US11178610B2 - Adaptive method for aggregation of distributed loads to provide emergency frequency support - Google Patents

Adaptive method for aggregation of distributed loads to provide emergency frequency support Download PDF

Info

Publication number
US11178610B2
US11178610B2 US16/392,509 US201916392509A US11178610B2 US 11178610 B2 US11178610 B2 US 11178610B2 US 201916392509 A US201916392509 A US 201916392509A US 11178610 B2 US11178610 B2 US 11178610B2
Authority
US
United States
Prior art keywords
frequency
power
nadir
switching
rofc
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active, expires
Application number
US16/392,509
Other versions
US20190380091A1 (en
Inventor
Haifeng Li
Xiao Lu
Yingmeng Xiang
Chunlei Xu
Di Shi
Zhe Yu
Shiming Xu
Xueming Li
Jiangpeng Dai
Zhiwei Wang
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Global Energy Interconnection Research Institute North America
Original Assignee
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Global Energy Interconnection Research Institute North America
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Jiangsu Electric Power Co Ltd, Global Energy Interconnection Research Institute North America filed Critical State Grid Corp of China SGCC
Priority to US16/392,509 priority Critical patent/US11178610B2/en
Publication of US20190380091A1 publication Critical patent/US20190380091A1/en
Application granted granted Critical
Publication of US11178610B2 publication Critical patent/US11178610B2/en
Active legal-status Critical Current
Adjusted expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W52/00Power management, e.g. TPC [Transmission Power Control], power saving or power classes
    • H04W52/02Power saving arrangements
    • H04W52/0209Power saving arrangements in terminal devices
    • H04W52/0212Power saving arrangements in terminal devices managed by the network, e.g. network or access point is master and terminal is slave
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B13/00Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion
    • G05B13/02Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric
    • G05B13/04Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric involving the use of models or simulators
    • G05B13/042Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric involving the use of models or simulators in which a parameter or coefficient is automatically adjusted to optimise the performance
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F1/00Details not covered by groups G06F3/00 - G06F13/00 and G06F21/00
    • G06F1/26Power supply means, e.g. regulation thereof
    • G06F1/32Means for saving power
    • G06F1/3203Power management, i.e. event-based initiation of a power-saving mode
    • G06F1/3206Monitoring of events, devices or parameters that trigger a change in power modality
    • G06F1/3209Monitoring remote activity, e.g. over telephone lines or network connections
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F1/00Details not covered by groups G06F3/00 - G06F13/00 and G06F21/00
    • G06F1/26Power supply means, e.g. regulation thereof
    • G06F1/32Means for saving power
    • G06F1/3203Power management, i.e. event-based initiation of a power-saving mode
    • G06F1/3234Power saving characterised by the action undertaken
    • G06F1/3287Power saving characterised by the action undertaken by switching off individual functional units in the computer system
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00006Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment
    • H02J13/00028Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment involving the use of Internet protocols
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/001Methods to deal with contingencies, e.g. abnormalities, faults or failures
    • H02J3/0012Contingency detection
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/12Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
    • H02J3/14Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/24Arrangements for preventing or reducing oscillations of power in networks
    • H02J3/241The oscillation concerning frequency
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W52/00Power management, e.g. TPC [Transmission Power Control], power saving or power classes
    • H04W52/02Power saving arrangements
    • H04W52/0209Power saving arrangements in terminal devices
    • H04W52/0261Power saving arrangements in terminal devices managing power supply demand, e.g. depending on battery level
    • H04W52/0274Power saving arrangements in terminal devices managing power supply demand, e.g. depending on battery level by switching on or off the equipment or parts thereof
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2310/00The network for supplying or distributing electric power characterised by its spatial reach or by the load
    • H02J2310/50The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads
    • H02J2310/56The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads characterised by the condition upon which the selective controlling is based
    • H02J2310/58The condition being electrical
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • Y02B70/3225Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02B90/20Smart grids as enabling technology in buildings sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02DCLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
    • Y02D30/00Reducing energy consumption in communication networks
    • Y02D30/70Reducing energy consumption in communication networks in wireless communication networks
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/222Demand response systems, e.g. load shedding, peak shaving

Definitions

  • This invention relates to grid power management.
  • Under-frequency load shedding (UFLS) schemes belong to special protection systems, and can cut off the load of an entire area connected to a substation or a feeder when the frequency drops to a pre-defined value, but such UFLS schemes suffer from the problem of low granularity as they could not distinguish the critical loads from the trivial loads. Also, UFLS schemes are passive methods, and could not actively respond upon the occurrence of a major disturbance before the frequency drops severely.
  • a practical hybrid strategy is instant, and the principle is online contingency estimation and centralized parameter setting for the cloud-based control center, and real-time measurement and decentralized decision making for the locally/remotely controlled outlet.
  • the instant hybrid strategy is robust and adaptive, and its performance is validated by numerical simulations.
  • systems and methods for power management by estimating power contingency of a grid at a cloud control center; performing decentralized real-time measurement and making local decisions at one more computer controlled outlets connected to the grid; and aggregating distributed loads to provide emergency frequency support to the grid.
  • an adaptive method for aggregation of distributed loads to provide emergency frequency support consists of centralized online contingency estimation and parameter setting of the cloud control center, as well as the decentralized real-time measurement and local decision-making of the smart outlets.
  • the instant method works with a smart outlet network consisting of a large number of smart outlets, the communication network and a cloud control center.
  • the decision-making for frequency control involves two major steps: (1) calculate the amount of flexible loads that need to shed based on the power system state, total amount of flexible loads, importance of the flexible loads, as well as the possible contingencies; (2) analyze the switching-off conditions of the smart outlets and send these conditions to the smart outlets.
  • the decision-making of the control center is usually conducted every few minutes.
  • the control involves two major steps: (1) Continuously measure the frequency of the power system; (2) Switch off the appliances when the switching-off conditions are satisfied, or when the switching-off commands sent from the cloud control center is received.
  • the decision-making of the control center is usually conducted in milliseconds/seconds after the disturbance.
  • the instant method is adaptive, robust, cost-effective, and fast-responsive. This method can adapt to different power system operation states, rapidly respond to frequency disturbances with fast local frequency tracking and control decision-making. Also, the cost of load shedding is reduced due to the wide-area smart outlet coordination and global optimization in the cloud control center.
  • the system can respond quickly to the increasing load demand, intermittent renewable integration, and potential risks from cyber-physical threats, and can work with aggregated flexible load demands to perform frequency regulation service, especially emergency frequency support in case of a major generator/line loss.
  • the system provides adaptive method for aggregation of distributed loads to provide emergency frequency support.
  • This method combines the centralized online contingency estimation and parameter setting of the cloud control center, and the decentralized real-time measurement and local decision-making of the smart outlets.
  • the system is fast, robust and cost-effective compared with the existing techniques like UFLS and centralized direct load control.
  • FIG. 1 shows an exemplary smart outlet network
  • FIG. 2 shows an exemplary Smart outlet structure
  • FIG. 3 shows an exemplary frequency response model of power system
  • FIG. 4 shows an exemplary system dynamics following a power deficit
  • FIG. 5 shows an exemplary relationship between the ROFC and frequency drop
  • FIG. 6 shows an exemplary control strategy of the cloud control center
  • FIG. 7 shows an exemplary smart outlet control strategy for frequency regulation
  • FIG. 8 shows an exemplary frequency drop in case of 633 MW power loss
  • FIG. 9 shows an exemplary sensitivity analysis for the relationship between the ROFC and frequency drop
  • FIG. 10 shows an exemplary frequency regulation performance of the instant method with sufficient load
  • FIG. 11 shows an exemplary influence of the amount of controllable power
  • the smart outlet network consists of a large number of smart outlets, the communication network and a cloud control center.
  • the smart outlet basically consists of a Microcontroller Unit (MCU), a measurement module, a control module, and a communication module, as shown in FIG. 2 .
  • the smart outlet can measure the voltage, current, frequency and power of the appliance connected to it using the measurement module, control the switching (e.g., on/off) of the appliance using the control module, communicate with the cloud control center using the communication module. All the computation work of the smart outlet is conducted using the MCU.
  • a smart outlet collects to the network router via wireless communication (e.g., Wifi and Lora) or wired communication (e.g., Ethernet).
  • the cloud control center can receive, store, and analyze the measurements sent from the smart outlets, send the control and setting commands to the smart outlets.
  • an adaptive method for aggregation of distributed loads to provide emergency frequency support is instant. It combines the centralized online contingency estimation and parameter setting at the cloud control center, with the decentralized real-time measurement and local decision-making of smart outlets. The detail is explained as follows.
  • This section presents the calculation of the amount of load curtailment in case of a serious contingency, e.g., a sudden loss of the generator or increase of the load.
  • a serious contingency e.g., a sudden loss of the generator or increase of the load.
  • the frequency will decrease rapidly until a minimum frequency (denoted by f nadir ) is reached due to the inertia of the generators and the frequency response of the load demands. Then the frequency will increase until a new equilibrium is achieved.
  • a typical power system frequency dynamics in response to severe power loss is shown in FIG. 4 . In FIG.
  • ⁇ P G (t) is the total increase of the power generation in per unit at time t
  • ⁇ P D (t) is the total increase of load demand in per unit at time t
  • D is the amount of load damping which indicates the sensitivity of the load in response to frequency change
  • ⁇ f(t) is the frequency change in per unit
  • H is the equivalent inertia constant of the system
  • ⁇ P SP is the change of the generator power set point
  • F H is the fraction of the power generator by the reheat turbine
  • T R is the average reheat time constant
  • K m is the power gain factor
  • R is a constant of the governor speed-droop control. It takes time to change the generator power set point, and ⁇ P SP is ignored in most cases.
  • the frequency response to the power imbalance in the frequency domain can be calculated as
  • ⁇ ⁇ ⁇ f ⁇ ( s ) R ⁇ ⁇ ⁇ n 2 DR + K m ⁇ 1 + T R ⁇ s s 2 + ⁇ n ⁇ s + ⁇ n 2 ⁇ - ⁇ ⁇ ⁇ P s ( 1 )
  • the frequency response in the time domain can be computed by inverse Laplace transform
  • ⁇ ⁇ ⁇ f ⁇ ( t ) - ⁇ j ⁇ R ⁇ ⁇ ⁇ ⁇ ⁇ P ⁇ ( t j ) DR + K m ⁇ ⁇ 1 + ⁇ ⁇ ⁇ e - ⁇ n ⁇ ( t - t j ) ⁇ sin ⁇ [ ⁇ r ⁇ ( t - t j ) + ⁇ ] ⁇ ( 8 )
  • ⁇ P(t j ) is the sudden power loss at time t j .
  • the time t nadir taken to reach f nadir can be computed as follows
  • f nadir can be obtained based on the following equation [5].
  • f nadir f n - R ⁇ ⁇ ⁇ ⁇ ⁇ P DR + K m ⁇ [ 1 + ⁇ ⁇ ⁇ e - ⁇ n ⁇ t nadir ⁇ sin ⁇ ( ⁇ r ⁇ t nadir + ⁇ ) ] ( 11 )
  • f n is the pre-contingency frequency of the steady state, and it is typically 1 in per unit.
  • One principle of the instant method is to ensure the system frequency does not drop to the point of conventional under frequency load shedding (UFLS) while minimizing the amount of load shedding by the smart outlets.
  • the starting frequency of the UFLS can be different for different systems.
  • a frequency slightly higher than the starting frequency of the UFLS, denoted as f s is chosen as the objective for the frequency control.
  • the threshold power loss ⁇ P s which makes the frequency drop to f s as the nadir frequency can be calculated as
  • the cloud control center can receive the measurements from the widely distributed smart outlets and predict the possible contingencies. Assume the maximum amount of sudden power deficit that could be induced among all the contingencies is ⁇ P max . The minimal controllable power ⁇ P v that needs to be shed to prevent the frequency from dropping below f s is calculated as
  • ⁇ ⁇ ⁇ P v ⁇ ⁇ ⁇ ⁇ P ma ⁇ ⁇ x - ⁇ ⁇ ⁇ P s if ⁇ ⁇ ⁇ ⁇ ⁇ P m ⁇ ⁇ ax > ⁇ ⁇ ⁇ P s 0 if ⁇ ⁇ ⁇ ⁇ ⁇ P ma ⁇ ⁇ x ⁇ ⁇ ⁇ P s ( 13 )
  • a typical relationship between the ROFC and the frequency can be represented as shown in FIG. 5 .
  • the corresponding frequency value f x and ROFC value g x can be obtained as
  • f x f n - R ⁇ ⁇ ⁇ ⁇ ⁇ P s DR + K m ⁇ [ 1 + ⁇ ⁇ ⁇ e - ⁇ ⁇ ⁇ ⁇ n ⁇ t x ⁇ sin ⁇ ( ⁇ r ⁇ t x + ⁇ ) ] ( 14 )
  • g x - ⁇ ⁇ ⁇ ⁇ n ⁇ R ⁇ ⁇ ⁇ ⁇ P DR + K m ⁇ e - ⁇ ⁇ ⁇ ⁇ n t x ⁇ sin ⁇ ( ⁇ r ⁇ t x + ⁇ 1 ) ( 15 )
  • the control strategy of the smart outlets in response to the frequency drop is described as follows. If the real-time frequency measurement is f x , and at the same time the ROFC measurement is lower than g x , the switching-off condition is satisfied. For robustness, the smart outlet will switch off when the switching-off condition is satisfied for multiple times.
  • the control strategy is elaborated considering more practical factors as follows.
  • the power system frequency may fluctuate in the normal operation.
  • the smart outlets should not switch off within this normal range in order to avoid the mis-tripping caused by noises or measurement errors.
  • (2) In the curve shown in FIG. 5 there is an infinite number of the (f x , g x ) pairs. It is not realistic to store every pair, as the storage within the smart outlet is limited. Also, the control strategy should not be too complicated. Thus, the frequency range between f s and f n is divided into a number of pieces, and the switching-off conditions of the smart outlets are presented in Table I.
  • the overall control strategy consisting of the cloud control center and the smart outlets are explained as follows.
  • the smart outlets measure the voltage, current, active power, reactive power, frequency, ROFC and switch status, etc. of the plugged-in appliances in real-time continuously.
  • the smart outlets periodically send the measurements to the cloud to keep the control center updated about the statuses of smart outlets.
  • the control center aggregates the widely distributed smart outlets into hierarchical blocks considering the types of appliances and their locations. Based on the measurements sent from the smart outlets, the total power of each block, as well as the total power P total of all the blocks, can be obtained. These blocks serve as the basis for the control and management of the smart outlets.
  • the blocks are not fixed but can dynamically change, merge or divide as needed.
  • the cloud control center has communication with the control center of the power system and can even be regarded as part of the power system energy management system (EMS). Based on the information from the control center of the power system, the cloud control center can update its power system model and parameters, including the equations (1)-(14).
  • EMS power system energy management system
  • the major control strategy of the cloud control center is described in FIG. 6 . Since the power system state estimation is updated every a few minutes, the control strategy shown in FIG. 6 needs to be updated every a few minutes in accordance with the state estimation. Also, when there are abundant controllable loads, i.e., P total > ⁇ P max ⁇ P s , only a selected amount of smart outlet load blocks are needed to prevent the system frequency from decreasing to below f s , and the relatively non-critical load blocks can be chosen with a priority. For the rest load blocks, they can stand by, be used to prevent the frequency drop, or be used for frequency restoration.
  • the flow chart of the smart outlet control is shown in FIG. 7 .
  • the parameters used in the power system frequency dynamics model are explained as follows.
  • the inertia constant H and the constant of the governor speed-droop control R are 5.8 s and 1/17 for a generator whose rated power is less than 100 MW, respectively; 8.1 s and 1/20 for rated power between 100 MW and 200 MW, respectively; 9.3 s and 1/22 for rated power larger than 200 MW, respectively.
  • D is 2.5
  • F H is 0.3
  • TR 8
  • Km 0.95.
  • t nadir is 3.72 seconds.
  • 49.1 Hz is chosen as the desired nadir frequency
  • the threshold power loss ⁇ P s is 633 MW which makes the frequency drop to the minimum frequency 49.1 Hz, as shown in FIG. 8 .
  • the sensitivity analysis for the relationship between the ROFC and the frequency drop is conducted for different power loss cases, as shown in FIG. 9 . It can be seen that at any frequency (e.g., 59.2 Hz), the ROFC for a higher power loss is larger than the ROFC for a lower power loss, which validates the ROFC can be used an accurate index for detecting and responding to a contingency.
  • any frequency e.g., 59.2 Hz
  • the developed smart outlets in Section III reports a frequency and a related ROFC value every 16 ms, and based on them check if any of the switching-off conditions is satisfied.
  • the smart outlet will turn off the switch when the switching-off conditions are satisfied for 3 times.
  • the response of the smart outlets in case of a sudden power loss can be analyzed.
  • a random frequency measurement error is added to each point of the frequency drop curve in FIG. 8 within the range [49.8 Hz, 49.9 Hz) to generate a new frequency drop curve with errors.
  • the generated frequency drop curve with errors is tested based on condition 1 in Table II to check whether the switching-off condition can be satisfied for 3 times.
  • 10 million frequency drop curves with errors are generated and tested to calculate the response rate.
  • the simulation results are shown in Table III. It can be shown that the instant control strategy for smart outlets is very robust and it can act very accurately (around 99.9% probability) even in case of very significant measurement noise or errors, e.g., 30% noises.
  • Case studies are conducted to verify the frequency regulation performance of the instant method when the available load is sufficient, as in FIG. 10 .
  • the power of the interconnection line is 1000 MW
  • the minimal controllable power that needs to be curtailed is 367 MW
  • the minimal controllable power will decrease to 67 MW when the power of the interconnection line is 700 MW. It is shown in FIG. 10 for these two cases that the frequency will not drop below 49.1 Hz, and the system is secure with the power provided by the outlets.

Abstract

Systems and methods are disclosed for power management by estimating power contingency of a grid at a cloud control center; performing decentralized real-time measurement and making local decisions at one more computer controlled outlets connected to the grid; and aggregating distributed loads to provide emergency frequency support to the grid.

Description

TECHNICAL FIELD
This invention relates to grid power management.
BACKGROUND
It is a critical requirement to ensure the power system frequency stability in order to provide reliable and secure power supply to the customers. The system frequency deviation is resulted as a mismatch between the load demand and the power generation due to the loss of generators, tripping of transmission lines, fluctuation of load demands, variation of the renewable generations, etc. In recent years, with the increasing penetration of power electronics interfaced generators, intermittency of the renewable generations, and arising cyber-physical threats, it becomes more challenging to maintain the frequency stability. For example, if a large generator or a tie-line carrying gigawatts of power is suddenly tripped due to lighting, grounding fault, or cyberattack, there will be a huge power imbalance in the power grid, the frequency will drop rapidly and may cause great blackouts, like happened in the 2003 Northeast Blackout in the US and Canada.
In the past, many frequency control schemes have been developed at/under different time scales and scenarios. Conventional hierarchical control including primary, secondary, and tertiary loops was designed to deal with trivial/mild disturbances, but they often become ineffective in the case of great disturbances or contingencies. Under-frequency load shedding (UFLS) schemes belong to special protection systems, and can cut off the load of an entire area connected to a substation or a feeder when the frequency drops to a pre-defined value, but such UFLS schemes suffer from the problem of low granularity as they could not distinguish the critical loads from the trivial loads. Also, UFLS schemes are passive methods, and could not actively respond upon the occurrence of a major disturbance before the frequency drops severely.
Recently, some demand response strategies including direct load control were instant as alternative frequency regulation approaches. However, their control strategies were usually centralized and heavily rely on the communication network to transfer the commands when needed, which is a heavy burden of the communication network, and make them unable to rapidly response to major contingencies, e.g., the sudden tripping of an HVDC line or major generator that can cause severe system frequency drop within seconds. While there are some distributed frequency control methods in the literature [3], they are often not adaptive to the variation of power system states and lack adequate coordination between the devices.
Thus, in this invention, a practical hybrid strategy is instant, and the principle is online contingency estimation and centralized parameter setting for the cloud-based control center, and real-time measurement and decentralized decision making for the locally/remotely controlled outlet. The instant hybrid strategy is robust and adaptive, and its performance is validated by numerical simulations.
SUMMARY OF THE INVENTION
In one aspect, systems and methods are disclosed for power management by estimating power contingency of a grid at a cloud control center; performing decentralized real-time measurement and making local decisions at one more computer controlled outlets connected to the grid; and aggregating distributed loads to provide emergency frequency support to the grid.
In another aspect, an adaptive method for aggregation of distributed loads to provide emergency frequency support is described. This method consists of centralized online contingency estimation and parameter setting of the cloud control center, as well as the decentralized real-time measurement and local decision-making of the smart outlets. The instant method works with a smart outlet network consisting of a large number of smart outlets, the communication network and a cloud control center. In the cloud control center, the decision-making for frequency control involves two major steps: (1) calculate the amount of flexible loads that need to shed based on the power system state, total amount of flexible loads, importance of the flexible loads, as well as the possible contingencies; (2) analyze the switching-off conditions of the smart outlets and send these conditions to the smart outlets. The decision-making of the control center is usually conducted every few minutes. For the smart outlets, the control involves two major steps: (1) Continuously measure the frequency of the power system; (2) Switch off the appliances when the switching-off conditions are satisfied, or when the switching-off commands sent from the cloud control center is received. The decision-making of the control center is usually conducted in milliseconds/seconds after the disturbance.
Advantages of the system may include one or more of the following. The instant method is adaptive, robust, cost-effective, and fast-responsive. This method can adapt to different power system operation states, rapidly respond to frequency disturbances with fast local frequency tracking and control decision-making. Also, the cost of load shedding is reduced due to the wide-area smart outlet coordination and global optimization in the cloud control center. The system can respond quickly to the increasing load demand, intermittent renewable integration, and potential risks from cyber-physical threats, and can work with aggregated flexible load demands to perform frequency regulation service, especially emergency frequency support in case of a major generator/line loss. The system provides adaptive method for aggregation of distributed loads to provide emergency frequency support. This method combines the centralized online contingency estimation and parameter setting of the cloud control center, and the decentralized real-time measurement and local decision-making of the smart outlets. The system is fast, robust and cost-effective compared with the existing techniques like UFLS and centralized direct load control.
BRIEF DESCRIPTIONS OF FIGURES
FIG. 1 shows an exemplary smart outlet network
FIG. 2 shows an exemplary Smart outlet structure
FIG. 3 shows an exemplary frequency response model of power system
FIG. 4 shows an exemplary system dynamics following a power deficit
FIG. 5 shows an exemplary relationship between the ROFC and frequency drop
FIG. 6 shows an exemplary control strategy of the cloud control center
FIG. 7 shows an exemplary smart outlet control strategy for frequency regulation
FIG. 8 shows an exemplary frequency drop in case of 633 MW power loss
FIG. 9 shows an exemplary sensitivity analysis for the relationship between the ROFC and frequency drop
FIG. 10 shows an exemplary frequency regulation performance of the instant method with sufficient load
FIG. 11 shows an exemplary influence of the amount of controllable power
DETAILED DESCRIPTION OF THE ILLUSTRATED EMBODIMENTS
For simplicity, the following adaptive frequency control method for utilizing aggregated flexible load demand to provide emergency frequency support service is based on the smart outlet network illustrated in FIG. 1. The smart outlet network consists of a large number of smart outlets, the communication network and a cloud control center. The smart outlet basically consists of a Microcontroller Unit (MCU), a measurement module, a control module, and a communication module, as shown in FIG. 2. The smart outlet can measure the voltage, current, frequency and power of the appliance connected to it using the measurement module, control the switching (e.g., on/off) of the appliance using the control module, communicate with the cloud control center using the communication module. All the computation work of the smart outlet is conducted using the MCU. A smart outlet collects to the network router via wireless communication (e.g., Wifi and Lora) or wired communication (e.g., Ethernet). The cloud control center can receive, store, and analyze the measurements sent from the smart outlets, send the control and setting commands to the smart outlets.
Based on the smart outlet network, an adaptive method for aggregation of distributed loads to provide emergency frequency support is instant. It combines the centralized online contingency estimation and parameter setting at the cloud control center, with the decentralized real-time measurement and local decision-making of smart outlets. The detail is explained as follows.
Determination of Minimal Controllable Load Required
This section presents the calculation of the amount of load curtailment in case of a serious contingency, e.g., a sudden loss of the generator or increase of the load. Based on the frequency response model of the power system in FIG. 3 [4], the frequency will decrease rapidly until a minimum frequency (denoted by fnadir) is reached due to the inertia of the generators and the frequency response of the load demands. Then the frequency will increase until a new equilibrium is achieved. A typical power system frequency dynamics in response to severe power loss is shown in FIG. 4. In FIG. 3, ΔPG(t) is the total increase of the power generation in per unit at time t; ΔPD(t) is the total increase of load demand in per unit at time t; D is the amount of load damping which indicates the sensitivity of the load in response to frequency change; Δf(t) is the frequency change in per unit; H is the equivalent inertia constant of the system; ΔPSP is the change of the generator power set point; FH is the fraction of the power generator by the reheat turbine; TR is the average reheat time constant; Km is the power gain factor; R is a constant of the governor speed-droop control. It takes time to change the generator power set point, and ΔPSP is ignored in most cases.
When a power mismatch between the generation and load demand suddenly happens, the system frequency will experience a dynamic change until a new equilibrium is reached. Using the Laplace transform, the frequency response to the power imbalance in the frequency domain can be calculated as
Δ f ( s ) = R ω n 2 DR + K m · 1 + T R s s 2 + ζω n s + ω n 2 · - Δ P s ( 1 ) where ω n = DR + K m 2 HR · T R ( 2 ) ζ = 2 HR + ( DR + K m F H ) T R 2 ( DR + K m ) ω n ( 3 )
Based on (1), the frequency response in the time domain can be computed by inverse Laplace transform,
Δ f ( t ) = - R Δ P DR + K m [ 1 + α e - ζ ω n t sin ( ω r t + ) ] where ( 4 ) α = 1 - 2 T R ζω n + T R 2 ω n 2 1 - ζ 2 ( 5 ) ω r = ω n 1 - ζ 2 ( 6 ) = 1 - 2 = tan - 1 ( T R ω r 1 - ζω n T R ) - tan - 1 ( 1 - ζ 2 - ζ ) ( 7 )
When there are multiple sudden power changes at different times, the frequency response is
Δ f ( t ) = - j R Δ P ( t j ) DR + K m { 1 + α e - ζω n ( t - t j ) sin [ ω r ( t - t j ) + ] } ( 8 )
where ΔP(tj) is the sudden power loss at time tj.
Given the initial power loss ΔP at time t0=0, the rate of frequency change (ROFC) g(t) can be calculated as
g ( t ) = d Δ f ( t ) dt = - α ω n R Δ P DR + K m e - ζ ω n t sin ( ω r t + 1 ) ( 9 )
When the ROFC is zero, the minimum frequency fnadir is obtained. Thus, the time tnadir taken to reach fnadir can be computed as follows
t nadir = π - 1 ω r = 1 ω r tan - 1 ( T R ω r ζ ω n T R - 1 ) ( 10 )
Thus, fnadir can be obtained based on the following equation [5].
f nadir = f n - R Δ P DR + K m [ 1 + α e - ζω n t nadir sin ( ω r t nadir + ) ] ( 11 )
where fn is the pre-contingency frequency of the steady state, and it is typically 1 in per unit.
One principle of the instant method is to ensure the system frequency does not drop to the point of conventional under frequency load shedding (UFLS) while minimizing the amount of load shedding by the smart outlets. The starting frequency of the UFLS can be different for different systems. For safety, a frequency slightly higher than the starting frequency of the UFLS, denoted as fs, is chosen as the objective for the frequency control. Hence, the threshold power loss ΔPs which makes the frequency drop to fs as the nadir frequency can be calculated as
Δ P s = ( f n - f s ) × ( DR + K m ) R × [ 1 + α e - ζ ω n t nadir sin ( ω r t nadir + ) ] ( 12 )
The cloud control center can receive the measurements from the widely distributed smart outlets and predict the possible contingencies. Assume the maximum amount of sudden power deficit that could be induced among all the contingencies is ΔPmax. The minimal controllable power ΔPv that needs to be shed to prevent the frequency from dropping below fs is calculated as
Δ P v = { Δ P ma x - Δ P s if Δ P m ax > Δ P s 0 if Δ P ma x Δ P s ( 13 )
Switching-Off Conditions of Smart Outlets
An adaptive and robust control strategy for the smart outlets is instant. A typical relationship between the ROFC and the frequency can be represented as shown in FIG. 5. Right after the loss of power ΔPs at time at any time tx, the corresponding frequency value fx and ROFC value gx can be obtained as
f x = f n - R Δ P s DR + K m [ 1 + α e - ζ ω n t x sin ( ω r t x + ) ] ( 14 ) g x = - α ω n R Δ P s DR + K m e - ζ ω n t x sin ( ω r t x + 1 ) ( 15 )
Thus, the control strategy of the smart outlets in response to the frequency drop is described as follows. If the real-time frequency measurement is fx, and at the same time the ROFC measurement is lower than gx, the switching-off condition is satisfied. For robustness, the smart outlet will switch off when the switching-off condition is satisfied for multiple times.
TABLE I
Switching-off conditions of the smart outlets
Frequency range Switching-off conditions
[fn, m, ∞) N/A
[fx, 1, fn, m) ROFC < gx, 1
[fx, 2, fx, 1) ROFC < gx, 2
. . . . . .
[fx, n, fx, n−1) ROFC < gx, n
[fs, fx, n) ROFC < 0
(−∞, fs) Unconditional switching-off
Further, the control strategy is elaborated considering more practical factors as follows. (1) The power system frequency may fluctuate in the normal operation. The smart outlets should not switch off within this normal range in order to avoid the mis-tripping caused by noises or measurement errors. (2) In the curve shown in FIG. 5, there is an infinite number of the (fx, gx) pairs. It is not realistic to store every pair, as the storage within the smart outlet is limited. Also, the control strategy should not be too complicated. Thus, the frequency range between fs and fn is divided into a number of pieces, and the switching-off conditions of the smart outlets are presented in Table I.
Overall Control Strategy
The overall control strategy consisting of the cloud control center and the smart outlets are explained as follows. The smart outlets measure the voltage, current, active power, reactive power, frequency, ROFC and switch status, etc. of the plugged-in appliances in real-time continuously. Also, the smart outlets periodically send the measurements to the cloud to keep the control center updated about the statuses of smart outlets. The control center aggregates the widely distributed smart outlets into hierarchical blocks considering the types of appliances and their locations. Based on the measurements sent from the smart outlets, the total power of each block, as well as the total power Ptotal of all the blocks, can be obtained. These blocks serve as the basis for the control and management of the smart outlets. The blocks are not fixed but can dynamically change, merge or divide as needed.
The cloud control center has communication with the control center of the power system and can even be regarded as part of the power system energy management system (EMS). Based on the information from the control center of the power system, the cloud control center can update its power system model and parameters, including the equations (1)-(14).
The major control strategy of the cloud control center is described in FIG. 6. Since the power system state estimation is updated every a few minutes, the control strategy shown in FIG. 6 needs to be updated every a few minutes in accordance with the state estimation. Also, when there are abundant controllable loads, i.e., Ptotal>ΔPmax−ΔPs, only a selected amount of smart outlet load blocks are needed to prevent the system frequency from decreasing to below fs, and the relatively non-critical load blocks can be chosen with a priority. For the rest load blocks, they can stand by, be used to prevent the frequency drop, or be used for frequency restoration.
Based on the parameter setting sent from the control center, the flow chart of the smart outlet control is shown in FIG. 7.
Case Studies
In order to verify the performance of the instant control method for emergency frequency support, case studies are performed using a modified IEEE 24-bus system. The original system [6] has 32 generators, and in this modified system the three generators on bus 23 are removed and an interconnection line between bus 23 and an external system is added. Assume the rated power of the interconnection line is 1000 MVA, thus the tripping of the interconnection line is often most serious single contingency.
The parameters used in the power system frequency dynamics model are explained as follows. The inertia constant H and the constant of the governor speed-droop control R are 5.8 s and 1/17 for a generator whose rated power is less than 100 MW, respectively; 8.1 s and 1/20 for rated power between 100 MW and 200 MW, respectively; 9.3 s and 1/22 for rated power larger than 200 MW, respectively. D is 2.5, FH is 0.3, TR is 8 and Km is 0.95. Based on the above parameters, it is calculated that tnadir is 3.72 seconds. 49.1 Hz is chosen as the desired nadir frequency, the threshold power loss ΔPs is 633 MW which makes the frequency drop to the minimum frequency 49.1 Hz, as shown in FIG. 8.
The sensitivity analysis for the relationship between the ROFC and the frequency drop is conducted for different power loss cases, as shown in FIG. 9. It can be seen that at any frequency (e.g., 59.2 Hz), the ROFC for a higher power loss is larger than the ROFC for a lower power loss, which validates the ROFC can be used an accurate index for detecting and responding to a contingency.
Thus, the specific switching-off conditions of the smart outlets can be obtained as in Table II.
TABLE II
Specific switching-off conditions of the smart outlets
Condition number Frequency range Switching-off conditions
1 [49.8, 49.9) ROFC < −0.528 Hz/s
2 [49.7, 49.8) ROFC < −0.476 Hz/s
3 [49.6, 49.7) ROFC < −0.421 Hz/s
4 [49.5, 49.6) ROFC < −0.363 Hz/s
5 [49.4, 49.5) ROFC < −0.300 Hz/s
6 [49.3, 49.4) ROFC < −0.231 Hz/s
7 [49.2, 49.3) ROFC < −0.150 Hz/s
8 [49.1, 49.2) ROFC < 0
9  [−∞, 49.1) Unconditional switching-off
TABLE III
Influence of measurement error on the smart outlet response
Maximum random error (%) Response rate
0 1.00000000
10 0.99899502
20 0.99899732
30 0.99899217
The developed smart outlets in Section III reports a frequency and a related ROFC value every 16 ms, and based on them check if any of the switching-off conditions is satisfied. The smart outlet will turn off the switch when the switching-off conditions are satisfied for 3 times.
Based on Table II, the response of the smart outlets in case of a sudden power loss can be analyzed. A random frequency measurement error is added to each point of the frequency drop curve in FIG. 8 within the range [49.8 Hz, 49.9 Hz) to generate a new frequency drop curve with errors. The generated frequency drop curve with errors is tested based on condition 1 in Table II to check whether the switching-off condition can be satisfied for 3 times. For each case of error, 10 million frequency drop curves with errors are generated and tested to calculate the response rate. The simulation results are shown in Table III. It can be shown that the instant control strategy for smart outlets is very robust and it can act very accurately (around 99.9% probability) even in case of very significant measurement noise or errors, e.g., 30% noises.
Case studies are conducted to verify the frequency regulation performance of the instant method when the available load is sufficient, as in FIG. 10. When the power of the interconnection line is 1000 MW, the minimal controllable power that needs to be curtailed is 367 MW; and the minimal controllable power will decrease to 67 MW when the power of the interconnection line is 700 MW. It is shown in FIG. 10 for these two cases that the frequency will not drop below 49.1 Hz, and the system is secure with the power provided by the outlets.
Also, sensitivity studies are carried out to check the influence of different amount of controllable power on the contingency. Assume a sudden power loss of 1000 MW, the system frequency dynamics in case of different amounts of controllable load is presented in FIG. 11. It can be seen when the amount of controllable load is not sufficient, it is unable to prevent the frequency from dropping below 49 Hz, but it can reduce the speed of frequency drop; with the increase of the amount of controllable load, the system is increasingly secure.

Claims (17)

What is claimed is:
1. A method for power management, comprising:
estimating power contingency of a grid at a cloud control center;
performing decentralized real-time measurement and making local decisions at one or more locally or remotely controlled outlets connected to the grid; and
aggregating distributed loads to provide emergency frequency support to the grid, wherein the control center aggregates the locally or remotely controlled outlets into hierarchical blocks based on appliance types and locations.
2. The method of claim 1, wherein in the cloud control center, performing decision-making for frequency control by determining one or more flexible loads to shed based on the power system state, total amount of flexible loads, importance of the flexible loads, and possible contingencies.
3. The method of claim 1, wherein in the cloud control center, performing decision-making for frequency control by analyzing switching-off conditions of the computer controlled outlets and send the conditions to the computer controlled outlets.
4. The method of claim 1, comprising continuously measuring a frequency of the grid at the locally/remotely controlled outlets.
5. The method of claim 4, comprising switching off one or more appliances when switching-off conditions are satisfied, or when switching-off commands sent from the cloud control center.
6. The method of claim 1, wherein the locally/remotely controlled outlets measure voltage, current, active power, reactive power, frequency, rate of frequency change (ROFC), and switch status one or more plugged-in appliances in real-time continuously.
7. The method of claim 1, wherein from measurements sent from the outlets and a total power of each block, and total power of all blocks are used to control and manage the outlets.
8. The method of claim 1, comprising updating power system model and parameters.
9. The method of claim 1, comprising determing a frequency response in the time domain as
Δ f ( t ) = - R Δ P DR + K m [ 1 + α e - ζ ω n t sin ( ω r t + ) ] where α = 1 - 2 T R ζω n + T R 2 ω n 2 1 - ζ 2 ω r = ω n 1 - ζ 2 = 1 - 2 = tan - 1 ( T R ω r 1 - ζω n T R ) - tan - 1 ( 1 - ζ 2 - ζ ) ω n = DR + K m 2 HR · T R ζ = 2 HR + ( DR + K m F H ) T R 2 ( DR + K m ) ω n
Δf (t) is the frequency change; R is a constant of the governor speed-droop control; ΔP is the initial power loss; D is the amount of load damping which indicates the sensitivity of the load in response to frequency change; Km is the power gain factor; H is the equivalent inertia constant of the system; ΔPsp is the change of the generator power set point; FH is the fraction of the power generator by the reheat turbine.
10. The method of claim 1, comprising receiving an initial power loss AP at time t0=0, and determining a rate of frequency change (ROFC) g (t) as:
g ( t ) = d Δ f ( t ) dt = - αω n R Δ P DR + K m e - ζ ω n t sin ( ω r t + 1 ) ]
11. The method of claim 1, 3, when the ROFC is zero, comprising determining a minimumn frequency fnadir and a time tnadir taken to reach fnadir:
t nadir = π - 1 ω r = 1 ω r tan - 1 ( T R ω r ζ ω n T R - 1 )
12. The method of claim 1, comprising determining fnadir as:
f nadir = f n - R Δ P DR + K m [ 1 + α e - ζω n t nadir sin ( ω r t nadir + ) ]
where fn, is the pre-contingency frequency of the steady state.
13. The method of claim 1, comprising ensuring a system frequency does not drop to below a under frequency load shedding (UFLS) point while minimizing the amount of load shedding by the controlled outlets.
14. The method of claim 1 or 8, comprising determining a threshold power loss ΔPs, as
Δ P s = ( f n - f s ) × ( DR + K m ) R × [ 1 + α e - ζω n t nadir sin ( ω r t nadir + ) ]
where fs is the minimal frequency allowed for the frequency control strategy.
15. The method of claim 1, comprising determining a minimal controllable power ΔPv, to be shed to prevent the frequency from dropping below fs as:
Δ P v = { Δ P ma x - Δ P s if Δ P ma x > Δ P s 0 if Δ P ma x Δ P s
where a maximum amount of sudden power deficit induced among all the contingencies is Pmax.
16. The method of claim 1 or 5 comprising determing the frequency value fx, and related ROFC value gx, after the loss of power ΔPs, at time at any time tx as
f x = f n - R Δ P s DR + K m [ 1 + α e - ζ ω n t x sin ( ω r t x + ) ] g x = αω n R Δ P s DR + K m e - ζ ω n t x sin ( ω r t x + 1 )
17. The method of claim 1 or 5 comprising locally determining the switching as: if the real-time frequency measurement is fx, and at the same time the ROFC measurement is lower than gx, the switching-off condition is satisfied, for robustness, the locally/remotely controlled outlet will switch off when the switching-off condition is satisfied for multiple times.
US16/392,509 2018-06-07 2019-04-23 Adaptive method for aggregation of distributed loads to provide emergency frequency support Active 2040-02-11 US11178610B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US16/392,509 US11178610B2 (en) 2018-06-07 2019-04-23 Adaptive method for aggregation of distributed loads to provide emergency frequency support

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US201862681806P 2018-06-07 2018-06-07
US16/392,509 US11178610B2 (en) 2018-06-07 2019-04-23 Adaptive method for aggregation of distributed loads to provide emergency frequency support

Publications (2)

Publication Number Publication Date
US20190380091A1 US20190380091A1 (en) 2019-12-12
US11178610B2 true US11178610B2 (en) 2021-11-16

Family

ID=68763689

Family Applications (1)

Application Number Title Priority Date Filing Date
US16/392,509 Active 2040-02-11 US11178610B2 (en) 2018-06-07 2019-04-23 Adaptive method for aggregation of distributed loads to provide emergency frequency support

Country Status (1)

Country Link
US (1) US11178610B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10990068B2 (en) * 2018-05-29 2021-04-27 Abb Schweiz Ag Technologies for providing cloud-based management of an electrical grid
US11042132B2 (en) * 2019-06-07 2021-06-22 Battelle Memorial Institute Transformative remedial action scheme tool (TRAST)
CN112564032B (en) * 2020-11-27 2023-03-28 国网四川省电力公司德阳供电公司 Adjusting method for setting line of low-frequency load shedding protection device of city power grid

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6314378B1 (en) * 1996-04-01 2001-11-06 Clc Global Llc Distributed frequency relay
US7242114B1 (en) * 2003-07-08 2007-07-10 Cannon Technologies, Inc. Thermostat device with line under frequency detection and load shedding capability
US20130321040A1 (en) * 2012-05-31 2013-12-05 General Electric Company Method and system for using demand response to provide frequency regulation
US20190027933A1 (en) * 2015-07-28 2019-01-24 Battelle Memorial Institute Frequency threshold determination for frequency-responsive load controllers

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6314378B1 (en) * 1996-04-01 2001-11-06 Clc Global Llc Distributed frequency relay
US7242114B1 (en) * 2003-07-08 2007-07-10 Cannon Technologies, Inc. Thermostat device with line under frequency detection and load shedding capability
US20130321040A1 (en) * 2012-05-31 2013-12-05 General Electric Company Method and system for using demand response to provide frequency regulation
US20190027933A1 (en) * 2015-07-28 2019-01-24 Battelle Memorial Institute Frequency threshold determination for frequency-responsive load controllers

Also Published As

Publication number Publication date
US20190380091A1 (en) 2019-12-12

Similar Documents

Publication Publication Date Title
Seethalekshmi et al. A synchrophasor assisted frequency and voltage stability based load shedding scheme for self-healing of power system
Hoseinzadeh et al. Adaptive tuning of frequency thresholds using voltage drop data in decentralized load shedding
Islam et al. Coordinated decentralized emergency voltage and reactive power control to prevent long-term voltage instability in a power system
US11178610B2 (en) Adaptive method for aggregation of distributed loads to provide emergency frequency support
US20170017298A1 (en) Real time control of voltage stability of power systems at the transmission level
EP2381094B1 (en) Energy network and control thereof
Santos et al. A new real-time multi-agent system for under frequency load shedding in a smart grid context
Modarresi et al. New adaptive and centralised under‐voltage load shedding to prevent short‐term voltage instability
Rajalwal et al. Recent trends in integrity protection of power system: A literature review
JP7131971B2 (en) Power system stabilization system and power system stabilization method
Kulkarni et al. Study of power system load shedding scheme based on dynamic simulation
Peng et al. Online inertia allocation for grid-connected renewable energy systems based on generic ASF model under frequency nadir constraint
Riquelme-Dominguez et al. Improved harmony search algorithm to compute the underfrequency load shedding parameters
Kerin et al. Small signal security index for contingency classification in dynamic security assessment
CN110458330B (en) Cascade section splitting optimization method and system based on grey correlation analysis method
Li et al. An under-frequency load shedding scheme with continuous load control proportional to frequency deviation
Voropai et al. Smart technologies in emergency control of Russia's unified energy system
Bevrani et al. An ANN-based power system emergency control scheme in the presence of high wind power penetration
Liang et al. Adaptive critic design based dynamic optimal power flow controller for a smart grid
Verdugo et al. Implementation of a Real Phasor Based Vulnerability Assessment and Control Scheme: The Ecuadorian WAMPAC System
Santos et al. Real-time closed loop system controlled by an Artificial Neural Network for estimation of the optimal load shedding
Chang et al. Simplified frequency estimation for unit scheduling criteria for grids with high wind penetration
Santos et al. A Holistic Fuzzy Measure for Load Priority in Under Frequency Load Shedding Schemes
Petrichenko et al. Development and integration of adaptive underfrequency load shedding into the smart grid
Awadalla et al. An approach to controlled islanding based on PMU measurements

Legal Events

Date Code Title Description
FEPP Fee payment procedure

Free format text: ENTITY STATUS SET TO UNDISCOUNTED (ORIGINAL EVENT CODE: BIG.); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY

STPP Information on status: patent application and granting procedure in general

Free format text: DOCKETED NEW CASE - READY FOR EXAMINATION

STPP Information on status: patent application and granting procedure in general

Free format text: NON FINAL ACTION MAILED

STPP Information on status: patent application and granting procedure in general

Free format text: RESPONSE TO NON-FINAL OFFICE ACTION ENTERED AND FORWARDED TO EXAMINER

STPP Information on status: patent application and granting procedure in general

Free format text: NOTICE OF ALLOWANCE MAILED -- APPLICATION RECEIVED IN OFFICE OF PUBLICATIONS

STPP Information on status: patent application and granting procedure in general

Free format text: AWAITING TC RESP., ISSUE FEE NOT PAID

STPP Information on status: patent application and granting procedure in general

Free format text: NOTICE OF ALLOWANCE MAILED -- APPLICATION RECEIVED IN OFFICE OF PUBLICATIONS

STPP Information on status: patent application and granting procedure in general

Free format text: PUBLICATIONS -- ISSUE FEE PAYMENT RECEIVED

STPP Information on status: patent application and granting procedure in general

Free format text: PUBLICATIONS -- ISSUE FEE PAYMENT VERIFIED

STCF Information on status: patent grant

Free format text: PATENTED CASE