TWM454435U - Scaffold - Google Patents

Scaffold Download PDF

Info

Publication number
TWM454435U
TWM454435U TW101222737U TW101222737U TWM454435U TW M454435 U TWM454435 U TW M454435U TW 101222737 U TW101222737 U TW 101222737U TW 101222737 U TW101222737 U TW 101222737U TW M454435 U TWM454435 U TW M454435U
Authority
TW
Taiwan
Prior art keywords
positioning
construction frame
axial
disposed
inserts
Prior art date
Application number
TW101222737U
Other languages
Chinese (zh)
Inventor
Yukio Yamane
Original Assignee
Yukio Yamane
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yukio Yamane filed Critical Yukio Yamane
Priority to TW101222737U priority Critical patent/TWM454435U/en
Publication of TWM454435U publication Critical patent/TWM454435U/en
Priority to JP2013156202A priority patent/JP5422075B1/en
Priority to PCT/JP2013/081452 priority patent/WO2014080998A1/en
Priority to CN201380012557.0A priority patent/CN104487637A/en
Priority to US14/418,077 priority patent/US20150152654A1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G7/00Connections between parts of the scaffold
    • E04G7/30Scaffolding bars or members with non-detachably fixed coupling elements
    • E04G7/32Scaffolding bars or members with non-detachably fixed coupling elements with coupling elements using wedges
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/006Scaffold with cantilevered sections, e.g. to accommodate overhangs or recesses in the facade
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/06Consoles; Brackets
    • E04G5/061Consoles; Brackets specially adapted for attachment to scaffolds
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G7/00Connections between parts of the scaffold
    • E04G7/02Connections between parts of the scaffold with separate coupling elements
    • E04G7/06Stiff scaffolding clamps for connecting scaffold members of common shape
    • E04G7/20Stiff scaffolding clamps for connecting scaffold members of common shape for ends of members only, e.g. for connecting members in end-to-end relation
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G7/00Connections between parts of the scaffold
    • E04G7/30Scaffolding bars or members with non-detachably fixed coupling elements
    • E04G7/302Scaffolding bars or members with non-detachably fixed coupling elements for connecting crossing or intersecting bars or members
    • E04G7/306Scaffolding bars or members with non-detachably fixed coupling elements for connecting crossing or intersecting bars or members the added coupling elements are fixed at several bars or members to connect
    • E04G7/308Scaffolding bars or members with non-detachably fixed coupling elements for connecting crossing or intersecting bars or members the added coupling elements are fixed at several bars or members to connect without tying means for connecting the bars or members
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16BDEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES; JOINTS OR JOINTING
    • F16B7/00Connections of rods or tubes, e.g. of non-circular section, mutually, including resilient connections
    • F16B7/22Connections of rods or tubes, e.g. of non-circular section, mutually, including resilient connections using hooks or like elements
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16BDEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES; JOINTS OR JOINTING
    • F16B2200/00Constructional details of connections not covered for in other groups of this subclass
    • F16B2200/10Details of socket shapes

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Mutual Connection Of Rods And Tubes (AREA)
  • Emergency Lowering Means (AREA)

Description

施工架Construction frame

本創作係一種施工架,尤指一種透過模組化可快速組裝的施工架。This creation is a construction frame, especially a construction frame that can be quickly assembled through modularization.

目前對於建築物或其外牆之施工方式,多是利用搭設施工架的方式來進行,其主要是搭設在建築物外部之結構,用來提供設置踏板讓施工人員進行建築物之施工建造、整修維護或粉刷清潔之用,或是建立護欄結構讓施工人員可在一個具有安全防護的環境下作業。At present, the construction methods of buildings or their external walls are mostly carried out by means of building facilities. The structure is mainly located outside the building to provide pedals for construction workers to construct and renovate the buildings. Maintenance or painting for cleaning, or the construction of a guardrail structure allows the constructor to work in a safe environment.

此外,由於施工架必需配合建築物之高度而向上搭建,以供施工人員進行上下移動或立足施工,因此整體施工所需之施工架數量極為龐大,且於施工之前必須先行予以搭建,於完工之後又必須將該建築物周邊所搭設之施工架一一拆除,因此造成了安裝上與使用上之不便。In addition, since the construction frame must be built up to match the height of the building, so that the construction workers can move up and down or stand on the ground, the number of construction frames required for the overall construction is extremely large, and must be built before construction. The construction frames that are placed around the building must be removed one by one, thus causing inconvenience in installation and use.

又由於施工架具有支撐用的垂直部位,與提供施工人員握持與踩踏之水平部位,藉此讓施工人員能沿著施工架上下移動於牆外進行施工,但目前的施工架尺寸為固定尺寸,並不會因為施工人員高度而有所不同,若是施工人員身高過矮時,將會有不易攀爬之使用情況,更是會提高攀爬過程之危險性,又為了防止高處施工人員有墜落之危險性,施工人員皆會於身上連繫有一安全鎖,並由安全鎖之另一端連接有一掛鉤,利用掛鉤 鉤扣於施工架與身體之間,進而提高移動之安全性,然而,由於扣具於施工架上扣固位置較少,使得多數施工人員皆會攀爬到指定施工位置時,才將扣具扣上,因此提高了通行過程中的危險性。Moreover, because the construction frame has vertical parts for support and provides a horizontal position for the construction personnel to hold and step on, thereby allowing the construction personnel to move up and down the wall along the construction frame for construction, but the current construction frame size is a fixed size. It will not be different because of the height of the construction personnel. If the height of the construction workers is too short, there will be difficulties in climbing, and it will increase the danger of the climbing process, and in order to prevent the construction workers from having high places. The danger of falling, the construction personnel will have a safety lock attached to the body, and a hook is connected to the other end of the safety lock. The hook is fastened between the construction frame and the body to improve the safety of the movement. However, since the fastening device has a small fastening position on the construction frame, most construction workers will climb to the designated construction position, and then the buckle will be Fastened, thus increasing the risk of passing.

有鑒於習知所遭遇的問題,本創作之主要目的在於提供一個一種施工架,係透過結構模組化的方式達到快速組立裝配目的的施工架。In view of the problems encountered in the prior art, the main purpose of the creation is to provide a construction frame, which is a construction frame that achieves rapid assembly and assembly through modularization of the structure.

根據本創作施工架係設置於待施工物件處的複數個支架體上,前述的施工架至少包含有複數軸向定位組件與至少一徑向定位組件,其中複數軸向定位組件分別設置於上述的支架體上,且每一個軸向定位組件還具有管體與定位件,其中管體係套設於上述支架體的其中之一上,而定位件則環設於管體外壁上。前述的徑向定位組件,設置於二個軸向定位組件之間,且徑向定位組件包括有至少二插固件與一個連結件,其中連結件的二端分別連接於插固件,而每一個插固件則分別插設於定位件中。According to the present invention, the construction frame is disposed on a plurality of bracket bodies at the object to be constructed, and the foregoing construction frame comprises at least a plurality of axial positioning components and at least one radial positioning component, wherein the plurality of axial positioning components are respectively disposed on the above The bracket body, and each of the axial positioning components further has a tube body and a positioning member, wherein the tube system is sleeved on one of the bracket bodies, and the positioning member is annularly disposed on the outer wall of the tube. The radial positioning assembly is disposed between two axial positioning assemblies, and the radial positioning assembly comprises at least two inserts and a connecting member, wherein the two ends of the connecting member are respectively connected to the inserting piece, and each of the inserting portions The firmware is inserted into the positioning member.

根據上述本創作施工架的實施例,其中定位件具有套管部以及複數個插槽,且這些插槽係以等分方式配置於套管部的周緣,而在每二個相鄰的插槽之間,形成有一間隔空間。According to the embodiment of the present invention, the positioning member has a sleeve portion and a plurality of slots, and the slots are disposed in an equally divided manner on the circumference of the sleeve portion, and in each of the two adjacent slots. Between them, a space is formed.

根據上述本創作施工架的實施例,其中每一個軸向定位組 件更包括有環形套件,且環形套件係套設於定位件外緣,此外,環形套件對應於間隔空間的部分即成為一個扣勾部,可供施工人員的安全索鎖扣卡扣於其上。According to the embodiment of the above-mentioned creative construction frame, each of the axial positioning groups The device further includes a ring sleeve, and the ring sleeve is sleeved on the outer edge of the positioning member. In addition, the portion of the ring sleeve corresponding to the space is a buckle portion, and the safety cable lock of the constructor can be buckled thereon. .

根據上述本創作施工架的實施例,其中各個插槽分別具有插入口及伸出口,且插入口的口徑大於伸出口的口徑,使得各個插槽形成上寬下窄的梯形結構,而梯形結構的斜邊係遠離於管體,各個插固件則具有一插入部,且插入部具有對應該梯形結構斜邊的斜面。According to the embodiment of the present invention, each of the slots has an insertion opening and an extension opening, and the diameter of the insertion opening is larger than the diameter of the protruding opening, so that each slot forms a wide and narrow trapezoidal structure, and the trapezoidal structure The beveled edge is away from the tubular body, and each of the inserts has an insertion portion, and the insertion portion has a slope corresponding to the oblique side of the trapezoidal structure.

根據上述本創作施工架的實施例,其中該斜面的長度大於該梯形結構斜邊的長度。According to an embodiment of the present invention, wherein the length of the slope is greater than the length of the oblique side of the ladder structure.

根據上述本創作施工架的實施例,其中各個插固件具有抵緊面,且抵緊面係對應於管體的側壁設置,此外,抵緊面還具有一曲弧面,且曲弧面之曲度對應於管體的側壁弧度。According to the embodiment of the present invention, wherein each of the inserts has an abutting surface, and the abutting surface is disposed corresponding to the side wall of the pipe body, and further, the abutting surface further has a curved surface, and the curved surface is curved. The degree corresponds to the curvature of the side wall of the tube.

根據上述本創作施工架的實施例,更包括複數個定位插銷,而其中的至少二個定位插銷係以十字交錯的方式,徑向貫穿管體與支架體,且位於插固件的上方,藉以限制插固件自定位件中脫出。According to the embodiment of the above-mentioned creative construction frame, a plurality of positioning pins are further included, and at least two positioning pins are radially inserted through the pipe body and the bracket body in a cross-staggered manner, and are located above the inserting body, thereby limiting The plug-in firmware is released from the positioning member.

根據上述本創作施工架的實施例,其中管體的長度至少包括有三種以上不同的長度。According to an embodiment of the present invention, the length of the tubular body includes at least three different lengths.

請參閱第1圖及第2圖,第1圖係本創作施工架之立體 組合示意圖,第2圖係本創作施工架之立體分解示意圖,如圖所示:係為施工架的一種實施例,通常設置於待施工物件處的複數個支架體10(請先共同參閱第7圖)上,在本實施例中的施工架包含有複數個軸向定位組件20與至少一個徑向定位組件30(於實際使用時通常包括有複數個徑向定位組件),其中前述的徑向定位組件30通常設置於二個軸向定位組件20之間,而徑向定位組件30可以例如是護欄的結構、平台的結構或工作架的結構,如此一來,藉由軸向定位組件20與徑向定位組件30的組合,便可提供一個安全防護週全的工作環境於施工物件處的複數個支架體上,使施工人員可以進行相關的施工作業。以下便再詳細說明本實施例中軸向定位組件20與徑向定位組件30的構成。Please refer to Figure 1 and Figure 2, Figure 1 is the three-dimensional construction of the creation The schematic diagram of the combination, the second figure is a three-dimensional exploded view of the construction frame, as shown in the figure: is an embodiment of the construction frame, usually set in a plurality of bracket bodies 10 at the object to be constructed (please refer to the seventh together) In the figure, the construction frame in this embodiment comprises a plurality of axial positioning assemblies 20 and at least one radial positioning assembly 30 (usually including a plurality of radial positioning assemblies in actual use), wherein the aforementioned radial direction The positioning assembly 30 is generally disposed between the two axial positioning assemblies 20, and the radial positioning assembly 30 can be, for example, a structure of a guardrail, a structure of a platform, or a structure of a work frame, such that the axial positioning assembly 20 is The combination of the radial positioning assembly 30 provides a safe and comprehensive working environment on a plurality of bracket bodies at the construction object, so that the construction personnel can carry out related construction work. The configuration of the axial positioning assembly 20 and the radial positioning assembly 30 in this embodiment will be described in detail below.

首先,上述的複數軸向定位組件20,在本實施例中係以二個為例,其分別對應設置於上述的支架體上,並位於同一水平面,以下請共同參閱第3圖及第4圖所示,第3圖係本創作施工架之軸向定位組件立體組合示意圖。第4圖係本創作施工架之軸向定位組件立體分解示意圖。如圖所示:每一該軸向定位組件20各具有管體21、定位件22與環形套件23,其中定位件22係環設於管體21外壁上,且更包括有套管部221以及複數個插槽222,該些插槽222係以等分方式配置於套管部221的周緣,而在每二個相鄰的插槽222之間再形成有間隔空間226,此外,上述的環形套件23係套設於定位件22 的外緣,此時環形套件23對應於間隔空間226的部分即成為一個扣勾部231,利用此扣勾部231可供施工人員的安全索鎖扣卡扣於其上,藉以作為安全防護之用。而管體21係用於套設在支架體10的其中之一上,如此便完成了軸向定位組件的組裝,並可於支架體上提供一個定位點,供施工者使用或提供其他施工件組裝之用。First, the above-mentioned plurality of axial positioning assemblies 20 are exemplified by two in the embodiment, which are respectively disposed on the bracket body and are located on the same horizontal plane. Please refer to FIG. 3 and FIG. 4 together. As shown, the third figure is a three-dimensional combination diagram of the axial positioning components of the artificial construction frame. Figure 4 is a perspective exploded view of the axial positioning assembly of the present construction frame. As shown in the figure, each of the axial positioning assemblies 20 has a tubular body 21, a positioning member 22 and an annular sleeve 23, wherein the positioning member 22 is looped on the outer wall of the tubular body 21, and further includes a sleeve portion 221 and a plurality of slots 222 are disposed in an equal manner on the circumference of the sleeve portion 221, and a space 226 is formed between each two adjacent slots 222. Further, the above ring is formed. The kit 23 is sleeved on the positioning member 22 The outer edge of the ring sleeve 23 corresponding to the space 226 at this time becomes a buckle hook portion 231, and the buckle hook portion 231 can be used for the safety cable lock of the construction worker to be buckled thereon, thereby being used as a safety protection. use. The tubular body 21 is used for arranging on one of the bracket bodies 10, so that the assembly of the axial positioning assembly is completed, and an positioning point can be provided on the bracket body for the constructor to use or provide other construction parts. For assembly purposes.

上述的徑向定位組件30,於本實施例中係與軸向定位組件20配合使用,故必需包括有至少一個徑向定位組件30,而徑向定位組件30係設置於位於同一水平面的二個軸向定位組件20之間,且徑向定位組件30包括有至少二個插固件31與一個連結件32,以下請共同參閱第5圖,係本創作施工架之徑向定位組件立體組合示意圖,如圖所示:連結件32的二端分別與插固件31連接,而二個插固件31則分別插設於二個軸向定位組件20的定位件22中,且各個插固件31均具有一個抵緊面311,其中抵緊面311係對應於管體21的側壁211設置,故抵緊面311在本實施例中為曲弧面的設計,且曲弧面之曲度對應於管體的側壁211弧度。如此一來,在插固件31插設於定位件22上時,藉由抵緊面311在本實施例中為曲弧面的設計,可使插固件31穩固地結合於軸向定位組件20上,並與軸向定位組件20保持同一軸向,不會產生旋動的情形,綜上所述,在軸向定位組件20與徑向定位組件30的相互組裝後,例如徑向定位組件30的連結件32為一個圓桿體時, 徑向定位組件30就具有護欄的效果,並在施工物件處的複數個支架體10上便可提供一個安全防護週全的工作環境,供施工人員於待施工物件處的複數個支架體10上進行施工。The radial positioning assembly 30 described above is used in conjunction with the axial positioning assembly 20 in this embodiment, so it must include at least one radial positioning assembly 30, and the radial positioning assembly 30 is disposed in two at the same horizontal plane. Between the axial positioning components 20, and the radial positioning component 30 includes at least two inserting pieces 31 and a connecting piece 32. Please refer to FIG. 5 together, which is a three-dimensional combination diagram of the radial positioning components of the creative construction frame. As shown in the figure, the two ends of the connecting member 32 are respectively connected to the inserting piece 31, and the two inserting pieces 31 are respectively inserted into the positioning members 22 of the two axial positioning assemblies 20, and each of the inserting pieces 31 has a The abutting surface 311, wherein the abutting surface 311 is disposed corresponding to the side wall 211 of the tubular body 21, so the abutting surface 311 is a curved curved surface design in this embodiment, and the curvature of the curved surface corresponds to the tubular body. The side wall 211 is arcuate. In this way, when the inserting piece 31 is inserted into the positioning member 22, the inserting piece 31 can be firmly coupled to the axial positioning assembly 20 by the design of the abutting surface 311 in the present embodiment as a curved surface. And maintaining the same axial direction as the axial positioning assembly 20 without causing a rotation. As described above, after the mutual assembly of the axial positioning assembly 20 and the radial positioning assembly 30, such as the radial positioning assembly 30 When the connecting member 32 is a round rod body, The radial positioning assembly 30 has the effect of a guardrail and provides a safe and protective working environment on the plurality of bracket bodies 10 at the construction object for the constructor to be on the plurality of bracket bodies 10 at the object to be constructed. Construction is carried out.

又,為了加強防護效果,本創作對於定位件22上的插槽222有更細部的設計,請參閱第4圖,在環設於管體21外壁上的複數個插槽222,各個插槽分別具有插入口223及伸出口224,且插入口223的口徑大於伸出口224的口徑,使得各個插槽222形成上寬下窄的一梯形結構,該梯形結構的斜邊225是指遠離於管體21的一側邊,而上述的各個插固件31同樣具有對應的結構,請參閱第5圖,各個插固件31均具有插入部312,且插入部312具有一個斜面313,其中斜面313即對應上述梯形結構的斜邊225,且斜面313的長度大於梯形結構斜邊225的長度,如此一來,在插固件31插入於插槽222時,藉由插入部312的斜面313與插槽222的梯形結構斜邊225,可使插固件31便於與插槽222組配,且利用插入部312的斜面313與插槽222的梯形結構斜邊225的相互迫緊,以及抵緊面311為曲弧面的設計,可使插固件31穩固地結合於軸向定位組件20上。Moreover, in order to enhance the protective effect, the present invention has a more detailed design for the slot 222 on the positioning member 22. Referring to FIG. 4, a plurality of slots 222 are disposed on the outer wall of the tubular body 21, and the respective slots are respectively The insertion opening 223 and the protruding opening 224, and the diameter of the insertion opening 223 is larger than the diameter of the protruding opening 224, so that each slot 222 forms a trapezoidal structure with an upper width and a lower width, and the oblique side 225 of the trapezoidal structure means away from the tubular body. One side of the 21, and each of the above-mentioned inserts 31 has a corresponding structure. Referring to FIG. 5, each of the inserts 31 has an insertion portion 312, and the insertion portion 312 has a slope 313, wherein the slope 313 corresponds to the above The oblique side 225 of the trapezoidal structure, and the length of the inclined surface 313 is greater than the length of the oblique side 225 of the trapezoidal structure, so that when the insert 31 is inserted into the slot 222, the inclined surface 313 of the insertion portion 312 and the trapezoid of the slot 222 The structural bevel 225 allows the insert 31 to be easily assembled with the slot 222, and the beveled surface 313 of the insertion portion 312 and the trapezoidal oblique bead 225 of the slot 222 are pressed against each other, and the abutting surface 311 is curved. Design that allows the plug-in firmware 31 to be securely 20 together in the axial direction positioning assembly.

除此之外,請參閱第6圖及第7圖所示,第6圖係本創作施工架之軸向定位組件與徑向定位組件組裝示意圖,第7圖係本創作施工架與支架體組裝示意圖,在圖示中可看出,本創作施工架的實施例中還包括了複數個定位插銷40,以作為待 施工物件處的複數個支架體10、軸向定位組件20與徑向定位組件30相互組裝的固定之用,在本實施例中係利用二個定位插銷40以十字交錯的方式,徑向貫穿管體21與支架體10,且位於插固件31的上方,除了可將軸向定位組件20固定於支架體10外,還可達到限制插固件31的目的,以防止插固件31自定位件22中脫出,同時可達到全部組件均穩固結合的要求,以確保使用上的安全性。In addition, please refer to Figure 6 and Figure 7, Figure 6 is a schematic diagram of the assembly of the axial positioning component and the radial positioning component of the creative construction frame, and Figure 7 is the assembly of the creative construction frame and the bracket body. Schematic, it can be seen in the figure that the embodiment of the creative construction frame further includes a plurality of positioning pins 40 as a waiting In the embodiment, the plurality of bracket bodies 10, the axial positioning component 20 and the radial positioning component 30 are assembled to each other for fixing. In the embodiment, the two positioning pins 40 are used to cross the tube in a crisscross manner. The body 21 and the bracket body 10 are located above the inserting member 31. In addition to fixing the axial positioning assembly 20 to the bracket body 10, the purpose of limiting the inserting member 31 can be achieved to prevent the inserting member 31 from being self-aligning member 22. Evacuation, at the same time, can achieve the requirements of a stable combination of all components to ensure the safety of use.

最後,請參閱第8圖所示,係本創作各種尺寸長度的軸向定位組件組裝示意圖,在圖中可清楚看出,本創作的複數軸向定位組件20,其管體21的長度至少包括有三種以上不同的長度d1、d2、d3,其中d3>d2>d1,藉此當複數軸向定位組件20套設組裝於待施工物件處的複數個支架體10上時,可提供不同高度的定位點,以配合不同施工場所、施工物件使用。Finally, please refer to FIG. 8 , which is a schematic diagram of assembly of axial positioning components of various sizes and lengths. It can be clearly seen from the figure that the complex axial positioning assembly 20 of the present invention has the length of the tubular body 21 at least included. There are three or more different lengths d1, d2, and d3, where d3>d2>d1, thereby providing different heights when the plurality of axial positioning assemblies 20 are sleeved on a plurality of bracket bodies 10 assembled at the object to be constructed. Positioning points to match the use of different construction sites and construction objects.

此外,本創作的施工架還包括有複數個軸向連接件50,每一個軸向連接件50係設置於二個軸向定位組件20之間,用於接連上下相鄰的軸向定位組件20,在本實施例中,當軸向定位組件20搭配軸向連接件50使用時,軸向定位組件20具有支架體10的作用,其藉由管體21直接架設於地面上,並鄰近於該待施工物件處,如此一來,以管體21作為支架,除可達到免用支架體10的目的外,更可節省施工架的元件數量,以符合環保工法的精神。In addition, the construction frame of the present invention further includes a plurality of axial connecting members 50, each of which is disposed between the two axial positioning assemblies 20 for connecting the vertically adjacent axial positioning assemblies 20 In the present embodiment, when the axial positioning assembly 20 is used with the axial connecting member 50, the axial positioning assembly 20 has the function of the bracket body 10, which is directly erected on the ground by the tubular body 21 and adjacent to the In the case of the object to be constructed, the tube body 21 is used as a bracket, and in addition to the purpose of eliminating the bracket body 10, the number of components of the construction frame can be saved to conform to the spirit of environmental protection law.

雖然本創作已於較佳實施例揭露如上,然其並非用以限定 本創作,任何熟悉此項技藝者,在不脫離本創作之精神和範圍內,仍可做些許的更動與潤飾,因此本創作之保護範圍當視後附之申請專利範圍所界定者為準。Although the present invention has been disclosed above in the preferred embodiments, it is not intended to be limiting. This creation, any person familiar with the art, can still make some changes and refinements without departing from the spirit and scope of this creation. Therefore, the scope of protection of this creation is subject to the definition of the patent application scope attached.

10‧‧‧支架體10‧‧‧ bracket body

20‧‧‧軸向定位組件20‧‧‧Axial positioning components

21‧‧‧管體21‧‧‧ tube body

211‧‧‧側壁211‧‧‧ side wall

22‧‧‧定位件22‧‧‧ Positioning parts

221‧‧‧套管部221‧‧‧ casing department

222‧‧‧插槽222‧‧‧ slots

223‧‧‧插入口223‧‧‧ insertion port

224‧‧‧伸出口224‧‧‧Extended

225‧‧‧梯形結構的斜邊225‧‧‧ oblique side of trapezoidal structure

226‧‧‧間隔空間226‧‧‧Interval space

23‧‧‧環形套件23‧‧‧Ring Kit

231‧‧‧扣勾部231‧‧‧ buckle hook

30‧‧‧徑向定位組件30‧‧‧ Radial positioning components

31‧‧‧插固件31‧‧‧ Inserting firmware

311‧‧‧抵緊面311‧‧‧Affirmation

312‧‧‧插入部312‧‧‧ Insertion Department

313‧‧‧斜面313‧‧‧Bevel

32‧‧‧連結件32‧‧‧Links

40‧‧‧定位插銷40‧‧‧ Positioning pin

50‧‧‧軸向連接件50‧‧‧Axial connectors

d1、d2、d3‧‧‧長度D1, d2, d3‧‧‧ length

第1圖係本創作施工架之立體組合示意圖。The first picture is a three-dimensional combination diagram of the artificial construction frame.

第2圖係本創作施工架之立體分解示意圖。Figure 2 is a three-dimensional exploded view of the construction frame.

第3圖係本創作施工架之軸向定位組件立體組合示意圖。The third figure is a three-dimensional combination diagram of the axial positioning components of the artificial construction frame.

第4圖係本創作施工架之軸向定位組件立體分解示意圖。Figure 4 is a perspective exploded view of the axial positioning assembly of the present construction frame.

第5圖係本創作施工架之徑向定位組件立體組合示意圖。The fifth figure is a three-dimensional combination diagram of the radial positioning components of the artificial construction frame.

第6圖係本創作施工架之軸向定位組件與徑向定位組件組裝示意圖。Figure 6 is a schematic view showing the assembly of the axial positioning assembly and the radial positioning assembly of the present construction frame.

第7圖係本創作施工架與支架體組裝示意圖。Figure 7 is a schematic diagram of the assembly of the construction frame and the bracket body.

第8圖係本創作各種尺寸長度的軸向定位組件組裝示意圖。Figure 8 is a schematic view showing the assembly of the axial positioning components of various sizes and lengths of the present invention.

20‧‧‧軸向定位組件20‧‧‧Axial positioning components

30‧‧‧徑向定位組件30‧‧‧ Radial positioning components

Claims (11)

一種施工架,設置於一待施工物件處的複數個支架體上,該施工架包括:複數軸向定位組件,分別設置於該些支架體上,且每一該軸向定位組件具有一管體與一定位件,其中該管體係套設於該些支架體的其中之一上,而該定位件則環設於該管體外壁上;以及至少一徑向定位組件,設置於該些軸向定位組件中的至少二個之間,且該至少一徑向定位組件包括有至少二插固件與一連結件,其中該連結件的二端分別連接於該至少二插固件,而每一該插固件則分別插設於該定位件中。A construction frame is disposed on a plurality of bracket bodies at a work object to be constructed, the construction frame includes: a plurality of axial positioning components respectively disposed on the bracket bodies, and each of the axial positioning components has a pipe body And a positioning member, wherein the tube system is sleeved on one of the bracket bodies, and the positioning member is annularly disposed on the outer wall of the tube; and at least one radial positioning component is disposed in the axial direction Between at least two of the positioning components, and the at least one radial positioning component includes at least two inserts and a joint, wherein the two ends of the joint are respectively connected to the at least two inserts, and each of the inserts The firmware is respectively inserted into the positioning member. 如申請專利範圍第1項所述之施工架,其中該定位件具有一套管部以及複數個插槽,且該些插槽係以等分方式配置於該 套管部的周緣,而在每二個相鄰的該些插槽之間,形成有一間隔空間。The construction frame of claim 1, wherein the positioning member has a sleeve portion and a plurality of slots, and the slots are disposed in an equal manner. A peripheral edge of the sleeve portion is formed with a space between each of the two adjacent slots. 如申請專利範圍第2項所述之施工架,其中每一該軸向定位組件更包括有一環形套件,該環形套件套設於該定位件外緣,而該環形套件對應於該間隔空間的部分即成為一扣勾部。The construction frame of claim 2, wherein each of the axial positioning components further comprises an annular sleeve sleeved on an outer edge of the positioning member, and the annular sleeve corresponds to a portion of the spacing space It becomes a buckle. 如申請專利範圍第2項所述之施工架,其中各該插槽分別具有一插入口及一伸出口,且該插入口的口徑大於該伸出口的口徑,使得各該插槽形成上寬下窄的一梯形結構,該梯形結構的斜邊遠離於該管體,而各該插固件則具有一插入部,該插入部具有一斜面,且該斜面對應該梯形結構的斜邊。The construction frame of claim 2, wherein each of the slots has an insertion opening and an extension opening, and the diameter of the insertion opening is larger than the diameter of the protruding opening, so that the slots are formed to be wide and narrow. A trapezoidal structure, the oblique side of the trapezoidal structure is away from the tube body, and each of the inserts has an insertion portion having a sloped surface, and the oblique portion faces the oblique side of the trapezoidal structure. 如申請專利範圍第4項所述之施工架,其中該斜面的長度大於該梯形結構斜邊的長度。。The construction frame of claim 4, wherein the length of the slope is greater than the length of the oblique side of the trapezoidal structure. . 如申請專利範圍第4項所述之施工架,其中各該插固件則具有一抵緊面,該抵緊面係對應於該管體的側壁設置。The construction frame of claim 4, wherein each of the inserts has an abutting surface corresponding to a side wall of the pipe body. 如申請專利範圍第6項所述之施工架,其中該抵緊面具有一曲弧面,且該曲弧面之曲度對應於該管體的側壁弧度。The construction frame of claim 6, wherein the abutting mask has a curved surface, and the curvature of the curved surface corresponds to a side wall curvature of the tubular body. 如申請專利範圍第1項所述之施工架,更包括複數個定位插銷,而其中的至少二個定位插銷係以十字交錯的方式,徑向貫穿該管體與該支架體,且位於該至少二插固件的其中之一上方,藉以限制該至少二插固件的其中之一自該定位件中脫出。The construction frame of claim 1, further comprising a plurality of positioning pins, wherein at least two of the positioning pins are inserted in a crisscross manner, radially extending through the tube body and the bracket body, and located at least Above one of the two inserts, thereby limiting one of the at least two inserts from the locator. 如申請專利範圍第1項所述之施工架,其中該管體的長度至少包括有三種以上不同的長度。The construction frame of claim 1, wherein the length of the pipe body comprises at least three different lengths. 如申請專利範圍第1項所述之施工架,還包括有複數個軸向連接件,每一該軸向連接件係設置於二個軸向定位組件之間。The construction frame of claim 1, further comprising a plurality of axial connectors, each of the axial connectors being disposed between the two axial positioning assemblies. 一種施工架,設置於一待施工物件處,該施工架包括:複數軸向定位組件,每一該軸向定位組件具有一管體與一定位件,該定位件係環設於該管體外壁上,而該管體係架設於地面上並鄰近於該待施工物件處;至少一徑向定位組件,設置於該些軸向定位組件中的至少二個之間,且該至少一徑向定位組件包括有至少二插固件與一連結件,其中該連結件的二端分別連接於該至少二插固件,而每一該插固件則分別插設於該定位件中;以及複數個軸向連接件,每一該軸向連接件係分別設置於該些軸向定位組件之間。A construction frame is disposed at an object to be constructed, the construction frame includes: a plurality of axial positioning components, each of the axial positioning components has a pipe body and a positioning component, and the positioning component ring is disposed on the outer wall of the pipe And the pipe system is erected on the ground and adjacent to the object to be constructed; at least one radial positioning component is disposed between at least two of the axial positioning components, and the at least one radial positioning component The device includes at least two inserts and a joint member, wherein the two ends of the joint member are respectively connected to the at least two inserts, and each of the inserts is respectively inserted into the positioning member; and the plurality of axial joint members Each of the axial connectors is disposed between the axial positioning components.
TW101222737U 2012-11-23 2012-11-23 Scaffold TWM454435U (en)

Priority Applications (5)

Application Number Priority Date Filing Date Title
TW101222737U TWM454435U (en) 2012-11-23 2012-11-23 Scaffold
JP2013156202A JP5422075B1 (en) 2012-11-23 2013-07-27 Steel pipe for scaffolding or support column
PCT/JP2013/081452 WO2014080998A1 (en) 2012-11-23 2013-11-21 Suppot steel pipe for scaffolding or timbering
CN201380012557.0A CN104487637A (en) 2012-11-23 2013-11-21 Support steel pipe for scaffolding or timbering
US14/418,077 US20150152654A1 (en) 2012-11-23 2013-11-21 Support steel pipe and bracket for scaffolding or falsework, and scaffolding or falsework

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
TW101222737U TWM454435U (en) 2012-11-23 2012-11-23 Scaffold

Publications (1)

Publication Number Publication Date
TWM454435U true TWM454435U (en) 2013-06-01

Family

ID=49030481

Family Applications (1)

Application Number Title Priority Date Filing Date
TW101222737U TWM454435U (en) 2012-11-23 2012-11-23 Scaffold

Country Status (5)

Country Link
US (1) US20150152654A1 (en)
JP (1) JP5422075B1 (en)
CN (1) CN104487637A (en)
TW (1) TWM454435U (en)
WO (1) WO2014080998A1 (en)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9777490B2 (en) 2015-12-11 2017-10-03 Falsework & Shoring Designs, Inc. Falsework hook and fastener
JP6314279B1 (en) * 2017-03-29 2018-04-18 東阪工業株式会社 Temporary morning glory device
AU2018265313B2 (en) * 2017-05-09 2024-05-30 At-Pac China Business Trust Modified ledger and modular scaffold system with continuous work surface
CN108057250B (en) * 2017-12-19 2024-03-22 华强方特(芜湖)文化产业有限公司 Bottom bearing support for roller coaster
JP7194435B2 (en) * 2019-09-24 2022-12-22 平和技研株式会社 Structure of temporary scaffolding and connecting fittings used therefor
CN110983981B (en) * 2019-12-18 2021-03-26 中交第一航务工程局有限公司 Supporting method for assembled building template
JP6900085B1 (en) * 2020-10-23 2021-07-07 株式会社ワールドエンジニアリング Cleaning equipment for pipe-shaped members
CN112459438A (en) * 2020-11-30 2021-03-09 四川仟坤建设集团有限责任公司 Scaffold structure and erection method thereof
CN112814419B (en) * 2021-01-06 2022-05-20 江西省富煌钢构有限公司 Strutting arrangement for steel construction
CN113356574A (en) * 2021-06-16 2021-09-07 重庆渝能建筑安装工程有限公司 Building beam supporting structure and construction method
US11846107B2 (en) * 2021-08-12 2023-12-19 Grady F. Smith & Co., Inc. Collapsible utility scaffold

Family Cites Families (48)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1386238A (en) * 1971-05-28 1975-03-05 Kwikform Ltd Builders scaffolding
GB1479892A (en) * 1974-06-13 1977-07-13 Evans & Sons Ltd C Puncheon unit for builders scaffolding
GB1488170A (en) * 1974-12-06 1977-10-05 Evans & Sons Ltd C Supporting collar for use with builders scaffolding
DE7612366U1 (en) * 1975-04-26 1979-01-11 C. Bryant & Son Ltd., Shirley, Solihull, West Midlands (Grossbritannien) FRAMEWORK
DE2737859A1 (en) * 1977-08-23 1979-03-08 Eberhard Layher METAL PIPE FRAMEWORK
US4273463A (en) * 1979-10-03 1981-06-16 Gerhard Dobersch Steel tube scaffold
US4439052A (en) * 1981-06-11 1984-03-27 Stallningsgruppen I Goteborg Aktiebolag Device for coupling together laterally directed scaffold elements to uprights in a scaffold or the like
US4549634A (en) * 1983-04-15 1985-10-29 Waco International Corporation Scaffold connector assembly
US4525096A (en) * 1983-04-18 1985-06-25 Weldtec, Inc. Connecting clamp for builder's scaffolding
JPH06100022B2 (en) * 1988-07-13 1994-12-12 小野 辰雄 Support device for columns and stays
JPH02178442A (en) * 1988-12-28 1990-07-11 Tatsuo Ono Connecting method for stanchion and stanchion device
US4948289A (en) * 1989-03-07 1990-08-14 Dellinger Drew E Support frame corner connector
DE9106022U1 (en) * 1991-05-15 1991-07-25 Oesterreichische Doka Schalungstechnik Ges.M.B.H., Amstetten, At
CA2073648A1 (en) * 1991-07-12 1993-01-13 Ronald Lubinski Aluminum scaffold system
CA2111724A1 (en) * 1993-12-17 1995-06-18 Raymond Wayne Gillard Scaffold system
JP3131896B2 (en) * 1995-07-20 2001-02-05 辰雄 小野 Shoring
NL1000891C2 (en) * 1995-07-27 1997-01-28 Sgb Holdings Scaffolding construction as well as a method for mounting the scaffolding construction.
DE29715170U1 (en) * 1997-08-23 1997-10-30 Merkel Gerald Vertical diagonal bracing for wedge pocket modular scaffolds
JP4268701B2 (en) * 1997-12-26 2009-05-27 辰雄 小野 Frame and structure with frame assembled
JP4053153B2 (en) * 1998-09-14 2008-02-27 辰雄 小野 jack
SE517645E5 (en) * 1999-11-01 2016-06-07 Pluseight Technology Ab Device for connecting scaffolding elements
DE60136619D1 (en) * 2000-04-04 2009-01-02 Pieter Wouter Booysen FRAMEWORK
US6779631B1 (en) * 2000-06-28 2004-08-24 Deltak Manufacturing, Inc. Scaffold pick-up device
US6722471B2 (en) * 2000-12-22 2004-04-20 Albert A. Wolfe Scaffolding system having improved safety structures and connecting members
CA2385380A1 (en) * 2001-05-31 2002-11-30 Tatsuo Ono Mounting method for a handrail in a frame scafolding
US20060201745A1 (en) * 2002-09-17 2006-09-14 Francis Arnault Method of manufacturing a vertical scaffolding element, and element thus obtained
US6960044B2 (en) * 2003-02-27 2005-11-01 C & W Industries, Llc Support frame kit for canopies, display racks and the like
CA2436339A1 (en) * 2003-07-30 2005-01-30 Aluma Enterprises Inc. Shoring leg with node connectors
CN2654765Y (en) * 2003-11-07 2004-11-10 吕伟嘉 Inserted type gravity self locking scaffold
US7228940B2 (en) * 2004-08-11 2007-06-12 Bil-Jax, Inc. Scaffold having a replaceable locking and securing device
US7530540B2 (en) * 2005-12-15 2009-05-12 Haworth, Ltd. Upright post with mounting collar
DE202006015586U1 (en) * 2006-10-11 2008-02-21 Wilhelm Layher Verwaltungs-Gmbh Vertical frame element made of metal
DE102008006911A1 (en) * 2008-01-24 2009-07-30 Wilhelm Layher Verwaltungs-Gmbh For the construction of a frame support, a support frame and / or a shoring tower certain vertical frame
CA2634573C (en) * 2008-06-10 2011-05-24 Peter J. Rogers Modular scaffold system
US20120228060A1 (en) * 2008-06-10 2012-09-13 Rogers Peter J High capacity vertical member for use with modular scaffolding
CA2638365C (en) * 2008-07-29 2011-07-12 Peter J. Rogers Twist lock coupling spigot
NL2003206C2 (en) * 2009-07-15 2011-01-18 Scafom Internat B V Scaffolding system, as well as coupling, girder tube and standing tube intended for such a scaffolding system.
JP2011089315A (en) * 2009-10-22 2011-05-06 Ito Seisakusho:Kk Scaffold support connecting hook and safety belt
US8393439B2 (en) * 2010-01-26 2013-03-12 Steve Howard Thacker Scaffold system and method
DE102010021623A1 (en) * 2010-05-26 2011-12-01 Johannes Weiss Modular frame with rigidly fitting pipe bolt connections
US8973711B2 (en) * 2010-08-31 2015-03-10 Deltak Manufacturing, Inc. Intermediate scaffold joint
US20120186911A1 (en) * 2011-01-25 2012-07-26 Next Generation Scaffold Services Inc. Scaffold apparatus, method and system
US20120219354A1 (en) * 2011-02-24 2012-08-30 Bauer Ryan E Cup-lock coupler clamp for detachably attaching at any elevation on a vertical tube of the cup-lock scaffold system
GB201117717D0 (en) * 2011-10-13 2011-11-23 Three G Metal Fabrications Ltd Modular platform
CN202380713U (en) * 2011-12-12 2012-08-15 开平市优赢金属制品有限公司 Connecting structure of scaffold and scaffold adopting same
CN202611227U (en) * 2012-04-10 2012-12-19 开平市和益隆金属制品有限公司 Wheel buckle type scaffold
HK1172196A2 (en) * 2012-06-01 2013-04-12 Wls Intellectual Property Ltd Improvements in scaffolding
HK1172197A2 (en) * 2012-06-01 2013-04-12 Wls Intellectual Property Ltd Improvements in building components and structures

Also Published As

Publication number Publication date
JP2014105572A (en) 2014-06-09
CN104487637A (en) 2015-04-01
JP5422075B1 (en) 2014-02-19
WO2014080998A1 (en) 2014-05-30
US20150152654A1 (en) 2015-06-04

Similar Documents

Publication Publication Date Title
TWM454435U (en) Scaffold
JP5697814B1 (en) Freehandrail
JP5935111B1 (en) Safety band attachment for scaffolding and supporting handrail support
JP5654710B1 (en) Parent rope support
JP2008148634A (en) Device for preventing snake from climbing steel tower
JP3175380U (en) Fall prevention jig
GB2537401A (en) Scaffold clamps
KR102100695B1 (en) A device for building safety net the method for installing safety net
KR200480076Y1 (en) Length adjusting horizontal pipe for a temporary structure
KR100756538B1 (en) Working platform for a high place
KR20120109170A (en) Scaffolding ladder
CN211173036U (en) Socket type triangular operation frame
JP3209934U (en) Scaffolding coupler and scaffolding set
KR102099446B1 (en) Scaffold unit assembley, system scaffold having the same, and method for constructing the same
JP2004300748A (en) Handrail for scaffold
KR20130005833U (en) Ladder with auxiliary ladder
KR101253030B1 (en) inner open method safety net with pully and ball bearing
JP5645042B1 (en) Framework scaffolding
KR20140132311A (en) Disengagement prevent system
KR100484587B1 (en) Ladder for ascend and descend of manhole
KR101447355B1 (en) Apparatus for connecting column-foundation stone of wooden architecture
JP7012336B2 (en) Scaffolding device
CN106948589B (en) Scaffold easy to disassemble
JP3196574U (en) Standing structure of parent rope mounting strut
CN105460825B (en) A kind of portable air hose elevator

Legal Events

Date Code Title Description
MM4K Annulment or lapse of a utility model due to non-payment of fees