US20020002819A1 - Apparatus and methods for supplying auxiliary steam in a combined cycle system - Google Patents

Apparatus and methods for supplying auxiliary steam in a combined cycle system Download PDF

Info

Publication number
US20020002819A1
US20020002819A1 US09/905,982 US90598201A US2002002819A1 US 20020002819 A1 US20020002819 A1 US 20020002819A1 US 90598201 A US90598201 A US 90598201A US 2002002819 A1 US2002002819 A1 US 2002002819A1
Authority
US
United States
Prior art keywords
steam
conduit
turbine
gas turbine
auxiliary
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
US09/905,982
Other versions
US6422022B2 (en
Inventor
William Gorman
William Carberg
Charles Jones
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to US09/905,982 priority Critical patent/US6422022B2/en
Publication of US20020002819A1 publication Critical patent/US20020002819A1/en
Application granted granted Critical
Publication of US6422022B2 publication Critical patent/US6422022B2/en
Adjusted expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F02COMBUSTION ENGINES; HOT-GAS OR COMBUSTION-PRODUCT ENGINE PLANTS
    • F02CGAS-TURBINE PLANTS; AIR INTAKES FOR JET-PROPULSION PLANTS; CONTROLLING FUEL SUPPLY IN AIR-BREATHING JET-PROPULSION PLANTS
    • F02C9/00Controlling gas-turbine plants; Controlling fuel supply in air- breathing jet-propulsion plants
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01KSTEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
    • F01K23/00Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids
    • F01K23/02Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled
    • F01K23/06Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled combustion heat from one cycle heating the fluid in another cycle
    • F01K23/10Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled combustion heat from one cycle heating the fluid in another cycle with exhaust fluid of one cycle heating the fluid in another cycle
    • F01K23/106Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled combustion heat from one cycle heating the fluid in another cycle with exhaust fluid of one cycle heating the fluid in another cycle with water evaporated or preheated at different pressures in exhaust boiler
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F02COMBUSTION ENGINES; HOT-GAS OR COMBUSTION-PRODUCT ENGINE PLANTS
    • F02CGAS-TURBINE PLANTS; AIR INTAKES FOR JET-PROPULSION PLANTS; CONTROLLING FUEL SUPPLY IN AIR-BREATHING JET-PROPULSION PLANTS
    • F02C6/00Plural gas-turbine plants; Combinations of gas-turbine plants with other apparatus; Adaptations of gas-turbine plants for special use
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E20/00Combustion technologies with mitigation potential
    • Y02E20/14Combined heat and power generation [CHP]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E20/00Combustion technologies with mitigation potential
    • Y02E20/16Combined cycle power plant [CCPP], or combined cycle gas turbine [CCGT]

Definitions

  • the present invention relates to apparatus and methods for supplying auxiliary steam in a combined cycle system employing a gas turbine having steam cooling and particularly relates to a combined high pressure/low pressure system for extracting auxiliary steam from the combined cycle system and supplying the auxiliary steam to an end user, for example, steam seals and sparging devices for starting one or more additional combined cycle systems.
  • a gas turbine combusts a fuel/air mixture which expands to turn the turbine and drive a generator for the production of electricity.
  • the hot gases of combustion exhaust into a heat recovery steam generator in which water is converted to steam in the manner of a boiler.
  • Steam thus produced drives a steam turbine, typically comprising high, intermediate and low pressure turbines, in which additional work is extracted to drive a further load such as a second generator for producing additional electric power.
  • the gas and steam turbines drive a common generator and, in others, drive different generators.
  • auxiliary steam is often generated by a host system and applied to such second or additional systems for use during startup, for example, to provide auxiliary steam to the steam seals and sparging devices of such additional units.
  • Auxiliary steam is typically extracted from the exhaust of the high pressure steam turbine and supplied directly to a header which, in turn, supplies auxiliary steam to the sub-systems of the additional unit(s).
  • Auxiliary steam may also be utilized for other end purposes, for example, as process steam in co-generation applications.
  • Combined cycle systems also typically employ air-cooled gas turbines.
  • the auxiliary steam conventionally extracted from the high pressure steam turbine exhaust is sufficiently cool for direct auxiliary use without attemperation.
  • steam-cooled gas turbines are employed.
  • steam from the high pressure steam turbine flows through the steam-cooling circuit of the gas turbine and the spent cooling steam is reheated for return to the steam turbine, for example, the intermediate pressure steam turbine.
  • Low pressure steam is, of course, also supplied from the low pressure heater in the heat recovery steam generator to the steam turbine.
  • a combined cycle system employing a steam-cooled gas turbine wherein low pressure steam from the low pressure superheater of the heat recovery steam generator and normally supplied to the intermediate pressure steam turbine is diverted, at least in part, for flow through a first conduit by opening a pressure-responsive control valve.
  • the diverted flow of steam flows into a header for flowing steam to another combined cycle system during startup to steam seals, for use as sparging steam, and, when applicable, steam turbine cooling steam at startup.
  • spent cooling steam exhausting from the cooling circuit of the gas turbine may also be diverted in part from its return to the reheater by opening a pressure responsive high pressure control valve for flowing steam in a second conduit.
  • first and second steam flows are combined in a third conduit, also containing a flow nozzle for measuring the flow.
  • a water attemperator is disposed in the third conduit and a thermocouple measures the steam temperature in the header.
  • the attemperator is responsive to the measured flow and header steam temperature to reduce the temperature of the combined flows when the flow in the third conduit obtains a predetermined minimum flow and the header temperature exceeds a predetermined temperature.
  • low pressure steam from the heat recovery steam generator and high pressure spent cooling steam are combined and attemperated at a predetermined flow and header steam temperature to produce an auxiliary steam flow.
  • the attemperator is consequently used only when a predetermined minimum steam flow and temperature have been established.
  • the low pressure flow does not usually require attemperation and establishes the predetermined minimum flow.
  • the valve positions and, consequently, the flow through the first and second conduits is determined by the auxiliary steam pressure in the header to which the auxiliary steam is supplied.
  • auxiliary steam can be used as process steam for co-generation purposes.
  • Another use of the auxiliary steam is for starting other off-line combined cycle units. That is, in power generating stations having multiple combined cycle units, it is desirable to supply auxiliary steam from one operating unit to another unit during startup of the second unit.
  • Auxiliary steam is necessary during startup of a second combined cycle unit, for example, for purposes of activating the steam seals, sparging the condenser and commencing delivery of cooling steam to the steam turbine when the gas turbine and steam turbine use a common generator. Otherwise, another source of steam must be utilized, for example, from an additional boiler, which may not always be available.
  • the auxiliary steam generated by the host unit can be supplied to a second unit header for supplying auxiliary steam to the steam seals and sparging devices and for cooling the steam turbine of the second unit, if applicable. Because the auxiliary steam temperature may be too high for use in certain devices, attemperation or temperature reduction is desirable.
  • one or more additional off-line units can be started using auxiliary steam from the host unit as described and wherein the additional units may be started seriatim with short time intervals between starts.
  • the high pressure/low pressure system of this invention does not impact the steam-cooling requirements of the gas turbine of any one or more of the combined cycle units. This is significant because it is critically important that the steam flow for the cooling circuit in each gas turbine be maintained for proper cooling of the steam-cooled components thereof. Additional advantages of the present system include the use of low temperature steam from the LP HRSG system to establish a minimum flow level before the attemperator is used for the higher temperature supplemental steam.
  • each unit is provided its own steam turbine cooling, when a common generator is used, and sealing steam during full speed no-load operation after a load rejection.
  • apparatus for supplying auxiliary steam to an end user comprising a combined cycle system including a steam-cooled gas turbine, a steam turbine and a heat recovery steam generator in heat transfer relation with hot products of combustion from the gas turbine, the heat recovery steam generator including a low pressure superheater for generating steam and driving the steam turbine, a reheater for flowing spent cooling steam from the gas turbine to the steam turbine, a low pressure control valve for diverting at least a portion of the low pressure steam generated by the low pressure heater for flow through a first conduit for auxiliary steam use, a high pressure control valve for diverting at least a portion of the spent high pressure cooling steam from the gas turbine for flow thereof through a second conduit, a third conduit for receiving the low pressure and high pressure steam flows of the first and second conduits, respectively, and defining an auxiliary steam conduit for flow thereof to an end user and an attemperator in the third conduit for controlling the temperature of the auxiliary steam.
  • a combined cycle system having a steam cooled gas turbine, a steam turbine and heat recovery steam generator in heat transfer relation with hot products of combustion from the gas turbine and including a heater for generating steam and driving the steam turbine, a method of generating auxiliary steam for use by an end user, comprising the steps of diverting at least a portion of the steam generated by the heater supplied to the steam turbine for flow through a first conduit, diverting at least a portion of the spent cooling steam from the gas turbine for flow through a second conduit, combining the steam flows through the first and second conduits in a third conduit for flowing auxiliary steam to an end user and reducing the temperature of the steam in the third conduit.
  • FIG. 1 is a schematic illustration of an apparatus for supplying auxiliary steam in a combined cycle system in accordance with the present invention.
  • a combined cycle system which employs a gas turbine 12 for combusting a fuel/air mixture in a combustor 14 and supplying the hot gases of combustion to turn the turbine and generate work, for example, to drive a generator 16 for the production of electricity.
  • the turbine of course, has a compressor 18 for supplying compressed air as is conventional.
  • the hot gases of combustion exhausting from the gas turbine exhaust to a heat recovery steam generator (HRSG) 20 in which water is converted to steam in the manner of a boiler.
  • HRSG heat recovery steam generator
  • the steam thus produced drives a steam turbine, in this case represented by high pressure, intermediate pressure and low pressure turbines 22 , 24 and 26 , respectively, where additional work is extracted to also drive the generator or a second generator, not shown, for producing electricity.
  • a heat recovery steam generator typically comprises HP, IP and LP evaporators, as well as various heaters, i.e., economizers and superheaters, generally referred to as heaters, whereby the exhaust gases from the gas turbine at high temperature convert the water in the HRSG to steam for use in driving the steam turbine.
  • heaters i.e., economizers and superheaters
  • steam is also commonly extracted for use in other combined cycle systems, for example, starting the steam turbines whereby auxiliary steam is supplied to the steam seals and sparging devices of additional steam turbines.
  • the HRSG therefore, under normal operating conditions supplies low pressure, intermediate pressure and high pressure steam to the LP, IP and HP steam turbines via suitable piping arrangements, not all of which are shown.
  • the gas turbine 12 is steam cooled and most steam from the high pressure steam turbine is normally supplied to a cooling steam circuit 30 of the gas turbine via piping 32 from the high pressure steam turbine 22 .
  • the spent cooling steam exhausted from the gas turbine 12 via line 34 is normally supplied a reheater 36 via line 38 for use in the intermediate pressure turbine 24 .
  • Steam exhausting the intermediate pressure turbine 24 is supplied the low pressure turbine 26 via line 39 .
  • Steam from the low pressure superheater portion of the HRSG 20 is supplied via line 40 to the intermediate turbine 24 .
  • high pressure superheated steam is normally supplied the high pressure turbine 22 via valve 90 from the high pressure superheater, not shown, of the HRSG 20 for driving the high pressure steam turbine.
  • Most of the steam exhausting from the high pressure turbine 22 is supplied to the gas turbine steam cooling circuit 30 for cooling the gas turbine.
  • the spent cooling steam is supplied via reheater 36 to the intermediate pressure turbine 24 which, in turn, supplies steam to the low pressure turbine 26 via line 39 .
  • Each combined cycle system 10 , CC 2 , CC 3 , etc. includes a unit header 42 , 42 a , 42 b ( 42 a and 42 b are not completely shown), etc.
  • a host header 42 via piping 44 , 46 and 48 are a steam seal valve 50 , a sparging valve 52 and a cooling steam valve 54 (for a common GT/ST generator application).
  • the steam seal valve 50 couples the piping 44 to the steam seals of the steam turbine.
  • the steam valve 52 couples the steam of the header 42 to a sparging device for the condenser.
  • the valve 54 couples the steam in the header 42 to a steam cooling circuit for the steam turbine for use during startup when a common generator is used for the gas turbine and steam turbine.
  • a conduit 60 lies in communication with conduit 40 through a pressure control valve 62 .
  • Conduit 60 also lies in communication through a check valve 64 with a conduit 66 in communication with a conduit 68 for directly supplying auxiliary steam to the header 42 .
  • the control valve 62 is closed whereby steam flows from the HRSG 20 via conduit 40 to the intermediate turbine 24 .
  • the steam flowing in the low pressure conduit 40 has a pressure level which is suitable for a header system design.
  • the steam flowing in the low pressure conduit 40 has a temperature which generally meets the auxiliary steam use temperature requirements for starting additional combined cycle units and does not require cooling by attemperation.
  • the low pressure supply system may not have adequate capacity to meet all of the auxiliary steam supply requirements. Consequently, the auxiliary steam supplied from the low pressure superheater of the HRSG 20 may be supplemented by a high pressure auxiliary steam source.
  • a conduit 70 is coupled to the conduit 34 of the steam cooling circuit downstream of the gas turbine 12 and upstream of the reheater 36 for combining the spent cooling steam from the gas turbine from conduit 34 with the low pressure steam flowing via line 60 .
  • the low pressure steam in first conduit 60 is supplemented with the high pressure steam in second conduit 70 for flow in the third conduit 66 . Because the high pressure steam supply temperature is too high for auxiliary use during starting, and the temperature of the high pressure auxiliary steam flowing in line 70 is too hot for auxiliary use purposes, a temperature reduction to the steam use temperature is necessary.
  • a water attemperator 74 is provided in the third conduit 66 .
  • a water attemperator is used because a suitable steam attemperator source is not available with steam-cooled gas turbine combined cycle systems.
  • a flow nozzle 76 for measuring the flow in third conduit 66 is also provided.
  • the attemperator 74 is responsive to a predetermined minimum measured flow in conduit 66 and a predetermined temperature of the steam in header 42 to effect cooling of the auxiliary steam flowing in line 66 . That is, the attemperator is not turned on until a minimum flow through nozzle 76 and a predetermined temperature in header 42 are established.
  • the low pressure flowing from conduit 60 establishes the necessary minimum flow.
  • the flow through the conduit 70 prior to combining in conduit 66 with the flow through first conduit 60 from the low pressure source is controlled by a high pressure control valve 78 .
  • High pressure valve 78 is controlled to open at a slightly lower set point than the set point for the low pressure control valve 62 .
  • a thermocouple 79 measures the steam temperature in header 42 and provides a signal via line 81 to the attemperator should the steam temperature in header 42 exceed a predetermined temperature.
  • the intercept control valves 78 and 62 are responsive to the pressure in the header 42 .
  • the host unit 10 In operation, and to start, for example, off-line unit CC 2 using auxiliary steam from a host unit 10 , the host unit 10 is presumed operating at a suitable load. Where the units to be started are in a warm or hot condition, it is usually not necessary to attemperate the low pressure steam supply when supplying auxiliary steam.
  • the low pressure valve 62 For starting unit CC 2 , the low pressure valve 62 is opened to prewarm the header system 42 and valve 43 a is opened to prewarm header 42 a . Sealing steam to CC 2 is initiated by opening steam seal valve 50 a .
  • the host unit 10 low pressure control valve 62 will respond to provide the additional flow.
  • low pressure control valve 62 responds by providing additional low pressure steam.
  • the low pressure steam does not need to be attemperated and establishes a minimum flow requirement for attemperation if and when needed.
  • CC 2 steam use continues, such as opening steam cooling valve 54 , on a unit with a common generator for the gas and steam turbine, or as CC 3 unit is brought on-line, all of the low pressure steam flow will ultimately be utilized.
  • the additional steam flow required is provided from conduit 70 by opening high pressure control valve 78 .
  • the high pressure steam temperature is too hot for the steam uses and is cooled by the attemperator 66 by measuring the header temperature using thermocouple 79 . Water attemperation of the high temperature steam is acceptable because the low pressure flow has established the minimum flow requirement to ensure adequate mixing of steam and water.
  • Control valve 78 provide the necessary additional steam flow as needed.
  • the temperature of the low pressure steam may be too hot for the starting unit's steam seals.
  • the low pressure steam also needs to be cooled. Cooling of the low pressure steam is accomplished by opening the host unit's sparging valve 52 and admitting steam flow to the condenser. This will establish a minimum flow in the attemperator to ensure adequate steam to water mixing. Once this steam flow has been established, the low pressure steam can be attemperated to the proper temperature and the steam seal valve 50 a of the starting unit can then be opened. Sparging valve 52 a of the starting unit can then also be opened establishing additional steam flow through the host unit attemperator. Once the minimum flow in the attemperator has been established, the host unit's sparging valve 46 can be closed and the use of the auxiliary steam system continues in the normal manner.
  • the high pressure control valve 78 is reduced and closed when the steam demand is reduced.
  • the low pressure control valve 62 provides steam without attemperation. As the steam demand for the additional unit CC 2 reduces, the low pressure control valve is closed.
  • the additional unit CC 3 may be similarly started using auxiliary steam from the host unit 10 or from the second unit CC 2 in a similar manner.
  • the host unit and one or more of the additional units may operate continuously at full speed no-load (FSNL) after a load rejection to provide steam for sealing and steam turbine cooling for a single-shaft system.
  • FSNL full speed no-load
  • the steam turbine main control and reheat intercept valves 90 and 92 are closed and cooling steam is admitted, using the low pressure admission valve 94 to prevent overheating.
  • the source of steam is the low pressure conduit 40 from the HRSG. If the amount of low pressure steam via conduit 40 is insufficient, low pressure steam can be admitted to the header 42 through valve 62 with the cooling steam valve 54 open and the high pressure steam system used to supplement the low pressure steam.
  • intermediate pressure steam for sealing steam may be used.

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Engine Equipment That Uses Special Cycles (AREA)

Abstract

To provide auxiliary steam, a low pressure valve is opened in a combined cycle system to divert low pressure steam from the heat recovery steam generator to a header for supplying steam to a second combined cycle's steam turbine seals, sparging devices and cooling steam for the steam turbine if the steam turbine and gas turbine lie on a common shaft with the generator. Cooling steam is supplied the gas turbine in the combined cycle system from the high pressure steam turbine. Spent gas turbine cooling steam may augment the low pressure steam supplied to the header by opening a high pressure valve whereby high and low pressure steam flows are combined. An attemperator is used to reduce the temperature of the combined steam in response to auxiliary steam flows above a predetermined flow and a steam header temperature above a predetermined temperature. The auxiliary steam may be used to start additional combined cycle units or to provide a host unit with steam turbine cooling and sealing steam during full-speed no-load operation after a load rejection.

Description

    TECHNICAL FIELD
  • The present invention relates to apparatus and methods for supplying auxiliary steam in a combined cycle system employing a gas turbine having steam cooling and particularly relates to a combined high pressure/low pressure system for extracting auxiliary steam from the combined cycle system and supplying the auxiliary steam to an end user, for example, steam seals and sparging devices for starting one or more additional combined cycle systems. [0001]
  • BACKGROUND OF THE INVENTION
  • In a typical combined cycle system, a gas turbine combusts a fuel/air mixture which expands to turn the turbine and drive a generator for the production of electricity. The hot gases of combustion exhaust into a heat recovery steam generator in which water is converted to steam in the manner of a boiler. Steam thus produced drives a steam turbine, typically comprising high, intermediate and low pressure turbines, in which additional work is extracted to drive a further load such as a second generator for producing additional electric power. In some configurations, the gas and steam turbines drive a common generator and, in others, drive different generators. [0002]
  • In a conventional combined cycle system where additional similar combined cycle systems are employed, auxiliary steam is often generated by a host system and applied to such second or additional systems for use during startup, for example, to provide auxiliary steam to the steam seals and sparging devices of such additional units. Auxiliary steam is typically extracted from the exhaust of the high pressure steam turbine and supplied directly to a header which, in turn, supplies auxiliary steam to the sub-systems of the additional unit(s). Auxiliary steam may also be utilized for other end purposes, for example, as process steam in co-generation applications. [0003]
  • Combined cycle systems also typically employ air-cooled gas turbines. The auxiliary steam conventionally extracted from the high pressure steam turbine exhaust is sufficiently cool for direct auxiliary use without attemperation. In more recent advanced design combined cycle systems, however, steam-cooled gas turbines are employed. Thus, steam from the high pressure steam turbine flows through the steam-cooling circuit of the gas turbine and the spent cooling steam is reheated for return to the steam turbine, for example, the intermediate pressure steam turbine. Low pressure steam is, of course, also supplied from the low pressure heater in the heat recovery steam generator to the steam turbine. Given the necessity of maintaining the flow of cooling steam through the gas turbine, it no longer remains practical to use steam from the high pressure steam turbine for use as auxiliary steam because to do so reduces the necessary cooling steam for the gas turbine, causing overheating and attendant problems. Consequently, the problem addressed is the provision of auxiliary steam in a combined cycle system employing a steam-cooled gas turbine. [0004]
  • BRIEF SUMMARY OF THE INVENTION
  • In accordance with an embodiment of the present invention, there is provided a combined cycle system employing a steam-cooled gas turbine wherein low pressure steam from the low pressure superheater of the heat recovery steam generator and normally supplied to the intermediate pressure steam turbine is diverted, at least in part, for flow through a first conduit by opening a pressure-responsive control valve. The diverted flow of steam flows into a header for flowing steam to another combined cycle system during startup to steam seals, for use as sparging steam, and, when applicable, steam turbine cooling steam at startup. When additional steam flow is required, spent cooling steam exhausting from the cooling circuit of the gas turbine may also be diverted in part from its return to the reheater by opening a pressure responsive high pressure control valve for flowing steam in a second conduit. These first and second steam flows are combined in a third conduit, also containing a flow nozzle for measuring the flow. A water attemperator is disposed in the third conduit and a thermocouple measures the steam temperature in the header. The attemperator is responsive to the measured flow and header steam temperature to reduce the temperature of the combined flows when the flow in the third conduit obtains a predetermined minimum flow and the header temperature exceeds a predetermined temperature. Thus, low pressure steam from the heat recovery steam generator and high pressure spent cooling steam are combined and attemperated at a predetermined flow and header steam temperature to produce an auxiliary steam flow. The attemperator is consequently used only when a predetermined minimum steam flow and temperature have been established. The low pressure flow does not usually require attemperation and establishes the predetermined minimum flow. The valve positions and, consequently, the flow through the first and second conduits is determined by the auxiliary steam pressure in the header to which the auxiliary steam is supplied. [0005]
  • There are many different types of end uses for the generated auxiliary steam. For example, auxiliary steam can be used as process steam for co-generation purposes. Another use of the auxiliary steam is for starting other off-line combined cycle units. That is, in power generating stations having multiple combined cycle units, it is desirable to supply auxiliary steam from one operating unit to another unit during startup of the second unit. Auxiliary steam is necessary during startup of a second combined cycle unit, for example, for purposes of activating the steam seals, sparging the condenser and commencing delivery of cooling steam to the steam turbine when the gas turbine and steam turbine use a common generator. Otherwise, another source of steam must be utilized, for example, from an additional boiler, which may not always be available. Consequently, the auxiliary steam generated by the host unit can be supplied to a second unit header for supplying auxiliary steam to the steam seals and sparging devices and for cooling the steam turbine of the second unit, if applicable. Because the auxiliary steam temperature may be too high for use in certain devices, attemperation or temperature reduction is desirable. [0006]
  • It will be appreciated from the foregoing-described system that one or more additional off-line units can be started using auxiliary steam from the host unit as described and wherein the additional units may be started seriatim with short time intervals between starts. Additionally, the high pressure/low pressure system of this invention does not impact the steam-cooling requirements of the gas turbine of any one or more of the combined cycle units. This is significant because it is critically important that the steam flow for the cooling circuit in each gas turbine be maintained for proper cooling of the steam-cooled components thereof. Additional advantages of the present system include the use of low temperature steam from the LP HRSG system to establish a minimum flow level before the attemperator is used for the higher temperature supplemental steam. This minimizes the potential for water-related damage due to inadequate mixing of the steam and attemperating water. Further advantages include the use of reduced cost headers, for example, carbon steel headers instead of alloyed headers necessary for higher temperature steam. Still further, each unit is provided its own steam turbine cooling, when a common generator is used, and sealing steam during full speed no-load operation after a load rejection. [0007]
  • In a preferred embodiment according to the present invention, there is provided apparatus for supplying auxiliary steam to an end user comprising a combined cycle system including a steam-cooled gas turbine, a steam turbine and a heat recovery steam generator in heat transfer relation with hot products of combustion from the gas turbine, the heat recovery steam generator including a low pressure superheater for generating steam and driving the steam turbine, a reheater for flowing spent cooling steam from the gas turbine to the steam turbine, a low pressure control valve for diverting at least a portion of the low pressure steam generated by the low pressure heater for flow through a first conduit for auxiliary steam use, a high pressure control valve for diverting at least a portion of the spent high pressure cooling steam from the gas turbine for flow thereof through a second conduit, a third conduit for receiving the low pressure and high pressure steam flows of the first and second conduits, respectively, and defining an auxiliary steam conduit for flow thereof to an end user and an attemperator in the third conduit for controlling the temperature of the auxiliary steam. [0008]
  • In a further preferred embodiment according to the present invention, there is provided in a combined cycle system having a steam cooled gas turbine, a steam turbine and heat recovery steam generator in heat transfer relation with hot products of combustion from the gas turbine and including a heater for generating steam and driving the steam turbine, a method of generating auxiliary steam for use by an end user, comprising the steps of diverting at least a portion of the steam generated by the heater supplied to the steam turbine for flow through a first conduit, diverting at least a portion of the spent cooling steam from the gas turbine for flow through a second conduit, combining the steam flows through the first and second conduits in a third conduit for flowing auxiliary steam to an end user and reducing the temperature of the steam in the third conduit. [0009]
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • FIG. 1 is a schematic illustration of an apparatus for supplying auxiliary steam in a combined cycle system in accordance with the present invention.[0010]
  • DETAILED DESCRIPTION OF THE INVENTION
  • Referring to the single drawing FIGURE, there is illustrated a combined cycle system, generally designated [0011] 10, which employs a gas turbine 12 for combusting a fuel/air mixture in a combustor 14 and supplying the hot gases of combustion to turn the turbine and generate work, for example, to drive a generator 16 for the production of electricity. The turbine, of course, has a compressor 18 for supplying compressed air as is conventional. In a combined cycle system, the hot gases of combustion exhausting from the gas turbine exhaust to a heat recovery steam generator (HRSG) 20 in which water is converted to steam in the manner of a boiler. The steam thus produced drives a steam turbine, in this case represented by high pressure, intermediate pressure and low pressure turbines 22, 24 and 26, respectively, where additional work is extracted to also drive the generator or a second generator, not shown, for producing electricity.
  • A heat recovery steam generator typically comprises HP, IP and LP evaporators, as well as various heaters, i.e., economizers and superheaters, generally referred to as heaters, whereby the exhaust gases from the gas turbine at high temperature convert the water in the HRSG to steam for use in driving the steam turbine. When there are multiple combined cycle systems in a plant, steam is also commonly extracted for use in other combined cycle systems, for example, starting the steam turbines whereby auxiliary steam is supplied to the steam seals and sparging devices of additional steam turbines. The HRSG, therefore, under normal operating conditions supplies low pressure, intermediate pressure and high pressure steam to the LP, IP and HP steam turbines via suitable piping arrangements, not all of which are shown. [0012]
  • In advanced gas turbine design, however, the [0013] gas turbine 12 is steam cooled and most steam from the high pressure steam turbine is normally supplied to a cooling steam circuit 30 of the gas turbine via piping 32 from the high pressure steam turbine 22. As will be appreciated from the drawing FIGURE, the spent cooling steam exhausted from the gas turbine 12 via line 34 is normally supplied a reheater 36 via line 38 for use in the intermediate pressure turbine 24. Steam exhausting the intermediate pressure turbine 24 is supplied the low pressure turbine 26 via line 39. Steam from the low pressure superheater portion of the HRSG 20 is supplied via line 40 to the intermediate turbine 24. Thus, in normal operation of the combined cycle system, high pressure superheated steam is normally supplied the high pressure turbine 22 via valve 90 from the high pressure superheater, not shown, of the HRSG 20 for driving the high pressure steam turbine. Most of the steam exhausting from the high pressure turbine 22 is supplied to the gas turbine steam cooling circuit 30 for cooling the gas turbine. The spent cooling steam is supplied via reheater 36 to the intermediate pressure turbine 24 which, in turn, supplies steam to the low pressure turbine 26 via line 39.
  • Each combined [0014] cycle system 10, CC2, CC3, etc. includes a unit header 42, 42 a, 42 b (42 a and 42 b are not completely shown), etc. Connected to each header, for example, a host header 42 via piping 44, 46 and 48 are a steam seal valve 50, a sparging valve 52 and a cooling steam valve 54 (for a common GT/ST generator application). The steam seal valve 50 couples the piping 44 to the steam seals of the steam turbine. The steam valve 52 couples the steam of the header 42 to a sparging device for the condenser. Finally, the valve 54 couples the steam in the header 42 to a steam cooling circuit for the steam turbine for use during startup when a common generator is used for the gas turbine and steam turbine.
  • The following description of the combined [0015] cycle system 10 is considered as a description of the additional systems CC2, CC3, etc., which are identical to combined cycle system 10. As illustrated, low pressure steam from the HRSG superheater is provided via line 40 to the intermediate pressure turbine 24. To extract auxiliary steam from the combined cycle system, and supply auxiliary steam to the header 42, or to the headers 42 a and 42 b of systems CC2 and CC3, respectively, a conduit 60 lies in communication with conduit 40 through a pressure control valve 62. Conduit 60 also lies in communication through a check valve 64 with a conduit 66 in communication with a conduit 68 for directly supplying auxiliary steam to the header 42. During normal operation, the control valve 62 is closed whereby steam flows from the HRSG 20 via conduit 40 to the intermediate turbine 24. The steam flowing in the low pressure conduit 40 has a pressure level which is suitable for a header system design. The steam flowing in the low pressure conduit 40 has a temperature which generally meets the auxiliary steam use temperature requirements for starting additional combined cycle units and does not require cooling by attemperation. However, the low pressure supply system may not have adequate capacity to meet all of the auxiliary steam supply requirements. Consequently, the auxiliary steam supplied from the low pressure superheater of the HRSG 20 may be supplemented by a high pressure auxiliary steam source.
  • To accomplish this, a [0016] conduit 70 is coupled to the conduit 34 of the steam cooling circuit downstream of the gas turbine 12 and upstream of the reheater 36 for combining the spent cooling steam from the gas turbine from conduit 34 with the low pressure steam flowing via line 60. Thus, the low pressure steam in first conduit 60 is supplemented with the high pressure steam in second conduit 70 for flow in the third conduit 66. Because the high pressure steam supply temperature is too high for auxiliary use during starting, and the temperature of the high pressure auxiliary steam flowing in line 70 is too hot for auxiliary use purposes, a temperature reduction to the steam use temperature is necessary. To reduce the temperature of the supplementary steam for the off-line units, e.g., CC2 or CC3, a water attemperator 74 is provided in the third conduit 66. A water attemperator is used because a suitable steam attemperator source is not available with steam-cooled gas turbine combined cycle systems. A flow nozzle 76 for measuring the flow in third conduit 66 is also provided. The attemperator 74 is responsive to a predetermined minimum measured flow in conduit 66 and a predetermined temperature of the steam in header 42 to effect cooling of the auxiliary steam flowing in line 66. That is, the attemperator is not turned on until a minimum flow through nozzle 76 and a predetermined temperature in header 42 are established. The low pressure flowing from conduit 60 establishes the necessary minimum flow. The flow through the conduit 70 prior to combining in conduit 66 with the flow through first conduit 60 from the low pressure source is controlled by a high pressure control valve 78. High pressure valve 78 is controlled to open at a slightly lower set point than the set point for the low pressure control valve 62. A thermocouple 79 measures the steam temperature in header 42 and provides a signal via line 81 to the attemperator should the steam temperature in header 42 exceed a predetermined temperature.
  • It is essential that the steam cooling of the gas turbine be maintained at all times. Thus, to maintain pressure at the inlet to the gas turbine cooling system when extracting steam from the reheat system, the [0017] intercept control valves 78 and 62 are responsive to the pressure in the header 42.
  • In operation, and to start, for example, off-line unit CC[0018] 2 using auxiliary steam from a host unit 10, the host unit 10 is presumed operating at a suitable load. Where the units to be started are in a warm or hot condition, it is usually not necessary to attemperate the low pressure steam supply when supplying auxiliary steam. For starting unit CC2, the low pressure valve 62 is opened to prewarm the header system 42 and valve 43 a is opened to prewarm header 42 a. Sealing steam to CC2 is initiated by opening steam seal valve 50 a. The host unit 10 low pressure control valve 62 will respond to provide the additional flow. Similarly, as the sparging valve 43 a is opened to provide sparging steam for starting unit CC2, low pressure control valve 62 responds by providing additional low pressure steam. The low pressure steam does not need to be attemperated and establishes a minimum flow requirement for attemperation if and when needed. As CC2 steam use continues, such as opening steam cooling valve 54, on a unit with a common generator for the gas and steam turbine, or as CC3 unit is brought on-line, all of the low pressure steam flow will ultimately be utilized. The additional steam flow required is provided from conduit 70 by opening high pressure control valve 78. The high pressure steam temperature is too hot for the steam uses and is cooled by the attemperator 66 by measuring the header temperature using thermocouple 79. Water attemperation of the high temperature steam is acceptable because the low pressure flow has established the minimum flow requirement to ensure adequate mixing of steam and water. Control valve 78 provide the necessary additional steam flow as needed.
  • For starting a cold unit, the temperature of the low pressure steam may be too hot for the starting unit's steam seals. In this case the low pressure steam also needs to be cooled. Cooling of the low pressure steam is accomplished by opening the host unit's [0019] sparging valve 52 and admitting steam flow to the condenser. This will establish a minimum flow in the attemperator to ensure adequate steam to water mixing. Once this steam flow has been established, the low pressure steam can be attemperated to the proper temperature and the steam seal valve 50 a of the starting unit can then be opened. Sparging valve 52 a of the starting unit can then also be opened establishing additional steam flow through the host unit attemperator. Once the minimum flow in the attemperator has been established, the host unit's sparging valve 46 can be closed and the use of the auxiliary steam system continues in the normal manner.
  • The high [0020] pressure control valve 78 is reduced and closed when the steam demand is reduced. The low pressure control valve 62 provides steam without attemperation. As the steam demand for the additional unit CC2 reduces, the low pressure control valve is closed. The additional unit CC3 may be similarly started using auxiliary steam from the host unit 10 or from the second unit CC2 in a similar manner.
  • The host unit and one or more of the additional units may operate continuously at full speed no-load (FSNL) after a load rejection to provide steam for sealing and steam turbine cooling for a single-shaft system. With respect to [0021] unit 10, at FSNL after a load rejection, the steam turbine main control and reheat intercept valves 90 and 92 are closed and cooling steam is admitted, using the low pressure admission valve 94 to prevent overheating. The source of steam is the low pressure conduit 40 from the HRSG. If the amount of low pressure steam via conduit 40 is insufficient, low pressure steam can be admitted to the header 42 through valve 62 with the cooling steam valve 54 open and the high pressure steam system used to supplement the low pressure steam. For steam seal supply, at FSNL after a load rejection, intermediate pressure steam for sealing steam may be used.
  • While the invention has been described in connection with what is presently considered to be the most practical and preferred embodiment, it is to be understood that the invention is not to be limited to the disclosed embodiment, but on the contrary, is intended to cover various modifications and equivalent arrangements included within the spirit and scope of the appended claims. [0022]

Claims (12)

What is claimed is:
1. Apparatus for supplying auxiliary steam to an end user comprising:
a combined cycle system including a steam-cooled gas turbine, a steam turbine and a heat recovery steam generator in heat transfer relation with hot products of combustion from said gas turbine, said heat recovery steam generator including a low pressure heater for generating steam and driving said steam turbine;
a reheater for flowing spent cooling steam from said gas turbine to said steam turbine;
a low pressure control valve for diverting at least a portion of the low pressure steam generated by the low pressure heater for flow through a first conduit for auxiliary steam use;
a high pressure control valve for diverting at least a portion of the spent high pressure cooling steam from said gas turbine for flow thereof through a second conduit;
a third conduit for receiving the low pressure and high pressure steam flows of said first and second conduits, respectively, and defining an auxiliary steam conduit for flow thereof to an end user; and
a water attemperator in said third conduit for controlling the temperature of the auxiliary steam.
2. Apparatus according to claim 1 including a measuring device for measuring flow of steam in said third conduit, said attemperator being activated in response to a measurement of a predetermined steam flow in said third conduit provided by the steam flowing through said first conduit into said third conduit.
3. Apparatus according to claim 1 including a second combined cycle system including a second gas turbine, a second steam turbine and a second heat recovery steam generator in heat transfer relation with hot products of combustion from said second gas turbine for generating steam for the second steam turbine, steam seals in said second combined cycle system for the second steam turbine and a fourth conduit for connecting the third conduit to said steam seals.
4. Apparatus according to claim 1 including a second combined cycle system having a second gas turbine, a second steam turbine and a second heat recovery steam generator in heat transfer relation with hot products of combustion from said second gas turbine for generating steam for the second steam turbine, a steam sparger in said second combined cycle system for sparging water in a condenser of the second steam turbine and a fourth conduit for connecting the third conduit to said sparging device.
5. Apparatus according to claim 1 including a second combined cycle system including a second gas turbine, a second steam turbine and a second heat recovery steam generator in heat transfer relation with hot products of combustion from said second gas turbine for generating steam for the second steam turbine, a steam cooling circuit for the second steam turbine and a fourth conduit for connecting the third conduit to said steam cooling circuit.
6. In a combined cycle system having a steam cooled gas turbine, a steam turbine and heat recovery steam generator in heat transfer relation with hot products of combustion from said gas turbine and including a heater for generating steam and driving the steam turbine, a method of generating auxiliary steam for use by an end user, comprising the steps of:
diverting at least a portion of the steam generated by the heater supplied to said steam turbine for flow through a first conduit;
diverting at least a portion of the spent cooling steam from said gas turbine for flow through a second conduit;
combining the steam flows through the first and second conduits in a third conduit for flowing auxiliary steam to an end user; and
reducing the temperature of the steam in said third conduit.
7. A method according to claim 6 including reducing the temperature of the steam in said third conduit in response at least in part to a predetermined flow of steam in said third conduit.
8. A method according to claim 6 including reducing the temperature of the steam in said third conduit in response, at least in part, to a predetermined temperature of the steam in said third conduit.
9. A method according to claim 6 including reducing the temperature of the steam in said third conduit in response to a predetermined flow of steam and the temperature of the steam in the third conduit.
10. A method according to claim 6 including a second steam turbine having seals, and flowing the auxiliary steam in said third conduit to said steam seals prior to start-up of said second steam turbine.
11. A method according to claim 6 including a second steam turbine and a condensor, and flowing the auxiliary steam in said third conduit to said condensor for use as sparging steam.
12. A method according to claim 6 including a second steam turbine having a steam cooling circuit, and flowing the auxiliary steam in said third conduit to said steam cooling circuit for cooling said second steam turbine at startup thereof.
US09/905,982 1998-12-17 2001-07-17 Apparatus and methods for supplying auxiliary steam in a combined cycle system Expired - Fee Related US6422022B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US09/905,982 US6422022B2 (en) 1998-12-17 2001-07-17 Apparatus and methods for supplying auxiliary steam in a combined cycle system

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
US21325398A 1998-12-17 1998-12-17
US64066700A 2000-08-18 2000-08-18
US09/905,982 US6422022B2 (en) 1998-12-17 2001-07-17 Apparatus and methods for supplying auxiliary steam in a combined cycle system

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
US64066700A Continuation 1998-12-17 2000-08-18

Publications (2)

Publication Number Publication Date
US20020002819A1 true US20020002819A1 (en) 2002-01-10
US6422022B2 US6422022B2 (en) 2002-07-23

Family

ID=22794344

Family Applications (1)

Application Number Title Priority Date Filing Date
US09/905,982 Expired - Fee Related US6422022B2 (en) 1998-12-17 2001-07-17 Apparatus and methods for supplying auxiliary steam in a combined cycle system

Country Status (5)

Country Link
US (1) US6422022B2 (en)
EP (1) EP1010864B1 (en)
JP (1) JP4337960B2 (en)
KR (1) KR100592144B1 (en)
DE (1) DE69932025T2 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6990930B2 (en) 2003-05-23 2006-01-31 Acs Engineering Technologies Inc. Steam generation apparatus and method
CN101956607A (en) * 2009-01-09 2011-01-26 通用电气公司 Ammonia injection system for peaker cycle
US20120324862A1 (en) * 2011-06-27 2012-12-27 General Electric Company Systems and methods for steam turbine wheel space cooling
CN104763536A (en) * 2014-01-07 2015-07-08 通用电气公司 Method and system for combustion mode transfer for a gas turbine engine
US9328633B2 (en) 2012-06-04 2016-05-03 General Electric Company Control of steam temperature in combined cycle power plant

Families Citing this family (28)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6608395B1 (en) * 2000-03-28 2003-08-19 Kinder Morgan, Inc. Hybrid combined cycle power generation facility
CA2364125C (en) * 2000-11-28 2005-05-24 Mitsubishi Heavy Industries, Ltd. Steam cooling apparatus for gas turbine
JP2003083003A (en) * 2001-09-13 2003-03-19 Mitsubishi Heavy Ind Ltd Method for operating gas turbine and gas turbine combined power generating plant
WO2003091163A2 (en) * 2002-04-24 2003-11-06 Liprie Randal C Cogeneration wasteheat evaporation system and method for wastewater treatment utilizing wasteheat recovery
EP1541811A3 (en) * 2003-09-18 2005-06-22 Matsushita Electric Industrial Co., Ltd. Cogeneration system
US7284709B2 (en) * 2003-11-07 2007-10-23 Climate Energy, Llc System and method for hydronic space heating with electrical power generation
JP2006009713A (en) * 2004-06-28 2006-01-12 Hitachi Ltd Cogeneration system and energy supply system
KR100579576B1 (en) * 2004-08-17 2006-05-15 엘지전자 주식회사 Steam supply and power generation system
KR100600752B1 (en) * 2004-08-17 2006-07-14 엘지전자 주식회사 Steam supply and power generation system
KR100624815B1 (en) * 2004-08-17 2006-09-20 엘지전자 주식회사 Exhaust gas heat exchanger for cogeneration system
US7174715B2 (en) * 2005-02-02 2007-02-13 Siemens Power Generation, Inc. Hot to cold steam transformer for turbine systems
US20060233634A1 (en) * 2005-04-18 2006-10-19 General Electric Company Method of indicating sealing steam temperature and related apparatus
US20060254280A1 (en) * 2005-05-12 2006-11-16 Siemens Westinghouse Power Corporation Combined cycle power plant using compressor air extraction
EP2329144A2 (en) * 2008-09-17 2011-06-08 Siemens Concentrated Solar Power Ltd. Solar thermal power plant
US9121609B2 (en) 2008-10-14 2015-09-01 General Electric Company Method and apparatus for introducing diluent flow into a combustor
US8567199B2 (en) * 2008-10-14 2013-10-29 General Electric Company Method and apparatus of introducing diluent flow into a combustor
US20100089020A1 (en) * 2008-10-14 2010-04-15 General Electric Company Metering of diluent flow in combustor
US20100089022A1 (en) * 2008-10-14 2010-04-15 General Electric Company Method and apparatus of fuel nozzle diluent introduction
US8733104B2 (en) * 2009-03-23 2014-05-27 General Electric Company Single loop attemperation control
JP5475315B2 (en) * 2009-04-24 2014-04-16 株式会社東芝 Combined cycle power generation system
US8887481B2 (en) * 2010-12-10 2014-11-18 Alstom Technology Ltd Method for starting a combined cycle power plant
JP5912558B2 (en) * 2012-01-13 2016-04-27 三菱日立パワーシステムズ株式会社 Combined cycle power plant and control method thereof
US9145786B2 (en) 2012-04-17 2015-09-29 General Electric Company Method and apparatus for turbine clearance flow reduction
US9341113B2 (en) 2012-10-23 2016-05-17 General Electric Company Atomizing air heat exchange for heating attemperation feed water in a combined cycle turbine
RU2607118C2 (en) * 2015-02-16 2017-01-10 Евгений Глебович Шадек Method and system for deep heat recovery of boiler combustion products of thermal power plants
CN112361424B (en) * 2020-10-30 2022-04-22 广西电网有限责任公司电力科学研究院 Steam boosting heat supply method suitable for electricity cogeneration unit
CN114643292B (en) * 2022-03-17 2023-06-30 河北鑫达钢铁集团有限公司 Strip steel cooling device
CN114592936A (en) * 2022-03-18 2022-06-07 中国能源建设集团广东省电力设计研究院有限公司 Cooling steam supply method and device based on gas-steam combined cycle unit

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4391101A (en) * 1981-04-01 1983-07-05 General Electric Company Attemperator-deaerator condenser
JPH06264763A (en) * 1993-03-11 1994-09-20 Hitachi Ltd Combined plant system
US5428950A (en) * 1993-11-04 1995-07-04 General Electric Co. Steam cycle for combined cycle with steam cooled gas turbine
US5577377A (en) * 1993-11-04 1996-11-26 General Electric Co. Combined cycle with steam cooled gas turbine
DE69625147T2 (en) * 1995-09-22 2003-09-11 Toshiba Kawasaki Kk Power plant with a combined circuit
JP3564242B2 (en) * 1996-10-29 2004-09-08 三菱重工業株式会社 Cooling steam system for steam-cooled gas turbine
US6286297B1 (en) * 1997-07-02 2001-09-11 Mitsubishi Heavy Industries, Ltd. Steam cooled type combined cycle power generation plant and operation method thereof

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6990930B2 (en) 2003-05-23 2006-01-31 Acs Engineering Technologies Inc. Steam generation apparatus and method
CN101956607A (en) * 2009-01-09 2011-01-26 通用电气公司 Ammonia injection system for peaker cycle
US20120324862A1 (en) * 2011-06-27 2012-12-27 General Electric Company Systems and methods for steam turbine wheel space cooling
US8899909B2 (en) * 2011-06-27 2014-12-02 General Electric Company Systems and methods for steam turbine wheel space cooling
US9328633B2 (en) 2012-06-04 2016-05-03 General Electric Company Control of steam temperature in combined cycle power plant
CN104763536A (en) * 2014-01-07 2015-07-08 通用电气公司 Method and system for combustion mode transfer for a gas turbine engine
US20150192912A1 (en) * 2014-01-07 2015-07-09 General Electric Company Method and system for combustion mode transfer for a gas turbine engine
US9639071B2 (en) * 2014-01-07 2017-05-02 General Electric Company Method and system for combustion mode transfer for a gas turbine engine

Also Published As

Publication number Publication date
EP1010864A3 (en) 2002-08-07
KR20000048124A (en) 2000-07-25
DE69932025D1 (en) 2006-08-03
US6422022B2 (en) 2002-07-23
EP1010864B1 (en) 2006-06-21
EP1010864A2 (en) 2000-06-21
KR100592144B1 (en) 2006-06-23
DE69932025T2 (en) 2007-01-04
JP2000199407A (en) 2000-07-18
JP4337960B2 (en) 2009-09-30

Similar Documents

Publication Publication Date Title
US6422022B2 (en) Apparatus and methods for supplying auxiliary steam in a combined cycle system
US5613356A (en) Method of cooling thermally loaded components of a gas turbine group
US5428950A (en) Steam cycle for combined cycle with steam cooled gas turbine
JP3481983B2 (en) How to start a steam turbine
US5577377A (en) Combined cycle with steam cooled gas turbine
US5628179A (en) Steam attemperation circuit for a combined cycle steam cooled gas turbine
US6499302B1 (en) Method and apparatus for fuel gas heating in combined cycle power plants
US5799481A (en) Method of operating a gas-turbine group combined with a waste-heat steam generator and a steam consumer
US5412937A (en) Steam cycle for combined cycle with steam cooled gas turbine
US6244039B1 (en) Combined cycle plant having a heat exchanger for compressed air
USRE36524E (en) Steam attemperation circuit for a combined cycle steam cooled gas turbine
USRE36497E (en) Combined cycle with steam cooled gas turbine
US6141952A (en) Method of operating a combined-cycle power plant
US11879365B2 (en) Steam turbine plant and operation method, combined cycle plant and operation method
US6272841B2 (en) Combined cycle power plant
JP2002021508A (en) Condensate supply system
JP2004245184A (en) Reheat steam turbine plant and starting method for the plant
JP2002256816A (en) Combined cycle generating plant
JPH11117712A (en) Gas turbine combined plant
JP4090584B2 (en) Combined cycle power plant
EP0978636B1 (en) Combined cycle power plant
JP2001214758A (en) Gas turbine combined power generation plant facility
JPH11148315A (en) Combined cycle power plant
JP2642954B2 (en) How to start a reheat combined plant
JPH02163402A (en) Compound electric power plant and its operation

Legal Events

Date Code Title Description
FEPP Fee payment procedure

Free format text: PAYOR NUMBER ASSIGNED (ORIGINAL EVENT CODE: ASPN); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY

REMI Maintenance fee reminder mailed
FPAY Fee payment

Year of fee payment: 4

SULP Surcharge for late payment
FPAY Fee payment

Year of fee payment: 8

REMI Maintenance fee reminder mailed
LAPS Lapse for failure to pay maintenance fees
STCH Information on status: patent discontinuation

Free format text: PATENT EXPIRED DUE TO NONPAYMENT OF MAINTENANCE FEES UNDER 37 CFR 1.362

FP Lapsed due to failure to pay maintenance fee

Effective date: 20140723