the provision of wireline inspection, well servicing fluid tanks, mixers, and pumps. Unlike the present invention, the preferred type of nitrogen system is tanks of liquid nitrogen, although an alternative mode is disclosed in which the liquid nitrogen system is replaced with one or more nitrogen generators that gather nitrogen from the earth's atmosphere. However, it was not disclosed, as in the present invention, that the nitrogen could be mixed with well servicing fluids provided by the same unit.
  • PCT Application US2004/034521 teaches a three in-one nitrogen treatment system, fluid system, and coiled tubing system in one unit. A single tractor-trailer or marine unit is provided, but unlike the engineless present invention, an onboard engine drives a plurality of hydraulic motors that control the pumps and motors associated with a nitrogen system and a fluid system that is used for injecting nitrogen and fluid into a well. Like the present invention, a coil tubing system is also provided. The only means disclosed for pumping fluid to the well is through the coil tubing system and no disclosure is made for the injection of well servicing fluids directly into the well, and no fluid blending tank is disclosed. Also, no means for wireline inspection is provided.
  • The off-shore prior art that has the same functionality as the present invention is larger, more expensive, and requires either multiple barges or ships—necessitating additional time and expense for set up and take down of ship to ship plumbing- or a larger, more expensive barge or ship that has a deeper draft and can therefore depart from and reach fewer locations.
  • The primary object of this present invention is to provide a small engineless unit that can be placed on a single small barge or ship or a single tractor-trailer or marsh buggy and use an onsite power supply to provide wireline inspection, coil tubing operations, and nitrogen generation and pump a combination of high pressure nitrogen and acids or other chemicals into wells. The configuration of the present invention on a marsh buggy could be nearly identical to the configuration on a boat or barge. Combination of multiple units such as a wireline, coil tubing unit, nitrogen generator with fluid pumping and mixing on a single transportation unit and all powered by an external power source through a single onboard custom hydraulic manifold is not known in the prior art to the best of the inventor's knowledge.
  • The primary object of the present invention is to provide a modular well servicing unit that can be placed on a single tractor-trailer, amphibious vehicle, or a small barge or ship.
  • The approaches described in this section are approaches that could be pursued, but not necessarily approaches that have been previously conceived or pursued. Therefore, unless otherwise indicated, it should not be assumed that any of the approaches described in this section qualify as prior art merely by virtue of their inclusion in this section.
  • SUMMARY
  • A single well servicing combination unit comprising: a hydraulic manifold removably connectable to the power-take-off of a power source to drive a plurality of hydraulic pumps and motors that control a plurality of well servicing modules that are removably mounted on said combination unit, said well servicing modules being interconnectable by plumbing.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • These and other features, aspects, and advantages of the present invention will become better understood when the following detailed description is read with reference to the accompanying drawings in which like characters represent like parts throughout the drawings, wherein:
  • FIG. 1 is a top view diagram of the lay out of a 105 class jack-up boat with a custom hydraulic manifold, wireline inspection module, coil tubing module, crane, mixing tank module, storage tank module, fluid pump with power pack, operator console module, and nitrogen generation module, in accordance with an embodiment of the present invention.
  • FIG. 2 is an elevated, block diagram side view of the deck of the boat from FIG. 1, that shows a nitrogen generation module that is connected to the discharge line at a tee, and storage, mixing, and pumping modules for well servicing fluid connected to said discharge line at said tee, in accordance with an embodiment of the present invention.
  • FIG. 3 illustrates, in block diagram, the various systems that are used in accordance with the present invention to treat a well with nitrogen and well servicing fluid, in accordance with an embodiment of the present invention.
  • FIG. 4 is a pictorial view of three nitrogen generator modules, in accordance with an embodiment of the present invention.
  • FIG. 5 is a pictorial view of a module using membrane technology to pull gaseous nitrogen out of the atmosphere, in accordance with an embodiment of the present invention.
  • FIG. 6 shows the external interfaces of the entire WISE™ unit including customer-furnished modules, in accordance with an embodiment of the present invention.
  • FIG. 7 shows the external interfaces of a subset of the entire WISE™ unit, in accordance with an embodiment of the present invention.
  • FIG. 8 shows injector head performance, in accordance with an embodiment of the present invention.
  • FIG. 9 shows injector head performance, in accordance with an embodiment of the present invention.
  • FIG. 10 is a block diagram of a WISE™ Unit including a coil tubing deployment module, injector head module, and well control stack module, in accordance with an embodiment of the present invention.
  • FIG. 11 is a block diagram of a WISE™ CTN2 Unit including a coil tubing deployment module, injector head module, and well control stack BOP Module, in accordance with an embodiment of the present invention.
  • DESCRIPTION
  • The preferred embodiment of the present invention is the “WISE™ Unit”, comprising a plurality of modules and components.
  • The “WISE™ Unit” is the entire package of equipment delivered.
      • Example configurations:
        • a WISE 2 Unit, or
        • an OFFSHORE WISE™ Unit
  • A “Module” can be any of the removably connectable major parts of the “WISE™ Unit.” Examples:
      • the CT Module,
      • the Nitrogen Module,
      • the Operator Control Module
      • the power pack module
  • A Component is a sub part of a Module. This specification defines components only to the extent necessary for manufacturing or operational flexibility.
      • EXAMPLES
        • Pumps
        • Cranes
        • Valves
        • Gauges
  • The WISE™ CT SGN2 unit's architecture (also called the “WISE™ Architecture”) allows the insertion of different servicing modules (i.e., coiled tubing, self-generating nitrogen, and servicing fluid pumps) when ordering future WISE™ Units without redesign of other Modules (i.e., operator control module, transportation modules, and power packs).
  • The WISE™ Unit's architecture and design documentation allow substitution of major Modules and Components supplied by one manufacturer with Modules and Components meeting the same specifications supplied by another manufacturer to take advantage of shorter lead times. A system integrator approach is enabled by completely modularity. Every piece of well intervention equipment becomes a Module to be “integrated” into a working unit. This gives WISE flexibility of design without sacrificing producibility of design (manufacturability—standards) and has direct impact on depot maintenance program and reduces the number of different spare parts in inventory (Standardization).
  • This specification uses the terms “vendor” and “manufacturer” interchangeably.
  • Referring now to FIG. 1, a top view of jack-up boat 10 having either a gasoline engine or a diesel engine is illustrated. Mounted on the boat deck 30 is nitrogen generator module 31 (also shown in FIG. 4) that extracts nitrogen from the atmosphere to eliminate the need for (and the associated cost of) transporting and filling nitrogen tanks. Mounted to boat deck 30 are chemical storage tank modules 42 that supply chemicals to blending tank modules 50 where the chemicals are mixed. The mixed chemicals flow to the well servicing fluid pump module 48. The mixed chemicals may flow through the coil tubing 82, 50 to the well head. Wireline inspection module 52 is mounted to deck 30. Also mounted on the deck 30 is control cabin module 34 in which the electrical and hydraulic modules 36 are controlled by a human operator. Components are described in greater detail in the description of FIG. 2 below.
  • Referring now to FIG. 2, a diagram of a jack-up boat 10 is illustrated. Mounted on the boat deck 30 is a custom hydraulic manifold 70 that distributes power from an external power source 200 to all engineless modules on deck 30—nitrogen air feed module 32, injector module 44, crane module 46, well servicing pump module 48, blending tank module 50, and Wireline module 52. Mounted on deck 30 is a feed air system 32 that is connected to nitrogen membranes 33. Together, the feed air system 32 and nitrogen membranes 33 function as a nitrogen generator module 31 (also shown in FIG. 4) that extracts nitrogen from the atmosphere to eliminate the need for (and the associated cost of) transporting and filling nitrogen tanks. In the preferred embodiment, nitrogen generator module 31 utilizes a membrane 33 (also shown in detail in FIG. 5) that allows nitrogen-rich air from the earth's atmosphere to be continuously fed into the bundle housing. The air reaches the center of the bundle of membrane fibers which, at that point, consists mostly of gaseous nitrogen. The nitrogen collects in the mandrel at the center of the bundle. As the air passes through the bundle of membrane fibers, the oxygen and other fast gases pass through the wall of the membrane fibers as the fast gases go through to be collected at the end. Oxygen, water vapor, and the other fast gases are continuously collected and are moved from the bundle, thus leaving the nitrogen available to be used for injection into the well being treated. This occurs at near ambient pressure and temperature. It is an advantage of this embodiment that large volumes of nitrogen can be provided at the well site to be pumped into the well, without the need to transport that entire volume in either liquid or gaseous form to the well site. The nitrogen generator modules 31 of the preferred embodiment accomplish this nitrogen generation with a smaller footprint than any prior art the inventor knows. The nitrogen then flows to the nitrogen booster compressor 38 that then compresses the dry nitrogen to the desired pressure. The nitrogen will then be pumped to the tee 39 where it mixes with a fluid or a fluid mix, such as an acid, and then the resulting mixture enters the discharge line 41. The nitrogen in the discharge line may be either liquid or gas. Mounted to boat deck 30 are chemical storage tank modules 42 that supply chemicals to blending tanks 50 where the chemicals are mixed. The mixed chemicals flow first to the centrifugal pump 47 and then to the well servicing fluid pump module 48. The mixed chemicals flow to the tee 39 where the mixed chemicals mix with nitrogen and the resulting mixture flows into the discharge line 41. From the discharge line 41 the resulting mixture can flow directly to the well head or through the coil tubing 55 to the well head. An injector module 44, also described in more detail hereinafter, is situated on the boat deck. A hydraulically driven crane module 46 is also situated on the boat deck for situating the coiled tubing injector module 44 immediately above the well being treated. A hose reel module 45 and a coiled tubing reel module 55 are situated on the deck 30. A goose neck module 53 is also situated on the deck 30 adjacent the coiled tubing injector module 44 for feeding the coiled tubing from the reel into the injector. A stripper 54 is located on the lower end of the coiled tubing injector system 44 for enabling the coiled tubing 55 to be placed into the well being treated. A blow out preventer module 56 is also located on the boat deck to be used in shutting in the well to be treated, if needed. Wireline inspection module 52 is mounted to deck 30. Also mounted on the deck 30 is a control cabin 34 in which the electrical 36 (not shown) and hydraulic modules 70 are controlled by a human operator. Referring now to FIG. 3, there is illustrated in block diagram some of the components that are illustrated in FIGS. 1 and 2.
  • The nitrogen air feed module 32 has its output connected into the input of a hydraulic pump 90. The custom hydraulic manifold 70, which may be connected to either a gasoline powered or diesel powered external power source or marine mobile power pack 200, has a return line 74. A hydraulic pump 90 is connected into a hydraulic motor 92 that is used to drive the return line 74.
  • A hydraulic pump 96 is connected into a hydraulic motor 98 that is used to drive the chains of the injector module 44 that can either move the coiled tubing into the well being treated or pull the coiled tubing out of the well being treated, as desired, depending on the direction of the chain rotation.
  • Another hydraulic pump 100 drives a motor 102 to drive the crane 46 illustrated in FIG. 2.
  • Another hydraulic pump 110 drives a motor 112 to power the well servicing pump 48, which is illustrated in FIG. 2.
  • Another hydraulic pump 116 drives a motor 118 to power the blending tank modules 50, which are illustrated in FIG. 2.
  • Another hydraulic pump 122 drives a motor 124 to power the wireline inspection module 52, which is illustrated in FIG. 2.
  • It should be appreciated that from the power-take-off of a power source 200, a custom hydraulic manifold distributes power to each of the five modules. Said power source with a power-take-off 200 routed through custom hydraulic manifold 70 drives each of the hydraulic pumps 90, 96, 100, 116 and 122 as shown by the line 106. Coming off of the custom hydraulic manifold 70, the hydraulic pumps 90, 96, 100, 116 and 122 are preferably driven by one or more belts that can be used with clutch pulleys as desired. The compressor module 108 is also driven by the custom hydraulic manifold 70 via the drive line 106 to bring the nitrogen down to its desired temperature. By using a power-take-off on the vessel (rig, platform, work boat, tug boat, or jack up barge) that is already on site, that power source 200, with over 1000 horsepower available, can drive more machines than a less powerful onboard source could.
  • The preferred embodiment of the present invention can operate with a separate land or marine external power source. As long as the preferred embodiment of the present invention can avail itself of an adequate power source it can do all of the following well servicing, including but not limited to:
      • Completions
      • Workovers
      • Underbalanced drilling Well servicing
      • Enhanced oil recovery
      • Industrial plant degassing and purging
      • Mining
      • Purging pipelines with nitrogen
      • Deepwater marine applications
      • LNG & LPG tanks and facilities
      • Nitrogen lifting, the flooding wells that won't flow with nitrogen
      • Nitrified Acid
      • Nitrogen Displacement
        Pipeline testing
        Tubing testing
    Acidizing Cleanouts
  • Fix sanding up—Paraffins—Foam wash
    Jet with nitrogen
    Nitrify acid
    Nitrogen inhibitor
  • Wireline Inspection
  • One advantage of the present invention is that it makes it possible to do with one unit and an single power source what previously required five separate powered units—a wireline inspection unit, a coiled tubing unit, a liquid nitrogen tank transport means, a powered unit with a high pressure pumping system for other chemicals and acids, and a unit with a nitrogen pumping means. Because this embodiment allows one unit to do what once required several powered units connected together with the requisite hoses and plumbing, the time and expense of plumbing rig-up is avoided. Disconnecting and stowing all of the plumbing after completion is also avoided, saving additional time and labor. Where the prior art would have taken several units and several days (for set-up, inspection, well treatment, and disassembly), the preferred embodiment of the present invention can do the same job with one unit in one day. The present invention saves the trouble and expense of transporting five separate power sources to the site, each of which takes up over sixty square feet of deck space, allowing this combined unit to be smaller and cheaper than any prior art equivalent. The smallest existing vessel with a coil tubing unit is a 175 class boat, yet an embodiment of the present invention with an integrated coil tubing module along with four other integrated modules can be placed on a single 105 class boat. The deck load of the prior art equivalent would be about 150,000 pounds, yet an embodiment of the present invention has a deck load of only about 50,000 pounds, allowing operations in shallower water. The danger of transporting liquid nitrogen, which is an explosion hazard, is also avoided. Hazards associated with running plumbing and hoses from boat to boat are also avoided, and fewer personnel are required. As far as the inventor knows, the preferred embodiment of the present invention has a smaller footprint and lighter weight than any functional equivalent.
  • The preferred embodiment of the present invention is even more advantageous in remote locations where liquid nitrogen is rare and expensive, or extremely difficult to transport to the well head.
  • The invention is well suited for off shore use. Because of its small footprint, this invention allows replacement of large, expensive vessels with much smaller and cheaper barges or ships that have shallower drafts.
  • It should be noted that while the embodiment described so far is powered by a prime mover such as a marine mobile power pack, the invention can also be mounted on and use the engine of a truck power pack and is equally suited for on shore use. An embodiment of the present invention may be trailered on land, to replace as many as five separate units and realize similar time and cost savings.
  • Another embodiment of the present invention comprises an onshore-offshore convertible WISE™ Combination Coiled Tubing (CT) and Nitrogen (N2) Unit with a Self-Generating Nitrogen (SGN2) Module. This WISE™ Unit is called the “WISE™ CT SGN2 ONSHORE-OFFSHORE CONVERTIBLE UNIT” abbreviated as “CT SGN2”.
  • In the onshore configuration, a Truck Power Pack will tow a crane trailer module loaded with modules such as: an Operator Control Module, Coiled Tubing Deployment Module, Injector Head Module, Well Control Stack BOP Module, and SGN2 Nitrogen Module to and from well servicing sites. At well servicing sites, the Truck Power Pack will power the servicing equipment.
  • An advantage of the present invention is that customer-furnished equipment (CFE) can be provided to be integrated into the WISE™ Unit, allowing a high degree of customization and cost savings. Changes to the unit configuration can be made much later in the manufacturing/assembly process, or even after the unit is in use in the field.
  • Reconfiguration between On-Shore and Off-Shore Jobs
  • This WISE™ Unit can be deployed for both on-shore and off-shore jobs:
      • The onshore subset of this WISE™ Unit is a truck power pack that tows all servicing modules mounted on a crane trailer to the job site and then powers the servicing equipment on the job site.
      • The offshore subset of this WISE™ Unit is the operator control module and servicing modules removed from the onshore crane trailer plus marine mobile power pack. These modules are transported on a customer-furnished truck to port and on a customer-furnished boat to an offshore oil platform. On the offshore oil platform, the marine mobile power pack supplies all power required for the WISE™ Unit.
      • By itself, the marine mobile power pack can be used as a backup or substitute for the WISE™ III marine power pack.
    Reconfiguration for Different Well-Servicing Functions
  • In the onshore configuration, the WISE™ CTN2 Unit can be augmented by an independently-powered fluid pump (customer-furnished) to deliver servicing fluid or nitrified servicing fluid into the well.
  • In the offshore configuration, the WISE™ CTN2 Unit provides fluid pumping from its Marine Mobile Power Pack to deliver servicing fluid or nitrified servicing fluid into the well.
  • The WISE™ Unit can be reconfigured for different well-servicing functions at the maintenance depot level. The cryogenic liquid nitrogen module can be replaced by or augmented by a fluid servicing pump without modifying the operator control module.
  • In the preferred embodiment, to facilitate modularity the following interface standards are universal throughout all of the WISE™ units. These standards govern connections between the Operator Control Module and other modules within the WISE™ Unit.
  • Equipment Interface Table
    Air Pneumatics ¾″ and Smaller “Parker” 30 Series QD
    couplers & Industrial
    Interchange Nipples
    1″ Industry Standard “crow's
    foot” couplers
    Hydraulic Fluid 1″ and Smaller “Parker 6600 Series” QD
    Couplers and Nipples
    1¼″ and Larger “Snap-Tite” 75 Series
    Wing Type QD Couplers
    and Nipples
    Water Glycol All “Snap-Tite” VH Series QD
    Vaporization Loops Couplers and Nipples
    Water Glycol All “Snap-Tite” VH Series QD
    Vaporization Loops Couplers and Nipples
    Liquid Nitrogen All 150N Acme Thread
    Couplers and Nipples
    Gaseous Nitrogen All Figure 1502 Hammer
    Unions
    Well Treatment Fluids All Figure 1502 Hammer
    Unions
    120/220 VAC Electrical All NEMA Twist Lock
    Power Connectors
    DC Instrumentation All Meltric SS PN 12 Series
    Connectors
    12 VDC Power All 4-Pin SAE Truck/Trailer
    couplings
  • Functional and Performance Requirements Nitrogen Delivery
  • The WISE™ Unit will preferably provide nitrogen at a discharge pressure ranging from 0-7500 psig and at an operator-controllable flow rate ranging from 0-850 scfm, while maintaining the discharge temperature at 10° F. above ambient.
  • Onshore Configuration
  • In the onshore configuration, the WISE™ Unit will preferably transfer servicing fluid from an independently-powered, customer-furnished source to the well via 2-inch pipe with 1502 Hammer unions compatible with well-servicing fluids.
  • TABLE CTN2-4
    Well-Servicing Fluid Supply
    Circuit Flow
    acid 1500 gal
    cement
     10 bbl
    sand slurry 1500 lbs
  • Offshore Configuration
  • In the offshore configuration, the WISE™ Unit will preferably pressurize and transfer servicing fluid from a customer-furnished source to the well via the CT at an operator-controllable flow rate ranging from 0-50 gpm and a pressure ranging from 0-5000 psig.
  • Transportability Requirements
  • In between well interventions, the Truck Power Pack will tow the WISE™ Unit trailer (comprising for example: a crane trailer loaded with an Operator Control Module, Coiled Tubing Deployment Module, and Nitrogen Module) to and from well servicing sites.
  • The Unit travels over a wide range of roads, paved and unpaved, between well-servicing jobs. The Unit should configure for transportation to minimize need for special permits in onshore and offshore configurations.
  • At well servicing sites, the Unit can operate beyond its transportation envelope with an operator-extended crane and other extensions such as coolers or open ventilation doors.
  • The Unit may be Shipped Overseas.
  • Well servicing modules can be installed onto the Onshore Transport Trailer Module with cranes or forklifts.
  • Onshore
  • The WISE™ Unit can provide self-contained onshore transportation for the onshore configuration. An embodiment of the onshore configuration comprises all modules except the offshore marine mobile power pack, transportation skid kit, and hose basket with offshore hose bundle.
  • In the preferred embodiment of an onshore transportation configuration, the WISE™ Unit should preferably have a total height less than 13 feet, 6 inches.
  • In the preferred embodiment of an onshore transportation configuration, the WISE™ Unit should preferably have a total width of less than 8 feet, 6 inches.
  • In the preferred embodiment of an onshore transportation configuration, the WISE™ Unit should preferably have a total length of less than 64 feet.
  • Offshore
  • The preferred embodiment of a marine mobile power pack should preferably be transportable onshore on trucks.
  • In the preferred embodiment, it is preferable that no single skid in the offshore transportation configuration weigh more than 18,500 pounds, except for the coil tubing drum loaded with coil tubing in its transportation skid.
  • In the offshore configuration, the WISE™ Unit should preferably weigh less than 85,000 pounds including one full cryogenic nitrogen storage vessel and 10,000 feet of 1¼″ coil tubing.
  • Onshore To Offshore Conversion
  • The WISE™ Unit should preferably be designed so that the following modules and components can be removed from its onshore transportation trailer for separate transport to an offshore site:
      • operator control module
      • coil tubing deployment module
      • cryogenic liquid nitrogen module except cryogenic liquid nitrogen storage vessel
  • The goal for this onshore to offshore conversion is completion in 8 hours using a three-person operations crew and the following equipment:
      • customer-furnished forklift
      • customer-furnished crane
      • Transportation Skid Kit included with the WISE™ Unit
      • Hose Reel Skid included with the WISE™ Unit
    Offshore to Onshore Conversion
  • The goal for this onshore to offshore conversion is completion in 24 hours using a three-person operations crew and the following equipment:
      • customer-furnished forklift
      • customer-furnished crane
      • Transportation Skid Kit included with the WISE™ Unit
      • Hose Reel Skid included with the WISE™ Unit
    Availability and Reliability
  • Overall WISE™ Unit availability is a function of the WISE™ Unit reliability and maintenance and logistics systems. “Availability” is defined as the WISE™ Unit being ready for transit between well-servicing sites and for performing well-servicing activities. Increasing availability of units minimizes maintenance down time and increases utilization rate. By keeping modules at the depot in inventory, a “broken” module is simply replaced by a certified working. This keeps a unit in service more days per month but with no additional fixed costs (such as crew, etc.). Taking this maintenance approach improves unit availability (utilization).
  • WISE™ Unit Maintainability Requirements
  • The WISE™ Unit should preferably provide well services for 12 hours without refueling.
  • The WISE™ Unit should preferably require no preventive maintenance beyond that described in Appendix C, Customer Maintenance Program.
  • Growth Requirements
  • The WISE™ Unit should preferably incorporate the following provisions (hardware “scars”) for the post-deployment addition of a well servicing fluid pump integrated into the onshore configuration:
      • operator control module fluid pump control
    WISE™ Architecture and Design Constraints Module Definition
  • The complete WISE™ Unit has the following modules integrated:
      • One (1) Operator Control Module
      • One (1) Truck Power Pack
      • One (1) Trailer with Crane for Onshore Operations
      • One (1) Coiled Tubing Deployment Module (Reel assembly) with major components:
      • One (1) Coiled Tubing Reel Skid (cfe)
        • One (1) Coiled Tubing Reel Drum (cfe)
        • Tubing (cfe)
      • One (1) Injector Head Module (cfe)
      • One (1) Well Control Stack (Blow Out Preventor (BOP) Module (cfe)
        • One (1) Cryogenic Liquid Nitrogen Pumping Module
        • One (1) Marine Mobile Power Pack
      • One (1) Crew Cab Truck (cfe)
      • One (1) Tools (cfe)
      • One (1) Electrical Generator
        • One (1) Transportation Skid Kit
        • One (1) Hose Reel Skid
    3.2 Internal Interfaces
  • Interface P-1 and P-2 should preferably be identical for hydraulics and electrical.
  • Interface P-2 should preferably be identical to the interface between the WISE™ III power pack and the remainder of the WISE™ III Unit.
  • Module-Level Requirements
  • The following sections contain the requirements for the modules and their major components.
  • Operator Control Module
  • The Operator Control Module (WISE™ Power Management Module) represents the core of the WISE™ technology principal of central control and operation of multiple well-serving functions from a single power source and control point. Mated with the appropriate power sources and ancillary equipment packages, this module monitors and controls: Coiled Tubing Deployment, Cryogenic Nitrogen, and Fluid Pumping Operations (if installed).
  • The Operator Control Module should preferably provide:
  • 1. Operator Control and Monitoring interface for entire WISE™ Unit except crane
    2. Electrical power transformation (120 VAC to 12 VDC) and distribution to all systems needing electrical power
    3. Hydraulic power distribution control to all well-servicing modules and crane
    4. Heat transfer water and glycol distribution to N2 (if installed).
    5. Well servicing fluid distribution and control in offshore configuration.
    6. Well servicing fluid control if integrated in onshore configuration (see 2.11, Growth Requirements).
  • Note that external customer-furnished fluid pumping is not controlled by the operator control module,
  • The Operator Control Module should preferably be a skid-mounted module with a crash frame; forklift guide tubes and a four point sling lift attachment points. Lifting slings are CFE.
  • In the transportation configuration, the Operator Control Module should preferably e 96″ long×96″ wide with height to allow 13′6″ height clearance when loaded on a 48″ tall truck trailer. The Operator Control Module should preferably weigh 15,500 lbs or less.
  • The Operator Control Module should preferably operate in the offshore well servicing environment.
  • The Operator Control Module should preferably operate in the onshore well servicing environment.
  • Operator Control and Monitoring Telescoping Operator Control Cabin
  • The control cabin shall:
      • Telescope upward to an operator-controllable height (up to 5′ maximum extension) from the volume of the transportation skid. (to provide operator with visibility of well-servicing operations)
      • Be 84″ wide×84″ long (interior)
      • Have two (2) side access doors for operator entry with stainless steel door hardware, fixed windows in doors, and rain gutter above doors.
      • Have operator access by ladder on one side and steps on the other
      • Have front window protected with hinged metal guard that can be fully removed by operator.
      • Have fixed side wall windows.
      • Have Sliding rear windows.
      • Have tempered safety glass in all windows.
      • Have all windows tinted.
      • Light its interior with one (1) 110 volt interior fluorescent lamp
      • Contain an unmounted, portable office-style chair with armrest for operator comfort.
      • Contain a 48″ wide bench seat along rear of cabin with removable to access storage below bench seat.
      • Contain one (1) chart recorder of a two (2) pen type Well Head Pressure and Circulating Pressure.
      • Be cooled by one (1) through the wall Air Conditioner of 12,000 btuh cooling capacity.
      • Interface with electrical distribution via one (1) electrical junction box for 110/220 volt power connection for Lighting and Air Conditioner.
      • Contain a Control Console of an open “L” shape having a lower section sloped and an upper near vertical section running along the front of the cabin so that operators in both sitting and standing positions can read all instruments and move all controls through their full ranges.
    Operator Interface Controls and Indicators
  • The preferred embodiment of the control console module provides the following controls and indicators for the operator:
  • 1) 6-Bank BOP control valve with a single function handles. BOP control valves should preferably be labeled from left to right “Blinds”, “Cutters”, “Slips”, “Pipe”, “Aux Pipe” and “Blind Shears”. BOP's to have an emergency back-up circuit from an air or hand operated in cabin pump.
  • 2) BOP Circuit Master Push/pull Actuation Valve and Pressure Gauge
  • 3) 5-Bank valve panel with integral locking Walvoil type SD6 valves in corner of console for remote plug valve operations. Valves to be labeled “BOP Kill”, “Aux Kill”, “Return”, “Spare 1” and “Spare 2”
    4) Air Regulator Valve and Air Supply Gauge for Stripper Pack-off Air over Hydraulic Pump.
    5) Stripper Circuit Air Drive pump with emergency manual operator.
    6) Snap-Tite Stripper control valve and Stripper circuit hydraulic pressure gauge.
    7) Injector Weight Indicator mounted in center of Panel Upper section. Indicator should preferably read 60,000 lb pipe heavy and 15,000 lb pipe light.
    8) Single Pressure Regulator Valve and isolation valves with circuit pressure gauges for three (3) injector traction circuits.
    9) Emergency Accumulator systems for:
    a) injector traction circuits with full pressure activation valve
    b) injector head skate system chain tension circuits with TBD valve
    10) Single Pressure Regulator Valve and isolation valve with circuit pressure gauge for a single injector chain tension circuit.
    11) Gresen (Munson-Tyson Type) Control Valve for Injection speed and direction, with Cartridge valve for fine control of injector speed. (Auto-driller arrangement)
    12) Selector Valves for Injector speed range and injector brake circuit with status indicator gauges.
    13) Pressure Control Valve for Setting Injector Power Circuit pressure with gauge.
    14) Needle Valve for injector chain oiler control.
    15) Three (3) single bank directional control valves for Tubing Reel Pay-Out and Take-Up; Levelwind Raise and Lower; and Levelwind Override.
    16) Pressure Control Valve for Reel tension Control with tension pressure gauge.
    17) Control Valve for reel brake circuit with pressure gauge.
    18) Two (2) 6″ face 4:1 ratio 15,000 psig reading pressure gauges, One (1) for circulating pressure to the left of weight indicator and one (1) for well head pressure to the right of the weight indicator.
    19) Air operated controls for power pack engine throttle, shutdown and emergency kill.
    20) Power Pack Engine remote instrumentation Package to include, Tachometer, Coolant Temperature.
    21) Cryogenic Nitrogen Centrifugal Boost Pump Speed control Valve.
    22) N2 Boost Pump hydraulic pressure gauge.
    23) N2 Boost Pump LN2 discharge pressure gauge (150 psi) with debooster or remote sender to protect operators from cryogenic N2 exposure in case of gauge or gauge plumbing failure.
    24) N2 tank discharge (vaporizer inlet) pressure gauge (10,000 psi) with debooster or remote sender to protect operators from cryogenic N2 exposure in case of gauge or gauge plumbing failure.
    25) Cryogenic Nitrogen Triplex Injection Pump Speed control valve (warm end).
    26) N2 Triplex pump hydraulic pressure gauge.
    27) N2 Triplex pump LN2 discharge pressure gauge.
  • 28) Auxiliary Heat Load Hydraulic Pressure Control Valve. 29) Auxiliary Heat Load Hydraulic Pressure Gauge.
  • 30) Remote Air Operated Low Pressure LN2 Prime to Atmosphere control valve.
    31) Remote Air Operated Low Pressure LN2 bypass to tank control valve.
    32) Remote Air Operated High Pressure LN2 bypass to tank control valve.
  • 33) Remote Air Operated High Pressure GN2 tempering control valve.
  • The hydraulic controls should preferably be rated for operation at 3000 psi working pressure.
  • Hydraulic Distribution
  • The hydraulic distribution component of the operator control module should preferably include:
  • Permanently installed hoses from the control cabin bulkhead for connection to the following:
      • Injector main drive hoses—power pack to rear of trailer plus extensions to the hose reel.
      • Reel pivot hose
      • BOP control hoses installed with extensions to the hose rack
      • Injector control hoses installed with extensions to the hose rack
      • Reel control jumper hoses
      • Two (2) 15 gallon accumulators for BOP circuits mounted inside trailer frame rails.
  • The hoses should preferably be labeled at each end with bands imprinted with customer-specified text and by numbered stainless steel washers.
  • Electrical Transformation and Distribution
  • The electrical distribution component of the operator control module should preferably distribute 120 VAC from the electric generator to the listed components at no more than listed current:
      • the control cabin air conditioning component (10.0 amps)
      • the control cabin lighting (2.0 amps)
  • The electrical distribution component of the operator control module should preferably distribute 120 VAC from an offshore platform supply to the listed components at no more than listed current:
      • the control cabin air conditioning component (10.0 amps)
      • the control cabin lighting (2.0 amps)
  • The electrical distribution component should preferably transform 120 VAC to 12 VDC and distribute 12 VDC to:
      • monitoring instrumentation
    Heat Transfer Water-Glycol Distribution
  • The Water-Glycol Distribution component should preferably distribute a water and glycol mix from the power pack to the cryogenic liquid nitrogen modules via the hydraulics heat exchanger.
  • Well-Servicing Fluid Distribution and Control
  • In the off-shore configuration, the operator control module shall:
      • Control the well-servicing fluid pump in the marine mobile power pack
      • Distribute well-servicing fluid from the power pack to the CT
    Truck Power Pack
  • An over-the-road truck tractor provides onshore transportation and onshore power to the hydraulic systems for all Coiled Tubing and Nitrogen Modules.
  • The truck power pack should preferably tow the trailer containing the crane and well-servicing modules to onshore well servicing sites and maintenance locations.
  • At the well-servicing site, the truck power pack should preferably provide hydraulic power to concurrently operate the coil tubing and nitrogen modules at their maximum capabilities described in section 2.2 (functional and performance requirements).
  • The truck power pack should preferably operate in the onshore well servicing environment.
  • The truck power pack consists of a Freightliner 515-hp Detroit Diesel series 60, 14.0 L tractor with 10-speed transmission plus “wet kit” consisting of: an auxiliary transmission, a pair of PTO's, a hydraulic reservoir, a glycol reservoir, fluid coolers, hydraulic pumps, and various hoses, fittings, and control valves. Its features include:
      • 515 peak Horsepower Tractor Engine
      • Full power capacity driveshaft driven auxiliary transmission with forward and rear facing hydraulic pump mounts.
      • Two (2) truck transmission mounted PTO's.
      • Two (2) axial piston pressure compensated hydraulic pumps, one for Nitrogen Modules, and one to drive the Coiled Tubing Injector Head.
      • One (1) single vane hydraulic pump to serve dual purposes, powering either the pedestal crane, or an auxiliary heat load circuit.
      • One (1) double-vane hydraulic pump, with one (1) circuit dedicated to the coiled tubing reel hydraulics distribution, and one (1) circuit dedicated to BOP and safety control modules hydraulic distribution.
      • One (1) double-gear glycol and water pump for circulation of water glycol mixture for LN2 vaporization.
      • Multiple baffled hydraulic reservoir with integral return filters, strainers and connection points for truck power pack to trailer.
      • Two (2) hydraulic fan powered fluid coolers.
      • One (1) glycol reservoir and expansion chamber.
        OnShore Transport Trailer with Crane
  • Major components of this module are the Transport Trailer and Crane.
  • The OnShore Transport Trailer with Crane should preferably operate in the onshore well servicing environment.
  • Transport Trailer
  • Preferably, a 48 ft long single drop-deck triple-axle trailer provides the transportation and work platform for all the well servicing equipment and a hydraulic pedestal crane.
  • Trailer
  • Trailer specifications are:
      • Three air ride axles with third (rearmost) axle set up with a dump valve to shorten effective trailer turn radius.
        • 48 ft long single drop deck trailer with 11 ft long upper deck, 37 ft lower section.
        • Upper deck should preferably be plate, lower section should preferably be bare frame rails.
        • 8′ width
        • 12″ minimum ground clearance
        • Standard king pin setting
        • Landing legs 160,000 lb.
        • Three (3) each 25,000 lbs. Axles (minimum)
        • Brakes 16½×7 air type
        • Michelin tires or equivalent 11R24.5
        • Parking brake air chambers mounted above axles
        • 3½″ SAE King pin with ⅜ rub plate
        • Lights, stop/turn armored clearance
        • Mud flaps
        • Rear bumper
        • Running lights for highway use
    Equipment Mounts
  • Complete equipment mounts installed on the trailer should preferably allow quick pin-on and rig-up of equipment:
      • Well control stack
      • Injector head
      • All skidded equipment
      • Tool boxes
  • Injector head and well control stack equipment mount should preferably be within the crane's operating envelope. As shown in FIGS. 8 and 9, the injector may be operated continuously at the intersection of any speed and pull combination as long as the intersection remains on or to the left and below of the 100 hp continuous output curve.
  • Injector head mount should preferably position the HydraRig 635 injector head so that the COIL TUBING can remain stabbed during transport between well servicing sites.
  • Mounting brackets and setups should preferably secure one 1800-gallon cryogenic liquid nitrogen tank (tank itself is described in nitrogen module specification).
  • Crane Assembly
  • A hydraulically-operated pedestal crane (such as: National Crane Model 638, 18 ton Pedestal Crane) should preferably be installed on the crane trailer.
  • Specifications of the Crane are: Crane Capacities:
  • 36,000 lbs. maximum
    23,000 lbs. @  8 ft. boom Radius
    16,550 lbs. @ 12 ft. boom Radius
    10,500 lbs. @ 20 ft. boom Radius
     5,050 lbs. @ 35 ft. boom Radius
    Note:
    Crane capacities may vary with boom length and attachments.
  • Frame:
  • Box construction pedestal with turret mounted on shear type ball bearing and bulkhead fittings for crane operation.
  • Rotation:
  • 270□ non-continuous by means of planetary gear, hydraulic drive unit, and swing stops.
  • Boom:
  • Three (3) section hydraulic telescoping boom, 16 ft. retracted to 38 ft. extended (maximum horizontal reach).
  • Winch:
  • High performance planetary winch rated at 10,000 lbs. bare drum single line pull
  • Controls:
  • “RVC” (or equivalent) remote valve control group
  • Anti-Two Block:
  • Explosion-proof system that helps prevent cable damage by sensing position of winch cable and attachments with respect to sheave case.
  • Stabilizers:
  • Rear hydraulic stabilizers, “A” type.
  • Physical Dimensions for Transportability:
  • The crane must fold up and fit in the space provided on the crane trailer during transport.
  • Reel Pivot:
  • A reel pivot cylinder that will pivot to either side of the unit will be installed on the unit.
  • 3.3.4 Coiled Tubing Deployment Module
  • The WISE™ Unit should preferably deploy coiled tubing using the following combinations of coil tubing deployment modules and injector heads:
  • Configuration Coil Tubing Deployment Module Injector Head
    122″-A Modified HPT 122″ CT Reel Assembly HydraRig 635
    122″-B Modified HPT 122″ CT Reel Assembly LSI
    102″-A LSI 102″ CT Reel Assembly HydraRig 635
    102″-B LSI 102″ CT Reel Assembly LSI
  • In the 122″ A and B configurations the WISE™ Unit can:
      • spool 1¾″ diameter CT @ 2500 psig operating pressure.
      • provide coiled tubing storage capacity for 1¼″-1¾″ Coiled Tubing (CT).
      • provide CT capacity by volume of:
      • 21,500 feet of 1¼″ tubing
      • 15,500 feet of 1½″ tubing and
      • 11,500 feet of 1¾″ tubing.
  • In the 102″ A and B configuration embodiments the WISE™ Unit can:
      • spool 1½″ diameter×0.125″ wall thickness CT @ 2500 psig operating pressure.
      • provide coiled tubing storage capacity for 1″-1½″ Coiled Tubing (CT).
      • provide CT capacity by volume of:
      • 16,000 feet of 1¼″ tubing and
      • 111,000 feet of 1½″ tubing.
      • provide coil tubing capacity by weight for carrying and deploying a total of 20,000 pounds of continuous coiled tubing.
  • Note that this embodiment of the WISE™ Unit's CT length is limited by weight carrying capacity, not volume. Depending upon the wall thickness string length capacities will vary.
  • This embodiment of the WISE™ Unit supplies hydraulic fluid to an injector at an operator-controllable rate ranging from 0-85 gpm (inclusive) and at an operator-controllable pressure ranging from 0-3000 psig (inclusive).
  • Cryogenic Liquid Nitrogen Module
  • The Cryogenic Liquid Nitrogen Module should preferably output up to 1,500 scfm gaseous nitrogen at 10,000 psig. However, note that overall integrated unit nitrogen capacities are below this peak due to horsepower limitations.
  • The Cryogenic Liquid Nitrogen Module should preferably meet these output requirements in the onshore well servicing environment.
  • The cryogenic liquid nitrogen module has two major components:
      • the cryogenic liquid nitrogen storage vessel
      • the nitrogen pump and vaporization component
    Cryogenic Liquid Nitrogen Storage Vessel
  • In the preferred embodiment the Cryogenic Liquid Nitrogen Storage Vessel module should preferably comprise a double layer vacuum insulated pressure vessel. This tank should preferably be provided with fill, suction vent, and pressure building manifolds and valves. The vessel capacity should preferably be approximately 1800 liquid gallons. This vessel will be removably attached to the upper deck on the land transport trailer:
      • Inner vessel design pressure of 45 psi
      • 2½″ Fill and Drain piping
      • 1½″ Vent, Recirculation, Rear Fill, and Top Fill piping
      • 1″ pressure-build pipes
    Cryogenic Liquid Nitrogen Pump and Vaporization Component
  • The Cryogenic Liquid Nitrogen Pump and Vaporization Component should preferably draw cryogenic liquid nitrogen from the Cryogenic Liquid Nitrogen Storage vessel and force it through the vaporizer to produce gaseous nitrogen.
  • The Cryogenic Liquid Nitrogen Pump and Vaporization Component should preferably meet its output requirements in the offshore well servicing environment.
  • The preferred embodiment of the Cryogenic Liquid Nitrogen Pump and Vaporization Component comprises:
      • 2″×1″×4½″ cryogenic centrifugal boost pump with mated high speed hydraulic motor to draw cryogenic liquid nitrogen from the storage vessel and pump it at low pressure (less than 100 psig) to a triplex injection pump.
      • Triplex ICMP 100 type Cryogenic Nitrogen Positive displacement Pump, with mated bent axis hydraulic motor, to develop pressure necessary to overcome the resistance to the fluid through the vaporizer.
      • Pressure oil lubrication system for triplex pump crankcase.
      • Liquid circulation type Liquid Nitrogen Vaporizer.
  • This component should preferably be packaged separate from other systems and the cryogenic liquid nitrogen storage vessel.
  • The Cryogenic Liquid Nitrogen Pump and Vaporization Component should interface with customer-furnished offshore cryogenic liquid nitrogen storage vessels without modification.
  • Marine Mobile Power Pack
  • The Marine Mobile Power Pack provides hydraulic power to concurrently operate the coil tubing and nitrogen modules at their maximum capabilities.
  • The Marine Mobile Power Pack should meet its power output requirement in the offshore well servicing environment.
  • The preferred embodiment of the Marine Mobile Power Pack should preferably be skid-mounted and comprise a crash frame, forklift guide tubes and a 4-point lift attachment for lifting slings, and one fall protection harness tie off point incorporated into its crash frame.
  • The Marine Mobile Power Pack should preferably be no larger than 126″long×96″ wide×102″ high including the structural skid to allow 13′6″ height clearance when loaded on a 48″ tall truck trailer.
  • The Marine Mobile Power Pack should preferably weigh no more than 18,500 lbs maximum wet.
  • The preferred embodiment of the Marine Mobile Power Pack will preferably have the following features:
      • Caterpillar 3406C Diesel Engine with a double pump drive attached directly to the flywheel housing.
      • Caterpillar matched heavy duty solder dripped radiator.
      • Engine has onboard systems for shutdown in over-temperature and low oil pressure situations. Engine also has overspeed auto-shutdown protection and spark arrester exhaust.
      • Engine has mechanical lever for remote throttle position to control engine speed at power pack.
      • Air Operated fuel shutdown system, and air operated emergency shutdown (air shut-off). Emergency Kill system is failsafe (air signal to run, absent signal shutdown) type.
      • Engine mounted Tachometer, oil pressure gauge, coolant temperature gauge and reservoir mounted air pressure gauge.
      • 12 cfm air compressor system with 15 gallon reservoir
      • Air Starter System
      • Axial Piston high pressure open-loop pump for CT injector drive.
      • Axial Piston high pressure open-loop pump for Nitrogen System drive.
      • Double Vane pump for tubing reel and BOP functions.
      • Single Gear pump for water/glycol circulation.
      • Pump for well-servicing fluid with manifold designed to pump small volumes of acid (1500 gal), cement (10 bbl), and sand slurry (1500 lbs)
      • Single fan powered air to oil heat exchanger mounted above fluid pump for hydraulic fluid cooling.
      • Hydraulic Oil Reservoir capacity 250 gallons. Reservoir supplied with protected sight glass, returning fluid filters, and sampling port.
      • Hydraulic Pump relief valves are piloted to a series of dump valves at a system start panel.
      • Crash Frame provides an integrated access ladder to skid top
    Electric Generator
  • An Electric Generator provides electric power for distribution by the operator control module in onshore applications.
  • The preferred embodiment of the electric generator will:
      • Use Diesel Fuel
      • Meet a 6500 Watt Surge capacity
      • Produce 5500 Watts continuous
      • Start using a self-contained Electric Start system
      • Output 120 VAC at 51 amps
      • Output 120 VAC at TBD amps Duplicate Specification
      • Run at least 12 hours on one tank of fuel
      • fit within 36″ length×24″ width×24″ height space on the onshore crane trailer
      • weigh no more than 400 lbs
  • The Electric Generator should preferably meet these requirements in the onshore well servicing environment.
  • Coil Tubing Reel Carry Skid
  • A Coil Tubing Reel Carry Skid is used for transport of a Coil Tubing Reel Drum when the drum is removed from unit.
  • The Coil Tubing Reel Carry Skid should preferably hold the Coil Tubing Reel Drum in axle-horizontal position during:
      • onshore transport
      • offshore boat transport
  • The preferred embodiment of the Coil Tubing Reel Carry Skid should comprise forklift and crane sling provisions for moving between ground, truck, and boat in loaded and unloaded configurations, and one fall protection harness tie off point incorporated into its crash frame.
  • Coil Tubing Component Carry Skid
  • A Coil Tubing Component Carry Skid is used for transport of injector head, well control stack, and CT-specific tools when removed from a WISE™ Unit onshore transportation trailer.
  • The Coil Tubing Component Carry Skid should preferably hold the injector head, well control stack, and CT-specific tools during:
      • onshore transport from onshore-to-offshore conversion location to dock
      • offshore boat transport
  • The Coil Tubing Component Carry Skid should preferably have provisions for moving between ground, truck, and boat in loaded and unloaded configurations.
  • Hose Reel Skid
  • In the preferred embodiment, when the WISE™ Unit is converted to offshore use, a hose reel skid will provide the hydraulic fluid distribution between the modules. The onshore hydraulic fluid distribution will remain on the crane trailer.
  • The Hose Reel Skid should preferably carry all the WISE™ Unit's interconnecting hoses needed for offshore use.
  • The Hose Reel Skid should preferably protect the WISE™ Unit's interconnecting hoses from damage during transport from onshore to offshore.
  • The Hose Reel Skid should preferably have provisions for moving between ground, truck, and boat in loaded and unloaded configurations.
  • The Hose Reel Skid should preferably comprise:
      • All hoses necessary to connect the Operator Control Module to the injector head and well control stack in 150-foot lengths.
      • All hoses necessary to connect the Marine Mobile Power Pack to the Operator Control Module in 35-foot lengths.
      • All hoses necessary to connect the Operator Control Module to the CT Reel in 35-foot lengths.
  • The hoses should preferably be labeled at each end with bands imprinted with text and by numbered stainless steel washers.
  • The Hose Reel Skid should preferably include 3 hose reels:
      • One reel for OCM to injector head power hoses
      • One reel for injector head control hoses
      • One reel for BOP control hoses
  • The Hose Reel Skid should preferably include a hose rack for the marine mobile power pack-to-operator control module hoses.
  • An advantage of the present invention is that modularity enables change scenarios that can be quickly and cost effectively implemented:
      • 1) Customer desires a change to WISE™ Unit-level requirements (addition, deletion, or change of capability) due to changing business environment
      • 2) Vendor discovers that requirements cannot be met on schedule (i.e., component supplier lead times too great) and proposes alternatives that meet schedule.
    Abbreviations Abbreviation Definition BOP Blowout Preventer
  • btuh British Thermal Units-Hour
    CT Coiled tubing
    gpm gallons per minute
  • LSI Lamb Services, Inc NEMA National Electrical Manufacturers Association N2 Diatomic Nitrogen
  • PN Part number
    psig Pounds per square inch gauge
    scfm Standard cubic feet per minute
    SS Stainless steel
  • MTBF Mean Time Between Failures VDC Volts DC
  • VAC Volts AC
  • Definitions
  • Availability—The days on which the WISE™ Unit is ready for transit between well-servicing sites and for well-servicing activities
    Scar—A hardware provision for a module or component coming later: must be consistent with the interface requirement
    Hook—A software provision for programming coming later, such as the ability to expand functionality etc.
    Depot Maintenance—maintenance done at a shop
    Field Maintenance—maintenance done at a job site (other than inside the shop)
    Line-replaceable subsystem—
    Glycol—antifreeze used with water in heat transfer loops
  • Although the present invention has been described by reference to its preferred embodiment as is disclosed in the specification and drawings above, many more embodiments of the present invention are possible without departing from the invention. Thus, the scope of the invention should be limited only by the appended claims.

Claims (47)

1. A single well servicing combination unit comprising:
a hydraulic manifold removably connectable to the power-take-off of a power source to drive a plurality of hydraulic pumps and motors that control a plurality of well servicing modules that are removably mounted on said combination unit, said well servicing modules being interconnectable by plumbing.
2. The combination unit according to claim 1, wherein said power source comprises a power pack module.
3. The combination unit according to claim 2, wherein said power pack module is removably connected to said well servicing combination unit.
4. The combination unit according to claim 2, wherein said power pack module comprises a truck power pack.
5. The combination unit according to claim 2, wherein said power pack module comprises a marine mobile power pack.
6. The combination unit according to claim 2, wherein each module comprises a skid.
7. The combination unit according to claim 1, wherein said well servicing modules comprise:
i. an operator control module;
ii. a combination module;
iii. a nitrogen module;
said modules being interconnectable by plumbing.
8. The combination unit according to claim 7, wherein said combination module comprises a coil tubing module and an acid module.
9. The combination unit according to claim 8, wherein said coil tubing module comprises a coiled tubing reel and a coil tubing string.
10. The combination unit according to claim 9, wherein said coiled tubing reel ranges in diameter from about 102 inches to over 122 inches and said coil tubing string ranges in diameter from about 1.25 inches to about 2 inches.
11. The combination unit according to claim 7, wherein said combination module comprises a coil tubing module and a cement module.
12. The combination unit according to claim 11, wherein said coil tubing module comprises a coiled tubing reel and a coil tubing string.
13. The combination unit according to claim 12, wherein said coiled tubing reel ranges in diameter from about 102 inches to over 122 inches and said coil tubing string ranges in diameter from about 1.25 inches to about 2 inches.
14. The combination unit according to claim 7, wherein said combination module comprises a cement module and an acid module.
15. The combination unit according to claim 7, wherein said nitrogen module comprises a tank of cryogenic nitrogen.
16. The combination unit according to claim 7, wherein said nitrogen module comprises a nitrogen generator that gathers nitrogen from the earth's atmosphere and wherein said combination unit further comprises a compressor connectable by plumbing to said nitrogen generator.
17. The combination unit according to claim 7, wherein said nitrogen module comprises a tank of compressed nitrogen gas.
18. The combination unit according to claim 7, wherein said combination module comprises a sand fracturing tool.
19. The combination unit according to claim 1, wherein said well servicing modules comprise: an electric wireline apparatus comprising a tubing encapsulated wire conveyance medium suitable for electric wireline operations.
20. The combination unit according to claim 2, wherein said well servicing modules comprise: a combination module and an electric wireline apparatus comprising a tubing encapsulated wire conveyance medium suitable for electric wireline operations.
21. The combination unit according to claim 1, wherein said well servicing modules comprise: a wireline inspection unit and a coiled tubing unit.
22. The combination unit according to claim 4, wherein said combination unit comprises a crane trailer and said Truck Power Pack comprises a truck capable of towing said crane trailer.
23. The combination unit according to claim 4, wherein said well servicing modules are removably mounted on said crane trailer and comprise an Operator Control Module, a Coiled Tubing Deployment Module, an Injector Head Module, Well Control Stack Blow Out Preventer Module, and a Nitrogen Module.
24. The combination unit according to claim 23, wherein said Nitrogen Module comprises a Self Generating Nitrogen Module.
25. The combination unit according to claim 1, wherein each of said modules and components is designed to function in conjunction with a plurality of combinations of said well servicing modules.
26. The combination unit according to claim 1, wherein said modules may be custom arranged to allow the combination unit to fit in available space for a particular well servicing job.
27. The combination unit according to claim 1, further comprising a transportation module.
28. The combination unit according to claim 27, wherein said transportation module comprises a marine vessel.
29. The combination unit according to claim 28, further comprising a marine mobile power pack.
30. The combination unit according to claim 27, wherein said transportation module comprises an amphibious vessel.
31. The combination unit according to claim 30, further comprising a marine mobile power pack.
32. The combination unit according to claim 27, wherein said transportation module comprises a trailer.
33. The combination unit according to claim 30, further comprising a truck power pack.
34. The combination unit according to claim 27, wherein said transportation module comprises a skid.
35. The combination unit according to claim 1, wherein said well servicing units comprise: a high pressure pump and a blending tank; said high pressure pump and blending tank being interconnectable by plumbing.
36. The combination unit according to claim 35, further comprising a crane, said blending tank, high pressure pump and crane being interconnectable by plumbing.
37. The combination unit according to claim 1, wherein said well servicing modules comprise:
i. a wireline inspection module;
ii. a coiled tubing module;
iii. a nitrogen module;
iv. a unit pump module; and
v. a blending tank module.
38. The combination unit according to claim 37 further comprising an acid pump module and an acid tank module that is connectable by plumbing to said blending tank module and said coil tubing module, wherein said hydraulic manifold is removably connectable to said power-take-off of said power source to also drive hydraulic pumps and motors that control said acid pump module.
The combination unit according to claim 1, wherein said well servicing modules comprise: a coil tubing module and at least one other well servicing module.
39. The combination unit according to claim 1, wherein said well servicing modules comprise: a wireline inspection module; and at least one other well servicing module.
40. The combination unit according to claim 37, further comprising a combination nitrogen and high pressure pump module that is connectable by plumbing to said blending tank module and said coil tubing module, wherein said hydraulic manifold is removably connectable to the power-take-off of said power source to also drive hydraulic pumps and motors that control said combination nitrogen and high pressure pump module.
41. The combination unit according to claim 1, wherein said well servicing modules comprise: coiled tubing reel module for introducing well treatment fluid into a well; and an injector module that can advance said coiled tubing into a wellbore.
42. The combination unit according to claim 1, wherein said well servicing modules comprise a coiled tubing injector module and a crane module for picking up and lowering the coiled tubing injector of said coil tubing injector module.
43. The combination unit according to claim 1, further comprising an operator's console module whereby said motors and pumps may be controlled by an operator.
44. The combination unit according to claim 1, wherein at least one of said modules is skid mounted.
45. The combination unit according to claim 1, wherein at least one of said modules is skid mounted.
46. A method of well servicing unit maintenance comprising keeping functional modules in inventory and replacing broken or unsatisfactory modules of a modular well servicing combination unit as desired.
47. A method of producing a well servicing unit comprising assembling standardized well servicing modules having standardized interfaces and connectors.
US11/796,168 2007-04-29 2007-04-29 Modular well servicing combination unit Abandoned US20080264649A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US11/796,168 US20080264649A1 (en) 2007-04-29 2007-04-29 Modular well servicing combination unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US11/796,168 US20080264649A1 (en) 2007-04-29 2007-04-29 Modular well servicing combination unit

Publications (1)

Publication Number Publication Date
US20080264649A1 true US20080264649A1 (en) 2008-10-30

Family

ID=39885628

Family Applications (1)

Application Number Title Priority Date Filing Date
US11/796,168 Abandoned US20080264649A1 (en) 2007-04-29 2007-04-29 Modular well servicing combination unit

Country Status (1)

Country Link
US (1) US20080264649A1 (en)

Cited By (96)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090050311A1 (en) * 2006-03-20 2009-02-26 Crawford James B Well servicing combination unit
US20100263860A1 (en) * 2009-04-21 2010-10-21 Rod Shampine System and Method to Provide Well Service Unit With Integrated Gas Delivery
WO2013022430A1 (en) * 2011-08-09 2013-02-14 Halliburton Energy Services, Inc. Systems and methods for a modular drum with a common power pack unit
US20140374114A1 (en) * 2013-06-24 2014-12-25 Helix Energy Solutions Group, Inc. Subsea Intervention System
CN104265244A (en) * 2014-09-14 2015-01-07 哈尔滨理工大学 Underground submersible multistage lifting type pumping system and configuration method thereof
US8978695B2 (en) 2009-04-20 2015-03-17 S.P.M. Flow Control, Inc. Flowline flapper valve
US8998168B2 (en) 2009-06-03 2015-04-07 S.P.M. Flow Control, Inc. Plug valve indicator
USD734434S1 (en) 2013-03-15 2015-07-14 S.P.M. Flow Control, Inc. Seal assembly
US9103448B2 (en) 2012-08-16 2015-08-11 S.P.M. Flow Control, Inc. Plug valve having preloaded seal segments
US9103193B2 (en) 2011-04-07 2015-08-11 Evolution Well Services, Llc Mobile, modular, electrically powered system for use in fracturing underground formations
US20150242411A1 (en) * 2014-02-27 2015-08-27 Halliburton Energy Services, Inc. Data File Processing for a Well Job Data Archive
WO2015131284A1 (en) * 2014-03-06 2015-09-11 Trican Well Service Ltd. Method and system for purging coil tubing using onsite gas
US9140110B2 (en) 2012-10-05 2015-09-22 Evolution Well Services, Llc Mobile, modular, electrically powered system for use in fracturing underground formations using liquid petroleum gas
US9273543B2 (en) 2012-08-17 2016-03-01 S.P.M. Flow Control, Inc. Automated relief valve control system and method
US9322243B2 (en) 2012-08-17 2016-04-26 S.P.M. Flow Control, Inc. Automated relief valve control system and method
US9568138B2 (en) 2013-07-01 2017-02-14 S.P.M. Flow Control, Inc. Manifold assembly
US9611728B2 (en) 2012-11-16 2017-04-04 U.S. Well Services Llc Cold weather package for oil field hydraulics
US9650871B2 (en) 2012-11-16 2017-05-16 Us Well Services Llc Safety indicator lights for hydraulic fracturing pumps
US9650879B2 (en) 2012-11-16 2017-05-16 Us Well Services Llc Torsional coupling for electric hydraulic fracturing fluid pumps
US9745840B2 (en) 2012-11-16 2017-08-29 Us Well Services Llc Electric powered pump down
US9840901B2 (en) 2012-11-16 2017-12-12 U.S. Well Services, LLC Remote monitoring for hydraulic fracturing equipment
US9893500B2 (en) 2012-11-16 2018-02-13 U.S. Well Services, LLC Switchgear load sharing for oil field equipment
US20180066485A1 (en) * 2015-03-24 2018-03-08 Fmc Kongsberg Subsea As Modular system and method for controlling subsea operations
US9964245B2 (en) 2007-07-03 2018-05-08 S.P.M. Flow Control, Inc. Swivel joint with uniform ball bearing requirements
US9970278B2 (en) 2012-11-16 2018-05-15 U.S. Well Services, LLC System for centralized monitoring and control of electric powered hydraulic fracturing fleet
US9995218B2 (en) 2012-11-16 2018-06-12 U.S. Well Services, LLC Turbine chilling for oil field power generation
US10020711B2 (en) 2012-11-16 2018-07-10 U.S. Well Services, LLC System for fueling electric powered hydraulic fracturing equipment with multiple fuel sources
US10036238B2 (en) 2012-11-16 2018-07-31 U.S. Well Services, LLC Cable management of electric powered hydraulic fracturing pump unit
US10119381B2 (en) 2012-11-16 2018-11-06 U.S. Well Services, LLC System for reducing vibrations in a pressure pumping fleet
US10232332B2 (en) 2012-11-16 2019-03-19 U.S. Well Services, Inc. Independent control of auger and hopper assembly in electric blender system
US10254732B2 (en) 2012-11-16 2019-04-09 U.S. Well Services, Inc. Monitoring and control of proppant storage from a datavan
US10280724B2 (en) 2017-07-07 2019-05-07 U.S. Well Services, Inc. Hydraulic fracturing equipment with non-hydraulic power
US10337308B2 (en) 2012-11-16 2019-07-02 U.S. Well Services, Inc. System for pumping hydraulic fracturing fluid using electric pumps
US10407990B2 (en) 2012-11-16 2019-09-10 U.S. Well Services, LLC Slide out pump stand for hydraulic fracturing equipment
US10408031B2 (en) 2017-10-13 2019-09-10 U.S. Well Services, LLC Automated fracturing system and method
US10526882B2 (en) 2012-11-16 2020-01-07 U.S. Well Services, LLC Modular remote power generation and transmission for hydraulic fracturing system
US10557576B2 (en) 2015-06-15 2020-02-11 S.P.M. Flow Control, Inc. Full-root-radius-threaded wing nut having increased wall thickness
US10598258B2 (en) 2017-12-05 2020-03-24 U.S. Well Services, LLC Multi-plunger pumps and associated drive systems
US10648270B2 (en) 2018-09-14 2020-05-12 U.S. Well Services, LLC Riser assist for wellsites
US10648311B2 (en) 2017-12-05 2020-05-12 U.S. Well Services, LLC High horsepower pumping configuration for an electric hydraulic fracturing system
US10655435B2 (en) 2017-10-25 2020-05-19 U.S. Well Services, LLC Smart fracturing system and method
US10677365B2 (en) 2015-09-04 2020-06-09 S.P.M. Flow Control, Inc. Pressure relief valve assembly and methods
US10815764B1 (en) 2019-09-13 2020-10-27 Bj Energy Solutions, Llc Methods and systems for operating a fleet of pumps
US10895202B1 (en) 2019-09-13 2021-01-19 Bj Energy Solutions, Llc Direct drive unit removal system and associated methods
US10954770B1 (en) 2020-06-09 2021-03-23 Bj Energy Solutions, Llc Systems and methods for exchanging fracturing components of a hydraulic fracturing unit
US10961908B1 (en) 2020-06-05 2021-03-30 Bj Energy Solutions, Llc Systems and methods to enhance intake air flow to a gas turbine engine of a hydraulic fracturing unit
US10968837B1 (en) 2020-05-14 2021-04-06 Bj Energy Solutions, Llc Systems and methods utilizing turbine compressor discharge for hydrostatic manifold purge
US10989180B2 (en) 2019-09-13 2021-04-27 Bj Energy Solutions, Llc Power sources and transmission networks for auxiliary equipment onboard hydraulic fracturing units and associated methods
US11002189B2 (en) 2019-09-13 2021-05-11 Bj Energy Solutions, Llc Mobile gas turbine inlet air conditioning system and associated methods
US11009162B1 (en) 2019-12-27 2021-05-18 U.S. Well Services, LLC System and method for integrated flow supply line
US11015594B2 (en) 2019-09-13 2021-05-25 Bj Energy Solutions, Llc Systems and method for use of single mass flywheel alongside torsional vibration damper assembly for single acting reciprocating pump
US11015536B2 (en) 2019-09-13 2021-05-25 Bj Energy Solutions, Llc Methods and systems for supplying fuel to gas turbine engines
US11022526B1 (en) 2020-06-09 2021-06-01 Bj Energy Solutions, Llc Systems and methods for monitoring a condition of a fracturing component section of a hydraulic fracturing unit
US11028677B1 (en) 2020-06-22 2021-06-08 Bj Energy Solutions, Llc Stage profiles for operations of hydraulic systems and associated methods
US11035207B2 (en) 2018-04-16 2021-06-15 U.S. Well Services, LLC Hybrid hydraulic fracturing fleet
US11066915B1 (en) 2020-06-09 2021-07-20 Bj Energy Solutions, Llc Methods for detection and mitigation of well screen out
US11067481B2 (en) 2017-10-05 2021-07-20 U.S. Well Services, LLC Instrumented fracturing slurry flow system and method
US11098651B1 (en) 2019-09-13 2021-08-24 Bj Energy Solutions, Llc Turbine engine exhaust duct system and methods for noise dampening and attenuation
US11109508B1 (en) 2020-06-05 2021-08-31 Bj Energy Solutions, Llc Enclosure assembly for enhanced cooling of direct drive unit and related methods
US11114857B2 (en) 2018-02-05 2021-09-07 U.S. Well Services, LLC Microgrid electrical load management
US11111768B1 (en) 2020-06-09 2021-09-07 Bj Energy Solutions, Llc Drive equipment and methods for mobile fracturing transportation platforms
US11125066B1 (en) 2020-06-22 2021-09-21 Bj Energy Solutions, Llc Systems and methods to operate a dual-shaft gas turbine engine for hydraulic fracturing
US11149533B1 (en) 2020-06-24 2021-10-19 Bj Energy Solutions, Llc Systems to monitor, detect, and/or intervene relative to cavitation and pulsation events during a hydraulic fracturing operation
US11181107B2 (en) 2016-12-02 2021-11-23 U.S. Well Services, LLC Constant voltage power distribution system for use with an electric hydraulic fracturing system
US11193361B1 (en) 2020-07-17 2021-12-07 Bj Energy Solutions, Llc Methods, systems, and devices to enhance fracturing fluid delivery to subsurface formations during high-pressure fracturing operations
US11211801B2 (en) 2018-06-15 2021-12-28 U.S. Well Services, LLC Integrated mobile power unit for hydraulic fracturing
US11208953B1 (en) 2020-06-05 2021-12-28 Bj Energy Solutions, Llc Systems and methods to enhance intake air flow to a gas turbine engine of a hydraulic fracturing unit
US11208880B2 (en) 2020-05-28 2021-12-28 Bj Energy Solutions, Llc Bi-fuel reciprocating engine to power direct drive turbine fracturing pumps onboard auxiliary systems and related methods
US11208878B2 (en) 2018-10-09 2021-12-28 U.S. Well Services, LLC Modular switchgear system and power distribution for electric oilfield equipment
US11220895B1 (en) 2020-06-24 2022-01-11 Bj Energy Solutions, Llc Automated diagnostics of electronic instrumentation in a system for fracturing a well and associated methods
US11236739B2 (en) 2019-09-13 2022-02-01 Bj Energy Solutions, Llc Power sources and transmission networks for auxiliary equipment onboard hydraulic fracturing units and associated methods
US11255173B2 (en) 2011-04-07 2022-02-22 Typhon Technology Solutions, Llc Mobile, modular, electrically powered system for use in fracturing underground formations using liquid petroleum gas
US11268346B2 (en) 2019-09-13 2022-03-08 Bj Energy Solutions, Llc Fuel, communications, and power connection systems
CN114427359A (en) * 2022-02-09 2022-05-03 辽宁石油化工大学 Novel tool carrying device for well repair
US11408794B2 (en) 2019-09-13 2022-08-09 Bj Energy Solutions, Llc Fuel, communications, and power connection systems and related methods
US11415125B2 (en) 2020-06-23 2022-08-16 Bj Energy Solutions, Llc Systems for utilization of a hydraulic fracturing unit profile to operate hydraulic fracturing units
US11428165B2 (en) 2020-05-15 2022-08-30 Bj Energy Solutions, Llc Onboard heater of auxiliary systems using exhaust gases and associated methods
US11449018B2 (en) 2012-11-16 2022-09-20 U.S. Well Services, LLC System and method for parallel power and blackout protection for electric powered hydraulic fracturing
US11473413B2 (en) 2020-06-23 2022-10-18 Bj Energy Solutions, Llc Systems and methods to autonomously operate hydraulic fracturing units
US11476781B2 (en) 2012-11-16 2022-10-18 U.S. Well Services, LLC Wireline power supply during electric powered fracturing operations
US11486788B2 (en) 2020-05-28 2022-11-01 Schlumberger Technology Corporation Test system for a pressure control equipment system
US11542786B2 (en) 2019-08-01 2023-01-03 U.S. Well Services, LLC High capacity power storage system for electric hydraulic fracturing
US11560845B2 (en) 2019-05-15 2023-01-24 Bj Energy Solutions, Llc Mobile gas turbine inlet air conditioning system and associated methods
US11578577B2 (en) 2019-03-20 2023-02-14 U.S. Well Services, LLC Oversized switchgear trailer for electric hydraulic fracturing
US11624326B2 (en) 2017-05-21 2023-04-11 Bj Energy Solutions, Llc Methods and systems for supplying fuel to gas turbine engines
US11635074B2 (en) 2020-05-12 2023-04-25 Bj Energy Solutions, Llc Cover for fluid systems and related methods
US11639654B2 (en) 2021-05-24 2023-05-02 Bj Energy Solutions, Llc Hydraulic fracturing pumps to enhance flow of fracturing fluid into wellheads and related methods
US11708752B2 (en) 2011-04-07 2023-07-25 Typhon Technology Solutions (U.S.), Llc Multiple generator mobile electric powered fracturing system
US11728709B2 (en) 2019-05-13 2023-08-15 U.S. Well Services, LLC Encoderless vector control for VFD in hydraulic fracturing applications
US11867118B2 (en) 2019-09-13 2024-01-09 Bj Energy Solutions, Llc Methods and systems for supplying fuel to gas turbine engines
CN117646614A (en) * 2024-01-29 2024-03-05 中国石油集团川庆钻探工程有限公司 Freezing temporary plugging valve replacing device and method
US11933153B2 (en) 2020-06-22 2024-03-19 Bj Energy Solutions, Llc Systems and methods to operate hydraulic fracturing units using automatic flow rate and/or pressure control
US11939853B2 (en) 2020-06-22 2024-03-26 Bj Energy Solutions, Llc Systems and methods providing a configurable staged rate increase function to operate hydraulic fracturing units
US11955782B1 (en) 2022-11-01 2024-04-09 Typhon Technology Solutions (U.S.), Llc System and method for fracturing of underground formations using electric grid power
US11959371B2 (en) 2012-11-16 2024-04-16 Us Well Services, Llc Suction and discharge lines for a dual hydraulic fracturing unit
US11994014B2 (en) 2023-01-25 2024-05-28 Bj Energy Solutions, Llc Methods, systems, and devices to enhance fracturing fluid delivery to subsurface formations during high-pressure fracturing operations

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3129774A (en) * 1960-09-09 1964-04-21 California Research Corp Method and apparatus for drilling and working in offshore wells
US5965031A (en) * 1995-12-28 1999-10-12 Union Oil Company Of California pH modification of geothermal brine with sulfur-containing acid
US6003598A (en) * 1998-01-02 1999-12-21 Cancoil Technology Corporation Mobile multi-function rig
US6068056A (en) * 1999-10-13 2000-05-30 Schlumberger Technology Corporation Well treatment fluids comprising mixed aldehydes
US6234260B1 (en) * 1997-03-19 2001-05-22 Coast Machinery, Inc. Mobile drilling apparatus
US20040244993A1 (en) * 2002-04-22 2004-12-09 Crawford James B. Three in one combined power unit for nitrogen system, fluid system, and coiled tubing system
US20080110635A1 (en) * 2006-11-14 2008-05-15 Schlumberger Technology Corporation Assembling Functional Modules to Form a Well Tool

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3129774A (en) * 1960-09-09 1964-04-21 California Research Corp Method and apparatus for drilling and working in offshore wells
US5965031A (en) * 1995-12-28 1999-10-12 Union Oil Company Of California pH modification of geothermal brine with sulfur-containing acid
US6234260B1 (en) * 1997-03-19 2001-05-22 Coast Machinery, Inc. Mobile drilling apparatus
US6003598A (en) * 1998-01-02 1999-12-21 Cancoil Technology Corporation Mobile multi-function rig
US6068056A (en) * 1999-10-13 2000-05-30 Schlumberger Technology Corporation Well treatment fluids comprising mixed aldehydes
US20040244993A1 (en) * 2002-04-22 2004-12-09 Crawford James B. Three in one combined power unit for nitrogen system, fluid system, and coiled tubing system
US20080110635A1 (en) * 2006-11-14 2008-05-15 Schlumberger Technology Corporation Assembling Functional Modules to Form a Well Tool

Cited By (256)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090050311A1 (en) * 2006-03-20 2009-02-26 Crawford James B Well servicing combination unit
US9964245B2 (en) 2007-07-03 2018-05-08 S.P.M. Flow Control, Inc. Swivel joint with uniform ball bearing requirements
US8978695B2 (en) 2009-04-20 2015-03-17 S.P.M. Flow Control, Inc. Flowline flapper valve
US20100263860A1 (en) * 2009-04-21 2010-10-21 Rod Shampine System and Method to Provide Well Service Unit With Integrated Gas Delivery
US8590612B2 (en) * 2009-04-21 2013-11-26 Schlumberger Technology Corporation System and method to provide well service unit with integrated gas delivery
US8998168B2 (en) 2009-06-03 2015-04-07 S.P.M. Flow Control, Inc. Plug valve indicator
US9103193B2 (en) 2011-04-07 2015-08-11 Evolution Well Services, Llc Mobile, modular, electrically powered system for use in fracturing underground formations
US10724353B2 (en) 2011-04-07 2020-07-28 Typhon Technology Solutions, Llc Dual pump VFD controlled system for electric fracturing operations
US11187069B2 (en) 2011-04-07 2021-11-30 Typhon Technology Solutions, Llc Multiple generator mobile electric powered fracturing system
US10502042B2 (en) 2011-04-07 2019-12-10 Typhon Technology Solutions, Llc Electric blender system, apparatus and method for use in fracturing underground formations using liquid petroleum gas
US10648312B2 (en) 2011-04-07 2020-05-12 Typhon Technology Solutions, Llc Dual pump trailer mounted electric fracturing system
US20190271218A1 (en) * 2011-04-07 2019-09-05 Evolution Well Services, Llc Vfd controlled motor mobile electrically powered system for use in fracturing underground formations for electric fracturing operations
US11255173B2 (en) 2011-04-07 2022-02-22 Typhon Technology Solutions, Llc Mobile, modular, electrically powered system for use in fracturing underground formations using liquid petroleum gas
US9121257B2 (en) 2011-04-07 2015-09-01 Evolution Well Services, Llc Mobile, modular, electrically powered system for use in fracturing underground formations
US11391133B2 (en) 2011-04-07 2022-07-19 Typhon Technology Solutions (U.S.), Llc Dual pump VFD controlled motor electric fracturing system
US10689961B2 (en) 2011-04-07 2020-06-23 Typhon Technology Solutions, Llc Multiple generator mobile electric powered fracturing system
US11391136B2 (en) 2011-04-07 2022-07-19 Typhon Technology Solutions (U.S.), Llc Dual pump VFD controlled motor electric fracturing system
US10227855B2 (en) 2011-04-07 2019-03-12 Evolution Well Services, Llc Mobile, modular, electrically powered system for use in fracturing underground formations
US10221668B2 (en) 2011-04-07 2019-03-05 Evolution Well Services, Llc Mobile, modular, electrically powered system for use in fracturing underground formations
US9366114B2 (en) 2011-04-07 2016-06-14 Evolution Well Services, Llc Mobile, modular, electrically powered system for use in fracturing underground formations
US11613979B2 (en) 2011-04-07 2023-03-28 Typhon Technology Solutions, Llc Mobile, modular, electrically powered system for use in fracturing underground formations using liquid petroleum gas
US10718194B2 (en) 2011-04-07 2020-07-21 Typhon Technology Solutions, Llc Control system for electric fracturing operations
US10718195B2 (en) 2011-04-07 2020-07-21 Typhon Technology Solutions, Llc Dual pump VFD controlled motor electric fracturing system
US11002125B2 (en) 2011-04-07 2021-05-11 Typhon Technology Solutions, Llc Control system for electric fracturing operations
US11708752B2 (en) 2011-04-07 2023-07-25 Typhon Technology Solutions (U.S.), Llc Multiple generator mobile electric powered fracturing system
US10774630B2 (en) 2011-04-07 2020-09-15 Typhon Technology Solutions, Llc Control system for electric fracturing operations
US10982521B2 (en) 2011-04-07 2021-04-20 Typhon Technology Solutions, Llc Dual pump VFD controlled motor electric fracturing system
US11851998B2 (en) 2011-04-07 2023-12-26 Typhon Technology Solutions (U.S.), Llc Dual pump VFD controlled motor electric fracturing system
US11913315B2 (en) 2011-04-07 2024-02-27 Typhon Technology Solutions (U.S.), Llc Fracturing blender system and method using liquid petroleum gas
US11939852B2 (en) 2011-04-07 2024-03-26 Typhon Technology Solutions (U.S.), Llc Dual pump VFD controlled motor electric fracturing system
US10837270B2 (en) * 2011-04-07 2020-11-17 Typhon Technology Solutions, Llc VFD controlled motor mobile electrically powered system for use in fracturing underground formations for electric fracturing operations
US10895138B2 (en) 2011-04-07 2021-01-19 Typhon Technology Solutions, Llc Multiple generator mobile electric powered fracturing system
US10876386B2 (en) 2011-04-07 2020-12-29 Typhon Technology Solutions, Llc Dual pump trailer mounted electric fracturing system
US10851634B2 (en) 2011-04-07 2020-12-01 Typhon Technology Solutions, Llc Dual pump mobile electrically powered system for use in fracturing underground formations
WO2013022430A1 (en) * 2011-08-09 2013-02-14 Halliburton Energy Services, Inc. Systems and methods for a modular drum with a common power pack unit
US20140048286A1 (en) * 2011-08-09 2014-02-20 Fabian Fidel Rojas Systems and methods for a modular drum with a common power pack unit
US9638337B2 (en) 2012-08-16 2017-05-02 S.P.M. Flow Control, Inc. Plug valve having preloaded seal segments
US9103448B2 (en) 2012-08-16 2015-08-11 S.P.M. Flow Control, Inc. Plug valve having preloaded seal segments
US9322243B2 (en) 2012-08-17 2016-04-26 S.P.M. Flow Control, Inc. Automated relief valve control system and method
US9857807B2 (en) 2012-08-17 2018-01-02 S.P.M. Flow Control, Inc. Automated relief valve control system and method
US9273543B2 (en) 2012-08-17 2016-03-01 S.P.M. Flow Control, Inc. Automated relief valve control system and method
US11118438B2 (en) 2012-10-05 2021-09-14 Typhon Technology Solutions, Llc Turbine driven electric fracturing system and method
US9475020B2 (en) 2012-10-05 2016-10-25 Evolution Well Services, Llc Mobile, modular, electrically powered system for use in fracturing underground formations using liquid petroleum gas
US10107085B2 (en) 2012-10-05 2018-10-23 Evolution Well Services Electric blender system, apparatus and method for use in fracturing underground formations using liquid petroleum gas
US9140110B2 (en) 2012-10-05 2015-09-22 Evolution Well Services, Llc Mobile, modular, electrically powered system for use in fracturing underground formations using liquid petroleum gas
US10107084B2 (en) 2012-10-05 2018-10-23 Evolution Well Services System and method for dedicated electric source for use in fracturing underground formations using liquid petroleum gas
US9475021B2 (en) 2012-10-05 2016-10-25 Evolution Well Services, Llc Mobile, modular, electrically powered system for use in fracturing underground formations using liquid petroleum gas
US11850563B2 (en) 2012-11-16 2023-12-26 U.S. Well Services, LLC Independent control of auger and hopper assembly in electric blender system
US10947829B2 (en) 2012-11-16 2021-03-16 U.S. Well Services, LLC Cable management of electric powered hydraulic fracturing pump unit
US10408030B2 (en) 2012-11-16 2019-09-10 U.S. Well Services, LLC Electric powered pump down
US10407990B2 (en) 2012-11-16 2019-09-10 U.S. Well Services, LLC Slide out pump stand for hydraulic fracturing equipment
US11136870B2 (en) 2012-11-16 2021-10-05 U.S. Well Services, LLC System for pumping hydraulic fracturing fluid using electric pumps
US11091992B2 (en) 2012-11-16 2021-08-17 U.S. Well Services, LLC System for centralized monitoring and control of electric powered hydraulic fracturing fleet
US10526882B2 (en) 2012-11-16 2020-01-07 U.S. Well Services, LLC Modular remote power generation and transmission for hydraulic fracturing system
US11066912B2 (en) 2012-11-16 2021-07-20 U.S. Well Services, LLC Torsional coupling for electric hydraulic fracturing fluid pumps
US11449018B2 (en) 2012-11-16 2022-09-20 U.S. Well Services, LLC System and method for parallel power and blackout protection for electric powered hydraulic fracturing
US11476781B2 (en) 2012-11-16 2022-10-18 U.S. Well Services, LLC Wireline power supply during electric powered fracturing operations
US11674352B2 (en) 2012-11-16 2023-06-13 U.S. Well Services, LLC Slide out pump stand for hydraulic fracturing equipment
US10254732B2 (en) 2012-11-16 2019-04-09 U.S. Well Services, Inc. Monitoring and control of proppant storage from a datavan
US9611728B2 (en) 2012-11-16 2017-04-04 U.S. Well Services Llc Cold weather package for oil field hydraulics
US11713661B2 (en) 2012-11-16 2023-08-01 U.S. Well Services, LLC Electric powered pump down
US9650871B2 (en) 2012-11-16 2017-05-16 Us Well Services Llc Safety indicator lights for hydraulic fracturing pumps
US11181879B2 (en) 2012-11-16 2021-11-23 U.S. Well Services, LLC Monitoring and control of proppant storage from a datavan
US10686301B2 (en) 2012-11-16 2020-06-16 U.S. Well Services, LLC Switchgear load sharing for oil field equipment
US10232332B2 (en) 2012-11-16 2019-03-19 U.S. Well Services, Inc. Independent control of auger and hopper assembly in electric blender system
US10119381B2 (en) 2012-11-16 2018-11-06 U.S. Well Services, LLC System for reducing vibrations in a pressure pumping fleet
US10107086B2 (en) 2012-11-16 2018-10-23 U.S. Well Services, LLC Remote monitoring for hydraulic fracturing equipment
US10036238B2 (en) 2012-11-16 2018-07-31 U.S. Well Services, LLC Cable management of electric powered hydraulic fracturing pump unit
US10731561B2 (en) 2012-11-16 2020-08-04 U.S. Well Services, LLC Turbine chilling for oil field power generation
US9650879B2 (en) 2012-11-16 2017-05-16 Us Well Services Llc Torsional coupling for electric hydraulic fracturing fluid pumps
US10020711B2 (en) 2012-11-16 2018-07-10 U.S. Well Services, LLC System for fueling electric powered hydraulic fracturing equipment with multiple fuel sources
US11959371B2 (en) 2012-11-16 2024-04-16 Us Well Services, Llc Suction and discharge lines for a dual hydraulic fracturing unit
US9995218B2 (en) 2012-11-16 2018-06-12 U.S. Well Services, LLC Turbine chilling for oil field power generation
US9970278B2 (en) 2012-11-16 2018-05-15 U.S. Well Services, LLC System for centralized monitoring and control of electric powered hydraulic fracturing fleet
US9745840B2 (en) 2012-11-16 2017-08-29 Us Well Services Llc Electric powered pump down
US10337308B2 (en) 2012-11-16 2019-07-02 U.S. Well Services, Inc. System for pumping hydraulic fracturing fluid using electric pumps
US9893500B2 (en) 2012-11-16 2018-02-13 U.S. Well Services, LLC Switchgear load sharing for oil field equipment
US9840901B2 (en) 2012-11-16 2017-12-12 U.S. Well Services, LLC Remote monitoring for hydraulic fracturing equipment
US10927802B2 (en) 2012-11-16 2021-02-23 U.S. Well Services, LLC System for fueling electric powered hydraulic fracturing equipment with multiple fuel sources
US10934824B2 (en) 2012-11-16 2021-03-02 U.S. Well Services, LLC System for reducing vibrations in a pressure pumping fleet
USD734434S1 (en) 2013-03-15 2015-07-14 S.P.M. Flow Control, Inc. Seal assembly
US20140374114A1 (en) * 2013-06-24 2014-12-25 Helix Energy Solutions Group, Inc. Subsea Intervention System
US9273536B2 (en) * 2013-06-24 2016-03-01 Helix Energy Solutions Group, Inc. Subsea intervention system
US9568138B2 (en) 2013-07-01 2017-02-14 S.P.M. Flow Control, Inc. Manifold assembly
US10738928B2 (en) 2013-07-01 2020-08-11 S.P.M. Flow Control, Inc. Manifold assembly
USD873860S1 (en) 2013-07-01 2020-01-28 S.P.M. Flow Control, Inc. Mounting bracket for manifold assembly
US20150242411A1 (en) * 2014-02-27 2015-08-27 Halliburton Energy Services, Inc. Data File Processing for a Well Job Data Archive
US9417970B2 (en) * 2014-02-27 2016-08-16 Halliburton Energy Services, Inc. Data file processing for a well job data archive
WO2015131284A1 (en) * 2014-03-06 2015-09-11 Trican Well Service Ltd. Method and system for purging coil tubing using onsite gas
CN104265244A (en) * 2014-09-14 2015-01-07 哈尔滨理工大学 Underground submersible multistage lifting type pumping system and configuration method thereof
US20180066485A1 (en) * 2015-03-24 2018-03-08 Fmc Kongsberg Subsea As Modular system and method for controlling subsea operations
US10570682B2 (en) * 2015-03-24 2020-02-25 Fmc Kongsberg Subsea As Modular system and method for controlling subsea operations
US10557576B2 (en) 2015-06-15 2020-02-11 S.P.M. Flow Control, Inc. Full-root-radius-threaded wing nut having increased wall thickness
US11519530B2 (en) 2015-06-15 2022-12-06 Spm Oil & Gas Inc. Full-root-radius-threaded wing nut having increased wall thickness
US10677365B2 (en) 2015-09-04 2020-06-09 S.P.M. Flow Control, Inc. Pressure relief valve assembly and methods
US11181107B2 (en) 2016-12-02 2021-11-23 U.S. Well Services, LLC Constant voltage power distribution system for use with an electric hydraulic fracturing system
US11624326B2 (en) 2017-05-21 2023-04-11 Bj Energy Solutions, Llc Methods and systems for supplying fuel to gas turbine engines
US10280724B2 (en) 2017-07-07 2019-05-07 U.S. Well Services, Inc. Hydraulic fracturing equipment with non-hydraulic power
US11067481B2 (en) 2017-10-05 2021-07-20 U.S. Well Services, LLC Instrumented fracturing slurry flow system and method
US11203924B2 (en) 2017-10-13 2021-12-21 U.S. Well Services, LLC Automated fracturing system and method
US10408031B2 (en) 2017-10-13 2019-09-10 U.S. Well Services, LLC Automated fracturing system and method
US10655435B2 (en) 2017-10-25 2020-05-19 U.S. Well Services, LLC Smart fracturing system and method
US11959533B2 (en) 2017-12-05 2024-04-16 U.S. Well Services Holdings, Llc Multi-plunger pumps and associated drive systems
US10598258B2 (en) 2017-12-05 2020-03-24 U.S. Well Services, LLC Multi-plunger pumps and associated drive systems
US10648311B2 (en) 2017-12-05 2020-05-12 U.S. Well Services, LLC High horsepower pumping configuration for an electric hydraulic fracturing system
US11114857B2 (en) 2018-02-05 2021-09-07 U.S. Well Services, LLC Microgrid electrical load management
US11035207B2 (en) 2018-04-16 2021-06-15 U.S. Well Services, LLC Hybrid hydraulic fracturing fleet
US11211801B2 (en) 2018-06-15 2021-12-28 U.S. Well Services, LLC Integrated mobile power unit for hydraulic fracturing
US10648270B2 (en) 2018-09-14 2020-05-12 U.S. Well Services, LLC Riser assist for wellsites
US11208878B2 (en) 2018-10-09 2021-12-28 U.S. Well Services, LLC Modular switchgear system and power distribution for electric oilfield equipment
US11578577B2 (en) 2019-03-20 2023-02-14 U.S. Well Services, LLC Oversized switchgear trailer for electric hydraulic fracturing
US11728709B2 (en) 2019-05-13 2023-08-15 U.S. Well Services, LLC Encoderless vector control for VFD in hydraulic fracturing applications
US11560845B2 (en) 2019-05-15 2023-01-24 Bj Energy Solutions, Llc Mobile gas turbine inlet air conditioning system and associated methods
US11542786B2 (en) 2019-08-01 2023-01-03 U.S. Well Services, LLC High capacity power storage system for electric hydraulic fracturing
US11236739B2 (en) 2019-09-13 2022-02-01 Bj Energy Solutions, Llc Power sources and transmission networks for auxiliary equipment onboard hydraulic fracturing units and associated methods
US11346280B1 (en) 2019-09-13 2022-05-31 Bj Energy Solutions, Llc Direct drive unit removal system and associated methods
US11156159B1 (en) 2019-09-13 2021-10-26 Bj Energy Solutions, Llc Mobile gas turbine inlet air conditioning system and associated methods
US11971028B2 (en) 2019-09-13 2024-04-30 Bj Energy Solutions, Llc Systems and method for use of single mass flywheel alongside torsional vibration damper assembly for single acting reciprocating pump
US11149726B1 (en) 2019-09-13 2021-10-19 Bj Energy Solutions, Llc Systems and method for use of single mass flywheel alongside torsional vibration damper assembly for single acting reciprocating pump
US10815764B1 (en) 2019-09-13 2020-10-27 Bj Energy Solutions, Llc Methods and systems for operating a fleet of pumps
US10895202B1 (en) 2019-09-13 2021-01-19 Bj Energy Solutions, Llc Direct drive unit removal system and associated methods
US10907459B1 (en) 2019-09-13 2021-02-02 Bj Energy Solutions, Llc Methods and systems for operating a fleet of pumps
US11867118B2 (en) 2019-09-13 2024-01-09 Bj Energy Solutions, Llc Methods and systems for supplying fuel to gas turbine engines
US11859482B2 (en) 2019-09-13 2024-01-02 Bj Energy Solutions, Llc Power sources and transmission networks for auxiliary equipment onboard hydraulic fracturing units and associated methods
US10961912B1 (en) 2019-09-13 2021-03-30 Bj Energy Solutions, Llc Direct drive unit removal system and associated methods
US11852001B2 (en) 2019-09-13 2023-12-26 Bj Energy Solutions, Llc Methods and systems for operating a fleet of pumps
US11015536B2 (en) 2019-09-13 2021-05-25 Bj Energy Solutions, Llc Methods and systems for supplying fuel to gas turbine engines
US11560848B2 (en) 2019-09-13 2023-01-24 Bj Energy Solutions, Llc Methods for noise dampening and attenuation of turbine engine
US11530602B2 (en) 2019-09-13 2022-12-20 Bj Energy Solutions, Llc Power sources and transmission networks for auxiliary equipment onboard hydraulic fracturing units and associated methods
US11015594B2 (en) 2019-09-13 2021-05-25 Bj Energy Solutions, Llc Systems and method for use of single mass flywheel alongside torsional vibration damper assembly for single acting reciprocating pump
US11767791B2 (en) 2019-09-13 2023-09-26 Bj Energy Solutions, Llc Mobile gas turbine inlet air conditioning system and associated methods
US11761846B2 (en) 2019-09-13 2023-09-19 Bj Energy Solutions, Llc Fuel, communications, and power connection systems and related methods
US11098651B1 (en) 2019-09-13 2021-08-24 Bj Energy Solutions, Llc Turbine engine exhaust duct system and methods for noise dampening and attenuation
US11725583B2 (en) 2019-09-13 2023-08-15 Bj Energy Solutions, Llc Mobile gas turbine inlet air conditioning system and associated methods
US11578660B1 (en) 2019-09-13 2023-02-14 Bj Energy Solutions, Llc Direct drive unit removal system and associated methods
US11268346B2 (en) 2019-09-13 2022-03-08 Bj Energy Solutions, Llc Fuel, communications, and power connection systems
US11719234B2 (en) 2019-09-13 2023-08-08 Bj Energy Solutions, Llc Systems and method for use of single mass flywheel alongside torsional vibration damper assembly for single acting reciprocating pump
US11280266B2 (en) 2019-09-13 2022-03-22 Bj Energy Solutions, Llc Mobile gas turbine inlet air conditioning system and associated methods
US11280331B2 (en) 2019-09-13 2022-03-22 Bj Energy Solutions, Llc Systems and method for use of single mass flywheel alongside torsional vibration damper assembly for single acting reciprocating pump
US11287350B2 (en) 2019-09-13 2022-03-29 Bj Energy Solutions, Llc Fuel, communications, and power connection methods
US10982596B1 (en) 2019-09-13 2021-04-20 Bj Energy Solutions, Llc Direct drive unit removal system and associated methods
US11598263B2 (en) 2019-09-13 2023-03-07 Bj Energy Solutions, Llc Mobile gas turbine inlet air conditioning system and associated methods
US11512642B1 (en) 2019-09-13 2022-11-29 Bj Energy Solutions, Llc Direct drive unit removal system and associated methods
US11319878B2 (en) 2019-09-13 2022-05-03 Bj Energy Solutions, Llc Direct drive unit removal system and associated methods
US10989180B2 (en) 2019-09-13 2021-04-27 Bj Energy Solutions, Llc Power sources and transmission networks for auxiliary equipment onboard hydraulic fracturing units and associated methods
US11604113B2 (en) 2019-09-13 2023-03-14 Bj Energy Solutions, Llc Fuel, communications, and power connection systems and related methods
US11002189B2 (en) 2019-09-13 2021-05-11 Bj Energy Solutions, Llc Mobile gas turbine inlet air conditioning system and associated methods
US11555756B2 (en) 2019-09-13 2023-01-17 Bj Energy Solutions, Llc Fuel, communications, and power connection systems and related methods
US11655763B1 (en) 2019-09-13 2023-05-23 Bj Energy Solutions, Llc Direct drive unit removal system and associated methods
US11473997B2 (en) 2019-09-13 2022-10-18 Bj Energy Solutions, Llc Fuel, communications, and power connection systems and related methods
US11649766B1 (en) 2019-09-13 2023-05-16 Bj Energy Solutions, Llc Mobile gas turbine inlet air conditioning system and associated methods
US11092152B2 (en) 2019-09-13 2021-08-17 Bj Energy Solutions, Llc Systems and method for use of single mass flywheel alongside torsional vibration damper assembly for single acting reciprocating pump
US11473503B1 (en) 2019-09-13 2022-10-18 Bj Energy Solutions, Llc Direct drive unit removal system and associated methods
US11629584B2 (en) 2019-09-13 2023-04-18 Bj Energy Solutions, Llc Power sources and transmission networks for auxiliary equipment onboard hydraulic fracturing units and associated methods
US11401865B1 (en) 2019-09-13 2022-08-02 Bj Energy Solutions, Llc Direct drive unit removal system and associated methods
US11408794B2 (en) 2019-09-13 2022-08-09 Bj Energy Solutions, Llc Fuel, communications, and power connection systems and related methods
US11060455B1 (en) 2019-09-13 2021-07-13 Bj Energy Solutions, Llc Mobile gas turbine inlet air conditioning system and associated methods
US11608725B2 (en) 2019-09-13 2023-03-21 Bj Energy Solutions, Llc Methods and systems for operating a fleet of pumps
US11415056B1 (en) 2019-09-13 2022-08-16 Bj Energy Solutions, Llc Turbine engine exhaust duct system and methods for noise dampening and attenuation
US11460368B2 (en) 2019-09-13 2022-10-04 Bj Energy Solutions, Llc Fuel, communications, and power connection systems and related methods
US11619122B2 (en) 2019-09-13 2023-04-04 Bj Energy Solutions, Llc Methods and systems for operating a fleet of pumps
US11459954B2 (en) 2019-09-13 2022-10-04 Bj Energy Solutions, Llc Turbine engine exhaust duct system and methods for noise dampening and attenuation
US11613980B2 (en) 2019-09-13 2023-03-28 Bj Energy Solutions, Llc Methods and systems for operating a fleet of pumps
US11009162B1 (en) 2019-12-27 2021-05-18 U.S. Well Services, LLC System and method for integrated flow supply line
US11635074B2 (en) 2020-05-12 2023-04-25 Bj Energy Solutions, Llc Cover for fluid systems and related methods
US11708829B2 (en) 2020-05-12 2023-07-25 Bj Energy Solutions, Llc Cover for fluid systems and related methods
US11898504B2 (en) 2020-05-14 2024-02-13 Bj Energy Solutions, Llc Systems and methods utilizing turbine compressor discharge for hydrostatic manifold purge
US10968837B1 (en) 2020-05-14 2021-04-06 Bj Energy Solutions, Llc Systems and methods utilizing turbine compressor discharge for hydrostatic manifold purge
US11698028B2 (en) 2020-05-15 2023-07-11 Bj Energy Solutions, Llc Onboard heater of auxiliary systems using exhaust gases and associated methods
US11434820B2 (en) 2020-05-15 2022-09-06 Bj Energy Solutions, Llc Onboard heater of auxiliary systems using exhaust gases and associated methods
US11624321B2 (en) 2020-05-15 2023-04-11 Bj Energy Solutions, Llc Onboard heater of auxiliary systems using exhaust gases and associated methods
US11959419B2 (en) 2020-05-15 2024-04-16 Bj Energy Solutions, Llc Onboard heater of auxiliary systems using exhaust gases and associated methods
US11428165B2 (en) 2020-05-15 2022-08-30 Bj Energy Solutions, Llc Onboard heater of auxiliary systems using exhaust gases and associated methods
US11542868B2 (en) 2020-05-15 2023-01-03 Bj Energy Solutions, Llc Onboard heater of auxiliary systems using exhaust gases and associated methods
US11365616B1 (en) 2020-05-28 2022-06-21 Bj Energy Solutions, Llc Bi-fuel reciprocating engine to power direct drive turbine fracturing pumps onboard auxiliary systems and related methods
US11486788B2 (en) 2020-05-28 2022-11-01 Schlumberger Technology Corporation Test system for a pressure control equipment system
US11313213B2 (en) 2020-05-28 2022-04-26 Bj Energy Solutions, Llc Bi-fuel reciprocating engine to power direct drive turbine fracturing pumps onboard auxiliary systems and related methods
US11603745B2 (en) 2020-05-28 2023-03-14 Bj Energy Solutions, Llc Bi-fuel reciprocating engine to power direct drive turbine fracturing pumps onboard auxiliary systems and related methods
US11814940B2 (en) 2020-05-28 2023-11-14 Bj Energy Solutions Llc Bi-fuel reciprocating engine to power direct drive turbine fracturing pumps onboard auxiliary systems and related methods
US11208880B2 (en) 2020-05-28 2021-12-28 Bj Energy Solutions, Llc Bi-fuel reciprocating engine to power direct drive turbine fracturing pumps onboard auxiliary systems and related methods
US11723171B2 (en) 2020-06-05 2023-08-08 Bj Energy Solutions, Llc Enclosure assembly for enhanced cooling of direct drive unit and related methods
US11627683B2 (en) 2020-06-05 2023-04-11 Bj Energy Solutions, Llc Enclosure assembly for enhanced cooling of direct drive unit and related methods
US11129295B1 (en) 2020-06-05 2021-09-21 Bj Energy Solutions, Llc Enclosure assembly for enhanced cooling of direct drive unit and related methods
US11891952B2 (en) 2020-06-05 2024-02-06 Bj Energy Solutions, Llc Systems and methods to enhance intake air flow to a gas turbine engine of a hydraulic fracturing unit
US11208953B1 (en) 2020-06-05 2021-12-28 Bj Energy Solutions, Llc Systems and methods to enhance intake air flow to a gas turbine engine of a hydraulic fracturing unit
US10961908B1 (en) 2020-06-05 2021-03-30 Bj Energy Solutions, Llc Systems and methods to enhance intake air flow to a gas turbine engine of a hydraulic fracturing unit
US11109508B1 (en) 2020-06-05 2021-08-31 Bj Energy Solutions, Llc Enclosure assembly for enhanced cooling of direct drive unit and related methods
US11746698B2 (en) 2020-06-05 2023-09-05 Bj Energy Solutions, Llc Systems and methods to enhance intake air flow to a gas turbine engine of a hydraulic fracturing unit
US11598264B2 (en) 2020-06-05 2023-03-07 Bj Energy Solutions, Llc Systems and methods to enhance intake air flow to a gas turbine engine of a hydraulic fracturing unit
US11300050B2 (en) 2020-06-05 2022-04-12 Bj Energy Solutions, Llc Systems and methods to enhance intake air flow to a gas turbine engine of a hydraulic fracturing unit
US11378008B2 (en) 2020-06-05 2022-07-05 Bj Energy Solutions, Llc Systems and methods to enhance intake air flow to a gas turbine engine of a hydraulic fracturing unit
US11867046B2 (en) 2020-06-09 2024-01-09 Bj Energy Solutions, Llc Systems and methods for exchanging fracturing components of a hydraulic fracturing unit
US11339638B1 (en) 2020-06-09 2022-05-24 Bj Energy Solutions, Llc Systems and methods for exchanging fracturing components of a hydraulic fracturing unit
US11022526B1 (en) 2020-06-09 2021-06-01 Bj Energy Solutions, Llc Systems and methods for monitoring a condition of a fracturing component section of a hydraulic fracturing unit
US11208881B1 (en) 2020-06-09 2021-12-28 Bj Energy Solutions, Llc Methods and systems for detection and mitigation of well screen out
US11939854B2 (en) 2020-06-09 2024-03-26 Bj Energy Solutions, Llc Methods for detection and mitigation of well screen out
US11066915B1 (en) 2020-06-09 2021-07-20 Bj Energy Solutions, Llc Methods for detection and mitigation of well screen out
US11015423B1 (en) 2020-06-09 2021-05-25 Bj Energy Solutions, Llc Systems and methods for exchanging fracturing components of a hydraulic fracturing unit
US10954770B1 (en) 2020-06-09 2021-03-23 Bj Energy Solutions, Llc Systems and methods for exchanging fracturing components of a hydraulic fracturing unit
US11566506B2 (en) 2020-06-09 2023-01-31 Bj Energy Solutions, Llc Methods for detection and mitigation of well screen out
US11111768B1 (en) 2020-06-09 2021-09-07 Bj Energy Solutions, Llc Drive equipment and methods for mobile fracturing transportation platforms
US11512570B2 (en) 2020-06-09 2022-11-29 Bj Energy Solutions, Llc Systems and methods for exchanging fracturing components of a hydraulic fracturing unit
US11629583B2 (en) 2020-06-09 2023-04-18 Bj Energy Solutions, Llc Systems and methods for exchanging fracturing components of a hydraulic fracturing unit
US11085281B1 (en) 2020-06-09 2021-08-10 Bj Energy Solutions, Llc Systems and methods for exchanging fracturing components of a hydraulic fracturing unit
US11261717B2 (en) 2020-06-09 2022-03-01 Bj Energy Solutions, Llc Systems and methods for exchanging fracturing components of a hydraulic fracturing unit
US11174716B1 (en) 2020-06-09 2021-11-16 Bj Energy Solutions, Llc Drive equipment and methods for mobile fracturing transportation platforms
US11319791B2 (en) 2020-06-09 2022-05-03 Bj Energy Solutions, Llc Methods and systems for detection and mitigation of well screen out
US11643915B2 (en) 2020-06-09 2023-05-09 Bj Energy Solutions, Llc Drive equipment and methods for mobile fracturing transportation platforms
US11125066B1 (en) 2020-06-22 2021-09-21 Bj Energy Solutions, Llc Systems and methods to operate a dual-shaft gas turbine engine for hydraulic fracturing
US11639655B2 (en) 2020-06-22 2023-05-02 Bj Energy Solutions, Llc Systems and methods to operate a dual-shaft gas turbine engine for hydraulic fracturing
US11952878B2 (en) 2020-06-22 2024-04-09 Bj Energy Solutions, Llc Stage profiles for operations of hydraulic systems and associated methods
US11236598B1 (en) 2020-06-22 2022-02-01 Bj Energy Solutions, Llc Stage profiles for operations of hydraulic systems and associated methods
US11598188B2 (en) 2020-06-22 2023-03-07 Bj Energy Solutions, Llc Stage profiles for operations of hydraulic systems and associated methods
US11572774B2 (en) 2020-06-22 2023-02-07 Bj Energy Solutions, Llc Systems and methods to operate a dual-shaft gas turbine engine for hydraulic fracturing
US11939853B2 (en) 2020-06-22 2024-03-26 Bj Energy Solutions, Llc Systems and methods providing a configurable staged rate increase function to operate hydraulic fracturing units
US11408263B2 (en) 2020-06-22 2022-08-09 Bj Energy Solutions, Llc Systems and methods to operate a dual-shaft gas turbine engine for hydraulic fracturing
US11933153B2 (en) 2020-06-22 2024-03-19 Bj Energy Solutions, Llc Systems and methods to operate hydraulic fracturing units using automatic flow rate and/or pressure control
US11732565B2 (en) 2020-06-22 2023-08-22 Bj Energy Solutions, Llc Systems and methods to operate a dual-shaft gas turbine engine for hydraulic fracturing
US11898429B2 (en) 2020-06-22 2024-02-13 Bj Energy Solutions, Llc Systems and methods to operate a dual-shaft gas turbine engine for hydraulic fracturing
US11028677B1 (en) 2020-06-22 2021-06-08 Bj Energy Solutions, Llc Stage profiles for operations of hydraulic systems and associated methods
US11208879B1 (en) 2020-06-22 2021-12-28 Bj Energy Solutions, Llc Stage profiles for operations of hydraulic systems and associated methods
US11719085B1 (en) 2020-06-23 2023-08-08 Bj Energy Solutions, Llc Systems and methods to autonomously operate hydraulic fracturing units
US11566505B2 (en) 2020-06-23 2023-01-31 Bj Energy Solutions, Llc Systems and methods to autonomously operate hydraulic fracturing units
US11473413B2 (en) 2020-06-23 2022-10-18 Bj Energy Solutions, Llc Systems and methods to autonomously operate hydraulic fracturing units
US11415125B2 (en) 2020-06-23 2022-08-16 Bj Energy Solutions, Llc Systems for utilization of a hydraulic fracturing unit profile to operate hydraulic fracturing units
US11428218B2 (en) 2020-06-23 2022-08-30 Bj Energy Solutions, Llc Systems and methods of utilization of a hydraulic fracturing unit profile to operate hydraulic fracturing units
US11939974B2 (en) 2020-06-23 2024-03-26 Bj Energy Solutions, Llc Systems and methods of utilization of a hydraulic fracturing unit profile to operate hydraulic fracturing units
US11649820B2 (en) 2020-06-23 2023-05-16 Bj Energy Solutions, Llc Systems and methods of utilization of a hydraulic fracturing unit profile to operate hydraulic fracturing units
US11466680B2 (en) 2020-06-23 2022-10-11 Bj Energy Solutions, Llc Systems and methods of utilization of a hydraulic fracturing unit profile to operate hydraulic fracturing units
US11661832B2 (en) 2020-06-23 2023-05-30 Bj Energy Solutions, Llc Systems and methods to autonomously operate hydraulic fracturing units
US11220895B1 (en) 2020-06-24 2022-01-11 Bj Energy Solutions, Llc Automated diagnostics of electronic instrumentation in a system for fracturing a well and associated methods
US11274537B2 (en) 2020-06-24 2022-03-15 Bj Energy Solutions, Llc Method to detect and intervene relative to cavitation and pulsation events during a hydraulic fracturing operation
US11746638B2 (en) 2020-06-24 2023-09-05 Bj Energy Solutions, Llc Automated diagnostics of electronic instrumentation in a system for fracturing a well and associated methods
US11149533B1 (en) 2020-06-24 2021-10-19 Bj Energy Solutions, Llc Systems to monitor, detect, and/or intervene relative to cavitation and pulsation events during a hydraulic fracturing operation
US11255174B2 (en) 2020-06-24 2022-02-22 Bj Energy Solutions, Llc Automated diagnostics of electronic instrumentation in a system for fracturing a well and associated methods
US11506040B2 (en) 2020-06-24 2022-11-22 Bj Energy Solutions, Llc Automated diagnostics of electronic instrumentation in a system for fracturing a well and associated methods
US11542802B2 (en) 2020-06-24 2023-01-03 Bj Energy Solutions, Llc Hydraulic fracturing control assembly to detect pump cavitation or pulsation
US11668175B2 (en) 2020-06-24 2023-06-06 Bj Energy Solutions, Llc Automated diagnostics of electronic instrumentation in a system for fracturing a well and associated methods
US11391137B2 (en) 2020-06-24 2022-07-19 Bj Energy Solutions, Llc Systems and methods to monitor, detect, and/or intervene relative to cavitation and pulsation events during a hydraulic fracturing operation
US11692422B2 (en) 2020-06-24 2023-07-04 Bj Energy Solutions, Llc System to monitor cavitation or pulsation events during a hydraulic fracturing operation
US11299971B2 (en) 2020-06-24 2022-04-12 Bj Energy Solutions, Llc System of controlling a hydraulic fracturing pump or blender using cavitation or pulsation detection
US11512571B2 (en) 2020-06-24 2022-11-29 Bj Energy Solutions, Llc Automated diagnostics of electronic instrumentation in a system for fracturing a well and associated methods
US11193361B1 (en) 2020-07-17 2021-12-07 Bj Energy Solutions, Llc Methods, systems, and devices to enhance fracturing fluid delivery to subsurface formations during high-pressure fracturing operations
US11920450B2 (en) 2020-07-17 2024-03-05 Bj Energy Solutions, Llc Methods, systems, and devices to enhance fracturing fluid delivery to subsurface formations during high-pressure fracturing operations
US11193360B1 (en) 2020-07-17 2021-12-07 Bj Energy Solutions, Llc Methods, systems, and devices to enhance fracturing fluid delivery to subsurface formations during high-pressure fracturing operations
US11603744B2 (en) 2020-07-17 2023-03-14 Bj Energy Solutions, Llc Methods, systems, and devices to enhance fracturing fluid delivery to subsurface formations during high-pressure fracturing operations
US11365615B2 (en) 2020-07-17 2022-06-21 Bj Energy Solutions, Llc Methods, systems, and devices to enhance fracturing fluid delivery to subsurface formations during high-pressure fracturing operations
US11608727B2 (en) 2020-07-17 2023-03-21 Bj Energy Solutions, Llc Methods, systems, and devices to enhance fracturing fluid delivery to subsurface formations during high-pressure fracturing operations
US11255175B1 (en) 2020-07-17 2022-02-22 Bj Energy Solutions, Llc Methods, systems, and devices to enhance fracturing fluid delivery to subsurface formations during high-pressure fracturing operations
US11867045B2 (en) 2021-05-24 2024-01-09 Bj Energy Solutions, Llc Hydraulic fracturing pumps to enhance flow of fracturing fluid into wellheads and related methods
US11639654B2 (en) 2021-05-24 2023-05-02 Bj Energy Solutions, Llc Hydraulic fracturing pumps to enhance flow of fracturing fluid into wellheads and related methods
US11732563B2 (en) 2021-05-24 2023-08-22 Bj Energy Solutions, Llc Hydraulic fracturing pumps to enhance flow of fracturing fluid into wellheads and related methods
CN114427359A (en) * 2022-02-09 2022-05-03 辽宁石油化工大学 Novel tool carrying device for well repair
US11955782B1 (en) 2022-11-01 2024-04-09 Typhon Technology Solutions (U.S.), Llc System and method for fracturing of underground formations using electric grid power
US11994014B2 (en) 2023-01-25 2024-05-28 Bj Energy Solutions, Llc Methods, systems, and devices to enhance fracturing fluid delivery to subsurface formations during high-pressure fracturing operations
CN117646614A (en) * 2024-01-29 2024-03-05 中国石油集团川庆钻探工程有限公司 Freezing temporary plugging valve replacing device and method

Similar Documents

Publication Publication Date Title
US20080264649A1 (en) Modular well servicing combination unit
WO2009023042A1 (en) Well servicing modular combination unit
US11506026B2 (en) Power system and method
US11339637B2 (en) Packaging and deployment of a frac pump on a frac pad
US10830029B2 (en) Equipment, system and method for delivery of high pressure fluid
US10837270B2 (en) VFD controlled motor mobile electrically powered system for use in fracturing underground formations for electric fracturing operations
US7207389B2 (en) Hybrid coiled tubing/fluid pumping unit
US7921914B2 (en) Combined three-in-one fracturing system
US7051818B2 (en) Three in one combined power unit for nitrogen system, fluid system, and coiled tubing system
US20090050311A1 (en) Well servicing combination unit
US11255173B2 (en) Mobile, modular, electrically powered system for use in fracturing underground formations using liquid petroleum gas
US20090151927A1 (en) Combined nitrogen generation system and well servicing fluid system in one power unit apparatus
US10850970B2 (en) Method and apparatus for direct gravity-fed fuel delivery
US20170107793A1 (en) Method and system for purging coil tubing using onsite gas
US11519369B1 (en) Fuel supply system
WO2018209248A1 (en) Equipment, system and method for delivery of high pressure fluid
CN202156464U (en) Continuous oil pipe semitrailer
US20230064970A1 (en) Power system and method
US11952893B2 (en) Compact peripheral unit for onshore production rigs
WO2018195124A1 (en) Power system and method
CA2457307C (en) Hybrid coiled tubing/fluid pumping unit
Cooper et al. Jet Frac Porta-Skid-A New Concept in Oil Field Service Pump Equipment

Legal Events

Date Code Title Description
AS Assignment

Owner name: WS (BLOCKER), INC., CALIFORNIA

Free format text: BILL OF SALE/ASSIGNMENT;ASSIGNOR:WISE WELL INTERVENTION SERVICES, INC.;REEL/FRAME:023586/0279

Effective date: 20070831

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION