US20020007947A1 - System and method for scheduling cyclic steaming of wells - Google Patents

System and method for scheduling cyclic steaming of wells Download PDF

Info

Publication number
US20020007947A1
US20020007947A1 US09/816,848 US81684801A US2002007947A1 US 20020007947 A1 US20020007947 A1 US 20020007947A1 US 81684801 A US81684801 A US 81684801A US 2002007947 A1 US2002007947 A1 US 2002007947A1
Authority
US
United States
Prior art keywords
production
steaming
schedules
ranking
schedule
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
US09/816,848
Other versions
US6446721B2 (en
Inventor
Anilkumar Patel
Charles Guthrie
Loren Lederhos
James Ouimette
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to US09/816,848 priority Critical patent/US6446721B2/en
Publication of US20020007947A1 publication Critical patent/US20020007947A1/en
Application granted granted Critical
Publication of US6446721B2 publication Critical patent/US6446721B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • E21B43/24Enhanced recovery methods for obtaining hydrocarbons using heat, e.g. steam injection
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/02Marketing; Price estimation or determination; Fundraising
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/06Buying, selling or leasing transactions
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/06Buying, selling or leasing transactions
    • G06Q30/0601Electronic shopping [e-shopping]
    • G06Q30/0613Third-party assisted
    • G06Q30/0617Representative agent
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/06Buying, selling or leasing transactions
    • G06Q30/0601Electronic shopping [e-shopping]
    • G06Q30/0633Lists, e.g. purchase orders, compilation or processing

Definitions

  • This invention relates to a system and method of scheduling cyclic steaming of wells.
  • Cyclic Steaming is a method of increasing oil recovery from an oil field where the oil is contained in earth that has low permeability. The low permeability slows or prevents flow of oil thus inhibiting the recovery of oil. Cyclic steaming is a method that greatly increases the permeability of the earth in such a field and at least temporarily increases the oil production from individual wells and the field as a whole. Generally any given well in such an area must be repeatedly steamed as production decreases over time. Typically after a particular steam event a well produces at a high rate for some period of time, but the rate decreases over time until it is no longer producing efficiently and needs to be re-steamed. The rate of decline in production by a given well can vary quite significantly.
  • the amount of production to be expected from wells within a particular field can vary radically. It is generally desired to maximize the amount of oil produced in a particular field over time given a finite amount of steam available. Thus given the variability of potential production of individual wells within a field it is important to choose carefully which wells to steam and when to steam them in order to maximize oil produced by the field.
  • Cyclic steaming can be accomplished as follows: The method generally involves the drilling of a wellbore which traverses the low permeability formation. First, a lower interval within the low permeability formation is selected and perforated. Tubing is run into the wellbore, and a thermal packer is set at the upper boundary of the low permeability formation to be produced. Steam is injected into the wellbore through the tubing at sufficient pressure and flow rate to cause the low permeability formation at the first selected lower interval to accept fluid in the case of naturally fractured low permeability formations, or to fracture in other formations such as diatomite.
  • the steam injection is continued until a predetermined quantity of steam has been injected. Following a relatively short “soak” period, the well is allowed to produce back from the first set of perforations. Short steam cycles alternating with production are repeated for the first interval in the wellbore. Next, sand or sand in combination with other material impervious to steam such as cement, or a mechanical isolation device, is placed into the wellbore sufficient to prevent steam from entering the formation through the first set of perforations. A second interval in the low permeability formation is then selected and perforated. Steam is once again flowed from the surface down the wellbore and may enter the formation only through the new second set of perforations due to the impervious sand or other blocking means in the wellbore.
  • the sand, isolating device or other steam impervious material is circulated out, or drilled through, so as to open all the perforations and place the fractured intervals in fluid communication with the wellbore.
  • Steam from a surface steam generator may then be flowed down the tubing and into the entire set of previously isolated perforations, and after a short cycle of steam followed by a soak period, the well is returned to the production mode.
  • any single or set of fractured intervals may be isolated and selectively re-steamed.
  • the method of the present invention provides a means for producing an optimized steaming schedule in order to optimize for selected optimization criteria.
  • the invention includes a method of scheduling cyclic steaming of a group of petroleum-containing wells including: inputting to a production-predicting means a group of data describing at least in part the past cyclic steaming and resulting production of a group of petroleum-containing wells; processing the data in the production-predicting means and outputting a group of production predictions for the group of wells during a future steaming cycle; inputting the group of production predictions into an optimization means; inputting an initial steaming cycle schedule for the group of wells into the optimization means; processing the group of production predictions and the initial steaming cycle schedule in the optimization means by the steps including: determining a ranking for the initial steaming cycle schedule for the group of production predictions against a pre-determined ranking criteria; producing a group of new steaming cycle schedules based on the ranking of the initial steaming cycle a schedule optimization algorithm; determining a ranking for the new steaming cycle schedules against the pre-determined ranking criteria; repeating the production of new steaming cycle schedules and determining ranking steps until some pre-determined termination criteria
  • the invention includes systems configured and adapted to perform the steps listed in the above-described methods, and computer readable media containing computer readable instructions configured and adapted to perform the steps listed in the above-described methods.
  • One system embodiment of the invention includes a system for scheduling cyclic steaming of a group of petroleum-containing wells including: a production-predicting means configured for receiving an input of a group of data describing at least in part the past cyclic steaming and resulting production of a group of petroleum-containing wells, and for processing the data outputting a group of production predictions for the group of wells during a future steaming cycle; an optimization means configured for receiving as input the output of the production-predicting means and for receiving as input steaming cycle schedules for the group of wells, and for processing the group of production predictions and the steaming cycle schedules by the steps including: determining a ranking for the initial steaming cycle schedule for the group of production predictions against a pre-determined ranking criteria; producing a group of new steaming cycle schedules based on the ranking of the initial steaming cycle a schedule optimization algorithm; determining a ranking for the new steaming cycle schedules against the pre-determined ranking criteria; repeating the production of new steaming cycle schedules and determining ranking steps until some pre-determined
  • FIG. 1 is a schematic diagram combining aspects of a conceptual data model/entity-relationship diagram showing the environment of the invention and its relationship to other systems.
  • FIG. 2 is a schematic block system level 0 flow chart diagram/system diagram of one embodiment of the invention.
  • FIGS. 3A and 3B respectively, depict an embodiment of a conceptual view of a schedule output, and one graphical Gantt Chart view, by the process of the invention and/or the information stored in the schedule database.
  • FIG. 4 is a schematic level 1 data flow diagram (a first decomposition of the system diagram in FIG. 2) and shows logical data flow between major processes of one embodiment of the invention.
  • FIG. 5 depicts in one detailed embodiment of a conceptual view of well-production-prediction data used in testing new schedules for meeting selected objectives in accordance with the invention.
  • FIG. 6 depicts an exemplary embodiment in graphical format of past well-production data input to the well-production-prediction means.
  • FIGS. 7A and 7B depict, respectively, one embodiment of pre-selected processing parameters used in the invention embodiment employing a genetic algorithm, and constraints selected, as part of the schedule optimization processing.
  • FIG. 8 depicts one embodiment of a graphical display of change-of-oil production as a function of genetic algorithm generations, for use in the termination-criteria element of the invention.
  • FIG. 1 is a schematic diagram combining aspects of a conceptual data model/entity-relationship diagram showing the environment of the invention and its relationship to other systems.
  • Petroleum-well field 110 includes several wells 120 , at typically one oil plant 125 and one steam plant 115 .
  • steam plant 115 passes steam to one or more of wells 120 .
  • one or more of wells 120 pass petroleum such as oil and gas as well as any steam and water in the well to oil plant 125 .
  • the recovered material is treated, e.g., to remove water and separate oil from gas.
  • the timing of the phases of the cyclic steaming process substantially occur in accordance with the schedule produced by Schedule Optimization System 105 .
  • Historical information from petroleum-well field 110 such as details of prior cyclic steaming runs, including water and steam usage, cost, and petroleum production, are input to Schedule optimization System 105 .
  • Schedule Optimization System 105 utilizes this information optionally in conjunction with other information in certain algorithms to produce a new cyclic steaming process schedule optimized for meeting pre-determined optimization criteria. Further details of this process are described below.
  • linkage between the Schedule Optimization System 105 and petroleum-well field 110 is optionally electronic, manual, or other known linkage means. That is, input of data from petroleum-well field 110 to Schedule Optimization System 105 may be manual or it may be transferred via data collection or storage systems installed in the petroleum-well field 110 . Such systems could include electronic or physical measurement devices, gauges, databases, and related equipment known in the art.
  • application to the petroleum-well field 110 of the schedule output from the Schedule Optimization System 105 may be manual, automated, or mixtures thereof. That is, in an automated application, the output schedule could be electronically transferred or read by a controller system which sends appropriate signals to subsystems for controlling the valves and other equipment used to time the different phases of the cyclic steaming process. In a manual application, a human operator reads a paper or electronic version of the schedule output and manually adjusts the necessary valves and other equipment at the proper times to carry out the schedule.
  • FIG. 2 is a schematic block system level 0 flow chart diagram/system diagram of one embodiment of the invention.
  • Schedule Optimization System 205 includes Scheduling Process 215 , Output Schedule 250 , datastore 220 which includes Well Data base 225 , Steam Plant Database 230 , and Schedule Database 235 .
  • Datastore 220 is optionally external to, and not a component of, Schedule Optimization System 205 .
  • the databases may be designed in a variety of ways known to those skilled in the database arts. For example, there may be separate or a single database for each data type.
  • the databases may be special purpose databases solely for use by the Schedule Optimization System 205 or they may be pre-existing databases also accessed by, or part of, other applications or systems.
  • Additional databases are also accessed by, or internal to, the Scheduling Process 215 . These optionally include a database for output of a reservoir simulator which models the effects on oil production of several parameters of multiple petroleum-containing wells. The simulator typically is theoretically-based and the parameters may include steam quality and quantity.
  • Another database is a database of output from a steam cycle simulator which uses past oil production curves and steam cycle data or curve-fitted data to predict a future oil production curve.
  • Schedule Database 235 includes historical information of prior cyclic steaming cycles and resulting production, cost, or other information of interest resulting from implementing the various prior run steaming cycles.
  • the Steam Database 230 includes prior steam production and usage rates for past run schedules and for different wells.
  • Well Database 225 includes data representing oil production and other information of interest, typically as function of days of steaming run, for past steaming cycles.
  • FIG. 3A depicts one embodiment a conceptual view 310 of a final Schedule 240 .
  • FIG. 3B is a Gantt chart view.
  • Final Schedule 240 is passed to Schedule Database 235 for updating the database, and optionally to an Implementation System 210 for application.
  • the final Schedule 240 is implemented, electronically or manually or by combined means, in Implementing Schedule Process 245 .
  • Data collected 250 from running final Schedule 240 is passed to the respective databases 225 and 230 for updating those databases. Greater details of Scheduling Process 215 are given in FIG. 4 below.
  • FIG. 4 is a schematic level 1 data flow diagram (a first decomposition of the system diagram in FIG. 2) and shows logical data flow between major processes of one embodiment of the invention.
  • Data as needed from all Databases 410 (collectively shown as a single database for simplification) is read in Read Data Process 415 which is optionally internal or external to Scheduling Process 405 . All or a portion of the read data is passed to Predict Production or Other Performance Criteria of Next Steaming Process 420 (“Prediction Process 420 ”.
  • Prediction Process 420 oil production curve-fitted data is input from past steaming cycles, the process applies a predictive algorithm such as regression analysis, and outputs a predicted oil production curve for a future steaming cycle. Alternative output could include predicted cost or steam usage curves.
  • the output from Prediction Process 420 passes to Inut Initial/subsequent Schedules and run Fitness Function/Simulator to Rank Schedules Process 425 (“Fitness Function Process 420 ”).
  • This process in one embodiment is a simulation algorithm for simulating one or more proposed steam cycles in light of the output, e.g., oil production curves, from Prediction Process 420 .
  • Such an algorithm typically steps through each phase of the steaming cycle in the schedule being simulated, and accesses the predicted oil production curves as needed to predict the performance criteria of interest, in this case, total oil production over the course of the tested schedule.
  • schedules are tested and then ranked based on the selected performance criteria. For example, a portion of schedules having the highest oil production are selected to survive and the remaining tested schedules are discarded.
  • the surviving schedules from Fitness Function Process 420 are passed to Make New Schedules Process 430 . In this process one or more optimization algorithms utilize the surviving schedules to make new schedules for testing.
  • the output of several proposed schedules are passed to decision module 435 to verify of certain pre-determined constraints are met. Such constraints include, e.g., total steam usage in a proposed steaming cycle not exceed total available steam from the steam plant.
  • constraints include, e.g., total steam usage in a proposed steaming cycle not exceed total available steam from the steam plant.
  • a sample constraint sheet is shown in FIG. 7B.
  • Failing schedules may be passed to Discard or Apply Penalty Process 440 (“Penalty Process 440 ”). There the failing schedule is discarded or a penalty is added such that it is effectively discarded in that it will not survive the next testing in the Fitness Function Process 425 . If the penalty method is applied to the failed schedules, then the failed schedules and other schedules are passed back to Fitness Function 425 . This loop continues until pre-determined termination criteria are met. This is tested in Termination Criteria Met Process 445 .
  • the percent increase in oil production over prior schedules is determined and if it falls below a pre-set amount, the schedule passing the pre-determined termination criteria is the final Schedule output 450 .
  • the final Schedule 450 is stored in Schedule Database 455 .
  • Various optimization algorithms known in the art may be utilized in the Make New Schedules Process 430 . These include genetic algorithms. Genetic algorithms attempt to simulate natural selection by selected the most fit schedules from which to produce new schedules (offspring). Typically several generations of schedules may be produced before one meets the termination criteria. Genetic algorithms are described in U.S. Pat. No. 6,182,057 entitled Device, Method, And Program Storage Medium For Executing Genetic Algorithm, and U.S. Pat. No. 5,924,048 entitled Automated Material Balance System For Hydrocarbon Reservoirs Using a Genetic Procedure, which are each incorporated herein by reference in their entirety.
  • Non-patent information includes, e.g., Introduction to Genetic Algorithms, (see http://lancet.mit.edu/ ⁇ mbwall/presentations/IntroToGAs/). Genetic algorithm software source code is available free over the Internet and available commercially. Commercially available genetic algorithm programs include Gene HunterTM from Ward Systems Group Inc. (see http://wardsystems.com) and Evolver from Palisade Corp. (see http://www.palisade.com/html/evolver.html) Other potential known algorithms for use in the Make New Schedules Process 430 include simulated annealing, mixed integer nonlinear programming, and combinations thereof.
  • FIG. 5 depicts in one detailed embodiment of a conceptual view of well-production-prediction data used in testing new schedules for meeting selected objectives in accordance with the invention.
  • FIG. 6 depicts an exemplary embodiment in graphical format of curve-fitted graphs of past well-production data input to the well-production-prediction means.
  • FIGS. 7A and 7B depict, respectively, one embodiment of pre-selected processing parameters used in the invention embodiment employing a genetic algorithm, and constraints selected, as part of the schedule optimization processing.
  • FIG. 8 depicts one embodiment of a graphical display of change-of-oil production as a function of genetic algorithm generations, for use in the termination-criteria element of the invention. Various other termination-criteria may be used.

Abstract

The invention includes a method of scheduling cyclic steaming of a group of petroleum-containing wells including: inputting to a production-predicting means a group of data describing at least in part the past cyclic steaming and resulting production of a group of petroleum-containing wells; processing the data in the production-predicting means and outputting a group of production predictions for the group of wells during a future steaming cycle; inputting the group of production predictions into an optimization means; inputting an initial steaming cycle schedule for the group of wells into the optimization means; processing the group of production predictions and the initial steaming cycle schedule in the optimization means by the steps including: determining a ranking for the initial steaming cycle schedule for the group of production predictions against a pre-determined ranking criteria; producing a group of new steaming cycle schedules based on the ranking of the initial steaming cycle a schedule optimization algorithm; determining a ranking for the new steaming cycle schedules against the pre-determined ranking criteria; repeating the production of new steaming cycle schedules and determining ranking steps until some pre-determined termination criteria is met; and outputting a final steaming cycle schedule.

Description

    I. COPYRIGHT NOTICE AND AUTHORIZATION
  • This patent document contains material which is subject to copyright protection. [0001]
  • (C) Copyright 2001 Chevron Research and Technology Company, a division of Chevron U.S.A. Inc., Inc. All rights reserved. [0002]
  • With respect to this material which is subject to copyright protection. The owner, Chevron Research and Technology Company, a division of Chevron U.S.A. Inc., has no objection to the facsimile reproduction by any one of the patent disclosure, as it appears in the Patent and Trademark Office patent files or records of any country, but otherwise reserves all rights whatsoever. [0003]
  • II. FIELD OF THE INVENTION
  • This invention relates to a system and method of scheduling cyclic steaming of wells. [0004]
  • III. BACKGROUND OF THE INVENTION
  • Cyclic Steaming is a method of increasing oil recovery from an oil field where the oil is contained in earth that has low permeability. The low permeability slows or prevents flow of oil thus inhibiting the recovery of oil. Cyclic steaming is a method that greatly increases the permeability of the earth in such a field and at least temporarily increases the oil production from individual wells and the field as a whole. Generally any given well in such an area must be repeatedly steamed as production decreases over time. Typically after a particular steam event a well produces at a high rate for some period of time, but the rate decreases over time until it is no longer producing efficiently and needs to be re-steamed. The rate of decline in production by a given well can vary quite significantly. Also the amount of production to be expected from wells within a particular field can vary radically. It is generally desired to maximize the amount of oil produced in a particular field over time given a finite amount of steam available. Thus given the variability of potential production of individual wells within a field it is important to choose carefully which wells to steam and when to steam them in order to maximize oil produced by the field. [0005]
  • A Patent that describes the Cyclic Steaming process is U.S. Pat. No. 5,085,276 which is herein incorporated by reference in its entirety. Cyclic steaming can be accomplished as follows: The method generally involves the drilling of a wellbore which traverses the low permeability formation. First, a lower interval within the low permeability formation is selected and perforated. Tubing is run into the wellbore, and a thermal packer is set at the upper boundary of the low permeability formation to be produced. Steam is injected into the wellbore through the tubing at sufficient pressure and flow rate to cause the low permeability formation at the first selected lower interval to accept fluid in the case of naturally fractured low permeability formations, or to fracture in other formations such as diatomite. The steam injection is continued until a predetermined quantity of steam has been injected. Following a relatively short “soak” period, the well is allowed to produce back from the first set of perforations. Short steam cycles alternating with production are repeated for the first interval in the wellbore. Next, sand or sand in combination with other material impervious to steam such as cement, or a mechanical isolation device, is placed into the wellbore sufficient to prevent steam from entering the formation through the first set of perforations. A second interval in the low permeability formation is then selected and perforated. Steam is once again flowed from the surface down the wellbore and may enter the formation only through the new second set of perforations due to the impervious sand or other blocking means in the wellbore. After a predetermined amount of steam is flowed into the formation to cause controlled fracturing from the second set of perforations, the steam flow is ceased and after another short soak period of about five days, the well is allowed to produce from the second interval. Again, alternating steam and production cycles of short duration without a significant period in between due to well pump pulling is accomplished. The sequence of perforating, steam fracturing, and cycle steaming and producing the new fractures, followed by sanding back or otherwise isolating, and repeating at an upper interval is repeated until a desired amount of the low permeability formation has been fractured and completed by the controlled technique of the present invention. [0006]
  • When the final set of perforations has been completed, steamed and produced for several cycles, the sand, isolating device or other steam impervious material is circulated out, or drilled through, so as to open all the perforations and place the fractured intervals in fluid communication with the wellbore. Steam from a surface steam generator may then be flowed down the tubing and into the entire set of previously isolated perforations, and after a short cycle of steam followed by a soak period, the well is returned to the production mode. Alternatively, any single or set of fractured intervals may be isolated and selectively re-steamed. [0007]
  • As mentioned above it is desired to maximize the amount of oil produced using Cyclic Steaming, or minimize steam usage or total cost or optimize some other criteria, in a particular field over time given a finite amount of steam available. The method of the present invention provides a means for producing an optimized steaming schedule in order to optimize for selected optimization criteria. [0008]
  • IV. SUMMARY OF THE INVENTION
  • The invention includes a method of scheduling cyclic steaming of a group of petroleum-containing wells including: inputting to a production-predicting means a group of data describing at least in part the past cyclic steaming and resulting production of a group of petroleum-containing wells; processing the data in the production-predicting means and outputting a group of production predictions for the group of wells during a future steaming cycle; inputting the group of production predictions into an optimization means; inputting an initial steaming cycle schedule for the group of wells into the optimization means; processing the group of production predictions and the initial steaming cycle schedule in the optimization means by the steps including: determining a ranking for the initial steaming cycle schedule for the group of production predictions against a pre-determined ranking criteria; producing a group of new steaming cycle schedules based on the ranking of the initial steaming cycle a schedule optimization algorithm; determining a ranking for the new steaming cycle schedules against the pre-determined ranking criteria; repeating the production of new steaming cycle schedules and determining ranking steps until some pre-determined termination criteria is met; and outputting a final steaming cycle schedule. [0009]
  • In other embodiments the invention includes systems configured and adapted to perform the steps listed in the above-described methods, and computer readable media containing computer readable instructions configured and adapted to perform the steps listed in the above-described methods. [0010]
  • One system embodiment of the invention includes a system for scheduling cyclic steaming of a group of petroleum-containing wells including: a production-predicting means configured for receiving an input of a group of data describing at least in part the past cyclic steaming and resulting production of a group of petroleum-containing wells, and for processing the data outputting a group of production predictions for the group of wells during a future steaming cycle; an optimization means configured for receiving as input the output of the production-predicting means and for receiving as input steaming cycle schedules for the group of wells, and for processing the group of production predictions and the steaming cycle schedules by the steps including: determining a ranking for the initial steaming cycle schedule for the group of production predictions against a pre-determined ranking criteria; producing a group of new steaming cycle schedules based on the ranking of the initial steaming cycle a schedule optimization algorithm; determining a ranking for the new steaming cycle schedules against the pre-determined ranking criteria; repeating the production of new steaming cycle schedules and determining ranking steps until some pre-determined termination criteria is met; and outputting a final steaming cycle schedule. [0011]
  • These and other features and advantages of the present invention will be made more apparent through a consideration of the following detailed description of a preferred embodiment of the invention. In the course of this description, frequent reference will be made to the attached drawings.[0012]
  • V. BRIEF DESCRIPTION OF THE DRAWINGS
  • FIG. 1 is a schematic diagram combining aspects of a conceptual data model/entity-relationship diagram showing the environment of the invention and its relationship to other systems. [0013]
  • FIG. 2 is a schematic [0014] block system level 0 flow chart diagram/system diagram of one embodiment of the invention.
  • FIGS. 3A and 3B, respectively, depict an embodiment of a conceptual view of a schedule output, and one graphical Gantt Chart view, by the process of the invention and/or the information stored in the schedule database. [0015]
  • FIG. 4 is a [0016] schematic level 1 data flow diagram (a first decomposition of the system diagram in FIG. 2) and shows logical data flow between major processes of one embodiment of the invention.
  • FIG. 5 depicts in one detailed embodiment of a conceptual view of well-production-prediction data used in testing new schedules for meeting selected objectives in accordance with the invention. [0017]
  • FIG. 6 depicts an exemplary embodiment in graphical format of past well-production data input to the well-production-prediction means. [0018]
  • FIGS. 7A and 7B depict, respectively, one embodiment of pre-selected processing parameters used in the invention embodiment employing a genetic algorithm, and constraints selected, as part of the schedule optimization processing. [0019]
  • FIG. 8 depicts one embodiment of a graphical display of change-of-oil production as a function of genetic algorithm generations, for use in the termination-criteria element of the invention.[0020]
  • VI. DETAILED DESCRIPTION OF PREFERRED EMBODIMENTS
  • The major components (also interchangeably called aspects, subsystems, modules, functions, services) of the system and method of the invention, and examples of advantages they provide, are described below with reference to the figures. For figures including process/means blocks, each block, separately or in combination, is alternatively computer implemented, computer assisted, and/or human implemented. Computer implementation optionally includes one or more conventional general purpose computers having a processor, memory, storage, input devices, output devices and/or conventional networking devices, protocols, and/or conventional client-server hardware and software. Where any block or combination of blocks is computer implemented, it is done optionally by conventional means, whereby one skilled in the art of computer implementation could utilize conventional algorithms, components, and devices to implement the requirements and design of the invention provided herein. However, the invention also includes any new, unconventional implementation means. [0021]
  • FIG. 1 is a schematic diagram combining aspects of a conceptual data model/entity-relationship diagram showing the environment of the invention and its relationship to other systems. Petroleum-[0022] well field 110 includes several wells 120, at typically one oil plant 125 and one steam plant 115. During the steaming phase of a cyclic steaming process, steam plant 115 passes steam to one or more of wells 120. During the production stage of a cyclic steaming process, one or more of wells 120 pass petroleum such as oil and gas as well as any steam and water in the well to oil plant 125. There the recovered material is treated, e.g., to remove water and separate oil from gas.
  • When applying the method and system of the invention, the timing of the phases of the cyclic steaming process substantially occur in accordance with the schedule produced by [0023] Schedule Optimization System 105. Historical information from petroleum-well field 110 such as details of prior cyclic steaming runs, including water and steam usage, cost, and petroleum production, are input to Schedule optimization System 105. Schedule Optimization System 105 utilizes this information optionally in conjunction with other information in certain algorithms to produce a new cyclic steaming process schedule optimized for meeting pre-determined optimization criteria. Further details of this process are described below.
  • When applying the method/system of the invention in commercial use, linkage between the [0024] Schedule Optimization System 105 and petroleum-well field 110 is optionally electronic, manual, or other known linkage means. That is, input of data from petroleum-well field 110 to Schedule Optimization System 105 may be manual or it may be transferred via data collection or storage systems installed in the petroleum-well field 110. Such systems could include electronic or physical measurement devices, gauges, databases, and related equipment known in the art.
  • Similarly, application to the petroleum-[0025] well field 110 of the schedule output from the Schedule Optimization System 105 may be manual, automated, or mixtures thereof. That is, in an automated application, the output schedule could be electronically transferred or read by a controller system which sends appropriate signals to subsystems for controlling the valves and other equipment used to time the different phases of the cyclic steaming process. In a manual application, a human operator reads a paper or electronic version of the schedule output and manually adjusts the necessary valves and other equipment at the proper times to carry out the schedule.
  • FIG. 2 is a schematic [0026] block system level 0 flow chart diagram/system diagram of one embodiment of the invention. Schedule Optimization System 205 includes Scheduling Process 215, Output Schedule 250, datastore 220 which includes Well Data base 225, Steam Plant Database 230, and Schedule Database 235. Datastore 220 is optionally external to, and not a component of, Schedule Optimization System 205. The databases may be designed in a variety of ways known to those skilled in the database arts. For example, there may be separate or a single database for each data type. The databases may be special purpose databases solely for use by the Schedule Optimization System 205 or they may be pre-existing databases also accessed by, or part of, other applications or systems.
  • Additional databases (not shown) are also accessed by, or internal to, the [0027] Scheduling Process 215. These optionally include a database for output of a reservoir simulator which models the effects on oil production of several parameters of multiple petroleum-containing wells. The simulator typically is theoretically-based and the parameters may include steam quality and quantity. Another database (not shown) is a database of output from a steam cycle simulator which uses past oil production curves and steam cycle data or curve-fitted data to predict a future oil production curve.
  • [0028] Schedule Database 235 includes historical information of prior cyclic steaming cycles and resulting production, cost, or other information of interest resulting from implementing the various prior run steaming cycles. The Steam Database 230 includes prior steam production and usage rates for past run schedules and for different wells. Well Database 225 includes data representing oil production and other information of interest, typically as function of days of steaming run, for past steaming cycles.
  • Updated information from each Database is passed to [0029] Scheduling Process 215. A final Schedule 240 is the output of Scheduling Process 215. FIG. 3A depicts one embodiment a conceptual view 310 of a final Schedule 240. FIG. 3B is a Gantt chart view. Final Schedule 240 is passed to Schedule Database 235 for updating the database, and optionally to an Implementation System 210 for application. In this optional embodiment, the final Schedule 240 is implemented, electronically or manually or by combined means, in Implementing Schedule Process 245. Data collected 250 from running final Schedule 240 is passed to the respective databases 225 and 230 for updating those databases. Greater details of Scheduling Process 215 are given in FIG. 4 below.
  • FIG. 4 is a [0030] schematic level 1 data flow diagram (a first decomposition of the system diagram in FIG. 2) and shows logical data flow between major processes of one embodiment of the invention. Data as needed from all Databases 410 (collectively shown as a single database for simplification) is read in Read Data Process 415 which is optionally internal or external to Scheduling Process 405. All or a portion of the read data is passed to Predict Production or Other Performance Criteria of Next Steaming Process 420 (“Prediction Process 420”. In one embodiment of this process, oil production curve-fitted data is input from past steaming cycles, the process applies a predictive algorithm such as regression analysis, and outputs a predicted oil production curve for a future steaming cycle. Alternative output could include predicted cost or steam usage curves.
  • The output from [0031] Prediction Process 420, and any other needed data from Read Data Process 415, passes to Inut Initial/subsequent Schedules and run Fitness Function/Simulator to Rank Schedules Process 425 (“Fitness Function Process 420”). This process, in one embodiment is a simulation algorithm for simulating one or more proposed steam cycles in light of the output, e.g., oil production curves, from Prediction Process 420. Such an algorithm typically steps through each phase of the steaming cycle in the schedule being simulated, and accesses the predicted oil production curves as needed to predict the performance criteria of interest, in this case, total oil production over the course of the tested schedule.
  • Typically, several schedules are tested and then ranked based on the selected performance criteria. For example, a portion of schedules having the highest oil production are selected to survive and the remaining tested schedules are discarded. The surviving schedules from [0032] Fitness Function Process 420 are passed to Make New Schedules Process 430. In this process one or more optimization algorithms utilize the surviving schedules to make new schedules for testing. The output of several proposed schedules are passed to decision module 435 to verify of certain pre-determined constraints are met. Such constraints include, e.g., total steam usage in a proposed steaming cycle not exceed total available steam from the steam plant. A sample constraint sheet is shown in FIG. 7B.
  • There are various methods of handling proposed schedules which fail the constraints. Failing schedules may be passed to Discard or Apply Penalty Process [0033] 440 (“Penalty Process 440”). There the failing schedule is discarded or a penalty is added such that it is effectively discarded in that it will not survive the next testing in the Fitness Function Process 425. If the penalty method is applied to the failed schedules, then the failed schedules and other schedules are passed back to Fitness Function 425. This loop continues until pre-determined termination criteria are met. This is tested in Termination Criteria Met Process 445. In this process, e.g., the percent increase in oil production over prior schedules is determined and if it falls below a pre-set amount, the schedule passing the pre-determined termination criteria is the final Schedule output 450. The final Schedule 450 is stored in Schedule Database 455.
  • Various optimization algorithms known in the art may be utilized in the Make New Schedules [0034] Process 430. These include genetic algorithms. Genetic algorithms attempt to simulate natural selection by selected the most fit schedules from which to produce new schedules (offspring). Typically several generations of schedules may be produced before one meets the termination criteria. Genetic algorithms are described in U.S. Pat. No. 6,182,057 entitled Device, Method, And Program Storage Medium For Executing Genetic Algorithm, and U.S. Pat. No. 5,924,048 entitled Automated Material Balance System For Hydrocarbon Reservoirs Using a Genetic Procedure, which are each incorporated herein by reference in their entirety. Non-patent information includes, e.g., Introduction to Genetic Algorithms, (see http://lancet.mit.edu/˜mbwall/presentations/IntroToGAs/). Genetic algorithm software source code is available free over the Internet and available commercially. Commercially available genetic algorithm programs include Gene Hunter™ from Ward Systems Group Inc. (see http://wardsystems.com) and Evolver from Palisade Corp. (see http://www.palisade.com/html/evolver.html) Other potential known algorithms for use in the Make New Schedules Process 430 include simulated annealing, mixed integer nonlinear programming, and combinations thereof.
  • FIG. 5 depicts in one detailed embodiment of a conceptual view of well-production-prediction data used in testing new schedules for meeting selected objectives in accordance with the invention. FIG. 6 depicts an exemplary embodiment in graphical format of curve-fitted graphs of past well-production data input to the well-production-prediction means. [0035]
  • FIGS. 7A and 7B depict, respectively, one embodiment of pre-selected processing parameters used in the invention embodiment employing a genetic algorithm, and constraints selected, as part of the schedule optimization processing. FIG. 8 depicts one embodiment of a graphical display of change-of-oil production as a function of genetic algorithm generations, for use in the termination-criteria element of the invention. Various other termination-criteria may be used. [0036]

Claims (20)

What is claimed is:
1. A method of scheduling cyclic steaming of a plurality of petroleum-containing wells comprising:
(a) inputting to a production-predicting means a plurality of data describing at least in part the past cyclic steaming and resulting production of a plurality of petroleum-containing wells;
(b) processing said data in said production-predicting means and outputting a plurality of production predictions for said plurality of wells during a future steaming cycle;
(c) inputting said plurality of production predictions into an optimization means;
(d) inputting an initial steaming cycle schedule for said plurality of wells into said optimization means;
(e) processing said plurality of production predictions and said initial steaming cycle schedule in said optimization means by the steps comprising:
(1) determining a ranking for said initial steaming cycle schedule for said plurality of production predictions against pre-determined ranking criteria;
(2) producing in a schedule optimization algorithm a plurality of new steaming cycle schedules based on said ranking of said initial steaming cycle;
(3) determining a ranking for said new steaming cycle schedules against said pre-determined ranking criteria;
(4) repeating said production of new steaming cycle schedules and determining ranking steps until some pre-determined termination criteria are met; and
(5) outputting a final steaming cycle schedule.
2. The method of claim 1, wherein said schedule optimization algorithm is a genetic algorithm.
3. The method of claim 1, wherein said pre-determined ranking criteria are selected from the group consisting of total production, total steam usage, total water production, total cost, total energy efficiency, and mixtures thereof.
4. The method of claim 1, wherein said pre-determined termination criteria are selected from the group consisting of total iterations, percent change in said ranking criteria, and mixtures thereof.
5. The method of claim 2, wherein said genetic algorithm receives as input a plurality of chromosomes consisting of cyclic steaming schedules and the ranking criteria for each, mixes portions of two or more of each of said schedules to produce new schedules.
6. The method of claim 5, further comprising randomly modifying at least a portion of said new schedules, thereby resulting in modified new schedules which are not direct combinations of portions of the input schedules.
7. The method claim 1, wherein said inputting step (a) further comprises inputting to said production-scheduling means the output of a reservoir simulation means which models past steaming cycles of a plurality of petroleum-containing wells.
8. A system for scheduling cyclic steaming of a plurality of petroleum-containing wells comprising:
(a) a production-predicting means configured for receiving an input of a plurality of data describing at least in part the past cyclic steaming and resulting production of a plurality of petroleum-containing wells, and for processing said data outputting a plurality of production predictions for said plurality of wells during a future steaming cycle;
(b) an optimization means configured for receiving as input said output of said production-predicting means and for receiving as input steaming cycle schedules for said plurality of wells, and for processing said plurality of production predictions and said steaming cycle schedules by the steps comprising:
(1) determining a ranking for said initial steaming cycle schedule for said plurality of production predictions against a pre-determined ranking criteria;
(2) producing in a schedule optimization algorithm a plurality of new steaming cycle schedules based on said ranking of said initial steaming cycle a schedule optimization algorithm;
(3) determining a ranking for said new steaming cycle schedules against said pre-determined ranking criteria;
(4) repeating said production of new steaming cycle schedules and determining ranking steps until some pre-determined termination criteria is met; and
(5) outputting a final steaming cycle schedule.
9. The system of claim 8, wherein said schedule optimization algorithm is a genetic algorithm.
10. The system of claim 8, wherein said pre-determined ranking criteria are selected from the group consisting of total production, total steam usage, total water production, total cost, total energy efficiency, and mixtures thereof.
11. The system of claim 8, wherein said pre-determined termination criteria are selected from the group consisting of total iterations, percent change in said ranking criteria, and mixtures thereof.
12. The system of claim 9, wherein said genetic algorithm receives as input a plurality of chromosomes consisting of cyclic steaming schedules and the ranking criteria for each, mixes portions of two or more of each of said schedules to produce new schedules.
13. The system of claim 12, wherein said genetic algorithm is further configured to randomly modify at least a portion of said new schedules, thereby resulting in modified new schedules which are not direct combinations of portions of the input schedules.
14. The system claim 8, wherein said production-predicting means is further configured for receiving as input to said production-scheduling means the output of a reservoir simulation means which models past steaming cycles of a plurality of petroleum-containing wells.
15. A method of scheduling cyclic steaming of a plurality of petroleum-containing wells comprising:
(a) inputting to a production-predicting means a plurality of data describing at least in part the past cyclic steaming and resulting production of a plurality of petroleum-containing wells;
(b) processing said data in said production-predicting means and outputting a plurality of production predictions for said plurality of wells during a future steaming cycle;
(c) inputting said plurality of production predictions into an optimization means;
(d) inputting an initial steaming cycle schedule for said plurality of wells into said optimization means;
(e) processing said plurality of production predictions and said initial steaming cycle schedule in said optimization means by the steps comprising:
(1) determining a ranking for said initial steaming cycle schedule for said plurality of production predictions against pre-determined ranking criteria;
(2) producing with a genetic algorithm a plurality of new steaming cycle schedules based on said ranking of said initial steaming cycle;
(3) determining a ranking for said new steaming cycle schedules against said pre-determined ranking criteria;
(4) repeating said production of new steaming cycle schedules and determining ranking steps until some pre-determined termination criteria are met; and
(5) outputting a final steaming cycle schedule.
16. The method of claim 15, wherein said pre-determined ranking criteria are selected from the group consisting of total production, total steam usage, total water production, total cost, total energy efficiency, and mixtures thereof.
17. The method of claim 15, wherein said pre-determined termination criteria are selected from the group consisting of total iterations, percent change in said ranking criteria, and mixtures thereof.
18. The method of claim 16, wherein said genetic algorithm receives as input a plurality of chromosomes consisting of cyclic steaming schedules and the ranking criteria for each, mixes portions of two or more of each of said schedules to produce new schedules.
19. The method of claim 18, further comprising randomly modifying at least a portion of said new schedules, thereby resulting in modified new schedules which are not direct combinations of portions of the input schedules.
20. The method claim 15, wherein said inputting step (a) further comprises inputting to said production-scheduling means the output of a reservoir simulation means which models past steaming cycles of a plurality of petroleum-containing wells.
US09/816,848 2000-04-07 2001-03-23 System and method for scheduling cyclic steaming of wells Expired - Lifetime US6446721B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US09/816,848 US6446721B2 (en) 2000-04-07 2001-03-23 System and method for scheduling cyclic steaming of wells

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US19571600P 2000-04-07 2000-04-07
US09/816,848 US6446721B2 (en) 2000-04-07 2001-03-23 System and method for scheduling cyclic steaming of wells

Publications (2)

Publication Number Publication Date
US20020007947A1 true US20020007947A1 (en) 2002-01-24
US6446721B2 US6446721B2 (en) 2002-09-10

Family

ID=22722485

Family Applications (2)

Application Number Title Priority Date Filing Date
US09/816,848 Expired - Lifetime US6446721B2 (en) 2000-04-07 2001-03-23 System and method for scheduling cyclic steaming of wells
US09/834,382 Abandoned US20020002501A1 (en) 2000-04-07 2001-04-12 System and method for an independent retailer business-to-business market exchange

Family Applications After (1)

Application Number Title Priority Date Filing Date
US09/834,382 Abandoned US20020002501A1 (en) 2000-04-07 2001-04-12 System and method for an independent retailer business-to-business market exchange

Country Status (3)

Country Link
US (2) US6446721B2 (en)
AU (1) AU2001247927A1 (en)
WO (1) WO2001077941A2 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20110295771A1 (en) * 2010-05-26 2011-12-01 Matthew A Dawson Method of Distributing A Viscosity Reducing Solvent To A Set of Wells
US8684079B2 (en) 2010-03-16 2014-04-01 Exxonmobile Upstream Research Company Use of a solvent and emulsion for in situ oil recovery
US8752623B2 (en) 2010-02-17 2014-06-17 Exxonmobil Upstream Research Company Solvent separation in a solvent-dominated recovery process
US10613488B2 (en) * 2016-02-18 2020-04-07 General Electric Co. System and method for generating a schedule to extract a resource fluid from a reservoir

Families Citing this family (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7007088B1 (en) * 2000-05-31 2006-02-28 Sun Microsystems, Inc. Method and apparatus for providing an E-business audit trail in a distributed computing system
US7505923B1 (en) * 2000-06-30 2009-03-17 Tetsuro Yoshioka Network based franchise business system and method
US6519531B1 (en) * 2000-09-27 2003-02-11 Rod P. Batycky System and methods for visual interpretation of well rate allocation factors
US6978210B1 (en) * 2000-10-26 2005-12-20 Conocophillips Company Method for automated management of hydrocarbon gathering systems
US20020138320A1 (en) * 2000-12-26 2002-09-26 Appareon System, method and article of manufacture for global, device-independent deployment of a supply chain management system
US6785662B1 (en) * 2001-05-04 2004-08-31 Uop Llc Refinery scheduling of incoming crude oil using a genetic algorithm
US7797139B2 (en) * 2001-12-07 2010-09-14 Chevron U.S.A. Inc. Optimized cycle length system and method for improving performance of oil wells
AU2003210591A1 (en) * 2002-01-18 2003-09-04 Sales Automation Support, Inc. Mobile marketing system
US20040044591A1 (en) * 2002-06-19 2004-03-04 Gilliland Ramelle L. Method and system for electronic procurement involving electronic requests for quotation
CA2527864C (en) * 2003-04-30 2016-05-24 Landmark Graphics Corporation Stochastically generating facility and well schedules
KR100559180B1 (en) * 2003-05-20 2006-03-14 김민서 Electronic settlement method and server according to conditional trade
US20070282663A1 (en) * 2006-05-11 2007-12-06 Michael Best Friedrich Llp Group purchase program systems and methods
US20080283245A1 (en) * 2007-05-16 2008-11-20 Chevron U.S.A. Inc. Method and system for heat management of an oil field
US8214243B2 (en) * 2007-07-18 2012-07-03 Chevron U.S.A. Inc. Systems and methods for managing large oil field operations
WO2009012454A1 (en) * 2007-07-18 2009-01-22 Chevron U.S.A. Inc. Systems and methods for increasing safety and efficiency in oil field operations
US8615441B1 (en) 2010-11-23 2013-12-24 OE Connection LLC Automated order routing
US10467585B2 (en) * 2015-03-13 2019-11-05 Jason K. Smith Beverage product acquisition and inventory management system
US11188960B2 (en) * 2019-03-15 2021-11-30 Swapretail, Inc. Systems and methods for managing direct exchange

Family Cites Families (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3892270A (en) * 1974-06-06 1975-07-01 Chevron Res Production of hydrocarbons from underground formations
US4133382A (en) * 1977-09-28 1979-01-09 Texaco Canada Inc. Recovery of petroleum from viscous petroleum-containing formations including tar sands
US4167470A (en) 1978-05-15 1979-09-11 Karnofsky George B Process and apparatus for solvent extraction of oil from oil-containing diatomite ore
US4265310A (en) * 1978-10-03 1981-05-05 Continental Oil Company Fracture preheat oil recovery process
US4458759A (en) * 1982-04-29 1984-07-10 Alberta Oil Sands Technology And Research Authority Use of surfactants to improve oil recovery during steamflooding
US4565249A (en) 1983-12-14 1986-01-21 Mobil Oil Corporation Heavy oil recovery process using cyclic carbon dioxide steam stimulation
US4645005A (en) 1985-04-16 1987-02-24 Amoco Corporation Method of producing heavy oils
US4828031A (en) 1987-10-13 1989-05-09 Chevron Research Company In situ chemical stimulation of diatomite formations
US4986352A (en) * 1989-09-28 1991-01-22 Mobil Oil Corporation Intermittent steam injection
US4962814A (en) 1989-09-28 1990-10-16 Mobil Oil Corporation Optimization of cyclic steam in a reservoir with inactive bottom water
US5020596A (en) * 1990-01-24 1991-06-04 Indugas, Inc. Enhanced oil recovery system with a radiant tube heater
US5085276A (en) 1990-08-29 1992-02-04 Chevron Research And Technology Company Production of oil from low permeability formations by sequential steam fracturing
US5174377A (en) 1990-09-21 1992-12-29 Chevron Research And Technology Company Method for optimizing steamflood performance
CA2118885C (en) 1993-04-29 2005-05-24 Conrad K. Teran Process control system
US5415231A (en) 1994-03-21 1995-05-16 Mobil Oil Corporation Method for producing low permeability reservoirs using steam
US6625581B1 (en) * 1994-04-22 2003-09-23 Ipf, Inc. Method of and system for enabling the access of consumer product related information and the purchase of consumer products at points of consumer presence on the world wide web (www) at which consumer product information request (cpir) enabling servlet tags are embedded within html-encoded documents
US5978773A (en) * 1995-06-20 1999-11-02 Neomedia Technologies, Inc. System and method for using an ordinary article of commerce to access a remote computer
US5924048A (en) 1997-03-14 1999-07-13 Mccormack; Michael D. Automated material balance system for hydrocarbon reservoirs using a genetic procedure
US6002985A (en) 1997-05-06 1999-12-14 Halliburton Energy Services, Inc. Method of controlling development of an oil or gas reservoir
US5984010A (en) 1997-06-23 1999-11-16 Elias; Ramon Hydrocarbon recovery systems and methods
US6598026B1 (en) * 1999-01-25 2003-07-22 Nextag.Com, Inc. Methods and apparatus for brokering transactions
US20010039519A1 (en) * 2000-03-08 2001-11-08 Richards David John Cooperative buying system for purchasing consumer products using a computer network

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8752623B2 (en) 2010-02-17 2014-06-17 Exxonmobil Upstream Research Company Solvent separation in a solvent-dominated recovery process
US8684079B2 (en) 2010-03-16 2014-04-01 Exxonmobile Upstream Research Company Use of a solvent and emulsion for in situ oil recovery
US20110295771A1 (en) * 2010-05-26 2011-12-01 Matthew A Dawson Method of Distributing A Viscosity Reducing Solvent To A Set of Wells
US8899321B2 (en) * 2010-05-26 2014-12-02 Exxonmobil Upstream Research Company Method of distributing a viscosity reducing solvent to a set of wells
US10613488B2 (en) * 2016-02-18 2020-04-07 General Electric Co. System and method for generating a schedule to extract a resource fluid from a reservoir

Also Published As

Publication number Publication date
AU2001247927A1 (en) 2001-10-23
US6446721B2 (en) 2002-09-10
WO2001077941A8 (en) 2002-04-18
US20020002501A1 (en) 2002-01-03
WO2001077941A2 (en) 2001-10-18

Similar Documents

Publication Publication Date Title
US6446721B2 (en) System and method for scheduling cyclic steaming of wells
US7797139B2 (en) Optimized cycle length system and method for improving performance of oil wells
US7890307B2 (en) Method and apparatus for drilling waste disposal engineering and operations using a probabilistic approach
CA2743827C (en) Systems and methods for hydrocarbon reservoir development and management optimization
US20120130696A1 (en) Optimizing Well Management Policy
Nasir et al. Hybrid derivative-free technique and effective machine learning surrogate for nonlinear constrained well placement and production optimization
Nasrabadi et al. Well placement optimization: A survey with special focus on application for gas/gas-condensate reservoirs
Lyons et al. Well placement optimization under time-dependent uncertainty using an ensemble Kalman filter and a genetic algorithm
Feng et al. Optimizing well placement in a coalbed methane reservoir using the particle swarm optimization algorithm
Ng et al. Smart proxy modeling of a fractured reservoir model for production optimization: implementation of metaheuristic algorithm and probabilistic application
CA2505318A1 (en) Method and apparatus and program storage device for front tracking in hydraulic fracturing simulators
Annan Boah et al. Critical evaluation of infill well placement and optimization of well spacing using the particle swarm algorithm
US11119248B2 (en) Method for estimating the fractured volume in a reservoir domain by injecting a high pressure fluid
Nasir et al. Deep reinforcement learning for optimal well control in subsurface systems with uncertain geology
Nasir et al. A two-stage optimization strategy for large-scale oil field development
Kosmala et al. Coupling of a surface network with reservoir simulation
Mirzaei-Paiaman et al. Iterative sequential robust optimization of quantity and location of wells in field development under subsurface, operational and economic uncertainty
De Montleau et al. Production optimization under constraints using adjoint gradients
Curnow et al. Coupled geomechanics and fluid flow model for production optimization in naturally fractured shale reservoirs
Gharbi Economic optimization of EOR processes using knowledge-based system: case studies
Shelley et al. Granite wash completion optimization with the aid of artificial neural networks
Chen A genetic algorithm optimizer with applications to the SAGD process
Alpak et al. An optimized-hybrid in-situ-upgrading and steam-injection process for enhanced-heavy-oil recovery in a naturally fractured reservoir
Yang et al. A Physics-Based Proxy for Surface and Subsurface Coupled Simulation Models
Weiss et al. Large-scale facility expansion evaluations at the Kuparuk river field

Legal Events

Date Code Title Description
STCF Information on status: patent grant

Free format text: PATENTED CASE

FPAY Fee payment

Year of fee payment: 4

FPAY Fee payment

Year of fee payment: 8

FPAY Fee payment

Year of fee payment: 12