TWI420407B - Production line managing system with virtual context and managing method for the same - Google Patents

Production line managing system with virtual context and managing method for the same Download PDF

Info

Publication number
TWI420407B
TWI420407B TW100112483A TW100112483A TWI420407B TW I420407 B TWI420407 B TW I420407B TW 100112483 A TW100112483 A TW 100112483A TW 100112483 A TW100112483 A TW 100112483A TW I420407 B TWI420407 B TW I420407B
Authority
TW
Taiwan
Prior art keywords
virtual
production
production schedule
score
product information
Prior art date
Application number
TW100112483A
Other languages
Chinese (zh)
Other versions
TW201241760A (en
Inventor
Ching Wen Weng
Ching Pin Weng
Original Assignee
Lane Best Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Lane Best Technology Co Ltd filed Critical Lane Best Technology Co Ltd
Priority to TW100112483A priority Critical patent/TWI420407B/en
Publication of TW201241760A publication Critical patent/TW201241760A/en
Application granted granted Critical
Publication of TWI420407B publication Critical patent/TWI420407B/en

Links

Description

結合虛擬情境的生產線管理系統及其方法Production line management system combined with virtual situation and method thereof

本發明係有關於生產線管理系統,尤其更有關於將各種產品資訊虛擬化的生產線管理系統。The present invention relates to a production line management system, and more particularly to a production line management system for virtualizing various product information.

傳統的生產線中,主要是依靠企業資源計畫(Enterprise Resource Planning,ERP)系統、製造執行系統(Manufacturing Execution System,MES)及先進排程(Advanced Planning and Scheduling,APS)系統來傳遞資訊流及物流。藉以,依照實際需求來產生預定生產排程,並令生產線上的設備操作人員能夠按照預定生產排程來進行產品的生產。Traditional production lines rely on Enterprise Resource Planning (ERP) systems, Manufacturing Execution System (MES) and Advanced Planning and Scheduling (APS) systems to deliver information flow and logistics. . Therefore, the predetermined production schedule is generated according to the actual demand, and the equipment operators on the production line can perform the production of the products according to the predetermined production schedule.

上述軟體的供應商在提供資訊時,主要是以文字報表的方式來提供,並且通過網頁(Web blower)或是圖形使用者介面(Graphical User Interface,GUI)來呈現,藉以相關人員通過上述網頁或是上述GUI來查詢及跟催。舉例來說,設備操作人員必須先登入網頁或是GUI查詢上述文字報表,再依據文字報表上的生產排程來選取待生產品。The above-mentioned software suppliers provide information mainly by means of text reports, and are presented through a web blower or a graphical user interface (GUI), whereby the relevant personnel pass the above webpage or It is the above GUI to query and follow. For example, the device operator must first log in to the web page or the GUI to query the above text report, and then select the product to be produced according to the production schedule on the text report.

然而,上述文字報表並不是一種很直觀的產品資訊,因此當產品的種類繁多,或是工序較為複雜時,將會非常不利於設備操作人員的查詢,進而會浪費過多的查詢時間。However, the above text report is not a very intuitive product information. Therefore, when there are many kinds of products or complicated processes, it will be very unfavorable for the equipment operators to query, which will waste too much query time.

再者,設備操作人員長期面對文字報表實非常乏味,長久下來也會對生產效率造成影響。並且,各設備操作人員的生產效率無法即時為管理人員所掌握,進而管理人員也無法針對生產效率,及時對各設備操作人員的績效評定方式進行調整。是以,長久下來,設備操作人員對生產線管理人員的績效評定方式認同度會下降,如此也會影響到設備操作人員的主動性和積極性,造成管理人員對生產排程的控管更加的不易。Moreover, it is very tedious for equipment operators to face text reports for a long time, and it will affect production efficiency in the long run. Moreover, the production efficiency of each equipment operator cannot be immediately grasped by the management personnel, and the management personnel cannot adjust the performance evaluation manner of each equipment operator in time for the production efficiency. Therefore, for a long time, the equipment operators will reduce the recognition of the performance evaluation methods of the production line managers, which will also affect the initiative and enthusiasm of the equipment operators, making it more difficult for managers to control the production schedule.

是以,如何提昇設備操作人員的主動性和積極性,降低工作時的乏味感,以縮短產品的生產周期,並且利於管理人員評定績效,進而創造企業的利潤,即為本領域技藝之人潛心研究的課題。Therefore, how to improve the initiative and enthusiasm of equipment operators, reduce the boring sense of work, shorten the production cycle of products, and help managers assess performance, and thus create profits of enterprises, that is, people who are skilled in the field Question.

本發明之主要目的,係在於提供一種結合虛擬情境的生產線管理系統及其方法,係以虛擬的圖畫或動畫的方式取代文字報表,呈現操作人員資訊、生產排程及產品資訊等資訊,藉以令操作人員易於了解產品的優先生產順序,並令管理人員易於管控生產排程。The main purpose of the present invention is to provide a production line management system and a method thereof in combination with a virtual situation, which replaces a text report with a virtual picture or animation, and presents information such as operator information, production schedule and product information, so as to Operators have easy access to the product's prioritized production sequence and make it easy for managers to manage production schedules.

本發明之另一目的,係在於提供一種結合虛擬情境的生產線管理系統及其方法,係分別為各個虛擬物件設定對應的虛擬分數,並通過各設備操作人員最終獲得的總分值,對設備操作人員進行績效管理。Another object of the present invention is to provide a production line management system and a method thereof for combining virtual situations, which respectively set corresponding virtual scores for each virtual object, and operate the device through the total score obtained by each device operator. Personnel perform performance management.

為達上述目的,本發明係於傳統的生產線管理系統中加入一虛擬生產資訊整合系統,包括一資料庫及一物件轉換表。生產線管理系統係將預定生產排程及各產品的產品資訊導入物件轉換表,以在比較目前的生產進度與預定生產排程後,將各產品資訊分別轉換成相對應的虛擬物件,並且依據比對結果,對各虛擬物件設定對應的虛擬分數。設備操作人員可通過對虛擬分數的篩選,選擇對應的虛擬物件,進而選取虛擬物件所代表的產品來進行生產。To achieve the above object, the present invention is to add a virtual production information integration system to a conventional production line management system, including a database and an object conversion table. The production line management system introduces the scheduled production schedule and product information of each product into the object conversion table to convert each product information into corresponding virtual objects after comparing the current production schedule with the scheduled production schedule, and according to the ratio. For the result, a corresponding virtual score is set for each virtual object. The equipment operator can select the corresponding virtual object by filtering the virtual score, and then select the product represented by the virtual object to produce.

本發明對照先前技術所能達成之功效在於,藉由虛擬角色和虛擬情境的登入使用,可增加設備操作人員工作時的樂趣,並提升其主動性和積極性。並且,通過虛擬圖畫或動畫來取代文字報表,還可降低設備操作人員查詢產品資訊時的乏味感,藉以可以有效減少查詢的時間,降低因為查詢產品資訊而擔誤的生產週期。The effect achieved by the present invention over the prior art is that the login and use of virtual characters and virtual situations can increase the fun of the equipment operators and enhance their initiative and enthusiasm. Moreover, replacing the text report with a virtual picture or animation can also reduce the tedium of the equipment operator when inquiring about the product information, thereby effectively reducing the time of the inquiry and reducing the production cycle that is hampered by the inquiry of the product information.

再者,針對各個產品導出相對應的虛擬物品,並對虛擬物品設定相對應的虛擬分數,可讓各設備操作人員通過虛擬分數的高低,迅速了解各產品的優先生產順序,藉以獲得高分。管理人員亦可從最終生產資訊中的分數了解到目前的生產進度與預定生產排程相比,是為超前、及時或落後,藉以易於管控生產排程。並且,管理人員還可通過各設備操作人員所獲得之總分值,輕鬆對各設備操作人員進行績效的管理。Furthermore, the corresponding virtual items are exported for each product, and the corresponding virtual scores are set for the virtual items, so that the equipment operators can quickly understand the priority production order of each product through the virtual scores, and obtain high scores. Managers can also learn from the scores in the final production information that the current production schedule is ahead, timely or backward compared to the scheduled production schedule, so that it is easy to control the production schedule. Moreover, managers can easily manage the performance of each equipment operator through the total scores obtained by each equipment operator.

茲就本發明之一較佳實施例,配合圖式,詳細說明如後。DETAILED DESCRIPTION OF THE INVENTION A preferred embodiment of the present invention will be described in detail with reference to the drawings.

首請參閱第一圖,為本發明之一較佳具體實施例之系統架構圖。本發明主要係由一企業資源計劃(Enterprise Resource Planning,ERP)系統10、一製造執行系統(Manufacturing Execution System,MES)20、一先進排程(Advanced Planning and Scheduling,APS)系統30、一人力資源管理系統(Human Resource Managing System,HRMS)40、複數負載平衡伺服器6及複數終端機7來構成一生產線管理系統。並且該生產線管理系統中,更包括了一虛擬生產資訊整合系統5(下面將簡稱為該整合系統5)。Referring first to the first figure, a system architecture diagram of a preferred embodiment of the present invention is shown. The present invention mainly consists of an Enterprise Resource Planning (ERP) system 10, a Manufacturing Execution System (MES) 20, an Advanced Planning and Scheduling (APS) system 30, and a human resource. A Human Resource Management System (HRMS) 40, a complex load balancing server 6 and a plurality of terminal machines 7 constitute a production line management system. And the production line management system further includes a virtual production information integration system 5 (hereinafter referred to as the integration system 5 for short).

該整合系統5連接該ERP10、該MES20、該APS30及該HRMS40,藉以接收文字形式的資料流(例如文字報表以及文字的產品資訊等)後,將文字資料流虛擬化,以虛擬的圖畫或動畫來取代。更具體而言,係以2.5D或3D的虛擬圖畫或動畫來取代。如此,可以有效降低設備操作人員查詢時的乏味感,藉以減少查詢時間,降低因查詢而擔誤的生產週期。該整合系統5還連接複數該負載平衡伺服器6,並且每一個該負載平衡伺服器6分別連接至少一個該終端機7,各該終端機7係設置於生產線上的生產設備(圖未標示)旁。藉以,通過各該負載平衡伺服器6平衡整個系統的負載,避免多個設備操作人員同時操作複數的該終端機7時,產生系統負荷過度(overload)的現象。The integration system 5 connects the ERP 10, the MES 20, the APS 30, and the HRMS 40 to receive a text stream (such as a text report and product information of a text), and then virtualize the text stream to a virtual picture or animation. To replace. More specifically, it is replaced by a 2.5D or 3D virtual picture or animation. In this way, the boring sense of the equipment operator's query can be effectively reduced, thereby reducing the query time and reducing the production cycle that is borne by the query. The integration system 5 is also connected to a plurality of load balancing servers 6, and each of the load balancing servers 6 is connected to at least one of the terminal devices 7, each of which is a production device disposed on a production line (not shown). Next. Therefore, the load of the entire system is balanced by each of the load balancing servers 6, and when a plurality of device operators simultaneously operate the plurality of terminals 7 at the same time, a system overload occurs.

該整合系統5內主要包括一資料庫51及一物件轉換表52。該ERP10、該MES20及該APS30係於整合企業內部的資訊之後,產生一預定生產排程I1及該預定生產排程I1內的複數產品資訊I2,並且,將該預定生產排程11及該複數產品資訊I2提供給該整合系統5。The integration system 5 mainly includes a database 51 and an object conversion table 52. The ERP10, the MES20 and the APS30 are configured to generate a predetermined production schedule I1 and a plurality of product information I2 in the predetermined production schedule I1 after integrating the information inside the enterprise, and the predetermined production schedule 11 and the plural Product information I2 is provided to the integrated system 5.

請同時參閱第二圖,為本發明之一較佳具體實施例之資料庫示意圖。該資料庫51係接收並儲存上述該預定生產排程I1及該複數產品資訊I2。Please refer to the second figure at the same time, which is a schematic diagram of a database according to a preferred embodiment of the present invention. The database 51 receives and stores the predetermined production schedule I1 and the plurality of product information I2.

該物件轉換表52接收上述傳來的該預定生產排程I1及該複數產品資訊I2,並且,將目前的生產進度與該預定生產排程I1進行比對,藉以依據比對結果,將各該產品資訊I2轉換為相對應的虛擬物件I3,並分別為各個虛擬物件I3設定相對應的虛擬分數I4。最後,該整合系統5將各該虛擬物件I3及該虛擬分數I4儲存至該資料庫51中,並且導出到至少一個該終端機7上顯示。The object conversion table 52 receives the predetermined production schedule I1 and the complex product information I2, and compares the current production schedule with the predetermined production schedule I1, so as to be based on the comparison result. The product information I2 is converted into the corresponding virtual object I3, and the corresponding virtual score I4 is set for each virtual object I3. Finally, the integration system 5 stores each of the virtual object I3 and the virtual score I4 into the database 51 and exports it to at least one of the terminal devices 7.

如上所述,當生產線上,該虛擬物件I3所代表的產品被處理完成後,該整合系統5再針對進行處理的設備操作人員來分別儲存產品對應的該產品資訊I2及該虛擬分數I4,藉以為各個設備操作人員記錄並自動加總處理該產品所得的總分值。As described above, after the product represented by the virtual object I3 is processed on the production line, the integrated system 5 separately stores the product information I2 and the virtual score I4 corresponding to the product for the device operator performing the processing. Record and automatically sum the total scores for processing the product for each equipment operator.

舉例來說,若該預定生產排程I1中記錄將原料A處理為半成品B需通過程序一,並需時十分鐘;將半成品B生成為成品C需通過程序二,並需時二十分鐘。則該物件轉換表52可視目前的生產進度,將該原料A轉換為一第一虛擬物件,並給予一第一虛擬分數;將該半成品B轉換為一第二虛擬物件,並給予一第二虛擬分數。其中,可例如將該第一虛擬物件當作馬鈴薯,將該第二虛擬物件當作馬鈴薯切片,而成品C即為薯條。For example, if the raw material processing A is processed as the semi-finished product B in the predetermined production schedule I1, it takes 10 minutes to process the raw material A, and the semi-finished product B is processed into the finished product C, and it takes 20 minutes. Then, the object conversion table 52 converts the material A into a first virtual object according to the current production schedule, and gives a first virtual score; converts the semi-finished product B into a second virtual object, and gives a second virtual fraction. Wherein, for example, the first virtual object is regarded as a potato, the second virtual object is regarded as a potato slice, and the finished product C is a French fries.

如上所述,若目前的生產進度(例如程序一)落後於該預定生產排程I1的時間,則給予虛擬物件(例如該第一虛擬物件)較高的虛擬分數,以令設備操作人員優先處理該虛擬物件對應的產品(例如該馬鈴薯),藉以取得較高的虛擬分數。並且,當設備操作人員完成多個虛擬物件對應的產品時,該整合系統5自動加總處理該些產品所得的總分值。然而以上所述僅為本發明的較佳實施,不應加以限定。As described above, if the current production schedule (eg, program one) lags behind the scheduled production schedule I1, a virtual score is given to the virtual object (eg, the first virtual object) to prioritize the device operator. The product corresponding to the virtual object (for example, the potato) is used to obtain a higher virtual score. Moreover, when the equipment operator completes the products corresponding to the plurality of virtual objects, the integration system 5 automatically adds up the total scores obtained by processing the products. However, the above description is only a preferred embodiment of the present invention and should not be limited.

該HRMS40產生至少一設備操作人員資訊I5,並將該設備操作人員資訊I5提供給該整合系統5,以令該整合系統5儲存於該資料庫51中。該整合系統5中更包括一情境轉換表53,該情境轉換表53係接收該設備操作人員資訊I5,將該設備操作人員資訊I5轉換為對應的一虛擬角色I6及一虛擬情境I7,並且儲存至該資料庫51。當一設備操作人員通過至少一該終端機7登入該整合系統5,並選擇開啟角色扮演模式時,該整合系統5於該資料庫51中下載對應至該設備操作人員的該虛擬角色I6與該虛擬情境I7,並導出到該至少一終端機7上顯示。The HRMS 40 generates at least one device operator information I5 and provides the device operator information I5 to the integration system 5 to cause the integration system 5 to be stored in the database 51. The integration system 5 further includes a context conversion table 53 that receives the device operator information I5, converts the device operator information I5 into a corresponding virtual character I6 and a virtual context I7, and stores To the database 51. When a device operator logs in to the integrated system 5 through at least one of the terminal devices 7 and selects to activate the role playing mode, the integrated system 5 downloads the virtual character I6 corresponding to the device operator in the database 51 and the The virtual context I7 is exported to the at least one terminal 7 for display.

值得一提的是,該虛擬角色I6及該虛擬情境I7係可通過3D圖畫或動畫,將設備操作人員及產品模擬為其他領域的人及物。例如,將半導體產品及半導體作業員,模擬為上述的薯條及製作薯條的廚師,並將半導體製程中的各個製作程序模擬為薯條的各個製作程序。然而上述僅為本發明的較佳實例,不可加以為限。It is worth mentioning that the virtual character I6 and the virtual situation I7 can simulate the equipment operators and products into people and objects in other fields through 3D pictures or animations. For example, semiconductor products and semiconductor workers are simulated as the above-mentioned French fries and chefs who make French fries, and each production process in the semiconductor process is simulated as a production process of French fries. However, the above is only a preferred embodiment of the present invention and is not limited thereto.

設備操作人員於產品(半成品)處理完成後,可以得到產品所對應的該虛擬物件I3的該虛擬分數I4。該資料庫51中更包括有一積分表I8,係用以記錄並自動加總各設備操作人員處理產品所得的總分值。藉以,一管理人員可依該積分表I8中所記錄並加總的總分值,為各個設備操作人員進行績效的管理。After the equipment operator finishes processing the product (semi-finished product), the virtual score I4 of the virtual object I3 corresponding to the product can be obtained. The database 51 further includes a score table I8 for recording and automatically summing the total scores obtained by the equipment operators for processing the products. Therefore, a manager can manage the performance of each equipment operator according to the total score recorded and accumulated in the point table I8.

參閱第三圖,為本發明的第一系統操作流程圖。首先,係由一設備操作人員通過其中之一該終端機7登入該整合系統5(步驟S10),並且,該整合系統5判斷設備操作人員是否啟用角色扮演模式(步驟S12)。若設備操作人員要啟用角色扮演模式,則該整合系統5由該資料庫51中下載對應該設備操作人員的該虛擬角色I6及該虛擬情境I7(步驟S14),並導出至該終端機7上顯示下載的該虛擬角色I6及該虛擬情境I7(步驟S16)。Referring to the third figure, a flow chart of the first system operation of the present invention is shown. First, the device operator logs in to the integration system 5 through one of the terminal devices 7 (step S10), and the integration system 5 determines whether the device operator enables the role playing mode (step S12). If the device operator wants to enable the role playing mode, the integration system 5 downloads the virtual character I6 corresponding to the device operator and the virtual context I7 from the database 51 (step S14), and exports to the terminal device 7. The downloaded virtual character I6 and the virtual scenario I7 are displayed (step S16).

待該虛擬角色I6及該虛擬情境I7被選擇後,該整合系統5自該資料庫51下載相對應的該虛擬物件I3及該虛擬分數I4(步驟S18),最後再導出至該終端機7上顯示下載的該虛擬物件I3,及對應至該虛擬物件I3的該虛擬分數I4(步驟S20)。如此,設備操作人員即可通過該虛擬角色I6及該虛擬情境I7,查看目前可被生產的該虛擬物件I3有哪些,以及該些虛擬物件I3的虛擬分數I4分別是多少,藉以依據該虛擬分數I4來判斷哪些該虛擬物件I3需要優先生產。After the virtual character I6 and the virtual context I7 are selected, the integration system 5 downloads the corresponding virtual object I3 and the virtual score I4 from the database 51 (step S18), and finally exports to the terminal device 7. The downloaded virtual object I3 is displayed, and the virtual score I4 corresponding to the virtual object I3 is displayed (step S20). In this way, the device operator can view, by the virtual character I6 and the virtual context I7, which virtual object I3 can be currently produced, and what are the virtual scores I4 of the virtual objects I3, respectively, according to the virtual score. I4 to determine which virtual object I3 needs to be prioritized.

若於該步驟S12中判斷為否,則表示設備操作人員不願以虛擬化的3D圖畫或動畫來進行,因此該整合系統5即由該資料庫51下載未虛擬化的該產品資訊I2(步驟S22),並且導出至該終端機7上顯示下載的該產品資訊I2(步驟S24)。藉此,不習慣虛擬化的設備操作人員,不會被強迫使用本發明的該虛擬角色I6及該虛擬情境I7。If the determination in step S12 is NO, it means that the device operator is unwilling to perform the virtualized 3D picture or animation, so the integrated system 5 downloads the unvirtualized product information I2 from the database 51 (step S22), and the downloaded product information I2 is displayed on the terminal device 7 (step S24). Thereby, the device operator who is not accustomed to virtualization is not forced to use the virtual character I6 and the virtual context I7 of the present invention.

續請參閱第四圖,為本發明之第二系統操作流程圖。首先,本發明係通過該ERP10、該MES20及該APS30,將該預定生產排程I1導入該整合系統5中的該物件轉換表52(步驟S30)。接著,該整合系統5比對目前的生產進度與該預定生產排程I1(步驟S32),並於該步驟S32後,該整合系統5判斷目前的生產進度是否落後於該預定生產排程I1(步驟S34)。Please refer to the fourth figure for a flow chart of the second system operation of the present invention. First, the present invention introduces the predetermined production schedule I1 into the object conversion table 52 in the integration system 5 through the ERP 10, the MES 20, and the APS 30 (step S30). Next, the integration system 5 compares the current production schedule with the predetermined production schedule I1 (step S32), and after the step S32, the integration system 5 determines whether the current production schedule lags behind the predetermined production schedule I1 ( Step S34).

若目前的生產進度未落後該預定生產排程I1,則該整合系統5接著判斷目前的生產進度是否超前該預定生產排程I1一特定比例(步驟S36)。若目前的生產進度未超前該預定生產排程I1一特定比例,則通過該物件轉換表52將該產品資訊I2轉換為一第一虛擬物件,並為該第一虛擬物件設定一第一虛擬分數(步驟S38);若目前的生產進度確實超前該預定生產排程I1一特定比例,則通過該物件轉換表52將該產品資訊I2轉換為一第二虛擬物件,並為該第二虛擬物件設定一第二虛擬分數(步驟S40)。其中,該第一虛擬物件的生產進度超前或及時於該預定生產排程I1,而該第二虛擬物件的生產進度更超前於該第一虛擬物件的生產進度。因此,本實施例中主要係設定該第一虛擬分數高於該第二虛擬分數,藉以,設備操作人員會於虛擬分數的篩選後,先不生產該第二虛擬物件,以縮短該第二虛擬物件的超前進度。If the current production schedule does not fall behind the predetermined production schedule I1, the integration system 5 then determines whether the current production schedule is ahead of the predetermined production schedule I1 by a certain percentage (step S36). If the current production schedule does not advance the predetermined production schedule I1 by a specific ratio, the product information I2 is converted into a first virtual object by the object conversion table 52, and a first virtual score is set for the first virtual object. (Step S38); if the current production schedule is indeed ahead of the predetermined production schedule I1 by a specific ratio, the product information I2 is converted into a second virtual object by the object conversion table 52, and the second virtual object is set for the second virtual object. A second virtual score (step S40). The production progress of the first virtual object is advanced or timely in the predetermined production schedule I1, and the production progress of the second virtual object is more advanced than the production progress of the first virtual object. Therefore, in this embodiment, the first virtual score is set to be higher than the second virtual score, so that the equipment operator does not produce the second virtual object after the screening of the virtual score to shorten the second virtual The degree of advancement of the object.

若於該步驟S34中判斷目前的生產進度確實落後於該預定生產排程I1,則該整合系統5接著判斷目前的生產進度是否落後該預定生產排程I1一特定比例(步驟S42)。若目前的生產進度確實落後該預定生產排程I1一特定比例,則通過該物件轉換表52將該產品資訊I2轉換為一第三虛擬物件,並為該第三虛擬物件設定一第三虛擬分數(步驟S44);若目前的生產進度未落後該預定生產排程I1一特定比例,則通過該物件轉換表52將該產品資訊I2轉換為一第四虛擬物件,並為該第四虛擬物件設定一第四虛擬分數(步驟S46)。If it is determined in this step S34 that the current production schedule does fall behind the predetermined production schedule I1, the integration system 5 then determines whether the current production schedule is behind a predetermined ratio of the predetermined production schedule I1 (step S42). If the current production schedule is indeed behind the predetermined production schedule I1 by a specific ratio, the product information I2 is converted into a third virtual object by the object conversion table 52, and a third virtual score is set for the third virtual object. (Step S44); if the current production schedule does not fall behind the predetermined production schedule I1 by a specific ratio, the product information I2 is converted into a fourth virtual object by the object conversion table 52, and the fourth virtual object is set. A fourth virtual score (step S46).

其中,該第四虛擬物件的生產進度落後或及時於該預定生產排程I1,而該第三虛擬物件的生產進度更落後於該第四虛擬物件的生產進度。因此,本實施例中主要係該第三虛擬分數高於該第四虛擬分數,藉以,設備操作人員會於虛擬分數的篩選後,優先生產該第三虛擬物件,以縮短該第三虛擬物件的落後進度。The production progress of the fourth virtual object is backward or timely in the predetermined production schedule I1, and the production progress of the third virtual object is further behind the production progress of the fourth virtual object. Therefore, in this embodiment, the third virtual score is higher than the fourth virtual score, so that the equipment operator preferentially produces the third virtual object after the virtual score is filtered to shorten the third virtual object. Behind the progress.

值得一提的是,該特定比例可被設定為超前或落後該預定生產排程I1時可被接受的一個合理範圍,若未以該特定比例超前或落後於該預定生產排程I1時,即被視為處理及時。It is worth mentioning that the specific ratio can be set to a reasonable range that can be accepted when the predetermined production schedule I1 is advanced or behind, and if it is not advanced or behind the predetermined production schedule I1, It is treated as timely.

最後,於該上述該些虛擬物件I3及虛擬分數I4皆轉換並設定完成之後,將該虛擬物件I3及虛擬分數I4儲存至該資料庫51中(步驟S48)。Finally, after the virtual object I3 and the virtual score I4 are all converted and set, the virtual object I3 and the virtual score I4 are stored in the database 51 (step S48).

最後請參閱第五圖,為本發明之第三系統操作流程圖。在實際的生產動作中,係由設備操作人員在生產線上選取其中之一該虛擬物件I3所代表的產品(步驟S50),並將被選取的產品置入上述的該生產設備(圖未標示)中進行生產(步驟S52)。Finally, please refer to the fifth figure, which is a flow chart of the third system operation of the present invention. In the actual production operation, the equipment operator selects one of the products represented by the virtual object I3 on the production line (step S50), and places the selected product into the above-mentioned production equipment (not shown). Production is carried out (step S52).

步驟S52完成之後,該整合系統5針對進行處理的設備操作人員,來將產品所對應的該產品資訊I2儲存至該資料庫51中(步驟S54),藉以,管理人員能夠得知該產品為哪位設備操作人員所完成。最後,該整合系統5再針對進行處理的設備操作人員,來將產品所對應的該虛擬物件I3的該虛擬分數I4儲存至該資料庫51中(步驟S56)。更具體而言,係將該虛擬分數I4儲存至該資料庫51中的該積分表I8中,藉此,記錄並自動加總各設備操作人員處理產品所得的總分值,以利管理人員對各設備操作人員進行績效管理。值得一提的是,該步驟S54及該步驟S56並沒有執行上的順序關係,亦可先儲存該虛擬分數I4,再儲存該產品資訊I2,不加以限定。After the step S52 is completed, the integration system 5 stores the product information I2 corresponding to the product into the database 51 for the device operator performing the processing (step S54), so that the manager can know which product the product is. The device operator completed. Finally, the integration system 5 stores the virtual score I4 of the virtual object I3 corresponding to the product into the database 51 for the device operator performing the processing (step S56). More specifically, the virtual score I4 is stored in the credit table I8 in the database 51, thereby recording and automatically summing the total scores obtained by the equipment operators for processing the products, so as to facilitate the management personnel. Each equipment operator performs performance management. It is worth mentioning that the step S54 and the step S56 are not executed in the order relationship. The virtual score I4 may be stored first, and the product information I2 may be stored, which is not limited.

以上所述僅為本發明之較佳具體實例,非因此即侷限本發明之專利範圍,故舉凡運用本發明內容所為之等效變化,均同理皆包含於本發明之範圍內,合予陳明。The above is only a preferred embodiment of the present invention, and is not intended to limit the scope of the present invention. Therefore, equivalent changes to the scope of the present invention are included in the scope of the present invention. Bright.

10‧‧‧企業資源計畫系統10‧‧‧Enterprise Resource Planning System

20‧‧‧製造執行系統20‧‧‧ Manufacturing Execution System

30‧‧‧先進排程系統30‧‧‧Advanced scheduling system

40‧‧‧人力資源管理系統40‧‧‧Human Resources Management System

5‧‧‧虛擬生產資訊整合系統5‧‧‧Virtual Production Information Integration System

51‧‧‧資料庫51‧‧‧Database

52‧‧‧物件轉換表52‧‧‧ Object Conversion Form

53‧‧‧情境轉換表53‧‧‧Scenario conversion table

6‧‧‧負載平衡伺服器6‧‧‧Load Balancing Server

7‧‧‧終端機7‧‧‧ Terminal

I1‧‧‧預定生產排程I1‧‧‧ scheduled production schedule

I2‧‧‧產品資訊I2‧‧‧Product Information

I3‧‧‧虛擬物件I3‧‧‧Virtual objects

I4‧‧‧虛擬分數I4‧‧‧ virtual score

I5‧‧‧操作人員資訊I5‧‧‧Operator Information

I6‧‧‧虛擬角色I6‧‧‧virtual role

I7‧‧‧虛擬情境I7‧‧‧virtual situation

I8‧‧‧積分表I8‧‧‧ points table

S10~S24、S30~S48、S50~S56‧‧‧步驟S10~S24, S30~S48, S50~S56‧‧‧ steps

第一圖係本發明之一較佳具體實施例之系統架構圖。The first figure is a system architecture diagram of a preferred embodiment of the present invention.

第二圖係本發明之一較佳具體實施例之資料庫示意圖。The second drawing is a schematic diagram of a database of a preferred embodiment of the present invention.

第三圖係本發明之第一系統操作流程圖。The third figure is a flow chart of the first system operation of the present invention.

第四圖係本發明之第二系統操作流程圖。The fourth figure is a flow chart of the second system operation of the present invention.

第五圖係本發明之第三系統操作流程圖。The fifth figure is a flow chart of the third system operation of the present invention.

10‧‧‧企業資源計畫系統 10‧‧‧Enterprise Resource Planning System

20‧‧‧製造執行系統 20‧‧‧ Manufacturing Execution System

30‧‧‧先進排程系統 30‧‧‧Advanced scheduling system

40‧‧‧人力資源管理系統 40‧‧‧Human Resources Management System

5‧‧‧虛擬生產資訊整合系統 5‧‧‧Virtual Production Information Integration System

51‧‧‧資料庫 51‧‧‧Database

52‧‧‧物件轉換表 52‧‧‧ Object Conversion Form

53‧‧‧情境轉換表 53‧‧‧Scenario conversion table

6‧‧‧負載平衡伺服器 6‧‧‧Load Balancing Server

7‧‧‧終端機 7‧‧‧ Terminal

I1‧‧‧預定生產排程 I1‧‧‧ scheduled production schedule

I2‧‧‧產品資訊 I2‧‧‧Product Information

I5‧‧‧操作人員資訊 I5‧‧‧Operator Information

Claims (10)

一種結合虛擬情境的生產線管理系統,係由一企業資源計劃(Enterprise Resource Planning,ERP)系統、一製造執行系統(Manufacturing Execution System,MES)及一先進排程(Advanced Planning and Scheduling,APS)系統來整合企業內部的資訊,並提供一預定生產排程及該預定生產排程內的複數產品資訊,其特徵在於,該生產線管理系統更包括:
一虛擬生產資訊整合系統,連接該企業資源計畫系統、該製造執行系統及該先進排程系統,該虛擬生產資訊整合系統包括:
一資料庫,接收並儲存該預定生產排程及該複數產品資訊;及
一物件轉換表,接收該預定生產排程及該複數產品資訊,將目前的生產進度與該預定生產排程進行比對,藉以依據比對結果將各該產品資訊轉換為相對應的虛擬物件,並分別為各個虛擬物件設定相對應的虛擬分數;
其中,該物件轉換表將各該虛擬物件及相對應的虛擬分數儲存至該資料庫,並導出到至少一終端機上顯示,當該虛擬物件所代表的產品被處理完成後,針對進行處理的設備操作人員來儲存產品對應的產品資訊及虛擬分數,藉以為各設備操作人員分別統計總分值。
A production line management system combining virtual situations is composed of an Enterprise Resource Planning (ERP) system, a Manufacturing Execution System (MES), and an Advanced Planning and Scheduling (APS) system. Integrate information within the enterprise and provide a predetermined production schedule and multiple product information within the scheduled production schedule, characterized in that the production line management system further includes:
a virtual production information integration system connecting the enterprise resource planning system, the manufacturing execution system and the advanced scheduling system, the virtual production information integration system comprising:
a database for receiving and storing the predetermined production schedule and the plurality of product information; and an object conversion table for receiving the predetermined production schedule and the plurality of product information, and comparing the current production schedule with the predetermined production schedule According to the comparison result, each product information is converted into a corresponding virtual object, and a corresponding virtual score is set for each virtual object;
The object conversion table stores each virtual object and the corresponding virtual score into the database, and outputs the result to at least one terminal, and when the product represented by the virtual object is processed, the processing is performed. The equipment operator stores the product information and virtual score corresponding to the product, so that the operator scores are separately counted for each device operator.
如請求項1所述的結合虛擬情境的生產線管理系統,其中更通過一人力資源管理系統(Human Resource Managing System,HRMS)來提供一設備操作人員資訊,其特徵在於,該虛擬生產資訊整合系統連接該人力資源管理系統,並且該虛擬生產資訊整合系統更包括一情境轉換表,該情境轉換表接收該設備操作人員資訊,將該設備操作人員資訊轉換為對應的一虛擬角色及一虛擬情境,儲存至該資料庫,並導出到至少一終端機上顯示。The virtual line-integrated production line management system according to claim 1, wherein the device manager information is further provided by a Human Resource Management System (HRMS), wherein the virtual production information integration system is connected. The human resource management system, and the virtual production information integration system further includes a situation conversion table, the situation conversion table receives the device operator information, and converts the device operator information into a corresponding virtual character and a virtual situation, and stores Go to the database and export it to at least one terminal for display. 如請求項2所述的結合虛擬情境的生產線管理系統,其中該虛擬物件、該虛擬角色及該虛擬情境,係以3D圖畫或動畫方式呈現。The virtual line-integrated production line management system of claim 2, wherein the virtual object, the virtual character, and the virtual context are presented in a 3D drawing or animation. 如請求項1所述的結合虛擬情境的生產線管理系統,其中該資料庫中更包括一積分表,該積分表記錄並自動加總各設備操作人員處理各該虛擬物件所對應的產品後所得之該總分值。The virtual line-integrated production line management system according to claim 1, wherein the database further comprises a point table, wherein the point table records and automatically adds the equipment operators to process the products corresponding to the virtual objects. The total score. 一種結合虛擬情境的生產線管理方法,係通過一虛擬生產資訊整合系統來接收一預定生產排程及該預定生產排程內的複數產品資訊,該生產線管理方法包括下列步驟:
a)該虛擬生產資訊整合系統提供一物件轉換表;
b)將該預定生產排程及該複數產品資訊導入該物件轉換表;
c)將目前的生產進度與該預定生產排程進行比對;
d)依據比對結果,將各該產品資訊轉換為相對應的虛擬物件,並分別為各該虛擬物件設定相對應的虛擬分數;及
e)該虛擬生產資訊整合系統提供一資料庫,儲存各該虛擬物件及對應的該虛擬分數。
A production line management method combining virtual situations, through a virtual production information integration system to receive a predetermined production schedule and a plurality of product information within the predetermined production schedule, the production line management method comprising the following steps:
a) the virtual production information integration system provides an object conversion table;
b) introducing the predetermined production schedule and the plurality of product information into the object conversion table;
c) comparing the current production schedule with the scheduled production schedule;
d) converting the product information into corresponding virtual objects according to the comparison result, and respectively setting corresponding virtual scores for each virtual object;
e) The virtual production information integration system provides a database for storing each virtual object and the corresponding virtual score.
如請求項5所述的結合虛擬情境的生產線管理方法,其中該步驟d更包括下列步驟:
d1)判斷目前的生產進度是否落後於該預定生產排程;
d2)承步驟d1,若否,判斷目前的生產進度是否超前於該預定生產排程一特定比例;
d3)承步驟d2,若否,將各該產品資訊轉換為一第一虛擬物件,並分別為各該第一虛擬物件設定一第一虛擬分數;
d4)承步驟d2,若是,將各該產品資訊轉換為一第二虛擬物件,並分別為各該第二虛擬物件設定一第二虛擬分數,其中該第一虛擬分數高於該第二虛擬分數。
The method for managing a virtual line in combination with the virtual scenario as described in claim 5, wherein the step d further comprises the following steps:
D1) determining whether the current production schedule lags behind the scheduled production schedule;
D2) taking step d1, if not, determining whether the current production schedule is ahead of a predetermined ratio of the predetermined production schedule;
D3) taking step d2, if not, converting each product information into a first virtual object, and respectively setting a first virtual score for each of the first virtual objects;
D4) taking step d2, if yes, converting each product information into a second virtual object, and respectively setting a second virtual score for each of the second virtual objects, wherein the first virtual score is higher than the second virtual score .
如請求項5所述的結合虛擬情境的生產線管理方法,其中該步驟d更包括下列步驟:
d5)判斷目前的生產進度是否落後於該預定生產排程;
d6)承步驟d5,若是,判斷目前的生產進度是否落後於該預定生產排程一特定比例;
d7)承步驟d6,若是,將各該產品資訊轉換為一第三虛擬物件,並分別為各該第三虛擬物件設定一第三虛擬分數;
d8)承步驟d6,若否,將各該產品資訊轉換為一第四虛擬物件,並分別為各該第四虛擬物件設定一第四虛擬分數,其中該第三虛擬分數高於該第四虛擬分數。
The method for managing a virtual line in combination with the virtual scenario as described in claim 5, wherein the step d further comprises the following steps:
D5) determining whether the current production schedule lags behind the predetermined production schedule;
D6) taking step d5, if yes, determining whether the current production schedule lags behind the predetermined production schedule by a specific ratio;
D7) taking step d6, if yes, converting each product information into a third virtual object, and respectively setting a third virtual score for each third virtual object;
D8) taking step d6, if not, converting each product information into a fourth virtual object, and respectively setting a fourth virtual score for each fourth virtual object, wherein the third virtual score is higher than the fourth virtual fraction.
如請求項5所述的結合虛擬情境的生產線管理方法,其中更包括下列步驟:
f)於生產線上選取其中之一該虛擬物件所代表的產品;
g)將該被選取的產品置入一生產設備中進行生產處理;
h)步驟g之後,針對進行處理的設備操作人員來將該產品對應的該產品資訊儲存至該資料庫中;及
i)步驟g之後,針對進行處理的設備操作人員來將該產品對應的該虛擬物件的該虛擬分數儲存至該資料庫中。
The method for managing a virtual line in combination with the virtual scenario as described in claim 5, further comprising the following steps:
f) selecting one of the products represented by the virtual object on the production line;
g) placing the selected product into a production facility for production processing;
h) after step g, storing the product information corresponding to the product to the database for the device operator performing the processing; and
i) After step g, the virtual operator of the virtual object corresponding to the product is stored in the database for the device operator performing the processing.
如請求項5所述的結合虛擬情境的生產線管理方法,其中更包括下列步驟:
j)一設備操作人員通過一終端機登入該虛擬生產資訊整合系統;
k)選擇是否啟用角色扮演模式;
l)承步驟k,若是,由該資料庫下載至少一虛擬角色及一虛擬情境,並通過該終端機顯示;
m)其中之一該虛擬角色及該虛擬情境被選取後,由該資料庫下載相對應的該複數虛擬物件,以及對應至各該虛擬物件的虛擬分數;及
n)於該終端機顯示下載的該複數虛擬物件,以及對應至各該虛擬物件的虛擬分數。
The method for managing a virtual line in combination with the virtual scenario as described in claim 5, further comprising the following steps:
j) a device operator logs in to the virtual production information integration system through a terminal;
k) choose whether to enable the role playing mode;
l) taking step k, if yes, downloading at least one virtual character and a virtual situation from the database, and displaying through the terminal;
m) after the virtual character and the virtual context are selected, the corresponding virtual object is downloaded from the database, and the virtual score corresponding to each virtual object; and
n) displaying the downloaded virtual object at the terminal and the virtual score corresponding to each virtual object.
如請求項5所述的結合虛擬情境的生產線管理方法,其中更包括下列步驟:
o)一設備操作人員通過一終端機登入該虛擬生產資訊整合系統;
p)選擇是否啟用角色扮演模式;
q)承步驟p,若否,由該資料庫下載未虛擬化的該產品資訊;及
r)於該終端機顯示下載的該複數產品資訊。
The method for managing a virtual line in combination with the virtual scenario as described in claim 5, further comprising the following steps:
o) a device operator logs in to the virtual production information integration system through a terminal;
p) choose whether to enable the role playing mode;
q) taking step p, if not, downloading the unvirtualized product information from the database; and
r) displaying the downloaded product information at the terminal.
TW100112483A 2011-04-11 2011-04-11 Production line managing system with virtual context and managing method for the same TWI420407B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
TW100112483A TWI420407B (en) 2011-04-11 2011-04-11 Production line managing system with virtual context and managing method for the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
TW100112483A TWI420407B (en) 2011-04-11 2011-04-11 Production line managing system with virtual context and managing method for the same

Publications (2)

Publication Number Publication Date
TW201241760A TW201241760A (en) 2012-10-16
TWI420407B true TWI420407B (en) 2013-12-21

Family

ID=47600162

Family Applications (1)

Application Number Title Priority Date Filing Date
TW100112483A TWI420407B (en) 2011-04-11 2011-04-11 Production line managing system with virtual context and managing method for the same

Country Status (1)

Country Link
TW (1) TWI420407B (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020095423A1 (en) * 2001-01-17 2002-07-18 International Business Machines Corporation Mapping persistent data in multiple data sources into a single object-oriented component
TW565777B (en) * 2000-10-27 2003-12-11 Manugistics Inc System and method for optimizing resource plans
US20050149216A1 (en) * 2004-01-02 2005-07-07 Hal Popplewell Method for manufacturing an item
TW200532409A (en) * 2004-03-25 2005-10-01 Taiwan Semiconductor Mfg System and method for fabrication backup planning
US20070005755A1 (en) * 2005-06-30 2007-01-04 Humphries Marshall L Managing schedules for monitored resources
TWI294070B (en) * 2004-09-03 2008-03-01 Taiwan Semiconductor Mfg A computer-readable storage medium and method for semiconductor manufacturing automation
US20080126352A1 (en) * 2006-09-27 2008-05-29 Rockwell Automation Technologies, Inc. Client side state cache for industrial control systems
US20100082141A1 (en) * 2008-09-30 2010-04-01 Siemens Aktiengesellschaft Method for managing and controlling manufacturing processes planned by an enterprise resource planning and produced by a plant floor

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TW565777B (en) * 2000-10-27 2003-12-11 Manugistics Inc System and method for optimizing resource plans
US20020095423A1 (en) * 2001-01-17 2002-07-18 International Business Machines Corporation Mapping persistent data in multiple data sources into a single object-oriented component
US20050149216A1 (en) * 2004-01-02 2005-07-07 Hal Popplewell Method for manufacturing an item
TW200532409A (en) * 2004-03-25 2005-10-01 Taiwan Semiconductor Mfg System and method for fabrication backup planning
TWI294070B (en) * 2004-09-03 2008-03-01 Taiwan Semiconductor Mfg A computer-readable storage medium and method for semiconductor manufacturing automation
US20070005755A1 (en) * 2005-06-30 2007-01-04 Humphries Marshall L Managing schedules for monitored resources
US20080126352A1 (en) * 2006-09-27 2008-05-29 Rockwell Automation Technologies, Inc. Client side state cache for industrial control systems
US20100082141A1 (en) * 2008-09-30 2010-04-01 Siemens Aktiengesellschaft Method for managing and controlling manufacturing processes planned by an enterprise resource planning and produced by a plant floor

Also Published As

Publication number Publication date
TW201241760A (en) 2012-10-16

Similar Documents

Publication Publication Date Title
Dhiravidamani et al. Implementation of lean manufacturing and lean audit system in an auto parts manufacturing industry–an industrial case study
US9817991B2 (en) System and method for a cloud based solution to track notes against business records
Uriona Maldonado et al. Similarities and differences between business process management and lean management
US20150379455A1 (en) Project planning and implementing
WO2019100577A1 (en) Automated test management method and apparatus, terminal device, and storage medium
CN106529871A (en) Intelligent manufacturing method and system
CN106779336B (en) Engineering change method and device
US20140143014A1 (en) Information analysis system and method for network transactions
CN108628964B (en) Intelligent scene-based enterprise big data system
CN110086665A (en) A kind of network topological diagram methods of exhibiting based on jTopo
CN104471595A (en) Workflow management device and workflow management method
US20130006688A1 (en) Creating a 3rd party team project story board
CN110796416B (en) Industrial networking based order processing method and computer storage medium
US20130007694A1 (en) Project story board to board communication tools
CN102750596A (en) System and method combining virtual situation and used for managing production line
US20130304547A1 (en) Investment valuation projections in an on-demand system
TWI420407B (en) Production line managing system with virtual context and managing method for the same
CN111639380A (en) Data linkage method and device based on BIM (building information modeling) model, electronic terminal and storage medium
US20230128293A1 (en) Dynamic asset management system and methods for generating interactive simulations representing assets based on automatically generated asset records
US20130006687A1 (en) Creating a sub-story for a project story board
CN112328591A (en) Big data application system operation method based on automobile research and development and storage medium
CN111984882A (en) Data processing method, system and equipment
KR101535580B1 (en) Process management system and method thereof for digital media manufacturing
CN110262973B (en) Data maintenance method, device, equipment and computer storage medium
US11663169B2 (en) Dynamic asset management system and methods for automatically tracking assets, generating asset records for assets, and linking asset records to other types of records in a database of a cloud computing system

Legal Events

Date Code Title Description
MM4A Annulment or lapse of patent due to non-payment of fees