US20030024700A1 - Gas storage and production system - Google Patents

Gas storage and production system Download PDF

Info

Publication number
US20030024700A1
US20030024700A1 US09/923,211 US92321101A US2003024700A1 US 20030024700 A1 US20030024700 A1 US 20030024700A1 US 92321101 A US92321101 A US 92321101A US 2003024700 A1 US2003024700 A1 US 2003024700A1
Authority
US
United States
Prior art keywords
wellbore
gas
production
tubular string
storage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US09/923,211
Inventor
Travis Cavender
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Halliburton Energy Services Inc
Original Assignee
Halliburton Energy Services Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Halliburton Energy Services Inc filed Critical Halliburton Energy Services Inc
Priority to US09/923,211 priority Critical patent/US20030024700A1/en
Assigned to HALLIBURTON ENERGY SERVICES, INC. reassignment HALLIBURTON ENERGY SERVICES, INC. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: CAVENDER, TRAVIS WAYNE
Priority to US10/191,086 priority patent/US6994165B2/en
Priority to US10/289,189 priority patent/US6763885B2/en
Publication of US20030024700A1 publication Critical patent/US20030024700A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/02Subsoil filtering
    • E21B43/04Gravelling of wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/30Specific pattern of wells, e.g. optimizing the spacing of wells

Definitions

  • the present invention relates generally to gas storage in subterranean formations and, in an embodiment described herein, more particularly provides a gas storage and production system.
  • Natural gas stored underground is typically stored in leached out salt dome caverns or in depleted hydrocarbon-bearing formations. Where depleted formations are utilized, the formations are generally unconsolidated or poorly consolidated sandstones, which makes it possible to flow gas into and out of pores of the formations at high flow rates.
  • gravel packing is typically used.
  • gravel e.g., sand, ceramic or bauxite proppant, etc.
  • the gravel provides structure against which the formation sand bridges off, thereby preventing migration of the formation sand through the gravel, while permitting gas to flow therethrough.
  • a single tubing string is used for both the injecting and withdrawing operations. That is, the same tubing string is used to store the gas in the formation as is used to produce the stored gas from the formation.
  • gas is alternately flowed from the surface through the tubing string into the formation, and from the formation through the tubing string to the surface.
  • a gas storage and production system which enhances the profitability of subterranean gas storage by preventing or at least substantially decreasing migration of formation sand through a gravel pack.
  • a gas storage and production system includes a gas storage formation, a production and storage wellbores and a junction between the storage and production wellbores.
  • the system is of the type wherein gas is stored within pores of formation rock, such as in a depleted hydrocarbon-bearing formation.
  • the production wellbore extends into the formation for withdrawing gas from the formation.
  • the storage wellbore also extends into the same formation for injecting gas into the formation. In this manner, it is not necessary for a single wellbore to be used for both injecting and producing the gas.
  • a gas storage and production system wherein production and storage wellbores extend from a wellbore junction at a main wellbore.
  • the main wellbore extends from the earth's surface to the wellbore junction.
  • the storage and production wellbores each extend from the wellbore junction into a gas storage formation. Gas is injected from the main wellbore into the formation via the storage wellbore, and gas is withdrawn from the formation into the main wellbore via the production wellbore.
  • various means may be utilized for delivering gas to the storage wellbore for injection into the formation, and for delivering gas from the production wellbore to the earth's surface.
  • a single tubular string may be used to deliver the gas to the storage wellbore, and the gas may be received from the production wellbore into an annulus between the tubular string and the main wellbore for flowing to the earth's surface.
  • a single tubular string may be used for alternately delivering gas to the storage wellbore and receiving gas from the production wellbore.
  • separate tubular strings may be used for delivering gas to the storage wellbore and receiving gas from the production wellbore.
  • the method includes the steps of positioning a sand control device in the wellbore, placing gravel in an annulus formed between the sand control device and the wellbore, and flowing a retainer material into the annulus. The retainer material prevents displacement of the gravel in the annulus.
  • FIG. 1 is a schematic view of a gas storage and production system embodying principles of the present invention, wherein main and storage wellbores have been drilled, and the storage wellbore has been gravel packed;
  • FIG. 2 is a schematic view of the system of FIG. 1, wherein a production wellbore has been drilled and gravel packed;
  • FIG. 3 is a schematic view of the system of FIG. 1, wherein cement has been placed above the storage wellbore gravel pack;
  • FIG. 4 is a schematic view of the system of FIG. 1, wherein a first method of storing and producing the gas has been implemented;
  • FIG. 5 is a schematic view of the system of FIG. 1, wherein a second method of storing and producing the gas has been implemented;
  • FIG. 6 is a schematic view of the system of FIG. 1, wherein a third method of storing and producing the gas has been implemented.
  • FIG. 7 is a schematic view of the system of FIG. 1, wherein a fourth method of storing and producing the gas has been implemented.
  • FIG. 1 Representatively illustrated in FIG. 1 is a gas storage and production system 10 which embodies principles of the present invention.
  • directional terms such as “above”, “below”, “upper”, “lower”, etc., are used only for convenience in referring to the accompanying drawings. Additionally, it is to be understood that the various embodiments of the present invention described herein may be utilized in various orientations, such as inclined, inverted, horizontal, vertical, etc., and in various configurations, without departing from the principles of the present invention.
  • a main wellbore 12 has been drilled, cased and cemented, so that it extends from the earth's surface into a formation 14 in which it is desired to store gas. It is not necessary, however, for the main wellbore 12 to extend into the formation 14 .
  • a casing string 16 cemented in the main wellbore 12 includes an orienting latch coupling 18 of the type well known to those skilled in the art.
  • the latch coupling 18 is positioned below a desired exit window 20 through the casing 16 , so that, when a whipstock 22 is latched into the coupling 18 , a window mill (not shown) will be directed to mill through the casing at the desired position and in the desired direction.
  • the window 20 may be preformed, or at least provided for, in the casing string 16 when installed, for example, by including an item of equipment known to those skilled in the art as a window bushing or a window joint in the casing string.
  • a storage wellbore 24 is drilled as an extension of the main wellbore.
  • the storage wellbore 24 could be drilled as a lateral or branch wellbore from the main wellbore 12 .
  • the storage wellbore 24 is deviated, so that it extends substantially horizontally in the formation 14 . This maximizes the surface area of the formation 14 exposed to the storage wellbore 24 to increase the flow rate at which gas may be flowed from the storage wellbore into the formation.
  • a sand control assembly 26 is installed in the storage wellbore.
  • the sand control assembly 26 may be conventional and may include a gravel pack packer 28 (which is preferably set in the casing 16 above the storage wellbore), a tubular string 30 and a sand control device 32 .
  • a gravel pack packer 28 which is preferably set in the casing 16 above the storage wellbore
  • a tubular string 30 and a sand control device 32 .
  • the sand control device 32 is representatively illustrated in FIG. 1 as a tubular screen of the kind well known to those skilled in the art.
  • the screen 32 may be any type of well screen, including a wire-wrapped screen, a sintered metal screen, a wire mesh screen, etc.
  • Other types of sand control devices may also be used in the system 10 , such as slotted or perforated liners, etc. Therefore, the terms “sand control device” and “sand control screen” as used herein are to be taken as including any apparatus or device which excludes particulate matter, but permits liquid or gas to flow therethrough.
  • the wellbore is gravel packed. That is, gravel 34 is placed in an annulus 36 formed between the sand control assembly 26 and the wellbore 24 . Placement of the gravel 34 is accomplished using techniques well known to those skilled in the art. For example, a workstring (not shown) may be used to flow a gravel slurry from the workstring outward through a crossover tool (not shown) below the packer 28 . Of course, other methods of gravel packing the storage wellbore 24 may be used without departing from the principles of the present invention.
  • a plug 38 is installed in the packer 28 .
  • the plug 38 prevents debris from the window milling and cementing operations described below from passing into the sand control assembly 26 . Otherwise, this debris could fully or partially plug the screen 32 , thereby preventing or decreasing the flow of gas therethrough.
  • a whipstock 22 is then installed in the main wellbore 12 .
  • the latch coupling 18 secures the whipstock 22 longitudinally in the casing 16 and orients the whipstock so that it faces in the desired direction for milling the window 20 through the casing.
  • a window mill (not shown) or other cutting device is then deflected off of the whipstock 22 , so that it cuts the window 20 through the casing 16 .
  • an initial recess 40 is cut into the formation 14 beyond the cemented casing 16 .
  • a permeability reducing material 42 is then forced outwardly into the formation 14 surrounding the recess 40 .
  • the material 42 may be, for example, a plastic resin, a polymer, a cementitious material, a material known as PermaSealTM, etc.
  • the main purpose of using the material 42 is to prevent gas in the formation 14 surrounding the window 20 from passing through the window into the casing 16 .
  • use of the material 42 is not necessary in keeping with the principles of the present invention.
  • the recess 40 has been extended outward into the formation 14 , for example, by deflecting one or more drill bits off of the whipstock 22 and through the window 20 , thereby forming a production wellbore 44 .
  • the production wellbore 44 is preferably deviated or substantially horizontal in the formation 14 to expose a greater surface area of the formation to the wellbore, but this is not necessary in keeping with the principles of the invention.
  • Another sand control assembly 46 is installed in the production wellbore 44 .
  • a packer 48 of the sand control assembly 46 is set in the casing 16 above the window 20 , a sand control screen 50 is installed in the production wellbore 44 , and a tubular string 52 extends between the packer and the screen.
  • the sand control assembly 46 is similar to the sand control assembly 26 described above, but may differ in some respects.
  • the sand control assembly 46 may include ported collars 54 , 56 of the type used in cementing operations, interconnected in the tubular string 52 between the packer 48 and the screen 50 .
  • the ported collar 54 is positioned between the window 20 and the screen 50
  • the ported collar 56 is positioned between the packer 48 and the window. The use of the ported collars 54 , 56 in the system 10 is described in more detail below.
  • the production wellbore 44 is gravel packed using techniques well known to those skilled in the art.
  • Gravel 58 is placed in an annulus 60 between the sand control assembly 46 and the production wellbore 44 about the screen 50 .
  • the gravel 58 extends somewhat beyond the ports in the lower ported collar 54 .
  • One of the inventive aspects of the system 10 is a manner in which the gravel 58 is retained in the wellbore 44 about the screen 50 . Due to high flow rates of gas from a storage formation into a screen through a conventional gravel pack, the gravel is typically made to move about, disturbing any sand bridging that had previously developed, and permitting increased migration of sand through the gravel pack.
  • FIG. 3 the system 10 is depicted wherein additional steps have been performed. Specifically, a retainer material 62 has been flowed into the annulus 60 above the gravel 58 . The retainer material 62 is flowed outward into the annulus 60 through the lower ported collar 54 , and is flowed upward through the annulus, until it extends through the window 20 . During this process, returns are taken from the annulus 60 through the upper ported collar 56 .
  • the retainer material 62 is cement or another cementitious material.
  • conventional cementing techniques may be used to place the cement 62 in the annulus 60 above the gravel 58 .
  • a workstring such as a coiled tubing string (not shown) may be inserted into the sand control assembly 46 and used to open the ported collars 54 , 56 prior to pumping the cement through the workstring into the annulus 60 . Withdrawal of the workstring may cause the ported collars 54 , 56 to close.
  • any of the gravel 58 above the ports in the ported collar 54 will be displaced along with the cement 62 as it is flowed into the annulus 60 . This procedure will ensure intimate contact between the cement 62 and the top of the gravel 58 in the annulus 60 . Thus, when the cement 62 sets or hardens in the annulus 60 , it will prevent the gravel 58 from displacing when gas flows therethrough at a high rate. Note that the gravel 34 in the storage wellbore 24 could similarly be retained in keeping with the principles of the invention.
  • materials other than cement may be used for the retainer material 62 .
  • a polymer material maybe flowed into the annulus 60 above the gravel 58 .
  • Such a material may gel instead of harden when set.
  • a gelatinous material may be used.
  • any material which may serve to prevent displacement of the gravel 58 in the annulus 60 can be used for the retainer material 62 .
  • the packer 48 is retrieved from the main wellbore 12 .
  • the packer 48 could be retrieved before placing the retainer material 62 in the annulus 60 , in which case there would be no need to include the upper ported collar 56 in the tubular string 52 .
  • the system 10 is depicted wherein further steps have been performed.
  • the sand control assembly 46 extending inwardly through the window 20 has been milled away, so that the tubular string 52 terminates at the window. Any retainer material 62 left in the casing string 16 has also been removed.
  • the whipstock 22 has been retrieved, for example, by using a washover tool well known to those skilled in the art.
  • the plug 38 has been retrieved from the packer 28 .
  • a tubing string 64 having a seal assembly 66 proximate a lower end thereof is installed in the main wellbore 12 .
  • the seal assembly 66 is stabbed into the packer 28 or an associated seal bore extension.
  • the tubing string 64 now provides a conduit for injecting gas from the earth's surface, into the sand control assembly 26 in the storage wellbore 24 , and outward into the formation 14 .
  • the direction of gas flow is indicated by the arrow 68 .
  • Another conduit for gas flow is provided by an annulus 70 formed between the tubing string 64 and the wellbore 12 .
  • Gas is received into the annulus 70 from the sand control assembly 46 , which in turn receives the gas from the formation 14 .
  • the gas may be flowed to the earth's surface in the annulus 70 , in the direction indicated by arrows 72 .
  • the directions of gas flow indicated by arrows 68 , 72 are not reversed in normal gas storage and production operations.
  • the problems of flow reversal are substantially, if not totally, eliminated.
  • gas is preferably only flowed into the formation 14 .
  • gas is preferably only flowed out of the formation 14 .
  • these flow directions could be reversed if conditions warrant.
  • the gas could instead be injected via the annulus 70 and produced via the tubing string 64 .
  • the tubing string 64 could extend into the production wellbore 44 , where the seal assembly 66 could be stabbed into a seal bore (not shown) of the tubular string 52 .
  • the system 10 is depicted wherein an alternate method of storing and producing the gas in the formation 14 is used.
  • the tubing string 64 is installed in the main wellbore 12 and a seal assembly 66 is stabbed into the packer 28 , or a seal bore associated therewith, as described above for the version depicted in FIG. 4.
  • another tubing string 74 is installed in the main wellbore 12 , and a packer 76 on the tubing string is set in the casing 16 above the window 20 .
  • gas is preferably injected into the formation 14 via the tubing string 64 .
  • the gas is produced via an annulus 78 formed between the tubing strings 64 , 74 .
  • This method may be more desirable in jurisdictions where an annulus extending to the earth's surface, such as the annulus 80 between the tubing string 74 and the wellbore 12 , must be available for well control and monitoring, and cannot be used for production.
  • Use of the tubing string 74 provides the additional annulus 78 for production of the gas, leaving the annulus 80 available for well control and monitoring.
  • the tubing strings 64 , 74 are concentric or coaxial, and the flow of gas is as indicated by the arrows 68 , 72 .
  • the tubing strings 64 , 74 could be otherwise positioned, and the gas flow could be otherwise directed, in keeping with the principles of the invention.
  • the tubing strings 64 , 74 could be positioned side-by-side in the main wellbore 12 , the gas could be produced through the interior bore of the tubing string 64 , the gas could be injected through the interior bore of the tubing string 74 , etc.
  • the system 10 is depicted wherein another alternate method of producing and storing gas in the formation 14 is used.
  • the tubing string 64 is installed in the main wellbore 12 and the seal assembly 66 is stabbed into the packer 28 .
  • the tubing string 64 includes a packer 82 , which is set in the casing 16 above the window 20 , and a valve 84 , which is positioned between the packers 28 , 82 .
  • the valve 84 is of the type well known to those skilled in the art which alternately permits flow through its sidewall and its internal longitudinal bore. That is, the valve 84 has two positions-in the first position the valve permits flow through its sidewall but prevents flow through its internal bore, and in the second position the valve prevents flow through its sidewall and permits flow through its internal bore.
  • Such valves are used in several oilfield operations, including drill stem testing, where the valves are known as “tester” valves.
  • An example is the OmniTM valve available from Halliburton Energy Services, Inc.
  • the valve 84 may be of the type which uses pressure in a control line 86 to control its operation, as is commonly used in subsea operations. However, other actuation means may be used, such as acoustic, electromagnetic, etc., telemetry from a remote location, pressure or pressure pulses in the tubing string 64 or annulus 70 , etc.
  • valve 84 When the valve 84 is in its first position, gas is produced from the production wellbore 44 , through the sidewall of the valve, and to the earth's surface via the tubing string 64 above the valve. Flow between the storage wellbore 24 and the tubing string 64 above the valve 84 is prevented by the valve. Thus, when it is desired to produce gas from the formation 14 , the valve 84 is operated to its first position.
  • valve 84 When the valve 84 is in its second position, gas is injected through the tubing string 64 , through the internal bore of the valve, and into the storage wellbore 24 . Flow between the production wellbore 44 and the tubing string 64 is prevented by the valve 84 . Thus, when it is desired to store gas in the formation 14 , the valve is operated to its second position.
  • An advantage of this method shown in FIG. 6 is that only a single tubing string 64 is needed to both store and produce gas via the multiple wellbores 24 , 44 , while leaving an annulus 88 extending to the earth's surface above the packer 82 available for well control. No flow reversal occurs in any gravel pack of the system 10 .
  • the valve 84 is merely alternated between its first and second positions as needed to store or produce the gas.
  • FIG. 7 the system 10 is depicted wherein yet another method of storing and producing the gas is used. This method is similar to the method shown in FIG. 6 except that, instead of the valve 84 , two check valves 90 , 92 are used to control flow between the tubing string 64 and each of the storage and production wellbores 24 , 44 .
  • the check valve 90 prevents flow from the interior of the tubing string 64 to the production wellbore 44 , but permits flow from the production wellbore to the interior of the tubing string.
  • the check valve 92 prevents flow from the storage wellbore 24 to the interior of the tubing string 64 , but permits flow from the interior of the tubing string to the storage wellbore.
  • Biasing devices such as springs, may be added to the check valves 90 , 92 , so that predetermined pressure differentials are needed to open the valves. This may also ensure more positive closing of the valves 90 , 92 and/or allow greater latitude in the pressures which may be applied to the tubing string 64 to open or close the valves as desired.
  • the check valves 90 , 92 are shown schematically in FIG. 7 as being separate valves spaced apart in the tubing string 64 . However, these valves go, 92 could be otherwise configured and positioned in keeping with the principles of the present invention. For example, the valves 90 , 92 could be combined into a single assembly, the valves could be retrievable by slickline or coiled tubing, etc.
  • system 10 as depicted in FIG. 7 also has the advantage of using only a single tubing string 64 to inject and produce gas in the multiple wellbores 24 , 44 , while leaving the annulus 88 available for well control. This storage and production of gas through the tubing string 64 is accomplished without requiring flow reversal in any gravel pack of the system 10 .
  • FIGS. 1 - 7 depicting several embodiments of the invention
  • the production wellbore 44 is shown as intersecting the main wellbore 12 at a wellbore junction
  • the storage wellbore 24 is shown as being an extension of the main wellbore.
  • the main wellbore 16 is cased, while the production and storage wellbores 24 , 44 are uncased.
  • the production wellbore 44 is above the storage wellbore 24 .
  • these examples of embodiments of the invention are merely used for illustration purposes.
  • the main wellbore 12 could be uncased at its junction with the production and/or storage wellbores 24 , 44 , the storage and/or production wellbores could be cased, the storage wellbore could be above the production wellbore, the storage wellbore could intersect the main wellbore at a wellbore junction, the production wellbore could be an extension of the main wellbore, etc.
  • junction between the main wellbore 12 and the production wellbore 44 has been depicted in the drawings and described above as one in which the tubular string 52 in the production wellbore extends into the main wellbore and is cemented at least up to the window 20 .
  • wellbore junctions may be utilized, without departing from the principles of the present invention.
  • any of the wellbore junctions known to those skilled in the art as Levels 1 - 6 may be used, as well as any other type of wellbore junction.

Abstract

A gas storage and production system decreases production of formation sand and permits high gas flow rates in storing and producing operations. In a described embodiment, different flowpaths are used for injecting and withdrawing gas from a subterranean formation. In another embodiment, a gravel pack is confined to a set volume, so that it is not expanded when gas flows at a relatively high rate therethrough.

Description

    BACKGROUND
  • The present invention relates generally to gas storage in subterranean formations and, in an embodiment described herein, more particularly provides a gas storage and production system. [0001]
  • Natural gas stored underground is typically stored in leached out salt dome caverns or in depleted hydrocarbon-bearing formations. Where depleted formations are utilized, the formations are generally unconsolidated or poorly consolidated sandstones, which makes it possible to flow gas into and out of pores of the formations at high flow rates. [0002]
  • To prevent production of formation sand when gas is withdrawn from the formations, gravel packing is typically used. In a gravel packing operation, gravel (e.g., sand, ceramic or bauxite proppant, etc.) is placed in an annulus between a sand screen and a wellbore intersecting a formation. The gravel provides structure against which the formation sand bridges off, thereby preventing migration of the formation sand through the gravel, while permitting gas to flow therethrough. [0003]
  • In a common method of injecting gas into, and withdrawing gas from, a storage formation, a single tubing string is used for both the injecting and withdrawing operations. That is, the same tubing string is used to store the gas in the formation as is used to produce the stored gas from the formation. Thus, gas is alternately flowed from the surface through the tubing string into the formation, and from the formation through the tubing string to the surface. [0004]
  • Unfortunately, several problems are associated with this method. One problem is that only a single wellbore is available for both storage and production operations. Another problem is that when operations shift between storage and production, a flow reversal is experienced at the gravel pack in the wellbore. This flow reversal disturbs the gravel and the formation sand bridges therein, thereby escalating the migration of formation sand through the gravel. [0005]
  • Yet another problem with gravel packs in gas storage wells has to do with the high flow rates generally used in these wells. Typical gravel packs have an open upper end, and so the gravel is not fully contained. High gas flow rates through these gravel packs cause the gravel to move about, “fluffing” the gravel so that it has more open space between its grains. This makes it easier for formation sand to migrate through the spaces between the grains of gravel. [0006]
  • When formation sand migrates through a gravel pack, it enters the production flowpath and erodes equipment, plugs passages and must be separated from the produced gas. Each of these undermines the profitability of the operation. Therefore, it may be seen that it would be highly advantageous to provide a gas storage and production system which addresses some or all of the above problems. [0007]
  • SUMMARY
  • In carrying out the principles of the present invention, in accordance with an embodiment thereof, a gas storage and production system is provided which enhances the profitability of subterranean gas storage by preventing or at least substantially decreasing migration of formation sand through a gravel pack. [0008]
  • In one aspect of the invention, a gas storage and production system is provided. The system includes a gas storage formation, a production and storage wellbores and a junction between the storage and production wellbores. The system is of the type wherein gas is stored within pores of formation rock, such as in a depleted hydrocarbon-bearing formation. [0009]
  • The production wellbore extends into the formation for withdrawing gas from the formation. The storage wellbore also extends into the same formation for injecting gas into the formation. In this manner, it is not necessary for a single wellbore to be used for both injecting and producing the gas. [0010]
  • In another aspect of the invention, a gas storage and production system is provided wherein production and storage wellbores extend from a wellbore junction at a main wellbore. The main wellbore extends from the earth's surface to the wellbore junction. The storage and production wellbores each extend from the wellbore junction into a gas storage formation. Gas is injected from the main wellbore into the formation via the storage wellbore, and gas is withdrawn from the formation into the main wellbore via the production wellbore. [0011]
  • In yet another aspect of the invention, various means may be utilized for delivering gas to the storage wellbore for injection into the formation, and for delivering gas from the production wellbore to the earth's surface. For example, a single tubular string may be used to deliver the gas to the storage wellbore, and the gas may be received from the production wellbore into an annulus between the tubular string and the main wellbore for flowing to the earth's surface. As another example, a single tubular string may be used for alternately delivering gas to the storage wellbore and receiving gas from the production wellbore. As yet another example, separate tubular strings may be used for delivering gas to the storage wellbore and receiving gas from the production wellbore. [0012]
  • Also provided is a method of gravel packing a wellbore, which is particularly useful in high flow rate gas production of the type typically experienced in gas storage and production systems. The method includes the steps of positioning a sand control device in the wellbore, placing gravel in an annulus formed between the sand control device and the wellbore, and flowing a retainer material into the annulus. The retainer material prevents displacement of the gravel in the annulus. [0013]
  • These and other features, advantages, benefits and objects of the present invention will become apparent to one of ordinary skill in the art upon careful consideration of the detailed description of representative embodiments of the invention hereinbelow and the accompanying drawings.[0014]
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • FIG. 1 is a schematic view of a gas storage and production system embodying principles of the present invention, wherein main and storage wellbores have been drilled, and the storage wellbore has been gravel packed; [0015]
  • FIG. 2 is a schematic view of the system of FIG. 1, wherein a production wellbore has been drilled and gravel packed; [0016]
  • FIG. 3 is a schematic view of the system of FIG. 1, wherein cement has been placed above the storage wellbore gravel pack; [0017]
  • FIG. 4 is a schematic view of the system of FIG. 1, wherein a first method of storing and producing the gas has been implemented; [0018]
  • FIG. 5 is a schematic view of the system of FIG. 1, wherein a second method of storing and producing the gas has been implemented; [0019]
  • FIG. 6 is a schematic view of the system of FIG. 1, wherein a third method of storing and producing the gas has been implemented; and [0020]
  • FIG. 7 is a schematic view of the system of FIG. 1, wherein a fourth method of storing and producing the gas has been implemented.[0021]
  • DETAILED DESCRIPTION
  • Representatively illustrated in FIG. 1 is a gas storage and [0022] production system 10 which embodies principles of the present invention. In the following description of the system 10 and other apparatus and methods described herein, directional terms, such as “above”, “below”, “upper”, “lower”, etc., are used only for convenience in referring to the accompanying drawings. Additionally, it is to be understood that the various embodiments of the present invention described herein may be utilized in various orientations, such as inclined, inverted, horizontal, vertical, etc., and in various configurations, without departing from the principles of the present invention.
  • As depicted in FIG. 1, initial steps of a method used to practice the system have been performed. A [0023] main wellbore 12 has been drilled, cased and cemented, so that it extends from the earth's surface into a formation 14 in which it is desired to store gas. It is not necessary, however, for the main wellbore 12 to extend into the formation 14.
  • A [0024] casing string 16 cemented in the main wellbore 12 includes an orienting latch coupling 18 of the type well known to those skilled in the art. The latch coupling 18 is positioned below a desired exit window 20 through the casing 16, so that, when a whipstock 22 is latched into the coupling 18, a window mill (not shown) will be directed to mill through the casing at the desired position and in the desired direction. Note that the window 20 may be preformed, or at least provided for, in the casing string 16 when installed, for example, by including an item of equipment known to those skilled in the art as a window bushing or a window joint in the casing string.
  • After the [0025] casing string 16 is cemented in the main wellbore 12, a storage wellbore 24 is drilled as an extension of the main wellbore. Alternatively, the storage wellbore 24 could be drilled as a lateral or branch wellbore from the main wellbore 12. As shown in FIG. 1, the storage wellbore 24 is deviated, so that it extends substantially horizontally in the formation 14. This maximizes the surface area of the formation 14 exposed to the storage wellbore 24 to increase the flow rate at which gas may be flowed from the storage wellbore into the formation. However, it is to be clearly understood that it is not necessary for the storage wellbore 24 to be horizontal or deviated in the formation 14.
  • After the [0026] storage wellbore 24 is drilled, a sand control assembly 26 is installed in the storage wellbore. The sand control assembly 26 may be conventional and may include a gravel pack packer 28 (which is preferably set in the casing 16 above the storage wellbore), a tubular string 30 and a sand control device 32. Of course, if the formation 14 is well consolidated, or there is otherwise no need for controlling influx of formation sand into the storage wellbore 24, then the sand control assembly 26 may not be used.
  • The [0027] sand control device 32 is representatively illustrated in FIG. 1 as a tubular screen of the kind well known to those skilled in the art. The screen 32 may be any type of well screen, including a wire-wrapped screen, a sintered metal screen, a wire mesh screen, etc. Other types of sand control devices may also be used in the system 10, such as slotted or perforated liners, etc. Therefore, the terms “sand control device” and “sand control screen” as used herein are to be taken as including any apparatus or device which excludes particulate matter, but permits liquid or gas to flow therethrough.
  • After the [0028] sand control assembly 26 is positioned in the storage wellbore 24, the wellbore is gravel packed. That is, gravel 34 is placed in an annulus 36 formed between the sand control assembly 26 and the wellbore 24. Placement of the gravel 34 is accomplished using techniques well known to those skilled in the art. For example, a workstring (not shown) may be used to flow a gravel slurry from the workstring outward through a crossover tool (not shown) below the packer 28. Of course, other methods of gravel packing the storage wellbore 24 may be used without departing from the principles of the present invention.
  • After the [0029] storage wellbore 24 is gravel packed, a plug 38 is installed in the packer 28. The plug 38 prevents debris from the window milling and cementing operations described below from passing into the sand control assembly 26. Otherwise, this debris could fully or partially plug the screen 32, thereby preventing or decreasing the flow of gas therethrough.
  • A [0030] whipstock 22, or other deflection device, is then installed in the main wellbore 12. The latch coupling 18 secures the whipstock 22 longitudinally in the casing 16 and orients the whipstock so that it faces in the desired direction for milling the window 20 through the casing. A window mill (not shown) or other cutting device is then deflected off of the whipstock 22, so that it cuts the window 20 through the casing 16.
  • At this point, or after passing additional cutting tools, such as one or more drills, through the [0031] window 20, an initial recess 40 is cut into the formation 14 beyond the cemented casing 16. Preferably, a permeability reducing material 42 is then forced outwardly into the formation 14 surrounding the recess 40. The material 42 may be, for example, a plastic resin, a polymer, a cementitious material, a material known as PermaSeal™, etc. The main purpose of using the material 42 is to prevent gas in the formation 14 surrounding the window 20 from passing through the window into the casing 16. However, use of the material 42 is not necessary in keeping with the principles of the present invention.
  • Referring additionally now to FIG. 2, the [0032] system 10 is depicted with further steps having been performed. The recess 40 has been extended outward into the formation 14, for example, by deflecting one or more drill bits off of the whipstock 22 and through the window 20, thereby forming a production wellbore 44. The production wellbore 44 is preferably deviated or substantially horizontal in the formation 14 to expose a greater surface area of the formation to the wellbore, but this is not necessary in keeping with the principles of the invention.
  • Another [0033] sand control assembly 46 is installed in the production wellbore 44. A packer 48 of the sand control assembly 46 is set in the casing 16 above the window 20, a sand control screen 50 is installed in the production wellbore 44, and a tubular string 52 extends between the packer and the screen. The sand control assembly 46 is similar to the sand control assembly 26 described above, but may differ in some respects.
  • In particular, the [0034] sand control assembly 46 may include ported collars 54, 56 of the type used in cementing operations, interconnected in the tubular string 52 between the packer 48 and the screen 50. Preferably, the ported collar 54 is positioned between the window 20 and the screen 50, and the ported collar 56 is positioned between the packer 48 and the window. The use of the ported collars 54, 56 in the system 10 is described in more detail below.
  • After installing the [0035] sand control assembly 46, the production wellbore 44 is gravel packed using techniques well known to those skilled in the art. Gravel 58 is placed in an annulus 60 between the sand control assembly 46 and the production wellbore 44 about the screen 50. Preferably, the gravel 58 extends somewhat beyond the ports in the lower ported collar 54.
  • One of the inventive aspects of the [0036] system 10 is a manner in which the gravel 58 is retained in the wellbore 44 about the screen 50. Due to high flow rates of gas from a storage formation into a screen through a conventional gravel pack, the gravel is typically made to move about, disturbing any sand bridging that had previously developed, and permitting increased migration of sand through the gravel pack.
  • One reason the gravel in a conventional gravel pack is able to move about due to high gas flow rates therethrough is that the annulus above the gravel pack is typically open. That is, the upper level of a conventional gravel pack is typically spaced apart from the packer, leaving the annulus therebetween available for the gravel to displace into. [0037]
  • An example of this is shown in the accompanying figures wherein the [0038] storage wellbore 24 is gravel packed. The gravel 34 spaced apart from the packer 28, leaving the annulus 36 open therebetween. This does not present a problem of sand migration in the system 10, however, since gas preferably flows outward from the sand control assembly 26 into the formation 14, and not in the other direction, which is another significant advantage of the system.
  • For the production wellbore [0039] 44, wherein gas flows from the formation 14 into the sand control assembly 46, the problem of gravel movement is reduced or eliminated by retaining the gravel 58 in the annulus 60 about the screen 50, so that it cannot displace upward in the annulus 60.
  • Referring additionally now to FIG. 3, the [0040] system 10 is depicted wherein additional steps have been performed. Specifically, a retainer material 62 has been flowed into the annulus 60 above the gravel 58. The retainer material 62 is flowed outward into the annulus 60 through the lower ported collar 54, and is flowed upward through the annulus, until it extends through the window 20. During this process, returns are taken from the annulus 60 through the upper ported collar 56.
  • Preferably, the [0041] retainer material 62 is cement or another cementitious material. In that case, conventional cementing techniques may be used to place the cement 62 in the annulus 60 above the gravel 58. For example, a workstring, such as a coiled tubing string (not shown), may be inserted into the sand control assembly 46 and used to open the ported collars 54, 56 prior to pumping the cement through the workstring into the annulus 60. Withdrawal of the workstring may cause the ported collars 54, 56 to close.
  • Any of the [0042] gravel 58 above the ports in the ported collar 54 will be displaced along with the cement 62 as it is flowed into the annulus 60. This procedure will ensure intimate contact between the cement 62 and the top of the gravel 58 in the annulus 60. Thus, when the cement 62 sets or hardens in the annulus 60, it will prevent the gravel 58 from displacing when gas flows therethrough at a high rate. Note that the gravel 34 in the storage wellbore 24 could similarly be retained in keeping with the principles of the invention.
  • Of course, materials other than cement may be used for the [0043] retainer material 62. For example, a polymer material maybe flowed into the annulus 60 above the gravel 58. Such a material may gel instead of harden when set. A gelatinous material may be used. In short, any material which may serve to prevent displacement of the gravel 58 in the annulus 60 can be used for the retainer material 62.
  • After the [0044] retainer material 62 is permitted to set in the annulus 60, the packer 48 is retrieved from the main wellbore 12. Alternatively, the packer 48 could be retrieved before placing the retainer material 62 in the annulus 60, in which case there would be no need to include the upper ported collar 56 in the tubular string 52.
  • Referring additionally now to FIG. 4, the [0045] system 10 is depicted wherein further steps have been performed. The sand control assembly 46 extending inwardly through the window 20 has been milled away, so that the tubular string 52 terminates at the window. Any retainer material 62 left in the casing string 16 has also been removed. The whipstock 22 has been retrieved, for example, by using a washover tool well known to those skilled in the art. The plug 38 has been retrieved from the packer 28.
  • A [0046] tubing string 64 having a seal assembly 66 proximate a lower end thereof is installed in the main wellbore 12. The seal assembly 66 is stabbed into the packer 28 or an associated seal bore extension. The tubing string 64 now provides a conduit for injecting gas from the earth's surface, into the sand control assembly 26 in the storage wellbore 24, and outward into the formation 14. The direction of gas flow is indicated by the arrow 68.
  • Another conduit for gas flow is provided by an [0047] annulus 70 formed between the tubing string 64 and the wellbore 12. Gas is received into the annulus 70 from the sand control assembly 46, which in turn receives the gas from the formation 14. The gas may be flowed to the earth's surface in the annulus 70, in the direction indicated by arrows 72.
  • Preferably, the directions of gas flow indicated by [0048] arrows 68, 72 are not reversed in normal gas storage and production operations. Thus, the problems of flow reversal are substantially, if not totally, eliminated. In the storage wellbore 24, gas is preferably only flowed into the formation 14. In the production wellbore 44, gas is preferably only flowed out of the formation 14. Of course, these flow directions could be reversed if conditions warrant.
  • It should also be clearly understood that it is not necessary for the gas to be injected via the [0049] tubing string 64 and the gas to be produced via the annulus 70. The gas could instead be injected via the annulus 70 and produced via the tubing string 64. For example, the tubing string 64 could extend into the production wellbore 44, where the seal assembly 66 could be stabbed into a seal bore (not shown) of the tubular string 52.
  • Referring additionally now to FIG. 5, the [0050] system 10 is depicted wherein an alternate method of storing and producing the gas in the formation 14 is used. In this version, the tubing string 64 is installed in the main wellbore 12 and a seal assembly 66 is stabbed into the packer 28, or a seal bore associated therewith, as described above for the version depicted in FIG. 4. However, another tubing string 74 is installed in the main wellbore 12, and a packer 76 on the tubing string is set in the casing 16 above the window 20.
  • As with the version depicted in FIG. 4, gas is preferably injected into the [0051] formation 14 via the tubing string 64. However, the gas is produced via an annulus 78 formed between the tubing strings 64, 74. This method may be more desirable in jurisdictions where an annulus extending to the earth's surface, such as the annulus 80 between the tubing string 74 and the wellbore 12, must be available for well control and monitoring, and cannot be used for production. Use of the tubing string 74 provides the additional annulus 78 for production of the gas, leaving the annulus 80 available for well control and monitoring.
  • As shown in FIG. 5, the tubing strings [0052] 64, 74 are concentric or coaxial, and the flow of gas is as indicated by the arrows 68, 72. However, it is to be clearly understood that the tubing strings 64, 74 could be otherwise positioned, and the gas flow could be otherwise directed, in keeping with the principles of the invention. For example, the tubing strings 64, 74 could be positioned side-by-side in the main wellbore 12, the gas could be produced through the interior bore of the tubing string 64, the gas could be injected through the interior bore of the tubing string 74, etc.
  • Referring additionally now to FIG. 6, the [0053] system 10 is depicted wherein another alternate method of producing and storing gas in the formation 14 is used. As with the previously described versions, the tubing string 64 is installed in the main wellbore 12 and the seal assembly 66 is stabbed into the packer 28. However, in this version, the tubing string 64 includes a packer 82, which is set in the casing 16 above the window 20, and a valve 84, which is positioned between the packers 28, 82.
  • The [0054] valve 84 is of the type well known to those skilled in the art which alternately permits flow through its sidewall and its internal longitudinal bore. That is, the valve 84 has two positions-in the first position the valve permits flow through its sidewall but prevents flow through its internal bore, and in the second position the valve prevents flow through its sidewall and permits flow through its internal bore. Such valves are used in several oilfield operations, including drill stem testing, where the valves are known as “tester” valves. An example is the Omni™ valve available from Halliburton Energy Services, Inc.
  • The [0055] valve 84 may be of the type which uses pressure in a control line 86 to control its operation, as is commonly used in subsea operations. However, other actuation means may be used, such as acoustic, electromagnetic, etc., telemetry from a remote location, pressure or pressure pulses in the tubing string 64 or annulus 70, etc.
  • When the [0056] valve 84 is in its first position, gas is produced from the production wellbore 44, through the sidewall of the valve, and to the earth's surface via the tubing string 64 above the valve. Flow between the storage wellbore 24 and the tubing string 64 above the valve 84 is prevented by the valve. Thus, when it is desired to produce gas from the formation 14, the valve 84 is operated to its first position.
  • When the [0057] valve 84 is in its second position, gas is injected through the tubing string 64, through the internal bore of the valve, and into the storage wellbore 24. Flow between the production wellbore 44 and the tubing string 64 is prevented by the valve 84. Thus, when it is desired to store gas in the formation 14, the valve is operated to its second position.
  • An advantage of this method shown in FIG. 6 is that only a [0058] single tubing string 64 is needed to both store and produce gas via the multiple wellbores 24, 44, while leaving an annulus 88 extending to the earth's surface above the packer 82 available for well control. No flow reversal occurs in any gravel pack of the system 10. The valve 84 is merely alternated between its first and second positions as needed to store or produce the gas.
  • Referring additionally now to FIG. 7, the [0059] system 10 is depicted wherein yet another method of storing and producing the gas is used. This method is similar to the method shown in FIG. 6 except that, instead of the valve 84, two check valves 90, 92 are used to control flow between the tubing string 64 and each of the storage and production wellbores 24, 44.
  • The [0060] check valve 90 prevents flow from the interior of the tubing string 64 to the production wellbore 44, but permits flow from the production wellbore to the interior of the tubing string. The check valve 92 prevents flow from the storage wellbore 24 to the interior of the tubing string 64, but permits flow from the interior of the tubing string to the storage wellbore.
  • When it is desired to produce gas from the [0061] formation 14, pressure in the tubing string 64 is decreased below that in the production wellbore 44. This pressure differential opens the check valve 90 and gas flows from the production wellbore 44, through the check valve 90, into the tubing string 64, and to the earth's surface. The pressure in the tubing string 64 is also less than pressure in the storage wellbore 24, which maintains the check valve 92 in its closed position.
  • When it is desired to inject gas into the [0062] formation 14, pressure in the tubing string 64 is increased above that in the storage wellbore 24. This pressure differential opens the check valve 92, and gas flows from the tubing string 64, through the check valve, and into the storage wellbore 24. The pressure in the tubing string 64 is also greater than pressure in the production wellbore 44, which maintains the check valve 90 in its closed position.
  • Biasing devices, such as springs, may be added to the [0063] check valves 90, 92, so that predetermined pressure differentials are needed to open the valves. This may also ensure more positive closing of the valves 90, 92 and/or allow greater latitude in the pressures which may be applied to the tubing string 64 to open or close the valves as desired.
  • The [0064] check valves 90, 92 are shown schematically in FIG. 7 as being separate valves spaced apart in the tubing string 64. However, these valves go, 92 could be otherwise configured and positioned in keeping with the principles of the present invention. For example, the valves 90, 92 could be combined into a single assembly, the valves could be retrievable by slickline or coiled tubing, etc.
  • Note that the [0065] system 10 as depicted in FIG. 7 also has the advantage of using only a single tubing string 64 to inject and produce gas in the multiple wellbores 24, 44, while leaving the annulus 88 available for well control. This storage and production of gas through the tubing string 64 is accomplished without requiring flow reversal in any gravel pack of the system 10.
  • In the accompanying FIGS. [0066] 1-7 depicting several embodiments of the invention, the production wellbore 44 is shown as intersecting the main wellbore 12 at a wellbore junction, and the storage wellbore 24 is shown as being an extension of the main wellbore. The main wellbore 16 is cased, while the production and storage wellbores 24, 44 are uncased. The production wellbore 44 is above the storage wellbore 24. However, it is to be clearly understood that these examples of embodiments of the invention are merely used for illustration purposes. The main wellbore 12 could be uncased at its junction with the production and/or storage wellbores 24, 44, the storage and/or production wellbores could be cased, the storage wellbore could be above the production wellbore, the storage wellbore could intersect the main wellbore at a wellbore junction, the production wellbore could be an extension of the main wellbore, etc.
  • The junction between the [0067] main wellbore 12 and the production wellbore 44 has been depicted in the drawings and described above as one in which the tubular string 52 in the production wellbore extends into the main wellbore and is cemented at least up to the window 20. However, it is to be understood that other types of wellbore junctions may be utilized, without departing from the principles of the present invention. For example, any of the wellbore junctions known to those skilled in the art as Levels 1-6 may be used, as well as any other type of wellbore junction.
  • Thus, a person skilled in the art would, upon a careful consideration of the above description of representative embodiments of the invention, readily appreciate that many modifications, additions, substitutions, deletions, and other changes may be made to these specific embodiments, and such changes are contemplated by the principles of the present invention. Accordingly, the foregoing detailed description is to be clearly understood as being given by way of illustration and example only, the spirit and scope of the present invention being limited solely by the appended claims and their equivalents. [0068]

Claims (35)

What is claimed is:
1. A gas storage and production system, comprising:
a gas storage formation, wherein gas is stored within pores of formation rock;
a production wellbore extending into the formation for withdrawing gas from the formation;
a storage wellbore extending into the formation for injecting gas into the formation; and
the production and storage wellbores intersecting at a wellbore junction.
2. The system according to claim 1, wherein gas is only withdrawn through the production wellbore and gas is only injected through the storage wellbore.
3. The system according to claim 1, further comprising:
a main wellbore extending from the wellbore junction to the earth's surface; and
a tubular string positioned in the main wellbore,
gas being delivered to the storage wellbore via the tubular string for injection into the formation, and gas being delivered from the production wellbore via an annulus formed between the tubular string and the main wellbore for production to the earth's surface.
4. The system according to claim 1, further comprising:
a main wellbore extending from the wellbore junction to the earth's surface; and
a tubular string positioned in the main wellbore,
gas being delivered to the storage wellbore via the tubular string for injection into the formation, and gas being delivered from the production wellbore via the tubular string for production to the earth's surface.
5. The system according to claim 4, wherein the gas is alternately delivered to the storage wellbore via the tubular string and delivered from the production wellbore via the tubular string.
6. The system according to claim 4, further comprising at least one valve connected to the tubular string, the valve providing communication between the tubular string and each of the storage and production wellbores.
7. The system according to claim 6, wherein the valve alternately provides communication between the tubular string and each of the storage and production wellbores.
8. The system according to claim 7, wherein the valve is remotely controlled.
9. The system according to claim 7, wherein there are at least two of the valves, the valves being operated in response to a direction of gas flow in the tubular string.
10. The system according to claim 1, further comprising:
a main wellbore extending from the wellbore junction to the earth's surface; and
a tubular string positioned in the main wellbore,
gas being delivered to the storage wellbore via an annulus formed between the tubular string and the main wellbore for injection into the formation, and gas being delivered from the production wellbore via the tubular string for production to the earth's surface.
11. The system according to claim 1, further comprising:
a sand control screen positioned in the production wellbore;
a tubular string connected to the sand control screen and extending toward the wellbore junction;
gravel positioned about the screen in an annulus formed between the screen and the wellbore; and
a retainer material positioned in the annulus between the gravel and the wellbore junction, the retainer material preventing displacement of the gravel.
12. The system according to claim 11, wherein the retainer material is a cementitious material.
13. The system according to claim 11, wherein the retainer material is flowed into the annulus via at least one ported collar interconnected in the tubular string between the screen and the wellbore junction.
14. The system according to claim 1, further comprising:
a main wellbore extending from the wellbore junction to the earth's surface; and
injection and production tubular strings positioned in the main wellbore,
gas being delivered to the storage wellbore via the injection tubular string for injection into the formation, and gas being delivered from the production wellbore via the production tubular string for production to the earth's surface.
15. The system according to claim 14, wherein the injection and production tubular strings are coaxial within the main wellbore.
16. The system according to claim 14, wherein the injection tubular string is positioned within the production tubular string in the main wellbore.
17. A method of gravel packing a wellbore, the method comprising the steps of:
positioning a sand control device in the wellbore;
placing gravel in an annulus formed between the sand control device and the wellbore; and
flowing a retainer material into the annulus, the retainer material preventing displacement of the gravel in the annulus.
18. The method according to claim 17, wherein the flowing step further comprises the step of permitting the retainer material to set in the annulus, the retainer material when set abutting the gravel and preventing the gravel from displacing in the annulus.
19. The method according to claim 18, wherein in the flowing step, the retainer material is cementitious, so that the retainer material is hardened when set.
20. The method according to claim 18, wherein in the flowing step, the retainer material is gelatinous, so that the retainer material is gelled when set.
21. The method according to claim 17, wherein in the positioning step, the sand control device is connected to a tubular string in the wellbore, and wherein in the flowing step, the retainer material is flowed into the annulus between the tubular string and the wellbore.
22. The method according to claim 21, wherein the flowing step further comprises flowing the retainer material into the annulus via at least one ported collar interconnected in the tubular string.
23. The method according to claim 17, wherein the flowing step is performed after the placing step.
24. A gas storage and production system, the system comprising:
a main wellbore extending from the earth's surface to a wellbore junction;
a storage wellbore extending from the main wellbore into a gas storage formation; and
a production wellbore extending from the main wellbore into the formation,
gas being injected from the main wellbore into the formation via the storage wellbore, and gas being withdrawn from the formation into the main wellbore via the production wellbore.
25. The system according to claim 24, wherein at least one of the storage and production wellbores is an extension of the main wellbore.
26. The system according to claim 24, further comprising a tubular string positioned in the main wellbore, the tubular string alternately delivering gas to the storage wellbore and delivering gas from the production wellbore to the earth's surface.
27. The system according to claim 26, further comprising a valve connected to the tubular string, the valve alternately providing communication between the production wellbore and the tubular string, and between the storage wellbore and the tubular string.
28. The system according to claim 26, further comprising first and second valves connected to the tubular string, the first valve opening in response to a pressure differential from the tubular string to the storage wellbore, and the second valve opening in response to a pressure differential from the production wellbore to the tubular string.
29. The system according to claim 24, further comprising a sand control screen positioned in the production wellbore, and gravel disposed in an annulus formed between the screen and the production wellbore.
30. The system according to claim 29, further comprising cement in the annulus abutting the gravel and preventing displacement of the gravel axially relative to the annulus.
31. The system according to claim 24, further comprising first and second tubular strings positioned in the main wellbore, the first tubular string delivering gas to the storage wellbore, and the second tubular string receiving gas from the production wellbore.
32. The system according to claim 31, wherein the first and second tubular strings are concentrically disposed in the main wellbore.
33. The system according to claim 31, wherein the first tubular string is within the second tubular string in the main wellbore.
34. The system according to claim 24, further comprising a tubular string positioned within the main wellbore, the tubular string delivering gas to the storage wellbore, and an annulus between the tubular string and the main wellbore receiving gas from the production wellbore.
35. The system according to claim 34, wherein gas flows from the production wellbore to the earth's surface substantially entirely through the annulus.
US09/923,211 2001-08-06 2001-08-06 Gas storage and production system Abandoned US20030024700A1 (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
US09/923,211 US20030024700A1 (en) 2001-08-06 2001-08-06 Gas storage and production system
US10/191,086 US6994165B2 (en) 2001-08-06 2002-07-09 Multilateral open hole gravel pack completion methods
US10/289,189 US6763885B2 (en) 2001-08-06 2002-11-05 Method of gravel packing for a gas storage and production system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US09/923,211 US20030024700A1 (en) 2001-08-06 2001-08-06 Gas storage and production system

Related Child Applications (2)

Application Number Title Priority Date Filing Date
US10/191,086 Continuation-In-Part US6994165B2 (en) 2001-08-06 2002-07-09 Multilateral open hole gravel pack completion methods
US10/289,189 Division US6763885B2 (en) 2001-08-06 2002-11-05 Method of gravel packing for a gas storage and production system

Publications (1)

Publication Number Publication Date
US20030024700A1 true US20030024700A1 (en) 2003-02-06

Family

ID=25448316

Family Applications (2)

Application Number Title Priority Date Filing Date
US09/923,211 Abandoned US20030024700A1 (en) 2001-08-06 2001-08-06 Gas storage and production system
US10/289,189 Expired - Lifetime US6763885B2 (en) 2001-08-06 2002-11-05 Method of gravel packing for a gas storage and production system

Family Applications After (1)

Application Number Title Priority Date Filing Date
US10/289,189 Expired - Lifetime US6763885B2 (en) 2001-08-06 2002-11-05 Method of gravel packing for a gas storage and production system

Country Status (1)

Country Link
US (2) US20030024700A1 (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030047309A1 (en) * 2001-09-07 2003-03-13 Exxonmobil Upstream Research Company Acid gas disposal method
US20030085037A1 (en) * 2001-08-06 2003-05-08 Roane Thomas O. Multilateral open hole gravel pack completion
US20040055750A1 (en) * 2002-09-24 2004-03-25 Restarick Henry L. Multilateral injection/production/storage completion system
US20050115713A1 (en) * 2003-12-01 2005-06-02 Restarick Henry L. Multilateral completion system utilizing an alternate passage
US6951252B2 (en) 2002-09-24 2005-10-04 Halliburton Energy Services, Inc. Surface controlled subsurface lateral branch safety valve
WO2009113870A2 (en) * 2008-03-12 2009-09-17 Statoilhydro Asa System and method for controlling the flow of fluid in branched wells
US20100314109A1 (en) * 2009-06-16 2010-12-16 Schlumberger Technology Corporation Gravel pack completions in lateral wellbores of oil and gas wells
US10151190B2 (en) 2015-09-10 2018-12-11 Richard Muriel Cherry Assessment and production of minerals by directed horizontal drilling
CN109707349A (en) * 2018-12-06 2019-05-03 青岛海洋地质研究所 The exploitation of shale flour sand hydrate multiple-limb hole is drilled well integral method

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6907936B2 (en) * 2001-11-19 2005-06-21 Packers Plus Energy Services Inc. Method and apparatus for wellbore fluid treatment
US8167047B2 (en) 2002-08-21 2012-05-01 Packers Plus Energy Services Inc. Method and apparatus for wellbore fluid treatment
US7722289B2 (en) * 2004-12-08 2010-05-25 Casella Waste Systems, Inc. Systems and methods for underground storage of biogas
US7267172B2 (en) 2005-03-15 2007-09-11 Peak Completion Technologies, Inc. Cemented open hole selective fracing system
US8757273B2 (en) 2008-04-29 2014-06-24 Packers Plus Energy Services Inc. Downhole sub with hydraulically actuable sleeve valve
US9062529B2 (en) 2011-11-15 2015-06-23 Weatherford Technology Holdings, Llc Gravel pack assembly and method of use
CN108756798A (en) * 2018-06-15 2018-11-06 中盐金坛盐化有限责任公司 Salt cave old well reform gas storage well method for blocking

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6279658B1 (en) * 1996-10-08 2001-08-28 Baker Hughes Incorporated Method of forming and servicing wellbores from a main wellbore

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3277962A (en) * 1963-11-29 1966-10-11 Pan American Petroleum Corp Gravel packing method
US3489216A (en) * 1967-08-25 1970-01-13 Halliburton Co Bridge plug with valved hollow mandrel bypass
US3891034A (en) * 1974-01-08 1975-06-24 Gearhart Owen Industries Through-tubing bridge plug having covered expansible packer
US4491178A (en) * 1983-08-11 1985-01-01 Gearhart Industries, Inc. Through tubing bridge plug
NL8601342A (en) 1986-05-26 1987-12-16 Ir Arnold Willem Josephus Grup UNDERGROUND ENERGY STORAGE SYSTEM.
US5033549A (en) * 1989-12-27 1991-07-23 Perf-O-Log, Inc. Method for placing a gravel pack in an oil well with an electric wireline
US5419655A (en) 1993-08-02 1995-05-30 Westinghouse Electric Corporation Collection of liquid from below-ground location
US6397946B1 (en) * 1994-10-14 2002-06-04 Smart Drilling And Completion, Inc. Closed-loop system to compete oil and gas wells closed-loop system to complete oil and gas wells c
US6176307B1 (en) * 1999-02-08 2001-01-23 Union Oil Company Of California Tubing-conveyed gravel packing tool and method
US6311776B1 (en) 1999-04-19 2001-11-06 Camco International Inc. Dual diverter and orientation device for multilateral completions and method
US6457525B1 (en) 2000-12-15 2002-10-01 Exxonmobil Oil Corporation Method and apparatus for completing multiple production zones from a single wellbore

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6279658B1 (en) * 1996-10-08 2001-08-28 Baker Hughes Incorporated Method of forming and servicing wellbores from a main wellbore

Cited By (25)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030085037A1 (en) * 2001-08-06 2003-05-08 Roane Thomas O. Multilateral open hole gravel pack completion
US6994165B2 (en) * 2001-08-06 2006-02-07 Halliburton Energy Services, Inc. Multilateral open hole gravel pack completion methods
US20030047309A1 (en) * 2001-09-07 2003-03-13 Exxonmobil Upstream Research Company Acid gas disposal method
US7128150B2 (en) * 2001-09-07 2006-10-31 Exxonmobil Upstream Research Company Acid gas disposal method
US20040055750A1 (en) * 2002-09-24 2004-03-25 Restarick Henry L. Multilateral injection/production/storage completion system
US6840321B2 (en) * 2002-09-24 2005-01-11 Halliburton Energy Services, Inc. Multilateral injection/production/storage completion system
US6951252B2 (en) 2002-09-24 2005-10-04 Halliburton Energy Services, Inc. Surface controlled subsurface lateral branch safety valve
US20060000614A1 (en) * 2002-09-24 2006-01-05 Halliburton Energy Services, Inc. Surface controlled subsurface lateral branch safety valve
US20070221380A1 (en) * 2002-09-24 2007-09-27 Restarick Henry L Surface controlled subsurface lateral branch safety valve
US7434613B2 (en) 2002-09-24 2008-10-14 Halliburton Energy Services, Inc. Surface controlled subsurface lateral branch safety valve
US20050115713A1 (en) * 2003-12-01 2005-06-02 Restarick Henry L. Multilateral completion system utilizing an alternate passage
US7159661B2 (en) 2003-12-01 2007-01-09 Halliburton Energy Services, Inc. Multilateral completion system utilizing an alternate passage
WO2009113870A2 (en) * 2008-03-12 2009-09-17 Statoilhydro Asa System and method for controlling the flow of fluid in branched wells
WO2009113870A3 (en) * 2008-03-12 2010-08-19 Statoilhydro Asa System and method for controlling the flow of fluid in branched wells
GB2471595A (en) * 2008-03-12 2011-01-05 Statoil Asa System and method for controlling the fluid of fluid in branched wells
US20110048732A1 (en) * 2008-03-12 2011-03-03 Statoil Asa System and method for controlling the flow of fluid in branched wells
GB2471595B (en) * 2008-03-12 2012-10-31 Statoil Asa System and method for controlling the flow of fluid in branched wells
US8590630B2 (en) 2008-03-12 2013-11-26 Statoil Asa System and method for controlling the flow of fluid in branched wells
EA019016B1 (en) * 2008-03-12 2013-12-30 Статойл Аса System and method for controlling the flow of fluid in branched wells
AU2009224104B2 (en) * 2008-03-12 2015-03-12 Equinor Energy As System and method for controlling the flow of fluid in branched wells
US20100314109A1 (en) * 2009-06-16 2010-12-16 Schlumberger Technology Corporation Gravel pack completions in lateral wellbores of oil and gas wells
US8490697B2 (en) * 2009-06-16 2013-07-23 Schlumberger Technology Corporation Gravel pack completions in lateral wellbores of oil and gas wells
AU2010260393B2 (en) * 2009-06-16 2015-01-22 Schlumberger Technology B.V. Gravel pack completions in lateral wellbores of oil and gas wells
US10151190B2 (en) 2015-09-10 2018-12-11 Richard Muriel Cherry Assessment and production of minerals by directed horizontal drilling
CN109707349A (en) * 2018-12-06 2019-05-03 青岛海洋地质研究所 The exploitation of shale flour sand hydrate multiple-limb hole is drilled well integral method

Also Published As

Publication number Publication date
US6763885B2 (en) 2004-07-20
US20030063952A1 (en) 2003-04-03

Similar Documents

Publication Publication Date Title
US7950461B2 (en) Screened valve system for selective well stimulation and control
US6763885B2 (en) Method of gravel packing for a gas storage and production system
US6241021B1 (en) Methods of completing an uncemented wellbore junction
AU745928B2 (en) Methods of completing and producing a subterranean well and associated apparatus
AU2013200438B2 (en) A method and system of development of a multilateral well
US6575245B2 (en) Apparatus and methods for gravel pack completions
US4685519A (en) Hydraulic fracturing and gravel packing method employing special sand control technique
US6830106B2 (en) Multilateral well completion apparatus and methods of use
CA2696015C (en) Well construction using small laterals
US7159661B2 (en) Multilateral completion system utilizing an alternate passage
US9004155B2 (en) Passive completion optimization with fluid loss control
WO1997012112A1 (en) Method for isolating multi-lateral well completions while maintaining selective drainhole re-entry access
US7546875B2 (en) Integrated sand control completion system and method
US6439312B1 (en) Apparatus and methods for isolating a wellbore junction
WO2002018740A1 (en) Improved method for drilling multi-lateral wells with reduced under-reaming and related device
CA2704834C (en) Screened valve system for selective well stimulation and control
Pearson et al. The use of slimhole drilling and monobore completions to reduce development costs at the Kuparuk River Field
US20240117708A1 (en) Production sub including degradable orifice
US20240117707A1 (en) Production sub including a fluid flow assembly having a pair of radial burst discs
Walker et al. Underbalanced completions
Machado Case History of a Successful Selective Horizontal Openhole Gravel Pack With Zonal Isolation in Deep Water Field
Bamgboye et al. Computer-Aided Design for a Multilateral Well Completion in a Stacked Reservoir
PRASAD et al. REVIEW ON OPEN HOLE AND CASED HOLE WELL COMPELTION SYSTEMS IN OIL AND GAS WELLS
AU754711B2 (en) Methods of completing and producing a subterranean well and associated apparatus
Aubert Variations in multilateral well design and execution in the Prudhoe Bay Unit

Legal Events

Date Code Title Description
AS Assignment

Owner name: HALLIBURTON ENERGY SERVICES, INC., TEXAS

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:CAVENDER, TRAVIS WAYNE;REEL/FRAME:012150/0138

Effective date: 20010904

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION